Aerial work platform for building engineering construction

By using rotating rollers and airflow cleaning systems on the aerial working platform, safety hazards caused by impurities accumulation are solved, effective cleaning and safe passage of impurities are achieved, and construction safety is improved.

CN118911406AInactive Publication Date: 2024-11-08HUNAN DINGDA MASCH MFG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411197620.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-29
Publication Date
2024-11-08
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

During high-altitude operation, stones, dust and other impurities carried by the soles are easily accumulated on the high-altitude operation device, resulting in reduced friction and increased risks. It is difficult for the existing technology to effectively clean, affecting construction safety.

Method used

A high-altitude working platform for construction engineering construction was designed, using rotating rollers and airflow cleaning system to clean impurities by placing holes and curved plates on the mesh, combining airflow holes and splitting rods to ensure that impurities fall from the mesh, avoiding Stack and improve safety.

Benefits of technology

The impurities on the aerial working platform are effectively cleaned up to prevent accumulation, ensure that impurities pass, improve the safety of staff, and avoid the problems of impurities blocking the platform and reducing friction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118911406A_ABST
    Figure CN118911406A_ABST
Patent Text Reader

Abstract

The invention discloses an aerial work platform for building engineering construction, and relates to the technical field of building engineering construction. The aerial work platform for building engineering construction comprises a transport vehicle, a telescopic device is fixedly connected to the top of the transport vehicle, a guardrail frame is movably connected to the top of the telescopic device, a control device is fixedly connected to the outer wall of the guardrail frame, and a ladder is fixedly connected to the outer wall of the transport vehicle. The inner wall of the guardrail frame is fixedly connected with a placing net, and the outer wall of the guardrail frame is fixedly connected with a processing mechanism. According to the aerial work platform for building engineering construction, an electric sliding block can drive a rotating roller to move in a following mode when moving, the rotating roller is located at the bottom of a containing net to move, and many holes are formed in the containing net, so that impurities can fall off from the holes of the containing net, it is ensured that the impurities fall off, and the situation that the impurities are accumulated on the containing net is avoided; and the influence of accumulated impurities on workers is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building engineering construction, in particular to an aerial work platform for building engineering construction. Background Art

[0002] Aerial work platforms for construction projects are an indispensable and important equipment in modern construction. They provide a safe and stable working environment for construction workers and facilitate various operations at high altitudes. Their height can be adjusted to meet the construction needs of different floors.

[0003] The Chinese publication number CN117536423A is cited. This patent discloses an aerial work platform for construction engineering, which belongs to the technical field of aerial work platforms. It includes a bottom plate, one end of the bottom plate is provided with a side plate 1, the other end of the bottom plate is provided with a side plate 2, the upper ends of the side plate 2 and the side plate 1 are both provided with fences, and a number of connecting rods are provided between the two fences. The present invention provides a buffer assembly. When the operating platform is close to a wall and collides, one end of the buffer plate contacts the wall, and the impact force pushes the sliding column at one end of the buffer plate to move in the fixed frame, and the sliding plate at the other end of the sliding column moves to compress the damping rod and the buffer spring;

[0004] When working at heights, the soles of shoes will carry certain impurities such as stones and dust. In humid areas, they will also carry mud that adheres to the aerial work equipment. The accumulation of impurities will reduce the friction of the platform and easily lead to danger. Summary of the invention

[0005] In view of the deficiencies in the prior art, the present invention provides an aerial work platform for construction engineering to solve the problems raised in the above-mentioned background technology.

[0006] To achieve the above purpose, the present invention is implemented through the following technical solutions: an aerial work platform for construction engineering, comprising a transport vehicle, a telescopic device is fixedly connected to the top of the transport vehicle, a guardrail frame is movably connected to the top of the telescopic device, a control device is fixedly connected to the outer wall of the guardrail frame, a ladder is fixedly connected to the outer wall of the transport vehicle, a placement net is fixedly connected to the inner wall of the guardrail frame, and a processing mechanism is fixedly connected to the outer wall of the guardrail frame;

[0007] The processing mechanism comprises:

[0008] A slide rail, the slide rail being fixedly connected to one side of the guardrail frame;

[0009] An electric slider, wherein the electric slider is slidably connected to the outer wall of the slide rail;

[0010] A first guiding rod is fixedly connected to the top of the electric sliding block.

[0011] Preferably, a first movable sleeve is sleeved on the outer wall of the first guide rod, and a bearing is fixedly connected to the outer wall of the first movable sleeve.

[0012] Preferably, the outer wall of the bearing is rotatably connected to a rotating roller, and the outer wall of the rotating roller is provided with air flow holes, which will drive the rotating roller to follow the movement when the electric slider moves. The rotating roller is located at the bottom of the placement net and moves. A large number of holes are provided on the placement net, so impurities will fall from the holes of the placement net, ensuring the falling of impurities and avoiding the accumulation of impurities on the placement net, avoiding the influence of the accumulated impurities on the staff, and then the rotating roller will clean the impurities adhered to the bottom of the placement net, so that the impurities are cleaned and fall, avoiding the impurities from being blocked in the holes of the placement net, and ensuring the passage of impurities through the holes of the placement net.

[0013] Preferably, the outer wall of the rotating roller is fixedly connected to a split rod at the position of the air flow hole, and the split rod is in active contact with the placement net, the inner wall of the rotating roller is fixedly connected to a brush plate at the position of the air flow hole, and an arc-shaped plate is provided on the outer wall of the rotating roller at a position relative to the split rod. When the arc-shaped plate is squeezed to the bottom of the guardrail frame during the rotation of the rotating roller, the split rod will approach the bottom of the placement net, and then the split rod will be inserted into the hole of the placement net, and then the impurities in the placement mesh holes will be cleaned, ensuring the cleaning of impurities in the placement mesh holes and avoiding the presence of impurities affecting the discharge of impurities in the placement mesh holes. The collision of the split rod and the placement net will drive the vibration of the placement net, and the vibration will disperse the impurities, thereby avoiding the accumulation of impurities and improving the safety of the staff.

[0014] Preferably, an airflow mechanism is fixedly connected to the other side of the guardrail frame, and the airflow mechanism includes a second guide rod, and the second guide rod is fixedly connected to the other side of the guardrail frame.

[0015] Preferably, a second movable sleeve is sleeved on the outer wall of the second guiding rod, and a spring is fixedly connected between the second movable sleeve and the second guiding rod.

[0016] Preferably, the outer wall of the second movable sleeve is fixedly connected to an airflow bin, which blows air toward the placement net. The airflow flowing on the placement net will clean impurities on the placement net and avoid accumulation of impurities. The airflow is blown out from the airflow holes and blows to the bottom of the placement net. Then the airflow will clean impurities in the placement mesh holes. The airflow will also drive the brush plate to move. When the brush plate moves, it cleans the holes of the placement net, so that impurities fall directly from the holes of the placement net, ensuring the cleaning of impurities in the placement mesh holes, ensuring the normal falling of impurities from the placement mesh holes, and ensuring the normal passage of impurities. The outer wall of the airflow bin is fixedly connected to a zigzag pipe, and the outer wall of the zigzag pipe is fixedly connected to a fan. The bottom of the fan is fixedly connected to a bracket, and the bracket is fixedly connected to the other side of the guardrail frame.

[0017] Preferably, the outer wall of the airflow bin is fixedly connected with a receiving block, and the outer wall of the fan is rotatably connected with a toggle rod, and the toggle rod is in active contact with the receiving block. The fan interior is a fanning blade that drives the airflow to flow, so the toggle rod will be driven to rotate during the rotation of the fan blade. The rotating toggle rod hits the receiving block, and then drives the airflow bin to move. The airflow bin changes the blowing position of the airflow when it moves. The descent of the airflow bin will clean up impurities on the bottom of the guardrail frame. The change in the blowing position of the airflow can further clean up impurities in more positions, thereby avoiding the accumulation of impurities.

[0018] The present invention provides an aerial work platform for construction engineering, which has the following beneficial effects:

[0019] 1. The aerial work platform used for construction engineering will drive the rotating roller to follow the movement when the electric slider moves. The rotating roller is located at the bottom of the placement net and moves. There are many holes on the placement net, so impurities will fall from the holes of the placement net, ensuring the falling of impurities and avoiding the accumulation of impurities on the placement net, avoiding the impact of accumulated impurities on the workers, and then the rotating roller will clean the impurities adhered to the bottom of the placement net, so that the impurities are cleaned and fall, avoiding impurities from being blocked in the holes of the placement net, and ensuring the passage of impurities through the holes of the placement net.

[0020] 2. The aerial work platform used for construction engineering is equipped with an arc-shaped plate at a relative position of the split rod through the outer wall of the rotating roller. When the arc-shaped plate is squeezed to the bottom of the guardrail frame during the rotation of the rotating roller, the split rod will approach the bottom of the placement net, and then the split rod will be inserted into the hole of the placement net, and then the impurities in the placement net holes will be cleaned, ensuring the cleaning of impurities in the placement net holes and avoiding the presence of impurities affecting the discharge of impurities in the placement net holes. The collision between the split rod and the placement net will drive the vibration of the placement net, and the vibration will disperse the impurities, avoiding the accumulation of impurities and improving the safety of the staff.

[0021] 3. The aerial work platform used in the construction of the building project blows air toward the placement net through the airflow bin. The airflow flowing on the placement net will clean the impurities on the placement net and avoid the accumulation of impurities. The airflow is blown out from the airflow holes and blows to the bottom of the placement net. Then the airflow will clean the impurities in the placement mesh holes. The airflow will also drive the brush plate to move. When the brush plate moves, it cleans the holes of the placement net, so that the impurities fall directly from the holes of the placement net, ensuring the cleaning of impurities in the placement mesh holes, ensuring the normal falling of impurities from the placement mesh holes, and ensuring the normal passage of impurities.

[0022] 4. The aerial work platform used in the construction project drives the air flow by rotating the fan blades inside the fan. Therefore, the toggle rod will be driven to rotate during the rotation of the fan blades. The rotation of the toggle rod will hit the toggle block, and then the airflow bin will be driven to move. The airflow bin will change the blowing position of the airflow when it moves. The descent of the airflow bin will clean up the impurities on the bottom of the guardrail frame. The change in the blowing position of the airflow will clean up impurities in more positions, thereby avoiding the accumulation of impurities. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 It is a schematic diagram of the axial side stereoscopic structure of the present invention;

[0024] Figure 2 It is a bottom-up three-dimensional structural schematic diagram of the present invention;

[0025] Figure 3 It is a schematic diagram of the local structure of the guardrail frame of the present invention;

[0026] Figure 4 For the present invention Figure 3 The enlarged structural diagram of the middle B part;

[0027] Figure 5 It is a schematic diagram of the local structure of the rotating roller of the present invention;

[0028] Figure 6 For the present invention Figure 5 Schematic diagram of the cross-section structure;

[0029] Figure 7 For the present invention Figure 3 Schematic diagram of the dorsal structure;

[0030] Figure 8 For the present invention Figure 7 Schematic diagram of the enlarged structure of part A in the middle.

[0031] In the figure: 1. transport vehicle; 2. telescopic device; 3. ladder; 4. guardrail frame; 5. placement net; 6. control device; 7. processing mechanism; 71. slide rail; 72. electric slider; 73. first guide rod; 74. first movable sleeve; 75. bearing; 76. rotating roller; 77. split rod; 78. brush plate; 79. air flow hole; 8. air flow mechanism; 81. bracket; 82. fan; 83. zigzag pipe; 84. toggle rod; 85. toggle block; 86. air flow bin; 87. second movable sleeve; 88. second guide rod; 89. spring. DETAILED DESCRIPTION

[0032] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.

[0033] Examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, and should not be construed as limiting the present invention.

[0034] For example, see Figure 1-6 The present invention provides a technical solution: an aerial work platform for construction engineering, comprising a transport vehicle 1, a telescopic device 2 is fixedly connected to the top of the transport vehicle 1, a guardrail frame 4 is movably connected to the top of the telescopic device 2, a control device 6 is fixedly connected to the outer wall of the guardrail frame 4, a ladder 3 is fixedly connected to the outer wall of the transport vehicle 1, a placement net 5 is fixedly connected to the inner wall of the guardrail frame 4, and a processing mechanism 7 is fixedly connected to the outer wall of the guardrail frame 4;

[0035] The processing mechanism 7 includes:

[0036] A slide rail 71, the slide rail 71 is fixedly connected to one side of the guardrail frame 4;

[0037] The electric slider 72 is slidably connected to the outer wall of the slide rail 71. When the electric slider 72 moves, it will drive the rotating roller 76 to follow the movement. The rotating roller 76 is located at the bottom of the placement net 5 and moves. The placement net 5 is provided with a large number of holes, so impurities will fall from the holes of the placement net 5, ensuring the falling of impurities, avoiding the accumulation of impurities on the placement net 5, and avoiding the influence of the accumulated impurities on the staff. Then the rotating roller 76 will clean the impurities adhered to the bottom of the placement net 5, so that the impurities are cleaned and dropped, avoiding the impurities from being blocked in the holes of the placement net 5, and ensuring the impurities from passing through the holes of the placement net 5;

[0038] The first guiding rod 73 is fixedly connected to the top of the electric slider 72 .

[0039] A first movable sleeve 74 is sleeved on an outer wall of the first guide rod 73 , and a bearing 75 is fixedly connected to an outer wall of the first movable sleeve 74 .

[0040] The outer wall of the bearing 75 is rotatably connected to a rotating roller 76 , and the outer wall of the rotating roller 76 is provided with air flow holes 79 .

[0041] The outer wall of the rotating roller 76 is located at the position of the air flow hole 79 and is fixedly connected with a split rod 77. The split rod 77 is in active contact with the placement net 5. The inner wall of the rotating roller 76 is located at the position of the air flow hole 79 and is fixedly connected with a brush plate 78. The outer wall of the rotating roller 76 is located at the position opposite to the split rod 77 and an arc-shaped plate is provided. When the arc-shaped plate is squeezed to the bottom of the guardrail frame 4 during the rotation of the rotating roller 76, the split rod 77 will approach the bottom of the placement net 5, and then the split rod 77 will be inserted into the hole of the placement net 5, and then the impurities in the hole of the placement net 5 will be cleaned, ensuring the cleaning of the impurities in the holes of the placement net 5, and avoiding the presence of impurities affecting the discharge of impurities in the holes of the placement net 5. The collision of the split rod 77 with the placement net 5 will drive the vibration of the placement net 5, and the vibration will disperse the impurities, thereby avoiding the accumulation of impurities and improving the safety of the staff.

[0042] When in use, the transport vehicle 1 moves to the desired position, and then the telescopic device 2 is started to drive the guardrail frame 4 to rise and fall, and the placement net 5 is set in the guardrail frame 4. Then the staff climbs onto the placement net 5 through the ladder 3, and then stands on the placement net 5. The electric slider 72 is powered on and starts to move back and forth on the slide rail 71. When the electric slider 72 moves, it will drive the rotating roller 76 to follow the movement. The rotating roller 76 is located at the bottom of the placement net 5 and moves. There are many holes on the placement net 5, so impurities will fall from the holes of the placement net 5, and then the rotating roller 76 will clean the impurities adhered to the bottom of the placement net 5, so that the impurities are cleaned The split rod 77 is arranged on the outer wall of the rotating roller 76 and is located at a relative position of the split rod 77. When the arc-shaped plate is squeezed to the bottom of the guardrail frame 4 during the rotation of the rotating roller 76, the split rod 77 will approach the bottom of the placement net 5, and then the split rod 77 will be inserted into the hole of the placement net 5, and then the impurities in the hole of the placement net 5 will be cleaned. The first movable sleeve 74 is located on the first guide rod 73 and can move, and the movable height of the rotating roller 76 is limited. Moreover, the collision of the split rod 77 with the placement net 5 will drive the vibration of the placement net 5, and the vibration will disperse the impurities.

[0043] For example 2, please refer to Figure 1-8 Based on the first embodiment, the present invention provides a technical solution:

[0044] The other side of the guardrail frame 4 is fixedly connected with an airflow mechanism 8 , and the airflow mechanism 8 includes a second guide rod 88 , and the second guide rod 88 is fixedly connected to the other side of the guardrail frame 4 .

[0045] The outer wall of the second guide rod 88 is sleeved with a second movable sleeve 87 , and a spring 89 is fixedly connected between the second movable sleeve 87 and the second guide rod 88 .

[0046] The outer wall of the second movable sleeve 87 is fixedly connected with an airflow bin 86, and the airflow bin 86 blows air toward the placement net 5. The airflow flowing on the placement net 5 will clean the impurities on the placement net 5 and avoid the accumulation of impurities. The airflow is blown out from the airflow hole 79, and the airflow blows to the bottom of the placement net 5. Then the airflow will clean the impurities in the holes of the placement net 5. The airflow will also drive the brush plate 78 to move. When the brush plate 78 moves, it cleans the holes of the placement net 5, so that the impurities fall directly from the holes of the placement net 5, ensuring the cleaning of the impurities in the holes of the placement net 5, ensuring the normal falling of impurities from the holes of the placement net 5, and ensuring the normal passage of impurities. The outer wall of the airflow bin 86 is fixedly connected A zigzag tube 83 is connected, and a fan 82 is fixedly connected to the outer wall of the zigzag tube 83. A bracket 81 is fixedly connected to the bottom of the fan 82. The bracket 81 is fixedly connected to the other side of the guardrail frame 4. The fan blades inside the fan 82 rotate to fan the airflow, so during the rotation of the fan blades, the toggle rod 84 will be driven to rotate with it. The toggle rod 84 rotates and hits the toggle block 85, and then the airflow bin 86 will be driven to move. The airflow bin 86 changes the blowing position of the airflow when it moves. The descent of the airflow bin 86 will clean up the impurities on the bottom of the guardrail frame 4. The change in the blowing position of the airflow can clean up impurities in more positions, thereby avoiding the accumulation of impurities.

[0047] The outer wall of the airflow bin 86 is fixedly connected with a receiving block 85 , and the outer wall of the fan 82 is rotatably connected with a shifting rod 84 , and the shifting rod 84 is in active contact with the receiving block 85 .

[0048] When in use, the fan 82 is powered on and started, and the fan 82 is connected to the airflow bin 86 through the zigzag tube 83, and then blows air toward the placement net 5 through the airflow bin 86. The airflow flows on the placement net 5 to clean the impurities on the placement net 5.

[0049] Combined with Figure 7 and 4 As shown, a hole is opened on one side of the rotating roller 76 located at the airflow bin 86, and then the airflow blown out of the airflow bin 86 enters the rotating roller 76, passes through the inside of the rotating roller 76 and then blows out from the airflow hole 79, blows to the bottom of the placement net 5, and then the airflow cleans the impurities in the holes of the placement net 5, and the brush plate 78 is made of elastic material, and the airflow also drives the brush plate 78 to move, and the brush plate 78 cleans the holes of the placement net 5 when it moves, so that the impurities fall directly from the holes of the placement net 5;

[0050] Combined with Figure 7 and 8As shown, the airflow bin 86 is sleeved on the second guide rod 88 through the second movable sleeve 87, so the position of the airflow bin 86 can be changed. The fan blades inside the fan 82 rotate to fan the airflow, so during the rotation of the fan blades, the toggle rod 84 will be driven to rotate with it. The toggle rod 84 rotates and hits the toggle block 85, and then drives the airflow bin 86 to move. The airflow bin 86 changes the blowing position of the airflow when it moves, and the airflow bin 86 descends to clean the impurities on the bottom of the guardrail frame 4.

[0051] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. An aerial work platform for construction engineering, comprising a transport vehicle (1), a telescopic device (2) fixedly connected to the top of the transport vehicle (1), a guardrail frame (4) movably connected to the top of the telescopic device (2), a control device (6) fixedly connected to the outer wall of the guardrail frame (4), and a ladder (3) fixedly connected to the outer wall of the transport vehicle (1), characterized in that: The inner wall of the guardrail frame (4) is fixedly connected with a placement net (5), and the outer wall of the guardrail frame (4) is fixedly connected with a processing mechanism (7); The processing mechanism (7) comprises: A slide rail (71), wherein the slide rail (71) is fixedly connected to one side of the guardrail frame (4); An electric slider (72), wherein the electric slider (72) is slidably connected to the outer wall of the slide rail (71); A first guiding rod (73), wherein the first guiding rod (73) is fixedly connected to the top of the electric sliding block (72).

2. The aerial work platform for construction engineering according to claim 1, characterized in that: The outer wall of the first guide rod (73) is sleeved with a first movable sleeve (74), and the outer wall of the first movable sleeve (74) is fixedly connected with a bearing (75).

3. The aerial work platform for construction engineering according to claim 2, characterized in that: The outer wall of the bearing (75) is rotatably connected to a rotating roller (76), and the outer wall of the rotating roller (76) is provided with an air flow hole (79).

4. The aerial work platform for construction engineering according to claim 3, characterized in that: The outer wall of the rotating roller (76) is located at the position of the air flow hole (79) and is fixedly connected to a split rod (77), the split rod (77) is in active contact with the placement net (5), and the inner wall of the rotating roller (76) is located at the position of the air flow hole (79) and is fixedly connected to a brush plate (78).

5. The aerial work platform for construction engineering according to claim 1, characterized in that: The other side of the guardrail frame (4) is fixedly connected to an airflow mechanism (8), and the airflow mechanism (8) comprises a second guide rod (88), and the second guide rod (88) is fixedly connected to the other side of the guardrail frame (4).

6. The aerial work platform for construction engineering according to claim 5, characterized in that: The outer wall of the second guide rod (88) is sleeved with a second movable sleeve (87), and a spring (89) is fixedly connected between the second movable sleeve (87) and the second guide rod (88).

7. The aerial work platform for construction engineering according to claim 6, characterized in that: The outer wall of the second movable sleeve (87) is fixedly connected to an airflow bin (86), the outer wall of the airflow bin (86) is fixedly connected to a zigzag tube (83), the outer wall of the zigzag tube (83) is fixedly connected to a fan (82), the bottom of the fan (82) is fixedly connected to a bracket (81), and the bracket (81) is fixedly connected to the other side of the guardrail frame (4).

8. The aerial work platform for construction engineering according to claim 7, characterized in that: The outer wall of the airflow bin (86) is fixedly connected with a receiving block (85), and the outer wall of the fan (82) is rotatably connected with a shifting rod (84), and the shifting rod (84) is in active contact with the receiving block (85).