Hydrothermal terrestrial heat exploitation method utilizing horizontal well micro-fracturing augmented injection

By adopting horizontal well micro-fracting technology in geothermal reservoirs, the problems of low thermal efficiency and bottom-hole blockage of vertical well systems are solved, and efficient geothermal tail water recharge and heat exchange are achieved, ensuring the sustainable mining of geothermal resources.

CN118911644APending Publication Date: 2024-11-08HEBEI PETROLEUM VOCATIONAL & TECH UNIV

Patent Information

Application Number
CN202411030607.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-30
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

In the existing geothermal development technology, vertical well systems have low thermal efficiency and are prone to bottom-hole blockage, resulting in large back injection pressure, low back injection efficiency, and the thermal short circuit caused by large-scale fracturing is difficult to solve.

Method used

Using the hydrothermal geothermal mining method of micro-fracting of horizontal wells, by drilling multiple horizontal wells in the geothermal reservoir, using micro-fracting technology to expand and unblock, to form a larger heat exchange area and porosity, avoiding Thermal short circuit achieves efficient recharge of geothermal tail water.

Benefits of technology

The efficiency of geothermal tail water recharge is improved, the problem of blockage around the well is reduced, the problem of thermal short circuit is avoided, and the efficient, economical and environmentally friendly hydrothermal geothermal resource mining is achieved, ensuring the sustainable utilization of geothermal water.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118911644A_ABST
    Figure CN118911644A_ABST
Patent Text Reader

Abstract

A hydrothermal geothermal exploitation method using horizontal well micro-fracturing augmented injection belongs to the field of geothermal resource exploitation, and comprises the following steps: 1, selecting an exploitation target, and determining burial depths of an upper covering layer, a hydrothermal geothermal reservoir and a lower covering layer; 2, drilling a heat extraction horizontal well and a recharge horizontal well; 3, putting an oil pipe and an electric submersible pump into the heat removal horizontal well; 4, a fracturing pipe is tripped into the recharge horizontal well, and an annular space is sealed through a packer; 5, deploying a heat exchanger, a water storage tank and a high-pressure pump on the ground; 6, the electric submersible pump extracts formation hot water in the heat extraction horizontal well, and the formation hot water flows into the water storage tank after heat exchange in the heat exchanger; and 7, the high-pressure pump injects the geothermal tail water into the recharge horizontal well by adopting a stepped pressurization micro-fracturing process to form a well periphery expansion area and micro-cracks, so that the circulation of geothermal water is realized. While the geothermal tail water recharging efficiency is improved, the problem of thermal short circuit caused by large-scale fracturing can be effectively avoided, and efficient and economical exploitation of hydrothermal geothermal resources is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of geothermal resource exploitation and utilization, and in particular relates to a hydrothermal geothermal exploitation method utilizing horizontal well micro-fracture injection. Background Art

[0002] Geothermal energy is a promising renewable green clean energy. my country is rich in geothermal resources, mainly including shallow geothermal resources, medium-deep hydrothermal geothermal resources and hot dry rocks. Among them, medium-deep hydrothermal geothermal generally refers to geothermal resources buried in the form of hot water at a depth of 200m to 3000m. It is the main geothermal energy currently mined and utilized in the world, and it is also the most promising for application development. It has been widely used in heating, medical care, agricultural planting and industrial power generation.

[0003] In the early development of geothermal water resources, extensive extraction without injection led to problems such as groundwater level decline, reservoir pressure depletion, ground subsidence, tailwater discharge pollution, and resource depletion. Artificial injection is internationally recognized as an effective means to solve these problems, that is, to inject the cooled geothermal tailwater back into the geothermal reservoir to maintain reservoir pressure and achieve the purpose of "extracting heat without taking water".

[0004] At present, geothermal development wells are mainly vertical wells. Due to the limited thickness of heat reservoirs and the length of heat exchange well sections, the water inflow is generally small. At the same time, under the combined effects of suspended matter, bubbles, chemical precipitation, microorganisms, etc. in the water, the problem of bottom well blockage is common, facing technical challenges such as high recharge pressure and low recharge efficiency. Patent document CN106948795A discloses a method for developing hydrothermal geothermal energy by closed circulation of multi-branch horizontal wells. Although horizontal wells are used to increase the heat exchange area, the problem of bottom well blockage during the recharge process is not considered, which is not conducive to long-term stable exploitation. Patent documents CN103983035A, CN215571342U and CN214657428U all propose the use of hydraulic fracturing technology to improve the recharge efficiency of geothermal tail water. However, after fracturing, the low-temperature tail water recharged tends to migrate rapidly to the production well along the hydraulic fractures with high conductivity, resulting in thermal short circuit. At the same time, geothermal reservoir fracturing is difficult, with high equipment requirements and complex processes, and the fracturing effect is difficult to guarantee. Summary of the invention

[0005] The purpose of the present invention is to provide a hydrothermal geothermal exploitation method using horizontal well micro-fracturing injection, which can improve the geothermal tail water reinjection efficiency while effectively avoiding the thermal short circuit problem caused by large-scale fracturing in the prior art, thereby realizing efficient, economical, environmentally friendly and sustainable exploitation of hydrothermal geothermal resources.

[0006] The technical solution adopted by the present invention is:

[0007] A hydrothermal geothermal mining method using horizontal well micro-fracture injection includes the following steps:

[0008] Step 1: Select a hydrothermal geothermal reservoir with plastic deformation characteristics as the mining target, and determine the burial depths of the overburden, the hydrothermal geothermal reservoir and the underburden, wherein the hydrothermal geothermal reservoir is located between the overburden and the underburden;

[0009] Step 2: Drill the first heat extraction horizontal well, the second heat extraction horizontal well, and the reinjection horizontal well located between the two in the target production area, forming a one-injection and two-extraction horizontal well system with injection in the middle and heat extraction on both sides;

[0010] The first heat extraction horizontal well, the second heat extraction horizontal well and the reinjection horizontal well are all composed of a vertical well section and a horizontal well section, and the vertical well section and the horizontal well section are connected through a deflection well section; wherein casing is run into the vertical well section and the deflection well section, and cement is injected to cement the well; and a water filter pipe is run into the horizontal well section before the well is completed;

[0011] Step 3: Putting oil pipes and electric submersible pumps into both the first heat extraction horizontal well and the second heat extraction horizontal well, the ends of the oil pipes are connected to the electric submersible pumps, and the electric submersible pumps are located in the horizontal well section;

[0012] Step 4: Run the fracturing pipe into the horizontal well section, and seal the annular space between the fracturing pipe and the horizontal well by a packer; the fracturing pipe is connected to the wellhead of the horizontal well. The fracturing pipe is used to perform micro-fracturing operations around the well.

[0013] Step 5: deploy a heat exchanger on the ground, and connect the water inlet of the heat exchanger to the wellheads of the first heat extraction horizontal well and the second heat extraction horizontal well through a ground pipeline;

[0014] Step 6: placing a water storage tank on the ground to store the geothermal tail water after heat exchange, wherein the water inlet of the water storage tank is connected to the water outlet of the heat exchanger through a ground pipeline;

[0015] Step 7: deploy a high-pressure pump on the ground to recharge the geothermal tail water, the water inlet of the high-pressure pump is connected to the water outlet of the water storage tank through a ground pipeline, and the water outlet of the high-pressure pump is connected to the wellhead of the recharge horizontal well through a ground pipeline; the high-pressure pump is a constant speed and constant pressure water pump;

[0016] Step 8: Start the electric submersible pump, and the formation hot water flows into the wellbore of the first heat extraction horizontal well and the second heat extraction horizontal well under the action of the pressure difference. Under the suction action of the electric submersible pump, the hot water in the wellbore is transported to the wellheads of the first heat extraction horizontal well and the second heat extraction horizontal well through the oil pipe, and flows into the water storage tank after sufficient heat exchange in the heat exchanger;

[0017] Step nine: Start the high-pressure pump and use the micro-fracturing process with step-by-step pressure increase or step-by-step displacement increase to inject the geothermal tail water in the water storage into the reinjection horizontal well; when the pump pressure is greater than the minimum principal ground stress and less than the formation fracture pressure, the reservoir around the well undergoes elastic-plastic deformation under the action of tensile stress and shear stress, and the formation porosity and permeability increase, forming a expansion zone around the well; when the pump pressure reaches the formation fracture pressure, the formation is compressed to form micro-cracks.

[0018] Step 10: Adjust the pump pressure to the design pressure or the pump displacement to the design displacement to reinject geothermal tail water. The reinjected geothermal tail water is fully heated in the hydrothermal geothermal reservoir and then extracted again by the first heat extraction horizontal well and the second heat extraction horizontal well to achieve the recycling of geothermal water.

[0019] As mining proceeds, if the reinjection capacity decreases due to blockage of the reinjection horizontal well by sedimentation, microorganisms, etc., step 10 can be repeated to increase the formation reinjection capacity.

[0020] Furthermore, the hydrothermal geothermal reservoir described in step one is a shallow loose sandstone with a burial depth of less than 300m or a dense sandstone with a burial depth of more than 2000m.

[0021] Furthermore, the horizontal well sections of the first heat extraction horizontal well, the second heat extraction horizontal well and the reinjection horizontal well are all located in the middle of the hydrothermal geothermal reservoir; the length of the horizontal well section is designed to be 300 to 1500 m; and the well spacing is designed to be 200 to 400 m.

[0022] If the length of the horizontal well section is too short, the drainage area will be too small and the heat extraction efficiency will be low. If the horizontal well section is too long, the well layout cost will be too high. In addition, if the well spacing is too small, it will not be conducive to sufficient heat exchange and will increase the well layout cost. If the well spacing is too large, the connectivity between wells will be poor and the heat exchange time will be too long, thus reducing the extraction efficiency. In actual mining, the spacing between geothermal wells should be comprehensively considered according to various factors such as different geological conditions and hot water permeability coefficient.

[0023] Furthermore, the water filter pipe is one of a bridge water filter, a Johnson water filter pipe, a mesh water filter pipe, a wire-wrapped water filter pipe, and a gravel water filter pipe.

[0024] Furthermore, the oil pipe is an insulated oil pipe to reduce heat loss during hot water production.

[0025] Furthermore, the heat exchanger is one of a spiral plate heat exchanger, a U-tube heat exchanger, and a jacketed heat exchanger.

[0026] Furthermore, the water storage tank is made of heat-insulating and corrosion-resistant material with a capacity of 300m 3 ~3000m 3 .

[0027] Furthermore, the packer is located at the end of the deflection well section and is used to isolate the deflection well section and the horizontal well section, thereby realizing micro-fracturing operation in the horizontal well section.

[0028] Furthermore, the micro-fracturing process with stepped pressure increase is as follows: the pump pressure is increased gradually in a manner that the single pump pressure increase amplitude is not greater than 1 MPa, and after each pump pressure increase, the pump pressure is increased again after injection for not less than 10 minutes until the pump pressure reaches the formation fracture pressure.

[0029] Furthermore, the step-by-step displacement micro-fracturing process is as follows: the single pump displacement increase amplitude is no more than 0.1m 3 The pump displacement is gradually increased by 10 min / min, and the pump displacement is increased again after injection for no less than 10 min each time, until the pump pressure reaches the formation fracture pressure.

[0030] Beneficial effects of the present invention:

[0031] The present invention directly uses formation hot water to perform micro-fracturing operations, while conventional micro-fracturing methods require specially prepared fracturing fluids for operation; the present invention utilizes the combined effects of the thermal effect and pressure of the reservoir, and has better effects; the present invention can perform intermittent micro-fracturing operations according to the formation blockage conditions, and achieve continuous expansion and unblocking of the reservoir fracturing area, while conventional micro-fracturing operations are one-time operations, and when the operation is required again, the fracturing equipment and fracturing media need to be rearranged.

[0032] The geothermal exploitation method of the present invention can achieve the following effects:

[0033] 1. Strong recharge capacity. Aiming at the technical bottleneck of low efficiency of geothermal tail water recharge, the present invention adopts horizontal wells to increase the contact area between the wellbore and the geothermal reservoir, and realizes well perimeter expansion and microcrack expansion through micro-fracturing technology, thereby increasing the porosity and permeability of the reservoir perimeter. Therefore, this method effectively solves the problem of well perimeter blockage currently faced by recharge wells, reduces the difficulty of geothermal tail water recharge, and greatly improves the efficiency of geothermal tail water recharge.

[0034] 2. High heat extraction efficiency. In view of the low heat extraction efficiency of the current vertical well system and the thermal short circuit problem caused by uncontrollable large-scale fracturing, the horizontal well system adopted by the present invention can obtain a larger heat exchange area. At the same time, the micro-fracturing technology adopted by the present invention can not only meet the purpose of increased injection and permeability, but also effectively control the scope of reservoir transformation, thereby avoiding the thermal short circuit problem caused by large-scale fracturing. Therefore, this method is conducive to the heat exchange between low-temperature reinjection tail water and high-temperature formation reservoirs, greatly improving the heat extraction efficiency.

[0035] 3. Environmentally friendly, low cost, easy to implement, and sustainable. The present invention does not require the preparation of special fracturing fluids, and directly uses geothermal tail water to implement micro-fracturing operations on geothermal reservoirs. Compared with previous large-scale fracturing technologies, it is low cost and easy to implement. At the same time, the reinjection of geothermal tail water avoids environmental pollution caused by direct discharge, realizes the recycling of geothermal water and the maintenance of geothermal reservoir pressure, and effectively ensures the sustainable exploitation of geothermal water. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] Figure 1 It is a schematic diagram of the working principle of the present invention;

[0037] Figure 2 This is a schematic diagram of the underground structure of the heat extraction horizontal well in the present invention;

[0038] Figure 3 Schematic diagram of underground structure of horizontal well for reinjection and micro-fracture of geothermal reservoir in the present invention;

[0039] In the figure: 1- hydrothermal geothermal reservoir; 2- overburden; 3- underburden; 4- first horizontal well for heat extraction; 5- second horizontal well for heat extraction; 6- horizontal well for reinjection; 7- vertical well section; 8- deflection well section; 9- horizontal well section; 10- filter pipe; 11- oil pipe; 12- submersible pump; 13- fracturing pipe; 14- packer; 15- heat exchanger; 16- surface pipeline; 17- water storage tank; 18- high pressure pump; 19- expansion area around the well. DETAILED DESCRIPTION

[0040] Reference Figure 1-Figure 3 As shown, a hydrothermal geothermal production method using horizontal well micro-fracture injection includes the following steps:

[0041] Step 1: Select a hydrothermal geothermal reservoir 1 with plastic deformation characteristics as a mining target, and determine the burial depths of the overburden 2, the hydrothermal geothermal reservoir 1 and the underburden 3, wherein the hydrothermal geothermal reservoir 1 is located between the overburden 2 and the underburden 3;

[0042] Step 2: Design the horizontal wellbore structure based on the regional geological and geophysical data, and drill the first heat extraction horizontal well 4, the second heat extraction horizontal well 5 and the reinjection horizontal well 6 located between the two in the target mining area, forming a "one injection and two production" horizontal well system with injection in the middle and heat production on both sides.

[0043] The first heat extraction horizontal well 4, the second heat extraction horizontal well 5 and the reinjection horizontal well 6 are all composed of a vertical well section 7 and a horizontal well section 9. The vertical well section 7 is connected to the horizontal well section 9 through an inclined well section 8. The inclination angle and azimuth of the inclined well section 8 are controlled to ensure that the horizontal well section 9 is located in the middle of the hydrothermal geothermal reservoir 1.

[0044] The drilling process is as follows: (1) drilling the first section of the vertical well section 7, stopping drilling after passing through the loose layer on the surface, lowering the surface casing, and cementing the well; (2) drilling the second section of the vertical well section 7, stopping drilling after passing through the top 0.5m to 3m of the hydrothermal geothermal reservoir 1, lowering the technical casing, and cementing the well; (3) drilling the third section of the inclination well section 8, lowering the production casing, and cementing the well; (4) drilling the fourth section of the horizontal well section 9, lowering the water filter pipe 10, and completing the well. The water filter pipe 10 is a wire-wrapped water filter pipe. The length of the horizontal well section 9 is 500m to 1000m, and the well spacing between the horizontal wells is 250m to 350m.

[0045] Step three: The oil pipe 11 and the electric submersible pump 12 are lowered into the first horizontal heat extraction well 4 and the second horizontal heat extraction well 5. The end of the oil pipe 11 is connected to the electric submersible pump 12, and the electric submersible pump 12 is located in the horizontal well section 9; the top of the oil pipe 11 is connected to the wellheads of the two wells respectively; the oil pipe 11 is an insulated oil pipe to reduce heat loss during hot water extraction.

[0046] Step 4: Run the fracturing pipe 13 into the horizontal well section 9 in the horizontal well 6, and seal the annular space between the fracturing pipe 13 and the horizontal well 6 through the packer 14; the fracturing pipe 13 is connected to the wellhead of the horizontal well 6. The fracturing pipe 13 is used to implement micro-fracturing operations around the well. The packer 14 is located at the end of the deflection well section 8, and is used to isolate the deflection well section 8 and the horizontal well section 9, so as to implement micro-fracturing operations in the horizontal well section 9.

[0047] Step 5: Deploy a heat exchanger 15 on the ground. The water inlet end of the heat exchanger 15 is connected to the wellheads of the first heat extraction horizontal well 4 and the second heat extraction horizontal well 5 through a ground pipeline 16. The heat exchanger 18 is a U-tube heat exchanger, and the heat exchanger 18 extracts energy from hot water.

[0048] Step 6: Place a water storage tank 17 on the ground to store the geothermal tail water after heat exchange. The water inlet of the water storage tank 17 is connected to the water outlet of the heat exchanger 15 through a ground pipeline 16. The volume of the water storage tank 20 is 500m 3 ~2000m 3 , which is a corrosion-resistant and heat-insulating water storage tank.

[0049] Step 7: deploy a high-pressure pump 18 on the ground to recharge the geothermal tail water. The water inlet of the high-pressure pump 18 is connected to the water outlet of the water storage tank 17 through the ground pipeline 16, and the water outlet of the high-pressure pump 18 is connected to the wellhead of the recharge horizontal well 6 through the ground pipeline 16; the high-pressure pump 18 is a constant speed and constant pressure water pump;

[0050] Step 8: Start the electric submersible pump 12, and the formation hot water flows into the wellbore of the first heat extraction horizontal well 4 and the second heat extraction horizontal well 5 under the action of the pressure difference. Under the suction action of the electric submersible pump 12, the hot water in the wellbore is transported to the wellheads of the first heat extraction horizontal well 4 and the second heat extraction horizontal well 5 through the oil pipe 11, and flows into the water storage tank 17 after sufficient heat exchange in the heat exchanger 15;

[0051] Step nine: Start the high-pressure pump 18, and use a micro-fracturing process with step-by-step pressure increase or step-by-step displacement increase to inject the geothermal tail water in the water storage tank 17 into the reinjection horizontal well 6; when the pump pressure is greater than the minimum principal ground stress and less than the formation fracture pressure, the reservoir around the well undergoes elastic-plastic deformation under the action of tensile stress and shear stress, and the formation porosity and permeability increase, forming a well-surrounding expansion zone 19; when the pump pressure reaches the formation fracture pressure, the formation is compressed to form micro-cracks.

[0052] The micro-fracturing process with step-by-step displacement is as follows: 3 / min gradually increase the pump displacement, and after each increase in pump displacement, increase the pump displacement again after 15 minutes of injection until the pump pressure reaches the formation fracture pressure.

[0053] The adopted step-by-step pressure-increasing micro-fracturing process is: the pump pressure is gradually increased by 0.5MPa, and after each pump pressure increase, the pump pressure is increased again after injection for 15 minutes until the pump pressure reaches the formation fracture pressure.

[0054] As mining proceeds, if the reinjection capacity decreases due to blockage of the reinjection horizontal well 6 by sedimentation, microorganisms, etc., the micro-fracturing operation in this step can be used again to remove the blockage and increase permeability to ensure balanced injection and production.

[0055] Step 10: Adjust the pump pressure to the design pressure or the pump displacement to the design displacement to reinject geothermal tail water. The reinjected geothermal tail water is fully heated in the hydrothermal geothermal reservoir 1 and then extracted again by the first heat extraction horizontal well 4 and the second heat extraction horizontal well 5 to achieve the recycling of geothermal water.

Claims

1. A hydrothermal geothermal mining method using horizontal well micro-fracture injection, It is characterized in that The following steps are involved: Step 1: Select a hydrothermal geothermal reservoir (1) with plastic deformation characteristics as a mining target, and determine the burial depths of the overburden (2), the hydrothermal geothermal reservoir (1) and the underburden (3), wherein the hydrothermal geothermal reservoir (1) is located between the overburden (2) and the underburden (3); Step 2: Drilling a first heat extraction horizontal well (4), a second heat extraction horizontal well (5) and a reinjection horizontal well (6) located between the two in the target production area in sequence, forming a one-injection, two-extraction horizontal well system with injection in the middle and heat extraction on both sides; The first heat extraction horizontal well (4), the second heat extraction horizontal well (5) and the reinjection horizontal well (6) are all composed of a vertical well section (7) and a horizontal well section (9), wherein the vertical well section (7) and the horizontal well section (9) are connected via a deflection well section (8); wherein casing is run into the vertical well section (7) and the deflection well section (8), and cement is injected to cement the well; and a water filter pipe (10) is run into the horizontal well section (9) to complete the well; Step 3: A tubing (11) and an electric submersible pump (12) are lowered into the first heat extraction horizontal well (4) and the second heat extraction horizontal well (5), the end of the tubing (11) is connected to the electric submersible pump (12), and the electric submersible pump (12) is located in the horizontal well section (9); Step 4: lowering a fracturing pipe (13) into the horizontal well (6) to the horizontal well section (9), and sealing the annular space between the fracturing pipe (13) and the horizontal well (6) by means of a packer (14); the fracturing pipe (13) is connected to the wellhead of the horizontal well (6); Step 5: deploying a heat exchanger (15) on the ground, wherein the water inlet end of the heat exchanger (15) is connected to the wellheads of the first heat extraction horizontal well (4) and the second heat extraction horizontal well (5) through a ground pipeline (16); Step 6: Install a water storage tank (17) on the ground to store geothermal tail water after heat exchange, and the water inlet end of the water storage tank (17) is connected to the water outlet end of the heat exchanger (15) through a ground pipeline (16); Step 7: deploying a high-pressure pump (18) on the ground to recharge the geothermal tail water, wherein the water inlet of the high-pressure pump (18) is connected to the water outlet of the water storage tank (17) via a ground pipeline (16), and the water outlet of the high-pressure pump (18) is connected to the wellhead of the recharge horizontal well (6) via a ground pipeline (16); Step 8: Start the electric submersible pump (12), and the hot water in the formation flows into the wellbore of the first heat extraction horizontal well (4) and the second heat extraction horizontal well (5) under the action of the pressure difference. Under the suction action of the electric submersible pump (12), the hot water in the wellbore is transported to the wellheads of the first heat extraction horizontal well (4) and the second heat extraction horizontal well (5) through the oil pipe (11), and flows into the water storage tank (17) after sufficient heat exchange in the heat exchanger (15); Step nine: start the high-pressure pump (18), and use a micro-fracturing process with a step-by-step pressure increase or a step-by-step displacement increase to inject the geothermal tail water in the water storage tank (17) into the reinjection horizontal well (6); when the pump pressure is greater than the minimum principal ground stress and less than the formation fracture pressure, the reservoir around the well undergoes elastic-plastic deformation under the action of tensile stress and shear stress, and the formation porosity and permeability increase, forming a well-surrounding expansion zone (19); when the pump pressure reaches the formation fracture pressure, the formation is compressed to form micro-cracks; Step 10: Adjust the pump pressure to the designed pressure or the pump displacement to the designed displacement to reinject geothermal tail water. The reinjected geothermal tail water is fully heated in the hydrothermal geothermal reservoir (1) and then extracted again by the first heat extraction horizontal well (4) and the second heat extraction horizontal well (5), thereby realizing the recycling of geothermal water.

2. A hydrothermal geothermal production method using horizontal well micro-fracture injection as claimed in claim 1, It is characterized in that The hydrothermal geothermal reservoir (1) described in step 1 is a shallow loose sandstone with a burial depth of less than 300m or a dense sandstone with a burial depth of more than 2000m.

3. A hydrothermal geothermal mining method using horizontal well micro-fracture injection as claimed in claim 1, It is characterized in that The horizontal well sections (9) of the first heat extraction horizontal well (4), the second heat extraction horizontal well (5) and the reinjection horizontal well (6) are all located in the middle of the hydrothermal geothermal reservoir (1); the length of the horizontal well section (9) is designed to be 300 to 1500 m; and the well spacing is designed to be 200 to 400 m.

4. A hydrothermal geothermal mining method using horizontal well micro-fracture injection as claimed in claim 1, It is characterized in that The water filter pipe (10) is one of a bridge-type water filter, a Johnson water filter pipe, a mesh water filter pipe, a wire-wrapped water filter pipe, and a gravel water filter pipe.

5. A hydrothermal geothermal production method using horizontal well micro-fracture injection as claimed in claim 1, It is characterized in that The oil pipe (11) is a heat-insulating oil pipe.

6. A hydrothermal geothermal mining method using horizontal well micro-fracture injection as claimed in claim 1, It is characterized in that The heat exchanger (15) is one of a spiral plate heat exchanger, a U-tube heat exchanger, and a jacketed heat exchanger.

7. A hydrothermal geothermal production method using horizontal well micro-fracture injection as claimed in claim 1, It is characterized in that The water storage tank (17) is made of heat-insulating and corrosion-resistant material and has a capacity of 300m 3 ~3000m 3 .

8. A hydrothermal geothermal production method using horizontal well micro-fracture injection as claimed in claim 1, It is characterized in that The packer (14) is located at the end of the deflection well section (8) and is used to isolate the deflection well section (8) and the horizontal well section (9), thereby realizing micro-fracturing operations in the horizontal well section.

9. A hydrothermal geothermal production method using horizontal well micro-fracture injection as claimed in claim 1, It is characterized in that The micro-fracturing process with stepped pressure increase is as follows: the pump pressure is gradually increased in a manner that the single pump pressure increase amplitude is not greater than 1 MPa, and after each pump pressure increase, the pump pressure is increased again after injection for no less than 10 minutes until the pump pressure reaches the formation fracture pressure.

10. A hydrothermal geothermal production method using horizontal well micro-fracture injection as claimed in claim 1, It is characterized in that The step-by-step micro-fracturing process is as follows: the single pump displacement increase amplitude is no more than 0.1m 3 / min. After each increase in pump displacement, the pump displacement should be increased for no less than 10 minutes before it is increased again until the pump pressure reaches the formation fracture pressure.

Citation Information

Patent Citations

  • Double-well re-injection geothermal exploitation system based on fracturing technology

    CN103983035A

  • Method for developing hydrothermal type geothermal energy in multi-branch horizontal well closed circulation mode

    CN106948795A

  • Geothermal tail water oscillation fracturing recharge system

    CN214657428U

  • Co-fracturing type geothermal tail water recharging device

    CN215571342U

Cited By

  • Geothermal well and recharge well fracturing construction process

    CN120798275A

  • Geothermal exploitation method based on three-dimensional well pattern system and three-dimensional well pattern system

    CN121251307A

  • Method for geothermal exploitation based on three-dimensional well pattern system and three-dimensional well pattern system

    CN121251307B