Construction method of tunnel supporting system for forward penetrating goaf

By adopting the support system of the goaf in the tunnel construction, including advance drilling, mechanical excavation and buffer layer reinforcement, the collapse risk of the tunnel during the goaf construction is solved, and construction safety and structural stability are improved , adapt to various tunnel shapes and curves.

CN118911711APending Publication Date: 2024-11-08CHINA RAILWAY 23RD BUREAU GRP THIRD ENG CO LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202410294215.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-03-14
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

There is a risk of collapse during the tunnel during construction in goaf, which affects the construction safety. It is difficult for the existing technology to effectively stabilize goaf and surrounding rock.

Method used

The construction method of tunnel support system in the forward goaf is adopted, including advance drilling to understand the goaf situation, construction of advance anchor pipe shed, mechanical excavation and arch protection, protective nets are set up on the upper part, backfilling the hole slag and compacting, and steel is used on the outside. The frame and connecting ribs, the embedded buffer layer and the grouting tube are provided, and the polyurethane foam energy-absorbing buffer layer and the lightweight quick-coagulation concrete buffer layer are installed to gradually strengthen the guard.

Benefits of technology

By backfilling the flexibility of the hole slag and buffer layer to adapt to the tunnel shape, the stability of goaf and surrounding rock is improved, construction risks are reduced, and the safety and structural strength of tunnel construction are ensured, and the application value is high.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118911711A_ABST
    Figure CN118911711A_ABST
Patent Text Reader

Abstract

The invention discloses a construction method of a tunnel supporting system capable of penetrating through a goaf, and belongs to the technical field of tunnel engineering. During construction, firstly, the condition of a front tunnel face is detected, and a corresponding treatment means is adopted; after a safe construction environment is constructed, excavation contour lines of the upper arch protection step and the lower arch protection step are mechanically excavated and timely supported; hole slag is backfilled to the bottom elevation of the protective arch, and then tamping is conducted; performing primary support on the outer side of the protective arch to form a protective arch side wall outer mold; erecting a protective arch side wall inner mold, and grouting to form a concrete protective arch; a polyurethane foam energy-absorbing buffer layer is formed by grouting through a reserved arch-protecting grouting pipe, and a buffer layer is formed by light quick-setting concrete; tunnel primary support, waterproof layer and secondary lining construction are carried out, and subsequent construction is carried out after acceptance; the backfill hole slag, the buffer layer and the protective arch are matched to ensure the stability of the goaf and surrounding rock when the tunnel positively penetrates through the goaf, so that the safety of tunnel construction is ensured, and the potential risk of engineering is effectively reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of tunnel engineering, and in particular to a construction method of a tunnel support system passing through a goaf. Background Art

[0002] The situation where tunnels encounter goafs has gradually become normal. When the tunnel is passing through a goaf, tunnel excavation will affect the stability of the goaf, and there is a risk of tunnel collapse, which will seriously affect the safety of construction.

[0003] Therefore, it is necessary to develop a construction method for a tunnel support system that passes through the goaf to solve the above problems. Summary of the invention

[0004] The purpose of the present invention is to design a construction method of a tunnel support system that passes through a goaf in order to solve the above problems.

[0005] The present invention achieves the above-mentioned purpose through the following technical solutions:

[0006] A construction method for a tunnel support system passing through a goaf, comprising the following steps:

[0007] A. First, advance drilling is used to understand the specific direction of the goaf in front of the face, the water accumulation in the old kiln in the goaf, and the gas concentration in the goaf. If the gas concentration is high, ventilation is used to discharge the gas. If there is water and the pressure is high, drainage holes are constructed to drain the water.

[0008] B. When approaching the goaf, construct an advanced anchor rod pipe shed to strengthen the temporary support strength of the goaf and build a safe construction environment;

[0009] C. Mechanical excavation is used to excavate the excavation contour line of the upper step of the guard arch. The boundary of the goaf is located outside the contour line and no excavation is required. The construction cavity is protected by hanging nets and anchor spraying. At the same time, a protective net is set at the cavity position of the upper part of the guard arch to prevent foreign objects from falling;

[0010] D. Use mechanical excavation to follow the excavation contour line of the step below the arch. The boundary of the goaf outside the contour line does not need to be excavated, and the construction cavity is protected by anchor spraying;

[0011] E. After the cavity anchor spraying protection is constructed, start backfilling the hole slag to the bottom elevation of the arch and compact the backfilled hole slag;

[0012] F. The initial support method for the outer side of the arch is to use steel frames and connecting bars, set up steel mesh all around, connect the foot anchor pipes and mortar anchor rods according to the actual terrain on site, pre-buried buffer layer grouting pipes and arch grouting pipes, and carry out spray anchor construction;

[0013] G. Set up the inner formwork of the side wall of the arch, pour concrete and plant reinforcement. After the concrete strength of the side wall of the arch reaches the requirement, promptly carry out the anti-drainage of the arch, pour concrete of the arch, fill the arch and pour the low side wall;

[0014] H. After the construction of the inverted arch is completed, the arch protection trolley shall be installed and erected in time as the inner form of the arch protection. After the erection is completed, the arch protection concrete shall be poured in layers;

[0015] I. After the arch protection concrete reaches the designed strength, the arch protection trolley is retracted and moved forward, and grouting is performed through the reserved holes to form a polyurethane foam energy absorption buffer layer and a lightweight quick-setting concrete buffer layer;

[0016] J. After the buffer layer is completed, the initial support construction, waterproof layer construction, secondary lining reinforcement binding and embedded parts construction are carried out according to the normal construction procedures. After acceptance, the secondary lining trolley is moved forward to support the formwork and pour the secondary lining concrete.

[0017] The beneficial effects of the present invention are:

[0018] 1. By backfilling the slag, buffer layer and arch protection, there is a certain degree of construction flexibility. It can be adjusted according to the shape and size of the specific tunnel to adapt to various tunnel shapes and curve requirements, thereby ensuring the stability of the goaf and surrounding rock when the tunnel is passing through the goaf, thereby ensuring the safety of tunnel construction and effectively reducing potential risks of the project.

[0019] 2. The tunnel safety is ensured by using protective arches. Compared with the traditional dry-laid stone, the protective arches used when the tunnel is passing through the goaf have higher structural strength and stability, which fully guarantees the safety of the project and facilitates the smooth progress of the project. It has good engineering application and promotion value.

[0020] 3. A polyurethane foam energy-absorbing buffer layer and a lightweight quick-setting concrete buffer layer are arranged above the arch guard, so that a polyurethane foam energy-absorbing buffer layer is formed between the lightweight quick-setting concrete buffer layer and the arch guard, so that when force is applied from above, there is a buffer between the concrete buffer layer and the arch guard, thereby reducing the impact and damage to the arch guard and protecting the integrity and stability of the arch guard structure. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] Figure 1 It is a schematic diagram of the construction method flow of the tunnel support system that is passing through the goaf;

[0022] Figure 2 This is a schematic diagram of the overall structure of the tunnel support system that is passing through the goaf;

[0023] Figure 3 It is a longitudinal section of the overall structure of the tunnel support system that is passing through the goaf;

[0024] In the figure: 1-coal seam goaf; 2-lightweight quick-setting concrete buffer layer; 3-concrete arch protection; 4-waterproof layer; 5-secondary lining; 6-initial support; 7-tunnel slag; 8-unmined coal seam; 9-polyurethane foam energy-absorbing buffer layer; 10-anchor pipe shed. DETAILED DESCRIPTION

[0025] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.

[0026] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0027] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.

[0028] In the description of the present invention, it should be understood that the terms "upper", "lower", "inside", "outside", "left", "right", etc. indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings, or are directions or positional relationships in which the product of the invention is usually placed when in use, or are directions or positional relationships commonly understood by those skilled in the art. These directions or positional relationships are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore should not be understood as a limitation on the present invention.

[0029] Furthermore, the terms “first”, “second”, etc. are merely used for distinguishing descriptions and should not be understood as indicating or implying relative importance.

[0030] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms such as "setting" and "connection" should be understood in a broad sense. For example, "connection" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0031] The specific implementation modes of the present invention are described in detail below in conjunction with the accompanying drawings.

[0032] like Figure 1 As shown, a construction method of a tunnel support system passing through a goaf area comprises the following steps:

[0033] A. First, advance drilling should be used to understand the specific direction of the goaf in front of the face, the water accumulation in the old kiln in the goaf, and the gas concentration in the goaf. If there is a high gas concentration or water with high pressure, excavation should be stopped immediately, drainage holes should be constructed to drain water, and ventilation should be strengthened to discharge gas;

[0034] B. When approaching the goaf, construct an advanced anchor rod pipe shed to strengthen the temporary support strength of the goaf and build a safe construction environment;

[0035] C. Use mechanical excavation to excavate the excavation contour line of the upper step of the guard arch (no excavation is required if the boundary of the goaf is outside the contour line). The construction cavity is protected by hanging nets and anchor spraying. At the same time, a protective net is set at the cavity position of the upper part of the guard arch to prevent foreign objects from falling;

[0036] D. Use mechanical excavation to excavate the contour line of the step under the arch (no excavation is required if the boundary of the goaf is outside the contour line), and use anchor spraying for protection of the construction cavity;

[0037] E. After the cavity anchor spraying protection is constructed, start backfilling the hole slag to the bottom elevation of the arch and compact the backfilled hole slag

[0038] F. The initial support method for the outer side of the arch is to use steel frames and connecting bars, set up steel mesh all around, connect the foot anchor pipes and mortar anchor rods according to the actual terrain on site, pre-buried buffer layer grouting pipes and arch grouting pipes, and carry out spray anchor construction;

[0039] G. Set up the inner formwork of the arch side wall, and pour concrete and embed reinforcement. After the concrete strength of the arch side wall reaches the requirement, promptly construct the arch drainage facilities, pour the arch concrete, fill the arch, and pour the low side wall;

[0040] H. After the construction of the inverted arch is completed, the arch protection trolley shall be installed and erected in time as the inner form of the arch protection. After the erection is completed, the arch protection concrete shall be poured in layers;

[0041] I. After the arch protection concrete reaches the designed strength, the arch protection trolley is retracted and moved forward, and grouting is performed through the reserved holes to form a polyurethane foam energy-absorbing buffer layer and a lightweight quick-setting concrete buffer layer;

[0042] J. After the buffer layer is completed, the primary support construction, waterproof layer construction, secondary lining reinforcement binding and embedded parts construction are carried out according to the normal construction procedures. After acceptance by the supervising engineer, the secondary lining trolley is moved forward to support the formwork and pour the secondary lining concrete.

[0043] In step I, a polyurethane foam energy-absorbing buffer layer and a lightweight quick-setting concrete buffer layer are arranged above the arch guard, so as to ensure that a polyurethane foam energy-absorbing buffer layer is formed between the lightweight quick-setting concrete buffer layer and the arch guard, thereby ensuring the safety of the arch guard structure.

[0044] After completing the tunnel arch reinforcement of the corresponding section, repeat steps AJ to carry out the construction of the next section. This is suitable for the tunnel support system that passes through the goaf. When the goaf is relatively complex, it can significantly ensure the stability of the surrounding rock and the safety of construction.

[0045] The main part is to apply concrete arch protection and polyurethane foam energy absorption buffer layer to the tunnel construction that is passing through the goaf. The overall schematic diagram and longitudinal section diagram of the tunnel passing through the goaf are shown in the figure below. Figure 2 , Figure 3 As shown, it mainly includes: when the coal seam goaf 1 of the front face is detected, after corresponding treatment, the anchor pipe shed 10 is constructed to build a safe construction environment. The excavation contour line of the guard arch is mechanically excavated, and the corresponding timely support is provided, and then the slag 7 above the unmined coal seam 8 is backfilled to the bottom elevation of the guard arch and compacted. The outer side of the guard arch is supported to form the outer mold of the guard arch side wall and the inner mold of the guard arch side wall, and grouting is performed to form a concrete guard arch 3. Grouting is performed through the reserved guard arch grouting pipe to form a polyurethane foam energy absorption buffer layer 9 and a lightweight quick-setting concrete buffer layer 2, and finally the initial support 6 of the tunnel, the waterproof layer 4 and the secondary lining 5 are constructed, and subsequent construction is carried out after acceptance.

[0046] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. A construction method for a tunnel support system passing through a goaf, characterized in that: The following steps are involved: A. First, advance drilling is used to understand the specific direction of the goaf in front of the face, the water accumulation in the old kiln in the goaf, and the gas concentration in the goaf. If the gas concentration is high, ventilation is used to discharge the gas. If there is water and the pressure is high, drainage holes are constructed to drain the water. B. When approaching the goaf, construct an advanced anchor rod pipe shed to strengthen the temporary support strength of the goaf and build a safe construction environment; C. Mechanical excavation is used to excavate the excavation contour line of the upper step of the guard arch. The boundary of the goaf is located outside the contour line and no excavation is required. The construction cavity is protected by hanging nets and anchor spraying. At the same time, a protective net is set at the cavity position of the upper part of the guard arch to prevent foreign objects from falling; D. Use mechanical excavation to follow the excavation contour line of the step below the arch. The boundary of the goaf outside the contour line does not need to be excavated, and the construction cavity is protected by anchor spraying; E. After the cavity anchor spraying protection is constructed, start backfilling the hole slag to the bottom elevation of the arch and compact the backfilled hole slag; F. The initial support method for the outer side of the arch is to use steel frames and connecting bars, set up steel mesh all around, connect the foot anchor pipes and mortar anchor rods according to the actual terrain on site, pre-buried buffer layer grouting pipes and arch grouting pipes, and carry out spray anchor construction; G. Set up the inner formwork of the side wall of the arch, pour concrete and plant reinforcement. After the concrete strength of the side wall of the arch reaches the requirement, promptly carry out the anti-drainage of the arch, pour concrete of the arch, fill the arch and pour the low side wall; H. After the construction of the inverted arch is completed, the arch protection trolley shall be installed and erected in time as the inner form of the arch protection. After the erection is completed, the arch protection concrete shall be poured in layers; I. After the arch protection concrete reaches the designed strength, the arch protection trolley is retracted and moved forward, and grouting is performed through the reserved holes to form a polyurethane foam energy absorption buffer layer and a lightweight quick-setting concrete buffer layer; J. After the buffer layer is completed, the initial support construction, waterproof layer construction, secondary lining reinforcement binding and embedded parts construction are carried out according to the normal construction procedures. After acceptance, the secondary lining trolley is moved forward to support the formwork and pour the secondary lining concrete.

2. The construction method of a tunnel support system passing through a goaf according to claim 1, characterized in that: In step E, the backfill soil and rocks on both sides of the side wall are pieces of stone in the cave slag, and the pieces of stone are backfilled by stacking.

3. The construction method of a tunnel support system passing through a goaf according to claim 1, characterized in that: In step F, when the goaf passes through the tunnel and is located within the top disposal range of the tunnel section and the middle of the tunnel body, a concrete arch is set, and both ends of the arch are embedded in the bedrock by no less than 0.5m.