Nuclear power plant steam supply control method and system

By using nuclear power plant steam supply control methods and systems, the stability problem of industrial steam supply during nuclear power unit overhauls or malfunctions has been solved. It enables steam supply switching and dual-unit switching when nuclear power units are unavailable, ensuring the continuity and stability of steam supply and avoiding impacts on reactor core safety.

CN118911780APending Publication Date: 2024-11-08CHINA NUCLEAR POWER TECH RES INST CO LTD +1
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202410947575.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-15
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

Existing technologies cannot guarantee the stability and continuity of industrial steam supply during nuclear power plant overhauls or malfunctions, especially before switching to other steam sources.

Method used

By constructing a steam supply control method for nuclear power plants, including starting a delay timer when the first nuclear power unit is unavailable, controlling the opening and mode of the steam supply valve and bypass exhaust valve, adjusting the setpoint to prioritize industrial steam supply, and switching to pressure control mode when the delay time is reached, combined with the switching scheme of dual nuclear power units, the stability and reliability of steam supply are ensured.

Benefits of technology

When the nuclear power unit is unavailable, the industrial steam supply is prioritized by controlling the steam supply valve and the bypass steam exhaust valve. Excess steam is discharged through the bypass to maintain performance parameters, buy time for steam supply switching, and achieve a fast and reliable steam supply conversion during the switching of two units, thus avoiding challenges to the reactor core safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118911780A_ABST
    Figure CN118911780A_ABST
Patent Text Reader

Abstract

The invention discloses a nuclear power plant steam supply control method and system.The nuclear power plant steam supply control method comprises the steps that when a first nuclear power unit is unavailable and industrial steam supply is needed, a delay time timer is started, a first steam supply valve is controlled to keep the fixed opening degree, and a first bypass steam exhaust valve is controlled to be opened; and when the delay time is up, the control mode of the first bypass steam exhaust valve is adjusted to be a pressure control mode, and the setting value of the first bypass steam exhaust valve is increased, so that the opening degree of the first bypass steam exhaust valve is adjusted according to the secondary loop pressure of the steam supply system of the first nuclear power unit under the increased setting value. According to the technical scheme, when the current nuclear power unit is unavailable, by controlling the steam supply valve and the bypass steam exhaust valve, the main steam of the nuclear power unit can preferentially guarantee industrial steam supply, and performance parameters of the industrial steam supply are maintained as much as possible.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of nuclear reactor control technology, and in particular to a steam supply control method and system for a nuclear power plant. Background Art

[0002] The nuclear energy industrial steam supply uses the main steam of nuclear power as the heating source, adopts the main steam of nuclear power plant as the primary heat source, conducts secondary heat exchange conversion through the thermal power station, heats and converts the three-circuit feed water, produces qualified quality steam, and transports industrial steam to users through the long-distance pipeline network.

[0003] The reactor control system mainly includes the core power and coolant average temperature control system, the pressurizer pressure and water level control system, the steam generator water level control and the turbine bypass emission control system. The main purpose of the reactor control system is: 1. In steady-state operation, ensure the power matching of the first and second circuits and control the average coolant temperature, pressurizer pressure and water level, and SG water level to maintain them near their set values; 2. In transient state, adjust the reactor power so that the power of the first circuit tracks the power of the second circuit, and control the average coolant temperature, pressurizer pressure and water level, and SG water level to remain within the allowable range.

[0004] The main steam extraction before the turbine inlet valve will affect the reactor-machine matching process. The signals involved in the reactor control system are mainly secondary circuit signals such as the first-stage pressure of the turbine, feed water temperature and flow rate. The affected reactor control systems are: core power and coolant average temperature control system, steam generator water level control system and turbine bypass emission control system.

[0005] Industrial steam supply needs to ensure the continuity and stability of steam supply. However, when a nuclear power unit undergoes reactor tripping or turbine load shedding due to overhaul or temporary equipment failure, the steam supply capacity of the nuclear power unit's steam supply system will drop significantly, and the continuity and stability of industrial steam supply cannot be guaranteed. Even if industrial steam supply can be maintained by switching to other steam supply sources, the stability and continuity of industrial steam supply cannot be guaranteed during the period when other steam supply sources are not yet available. Summary of the invention

[0006] The technical problem to be solved by the present application is to provide a nuclear power plant steam supply control method and system in view of the technical defect of the prior art that the stability and continuity of industrial steam supply cannot be guaranteed.

[0007] The technical solution adopted by the present application to solve the technical problem is to construct a steam supply control method for a nuclear power plant, including:

[0008] When the first nuclear power unit is unavailable and industrial steam supply is required, the delay timer is started, and the first steam supply valve is controlled to maintain a fixed opening, and the first bypass exhaust valve is opened;

[0009] When the delay time is reached, the control mode of the first bypass steam exhaust valve is adjusted to the pressure control mode, and the set value of the first bypass steam exhaust valve is increased, so that the first bypass steam exhaust valve adjusts its opening according to the secondary circuit pressure of the steam supply system of the first nuclear power unit at the increased set value.

[0010] Preferably, the method further comprises:

[0011] If an emergency shutdown condition occurs in the first nuclear power unit, determining that the first nuclear power unit is unavailable; and / or

[0012] If the first nuclear power unit trips without tripping the reactor or the steam turbine is in load shedding condition, it is determined that the first nuclear power unit is unavailable.

[0013] Preferably, the step of increasing the setting value of the first bypass exhaust valve comprises:

[0014] If an emergency shutdown condition occurs, the setting value of the first bypass exhaust valve is adjusted from the first setting value to the second setting value, wherein the second setting value is greater than the first setting value;

[0015] If the machine trips without reactor tripping or the turbine load rejection condition occurs, the setting value of the first bypass exhaust valve is adjusted from the first setting value to a third setting value, wherein the third setting value is greater than the first setting value and less than the second setting value.

[0016] Preferably, when the delay time arrives, the method further includes:

[0017] If an emergency shutdown condition occurs, the first steam supply valve is controlled to enter a pressure control mode so that the first steam supply valve adjusts its opening according to the secondary circuit pressure of the steam supply system of the first nuclear power unit;

[0018] If the machine trips without reactor tripping or the turbine load rejection condition occurs, the first steam supply valve is controlled to maintain a fixed opening.

[0019] Preferably, when the first nuclear power unit is unavailable and industrial steam supply is required, the method further comprises:

[0020] If an emergency shutdown condition occurs, the first steam inlet valve is controlled to close;

[0021] If the machine trips without reactor tripping or the turbine load rejection condition occurs, the opening of the first steam inlet valve is controlled to decrease or close.

[0022] Preferably, the method further comprises:

[0023] When the first nuclear power unit is unavailable and industrial steam supply is needed, the first nuclear power unit is switched to the second nuclear power unit for industrial steam supply.

[0024] Preferably, the switching from the first nuclear power unit to the second nuclear power unit for industrial steam supply includes:

[0025] When the first nuclear power unit is unavailable and industrial steam supply is required, an alarm signal is output to prompt the operator of the second nuclear power unit to switch the steam supply;

[0026] receiving a switching signal input by the operator, and starting to gradually adjust the power of the second nuclear power unit at a first rate according to the switching signal;

[0027] Determining whether the second nuclear power unit meets the preset access conditions;

[0028] If the access condition is met, the first isolation valve arranged on the industrial steam supply pipeline of the first nuclear power unit is controlled to be closed, and the first nuclear power unit and the second nuclear power unit are switched when the first isolation valve is closed, and the setting value of the first bypass exhaust valve is switched to the first setting value after the first isolation valve is closed;

[0029] After the first isolation valve is closed, the second isolation valve arranged on the industrial steam supply pipeline of the second nuclear power unit is controlled to open, and the second steam supply valve of the second nuclear power unit is controlled to open gradually at a second rate until a fixed opening is reached, thereby completing the switching of the steam supply unit.

[0030] The present invention also constructs a nuclear power plant steam supply control system, including a processor and a memory storing a computer program, wherein the processor implements the steps of the nuclear power plant steam supply control method described above when executing the computer program.

[0031] The present invention also constructs a nuclear power plant steam supply control system, comprising:

[0032] The first control module is used to start the delay timer when the first nuclear power unit is unavailable and industrial steam supply is needed, and control the first steam supply valve to maintain a fixed opening, and control the first bypass exhaust valve to open;

[0033] The second control module is used to adjust the control mode of the first bypass exhaust valve to the pressure control mode when the delay time is reached, and to increase the set value of the first bypass exhaust valve so that the first bypass exhaust valve can adjust its opening according to the secondary circuit pressure of the steam supply system of the first nuclear power unit at the increased set value.

[0034] Through the technical solution of the present application, when the current nuclear power unit (the first nuclear power unit) is unavailable, although the main steam supply capacity of the nuclear power unit will drop instantly, through the control of the steam supply valve (the first steam supply valve) and the bypass exhaust valve (the first bypass exhaust valve), the main steam of the nuclear power unit can give priority to industrial steam supply, and the excess will be discharged through the bypass exhaust valve, so as to maintain the performance parameters of industrial steam supply as much as possible, buy time for steam supply switching, and will not pose a challenge to the safety of the core. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] In order to more clearly illustrate the embodiments of the present application, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work. In the drawings:

[0036] Figure 1 This is a schematic diagram of the steam supply for a single nuclear power unit;

[0037] Figure 2 It is a flow chart of Embodiment 1 of the steam supply control method for a nuclear power plant of the present invention;

[0038] Figure 3 It is a flow chart of a first embodiment of a method for controlling steam supply to a nuclear power plant when an emergency shutdown condition occurs;

[0039] Figure 4 is a flow chart of a first embodiment of a method for controlling steam supply in a nuclear power plant when a steam turbine load rejection condition occurs;

[0040] Figure 5 is a flow chart of Embodiment 2 of the steam supply control method for a nuclear power plant according to the present invention;

[0041] Figure 6 It is a schematic diagram of the steam supply of the dual-core generator set of the present invention. DETAILED DESCRIPTION

[0042] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0043] First, regarding the steam supply scheme for a single nuclear power unit during normal operation, it should be noted that Figure 1When the current nuclear power unit (the first nuclear power unit) is operating normally, the first steam inlet valve 11 is in an open state so that the main steam supplied by the steam supply system of the first nuclear power unit is sent to the steam turbine 14 for power generation; the first steam supply valve 12 is also at a certain fixed opening so that the main steam is sent to the industrial steam supply system; the first bypass exhaust valve (GCT valve) 13 forms an opening signal according to the average temperature of a circuit and the turbine load signal to discharge excess steam into the condenser 15.

[0044] Figure 2 1 is a flow chart of a first embodiment of a method for controlling steam supply to a nuclear power plant according to the present invention. The method for controlling steam supply to a nuclear power plant according to the embodiment comprises the following steps:

[0045] Step S10, when the first nuclear power unit is unavailable and industrial steam supply is required, start the delay timer, control the first steam supply valve to maintain a fixed opening, and control the first bypass exhaust valve to open;

[0046] In this step, combine Figure 1 When the first nuclear power unit is unavailable and industrial steam supply is needed, the first steam supply valve 12 is controlled to maintain a fixed opening so that the steam supplied by the steam supply system of the first nuclear power unit gives priority to industrial steam supply. It should be noted that when the unit unavailable signal is just triggered, the reactor still has residual heat, and industrial steam supply can be given priority; the first bypass exhaust valve 13 is controlled to open, and under the premise of ensuring industrial steam supply, excess steam is discharged into the first condenser 15 through the first bypass exhaust valve 13.

[0047] Step S20, when the delay time is reached, the control mode of the first bypass exhaust valve is adjusted to the pressure control mode, and the set value of the first bypass exhaust valve is increased, so that the first bypass exhaust valve adjusts its opening according to the secondary circuit pressure of the steam supply system of the first nuclear power unit at the increased set value.

[0048] In this step, combine Figure 1 When the delay time (for example, 10 seconds) is reached, the control mode of the first bypass exhaust valve 13 is adjusted from the power control mode to the pressure control mode, and the setting value of the first bypass exhaust valve 13 is higher than the pressure setting value of the manual mode under normal shutdown conditions to ensure that the steam supplied by the steam supply system of the first nuclear power unit has priority over industrial steam supply.

[0049] Through the technical solution of this embodiment, when the current nuclear power unit (the first nuclear power unit) is unavailable, although the main steam supply capacity of the nuclear power unit will drop instantly, by controlling the steam supply valve (the first steam supply valve) and the bypass exhaust valve (the first bypass exhaust valve), the main steam of the nuclear power unit can give priority to industrial steam supply, and the excess will be discharged through the bypass exhaust valve, so as to maintain the performance parameters of industrial steam supply as much as possible, buy time for steam supply switching, and will not pose a challenge to the safety of the core.

[0050] Furthermore, in an optional embodiment, the nuclear power plant steam supply control method of the present invention further includes:

[0051] If an emergency shutdown condition occurs in the first nuclear power unit, determining that the first nuclear power unit is unavailable; and / or

[0052] If the first nuclear power unit trips without tripping the reactor or the steam turbine is in load shedding condition, it is determined that the first nuclear power unit is unavailable.

[0053] Further, in step S20, the setting value of the first bypass exhaust valve is increased, including:

[0054] If an emergency shutdown condition occurs, the setting value of the first bypass exhaust valve is adjusted from the first setting value to the second setting value, wherein the second setting value is greater than the first setting value, and the first setting value is the setting value for pressure control in manual state under normal shutdown conditions;

[0055] If the machine trips without reactor tripping or the turbine load rejection condition occurs, the setting value of the first bypass exhaust valve is adjusted from the first setting value to the third setting value, wherein the third setting value is greater than the first setting value and less than the second setting value.

[0056] Furthermore, in step S20, when the delay time is reached, the nuclear power plant steam supply control method of the present invention further includes:

[0057] If an emergency shutdown condition occurs, the first steam supply valve is controlled to enter a pressure control mode so that the first steam supply valve adjusts its opening according to the secondary circuit pressure of the steam supply system of the first nuclear power unit;

[0058] If the machine trips without reactor tripping or the turbine is in load shedding condition, the first steam supply valve is controlled to maintain a fixed opening.

[0059] Furthermore, in step S10, when the first nuclear power unit is unavailable, the first steam inlet valve 11 should be controlled to be closed or to reduce its opening degree, so that the steam turbine power generation system stops running or runs at low power. Specifically:

[0060] If an emergency shutdown condition occurs, the first steam inlet valve is controlled to close;

[0061] If the machine trips without reactor tripping or the turbine is in load shedding condition, the opening of the first steam inlet valve is controlled to decrease or close.

[0062] The following describes the steam supply control process of the current nuclear power unit (the first nuclear power unit) when an emergency shutdown condition occurs, a machine trip without a reactor trip, or a load shedding condition to the plant power supply condition:

[0063] 1. Steam supply control under emergency shutdown conditions

[0064] Combination Figure 1 , 3 When the reactor emergency shutdown signal is received, the first steam inlet valve 11 is quickly closed, the first bypass exhaust valve 13 is automatically opened, and the steam supplied by the nuclear power unit is discharged through the first steam supply valve 12 and the first bypass exhaust valve 13. After the shutdown signal triggers a delay setting time (such as 10 seconds), the first bypass exhaust valve 13 and the first steam supply valve 12 are automatically adjusted to the emergency shutdown control mode, and in this mode:

[0065] The control mode of the first steam supply valve 12 is changed to pressure control mode, and the opening is adjusted by the secondary circuit pressure, and all secondary circuit steam is discharged through the industrial steam supply pipeline;

[0066] The control mode of the first bypass exhaust valve 13 is also a pressure control mode, but the set value will be adjusted higher than the set value during normal operation, as a backup heat removal method when the industrial steam supply cannot remove the waste heat and the secondary circuit pressure increases.

[0067] 2. Steam supply control under the condition of tripping the machine without tripping the reactor or shedding the load to the factory power supply

[0068] Combination Figure 1 , 4 When load shedding to plant power (or machine trip without reactor trip) occurs, the first steam inlet valve 11 is quickly closed or lowered, the first bypass exhaust valve 13 is automatically opened, and the steam supplied by the nuclear power unit is discharged through the first steam supply valve 12 and the first bypass exhaust valve 13. After the delay setting time (such as 10 seconds) of the machine trip without reactor trip or load shedding to plant power signal triggering, the first bypass exhaust valve 13 and the first steam supply valve 12 are automatically adjusted to the machine trip without reactor trip control mode, and in this mode:

[0069] The control mode of the first steam supply valve 12 remains unchanged, and the original fixed opening is maintained unchanged;

[0070] The control mode of the first bypass exhaust valve 13 is changed to pressure control mode, but the control set value is adjusted to the low power steam supply mode set value, which corresponds to the set value required for steam discharge to meet the nuclear power of about 30% FP and the industrial steam supply load unchanged.

[0071] Furthermore, in an optional embodiment, when the current nuclear power unit is unavailable, although the above embodiment can maintain the stability of industrial steam supply for a short time, if it is necessary to maintain the stability of industrial steam supply continuously, an industrial steam supply scheme in which dual nuclear power units serve as backup for each other can be set up. Specifically, the current nuclear power unit (the first nuclear power unit) is used as the main steam supply unit, and the second nuclear power unit is used as the backup steam supply unit. Moreover, when the first nuclear power unit is unavailable and industrial steam supply is needed, the first nuclear power unit is switched to the second nuclear power unit for industrial steam supply, thereby continuously ensuring the stability and reliability of industrial steam supply.

[0072] Furthermore, in an optional embodiment, the steam supply switching can be performed by the following steps:

[0073] When the first nuclear power unit is unavailable and requires industrial steam supply, for example, when the industrial steam supply demand signal and the unit unavailable signal of the first nuclear power unit are simultaneously effective, an alarm signal is output to prompt the operator of the second nuclear power unit to switch the steam supply;

[0074] receiving a switching signal input by an operator, and starting to gradually adjust the power of the second nuclear power unit at a first rate according to the switching signal;

[0075] Determine whether the second nuclear power unit meets the preset access conditions;

[0076] If the access condition is met, the first isolation valve on the industrial steam supply pipeline of the first nuclear power unit is controlled to be closed, and the first nuclear power unit and the second nuclear power unit are switched when the first isolation valve is closed, and the setting value of the first bypass exhaust valve is switched to the first setting value after the first isolation valve is closed;

[0077] After the first isolation valve is closed, the second isolation valve on the industrial steam supply pipeline of the second nuclear power unit is controlled to open, and the second steam supply valve of the second nuclear power unit is controlled to open gradually at a second rate until it reaches a fixed opening, thereby completing the switching of the steam supply unit.

[0078] Combine the following Figure 5 and Figure 6 Explain the dual-unit steam supply switching control process:

[0079] First of all, it should be noted that the first nuclear power unit 10 is the main steam supply unit, and the second nuclear power unit 20 is the backup steam supply unit. The logical structures of the two nuclear power units are similar, and each nuclear power unit has an isolation valve installed on the industrial steam supply pipeline, for example, isolation valves 16 and 26, which are used to isolate the industrial steam supply pipeline during switching.

[0080] When the main steam supply unit 10 (the first nuclear power unit) is unavailable, an alarm signal can be generated based on the steam supply demand signal superimposed on the unit unavailable signal to prompt the operator of the standby steam supply unit 20 (the second nuclear power unit) that the steam supply needs to be switched. At this time, the operator can press the switch button according to the relevant regulations when determining that the status of the main steam supply unit 10 is correct. Then the standby steam supply unit 20 starts to implement automatic steam supply switching. Specifically, the unit automatic control is adopted to first set the target power of the standby steam supply unit 20 to the default power for steam supply operation. rate, and then gradually adjust the power according to the first rate (for example, not higher than 5% FP / min). When the target power is reached, it is determined that the standby steam supply unit 20 is ready for access. At this time, the first isolation valve 16 is closed to isolate the industrial steam supply pipeline of the main steam supply unit 10, ensuring that the main steam supply unit 10 is switched to a normal shutdown or power supply state, and when the first isolation valve 16 is closed, the setting value of the first bypass exhaust valve 13 of the main steam supply unit 10 is switched to the first setting value (the setting value under normal shutdown conditions or power supply state). When the signal that the industrial steam supply pipeline of the main steam supply unit 10 is isolated is received, the second isolation valve 26 of the standby steam supply unit is opened, and the second steam supply valve of the standby steam supply unit 20 is gradually opened according to the second rate (for example, not higher than 5% FP / min) until it reaches a fixed opening, and the steam supply unit switching is completed, and the standby steam supply unit 20 starts to supply steam.

[0081] Through the technical solution of this embodiment, when the main steam supply unit is unavailable, the standby steam supply unit can be quickly switched to the industrial steam supply state, realizing the rapid switching of industrial steam supply of the dual-core generator unit, and ensuring the stability and reliability of industrial steam supply. Moreover, the entire switching process is automatically switched according to the control strategy, avoiding human operation errors.

[0082] The present invention also constructs a nuclear power plant steam supply control system, which includes a processor and a memory storing a computer program. The processor implements the steps of the above nuclear power plant steam supply control method when executing the computer program.

[0083] The present invention also constructs a nuclear power plant steam supply control system, which includes a first control module and a second control module, wherein the first control module is used to start a delay timer when the first nuclear power unit is unavailable and requires industrial steam supply, and control the first steam supply valve to maintain a fixed opening, and control the first bypass exhaust valve to open; the second control module is used to adjust the control mode of the first bypass exhaust valve to a pressure control mode when the delay time is reached, and increase the set value of the first bypass exhaust valve, so that the first bypass exhaust valve can adjust its opening according to the secondary circuit pressure of the steam supply system of the first nuclear power unit at the increased set value.

[0084] Furthermore, the nuclear power plant steam supply control system of the present invention also includes a third control module, which is used to control the first steam supply valve to enter the pressure control mode when an emergency shutdown condition occurs, so that the first steam supply valve adjusts the opening according to the secondary circuit pressure of the steam supply system of the first nuclear power unit; when a machine trip without reactor trip or a turbine load shedding condition occurs, the first steam supply valve is controlled to maintain a fixed opening.

[0085] The above description is only the preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the scope of the claims of the present application.

Claims

1. A method for controlling steam supply in a nuclear power plant, characterized in that: include: When the first nuclear power unit is unavailable and industrial steam supply is required, the delay timer is started, and the first steam supply valve is controlled to maintain a fixed opening, and the first bypass exhaust valve is controlled to open; When the delay time is reached, the control mode of the first bypass steam exhaust valve is adjusted to the pressure control mode, and the set value of the first bypass steam exhaust valve is increased, so that the first bypass steam exhaust valve adjusts its opening according to the secondary circuit pressure of the steam supply system of the first nuclear power unit at the increased set value.

2. The method for controlling steam supply in a nuclear power plant according to claim 1, characterized in that: The method further comprises: If an emergency shutdown condition occurs in the first nuclear power unit, determining that the first nuclear power unit is unavailable; and / or If the first nuclear power unit trips without tripping the reactor or the steam turbine is in load shedding condition, it is determined that the first nuclear power unit is unavailable.

3. The method for controlling steam supply in a nuclear power plant according to claim 2, characterized in that: The step of increasing the setting value of the first bypass exhaust valve comprises: If an emergency shutdown condition occurs, the setting value of the first bypass exhaust valve is adjusted from the first setting value to the second setting value, wherein the second setting value is greater than the first setting value; If the machine trips without reactor tripping or the turbine load rejection condition occurs, the setting value of the first bypass exhaust valve is adjusted from the first setting value to a third setting value, wherein the third setting value is greater than the first setting value and less than the second setting value.

4. The nuclear power plant steam supply control method according to claim 2, characterized in that: When the delay time arrives, the method further includes: If an emergency shutdown condition occurs, the first steam supply valve is controlled to enter a pressure control mode so that the first steam supply valve adjusts its opening according to the secondary circuit pressure of the steam supply system of the first nuclear power unit; If the machine trips without reactor tripping or the turbine load rejection condition occurs, the first steam supply valve is controlled to maintain a fixed opening.

5. The method for controlling steam supply in a nuclear power plant according to claim 2, characterized in that: When the first nuclear power unit is unavailable and industrial steam supply is required, the method further comprises: If an emergency shutdown condition occurs, the first steam inlet valve is controlled to close; If the machine trips without reactor tripping or the turbine load rejection condition occurs, the opening of the first steam inlet valve is controlled to decrease or close.

6. The method for controlling steam supply in a nuclear power plant according to any one of claims 1 to 4, characterized in that: The method further comprises: When the first nuclear power unit is unavailable and industrial steam supply is needed, the first nuclear power unit is switched to the second nuclear power unit for industrial steam supply.

7. The method for controlling steam supply in a nuclear power plant according to claim 6, characterized in that: The switching from the first nuclear power unit to the second nuclear power unit for industrial steam supply includes: When the first nuclear power unit is unavailable and industrial steam supply is required, an alarm signal is output to prompt the operator of the second nuclear power unit to switch the steam supply; receiving a switching signal input by the operator, and starting to gradually adjust the power of the second nuclear power unit at a first rate according to the switching signal; Determining whether the second nuclear power unit meets the preset access conditions; If the access condition is met, the first isolation valve arranged on the industrial steam supply pipeline of the first nuclear power unit is controlled to be closed, and the first nuclear power unit and the second nuclear power unit are switched when the first isolation valve is closed, and the setting value of the first bypass exhaust valve is switched to the first setting value after the first isolation valve is closed; After the first isolation valve is closed, the second isolation valve arranged on the industrial steam supply pipeline of the second nuclear power unit is controlled to open, and the second steam supply valve of the second nuclear power unit is controlled to open gradually at a second rate until a fixed opening is reached, thereby completing the switching of the steam supply unit.

8. The method for controlling steam supply in a nuclear power plant according to claim 6, characterized in that: The determining whether the second nuclear power unit meets the preset access condition includes: Determine whether the power of the second nuclear power unit has reached the target power.

9. A steam supply control system for a nuclear power plant, comprising a processor and a memory storing a computer program, characterized in that: The processor implements the steps of the nuclear power plant steam supply control method as described in any one of claims 1-8 when executing the computer program.

10. A steam supply control system for a nuclear power plant, characterized in that: include: The first control module is used to start the delay timer when the first nuclear power unit is unavailable and industrial steam supply is needed, and control the first steam supply valve to maintain a fixed opening, and control the first bypass exhaust valve to open; The second control module is used to adjust the control mode of the first bypass exhaust valve to the pressure control mode when the delay time is reached, and to increase the set value of the first bypass exhaust valve so that the first bypass exhaust valve can adjust its opening according to the secondary circuit pressure of the steam supply system of the first nuclear power unit at the increased set value.

Citation Information

Cited By

  • Coolant circulation loop pressure control method and device, electronic equipment and medium

    CN121393969A

  • Coolant circulation loop pressure control method and apparatus, electronic device, medium

    CN121393969B