Pipeline pressure test construction method
Through the multi-system combined pressure test device and blind plate isolation technology, the long construction period and medium circulation problems of pipeline system in petrochemical equipment are solved, and the pipeline pressure test with high safety and reliability is achieved, suitable for petrochemical equipment. process pipeline.
Patent Information
- Application Number
- CN202410963524.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-18
- Publication Date
- 2024-11-08
AI Technical Summary
In the pipeline systems of petrochemical and power plant-related devices, the transportation of high-risk, high-pressure, flammable, explosive and toxic substances requires strict pressure tests to prevent leakage accidents, but the existing technology has long construction cycles and multiple pressures. Problems such as not being able to test the grade at one time and being unable to reuse the pressure test medium.
Using a multi-system joint pressure test device, the pressure test system is isolated from the non-pressure test system, and connected through a blind plate to conduct pneumatic or hydraulic strength tests and tightness tests, and the circulation of pressure test media is realized by using a circulation supply device and a pressure test pump. Use and return, step by step boost and check for leakage to ensure the safety and reliability of the test system.
It improves the safety and reliability of pipeline pressure tests, simplifies the construction process, shortens the test cycle, ensures the integrity and structural strength of the pipeline system, and is suitable for process pipeline pressure tests in petrochemical devices.
Smart Images

Figure CN118913559A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of pipeline pressure testing, and in particular to a pipeline pressure testing construction method. Background Art
[0002] The petrochemical manufacturing industry is one of the country's pillar industries and plays a huge role in chemical production and operations. Since the various transport media in petrochemical and power plant related devices are mostly high-risk, high-pressure, flammable, explosive and toxic substances, in the construction of petrochemical and power plant related devices, various pipelines must be installed in strict accordance with national specifications and standards to ensure their quality and prevent pipeline leakage accidents. Therefore, pressure testing is a key procedure for pipeline system inspection and requires reliable methods and processes. Summary of the invention
[0003] The purpose of the present application is to provide a pipeline pressure test construction method in view of at least one technical problem involved in the background technology.
[0004] In order to achieve the above objectives, this application adopts the following technical solutions:
[0005] The present application provides a pipeline pressure test construction method, comprising:
[0006] Use blind plates to isolate the pressure test system from the non-pressure test system, and connect the pressure test system to the multi-system combined pressure test device;
[0007] Conduct strength test on pressure test system;
[0008] Conduct rigorous testing on the test system;
[0009] Drain and blow dry.
[0010] Optionally, the strength test described in the strength test on the pressure test system is an air pressure strength test;
[0011] The strength test of the pressure test system includes:
[0012] Apply air pressure to the pressure test system. When the pressure in the pressure test system rises to 50% of the test pressure, if there is no gas leakage in the pressure test system, continue to increase the pressure step by step by 10% of the test pressure, and maintain the pressure steady for 3 minutes at each level; when the pressure in the pressure test system rises to the test pressure, maintain the pressure steady for 10 minutes, and then reduce the pressure to the design pressure; if there is no gas leakage in the pressure test system, the strength of the pressure test system is qualified.
[0013] Optionally, the strength test performed on the pressure test system is a hydraulic strength test; and the strength test performed on the pressure test system includes:
[0014] Apply hydraulic pressure to the pressure test system. When the pressure in the pressure test system rises to 50% of the test pressure, if there is no liquid leakage, continue to increase the pressure, and check once every 10% of the test pressure (it can be understood that when there is no liquid leakage, continue to increase the pressure, and if there is liquid leakage, stop increasing the pressure). When the pressure in the pressure test system rises to the test pressure, stabilize the pressure for 30 minutes. If there is no liquid leakage in the pressure test system within the 30 minutes and the pressure in the pressure test system remains at the test pressure, the strength of the pressure test system is qualified. It can be understood that when the strength test is a hydraulic strength test, the test pressure is the preset maximum hydraulic value in the pressure test system during the strength test. In the embodiment of the present application, preferably, the strength test of the pressure test system is qualified when there is no gas leakage in the pressure test system and there is no visual deformation of the pressure test system.
[0015] Optionally, before performing a strength test on the pressure test system, the method further includes:
[0016] Water is injected into the pressure test system through the multi-system combined pressure test device, and the air is exhausted through the exhaust valve set at the highest point of the pressure test system.
[0017] Optionally, before performing a strength test on the pressure test system, the method further includes:
[0018] Purge the pressure test system.
[0019] Optionally, the strength test of the pressure test system includes:
[0020] The pressure test medium is delivered into the pressure test system through the pressure test pump in the multi-system combined pressure test device;
[0021] Accordingly, after the strength test of the pressure test system is performed, the pipeline pressure test construction method further includes:
[0022] Turn off the pressure test pump to allow the pressure test medium in the pressure test system to flow back to the multi-system combined pressure test device under the action of its own gravity.
[0023] Optionally, when applied to a single pressure test system, the strength test of the pressure test system includes:
[0024] The pressure test medium is delivered into the pressure test system through the pressure test pump in the multi-system combined pressure test device;
[0025] Accordingly, after the strength test of the pressure test system is performed, the pipeline pressure test construction method further includes:
[0026] The pressure test pump is turned off to allow the pressure test medium in the pressure test system to flow back to the pressure test medium storage tank in the multi-system combined pressure test device.
[0027] Optionally, when applied to multiple pressure test systems at the same time, the strength test of the pressure test system includes:
[0028] The pressure test medium is delivered to each pressure test system through the pressure test pump in the multi-system combined pressure test device;
[0029] After filling each of the pressure test systems with water, gradually increase the pressure in each pressure test system. When the pressure in a pressure test system reaches the preset pressure, close the corresponding third control valve on the multi-system combined pressure test device. When the third control valves corresponding to all pressure test systems are closed, shut down the pressure test pump.
[0030] Optionally, when applied to two pressure test systems with a large difference in test pressure, the strength test of the pressure test system includes:
[0031] Close the third control valve corresponding to the pressure test system with a smaller test pressure, and send the pressure test medium into the pressure test system with a larger test pressure through the pressure test pump in the multi-system combined pressure test device, so as to perform a strength test on the pressure test system with a larger test pressure;
[0032] After completing the strength test of the pressure test system with a larger test pressure, open the third control valve corresponding to the pressure test system with a smaller test pressure to transport the pressure test medium in the pressure test system with a larger test pressure to the pressure test system with a smaller test pressure;
[0033] If the pressure in the pressure test system with a smaller test pressure reaches the test pressure before all the pressure test medium in the pressure test system with a larger test pressure is transported to the pressure test system with a smaller test pressure, the third control valve corresponding to the pressure test system with a smaller test pressure is closed, and the strength test is performed on the pressure test system with a smaller test pressure;
[0034] If the pressure in the pressure test system with smaller test pressure still does not reach the test pressure after all the pressure test medium in the pressure test system with larger test pressure is transported to the pressure test system with smaller test pressure, the third control valve corresponding to the pressure test system with larger test pressure is closed, and the pressure test medium is transported to the pressure test system with smaller test pressure through the pressure test pump in the multi-system combined pressure test device.
[0035] Optionally, before the blind plate is used to isolate the pressure test system from the non-pressure test system and the pressure test system is connected to the multi-system combined pressure test device, the method further includes: selecting the thickness of the blind plate;
[0036] The thickness of the blind plate is obtained by the following formula:
[0037]
[0038] in,
[0039] T is the minimum thickness of the blind plate;
[0040] K is the blind plate coefficient and is 0.4 for the clip-on type;
[0041] D is the inner diameter of the gasket;
[0042] P is the test pressure;
[0043] σ is the allowable stress of the blind plate material at the test temperature.
[0044] The technical solution provided by this application can achieve at least one of the following beneficial effects:
[0045] The pipeline pressure test construction method provided in the present application performs a pressure test on the pipeline system by adopting a multi-system combined pressure test device, and in the pipeline pressure test construction method, a strength test and a tightness test are successively performed, so that the pressure test has high safety and reliability.
[0046] The additional technical features and advantages of the present application will be more clearly explained in the following description, or can be understood through the specific practice of the present application. BRIEF DESCRIPTION OF THE DRAWINGS
[0047] In order to more clearly illustrate the technical solutions of the specific implementation methods of the present application, the following is a brief introduction to the drawings required for the description of the specific implementation methods. Obviously, the drawings described below are some implementation methods of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0048] Figure 1 A schematic diagram of a process for implementing a pipeline pressure test construction method provided in an embodiment of the present application;
[0049] Figure 2 A schematic structural diagram of an implementation of a multi-system combined pressure testing device provided in an embodiment of the present application;
[0050] Figure 3 A schematic flow chart of an implementation method of a pipeline pressure test construction method provided in an embodiment of the present application. DETAILED DESCRIPTION
[0051] The technical solution of the present application will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the present application, rather than all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present application.
[0052] In the description of the present application, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present application. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0053] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0054] like Figures 1 to 3 As shown, the present application provides a pipeline pressure test construction method, comprising:
[0055] Step 100: Use a blind plate to isolate the pressure test system from the non-pressure test system, and connect the pressure test system to the multi-system combined pressure test device;
[0056] Step 200: Performing a strength test on the pressure test system;
[0057] Step 300: Conduct a tightness test on the test system;
[0058] Step 400: Drain and blow dry.
[0059] Optionally, the strength test described in the strength test on the pressure test system is an air pressure strength test;
[0060] The step 200 (performing a strength test on the pressure test system) includes:
[0061] Apply air pressure to the pressure test system. When the pressure in the pressure test system rises to 50% of the test pressure, if there is no gas leakage in the pressure test system, continue to increase the pressure step by step by 10% of the test pressure, and maintain the pressure steady for 3 minutes at each level; when the pressure in the pressure test system rises to the test pressure, maintain the pressure steady for 10 minutes, and then reduce the pressure to the design pressure; if there is no gas leakage in the pressure test system, the strength of the pressure test system is qualified.
[0062] It is understandable that when the strength test is an air pressure strength test, the test pressure is the preset maximum air pressure value in the pressure test system during the strength test, and the design pressure is the design pressure of the tested pipeline system, and the design pressure is less than the test pressure. In the embodiment of the present application, preferably, the pressure test system strength test is qualified when there is no gas leakage in the pressure test system and no visual deformation of the pressure test system.
[0063] Optionally, the strength test in step 200 (performing a strength test on the pressure test system) is a hydraulic strength test; step 200 includes:
[0064] Apply hydraulic pressure to the pressure test system. When the pressure in the pressure test system rises to 50% of the test pressure, if there is no liquid leakage, continue to increase the pressure, and check once every 10% of the test pressure (it can be understood that when there is no liquid leakage, continue to increase the pressure, and if there is liquid leakage, stop increasing the pressure). When the pressure in the pressure test system rises to the test pressure, stabilize the pressure for 30 minutes. If there is no liquid leakage in the pressure test system within the 30 minutes and the pressure in the pressure test system remains at the test pressure, the strength of the pressure test system is qualified. It can be understood that when the strength test is a hydraulic strength test, the test pressure is the preset maximum hydraulic value in the pressure test system during the strength test. In the embodiment of the present application, preferably, the strength test of the pressure test system is qualified when there is no gas leakage in the pressure test system and there is no visual deformation of the pressure test system.
[0065] Optionally, before step 200 (performing a strength test on the pressure test system), the method further includes:
[0066] Water is injected into the pressure test system through the multi-system combined pressure test device, and the air is exhausted through the exhaust valve set at the highest point of the pressure test system.
[0067] Optionally, before step 200 (performing a strength test on the pressure test system), the method further includes:
[0068] Purge the pressure test system.
[0069] Optionally, the step 200 (performing a strength test on the pressure test system) includes:
[0070] The pressure test medium is delivered into the pressure test system through the pressure test pump in the multi-system combined pressure test device;
[0071] Accordingly, after the strength test of the pressure test system is performed, the pipeline pressure test construction method further includes:
[0072] Turn off the pressure test pump to allow the pressure test medium in the pressure test system to flow back to the multi-system combined pressure test device under the action of its own gravity.
[0073] Optionally, when applied to a single pressure test system, the strength test of the pressure test system includes:
[0074] The pressure test medium is delivered into the pressure test system through the pressure test pump in the multi-system combined pressure test device;
[0075] Accordingly, after step 200 (performing a strength test on the pressure test system), the pipeline pressure test construction method further includes:
[0076] The pressure test pump is turned off to allow the pressure test medium in the pressure test system to flow back to the pressure test medium storage tank in the multi-system combined pressure test device.
[0077] Optionally, when applied to multiple pressure test systems at the same time, step 200 (performing a strength test on the pressure test system) includes:
[0078] The pressure test medium is delivered to each pressure test system through the pressure test pump in the multi-system combined pressure test device;
[0079] After filling each of the pressure test systems with water, gradually increase the pressure in each pressure test system. When the pressure in a pressure test system reaches the preset pressure, close the corresponding third control valve on the multi-system combined pressure test device. When the third control valves corresponding to all pressure test systems are closed, shut down the pressure test pump.
[0080] Optionally, when applied to two pressure test systems with a large difference in test pressure, step 200 (performing a strength test on the pressure test system) includes:
[0081] Close the third control valve corresponding to the pressure test system with a smaller test pressure, and send the pressure test medium into the pressure test system with a larger test pressure through the pressure test pump in the multi-system combined pressure test device, so as to perform a strength test on the pressure test system with a larger test pressure;
[0082] After completing the strength test of the pressure test system with a larger test pressure, open the third control valve corresponding to the pressure test system with a smaller test pressure to transport the pressure test medium in the pressure test system with a larger test pressure to the pressure test system with a smaller test pressure;
[0083] If the pressure in the pressure test system with a smaller test pressure reaches the test pressure before all the pressure test medium in the pressure test system with a larger test pressure is transported to the pressure test system with a smaller test pressure, the third control valve corresponding to the pressure test system with a smaller test pressure is closed, and the strength test is performed on the pressure test system with a smaller test pressure;
[0084] If the pressure in the pressure test system with smaller test pressure still does not reach the test pressure after all the pressure test medium in the pressure test system with larger test pressure is transported to the pressure test system with smaller test pressure, the third control valve corresponding to the pressure test system with larger test pressure is closed, and the pressure test medium is transported to the pressure test system with smaller test pressure through the pressure test pump in the multi-system combined pressure test device.
[0085] Optionally, before the step 100 (using a blind plate to isolate the pressure test system from the non-pressure test system and connecting the pressure test system to the multi-system combined pressure test device), the method further includes: selecting the thickness of the blind plate;
[0086] The thickness of the blind plate is obtained by the following formula:
[0087]
[0088] in,
[0089] T is the minimum thickness of the blind plate;
[0090] K is the blind plate coefficient and is 0.4 for the clip-on type;
[0091] D is the inner diameter of the gasket;
[0092] P is the test pressure;
[0093] σ is the allowable stress of the blind plate material at the test temperature.
[0094] Figure 2 As shown, it is a multi-system combined pressure test device used in the pipeline pressure test construction method provided in the embodiment of the present application, and the multi-system combined pressure test device includes a circulating supply device 1, a pressure test medium storage box 101, a pressure test pump 102, a check valve 103, a first control valve 104, a first connecting hose 105, a second connecting hose 106, a first pressure gauge 107, a second pressure gauge 108, a filter 109, a test tube group 2, a main line 201, a first branch pipe 202, a third pressure gauge 203, a second control valve 204, a flow meter 205, a third control valve 206, a combination valve 207, a reflux part 208, a cleaning port 3, a drain valve 301 and a vent valve 302, wherein each main line 201 is used to be connected to each pressure test system in a one-to-one correspondence.
[0095] In order to better illustrate the pipeline pressure test construction method provided by the present application, the present application also provides an application example of the pipeline pressure test construction method, and the application example is as follows:
[0096] The petrochemical manufacturing industry is one of the country's pillar industries and plays a huge role in chemical production and operations. Since the various transport media in the device are mostly high-risk, high-pressure, flammable, explosive and toxic substances. Therefore, in the construction of petrochemical and power plant related equipment, all kinds of pipelines must be installed in strict accordance with national specifications and standards to ensure their quality and prevent pipeline leakage accidents. Pressure testing is a key procedure for pipeline system inspection, including strength testing and tightness testing. The purpose is to prove that the tested pipeline system is systematic and leak-proof, and has the required structural strength under the strength test pressure.
[0097] Characteristics of the method
[0098] The process pipeline pressure test method and key links, including system division, medium selection, test pressure determination and temperature coefficient influence, etc., and propose the best determination method for each link of the pressure test work, so that the whole process of determining the pressure test method is scientific, safe and reasonable, ensuring the final construction quality and ensuring the long-term safe and stable operation of the device.
[0099] This method combines a multi-system joint pressure test device to overcome the problems of dense pipelines in the device area, multiple pressure levels, multiple pipe diameters, long pressure test construction period, inability to pressure test multiple pressure levels at one time, and inability to recycle and reuse pressure test media.
[0100] Scope of application
[0101] This method is applicable to the pressure test of process pipelines in petrochemical plants.
[0102] Process principle
[0103] The device has a simple process and is easy to operate. A special water storage tank is provided inside the device. The pressure test medium can be used reciprocatingly through circulation within the device. The device is provided with multiple pressure test interfaces, which are connected to the pipeline or system to be pressure tested through a high-pressure metal hose. Each pressure test interface is separately equipped with a pressure gauge, flow meter and other metering components, so that the water flow, pressure and other information used in the pressure test of each system can be accurately controlled.
[0104] Piping System Pressure Testing Procedure
[0105] Step 1: Add blind plates to isolate the non-pressure test system according to the pressure test system flow chart, and connect the multi-system combined pressure test device.
[0106] Step 2: Hydraulic strength test
[0107] Step 3: Pipeline system tightness test
[0108] Step 4: Drain and blow dry (compressed air)
[0109] Operation points
[0110] Pipeline integrity check
[0111] The integrity check of the pipeline is a necessary work before the pipeline pressure test. The system that has not been confirmed to be qualified by the integrity check shall not be subjected to pressure test. The basis for the integrity check is technical documents such as the pipeline single-line diagram, pipeline plan, pipe support atlas, and pipeline simple pressure test system diagram. The methods of integrity check are: first, the construction team will check the pipelines they construct according to the design drawings; second, the construction technicians will recheck each pipeline in the pressure test system one by one; third, after all pipelines in the pressure test system have been checked and qualified according to the design drawings, they will be reported to the supervisor and the owner for a three-party inspection. The content of the integrity check is divided into two parts: field work and internal work. The field inspection is to check whether the model, specification, material, coordinates, elevation, flow direction of the valve, direction of the handle, piers, support and hanger type, position, slope, verticality, and horizontality of the pipeline installed on site meet the design requirements and specifications.
[0112] The welding of pipelines should also be comprehensively inspected, mainly including whether the pipeline welding work has been completed, whether the stainless steel welds have been pickled and passivated, and whether the welds that need heat treatment have been processed. Internal inspection is to check whether the pressure test package information is complete, whether the welding records are correct and complete, whether the non-destructive testing is qualified, whether various record sheets have been signed and confirmed, etc.
[0113] Selection of Pipeline Blind Plate Thickness
[0114] During construction, for medium and low voltage blind plates, a piece of steel plate is actually cut on site to be used as a blind plate, and the diameter and thickness of the blind plate are mostly selected based on experience. If the thickness of the steel plate is too thin, it will be insufficient in strength and will bulge and deform in the middle during the pressure increase process, and will cause leakage in an instant, causing quality or safety accidents, and it will be difficult to pull it out from between the flanges later. If the blind plate is too thick, the spacing between the flanges is not wide enough, and it will be difficult to insert it between the flanges. In addition, this is also a waste of materials. Whether the blind plate is too thick or too thin, both situations will bring inconvenience to the construction.
[0115] Since the blind plate is mainly subjected to bending stress, the allowable stress value adopts the allowable bending stress of the steel plate. After checking the maximum bending stress of the blind plate and the yield strength of the material, and after actual field test application, the formula is obtained as follows:
[0116]
[0117] t=Minimum thickness of blind plate for pressure test (mm)
[0118] K = Blind plate coefficient, for clip-on type, take 0.4
[0119] D = gasket inner diameter (approximately equal to pipeline outer diameter)
[0120] P = test pressure (MPa)
[0121] σ = allowable stress of blind plate material at test temperature (MPa), allowable stress is 113N / M 2 .
[0122] Test process
[0123] The test pressure of pipelines subject to internal pressure is 1.5 times the design pressure of the pipelines;
[0124] When the design temperature of the pipeline is higher than the test temperature, the test pressure shall comply with the following formula: Ps = 1.5δ1 / δ2. When δ1 / δ2>6.5, the value of 6.5 shall be taken;
[0125] When Ps produces stress exceeding the yield strength at the test temperature, the test pressure should be reduced to the highest test pressure when the pipeline pressure does not exceed the yield strength. The test pressure of the air pressure test pipeline is 1.15 times the design pressure;
[0126] When the pressure of the air pressure test pipeline is greater than 0.6MPa, it can only be carried out after being specified in the design documents or agreed by the owner and taking safety measures.
[0127] Before the hydraulic test, the multi-system joint pressure test device is first filled with water, and an exhaust valve is installed at the highest point of the pipeline to exhaust all the air.
[0128] Install the pressure gauge at the highest position and in a position that is easily observed on the ground. Measure the pressure based on the reading of the pressure gauge at the highest position. Then increase the pressure slowly. When the test pressure is reached, maintain the pressure steady for 10 minutes. After a comprehensive inspection, the test is qualified if there is no leakage and visual deformation.
[0129] During the air pressure strength test, the pressure should be increased slowly. When the pressure rises to 50% of the test pressure, and only after confirming that there is no leakage or abnormal phenomenon, the pressure can be increased step by step by 10% of the test pressure. Each level should maintain the pressure for 3 minutes until the test pressure is reached, and then maintain the pressure for 10 minutes before reducing the pressure to the design pressure. No leakage and visual deformation will be considered acceptable.
[0130] After the pipeline strength test is passed, the pipeline air tightness test should be carried out. The air tightness test uses liquid as the medium. After the pressure of the pipeline system is reduced to the pressure specified in the design documents, a comprehensive inspection is carried out using the direct observation method. No leakage is considered qualified.
[0131] For pipelines that are tested for strength by hydraulic pressure and for air tightness by pneumatic pressure, the test should be carried out after the pipelines have been purged and passed. The pressure should be increased slowly during the test, and an inspection should be carried out when the pressure rises to 50% of the test pressure. The pressure can be increased only after confirmation that there are no leaks or abnormalities. Thereafter, an inspection should be carried out every 10% of the test pressure until the test pressure is reached. A comprehensive inspection should then be carried out, and the pressure should be stabilized for 30 minutes. No leakage or pressure drop will be considered acceptable.
[0132] For pipelines that are tested for strength by air pressure, when the strength test is qualified, the test pressure is directly reduced to the pressure of the air tightness test, and the pressure is stabilized for 30 minutes. It is qualified if there is no leakage and no pressure drop. The inspection method adopts the method of brushing leak detection liquid on the weld, flange and seal.
[0133] Application of multi-system joint pressure test device
[0134] The application of multi-system joint pressure test device is to first put the pressure test medium into the pressure test water tank. One side of the water tank is connected to a special water pump for pressure test, and the other side is connected to the device body. A control valve, filter, pressure gauge, and flexible water pipe are set on the pipeline between the water tank and the water pump. A flexible hose, check valve, pressure gauge, and control valve are set between the special water pump for pressure test and the device body. During the pressure test, the pressure test medium is pressurized by the water pump and injected into the device body. The pressure gauges before and after the special pressure test pump can show the pressure change after pressurization. The special water pump for pressure test adopts pressure detection sensor and safety valve to realize the adjustable flow and pressure of pressure test medium. After reaching the set pressure, the water pump will automatically stop pressurizing.
[0135] Six branch systems are set on the device body (can be increased or decreased according to site conditions). Each branch system is equipped with a pressure gauge (corresponding needle valve), a pressure gauge, and a flow sensor. The end of the installation thread head is connected to the high-pressure metal hose thread. The other side of the high-pressure metal hose is connected to the system or pipeline to be pressure tested. The connection point is recommended to be at the lowest point of the system horizontal plane to facilitate the recovery of the pressure test medium. The device body is also equipped with its own emptying and drain valve. Before the pressure test, the pressure test medium should be slowly emptied when it is injected to prevent air from entering the pressure test system or pipeline. After the pressure test, the equipment should be emptied in time to prevent the pressure test medium from being left for too long and the impurities in it reacting with the air to corrode the equipment body. The other side of the equipment is connected to the water tank, and a combination valve (a combination of a stop valve and a check valve) is set on it to prevent the water in the water tank from flowing back to the equipment body.
[0136] During the pressure test, the pressure test medium is pumped into the device body by a special pressure test pump. The body then pumps the pressure test medium into the corresponding system and pipeline through each branch system and the terminal high-pressure metal hose. After the pressure test is completed, the pressure test medium in the pressure test system or pipeline will flow back to the device body through the high-pressure metal hose due to the pipeline's own pressure and gravity, and then flow back to the pressure test water tank through the reflux pipe, or enter the next system through the device body.
[0137] When a single pressure test system or pipeline is tested, the pressure test medium is directly pumped into the pressure test system or pipeline through the device body from the pressure test special pump end. After the pressure test is completed, it flows back to the pressure test water tank through the reflux pipe at the end of the device body to realize the recovery of the pressure test medium.
[0138] When multiple pressure test systems or pipelines with different pressure levels are pressure tested simultaneously, the pressure test medium enters different pressure test systems or pipelines through the branch system on the device body. During the initial water filling, the flow rate is increased and the head is reduced through the variable frequency technology of the special pressure test pump. After the water is filled, the pressure is increased layer by layer from low to high pressure levels. After the pressure is set for different systems, the corresponding branch system is closed to achieve simultaneous pressure testing of multiple pipelines and different pressure levels. During the pressure maintenance acceptance of one system or pipeline, the water filling or pressure boosting operation of the next system or pipeline will not be delayed.
[0139] For systems or pipelines with large differences in pressure levels, the system or pipeline with the higher pressure level can be pressure tested first. After the pressure test of the system or pipeline with the higher pressure level is completed, the side with the higher pressure level can be directly introduced into the side with the lower pressure level through the equipment body. If the specified test pressure cannot be reached, the pressure can be increased again through a professional pressure test pump.
[0140] During the pressure test, the pipelines are combed and the pressure test packages or pressure test systems are reasonably divided. The adjacent pipelines or systems with the same pressure level are subjected to a unified pressure test. The water consumption of each pressure test system or pipeline is calculated based on the diameters and lengths of the pipelines included in the combed pressure test system. For systems with larger diameters and longer pipelines, multiple high-pressure metal hoses can be connected to the device to supply water.
[0141] The device can be reasonably arranged according to different sites and environments to save site space. The finished product tanks on site can also be used as pressure test water tanks to reduce device costs.
[0142] Recovery and storage of test media
[0143] The application of multi-system joint pressure test device can use the on-site containers as test water tanks. Through multiple devices, multiple systems can be used for the situation where the capacity of some systems’ larger water tanks is insufficient. The pressure test medium can be slowly added during the pressure test.
[0144] The device can be reasonably arranged according to different sites and environments to save site space. The finished product tanks on site can also be used as pressure test water tanks to reduce device costs.
[0145] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit it. Although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present application.
Claims
1. A pipeline pressure test construction method, characterized in that: include: Use blind plates to isolate the pressure test system from the non-pressure test system, and connect the pressure test system to the multi-system combined pressure test device; Conduct strength test on pressure test system; Conduct rigorous testing on the test system; Drain and blow dry.
2. The pipeline pressure test construction method according to claim 1, characterized in that: The strength test described in the strength test on the pressure test system is an air pressure strength test; The strength test of the pressure test system includes: Apply air pressure to the pressure test system. When the pressure in the pressure test system rises to 50% of the test pressure, if there is no gas leakage in the pressure test system, continue to increase the pressure step by step by 10% of the test pressure, and maintain the pressure steady for 3 minutes at each level; when the pressure in the pressure test system rises to the test pressure, maintain the pressure steady for 10 minutes, and then reduce the pressure to the design pressure; if there is no gas leakage in the pressure test system, the strength of the pressure test system is qualified.
3. The pipeline pressure test construction method according to claim 1, characterized in that: The strength test described in the strength test on the pressure test system is a hydraulic strength test; the strength test on the pressure test system includes: Apply hydraulic pressure to the pressure test system. When the pressure in the pressure test system rises to 50% of the test pressure, if there is no liquid leakage, continue to increase the pressure and check it every 10% of the test pressure. When the pressure in the pressure test system rises to the test pressure, maintain the pressure for 30 minutes. If there is no liquid leakage in the pressure test system and the pressure in the pressure test system is maintained at the test pressure within the 30 minutes, the strength of the pressure test system is qualified.
4. The pipeline pressure test construction method according to claim 3 is characterized in that: Before the strength test of the pressure test system is performed, the method further includes: Water is injected into the pressure test system through the multi-system combined pressure test device, and the air is exhausted through the exhaust valve set at the highest point of the pressure test system.
5. The pipeline pressure test construction method according to claim 3, characterized in that: Before the strength test of the pressure test system is performed, the method further includes: Purge the pressure test system.
6. The pipeline pressure test construction method according to claim 1, characterized in that: The strength test of the pressure test system includes: The pressure test medium is delivered into the pressure test system through the pressure test pump in the multi-system combined pressure test device; Accordingly, after the strength test of the pressure test system is performed, the pipeline pressure test construction method further includes: Turn off the pressure test pump to allow the pressure test medium in the pressure test system to flow back to the multi-system combined pressure test device under the action of its own gravity.
7. The pipeline pressure test construction method according to claim 1, characterized in that: When applied to a single pressure test system, the strength test of the pressure test system includes: The pressure test medium is delivered into the pressure test system through the pressure test pump in the multi-system combined pressure test device; Accordingly, after the strength test of the pressure test system is performed, the pipeline pressure test construction method further includes: The pressure test pump is turned off to allow the pressure test medium in the pressure test system to flow back to the pressure test medium storage tank in the multi-system combined pressure test device.
8. The pipeline pressure test construction method according to claim 1, characterized in that: When applied to multiple pressure test systems at the same time, the strength test of the pressure test system includes: The pressure test medium is delivered to each pressure test system through the pressure test pump in the multi-system combined pressure test device; After filling each of the pressure test systems with water, gradually increase the pressure in each pressure test system. When the pressure in a pressure test system reaches the preset pressure, close the corresponding third control valve on the multi-system combined pressure test device. When the third control valves corresponding to all pressure test systems are closed, shut down the pressure test pump.
9. The pipeline pressure test construction method according to claim 1, characterized in that: When applied to two pressure test systems with a large difference in test pressure, the strength test of the pressure test system includes: Close the third control valve corresponding to the pressure test system with a smaller test pressure, and send the pressure test medium into the pressure test system with a larger test pressure through the pressure test pump in the multi-system combined pressure test device, so as to perform a strength test on the pressure test system with a larger test pressure; After completing the strength test of the pressure test system with a larger test pressure, open the third control valve corresponding to the pressure test system with a smaller test pressure to transport the pressure test medium in the pressure test system with a larger test pressure to the pressure test system with a smaller test pressure; If the pressure in the pressure test system with a smaller test pressure reaches the test pressure before all the pressure test medium in the pressure test system with a larger test pressure is transported to the pressure test system with a smaller test pressure, the third control valve corresponding to the pressure test system with a smaller test pressure is closed, and the strength test is performed on the pressure test system with a smaller test pressure; If the pressure in the pressure test system with smaller test pressure still does not reach the test pressure after all the pressure test medium in the pressure test system with larger test pressure is transported to the pressure test system with smaller test pressure, the third control valve corresponding to the pressure test system with larger test pressure is closed, and the pressure test medium is transported to the pressure test system with smaller test pressure through the pressure test pump in the multi-system combined pressure test device.
10. The pipeline pressure test construction method according to any one of claims 1 to 9, characterized in that: Before the blind plate is used to isolate the pressure test system from the non-pressure test system and connect the pressure test system to the multi-system combined pressure test device, the method further includes: selecting the thickness of the blind plate; The thickness of the blind plate is obtained by the following formula: in, T is the minimum thickness of the blind plate; K is the blind plate coefficient and is 0.4 for the clamp type; D is the inner diameter of the gasket; P is the test pressure; σ is the allowable stress of the blind plate material at the test temperature.