Existing masonry structure retaining wall mortar plumpness detection method

By using transparent PVC pipes and hoisting devices in the mortar fullness detection, the problems of detection hole collapse and artificial camera unstable operation are solved, and clear and comprehensive shooting effects are achieved, ensuring the accuracy and safety of the inspection.

CN118914184APending Publication Date: 2024-11-08GUIZHOU CONSTR SCI RES & DESIGN INST OF CSCEC
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411032680.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-30
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

In the existing mortar fullness detection method, the detection hole may collapse, and a human handheld camera is required to enter the detection hole, resulting in poor shooting effect.

Method used

The camera is protected by a transparent PVC tube, and the camera is placed evenly and smoothly in the drill hole through the hoisting device to prevent the hole collapse and the mortar from falling and affecting the shooting effect.

Benefits of technology

Ensure that the drilling does not collapse, the photos are taken clearly and comprehensive, and the accuracy and reliability of the inspection are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118914184A_ABST
    Figure CN118914184A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of wall building mortar plumpness detection, and particularly discloses an existing masonry structure retaining wall mortar plumpness detection method, which comprises eight steps of retaining wall detection point determination, hole drilling, parameter detection, hole cleaning, pipe placing, shooting, picture splicing, and identification and calculation, the transparent PVC pipe is placed in the drill hole, then the camera is placed in the transparent PVC pipe, the camera penetrates through the transparent PVC pipe and does not affect shooting of the interior of the drill hole, under the blocking of the transparent PVC pipe, hole collapse cannot occur in the drill hole, even if mortar flows down, under the blocking of the PVC pipe, the fallen mortar does not make contact with the camera, and the shooting effect cannot be affected; and the camera can be uniformly and stably placed in the PVC pipe through the hoisting device, so that a shot picture is clear and comprehensive.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of wall mortar fullness detection, and in particular to a method for detecting the fullness of mortar in a retaining wall of an existing masonry structure. Background Art

[0002] Mortar fullness refers to the effective bonding degree between mortar and brick in the mortar joints of brick masonry, expressed as the percentage of the contact area between brick and mortar and the effective bonding area of ​​mortar on the brick surface. Mortar fullness directly affects the overall stability of masonry structures. Filling brick joints with mortar can increase the overall stability of masonry, prevent loosening and misalignment between bricks, and thus avoid cracks and tilt damage in masonry. During the construction process, due to the influence of various factors (such as masonry methods, mortar workability, construction environment, etc.), the mortar fullness may be insufficient. By regularly measuring the mortar fullness, these problems can be discovered in time, and corresponding measures can be taken to rectify them to prevent the problems from expanding and ensure the quality and safety of masonry structures.

[0003] There are various existing methods for testing the fullness of mortar. For example, the Chinese invention patent with the publication number "CN108562593A" discloses a method for testing the fullness of steel sleeve grouting material. It mainly includes six steps: determine the location of the detection hole → drill → clean the detection hole → insert the endoscope camera into the detection hole and connect the camera to take a picture of the surface of the grouting material → analyze the captured picture of the grouting material and determine the fullness of the grouting material at the detection hole location → after determining that the fullness of the grouting material meets the standard, repair the detection hole and smooth the surface to complete the detection and analysis of the mortar fullness. This detection method has a defect. That is, when the endoscopic camera is sent into the detection hole, the detection hole may collapse, causing the endoscopic camera to be stuck in the hole, or mortar may flow out, affecting the shooting effect. Moreover, during the detection process, the endoscopic camera is sent into the detection hole by hand. The manual hand-held operation of the camera entering the detection hole makes the camera unstable and the speed of extending into the hole is uneven. The instability may make the photos unclear, and the uneven speed makes the shooting incomplete, and the pictures of all the slurry surfaces in the detection hole are not captured. Therefore, there is an urgent need for a method that can prevent the detection hole from collapsing and prevent the camera from being manually held into the detection hole. Summary of the invention

[0004] The purpose of the present invention is to provide a method for detecting the fullness of mortar in a retaining wall of an existing masonry structure, so as to solve the problems that a detection hole may collapse during the detection process of the existing detection method and a human hand-held camera is required to enter the detection hole.

[0005] In order to solve the above problems, the technical solutions provided are as follows:

[0006] A method for detecting the fullness of mortar in a retaining wall of an existing masonry structure comprises the following steps:

[0007] S1: Determine the detection point of the retaining wall: According to the shape and structure of the retaining wall, determine the location of the detection hole through precise measurement and layout;

[0008] S2: Drilling: The drilling machine is in place and drilling is carried out from top to bottom at the detection point of the retaining wall. The diameter of the drilled hole is 80-110mm;

[0009] S3: Testing parameters: Use drilling holes and core samples to test the compressive strength of retaining wall blocks, the buried depth of retaining walls, the bearing layer and other parameters to improve the accuracy of retaining wall testing data and the economy of testing;

[0010] S4: Hole cleaning: remove the drill bit and clean the concrete debris in the drill hole;

[0011] S5: Put the transparent PVC tube into the drill hole to protect it. The gap between the transparent PVC tube and the inner wall of the drill hole is 10-30mm.

[0012] S6: Shooting: Place the camera into a transparent PVC tube through a hoisting device, lower it from top to bottom in the transparent PVC tube at a constant speed and shoot;

[0013] S7: mosaic: stitching the captured images to obtain the in-hole histogram;

[0014] S8: Identify and calculate: Use the characteristic information of blocks and mortar to identify the size of the block area, mortar area, and vacant area in the image, and identify the percentage of the vacant area in the mortar area to obtain the mortar fullness.

[0015] The beneficial effects of the above technical solution are: a transparent PVC tube is placed in the drill hole, and the camera is then placed in the transparent PVC tube. The camera can pass through the transparent PVC tube without affecting the shooting of the inside of the drill hole. Under the resistance of the transparent PVC tube, the drill hole cannot collapse. Even if mortar flows, the PVC tube will not allow the flowing mortar to contact the camera and affect the shooting effect. The camera can be placed evenly and stably in the PVC tube through the lifting device, so that the photos taken are clear and comprehensive.

[0016] Preferred solution 1: As a further optimization of the basic solution, two slide rails are symmetrically arranged in the transparent PVC tube in step S5, and two sliders are symmetrically arranged on the periphery of the camera in step S6. When the camera is placed in the PVC tube, the two sliders are slidably connected to the two slide rails respectively. Through the cooperation between the slider and the slide rail, the camera is limited to not rotate during the lowering process, and can only be lowered vertically in the PVC tube, so as to avoid the deformation and unclearness of the captured picture caused by the rotation of the camera.

[0017] Preferred solution 2: As a further optimization of preferred solution 1, the hoisting device in step S6 includes a pull rope, a winch and a controller. The controller controls the rotating shaft on the winch to rotate at a uniform speed. The pull rope is rolled up on the winch. A placement table is arranged at the bottom of the winch. The placement table is arranged on the upper end surface of the drill hole. A through hole is provided in the center of the placement table for stretching and passing through. The extended end of the pull rope is bolted to the top of the camera. The camera is suspended by the pull rope, and the controller controls the rotating shaft of the winch to rotate at a uniform speed, so that the pull rope is extended at a uniform speed, and the camera can be lowered steadily at a uniform speed to achieve the best shooting effect.

[0018] Preferred solution three: As a further optimization of preferred solution two, three chains are arranged on the top of the camera in step S6, and the three chains are arranged in a triangular distribution. A pull ring is welded together at one end of the three chains away from the camera, and the pull rope is bolted to the pull ring. The three chains arranged in a triangular distribution are stable and can stably hang the camera, and the pull rope is bolted to the pull ring for easy removal of the pull rope.

[0019] Preferred solution 4: As a further optimization of preferred solution 3, in step S5, a baffle is sleeved on the outer periphery of the transparent PVC tube in an interference fit, the diameter of the baffle is larger than the diameter of the drill hole, and the baffle is placed on the upper end surface of the drill hole and under the placement table. The baffle that is interference fit with the outer periphery of the transparent PVC tube is placed on the upper end surface of the drill hole, which can stabilize the transparent PVC tube in the drill hole and prevent the transparent PVC tube from shaking during the shooting process, which affects the shooting effect.

[0020] Preferred solution 5: As a further optimization of preferred solution 4, in step S5, the outside of the transparent PVC tube is provided with scale lines, through which the depth of the drilling hole can be read.

[0021] Preferred solution six: As a further optimization of the basic solution, the transparent PVC tube of step S5 is sleeved with a sleeve on the outside, and the transparent PVC tube and the sleeve are placed in the borehole together. The bottom of the sleeve is provided with a flange extending outside the sleeve. Before performing the shooting in step S6, the sleeve needs to be taken out of the borehole first. The flange at the bottom of the sleeve will also clean the inner wall of the borehole once, and the cleaned mortar will fall onto the flange. The sleeve is placed into the borehole together with the transparent PVC tube. The sleeve can protect the transparent PVC tube from being scratched by the sand and gravel on the inner wall of the borehole when entering the borehole, thereby ensuring the transparency of the transparent PVC tube and avoiding unclear shooting in the later stage. When the sleeve is taken out, the flange at the bottom can also clean the borehole again, and the cleaned sand and gravel are taken out of the borehole by the flange at the same time, and will not scratch the transparent PVC tube. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is a structural schematic diagram of an embodiment of the present invention;

[0023] Figure 2for Figure 1 A schematic diagram of the structure enlargement in the middle;

[0024] Figure 3 It is a schematic diagram of the structure in which the transparent PVC tube and the casing are placed together in the drill hole;

[0025] Figure 4 for Figure 3 Enlarged schematic diagram of the structure at point B in the middle.

[0026] The reference numerals in the drawings of the specification include: retaining wall 1, drill hole 2, transparent PVC pipe 3, slide rail 4, camera 5, slider 6, pull rope 7, winch 8, placement table 9, chain 10, pull ring 11, baffle 12, sleeve 13, flange 14. DETAILED DESCRIPTION

[0027] The following is further described in detail through specific implementation methods:

[0028] The embodiment is basically as shown in the attached Figure 1-2 As shown:

[0029] A device for detecting the fullness of mortar in a retaining wall of an existing masonry structure, such as Figure 1 As shown, it includes a transparent PVC tube 3 placed in the borehole 2, such as Figure 3 As shown, the outer side of the transparent PVC tube 3 is sleeved with a sleeve 13, as shown in FIG. Figure 4 As shown, the bottom end of the casing 13 is provided with a flange 14 extending out of the casing 13, and the height of the casing 13 is higher than the height of the drilled hole.

[0030] like Figure 2 As shown, two slide rails 4 are symmetrically arranged in the transparent PVC tube 3, a camera 5 is placed in the transparent PVC tube 3, and two sliders 6 are symmetrically arranged on the periphery of the camera 5. When the camera 5 is placed in the transparent PVC tube 3, the two sliders 6 are respectively slidably connected in the two slide rails 4. A hoisting device is arranged at the top of the camera 5, and the hoisting device includes a pull rope 7, a hoisting machine 8 and a controller. The controller controls the rotating shaft on the hoisting machine 8 to rotate at a uniform speed. The pull rope 7 is wound on the hoisting machine 8. A placing table 9 is arranged at the bottom of the hoisting machine 8. The placing table 9 is arranged on the upper end surface of the drill hole 2. A through hole is opened in the center of the placing table 9 for the pull rope to pass through. Three chains 10 are arranged at the top of the camera 5. The three chains 10 are distributed in a triangle. A pull ring 11 is welded together at one end of the three chains 10 away from the camera 5, and the pull rope 7 is bolted to the pull ring 11. The outer periphery of the transparent PVC tube 3 is sleeved with a baffle 12 with an interference fit, the diameter of the baffle 12 is larger than the diameter of the borehole 2, and the baffle 12 is placed on the upper end surface of the borehole 2 and under the placement table 9. The outer side of the transparent PVC tube 3 is provided with a scale line, and the gap between the transparent PVC tube and the inner wall of the borehole is 20mm.

[0031] A method for detecting the fullness of mortar in existing masonry structure retaining wall.

[0032] The specific implementation process is as follows, including the following steps:

[0033] S1: Determine the detection point of the retaining wall: According to the shape and structure of the retaining wall, determine the location of the detection hole through precise measurement and layout;

[0034] S2: Drilling: The drilling machine is in place and drilling is performed from top to bottom at the detection point of the retaining wall. The diameter of the drilled hole is 100 mm;

[0035] S3: Testing parameters: Use drilling holes and core samples to test the compressive strength of retaining wall blocks, the buried depth of retaining walls, the bearing layer and other parameters to improve the accuracy of retaining wall testing data and the economy of testing;

[0036] S4: Hole cleaning: remove the drill bit and clean the concrete debris in the drill hole;

[0037] S5: Put the tube: Put the transparent PVC tube and the casing together into the borehole. The casing protects the transparent PVC tube from being scratched by the sand and gravel on the inner wall of the borehole when entering the borehole, ensuring the transparency of the transparent PVC tube. The flange contacts the inner wall of the borehole, so that the gap between the transparent PVC tube and the inner wall of the borehole is always maintained at about 20 mm. In the subsequent shooting process, the transparent PVC tube protects the borehole to prevent the borehole from collapsing. Then the casing is pulled out of the borehole. The flange of the casing can clean the borehole again. The cleaned sand and gravel fall on the flange and are taken out of the borehole by the flange. The baffle is placed on the upper end surface of the borehole to prevent the PVC tube from shaking in the borehole and touching the inner wall of the borehole and being scratched.

[0038] S6: Shooting: first, place the placement table carrying the winch and the pull rope on the upper end surface of the drill hole, then connect the pull rope pulled out from the winch with the pull ring bolt on the upper end of the camera, then put the camera into the transparent PVC tube, and make the two sliders on the outer periphery of the camera slide and connect to the two slide rails respectively, and control the operation of the winch through the controller, so as to control the uniform extension of the pull rope, so that the camera is lowered from top to bottom in the transparent PVC tube at a uniform speed and shoots;

[0039] S7: mosaic: stitching the captured images to obtain the in-hole histogram;

[0040] S8: Identify and calculate: Use the characteristic information of blocks and mortar to identify the size of the block area, mortar area, and vacant area in the image, and identify the percentage of the vacant area in the mortar area to obtain the mortar fullness.

[0041] In the above measurement method, a transparent PVC tube is placed in the borehole, and the camera is then placed in the transparent PVC tube. The camera can pass through the transparent PVC tube without affecting the shooting of the inside of the borehole. Under the resistance of the transparent PVC tube, the borehole cannot collapse. Even if mortar flows, the PVC tube will not allow the flowing mortar to contact the camera and affect the shooting effect. The camera can be placed evenly and stably in the PVC tube through a lifting device, so that the photos taken are clear and comprehensive.

[0042] The above is only an embodiment of the present invention, and the common knowledge such as the known specific structure and characteristics in the scheme is not described in detail here. It should be pointed out that for those skilled in the art, several deformations and improvements can be made without departing from the structure of the present invention, which should also be regarded as the protection scope of the present invention, and these will not affect the effect of the implementation of the present invention and the practicality of the patent. The scope of protection required by this application shall be based on the content of its claims, and the specific implementation methods and other records in the specification can be used to interpret the content of the claims.

Claims

1. A method for detecting the fullness of mortar in an existing masonry structure retaining wall, characterized in that: The following steps are involved: S1: Determine the detection point of the retaining wall: According to the shape and structure of the retaining wall, determine the location of the detection hole through precise measurement and layout; S2: Drilling: The drilling machine is in place and drilling is carried out from top to bottom at the detection point of the retaining wall. The diameter of the drilled hole is 80-110mm; S3: Testing parameters: Use drilling holes and core samples to test the compressive strength of retaining wall blocks, the buried depth of retaining walls, the bearing layer and other parameters to improve the accuracy of retaining wall testing data and the economy of testing; S4: Hole cleaning: remove the drill bit and clean the concrete debris in the drill hole; S5: Put the transparent PVC tube into the drill hole to protect it. The gap between the transparent PVC tube and the inner wall of the drill hole is 10-20mm. S6: Shooting: Place the camera into a transparent PVC tube through a hoisting device, lower it from top to bottom in the transparent PVC tube at a constant speed and shoot; S7: mosaic: stitching the captured images to obtain the in-hole histogram; S8: Identify and calculate: Use the characteristic information of blocks and mortar to identify the size of the block area, mortar area, and vacant area in the image, and identify the percentage of the vacant area in the mortar area to obtain the mortar fullness.

2. The method for detecting the mortar fullness of an existing masonry structure retaining wall according to claim 1, characterized in that: In step S5, two slide rails are symmetrically arranged in the transparent PVC tube, and in step S6, two sliders are symmetrically arranged on the periphery of the camera. When the camera is placed in the PVC tube, the two sliders are slidably connected in the two slide rails respectively.

3. A method for detecting the mortar fullness of an existing masonry structure retaining wall according to claim 2, characterized in that: The hoisting device in step S6 includes a pull rope, a winch and a controller. The controller controls the rotating shaft on the winch to rotate at a uniform speed. The pull rope is wound on the winch. A placing table is arranged at the bottom of the winch. The placing table is arranged on the upper end surface of the drilled hole. A through hole is opened in the center of the placing table for stretching. The protruding end of the pull rope is bolted to the top of the camera.

4. The method for detecting the mortar fullness of an existing masonry structure retaining wall according to claim 3, characterized in that: In the step S6, three chains are arranged on the top of the camera, and the three chains are distributed in a triangle. A pull ring is welded together at one end of the three chains away from the camera, and the pull rope is bolted to the pull ring.

5. The method for detecting the mortar fullness of an existing masonry structure retaining wall according to claim 4, characterized in that: In step S5, a baffle is sleeved on the outer circumference of the transparent PVC tube in an interference fit, the diameter of the baffle is larger than the diameter of the drilled hole, and the baffle is placed on the upper end surface of the drilled hole and under the placement table.

6. A method for detecting the mortar fullness of an existing masonry structure retaining wall according to claim 5, characterized in that: In step S5, scale marks are provided on the outside of the transparent PVC tube.

7. The method for detecting the mortar fullness of an existing masonry structure retaining wall according to claim 1, characterized in that: The transparent PVC tube in step S5 is sleeved on the outside with a sleeve, and the transparent PVC tube and the sleeve are placed in the drill hole together. The bottom end of the sleeve is provided with a flange extending out of the sleeve. Before shooting in step S6, the sleeve needs to be taken out of the drill hole first. The flange at the bottom end of the sleeve will also clean the inner wall of the drill hole once, and the cleaned mortar will fall onto the flange.