Thermal power plant boiler fuel quantity instruction self-adaptive given method, system, equipment and medium

Through the adaptive adjustment of the boiler fuel quantity instruction, the operational instability of thermal power units caused by changes in coal quality in traditional methods is solved, and higher operating stability and economic benefits are achieved.

CN118915453APending Publication Date: 2024-11-08陕西君创智盈能源科技有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410967756.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-18
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

When the fuel quantity command of traditional thermal power sets is applicable to different coal quality inlets, the thermal power sets operating stability becomes poor and the main steam pressure and temperature fluctuate greatly.

Method used

Adaptively given method of boiler fuel quantity instruction for thermal power plant, by judging the working conditions based on the current operating data of the unit, adaptively finding the best load-coal quantity relationship, and calculating the appropriate coal quantity instruction, including the automatic working condition determination module , adaptive optimization module and coal quantity command output module, use technical means such as first-order inertial filtering and logic judgment module to dynamically adjust coal quantity commands.

Benefits of technology

It improves the adaptability of thermal power units to coal types changes, improves operating stability and economic benefits, and ensures the safe and economic operation of the units.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure BDA0004952227590000011
    Figure BDA0004952227590000011
  • Figure BDA0004952227590000221
    Figure BDA0004952227590000221
  • Figure HDA0004952227600000011
    Figure HDA0004952227600000011
Patent Text Reader

Abstract

The invention provides a thermal power plant boiler fuel quantity instruction self-adaptive given method, system, equipment and medium, and the method comprises the following steps: step 1, judging the current operation condition of a unit according to the current operation data of the unit, and entering step 2 when the operation condition of the unit is a steady state; step 2, adaptively searching an optimal load-coal quantity relationship according to the historical operation data of the unit to obtain an optimized load-coal quantity relationship; 3, according to the unit load instruction, the optimization load-coal quantity relation and the like, a proper coal quantity instruction is obtained through calculation; according to the method, the obtained coal quantity instruction can better reflect the actual load-coal quantity function of the unit, and the safe and economical operation of the coal blending combustion fire motor unit can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of thermal power plants, and in particular relates to a method, system, equipment and medium for adaptively giving a fuel quantity instruction for a boiler in a thermal power plant. Background Art

[0002] The coal supply quantity instruction of the boiler of a traditional thermal power unit is determined by the broken line function corresponding to the unit load instruction. For example, the load corresponding coal supply quantity instruction function of a 660MW ultra-supercritical unit is shown in Table 1 below.

[0003] Table 1 Load-coal quantity broken line function

[0004]

[0005] In Table 1, the load command is determined by the dispatching center of the power grid company, which sends the load command to the thermal power unit. After the unit receives the load command, the boiler coal quantity is determined by the function in Table 1, thereby performing the load change process. The boiler coal quantity command is mainly determined by Table 1. In addition, the boiler PID controller makes a small correction to the fuel quantity based on the main steam pressure deviation of the unit.

[0006] The traditional coal quantity instruction scheme determines the boiler coal input by the load-coal quantity instruction, which can effectively achieve the normal operation of the boiler when the unit input coal is the designed coal type. In recent years, the price of thermal coal has been rising. In order to improve economic benefits, thermal power units generally adopt the "coal blending" method to blend different calorific coal types to reduce fuel costs. Because the quality of coal entering the furnace is unstable, the coal type (calorific value requirement) corresponding to different load instructions is no longer a fixed value, and the load-coal fixed broken line relationship set in Table 1 is no longer applicable, which leads to poor operating stability of thermal power units, and large fluctuations in main steam pressure and main steam temperature. Summary of the invention

[0007] The purpose of the present invention is to provide a method for adaptively setting a fuel quantity instruction for a thermal power plant boiler, which solves the defect that the operating stability of the thermal power unit deteriorates when the existing thermal power plant boiler fuel quantity instruction is applied to different coal qualities entering the furnace.

[0008] In order to achieve the above object, the technical solution adopted by the present invention is:

[0009] The present invention provides a method for adaptively setting a fuel quantity instruction for a thermal power plant boiler, comprising the following steps:

[0010] Step 1, judging the current operating condition of the unit according to the current operating data of the unit, wherein when the operating condition of the unit is steady state, proceeding to step 2;

[0011] Step 2, adaptively searching for the best load-coal quantity relationship according to the historical operation data of the unit, and obtaining the optimal load-coal quantity relationship;

[0012] Step 3, calculate and obtain the appropriate coal quantity instruction according to the unit load instruction and the optimal load-coal quantity relationship.

[0013] Preferably, in step 1, the current operating condition of the unit is determined according to the current operating data of the unit, and the specific method is:

[0014] S11, respectively obtaining the unit desuperheating water flow rate, the actual value of the unit boiler main steam pressure, the unit load and the unit boiler coal quantity;

[0015] S12, judging whether the unit desuperheating water flow rate, the actual value of the unit boiler main steam pressure, the unit load and the unit boiler coal quantity meet the conditions. When the unit desuperheating water flow rate, the actual value of the unit boiler main steam pressure, the unit load and the unit boiler coal quantity all meet the conditions, the unit is in a steady state, wherein the unit desuperheating water flow rate, the actual value of the unit boiler main steam pressure, the unit load and the unit boiler coal quantity meet the conditions respectively:

[0016] The cooling water flow of the unit is subjected to first-order inertial filtering, and the cooling water flow after filtering is compared with the set value. When the cooling water flow after filtering is less than the set value and the set time is delayed;

[0017] The absolute value of the deviation between the set value of the main steam pressure of the computer unit boiler and the actual value of the main steam pressure. When the absolute value of the deviation is less than the set value and the set time is delayed;

[0018] The absolute value of the deviation between the load of the computer group and its load after first-order inertial filtering. When the absolute value of the deviation is less than the set value and the set time is delayed;

[0019] The absolute value of the deviation between the computer group's boiler coal quantity and the boiler coal quantity after the first-order inertial filtering. When the absolute value of the deviation is less than the set value and the set time is delayed.

[0020] Preferably, in step 2, the optimal load-coal quantity relationship is adaptively found according to the historical operation data of the unit to obtain the optimal load-coal quantity relationship. The specific method is:

[0021] The coal power ratio coefficient is calculated using the unit boiler coal quantity and unit load after the unit enters steady state;

[0022] The average value of the coal power ratio during the steady state period is calculated by obtaining the coal power ratio coefficient accumulated during the steady state period of the unit and the number of the coal power ratio coefficients;

[0023] According to the set pulse time and pulse number, the final coal power ratio coefficient corresponding to the unit load during the steady state period is determined, and the optimal load-coal quantity relationship is obtained.

[0024] A thermal power plant boiler fuel quantity command adaptive setting system, comprising:

[0025] The automatic operating condition determination module is used to determine the current operating condition of the unit based on the current operating data of the unit;

[0026] The adaptive optimization module is used to adaptively find the best load-coal quantity relationship according to the historical operation data of the unit to obtain the optimal load-coal quantity relationship;

[0027] The coal quantity instruction output module is used to calculate the appropriate coal quantity instruction based on the unit load instruction and the optimal load-coal quantity relationship.

[0028] Preferably, the working condition automatic determination module includes a first first-order inertia module HSFOP, a second first-order inertia module HSFOP, a third first-order inertia module HSFOP, a first judgment module LT, a second judgment module LT, a third judgment module LT, a fourth judgment module LT, a first delay module TON, a second delay module TON, a third delay module TON, a fourth delay module TON, a first subtraction module SUB, a second subtraction module SUB, a third subtraction module SUB, a first absolute value module ABS, a second absolute value module ABS, a third absolute value module ABS and an AND module, wherein:

[0029] The input value of the input end of the first first-order inertia module HSFOP is the cooling water flow rate, the output end of the first first-order inertia module HSFOP is connected to the first pin of the first judgment module LT, the second pin of the first judgment module LT is the set value B1, the output end of the first judgment module LT is connected to the input end of the first delay model TON, and the output end of the first delay module TON is connected to the first pin of the AND module;

[0030] The first pin input value of the first subtraction module SUB is the set value SP of the main steam pressure of the unit boiler, the second pin of the first subtraction module SUB is input to the actual value PV of the main steam pressure, the output end of the first subtraction module is connected to the input end of the first absolute value ABS, the output end of the first absolute value ABS is connected to the first pin of the second judgment module LT, the second pin of the second judgment module LT is the set value B2, the output end of the second judgment module LT is connected to the input end of the second delay module TON, and the output end of the second delay module TON is connected to the second pin of the AND module;

[0031] The input end of the second first-order inertia module HSFOP is input as the unit load, the output end of the second first-order inertia module HSFOP is connected to the second pin of the second subtraction module SUB, the first pin of the second subtraction module SUB is input as the unit load, the output end of the second subtraction module SUB is connected to the input end of the second absolute value ABS, the output end of the second absolute value ABS is connected to the first pin of the third judgment module LT, the second pin of the third judgment module LT is the set value B3, the output end of the third judgment module LT is connected to the input end of the third delay module TON, and the output end of the third delay module TON is connected to the AND module;

[0032] The input end of the third first-order inertia module HSFOP is input to the unit boiler coal amount, the output end of the third first-order inertia module HSFOP is connected to the second pin of the third subtraction module SUB, the first pin of the third subtraction module SUB is the unit boiler coal amount, the output end of the third subtraction module is connected to the input end of the third absolute value module ABS, the output end of the third absolute value module ABS is connected to the first pin of the fourth judgment module LT, the second pin of the fourth judgment module LT is the set value B4, the output end of the fourth judgment module LT is connected to the input end of the fourth delay module TON, and the output end of the fourth delay module TON is connected to the AND module.

[0033] Preferably, the adaptive optimization module includes a first logic judgment module GT, a second logic judgment module GT, a second AND module, a third AND module, a fifth delay module TON, a sixth delay module TON, a seventh delay module TON, a first pulse module TP, a second pulse module TP, a third pulse module TP, a first selection module SEL, a second selection module SEL, a third selection module SEL, a fourth selection module SEL, a fifth selection module SEL and a rate limiting module HSLIM_RATE, wherein:

[0034] The first pin input value of the first logic judgment module GT is the unit load, the second pin of the first logic judgment module GT is the set value A2, the output end of the first logic judgment module GT is connected to the second pin of the second AND module, and the first pin input value of the second AND module is the output value of the automatic working condition determination module; the output end of the second AND module is connected to the input end of the fifth delay module TON, and the output end of the fifth delay module is divided into three paths, one path is connected to the first pin of the fifth selection module SEL, the second path is connected to the input end of the first pulse module TP, and the third path is connected to the first pin of the third AND module. The output end of the third AND module is connected to the first pin of the second selection module SEL through the second pulse module TP, the seventh delay module TON and the third pulse module TP in sequence;

[0035] The second pin of the third AND module is connected to the output end of the sixth delay module TON, the input end of the sixth delay module TON is connected to the output end of the negation module NOT, the input end of the negation module NOT is connected to the output end of the delay disconnection module TOF, and the input end of the delay disconnection module TOF is connected to the output end of the second pulse module TP;

[0036] The output end of the second pulse module TP is also connected to the first pin of the first selection module SEL, the second pin of the first selection module SEL is connected to its output end, the third pin of the first selection module SEL is connected to the output end of the first division module DIV, the first pin input value of the first division module DIV is the coal amount of the unit boiler, and the second pin input value of the first division module DIV is the unit load;

[0037] The output end of the first selection module SEL is also connected to the second pin of the first addition module ADD, the first pin of the first addition module ADD is connected to the output end of the second selection module SEL, the output end of the first addition module ADD is connected to the third pin of the second selection module SEL, the second pin of the second selection module SEL is connected to the output end of the third selection module SEL, and the output end of the second selection module SEL is respectively connected to the second pin of the third selection module SEL and the first pin of the second division module DIV.

[0038] The third pin input value of the third selection module SEL is 0;

[0039] The first pin input value of the fourth subtraction module SUB is the coal power coefficient, and the second pin thereof is connected to the output end of the fifth selection module SEL; the output end of the fourth subtraction module SUB is connected to the input end of the second absolute value ABS, the output end of the second absolute value ABS is connected to the first pin of the fifth judgment module LT, the second pin input value of the fifth judgment module LT is 0.001, the output end of the fifth judgment module LT is connected to the second pin of the accumulation module DCSSUM, the first pin of the accumulation module DCSSUM is connected to the output end of the second pulse module TP, the output end of the accumulation module DCSSUM is respectively connected to the second pin of the second division module DIV and the first pin of the second logic judgment module GT, and the second pin of the second logic judgment module GT is the set value A2;

[0040] The output end of the second division module DIV is connected to the second pin of the fifth selection module SEL, the third pin of the fifth selection module SEL is connected to the output end of the fifth selection module SEL, and the output end of the fifth selection module SEL is connected to the first pin of the rate limiting module HSLIM_RATE;

[0041] The output end of the second logic judgment module GT is connected to the first pin of the fourth selection module SEL, the second pin of the fourth selection module SEL is 0, the third pin of the fourth selection module SEL is connected to the output end of the function module FX, and the input value of the input end of the function module FX is the unit load;

[0042] The output end of the fourth selection module SEL is connected to the second pin of the rate limiting module HSLIM_RATE, and the output value of the output end of the rate limiting module HSLIM_RATE is the coal power coefficient.

[0043] Preferably, the coal quantity instruction output module includes a fifth subtraction module SUB, a sixth subtraction module SUB, a seventh subtraction module SUB, a sixth selection module SEL, a third division module DIV, a second addition module ADD, a first multiplication module MUL and a second multiplication module MUL, wherein:

[0044] The first pin input value of the fifth subtraction module is the unit load instruction, the second pin input value is the deep peak load lower limit, and the output end of the fifth subtraction module SUB is connected to the first pin of the third division module DIV;

[0045] The first pin of the sixth selection module SEL is connected to the unit operating condition automatic determination module, the second pin thereof is connected to its output end, and the third pin input value is the unit load; the output end of the sixth selection module SEL is connected to the first pin of the sixth subtraction module SUB, the second pin input value of the sixth subtraction module SUB is the lower limit of the deep peak load, and the output end of the sixth subtraction module SUB is connected to the second pin of the third division module DIV;

[0046] The output end of the third division module DIV is connected to the first pin of the first multiplication module MUL;

[0047] The first pin input value of the seventh subtraction module SUB is the optimal coal power ratio, and the second pin input value is the lower limit coal power ratio of deep peak load. The output end of the seventh subtraction module SUB is connected to the second pin of the first multiplication module MUL, the output end of the first multiplication module MUL is connected to the first pin of the second addition module ADD, the second pin input value of the second addition module ADD is the lower limit coal power ratio of deep peak load, the output end of the second addition module ADD is connected to the second pin of the second multiplication module MUL, the first pin input value of the second multiplication module MUL is the unit load instruction, and the output end of the second multiplication module MUL outputs the coal quantity instruction.

[0048] A computer device comprising:

[0049] a processor suitable for executing a computer program;

[0050] A computer-readable storage medium stores a computer program, and when the computer program is executed by the processor, the method described is performed.

[0051] A computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the method described above is implemented.

[0052] A computer program product comprises a computer program, wherein the computer program implements the method when executed by a processor.

[0053] Compared with the prior art, the present invention has the following beneficial effects:

[0054] The present invention provides a method for adaptively setting a fuel quantity instruction for a thermal power plant boiler. Compared with the traditional control scheme that sets a fixed load-coal quantity instruction function, the method is more flexible. According to the operating state of the unit, the steady-state load-coal quantity relationship can be automatically and cyclically recorded to obtain the optimal coal power ratio coefficient, and finally the boiler coal quantity instruction is calculated according to the unit target load, coal power ratio coefficient, unit load lower limit, etc. The coal quantity instruction obtained by the method can better reflect the actual load-coal quantity function of the unit, which is helpful to improve the safe and economical operation of the coal-blended thermal power unit. BRIEF DESCRIPTION OF THE DRAWINGS

[0055] Figure 1 It is a structural diagram of the automatic working condition determination module;

[0056] Figure 2 It is a structural diagram of the adaptive optimization module;

[0057] Figure 3 This is a structural diagram of the coal quantity instruction output module;

[0058] Figure 4 It is a schematic diagram of the process of the present invention. DETAILED DESCRIPTION

[0059] In the following description, specific details such as specific system structures, technologies, etc. are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present application. However, it should be clear to those skilled in the art that the present application may also be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to prevent unnecessary details from obstructing the description of the present application.

[0060] It should be understood that when used in the present specification and the appended claims, the term "comprising" indicates the presence of described features, wholes, steps, operations, elements and / or components, but does not exclude the presence or addition of one or more other features, wholes, steps, operations, elements, components and / or combinations thereof.

[0061] It should also be understood that the term “and / or” used in the specification and appended claims refers to any and all possible combinations of one or more of the associated listed items, and includes these combinations.

[0062] As used in the specification and appended claims of this application, the term "if" can be interpreted as "when" or "uponce" or "in response to determining" or "in response to detecting", depending on the context. Similarly, the phrase "if it is determined" or "if [described condition or event] is detected" can be interpreted as meaning "uponce it is determined" or "in response to determining" or "uponce [described condition or event] is detected" or "in response to detecting [described condition or event]", depending on the context.

[0063] In addition, in the description of the present application specification and the appended claims, the terms "first", "second", "third", etc. are only used to distinguish the descriptions and cannot be understood as indicating or implying relative importance.

[0064] References to "one embodiment" or "some embodiments" etc. described in the specification of this application mean that one or more embodiments of the present application include specific features, structures or characteristics described in conjunction with the embodiment. Therefore, the statements "in one embodiment", "in some embodiments", "in some other embodiments", "in some other embodiments", etc. that appear in different places in this specification do not necessarily refer to the same embodiment, but mean "one or more but not all embodiments", unless otherwise specifically emphasized in other ways. The terms "including", "comprising", "having" and their variations all mean "including but not limited to", unless otherwise specifically emphasized in other ways.

[0065] Example 1

[0066] like Figure 4 As shown, this embodiment provides a method for adaptively setting a fuel quantity instruction for a thermal power plant boiler, comprising the following steps:

[0067] Step 1, judging the current operating condition of the unit according to the current operating data of the unit, wherein when the operating condition of the unit is steady state, proceeding to step 2;

[0068] Step 2, adaptively searching for the best load-coal quantity relationship according to the historical operation data of the unit, and obtaining the optimal load-coal quantity relationship;

[0069] Step 3, calculate and obtain the appropriate coal quantity instruction according to the unit load instruction and the optimal load-coal quantity relationship.

[0070] Example 2

[0071] This embodiment proposes a thermal power plant boiler fuel quantity command adaptive setting system, which can automatically mine the load-coal quantity relationship according to the historical operation data of the unit, and then adaptively give the corresponding coal quantity command according to the unit target load command, breaking the limitation of the load-coal quantity fixed broken line function in Table 1, and effectively improving the adaptability of the boiler to the change of coal type, and specifically includes the following modules:

[0072] Automatic unit operating condition determination module: determines the unit operating condition based on unit load, main steam pressure deviation, coal quantity, etc.

[0073] Adaptive optimization module: Adaptively find the optimal load-coal quantity relationship based on historical operating data.

[0074] Coal quantity instruction output module: calculates the appropriate coal quantity instruction based on the unit load instruction, optimizes the load-coal quantity relationship, etc.

[0075] Example 3

[0076] Based on Example 1, this embodiment provides a method for adaptively giving a fuel quantity instruction for a thermal power plant boiler, wherein the automatic operating condition determination module is used to determine the unit operating condition based on parameters such as unit load, coal quantity, feed water flow, main steam pressure deviation, and cooling water flow.

[0077] Specific as Figure 1 As shown, it includes a first first-order inertia module HSFOP, a second first-order inertia module HSFOP, a third first-order inertia module HSFOP, a first judgment module LT, a second judgment module LT, a third judgment module LT, a fourth judgment module LT, a first delay module TON, a second delay module TON, a third delay module TON, a fourth delay module TON, a first subtraction module SUB, a second subtraction module SUB, a third subtraction module SUB, a first absolute value module ABS, a second absolute value module ABS, a third absolute value module ABS and an AND module, wherein:

[0078] The input value of the input end of the first first-order inertia module HSFOP is the cooling water flow rate, the output end of the first first-order inertia module HSFOP is connected to the first pin of the first judgment module LT, the second pin of the first judgment module LT is the set value B1, the output end of the first judgment module LT is connected to the input end of the first delay model TON, and the output end of the first delay module TON is connected to the first pin of the AND module.

[0079] The cooling water flow of the unit is filtered by the first-order inertia module HSFOP, wherein the lag time of the first-order inertia module HSFOP is set to 10s. The cooling water flow after filtering and the set value B1 are judged in the first judgment module. When the cooling water flow after filtering is less than the set value B1, it is delayed for 60s.

[0080] In this embodiment, the setting value B1 is 30t / h.

[0081] The first pin input value of the first subtraction module SUB is the main steam pressure setting value SP of the unit boiler, the second pin input of the first subtraction module SUB is the main steam pressure actual value PV, the output end of the first subtraction module is connected to the input end of the first absolute value ABS, the output end of the first absolute value ABS is connected to the first pin of the second judgment module LT, the second pin of the second judgment module LT is the setting value B2, the output end of the second judgment module LT is connected to the input end of the second delay module TON, and the output end of the second delay module TON is connected to the second pin of the AND module.

[0082] When the absolute value of the deviation between the set value SP of the main steam pressure of the unit boiler and the actual value PV of the main steam pressure is less than the set value B2, the delay is 60s.

[0083] In this embodiment, the set value B2 is 0.5 MPa.

[0084] The input end of the second first-order inertia module HSFOP is input as the unit load, the output end of the second first-order inertia module HSFOP is connected to the second pin of the second subtraction module SUB, the first pin input value of the second subtraction module SUB is the unit load, the output end of the second subtraction module SUB is connected to the input end of the second absolute value ABS, the output end of the second absolute value ABS is connected to the first pin of the third judgment module LT, the second pin of the third judgment module LT is the set value B3, the output end of the third judgment module LT is connected to the input end of the third delay module TON, and the output end of the third delay module TON is connected to the AND module.

[0085] When the absolute value of the unit load minus the value after first-order inertia filtering is less than the set value B3, a delay of 60 seconds is applied.

[0086] In this embodiment, the set value B3 is 3MW; the lag time of the second first-order inertial module HSFOP is set to 60s.

[0087] The input end of the third first-order inertia module HSFOP is input to the unit boiler coal amount, the output end of the third first-order inertia module HSFOP is connected to the second pin of the third subtraction module SUB, the first pin of the third subtraction module SUB is the unit boiler coal amount, the output end of the third subtraction module is connected to the input end of the third absolute value module ABS, the output end of the third absolute value module ABS is connected to the first pin of the fourth judgment module LT, the second pin of the fourth judgment module LT is the set value B4, the output end of the fourth judgment module LT is connected to the input end of the fourth delay module TON, and the output end of the fourth delay module TON is connected to the AND module.

[0088] When the absolute value of the unit boiler coal quantity minus its first-order inertia filtering value (HSFOP, time set to 60s) is less than the set value B4, a delay of 60s is performed.

[0089] In this embodiment, the setting value B4 is 5 t / h; the lag time of the third first-order inertial module HSFOP is set to 60 s.

[0090] The working principle of this embodiment:

[0091] If the unit meets the following four conditions, it is judged that the unit is in steady state. At this time, all the operating parameters of the unit are relatively stable, and the coal power ratio coefficient of the unit can reflect the actual coal quality of the boiler, and enter the adaptive optimization module:

[0092] (1) After the first-order inertial filter, the cooling water flow is less than the set value of 30t / h and delayed by 60s;

[0093] (2) The absolute value of the deviation between the set value SP of the unit boiler main steam pressure and the actual value PV of the main steam pressure is less than the set value by 0.5 MPa and the delay is 60 seconds;

[0094] (3) The absolute value of the unit load minus its first-order inertia filter value is less than the set value of 3MW and the delay is 60s;

[0095] (4) The absolute value of the unit boiler coal quantity minus its first-order inertia filtering value is less than the set value of 5t / h and is delayed by 60s.

[0096] Example 4

[0097] Based on Example 1, this example provides a method for adaptively setting a fuel quantity instruction for a thermal power plant boiler. The adaptive optimization module is used to cyclically record the appropriate power-coal coefficient of the unit during the steady-state load period of the unit. The design strategy is as follows: Figure 2 As shown, including:

[0098] A first logic judgment module GT, a second logic judgment module GT, a second AND module, a third AND module, a fifth delay module TON, a sixth delay module TON, a seventh delay module TON, a first pulse module TP, a second pulse module TP, a third pulse module TP, a first selection module SEL, a second selection module SEL, a third selection module SEL, a fourth selection module SEL, a fifth selection module SEL and a rate limiting module HSLIM_RATE, wherein:

[0099] The first pin input value of the first logic judgment module GT is the unit load, the second pin of the first logic judgment module GT is the set value A2, the output end of the first logic judgment module GT is connected to the second pin of the second AND module, and the first pin input value of the second AND module is the output value of the automatic operating condition determination module; the output end of the second AND module is connected to the input end of the fifth delay module TON, and the output end of the fifth delay module is divided into three paths, one path is connected to the first pin of the fifth selection module SEL, the second path is connected to the input end of the first pulse module TP, and the third path is connected to the first pin of the third AND module. The output end of the third AND module is connected to the first pin of the second selection module SEL through the second pulse module TP, the seventh delay module TON and the third pulse module TP in sequence.

[0100] The second pin of the third AND module is connected to the output end of the sixth delay module TON, the input end of the sixth delay module TON is connected to the output end of the NOT module NOT, the input end of the NOT module NOT is connected to the output end of the delayed disconnection module TOF, and the input end of the delayed disconnection module TOF is connected to the output end of the second pulse module TP.

[0101] The output end of the second pulse module TP is also connected to the first pin of the first selection module SEL, the second pin of the first selection module SEL is connected to its output end, the third pin of the first selection module SEL is connected to the output end of the first division module DIV, the first pin input value of the first division module DIV is the coal amount of the unit boiler, and the second pin input value of the first division module DIV is the unit load.

[0102] The output end of the first selection module SEL is also connected to the second pin of the first addition module ADD, the first pin of the first addition module ADD is connected to the output end of the second selection module SEL, the output end of the first addition module ADD is connected to the third pin of the second selection module SEL, the second pin of the second selection module SEL is connected to the output end of the third selection module SEL, and the output end of the second selection module SEL is respectively connected to the second pin of the third selection module SEL and the first pin of the second division module DIV.

[0103] The third pin input value of the third selection module SEL is 0.

[0104] The first pin input value of the fourth subtraction module SUB is the coal power coefficient, and the second pin thereof is connected to the output end of the fifth selection module SEL; the output end of the fourth subtraction module SUB is connected to the input end of the second absolute value ABS, the output end of the second absolute value ABS is connected to the first pin of the fifth judgment module LT, the second pin input value of the fifth judgment module LT is 0.001, the output end of the fifth judgment module LT is connected to the second pin of the accumulation module DCSSUM, the first pin of the accumulation module DCSSUM is connected to the output end of the second pulse module TP, the output end of the accumulation module DCSSUM is respectively connected to the second pin of the second division module DIV and the first pin of the second logic judgment module GT, and the second pin of the second logic judgment module GT is the set value A2.

[0105] The output end of the second division module DIV is connected to the second pin of the fifth selection module SEL, the third pin of the fifth selection module SEL is connected to the output end of the fifth selection module SEL, and the output end of the fifth selection module SEL is connected to the first pin of the rate limiting module HSLIM_RATE.

[0106] The output end of the second logic judgment module GT is connected to the first pin of the fourth selection module SEL, the second pin of the fourth selection module SEL is 0, the third pin of the fourth selection module SEL is connected to the output end of the function module FX, and the input value of the input end of the function module FX is the unit load.

[0107] The output end of the fourth selection module SEL is connected to the second pin of the rate limiting module HSLIM_RATE, and the output value of the output end of the rate limiting module HSLIM_RATE is the coal power coefficient.

[0108] In this embodiment, the set value A1 is 50% of the rated load, such as 330MW.

[0109] The working process of this embodiment:

[0110] (1) Steady-state fixed-period data acquisition.

[0111] like Figure 2 As shown, when the load is steady and greater than the set value A1, the second AND module outputs 1, and after the fifth delay module delays for 5 minutes, it outputs 1. After the output of the sixth delay module, the third AND module outputs 1, and then after the second pulse module TP1 pulses for 5 seconds, it outputs 1.

[0112] After the output of the second pulse module TP changes from 0 to 1, the output of the delay disconnection module TOF changes from 0 to 1, the output of the negation module NOT changes from 1 to 0, and the output of the sixth delay module changes from 1 to 0. At this time, the output of the third AND module changes from 1 to 0.

[0113] After the second pulse module TP outputs a 5s pulse, its output changes from 1 to 0, the TOF output changes from 1 to 0 after a delay of 2s, the NOT module output changes from 0 to 1, and the sixth delay module output changes from 0 to 1 after a delay of 5min. After 5min, the sixth delay module TON output changes to 1, and then with the fifth delay module TON output, the third AND module output changes from 0 to 1, re-triggering the pulse. During the entire period when the fifth delay module TON output is 1, the second pulse module TP sends a 5s pulse 1 every 5min.

[0114] (2) Output of the first selection module SEL1.

[0115] The control pin of the first selection module SEL1 is the output of the second pulse module TP. When the output of the second pulse module TP is 0, the output of the first selection module SEL1 is equal to the value of its input second pin, that is, the output value itself, and its output value remains unchanged at this time. When the second pulse module TP1 outputs a 5s pulse, the output of the first selection module SEL1 is equal to the value of its input third pin, that is, the amount of coal divided by the load value, that is, the coal power ratio coefficient. After the second pulse module TP1 ends the 5s pulse, the output of the first selection module SEL1 continues to remain as the acquired coal power ratio coefficient. During the process of the second pulse module TP1 outputting a 5s pulse at a cyclic interval of 5min, the first selection module SEL1 takes the coal power ratio coefficient every 5min and uses it as its output value.

[0116] (3) Output of the second selection module SEL2.

[0117] After the second pulse module TP1 outputs a 5s pulse, the seventh delay module delays for 2s and then triggers the third pulse module TP2 pulse (the TP2 pulse time depends on the operation cycle of the control system controller. For example, if the conventional system cycle is 200ms, then the TP2 time can be set to less than 200ms. The principle is to ensure that the controller can only output one pulse signal in one scanning cycle).

[0118] The second selection module SEL2 input pin 2 is the output of the third selection module SEL3 module, and the third selection module SEL3 module control pin is the output of the first pulse module TP pulse time of 1s. After the unit enters the steady state, the fifth delay module TON output is 1, and the first pulse module TP sends a 1s pulse, then the third selection module SEL3 control pin is 1, and its output is equal to its input third pin value 0, otherwise its output is the output of the second selection module SEL. The second selection module SEL input pin 3 is the output of the first selection module SEL module superimposed on the original output value of the second selection module SEL.

[0119] Each time the unit enters steady state, the first pulse module TP pulse signal outputs 1, sets the output value of the third selection module SEL to 0, and the output of the second selection module SEL is also assigned to 0. Then, after the second pulse module TP sends a pulse, the first selection module SEL outputs the coal power ratio of the unit. After the second pulse module TP pulse ends, the first selection module SEL keeps outputting the coal power ratio of the unit. The second pulse module TP sends a 5s pulse, and after a delay of 2s, after the third pulse module TP sends a pulse, the second selection module SEL outputs the accumulated value of the coal power ratio of the unit.

[0120] During the steady-state operation of the unit, after the second pulse module TP pulse is issued every 5 minutes, the first selection module SEL takes the latest coal power ratio, the first addition module ADD accumulates it with the coal power ratio output by the original second selection module SEL, and then the second selection module SEL outputs and maintains it.

[0121] (4) Counting module.

[0122] Every time the second pulse module TP sends out a pulse, it enters the set terminal of the accumulation module DCSSUM, and the DCSSUM output is automatically increased by 1, otherwise the DCSSUM output is the number of accumulated coal power ratios.

[0123] (5) Calculate the average coal power ratio.

[0124] The first division module DIV input 1 is the accumulated coal power ratio of the unit during the steady state period, and input 2 is the number of accumulated coal power ratios. The division of the two is the average value of the coal power ratio during the steady state period.

[0125] (6) Coal power coefficient switching.

[0126] The fifth selection module SEL outputs the optimized coal power ratio coefficient. During the steady-state period of the unit, the fifth selection module SEL outputs the maintained coal power coefficient. After the load steady-state ends, the coal power coefficient is equal to the average value of the coal power ratio.

[0127] (7) Coal power ratio limited rate output.

[0128] The fifth selection module SEL outputs the average value of the coal power ratio and enters the rate limiting module HSLIM_RATE, and its change rate is the output of the fourth selection module SEL. If the number of accumulated coal power ratios during this sub-steady state does not exceed 10 (A2 value, which can be set according to the actual situation on site), the output of the fourth selection module SEL is 0 (that is, the change rate is 0, and the average coal power ratio coefficient taken in this steady state is discarded). If it is greater than 10, the change rate depends on the broken line function of the actual load of the unit. Taking the 660MW unit as an example, its settings are shown in Table 2 below. The setting principle is that the unit operation is relatively stable in the high load section, and the change rate is appropriately accelerated. In the low load section, in order to maintain the stability and safe operation of the unit, the change rate is appropriately reduced.

[0129] Table 2

[0130] load 0 132 264 330 498 550 660 coefficient 0.01 0.02 0.03 0.05 0.05 0.06 0.08

[0131] For example, if the unit load is 498MW, the coal power ratio coefficient changes at a rate of 0.05 / min.

[0132] (8) Coal power ratio coefficient obtained from system output.

[0133] The SEL output of the fifth selection module is equal to the output of HSLIM_RATE, and the DCSSUM module is reset (R pin) and its output returns to 0.

[0134] Example 5

[0135] Based on Example 1, this embodiment provides a method for adaptively setting a fuel quantity instruction for a thermal power plant boiler, wherein the coal quantity instruction output module is used to calculate the coal quantity instruction according to the acquired coal power coefficient and the unit load instruction, as follows: Figure 3 As shown, including:

[0136] a fifth subtraction module SUB, a sixth subtraction module SUB, a seventh subtraction module SUB, a sixth selection module SEL, a third division module DIV, a second addition module ADD, a first multiplication module MUL and a second multiplication module MUL, wherein:

[0137] The first pin input value of the fifth subtraction module is the unit load instruction, the second pin input value is the deep peak load lower limit, and the output end of the fifth subtraction module SUB is connected to the first pin of the third division module DIV.

[0138] The first pin of the sixth selection module SEL is connected to the unit operating condition automatic determination module, the second pin thereof is connected to its output end, and the third pin input value is the unit load; the output end of the sixth selection module SEL is connected to the first pin of the sixth subtraction module SUB, the second pin input value of the sixth subtraction module SUB is the lower limit of the deep peak load, and the output end of the sixth subtraction module SUB is connected to the second pin of the third division module DIV.

[0139] The output end of the third division module DIV is connected to the first pin of the first multiplication module MUL.

[0140] The first pin of the seventh subtraction module SUB is connected to the adaptive optimization module, and the input value of the second pin thereof is the lower limit coal power ratio of the deep peak load. The output end of the seventh subtraction module SUB is connected to the second pin of the first multiplication module MUL, and the output end of the first multiplication module MUL is connected to the first pin of the second addition module ADD, and the input value of the second pin of the second addition module ADD is the lower limit coal power ratio of the deep peak load. The output end of the second addition module ADD is connected to the second pin of the second multiplication module MUL, and the input value of the first pin of the second multiplication module MUL is the unit load instruction, and the output end of the second multiplication module MUL outputs the coal quantity instruction.

[0141] The working process of this embodiment:

[0142] Figure 3 The SEL module control pin is load steady state ( Figure 2 During the steady state period, the SEL output is the unit load. After the steady state ends, the SEL output remains the unit load during the steady state period.

[0143] The coal quantity instruction calculation is shown as follows:

[0144]

[0145] Among them, the load instruction is the target load in the actual operation of the unit, and the unit load lower limit is the load lower limit specified by the thermal power unit participating in deep peak regulation. For example, the lower limit of a 660MW unit participating in 20% deep regulation is 132MW, and the deep regulation coal power ratio is the lower limit of the unit's coal quantity at a load of 132MW (determined by the deep regulation test). The final coal quantity instruction is calculated by formula (1).

[0146] Example 6

[0147] This embodiment 6 provides a computer device, including: a memory for storing a computer program; a processor for implementing the steps of a computer method when executing the computer program, or the processor for implementing the functions of each module in the above system when executing the computer program.

[0148] Exemplarily, the computer program may be divided into one or more modules / units, which are stored in the memory and executed by the processor to implement the present invention. The one or more modules / units may be a series of computer program instruction segments capable of implementing preset functions, and the instruction segments are used to describe the execution process of the computer program in the computer device.

[0149] The computer device may be a computing device such as a desktop computer, a notebook, a PDA, and a cloud server. The computer device may include, but is not limited to, a processor and a memory. Those skilled in the art will appreciate that the above are examples of computer devices and do not constitute a limitation on computer devices. The computer device may include more components than the above, or a combination of certain components, or different components. For example, the computer device may also include input and output devices, network access devices, buses, etc.

[0150] The processor may be a central processing unit (CPU), other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor, etc. The processor is the control center of the computer device, and uses various interfaces and lines to connect various parts of the entire computer device.

[0151] The memory may be used to store the computer programs and / or modules, and the processor implements various functions of the computer device by running or executing the computer programs and / or modules stored in the memory and calling the data stored in the memory.

[0152] The memory may mainly include a program storage area and a data storage area, wherein the program storage area may store an operating system, an application required for at least one function (such as a sound playback function, an image playback function, etc.), etc.; the data storage area may store data created according to the use of the mobile phone (such as audio data, a phone book, etc.), etc. In addition, the memory may include a high-speed random access memory, and may also include a non-volatile memory, such as a hard disk, a memory, a plug-in hard disk, a smart memory card (SmartMediaCard, SMC), a secure digital (SecureDigital, SD) card, a flash card (FlashCard), at least one disk storage device, a flash memory device, or other volatile solid-state storage devices.

[0153] Example 7

[0154] This embodiment 7 also provides a computer-readable storage medium, which stores a computer program. When the computer program is executed by a processor, the steps of the method described are implemented.

[0155] If the module / unit integrated in the computer system is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium.

[0156] Based on such understanding, the present invention implements all or part of the processes in the above method, and can also be completed by instructing related hardware through a computer program, and the computer program can be stored in a computer-readable storage medium, and when the computer program is executed by a processor, the steps of the above computer method can be implemented. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or preset intermediate form, etc.

[0157] The computer-readable storage medium may include: any entity or device capable of carrying the computer program code, recording medium, USB flash drive, mobile hard disk, magnetic disk, optical disk, computer memory, read-only memory (ROM), random access memory (RAM), electrical carrier signal, telecommunication signal and software distribution medium, etc.

[0158] It should be noted that the content contained in the computer-readable storage medium can be appropriately increased or decreased according to the requirements of legislation and patent practice in the jurisdiction. For example, in some jurisdictions, according to legislation and patent practice, computer-readable storage media do not include electrical carrier signals and telecommunication signals.

[0159] Example 8

[0160] This embodiment 8 provides a computer product, which includes a computer program, and the computer program is stored in a computer-readable storage medium; the processor of the computer device reads the computer program from the computer-readable storage medium, and the processor executes the computer program, so that the computer device can execute the method in embodiment 1, which will not be repeated here.

[0161] It should be noted that a person of ordinary skill in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be implemented by instructing related hardware through a computer program. The program can be stored in a computer-readable storage medium. When the program is executed, it can include the processes of the embodiments of the above-mentioned methods.

[0162] The embodiments described above are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, a person skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application, and should all be included in the protection scope of the present application.

Claims

1. A method for adaptively setting fuel quantity instructions for boilers in thermal power plants, characterized in that: The following steps are involved: Step 1, judging the current operating condition of the unit according to the current operating data of the unit, wherein when the operating condition of the unit is steady state, proceeding to step 2; Step 2, adaptively searching for the best load-coal quantity relationship according to the historical operation data of the unit, and obtaining the optimal load-coal quantity relationship; Step 3, calculate and obtain the appropriate coal quantity instruction according to the unit load instruction and the optimal load-coal quantity relationship.

2. A method for adaptively setting a fuel quantity instruction for a thermal power plant boiler according to claim 1, characterized in that: In step 1, the current operating condition of the unit is determined based on the current operating data of the unit. The specific method is: S11, respectively obtaining the unit desuperheating water flow rate, the actual value of the unit boiler main steam pressure, the unit load and the unit boiler coal quantity; S12, judging whether the unit desuperheating water flow rate, the actual value of the unit boiler main steam pressure, the unit load and the unit boiler coal quantity meet the conditions. When the unit desuperheating water flow rate, the actual value of the unit boiler main steam pressure, the unit load and the unit boiler coal quantity all meet the conditions, the unit is in a steady state, wherein the unit desuperheating water flow rate, the actual value of the unit boiler main steam pressure, the unit load and the unit boiler coal quantity meet the conditions respectively: The cooling water flow of the unit is subjected to first-order inertial filtering, and the cooling water flow after filtering is compared with the set value. When the cooling water flow after filtering is less than the set value and the set time is delayed; The absolute value of the deviation between the set value of the main steam pressure of the computer unit boiler and the actual value of the main steam pressure. When the absolute value of the deviation is less than the set value and the set time is delayed; The absolute value of the deviation between the load of the computer group and its load after first-order inertial filtering. When the absolute value of the deviation is less than the set value and the set time is delayed; The absolute value of the deviation between the computer group's boiler coal quantity and the boiler coal quantity after the first-order inertial filtering. When the absolute value of the deviation is less than the set value and the set time is delayed.

3. A method for adaptively setting fuel quantity instructions for a thermal power plant boiler according to claim 1, characterized in that: In step 2, the optimal load-coal quantity relationship is adaptively found according to the historical operation data of the unit, and the optimal load-coal quantity relationship is obtained. The specific method is: The coal power ratio coefficient is calculated using the unit boiler coal quantity and unit load after the unit enters steady state; The average value of the coal power ratio during the steady state period is calculated by obtaining the coal power ratio coefficient accumulated during the steady state period of the unit and the number of the coal power ratio coefficients; According to the set pulse time and pulse number, the final coal power ratio coefficient corresponding to the unit load during the steady state period is determined, and the optimal load-coal quantity relationship is obtained.

4. A thermal power plant boiler fuel quantity command adaptive setting system, characterized in that: include: The automatic operating condition determination module is used to determine the current operating condition of the unit based on the current operating data of the unit; The adaptive optimization module is used to adaptively find the best load-coal quantity relationship according to the historical operation data of the unit to obtain the optimal load-coal quantity relationship; The coal quantity instruction output module is used to calculate the appropriate coal quantity instruction based on the unit load instruction and the optimal load-coal quantity relationship.

5. A thermal power plant boiler fuel quantity command adaptive setting system according to claim 4, characterized in that: The working condition automatic determination module includes a first first-order inertia module HSFOP, a second first-order inertia module HSFOP, a third first-order inertia module HSFOP, a first judgment module LT, a second judgment module LT, a third judgment module LT, a fourth judgment module LT, a first delay module TON, a second delay module TON, a third delay module TON, a fourth delay module TON, a first subtraction module SUB, a second subtraction module SUB, a third subtraction module SUB, a first absolute value module ABS, a second absolute value module ABS, a third absolute value module ABS and an AND module, wherein: The input value of the input end of the first first-order inertia module HSFOP is the cooling water flow rate, the output end of the first first-order inertia module HSFOP is connected to the first pin of the first judgment module LT, the second pin of the first judgment module LT is the set value B1, the output end of the first judgment module LT is connected to the input end of the first delay model TON, and the output end of the first delay module TON is connected to the first pin of the AND module; The first pin input value of the first subtraction module SUB is the set value SP of the main steam pressure of the unit boiler, the second pin of the first subtraction module SUB is input to the actual value PV of the main steam pressure, the output end of the first subtraction module is connected to the input end of the first absolute value ABS, the output end of the first absolute value ABS is connected to the first pin of the second judgment module LT, the second pin of the second judgment module LT is the set value B2, the output end of the second judgment module LT is connected to the input end of the second delay module TON, and the output end of the second delay module TON is connected to the second pin of the AND module; The input end of the second first-order inertia module HSFOP is input as the unit load, the output end of the second first-order inertia module HSFOP is connected to the second pin of the second subtraction module SUB, the first pin of the second subtraction module SUB is input as the unit load, the output end of the second subtraction module SUB is connected to the input end of the second absolute value ABS, the output end of the second absolute value ABS is connected to the first pin of the third judgment module LT, the second pin of the third judgment module LT is the set value B3, the output end of the third judgment module LT is connected to the input end of the third delay module TON, and the output end of the third delay module TON is connected to the AND module; The input end of the third first-order inertia module HSFOP is input to the unit boiler coal amount, the output end of the third first-order inertia module HSFOP is connected to the second pin of the third subtraction module SUB, the first pin of the third subtraction module SUB is the unit boiler coal amount, the output end of the third subtraction module is connected to the input end of the third absolute value module ABS, the output end of the third absolute value module ABS is connected to the first pin of the fourth judgment module LT, the second pin of the fourth judgment module LT is the set value B4, the output end of the fourth judgment module LT is connected to the input end of the fourth delay module TON, and the output end of the fourth delay module TON is connected to the AND module.

6. A thermal power plant boiler fuel quantity command adaptive setting system according to claim 4, characterized in that: The adaptive optimization module includes a first logic judgment module GT, a second logic judgment module GT, a second AND module, a third AND module, a fifth delay module TON, a sixth delay module TON, a seventh delay module TON, a first pulse module TP, a second pulse module TP, a third pulse module TP, a first selection module SEL, a second selection module SEL, a third selection module SEL, a fourth selection module SEL, a fifth selection module SEL and a rate limiting module HSLIM_RATE, wherein: The first pin input value of the first logic judgment module GT is the unit load, the second pin of the first logic judgment module GT is the set value A2, the output end of the first logic judgment module GT is connected to the second pin of the second AND module, and the first pin input value of the second AND module is the output value of the automatic working condition determination module; the output end of the second AND module is connected to the input end of the fifth delay module TON, and the output end of the fifth delay module is divided into three paths, one path is connected to the first pin of the fifth selection module SEL, the second path is connected to the input end of the first pulse module TP, and the third path is connected to the first pin of the third AND module. The output end of the third AND module is connected to the first pin of the second selection module SEL through the second pulse module TP, the seventh delay module TON and the third pulse module TP in sequence; The second pin of the third AND module is connected to the output end of the sixth delay module TON, the input end of the sixth delay module TON is connected to the output end of the negation module NOT, the input end of the negation module NOT is connected to the output end of the delay disconnection module TOF, and the input end of the delay disconnection module TOF is connected to the output end of the second pulse module TP; The output end of the second pulse module TP is also connected to the first pin of the first selection module SEL, the second pin of the first selection module SEL is connected to its output end, the third pin of the first selection module SEL is connected to the output end of the first division module DIV, the first pin input value of the first division module DIV is the coal amount of the unit boiler, and the second pin input value of the first division module DIV is the unit load; The output end of the first selection module SEL is also connected to the second pin of the first addition module ADD, the first pin of the first addition module ADD is connected to the output end of the second selection module SEL, the output end of the first addition module ADD is connected to the third pin of the second selection module SEL, the second pin of the second selection module SEL is connected to the output end of the third selection module SEL, and the output end of the second selection module SEL is respectively connected to the second pin of the third selection module SEL and the first pin of the second division module DIV; The third pin input value of the third selection module SEL is 0; The first pin input value of the fourth subtraction module SUB is the coal power coefficient, and the second pin thereof is connected to the output end of the fifth selection module SEL; the output end of the fourth subtraction module SUB is connected to the input end of the second absolute value ABS, the output end of the second absolute value ABS is connected to the first pin of the fifth judgment module LT, the second pin input value of the fifth judgment module LT is 0.001, the output end of the fifth judgment module LT is connected to the second pin of the accumulation module DCSSUM, the first pin of the accumulation module DCSSUM is connected to the output end of the second pulse module TP, the output end of the accumulation module DCSSUM is respectively connected to the second pin of the second division module DIV and the first pin of the second logic judgment module GT, and the second pin of the second logic judgment module GT is the set value A2; The output end of the second division module DIV is connected to the second pin of the fifth selection module SEL, the third pin of the fifth selection module SEL is connected to the output end of the fifth selection module SEL, and the output end of the fifth selection module SEL is connected to the first pin of the rate limiting module HSLIM_RATE; The output end of the second logic judgment module GT is connected to the first pin of the fourth selection module SEL, the second pin of the fourth selection module SEL is 0, the third pin of the fourth selection module SEL is connected to the output end of the function module FX, and the input value of the input end of the function module FX is the unit load; The output end of the fourth selection module SEL is connected to the second pin of the rate limiting module HSLIM_RATE, and the output value of the output end of the rate limiting module HSLIM_RATE is the coal power coefficient.

7. A thermal power plant boiler fuel quantity command adaptive setting system according to claim 4, characterized in that: The coal quantity instruction output module includes a fifth subtraction module SUB, a sixth subtraction module SUB, a seventh subtraction module SUB, a sixth selection module SEL, a third division module DIV, a second addition module ADD, a first multiplication module MUL and a second multiplication module MUL, wherein: The first pin input value of the fifth subtraction module is the unit load instruction, the second pin input value is the deep peak load lower limit, and the output end of the fifth subtraction module SUB is connected to the first pin of the third division module DIV; The first pin of the sixth selection module SEL is connected to the unit operating condition automatic determination module, the second pin thereof is connected to its output end, and the third pin input value is the unit load; the output end of the sixth selection module SEL is connected to the first pin of the sixth subtraction module SUB, the second pin input value of the sixth subtraction module SUB is the lower limit of the deep peak load, and the output end of the sixth subtraction module SUB is connected to the second pin of the third division module DIV; The output end of the third division module DIV is connected to the first pin of the first multiplication module MUL; The first pin input value of the seventh subtraction module SUB is the optimal coal power ratio, and the second pin input value is the lower limit coal power ratio of deep peak load. The output end of the seventh subtraction module SUB is connected to the second pin of the first multiplication module MUL, the output end of the first multiplication module MUL is connected to the first pin of the second addition module ADD, the second pin input value of the second addition module ADD is the lower limit coal power ratio of deep peak load, the output end of the second addition module ADD is connected to the second pin of the second multiplication module MUL, the first pin input value of the second multiplication module MUL is the unit load instruction, and the output end of the second multiplication module MUL outputs the coal quantity instruction.

8. A computer device, characterized in that: include: a processor suitable for executing a computer program; A computer-readable storage medium, wherein a computer program is stored in the computer-readable storage medium, and when the computer program is executed by the processor, the method according to any one of claims 1 to 3 is performed.

9. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the method according to any one of claims 1 to 3 is implemented.

10. A computer program product, characterized in that The computer program product comprises a computer program, and when the computer program is executed by a processor, the method according to any one of claims 1 to 3 is implemented.