Through the fully automatic monitoring system, the problems of inefficient and high error rates in the existing technology are solved, and the stability and cost reduction of the production process are achieved.
Patent Information
- Application Number
- CN202410967013.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-18
- Publication Date
- 2024-11-08
AI Technical Summary
In the prior art, working hours statistics and material supplementation mainly rely on manual operations, are inefficient and prone to errors, and lack real-time data tracking and analysis, resulting in unstable production process and increased costs.
Design a fully automatic monitoring method and system, receive production tasks through the fully automatic monitoring center, generate production strategies, call execution equipment for monitoring and feeding, analyze data in real time, generate feeding and reporting instructions, and improve the degree of automation of the production process .
It realizes automated monitoring of working hours statistics and material supplementation, reduces operational intervention, improves production stability and efficiency, reduces error rates, and reduces production costs.
Smart Images

Figure CN118915657A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of automated monitoring technology, and in particular to a fully automatic monitoring method and system for reporting work and replenishing materials. Background Art
[0002] In the manufacturing industry, the production process includes two core links: man-hour statistics and material replenishment. However, in the existing technology, workers usually use manual methods to perform man-hour statistics and material replenishment, which is not only inefficient but also prone to errors. In addition, due to the lack of effective information management tools in the existing technology, data in the production process is difficult to track and analyze in real time, which will also lead to instability in the production process and increase in production costs.
[0003] Therefore, there is an urgent need for a method and system for automatically monitoring working time statistics and material replenishment in the production process, so as to solve the problems of low efficiency and high error rate in reporting working hours and material replenishment in the prior art, as well as the problem of difficulty in real-time tracking and analysis of data in the production process and inability to ensure the stability of the production process. Summary of the invention
[0004] The purpose of this application is to provide a fully automatic monitoring method and system for reporting work and material replenishment, which can automatically monitor the working time statistics and material replenishment in the production process, and solve the problems of low efficiency and high error rate in reporting work and material replenishment in the prior art.
[0005] To achieve the above-mentioned purpose, the present application provides a fully automatic monitoring method for reporting work and replenishing materials, comprising the following steps: S1: the fully automatic monitoring center receives the production task sent by the task issuing end, and generates a production strategy according to the production task, wherein the production task at least includes: the current product name and production demand; the production strategy at least includes: production equipment information, monitoring equipment information and material information; S2: the fully automatic monitoring center calls the production execution equipment and the monitoring execution equipment according to the production strategy, and the production execution equipment executes the production process according to the production strategy, thereby obtaining the corresponding product; the monitoring execution equipment monitors the production process, and sends the monitoring data collected during the monitoring process to the fully automatic monitoring center; S3: The fully automatic monitoring center analyzes the monitoring data to obtain analysis results, wherein the analysis results at least include: equipment information, material replenishment information and work reporting information; S4: The fully automatic monitoring center generates a material replenishment instruction based on the material replenishment information in the analysis results, and sends the material replenishment instruction to the automatic material replenishment equipment, and the automatic material replenishment equipment replenishes the material according to the material replenishment instruction, wherein the material replenishment instruction at least includes: material replenishment name, estimated material replenishment time and predicted material replenishment amount; generates work reporting data based on the work reporting information in the analysis results, and sends the work reporting data to the task publishing end, wherein the work reporting data at least includes: work reporting time and current finished product quantity; sends the equipment information in the analysis results as equipment status data to the equipment maintenance end.
[0006] As above, the fully automatic monitoring center receives the production task sent by the task issuing end, and generates the sub-steps of the production strategy according to the production task as follows: S11: Perform security verification on the task issuing end and generate a security verification result. If the security verification result is safe, execute S12; if the security verification result is unsafe, send a risk alert; S12: Receive the production task, query the production process database according to the current product name in the production task, and use the production process data with the same product name as the current product name as the current production process data, wherein the production process data at least includes: product name, unit production time, names of multiple production equipment, execution order between multiple production equipment, names of multiple monitoring equipment, names of multiple materials and unit usage of each material; S13: Determine the running quantity of each production equipment, the running quantity of each monitoring equipment and the estimated usage of each material in the current production process data according to the production demand in the production task, wherein , the production demand at least includes: the preset total production time and / or the preset total production amount; S14: selecting the production execution equipment from all the production equipment according to the names of the multiple production equipment and the running quantity of each production equipment in the current production process data, and obtaining the number of each production execution equipment; generating production equipment information according to the names of the multiple production equipment, the running quantity of each production equipment, the execution order between the multiple production equipment and the number of each production execution equipment; S15: selecting the monitoring execution equipment from the multiple monitoring equipment according to the names of the multiple monitoring equipment and the running quantity of each monitoring equipment, and obtaining the number of each monitoring execution equipment; generating monitoring equipment information according to the names of the multiple monitoring equipment, the running quantity of each monitoring equipment and the number of each monitoring execution equipment; S16: generating material information according to the names of the multiple materials, the unit usage of each material and the estimated usage of each material; S17: generating a production strategy according to the production equipment information, the monitoring equipment information and the material information.
[0007] As above, the fully automatic monitoring center analyzes the monitoring data, and the sub-steps for obtaining the analysis results are as follows: S31: The real-time quantity of each semi-finished product in the monitoring data is used as the current quantity of semi-finished products, and the real-time quantity of finished products in the monitoring data is used as the current quantity of finished products, and the work report information is generated according to the current quantity of semi-finished products and the current quantity of finished products; S32: The monitoring data is analyzed to obtain equipment information, wherein the equipment information at least includes: operation information and energy consumption information; S33: The collection time, the real-time quantity of each semi-finished product, the real-time quantity of finished products and the real-time storage data of each material in the monitoring data are analyzed to obtain the replenishment information, wherein the replenishment information at least includes: the estimated replenishment time and the predicted replenishment amount range; S34: The analysis results are generated according to the equipment information, the replenishment information and the work report information.
[0008] As above, the sub-steps of analyzing the monitoring data and obtaining the equipment information are as follows: S321: Use the standard operation data of each production equipment to judge the real-time operation data of the corresponding production execution equipment in the monitoring data, and generate operation information, wherein the operation information at least includes: operation results and operation abnormality objects; if the real-time operation data of each production execution equipment is within the normal range of the standard operation data of the corresponding production equipment, then the operation result in the operation information is normal, and the operation abnormality object is none, and S322 is executed; if the real-time operation data of one or more production execution equipment is within the abnormal range of the standard operation data of the corresponding production equipment, then the operation result in the operation information is abnormal, and the operation abnormality object includes: operation abnormal equipment number; the real-time energy consumption data and current operating time of each production execution device except the device with abnormal operation are taken as the data to be analyzed; S322: analyze each data to be analyzed, obtain the current energy consumption difference, judge the current energy consumption difference by the preset energy consumption threshold, and generate energy consumption information, wherein the energy consumption information at least includes: energy consumption results and energy consumption abnormality objects; if the current energy consumption difference is less than or equal to the preset energy consumption threshold, the energy consumption result in the energy consumption information is normal, and the energy consumption abnormality object is: none, and execute S323; if the current energy consumption difference is greater than the preset energy consumption threshold, the energy consumption result in the energy consumption information is abnormal, and the energy consumption abnormality object is: the number of the energy consumption abnormal device, and execute S323; S323: generate equipment information according to the operation information and energy consumption information.
[0009] As above, the collection time in the monitoring data, the real-time quantity of each semi-finished product, the real-time quantity of finished products and the real-time storage data of each material are analyzed, and the sub-steps for obtaining the replenishment information are as follows: S331: Calculate the current unit loss of each material according to the real-time quantity of each semi-finished product, the real-time quantity of finished products and the real-time consumption data of each material; S332: Calculate the predicted replenishment duration according to the current unit loss of each material and the real-time storage data of each material, and take the collection time in the monitoring data as the starting point, and the time node obtained after moving back one predicted replenishment duration is the estimated replenishment time; S333: Calculate the predicted replenishment quantity range according to the current unit loss of each material and the real-time storage data of each material; S334: Generate replenishment information according to the estimated replenishment time and the predicted replenishment quantity range.
[0010] As above, the expression of the current unit loss is as follows: Among them, Dscl k is the current unit loss of the kth material; Csx k is the real-time consumption data of the kth material; Cbc k is the number of semi-finished products that have used the kth material; Ccp is the real-time number of finished products; Cyl kis the unit dosage of the kth material.
[0011] As above, the expression for predicting the feeding time is as follows: Among them, Tyb k is the predicted feeding time of the kth material; Zcl k Real-time storage data for the kth material; Cyl k is the unit dosage of the kth material; Dscl k is the current unit loss of the kth material; tdw is the unit production time; η is the parameter of the refill time; Δtf k is the feeding time of the kth material.
[0012] As above, the maximum value of the predicted feed amount range is expressed as: Among them, Blz k max is the maximum value of the predicted feed amount range of the kth material; Rzl k The storage bin for the k-th material can store the total amount of the k-th material; Zcl k is the real-time storage data of the kth material; the minimum value of the predicted feed amount range is expressed as: in, is the minimum value of the predicted feed amount range of the kth material; Cyl k is the unit dosage of the kth material; Dscl k is the current unit loss of the kth material; Szcl is the preset total production amount; Csx k is the real-time consumption data of the kth material; Zcl k Real-time storage data for the kth material; predict the range of feed quantity
[0013]
[0014] The present application also provides a fully automatic monitoring system for reporting work and replenishing materials, including: at least one task publishing terminal, multiple production equipment, multiple monitoring equipment, automatic replenishing equipment, equipment maintenance terminal and a fully automatic monitoring center; wherein, at least one task publishing terminal: is used to send production tasks; receive work reporting data; production equipment: allows the fully automatic monitoring center to call production execution equipment from multiple production equipment; monitoring equipment: allows the fully automatic monitoring center to call monitoring execution equipment from multiple monitoring equipment; automatic replenishing equipment: replenishes materials according to replenishment instructions; equipment maintenance terminal: receives equipment status data; fully automatic monitoring center: is used to execute the above-mentioned fully automatic monitoring method for reporting work and replenishing materials.
[0015] As mentioned above, the multiple monitoring devices include at least: operation data collection equipment, energy consumption collection equipment, quantity statistics equipment and time statistics equipment; wherein, the operation data collection equipment is used to collect the real-time operation data of each production execution equipment; the energy consumption collection equipment is used to collect the real-time energy consumption data of each production execution equipment; the quantity statistics equipment is used to collect the real-time quantity of each semi-finished product, the real-time quantity of finished products, the real-time storage data of each material and the real-time consumption data of each material; the time statistics equipment is used to collect the current operation time and collection time of each production execution equipment.
[0016] The beneficial effects achieved by this application are as follows:
[0017] (1) The fully automatic monitoring method and system for reporting work and replenishing materials of the present application can automatically monitor and analyze the working time statistics and material replenishment in the production process, thereby improving the degree of automation in the production process, reducing operator intervention, and solving the problems of low efficiency and high error rate in reporting work and replenishing materials in the prior art.
[0018] (2) The fully automatic monitoring method and system for reporting work and replenishing materials of the present application can track and analyze the monitoring data in the production process in real time, thereby ensuring the stability of the production process and reducing production costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present application. For ordinary technicians in this field, other drawings can also be obtained based on these drawings.
[0020] Figure 1 A structural schematic diagram of an embodiment of a fully automatic monitoring system for reporting work and replenishing materials;
[0021] Figure 2 The present invention is a flow chart of an embodiment of a fully automatic monitoring method for reporting work and replenishing materials. DETAILED DESCRIPTION
[0022] The following is a clear and complete description of the technical solutions in the embodiments of the present invention in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.
[0023] like Figure 1As shown, the present application provides a fully automatic monitoring system for reporting work and replenishing materials, including: at least one task issuing terminal 1, multiple production equipment 2, multiple monitoring equipment 3, automatic replenishing equipment 4, equipment maintenance terminal 5 and a fully automatic monitoring center 6.
[0024] Among them, at least one task publishing terminal 1 is used to send production tasks and receive work reporting data.
[0025] Production equipment 2: Allows the fully automatic monitoring center to call production execution equipment from a variety of production equipment.
[0026] Monitoring device 3: Allows the fully automatic monitoring center to call monitoring execution devices from a variety of monitoring devices.
[0027] Automatic feeding equipment 4: feeding according to feeding instructions.
[0028] Equipment maintenance terminal 5: receiving equipment status data.
[0029] Fully automatic monitoring center 6: used to execute the following fully automatic monitoring method for reporting work and replenishing materials.
[0030] Furthermore, the various production equipment 2 at least includes: various storage bins, material transfer equipment and various process line equipment.
[0031] Among them: Storage bin: used to store materials. Different materials are stored in different storage bins.
[0032] Material transfer equipment: used to transfer materials and / or semi-finished products between various process line equipment.
[0033] Process line equipment: equipment that uses materials to produce semi-finished products and equipment that uses materials and / or semi-finished products to produce finished products.
[0034] Furthermore, the various monitoring devices 1 at least include: an operation data collection device, an energy consumption collection device, a quantity statistics device and a time statistics device.
[0035] Among them, the operation data collection device is used to collect the real-time operation data of each production execution device.
[0036] Energy consumption collection equipment: used to collect real-time energy consumption data of each production execution equipment.
[0037] Quantity counting equipment: used to collect the real-time quantity of each semi-finished product, the real-time quantity of finished products, the real-time storage data of each material, and the real-time consumption data of each material.
[0038] Time statistics equipment: used to collect the current operating time and collection time of each production execution equipment.
[0039] Furthermore, the various monitoring devices 1 also include: various sensors; wherein the various sensors include at least: temperature sensors, pressure sensors, speed sensors, optical sensors, humidity sensors, liquid level sensors, vibration sensors, sound sensors, gas sensors and position sensors.
[0040] Among them, temperature sensors are used to monitor the temperature of production equipment, materials or production environment.
[0041] Pressure sensor: used to measure the pressure of liquid or gas to ensure that production equipment operates at a safe working pressure.
[0042] Speed sensor: used to monitor the speed of mechanical parts, conveyor belts or fluid flow in production equipment.
[0043] Optical sensor: including photoelectric switches and photoelectric sensors, used to detect the characteristics of objects (materials, semi-finished products or finished products). The characteristics of the object include at least: position, color and transparency.
[0044] Humidity Sensors: Used to monitor humidity levels in production environments.
[0045] Liquid level sensor: used to measure the liquid or powder level to ensure the stability of material supply.
[0046] Vibration Sensors: Used to monitor vibration levels of production equipment or mechanical components to detect malfunctions or maintenance needs.
[0047] Sound Sensors: Used to monitor noise levels or sound signals.
[0048] Gas sensor: used to detect gas concentration in the production environment.
[0049] Position sensor: used to monitor the position or movement of an object, including at least: encoder and laser rangefinder.
[0050] Furthermore, the fully automatic monitoring center also includes a display device for displaying the analysis results and providing operations for the staff, so that the staff can query the analysis results.
[0051] like Figure 2 As shown, the present application provides a fully automatic monitoring method for reporting work and replenishing materials, comprising the following steps:
[0052] S1: The fully automatic monitoring center receives the production task sent by the task issuing end, and generates a production strategy based on the production task, wherein the production task at least includes: the current product name and production requirements; the production strategy at least includes: production equipment information, monitoring equipment information and material information.
[0053] Furthermore, the fully automatic monitoring center receives the production task sent by the task publishing end, and generates the production strategy according to the production task in the following sub-steps:
[0054] S11: Perform security verification on the task issuing end and generate a security verification result. If the security verification result is safe, execute S12; if the security verification result is unsafe, send a risk alert.
[0055] Specifically, the method of performing security verification on the task issuing end at least includes: a user account password verification method and / or a biometric verification method.
[0056] User account and password verification method: If the account and password used by the task publisher to log in to the fully automatic monitoring center are correct, the security verification result is safe. If the account and password used by the task publisher to log in to the fully automatic monitoring center are inaccurate, the security verification result is unsafe.
[0057] Among them, the biometric verification methods include: any one or more of face recognition verification, iris recognition verification, voiceprint recognition verification, and fingerprint recognition verification.
[0058] Biometric verification method: If the biometrics collected in real time by the task publishing end are consistent with the biometrics preset by the fully automatic monitoring center, the security verification result is safe; if the biometrics collected in real time by the task publishing end are inconsistent with the biometrics preset by the fully automatic monitoring center, the security verification result is unsafe; among them, biometrics include: any one or more of facial image features, iris features, voiceprint features, and fingerprint features.
[0059] S12: Receive a production task, query the production process database according to the current product name in the production task, and use the production process data whose product name is consistent with the current product name as the current production process data, wherein the production process data at least includes: product name, unit production time, names of multiple production equipment, execution order between multiple production equipment, names of multiple monitoring equipment, names of multiple materials and unit usage of each material.
[0060] Specifically, the execution order between multiple production equipment refers to the order in which production equipment is used when producing a product. For example, production equipment a, production equipment b, and production equipment c are required to produce a product A. Production equipment a obtains product a' and transmits product a' to production equipment b. Production equipment b further produces product a' to obtain product b', and product b' is transmitted to production equipment c. Production equipment c further produces product b' to obtain product c', which is the required product A. Among them, product A is a finished product; product a' and product b' are semi-finished products of different categories.
[0061] The unit dosage of each material is the actual amount of that material used when producing a product, that is, the amount of that material contained in a product.
[0062] Unit production time: the time required to produce a product.
[0063] S13: Determine the operating quantity of each production equipment, the operating quantity of each monitoring equipment and the estimated usage of each material in the current production process data according to the production demand in the production task, wherein the production demand includes at least: the preset total production time and / or the preset total production quantity.
[0064] Specifically, the total preset production time is the operating time of the production equipment required to complete this production task.
[0065] The preset total production volume is the total volume of products required to complete this production task.
[0066] The operating quantity of each production equipment is: the quantity of each production equipment required to produce a preset number of products.
[0067] Further, as an embodiment, the expression for the estimated amount of material is:
[0068] Cl i =(Cyl i +ΔShl i )·Szcl;
[0069] Among them, Cl i is the estimated usage of the i-th material; Cyl i is the unit dosage of the i-th material; ΔShl i is the unit loss of the ith material; Szcl is the preset total production amount.
[0070] Further, as another embodiment, the expression for the estimated amount of material is:
[0071]
[0072] Among them, Cl i is the estimated usage of the i-th material; Cyl i is the unit dosage of the i-th material; ΔShl i is the unit loss of the i-th material; Tcl is the total preset production time; tdw is the unit production time.
[0073] Specifically, the unit loss of each material is the actual loss of the material in the entire production process when producing a product.
[0074] Furthermore, when the production task is completed, the actual material usage is analyzed through the estimated material usage. If the actual material usage is greater than the estimated material usage, the production equipment is checked to eliminate material waste caused by equipment failure.
[0075] S14: Select a production execution device from all the production equipment according to the names of the multiple production equipment and the running quantity of each production equipment in the current production process data, and obtain the number of each production execution device; generate production equipment information according to the names of the multiple production equipment, the running quantity of each production equipment, the execution order between the multiple production equipment and the number of each production execution device.
[0076] Specifically, the names of the selected multiple production execution devices are consistent with the names of the multiple production devices, and the number of each type of production execution device selected is equal to the running quantity of each type of production device.
[0077] S15: Select a monitoring execution device from a plurality of monitoring devices according to the names of the plurality of monitoring devices and the operating quantity of each monitoring device, and obtain the number of each monitoring execution device; generate monitoring device information according to the names of the plurality of monitoring devices, the operating quantity of each monitoring device and the number of each monitoring execution device.
[0078] Specifically, the names of the selected multiple monitoring execution devices are consistent with the names of the multiple monitoring devices. The number of each selected monitoring execution device is equal to the running number of each monitoring device.
[0079] S16: Generate material information according to names of multiple materials, unit usage of each material, and estimated usage of each material.
[0080] S17: Generate a production strategy based on the production equipment information, monitoring equipment information and material information.
[0081] S2: The fully automatic monitoring center calls the production execution equipment and the monitoring execution equipment according to the production strategy, and the production execution equipment executes the production process according to the production strategy to obtain the corresponding products; the monitoring execution equipment monitors the production process and sends the monitoring data collected during the monitoring process to the fully automatic monitoring center; wherein the monitoring data includes at least: collection time, real-time quantity of each semi-finished product, real-time quantity of finished products, current operating time of each production execution equipment, real-time energy consumption data of each production execution equipment, real-time operation data of each production execution equipment, real-time storage data of each material and real-time consumption data of each material.
[0082] The collection time is the time when the monitoring data is collected.
[0083] Furthermore, the monitoring execution device collects monitoring data for the monitoring process according to the set collection conditions. In this production task, the process of monitoring the entire production process is the monitoring process. In this production task, the entire process of producing the required product is the production process.
[0084] Among them, the set collection conditions are: collecting once each time a finished product is produced or collecting once when the interval time is equal to the preset interval time, but it is not limited to collecting once each time a finished product is produced or collecting once when the interval time is equal to the preset interval time. The present application preferably collects once each time a finished product is produced or collecting once when the interval time is equal to the preset interval time.
[0085] The interval time refers to the time period between the time node of the last monitoring data collection and the time node of the next monitoring data collection. The specific duration of the preset interval time can be set according to the actual situation.
[0086] The products produced by each production execution device before the finished product is generated are semi-finished products. The real-time quantity of each semi-finished product refers to the total number of each type of semi-finished product that has been produced and collected at this collection time.
[0087] The real-time quantity of finished products refers to the total number of finished products produced during this collection time.
[0088] Current operating time of each production execution device: the actual operating time of each production execution device collected during this collection time in this production task.
[0089] Real-time energy consumption data for each production equipment: In this production task, the actual energy consumption value of each production execution equipment collected at this collection time.
[0090] Real-time operation data of each production equipment: In this production task, the actual operation data of each production execution equipment collected at this collection time.
[0091] Real-time storage data of each material: In this production task, the current remaining amount of each material in the storage bin collected at this collection time.
[0092] Real-time consumption data of each material: the actual amount of each material used during the collection time in this production task.
[0093] S3: The fully automatic monitoring center analyzes the monitoring data to obtain analysis results, wherein the analysis results at least include: equipment information, material replenishment information and work report information.
[0094] Furthermore, the fully automatic monitoring center analyzes the monitoring data, and the sub-steps for obtaining the analysis results are as follows:
[0095] S31: The real-time quantity of each semi-finished product in the monitoring data is used as the current quantity of semi-finished products, and the real-time quantity of finished products in the monitoring data is used as the current quantity of finished products, and work report information is generated according to the current quantity of semi-finished products and the current quantity of finished products.
[0096] Specifically, the work reporting information includes at least: the current number of semi-finished products and the current number of finished products.
[0097] S32: Analyze the monitoring data to obtain device information, where the device information at least includes: operation information and energy consumption information.
[0098] Further, the sub-steps of analyzing the monitoring data and obtaining device information are as follows:
[0099] S321: Use the standard operation data of each production equipment to judge the real-time operation data of the corresponding production execution equipment in the monitoring data, and generate operation information, wherein the operation information at least includes: operation results and operation abnormality objects; if the real-time operation data of each production execution equipment is within the normal range of the standard operation data of the corresponding production equipment, the operation result in the operation information is normal, the operation abnormality object is none, and execute S322; if the real-time operation data of one or more production execution equipment is within the abnormal range of the standard operation data of the corresponding production equipment, the operation result in the operation information is abnormal, and the operation abnormality object includes: the number of the operation abnormal equipment; the real-time energy consumption data and current operation time of each production execution equipment except the operation abnormal equipment are used as data to be analyzed.
[0100] Specifically, an abnormal operation device refers to a production execution device whose real-time operation data is within the abnormal range of the standard operation data of the production device. One piece of data to be analyzed corresponds to one production execution device. The number of the abnormal operation device is the number of the production execution device whose real-time operation data is within the abnormal range of the standard operation data of the production device.
[0101] The standard operating data of each production equipment includes at least: normal range and abnormal range. The normal range refers to the range of operating data that the production equipment can operate normally; the abnormal range refers to the range of operating data that the production equipment cannot operate normally. The standard operating data of each production equipment is set according to the actual operating conditions of each production equipment.
[0102] S322: Analyze each data to be analyzed, obtain the current energy consumption difference, judge the current energy consumption difference by a preset energy consumption threshold, and generate energy consumption information, wherein the energy consumption information at least includes: energy consumption results and energy consumption abnormality objects; if the current energy consumption difference is less than or equal to the preset energy consumption threshold, the energy consumption result in the energy consumption information is normal, and the energy consumption abnormality object is: none, and execute S323; if the current energy consumption difference is greater than the preset energy consumption threshold, the energy consumption result in the energy consumption information is abnormal, and the energy consumption abnormality object is: the number of the energy consumption abnormal device, and execute S323.
[0103] Furthermore, the expression of the current energy consumption difference is as follows:
[0104]
[0105] Among them, Nhc j is the current energy consumption difference of the production execution equipment corresponding to the jth data to be analyzed; is the real-time energy consumption data of the jth data to be analyzed; is the current running time in the jth data to be analyzed; t dw is the set unit time; N dw The unit energy consumption value generated by the preset unit time of the production execution equipment; N dx is the damage energy consumption value per meter of wire; The total length of the electrical wires that supply energy to the production execution device corresponding to the jth data to be analyzed.
[0106] Specifically, the abnormal energy consumption device refers to a production execution device whose current energy consumption difference is greater than a preset energy consumption threshold. The number of the abnormal energy consumption device is the number of the production execution device whose current energy consumption difference is greater than the preset energy consumption threshold.
[0107] The specific value of the energy consumption threshold is set according to the actual situation. If the current energy consumption difference is greater than the preset energy consumption threshold, it means that the production execution equipment and / or the power line may be faulty.
[0108] S323: Generate device information according to the operation information and energy consumption information.
[0109] S33: Analyze the collection time, the real-time quantity of each semi-finished product, the real-time quantity of the finished product and the real-time storage data of each material in the monitoring data to obtain the feeding information, wherein the feeding information at least includes: the estimated feeding time and the predicted feeding amount range.
[0110] Furthermore, the acquisition time, the real-time quantity of each semi-finished product, the real-time quantity of the finished product, and the real-time storage data of each material in the monitoring data are analyzed, and the sub-steps of obtaining the replenishment information are as follows:
[0111] S331: Calculate the current unit loss of each material according to the real-time quantity of each semi-finished product, the real-time quantity of the finished product and the real-time consumption data of each material.
[0112] Furthermore, the expression of the current unit loss is as follows:
[0113]
[0114] Among them, Dscl k is the current unit loss of the kth material; Csx k is the real-time consumption data of the kth material; Cbc k is the number of semi-finished products that have used the kth material; Ccp is the real-time number of finished products; Cyl k is the unit dosage of the kth material.
[0115] S332: Calculate the predicted refilling time based on the current unit loss of each material and the real-time storage data of each material. Take the collection time in the monitoring data as the starting point, and move back one predicted refilling time to obtain the time node, which is the estimated refilling time.
[0116] Furthermore, the expression for predicting the feeding time is as follows:
[0117]
[0118] Among them, Tyb k is the predicted feeding time of the kth material; Zcl k Real-time storage data for the kth material; Cyl k is the unit dosage of the kth material; Dscl k is the current unit loss of the kth material; tdw is the unit production time; η is the parameter of the refill time; Δtf k is the feeding time of the kth material.
[0119] Specifically, the specific value of η is set according to the actual situation. In the present application, η=1.5 is preferred to facilitate preparation for the feeding process and avoid affecting the punctuality of the feeding.
[0120] The refilling time refers to the time required to refill the kth material through the corresponding refilling equipment.
[0121] S333: Calculate the predicted replenishment amount range based on the current unit loss of each material and the real-time storage data of each material.
[0122] Furthermore, the maximum value of the predicted feed amount range is expressed as:
[0123]
[0124] in, is the maximum value of the predicted feed amount range of the kth material; Rzl k The storage bin for the k-th material can store the total amount of the k-th material; Zcl k Real-time storage data for the k-th material.
[0125] The minimum value of the predicted feed amount range is expressed as:
[0126]
[0127] in, is the minimum value of the predicted feed amount range of the kth material; Cyl k is the unit dosage of the kth material; Dscl k is the current unit loss of the kth material; Szcl is the preset total production amount; Csx k is the real-time consumption data of the kth material; Zcl k Real-time storage data for the k-th material.
[0128]
[0129] S334: Generate feeding information according to the estimated feeding time and the predicted feeding amount range.
[0130] S34: Generate analysis results based on equipment information, material replenishment information and work report information.
[0131] S4: The fully automatic monitoring center generates a refilling instruction according to the refilling information in the analysis result, and sends the refilling instruction to the automatic refilling equipment, which refills according to the refilling instruction, wherein the refilling instruction at least includes: the refilling name, the estimated refilling time and the predicted refilling quantity; generates work reporting data according to the work reporting information in the analysis result, and sends the work reporting data to the task issuing end, wherein the work reporting data at least includes: the work reporting time and the current number of finished products; sends the equipment information in the analysis result as equipment status data to the equipment maintenance end.
[0132] Specifically, the feed name refers to the name of the material that needs to be fed.
[0133] The reporting time refers to the time when the reporting data is sent.
[0134] Automatic refilling equipment refills materials according to refilling instructions, which can improve the accuracy of refilling time and refilling amount, optimize material inventory management, and reduce waste and inventory backlogs.
[0135] The task issuing end reports work according to the reporting data, which increases production efficiency and the accuracy of production data.
[0136] The equipment maintenance end can perform timely maintenance on abnormal equipment based on equipment status data, which helps to detect problems and take measures in a timely manner.
[0137] The beneficial effects achieved by this application are as follows:
[0138] (1) The fully automatic monitoring method and system for reporting work and replenishing materials of the present application can automatically monitor and analyze the working time statistics and material replenishment in the production process, thereby improving the degree of automation in the production process, reducing operator intervention, and solving the problems of low efficiency and high error rate in reporting work and replenishing materials in the prior art.
[0139] (2) The fully automatic monitoring method and system for reporting work and replenishing materials of the present application can track and analyze the monitoring data in the production process in real time, thereby ensuring the stability of the production process and reducing production costs.
[0140] Although the preferred embodiments of the present application have been described, those skilled in the art may make additional changes and modifications to these embodiments once they are aware of the basic creative concepts. Therefore, the scope of protection of the present application is intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the present application. Obviously, those skilled in the art may make various changes and modifications to the present application without departing from the spirit and scope of the present application. Thus, if these modifications and variations of the present application fall within the scope of the protection scope of the present application and its equivalent technology, the present application is also intended to include these modifications and variations.
Claims
1. A fully automatic monitoring method for reporting work and replenishing materials, characterized in that: The steps include: S1: The fully automatic monitoring center receives the production task sent by the task issuing end, and generates a production strategy according to the production task, wherein the production task at least includes: the current product name and production demand; the production strategy at least includes: production equipment information, monitoring equipment information and material information; S2: The fully automatic monitoring center calls the production execution equipment and the monitoring execution equipment according to the production strategy, and the production execution equipment executes the production process according to the production strategy to obtain the corresponding products; the monitoring execution equipment monitors the production process and sends the monitoring data collected during the monitoring process to the fully automatic monitoring center; S3: The fully automatic monitoring center analyzes the monitoring data to obtain analysis results, wherein the analysis results at least include: equipment information, material replenishment information and work report information; S4: The fully automatic monitoring center generates a refilling instruction according to the refilling information in the analysis result, and sends the refilling instruction to the automatic refilling equipment, which refills according to the refilling instruction, wherein the refilling instruction at least includes: the refilling name, the estimated refilling time and the predicted refilling quantity; generates work reporting data according to the work reporting information in the analysis result, and sends the work reporting data to the task issuing end, wherein the work reporting data at least includes: the work reporting time and the current number of finished products; sends the equipment information in the analysis result as equipment status data to the equipment maintenance end.
2. The fully automatic monitoring method for reporting work and replenishing materials according to claim 1 is characterized in that: The fully automatic monitoring center receives the production tasks sent by the task publishing end, and generates the production strategy according to the production tasks in the following sub-steps: S11: Perform security verification on the task issuing end and generate a security verification result. If the security verification result is safe, execute S12; if the security verification result is unsafe, send a risk alert; S12: Receive a production task, query the production process database according to the current product name in the production task, and use the production process data whose product name is consistent with the current product name as the current production process data, wherein the production process data at least includes: product name, unit production time, names of multiple production equipment, execution order between multiple production equipment, names of multiple monitoring equipment, names of multiple materials and unit usage of each material; S13: Determine the running quantity of each production equipment, the running quantity of each monitoring equipment and the estimated usage of each material in the current production process data according to the production demand in the production task, wherein the production demand at least includes: the preset total production time and / or the preset total production amount; S14: selecting a production execution device from all the production devices according to the names of the multiple production devices in the current production process data and the running quantity of each production device, and obtaining the number of each production execution device; generating production equipment information according to the names of the multiple production devices, the running quantity of each production device, the execution order between the multiple production devices and the number of each production execution device; S15: selecting a monitoring execution device from the multiple monitoring devices according to the names of the multiple monitoring devices and the operating quantity of each monitoring device, and obtaining the number of each monitoring execution device; generating monitoring device information according to the names of the multiple monitoring devices, the operating quantity of each monitoring device and the number of each monitoring execution device; S16: Generate material information according to the names of multiple materials, the unit usage of each material, and the estimated usage of each material; S17: Generate a production strategy based on the production equipment information, monitoring equipment information and material information.
3. The fully automatic monitoring method for reporting work and replenishing materials according to claim 1 is characterized in that: The fully automatic monitoring center analyzes the monitoring data, and the sub-steps for obtaining the analysis results are as follows: S31: taking the real-time quantity of each semi-finished product in the monitoring data as the current semi-finished product quantity, taking the real-time quantity of the finished product in the monitoring data as the current finished product quantity, and generating work report information according to the current semi-finished product quantity and the current finished product quantity; S32: Analyze the monitoring data to obtain device information, where the device information at least includes: operation information and energy consumption information; S33: Analyze the collection time, the real-time quantity of each semi-finished product, the real-time quantity of the finished product, and the real-time storage data of each material in the monitoring data to obtain the material replenishment information, wherein the material replenishment information at least includes: the estimated material replenishment time and the predicted material replenishment amount range; S34: Generate analysis results based on equipment information, material replenishment information and work report information.
4. The fully automatic monitoring method for reporting work and replenishing materials according to claim 3 is characterized in that: The sub-steps for analyzing monitoring data and obtaining device information are as follows: S321: Use the standard operation data of each production equipment to judge the real-time operation data of the corresponding production execution equipment in the monitoring data, and generate operation information, wherein the operation information at least includes: operation results and operation abnormality objects; if the real-time operation data of each production execution equipment is within the normal range of the standard operation data of the corresponding production equipment, the operation result in the operation information is normal, the operation abnormality object is none, and S322 is executed; if there is one or more production execution equipment whose real-time operation data is within the abnormal range of the standard operation data of the corresponding production equipment, the operation result in the operation information is abnormal, and the operation abnormality object includes: the number of the abnormal operation equipment; the real-time energy consumption data and current operation time of each production execution equipment except the abnormal operation equipment are used as data to be analyzed; S322: Analyze each data to be analyzed, obtain the current energy consumption difference, judge the current energy consumption difference by a preset energy consumption threshold, and generate energy consumption information, wherein the energy consumption information at least includes: energy consumption results and energy consumption abnormal objects; if the current energy consumption difference is less than or equal to the preset energy consumption threshold, the energy consumption result in the energy consumption information is normal, and the energy consumption abnormal object is: none, and S323 is executed; if the current energy consumption difference is greater than the preset energy consumption threshold, the energy consumption result in the energy consumption information is abnormal, and the energy consumption abnormal object is: the number of the energy consumption abnormal device, and S323 is executed; S323: Generate device information according to the operation information and energy consumption information.
5. The fully automatic monitoring method for reporting work and replenishing materials according to claim 3 is characterized in that: The sub-steps of analyzing the collection time, the real-time quantity of each semi-finished product, the real-time quantity of the finished product, and the real-time storage data of each material in the monitoring data to obtain the replenishment information are as follows: S331: Calculate the current unit loss of each material according to the real-time quantity of each semi-finished product, the real-time quantity of the finished product and the real-time consumption data of each material; S332: Calculate the predicted refilling time according to the current unit loss of each material and the real-time storage data of each material, and take the collection time in the monitoring data as the starting point, and move back one predicted refilling time to obtain the time node, which is the estimated refilling time; S333: Calculating a predicted range of replenishment amount according to the current unit loss of each material and the real-time storage data of each material; S334: Generate feeding information according to the estimated feeding time and the predicted feeding amount range.
6. The fully automatic monitoring method for reporting work and replenishing materials according to claim 5 is characterized in that: The expression of current unit loss is as follows: Among them, Dscl k is the current unit loss of the kth material; Csx k is the real-time consumption data of the kth material; Cbc k is the number of semi-finished products that have used the kth material; Ccp is the real-time number of finished products; Cyl k is the unit dosage of the kth material.
7. The fully automatic monitoring method for reporting work and replenishing materials according to claim 6 is characterized in that: The expression for predicting the refilling time is as follows: Among them, Tyb k is the predicted feeding time of the kth material; Zcl k Real-time storage data for the kth material; Cyl k is the unit dosage of the kth material; Dscl k is the current unit loss of the kth material; tdw is the unit production time; η is the parameter of the refill time; Δtf k is the feeding time of the kth material.
8. The fully automatic monitoring method for reporting work and replenishing materials according to claim 7 is characterized in that: The maximum value of the predicted feed amount range is expressed as: in, is the maximum value of the predicted feed amount range of the kth material; Rzl k The storage bin for the k-th material can store the total amount of the k-th material; Zcl k Real-time storage data for the k-th material; The minimum value of the predicted feed amount range is expressed as: in, is the minimum value of the predicted feed amount range of the kth material; Cyl k is the unit dosage of the kth material; Dscl k is the current unit loss of the kth material; Szcl is the preset total production amount; Csx k is the real-time consumption data of the kth material; Zcl k Real-time storage data for the k-th material; 9. A fully automatic monitoring system for reporting work and replenishing materials, characterized in that: include: At least one task issuing terminal, multiple production equipment, multiple monitoring equipment, automatic feeding equipment, equipment maintenance terminal and fully automatic monitoring center; Among them, at least one task publishing terminal is used to send production tasks and receive work report data; Production equipment: allows the fully automatic monitoring center to call production execution equipment from a variety of production equipment; Monitoring equipment: allows the fully automatic monitoring center to call monitoring execution equipment from a variety of monitoring equipment; Automatic feeding equipment: feeding according to feeding instructions; Equipment maintenance terminal: receiving equipment status data; Fully automatic monitoring center: used to execute the fully automatic monitoring method for reporting work and replenishing materials as described in any one of claims 1-8.
10. The fully automatic monitoring system for reporting work and replenishing materials according to claim 9 is characterized in that: The various monitoring devices include at least: operation data collection equipment, energy consumption collection equipment, quantity statistics equipment and time statistics equipment; Among them, the operation data collection device is used to collect the real-time operation data of each production execution device; Energy consumption collection equipment: used to collect real-time energy consumption data of each production execution equipment; Quantity counting equipment: used to collect the real-time quantity of each semi-finished product, the real-time quantity of finished products, the real-time storage data of each material, and the real-time consumption data of each material; Time statistics equipment: used to collect the current operating time and collection time of each production execution equipment.