Unit economic operation method and system based on reservoir drought limit water level control

Through time-by-period sliding calculation method and locust optimization algorithm, the unit economic operation model under the drought water level control of the reservoir was constructed, which solved the calculation particle size and complexity of the unit economic operation in the drought water level control of the reservoir, and realized the hydropower station and The optimal operating strategy of the unit improves the reservoir's drought resistance and water supply safety.

CN118917751AActive Publication Date: 2024-11-08WUHAN UNIV
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202411046320.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-01
Publication Date
2024-11-08
Estimated Expiration
2044-08-01

AI Technical Summary

Technical Problem

The existing technology does not involve the economic operation method of the unit based on the reservoir drought water level control in the staged control of reservoir drought water level, resulting in the problem of finer particle size and higher model complexity, making it difficult to determine the optimal output and number of operating units of hydropower stations. , combination and output of each operating unit.

Method used

The period-by-period sliding calculation method is used to calculate the staged drought water level of the reservoir, and a unit economic operation model is constructed with the objective function of maximizing the total power generation of the reservoir during the planned period, and the working units in each period under the criterion of optimal power generation is combined with the locust optimization algorithm. the optimal economic operation strategy.

Benefits of technology

The drought water level control of reservoirs with finer particle size was realized, and the optimal output of hydropower stations, the number of operating units, combinations and output of each operating unit were determined. It provided a scientific operation plan under the control of the total water consumption, and improved the drought resistance scheduling capability of reservoirs. and water supply safety guarantee.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118917751A_ABST
    Figure CN118917751A_ABST
Patent Text Reader

Abstract

The invention provides a unit economic operation method and system based on reservoir drought limit water level control. The method comprises the following steps that the stage-by-stage drought limit water levels of a reservoir are obtained through calculation by adopting a period-by-period sliding calculation method; based on the staged drought limit water level of the reservoir, constructing a unit economic operation model which takes the maximum total generating capacity of the reservoir in the planned period as an objective function and meets reservoir-hydropower station-unit physical constraint conditions; and on the basis of the constructed unit economic operation model, an optimal economic operation strategy of the working unit in each time period under the optimal power generation criterion is sought by adopting a locust optimization algorithm. According to the method, a framework based on'drought limit water level control-unit economic operation-intelligent optimization 'is built, a general model of unit economic operation based on reservoir drought limit water level control is built and efficiently solved, and the unit economic operation method based on reservoir drought limit water level control is provided. And a theoretical basis and technical support can be provided for scientific formulation of a unit economic operation scheme under drainage basin reservoir drought limit water level staging control.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of reservoir dispatching, and in particular to a method and system for economic operation of a unit based on drought-limited water level control of a reservoir. Background Art

[0002] The drought-limit water level of a reservoir is the water level or flow rate at which the reservoir continues to be low and the flow rate continues to be low, affecting the water safety of urban and rural life, industrial and agricultural production, and the ecological environment, and it is the water level or flow rate at which drought-resistant measures should be taken.

[0003] The phased control of the drought-limited water level of a reservoir refers to the process of guiding the dispatching of reservoir benefits, ecological environment, etc. according to the scientifically demonstrated phased drought-limited water level during the drawdown period, taking into account the phased dry season and the low-water scenario, and ensuring the water safety of urban and rural life, industrial and agricultural production, and ecological environment. It is one of the effective methods to improve the level of water resource utilization and water supply guarantee capacity in the basin. The theory and method of phased control of the drought-limited water level of a reservoir are mainly divided into monthly sliding calculation method, decision analysis method, multi-objective optimization method, etc. according to their mathematical principles. These methods are all based on the reservoir or hydropower station as a whole, and the development of drought-limited water level phased control technology has not yet involved the unit economic operation method based on the drought-limited water level control of the reservoir.

[0004] Compared with the hydropower station dispatching under the staged control of the reservoir drought limit water level, the technical difficulties and challenges of the economic operation of the unit based on the reservoir drought limit water level control are as follows:

[0005] The calculation granularity is finer, not only to determine the optimal output of the hydropower station, but also to determine the number and combination of operating units and the output of each operating unit;

[0006] The model is more complex and requires not only the development of phased control technology for reservoir drought-limited water levels based on water supply safety, but also the development of economic operation technology for units under total water consumption control.

[0007] The existing technology mainly controls reservoir drought limit water level in stages for reservoirs or hydropower stations, and research on economic operation of units based on reservoir drought limit water level control has not yet been carried out. Summary of the invention

[0008] The present application provides a method and system for economic operation of a unit based on drought-limited water level control of a reservoir, which can solve the technical difficulties and challenges of economic operation of a unit based on drought-limited water level control of a reservoir in the prior art, such as the technical problems of finer calculation granularity and higher model complexity.

[0009] In a first aspect, the present application provides a method for economic operation of a unit based on reservoir drought limit water level control, comprising the following steps:

[0010] In each phase of the reservoir's dry season, the period-by-period sliding calculation method is used to calculate the reservoir's phased drought limit water level;

[0011] Based on the reservoir's phased drought limit water level, a unit economic operation model is constructed with the objective function of maximizing the total power generation of the reservoir during the planning period and satisfying the physical constraints of the reservoir, hydropower station and unit.

[0012] Based on the constructed unit economic operation model, the locust optimization algorithm is used to seek the optimal economic operation strategy of the units working in each period under the optimal power generation criterion.

[0013] In combination with the first aspect, in one implementation, in each period of the dry season of the reservoir, the period-by-period sliding calculation method is used to calculate and obtain the period-by-period drought limit water level of the reservoir, which specifically includes the following steps:

[0014] Following the principle of "summing up the water that cannot be combined and taking the maximum value of the water that can be combined", the water consumption of the reservoir during the dry season is deduced;

[0015] According to the estimated water consumption of the reservoir during the dry season, the water supply of the reservoir under the extremely low water scenario is calculated by using the sliding calculation method for each period;

[0016] The drought limit water level values ​​in different phases are determined based on the reservoir water level corresponding to the maximum value of the sum of the reservoir's water supply and dead storage capacity under extremely dry conditions and the reservoir water intake implementation elevation.

[0017] In combination with the first aspect, in one implementation, the principle of "summing up the water intakes that cannot be combined and taking the maximum value of the water intakes that can be combined" is followed to deduce the water consumption of the reservoir during the dry season as shown in the following formula:

[0018]

[0019] Where: W D (t) is the water consumption of the reservoir during period t; and are the water consumption above the dam and below the dam in period t respectively; W GS (t) is the water supply on the dam during period t; W FD (t), W GG (t) and W HS (t) are the water consumption for power generation, irrigation and environment and ecology in the dam during period t.

[0020] In combination with the first aspect, in one implementation, the water supply of the reservoir in the extreme low water scenario is calculated by using a sliding calculation method based on the estimated water consumption of the reservoir during the dry season as shown in the following formula:

[0021]

[0022] Where: W Y (t) is the amount of water that the reservoir should supply during period t.

[0023] In combination with the first aspect, in one implementation, the reservoir water level corresponding to the maximum value of the sum of the water supply and dead storage capacity of the reservoir under the extremely dry scenario and the reservoir water intake implementation elevation are combined to determine the staged drought limit water level value as shown in the following formula:

[0024]

[0025] Where: is the amount of water that the reservoir should supply in the i-th period t; W i max is the maximum value of the sum of the water supply and dead storage capacity of the reservoir in the i-th phase; is the reservoir water level corresponding to the maximum value of the sum of the reservoir water supply and dead storage capacity in the i-th phase; Z QS It is the elevation of the reservoir water intake facility; is the drought limit water level of the reservoir in the i-th period.

[0026] In combination with the first aspect, in one implementation, the objective function is shown as follows:

[0027]

[0028] Where: T is the planning period; E(T) is the total power generation of the reservoir during the planning period; U(t) is the number of units that can be put into operation at the tth moment, which is less than or equal to the total number of units; w is the number of the put-in-operation unit, which is less than or equal to U(t); g=L(t,w) is the internal number of the wth put-in-operation unit at the tth moment; N g (t) is the output of unit g in the plant.

[0029] In combination with the first aspect, in one embodiment, the reservoir-hydropower station-unit physical constraints specifically include total water volume constraints, reservoir hydropower station water balance constraints, reservoir water level constraints, unit head constraints, unit output limitations, unit water consumption characteristics, hydropower station total output limitations, comprehensive utilization constraints and initial reservoir water level constraints; wherein, the initial reservoir water level is equal to the water level at the end of the reservoir storage period, which is a known value.

[0030] In combination with the first aspect, in one implementation, the economic operation model of the unit constructed is based on the locust optimization algorithm to seek the optimal economic operation strategy of the unit working in each period under the optimal power generation criterion, which specifically includes the following steps:

[0031] Set locust algorithm parameters and initialize the population;

[0032] Evaluate the fitness of the initialized population and generate the offspring locust population;

[0033] The economic operation process of the unit is simulated based on the constructed unit economic operation model, and the physical constraints of the reservoir-hydropower station-unit are met, and the generated locust population is iteratively optimized;

[0034] The iteration termination situation of the offspring locust population is obtained according to the current number of iterations. When the iteration is terminated, the optimal economic operation strategy of the working units in each period under the optimal power generation criterion is output.

[0035] In a second aspect, the present application provides a unit economic operation system based on reservoir drought limit water level control, comprising:

[0036] The module for obtaining drought-limited water levels in different periods is used to calculate and obtain the drought-limited water levels of the reservoir in different periods of the dry season by using the sliding calculation method in each period;

[0037] A unit economic operation model construction module is connected to the phased drought limit water level acquisition module for constructing a unit economic operation model based on the phased drought limit water level of the reservoir, with the objective function of maximizing the total power generation of the reservoir during the planning period and satisfying the physical constraints of the reservoir, hydropower station and unit;

[0038] The optimal economic operation strategy acquisition module is communicated with the unit economic operation model construction module and is used to seek the optimal economic operation strategy of the unit working in each time period under the optimal power generation criterion by using the locust optimization algorithm based on the constructed unit economic operation model.

[0039] In conjunction with the second aspect, in one implementation, the module for acquiring drought-limited water levels in stages includes:

[0040] The unit for obtaining the water consumption of the reservoir during the dry season is used to deduce the water consumption of the reservoir during the dry season by following the principle of "summing up the water that cannot be combined and taking the maximum value of the water that can be combined";

[0041] A reservoir water supply acquisition unit is connected to the reservoir dry season water consumption acquisition unit for calculating the reservoir water supply under the extreme low water scenario by using a sliding calculation method based on the estimated reservoir dry season water consumption;

[0042] The phased drought limit water level value acquisition unit is communicatively connected with the reservoir water supply acquisition unit, and is used to determine the phased drought limit water level value by combining the reservoir water level corresponding to the maximum value of the sum of the reservoir water supply and the dead storage capacity under the extreme drought scenario and the reservoir water intake implementation elevation.

[0043] The beneficial effects brought by the technical solution provided by the embodiment of the present application include at least:

[0044] This application builds a framework based on "drought limit water level control-unit economic operation-intelligent optimization", constructs and efficiently solves a general model for unit economic operation based on reservoir drought limit water level control, and proposes a unit economic operation method based on reservoir drought limit water level control;

[0045] This application not only provides a reservoir drought limit water level staged control technology based on water supply safety, but also provides a unit economic operation method under total water consumption control, which can provide a theoretical basis and technical support for the scientific formulation of unit economic operation plans under the staged control of the drought limit water level of the basin reservoir;

[0046] The unit economic operation method based on reservoir drought limit water level control proposed in this application has a finer calculation granularity, which not only determines the optimal output of the hydropower station, but also determines the number and combination of operating units and the output of each operating unit. BRIEF DESCRIPTION OF THE DRAWINGS

[0047] Figure 1 A method flow chart of a method for economic operation of a unit based on reservoir drought limit water level control provided in an embodiment of the present application;

[0048] Figure 2 Another method flow chart of the unit economic operation method based on reservoir drought limit water level control provided in the embodiment of the present application;

[0049] Figure 3 The drought limit water level phased control diagram of the Three Gorges Reservoir provided in the embodiment of the present application;

[0050] Figure 4 The drought-limited water level control scheme for the Three Gorges Reservoir provided in the embodiment of the present application;

[0051] Figure 5 The locust algorithm iteration process for the economic operation of the Three Gorges Hydropower Station units provided in the embodiment of the present application. DETAILED DESCRIPTION

[0052] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0053] The terms "including" and "having" and any variations thereof in the specification and claims of this application and the above-mentioned drawings are intended to cover non-exclusive inclusions. For example, a process, method, system, product or device that includes a series of steps or units is not limited to the listed steps or units, but optionally includes steps or units that are not listed, or optionally includes other steps or units inherent to these processes, methods, products or devices. The terms "first", "second" and "third" are used to distinguish different objects, etc., and do not represent a sequence, nor do they limit "first", "second" and "third" to different types.

[0054] In the description of the embodiments of the present application, "exemplary", "for example" or "for example" are used to indicate examples, illustrations or descriptions. Any embodiment or design described as "exemplary", "for example" or "for example" in the embodiments of the present application should not be interpreted as being more preferred or more advantageous than other embodiments or designs. Specifically, the use of words such as "exemplary", "for example" or "for example" is intended to present related concepts in a specific way.

[0055] In the description of the embodiments of the present application, unless otherwise specified, “ / ” means or, for example, A / B can mean A or B; the “and / or” in the text is merely a description of the association relationship of associated objects, indicating that three relationships may exist, for example, A and / or B can mean: A exists alone, A and B exist at the same time, and B exists alone. In addition, in the description of the embodiments of the present application, “multiple” refers to two or more than two.

[0056] In some processes described in the embodiments of the present application, multiple operations or steps that appear in a specific order are included, but it should be understood that these operations or steps may not be executed in the order in which they appear in the embodiments of the present application or in parallel, and the sequence number of the operation is only used to distinguish the different operations, and the sequence number itself does not represent any execution order. In addition, these processes may include more or fewer operations, and these operations or steps may be executed in sequence or in parallel, and these operations or steps may be combined.

[0057] In order to make the objectives, technical solutions and advantages of the present application clearer, the implementation methods of the present application will be further described in detail below with reference to the accompanying drawings.

[0058] First, please refer to Figure 1-Figure 2 The embodiment of the present application provides a method for economic operation of a unit based on reservoir drought limit water level control, comprising the following steps:

[0059] Step S1: in each period of the dry season of the reservoir, the period-by-period sliding calculation method is used to calculate and obtain the period-by-period drought limit water level of the reservoir;

[0060] Step S2: Based on the phased drought limit water level of the reservoir, a unit economic operation model is constructed with the objective function of maximizing the total power generation of the reservoir during the planning period and satisfying the physical constraints of the reservoir, hydropower station and unit;

[0061] Step S3: Based on the constructed unit economic operation model, the locust optimization algorithm is used to seek the optimal economic operation strategy of the unit in each period under the optimal power generation criterion.

[0062] This application builds a framework based on "drought limit water level control-unit economic operation-intelligent optimization", constructs and efficiently solves a general model for unit economic operation based on reservoir drought limit water level control, and proposes a unit economic operation method based on reservoir drought limit water level control;

[0063] This application not only provides a reservoir drought limit water level staged control technology based on water supply safety, but also provides a unit economic operation method under total water consumption control, which can provide a theoretical basis and technical support for the scientific formulation of unit economic operation plans under the staged control of the drought limit water level of the basin reservoir;

[0064] The unit economic operation method based on reservoir drought limit water level control proposed in this application has a finer calculation granularity, which not only determines the optimal output of the hydropower station, but also determines the number and combination of operating units and the output of each operating unit.

[0065] In the present application, the unit is a water level control equipment unit of a reservoir or a hydropower station as a whole.

[0066] In one embodiment, step S1: in each period of the dry season of the reservoir, respectively using the time period sliding calculation method to calculate and obtain the periodic drought limit water level of the reservoir, specifically comprising the following steps:

[0067] Step S11: follow the principle of "summing up the water intakes that cannot be combined and taking the maximum value of the water intakes that can be combined" to deduce the water consumption of the reservoir during the dry season;

[0068] Step S12: Calculate the amount of water that should be supplied by the reservoir in the extreme low water scenario by using a sliding calculation method for each period according to the estimated water consumption of the reservoir during the dry season;

[0069] Step S13: Determine the drought limit water level value in stages by combining the reservoir water level corresponding to the maximum value of the sum of the reservoir water supply and dead storage capacity under the extreme drought scenario and the reservoir water intake implementation elevation, such as Figure 3 shown.

[0070] Based on step S1, the period-by-period sliding calculation method is used to calculate the reservoir's drought limit water level in stages, providing a theoretical basis for improving the reservoir's drought resistance and scheduling capabilities, effectively ensuring water supply safety, and providing water consumption constraints for the economic operation of the units. Under this premise, the economic operation of the reservoir's water supply units can be achieved.

[0071] In one embodiment, if Figure 4 As shown, based on the reservoir's staged drought limit water level, the reservoir's drought limit water level is controlled in stages. The reservoir will orderly implement drawdown scheduling between the staged drought limit water level (lower limit) and the normal water storage level (upper limit). The proposed reservoir drought limit water level staged control scheme is used for drawdown scheduling, and the reservoir's water storage and release process under different water inflow scenarios (design frequency ≥ 75%) is obtained.

[0072] In one embodiment, if the reservoir is mainly responsible for water supply tasks such as urban water supply, agricultural irrigation, environmental ecology, and power generation, the water supply is gravity diversion from the upstream of the reservoir, agricultural irrigation uses power generation tailwater, and environmental ecology is water use in the river downstream of the reservoir dam. Following the principle of "summing up if water cannot be combined, and taking the maximum value if water can be combined", the step S11: following the principle of "summing up if water cannot be combined, and taking the maximum value if water can be combined", the water consumption of the reservoir during the dry season is deduced as shown in the following formula:

[0073]

[0074] Where: tW D (t) is the water consumption of the reservoir during period t; and are the water consumption above the dam and below the dam in period t respectively; W GS (t) is the water supply on the dam during period t; W FD (t), W GG (v) and W HS (t) are the water consumption for power generation, irrigation and environment and ecology in the dam during period t.

[0075] In one embodiment, considering the water inflow in the drought year scenario (design frequency ≥ 75%), the water supply of the reservoir in each period is the difference between the water consumption in the period and the water inflow. The water supply of the reservoir in the extreme dry season scenario is calculated by the sliding calculation method by period based on the inferred water consumption of the reservoir in the dry season as shown in the following formula:

[0076]

[0077] Where: W Y (t) is the amount of water that the reservoir should supply during period t.

[0078] In one embodiment, if the dry season of a reservoir is divided into n phases, then in each phase, the reservoir water level corresponding to the maximum value of the sum of the water supply and dead storage capacity of the reservoir calculated by the sliding calculation method for each period is used as a basis, and factors such as the elevation of water intake implementation of the reservoir are considered, and the reservoir water level corresponding to the maximum value of the sum of the water supply and dead storage capacity of the reservoir under the extremely dry scenario and the elevation of water intake implementation of the reservoir are comprehensively analyzed to determine the drought limit water level value of each phase. The determination of the drought limit water level value of each phase is shown in the following formula based on the reservoir water level corresponding to the maximum value of the sum of the water supply and dead storage capacity of the reservoir under the extremely dry scenario and the elevation of water intake implementation of the reservoir:

[0079]

[0080]

[0081] Where: is the amount of water that the reservoir should supply in the i-th period t; Wi max is the maximum value of the sum of the water supply and dead storage capacity of the reservoir in the i-th phase; is the reservoir water level corresponding to the maximum value of the sum of the reservoir water supply and dead storage capacity in the i-th phase; Z QS It is the elevation of the reservoir water intake facility; is the drought limit water level of the reservoir in the i-th period.

[0082] In one embodiment, step S2: based on the phased drought limit water level of the reservoir, constructing a unit economic operation model with maximizing the total power generation of the reservoir during the planning period as the objective function and satisfying the physical constraints of the reservoir-hydropower station-unit, specifically comprising the following steps:

[0083] Step S21: Establishing an objective function with maximizing the total power generation of the reservoir during the planning period as the optimization goal;

[0084] Step S22: Obtain the physical constraints of the reservoir-hydropower station-unit, wherein the physical constraints of the reservoir-hydropower station-unit include total water volume constraints, reservoir hydropower station water balance constraints, reservoir water level constraints, unit head constraints, unit output limitations, unit water consumption characteristics, hydropower station total output limitations, comprehensive utilization constraints and initial reservoir water level constraints; wherein the initial reservoir water level is equal to the water level at the end of the reservoir storage period, which is a known value.

[0085] In one embodiment, the objective function in step S21 with maximizing the total power generation of the reservoir during the planning period as the optimization target is as shown in the following formula:

[0086]

[0087] Where: T is the planning period; E(T) is the total power generation of the reservoir during the planning period; U(t) is the number of units that can be put into operation at the tth moment, which is less than or equal to the total number of units; w is the number of the put-in-operation unit, which is less than or equal to U(t); g=L(t,w) is the internal number of the wth put-in-operation unit at the tth moment; N g (t) is the output of unit g in the plant.

[0088] In one embodiment, the physical constraints of the reservoir-hydropower station-generator unit in step S22 are as follows:

[0089] A: The total water volume constraint is as follows:

[0090]

[0091] Where: Q fd (t) is the power generation flow of the hydropower station at the tth moment; Q qs (t) is the amount of water discharged from the reservoir at the tth moment; is the power generation flow of unit g at time t; Wck (T) is the total water discharge from the reservoir during the planning period T, which is calculated based on the water release process of the reservoir implementing phased control of drought-limited water levels during the planning period in step 1.

[0092] B: The water balance constraint of the reservoir and hydropower station is as follows:

[0093]

[0094] C: Reservoir water level constraint is as follows:

[0095] Z min (t)≤Z(t)≤Z max (t)

[0096] Where: Z(t) is the reservoir water level at time t; Z min (t) and Z max (t) are the minimum and maximum water levels allowed by the reservoir at the tth moment, respectively. The minimum allowable water level here is the reservoir's drought limit water level in stages, and the maximum allowable water level is the reservoir's normal water level.

[0097] D: The unit head constraint is as follows:

[0098]

[0099] Where: H g (t) is the net water head of unit g at time t; and are the minimum and maximum water heads of unit g respectively; Z xy (t) is the water level downstream of the unit at time t; ΔH g (t) is the head loss of unit g at the tth moment; φ g (·) is the head loss function of unit g.

[0100] E: The unit output limit is as follows:

[0101]

[0102] Where: and They are the minimum and maximum output of unit g at the tth moment respectively.

[0103] F: The water consumption characteristics of the unit are shown as follows:

[0104]

[0105] Where: g (·,·) is the water consumption characteristic curve of unit g, which reflects the relationship between the unit power generation flow and the unit output and water head.

[0106] G: The total output limit of the hydropower station is as follows:

[0107]

[0108] Where: N(t) is the output of the hydropower station at the tth moment; N min (t) and N max (t) are the minimum and maximum outputs of the hydropower station at moment t respectively.

[0109] H: Comprehensive utilization constraints are as follows:

[0110]

[0111] Where: The minimum downstream flow rate is determined by comprehensively considering the needs of ecology, water supply, shipping, etc. for the minimum downstream flow rate required for downstream comprehensive utilization.

[0112] I: The initial reservoir water level constraint is as follows:

[0113] Z cs = Z(1)

[0114] Where: Z cs is the initial reservoir water level during the planning period; Z(1) is the reservoir water level at the first moment in the planning period T, which is equal to the reservoir water level at the end of the storage period and is a known value.

[0115] In addition to meeting the above constraints, the dispatching and operation of reservoirs and hydropower stations must also meet their own characteristic curve constraints, such as the reservoir water level-storage capacity relationship curve, the reservoir water level-discharge capacity curve, the downstream water level-flow relationship curve, the unit expected output limit line, and the optimal power characteristic curve of the entire plant. In addition, various variables must be non-negative variables.

[0116] The economic operation of the unit aims to find the optimal number and combination of the working units in each period and the distribution of active load among the working units under the optimal power generation criterion. According to the unique conversion relationship between the key variables of reservoirs (reservoir water storage at the end of the period) and the key variables of hydropower stations (generation output and generation flow of the units in the period), and considering the water-based electricity model, the reservoir water storage at the end of the period is selected as the decision variable of the unit economic operation model.

[0117] In one embodiment, step S3: based on the constructed unit economic operation model, the locust optimization algorithm is used to seek the optimal economic operation strategy of the unit in each period under the optimal power generation criterion, which specifically includes the following steps:

[0118] Step S31: Setting locust algorithm parameters and initializing the population; specifically, setting the locust population size N pop , maximum number of iterations G max , the minimum value of the attenuation coefficient C minand the maximum value C max ; Use real - number coding method to code and randomly generate N pop -scale decision variables, that is, the reservoir water level V(t + 1) at the end of the time period;

[0119] Step S32: Conduct fitness evaluation on the initial population to generate the offspring locust population; specifically, conduct fitness evaluation on the initial population, divide the locust population into grades according to the obtained fitness; perform roulette wheel operation to select the locust population with the maximum fitness (i.e., elitist retention strategy) to generate an offspring locust population with a scale still of N pop ;

[0120] Step S33: As Figure 5 shown, based on the constructed unit economic operation model, simulate the unit economic operation process, and meet the physical constraints of the reservoir - hydropower station - unit, and perform iterative optimization on the generated offspring locust population; specifically, simulate the unit economic operation process, and it is necessary to meet the physical constraints of the reservoir - hydropower station - unit. According to the locust swarm behavior, divide the activity area of locust individuals into an attraction area (0, a1], a comfort area (a1, a2], and a repulsion area (a2, a3], where 0 < a1 < a2 < a3; perform iterative optimization on the generated offspring locust population. The update calculation formula of the attenuation coefficient c k at the k - th iteration and the calculation formula of the position of the locust individual in the swarm are shown as follows respectively:

[0121] c k = C max - k·(C max - C min ) / G max

[0122]

[0123] In the formula, c k is the attenuation coefficient at the k - th iteration, used to adjust the ranges of the attraction area, comfort area, and repulsion area; is the position vector of the d - th (d = 1, 2,..., D) decision variable of the j - th locust individual, where D is the number of decision variables; is the best position vector of the d - th decision variable; U d and L d are respectively the upper and lower limits of the constraints of the d - th decision variable; and are respectively the positions of the d - th (d = 1, 2,..., D) decision variables of the n - th locust individual and the j - th locust individual; is the unit vector from the position of the jth locust individual to the position of the nth locust individual; s(x) is the clustering behavior function of the independent variable x, where the parameters F and L are the attraction intensity and attraction distance scale of the attraction zone, respectively.

[0124] Step S34: Obtain the iteration termination status of the offspring locust population according to the current iteration number. When the iteration terminates, output the optimal economic operation strategy of the working unit in each period under the optimal power generation criterion; specifically, if the current iteration number is less than the maximum iteration number G max , then repeat steps ② to ④; otherwise, terminate the calculation and output the optimal economic operation strategy of the working units in each period under the optimal power generation criterion.

[0125] Based on step S3, considering constraints such as predicted runoff and total water consumption, the locust optimization algorithm is used to seek the optimal number and combination of working units in each period and the distribution of active load among the working units under the optimal power generation criterion, so as to provide scientific support for guiding the economic operation of the units under the drought-limited water level control of the reservoir.

[0126] In a second aspect, the present application provides a unit economic operation system based on reservoir drought limit water level control, comprising:

[0127] The module for obtaining drought-limited water levels in different periods is used to calculate and obtain the drought-limited water levels of the reservoir in different periods of the dry season by using the sliding calculation method in each period;

[0128] A unit economic operation model construction module is connected to the phased drought limit water level acquisition module for constructing a unit economic operation model based on the phased drought limit water level of the reservoir, with the objective function of maximizing the total power generation of the reservoir during the planning period and satisfying the physical constraints of the reservoir, hydropower station and unit;

[0129] The optimal economic operation strategy acquisition module is communicated with the unit economic operation model construction module and is used to seek the optimal economic operation strategy of the unit working in each time period under the optimal power generation criterion by using the locust optimization algorithm based on the constructed unit economic operation model.

[0130] In conjunction with the second aspect, in one implementation, the module for acquiring drought-limited water levels in stages includes:

[0131] The unit for obtaining the water consumption of the reservoir during the dry season is used to deduce the water consumption of the reservoir during the dry season by following the principle of "summing up the water that cannot be combined and taking the maximum value of the water that can be combined";

[0132] A reservoir water supply acquisition unit is connected to the reservoir dry season water consumption acquisition unit for calculating the reservoir water supply under the extreme low water scenario by using a sliding calculation method based on the estimated reservoir dry season water consumption;

[0133] The phased drought limit water level value acquisition unit is communicatively connected with the reservoir water supply acquisition unit, and is used to determine the phased drought limit water level value by combining the reservoir water level corresponding to the maximum value of the sum of the reservoir water supply and the dead storage capacity under the extreme drought scenario and the reservoir water intake implementation elevation.

[0134] Among them, the functional implementation of each module in the above-mentioned unit economic operation system based on reservoir drought limit water level control corresponds to the steps in the above-mentioned unit economic operation method embodiment based on reservoir drought limit water level control, and its functions and implementation process will not be repeated here one by one.

[0135] On the third aspect, an embodiment of the present application provides a unit economic operation device based on reservoir drought limit water level control. The unit economic operation device based on reservoir drought limit water level control can be a personal computer (PC), a laptop computer, a server, or other device with data processing function.

[0136] The communication interface includes input / output (I / O) interface, physical interface and logical interface, etc., which are used to realize the interconnection of devices inside the economic operation equipment of the unit based on the drought limit water level control of the reservoir, and the interface used to realize the interconnection between the economic operation equipment of the unit based on the drought limit water level control of the reservoir and other devices (such as other computing devices or user devices). The physical interface can be an Ethernet interface, an optical fiber interface, an ATM interface, etc.; the user device can be a display (Display), a keyboard (Keyboard), etc.

[0137] The memory can be various types of storage media, such as random access memory (RAM), read-only memory (ROM), non-volatile RAM (NVRAM), flash memory, optical storage, hard disk, programmable ROM (PROM), erasable PROM (EPROM), electrically erasable PROM (EEPROM), etc.

[0138] The processor may be a general-purpose processor, which may call the unit economic operation program based on the reservoir drought limit water level control stored in the memory, and execute the unit economic operation method based on the reservoir drought limit water level control provided in the embodiment of the present application. For example, the general-purpose processor may be a central processing unit (CPU). The method executed when the unit economic operation program based on the reservoir drought limit water level control is called may refer to the various embodiments of the unit economic operation method based on the reservoir drought limit water level control in the present application, which will not be repeated here.

[0139] In a fourth aspect, an embodiment of the present application also provides a readable storage medium.

[0140] The readable storage medium of the present application stores a unit economic operation program based on reservoir drought limit water level control, wherein when the unit economic operation program based on reservoir drought limit water level control is executed by the processor, the steps of the unit economic operation method based on reservoir drought limit water level control as described above are implemented.

[0141] Among them, the method implemented when the unit economic operation program based on the drought-limited water level control of the reservoir is executed can refer to the various embodiments of the unit economic operation method based on the drought-limited water level control of the reservoir in this application, and will not be repeated here.

[0142] It should be noted that the serial numbers of the above-mentioned embodiments of the present application are only for description and do not represent the advantages or disadvantages of the embodiments.

[0143] Through the description of the above implementation methods, those skilled in the art can clearly understand that the above-mentioned embodiment methods can be implemented by means of software plus a necessary general hardware platform, and of course by hardware, but in many cases the former is a better implementation method. Based on such an understanding, the technical solution of the present application is essentially or the part that contributes to the prior art can be embodied in the form of a software product, which is stored in a storage medium (such as ROM / RAM, disk, CD) as described above, and includes a number of instructions for a terminal device to execute the methods described in each embodiment of the present application.

[0144] The above are only preferred embodiments of the present application, and are not intended to limit the patent scope of the present application. Any equivalent structure or equivalent process transformation made using the contents of the present application specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present application.

Claims

1. A method for economic operation of units based on reservoir drought limit water level control, It is characterized in that The following steps are involved: In each phase of the reservoir's dry season, the period-by-period sliding calculation method is used to calculate the reservoir's phased drought limit water level; Based on the reservoir's phased drought limit water level, a unit economic operation model is constructed with the objective function of maximizing the total power generation of the reservoir during the planning period and satisfying the physical constraints of the reservoir, hydropower station and unit. Based on the constructed unit economic operation model, the locust optimization algorithm is used to seek the optimal economic operation strategy of the units working in each period under the optimal power generation criterion.

2. The unit economic operation method based on reservoir drought limit water level control as claimed in claim 1, It is characterized in that In each phase of the dry season of the reservoir, the period-by-period sliding calculation method is used to calculate and obtain the phased drought limit water level of the reservoir, which specifically includes the following steps: Following the principle of "summing up the water intakes that cannot be combined and taking the maximum value of the water intakes that can be combined", the water consumption of the reservoir during the dry season is deduced; According to the estimated water consumption of the reservoir during the dry season, the water supply of the reservoir under the extremely low water scenario is calculated by using the sliding calculation method for each period; The drought limit water level values ​​in different phases are determined based on the reservoir water level corresponding to the maximum value of the sum of the reservoir's water supply and dead storage capacity under extremely dry conditions and the reservoir water intake implementation elevation.

3. The unit economic operation method based on reservoir drought limit water level control as claimed in claim 2, It is characterized in that Following the principle of "summing up water that cannot be combined and taking the maximum value of water that can be combined", the water consumption of the reservoir during the dry season is deduced as follows: Where: W D (t) is the water consumption of the reservoir during period t; and are the water consumption above the dam and below the dam in period t respectively; W GS (t) is the water supply on the dam during period t; W FD (t), W GG (t) and W HS (t) are the water consumption for power generation, irrigation and environment and ecology in the dam during period t.

4. The method for economic operation of a unit based on reservoir drought limit water level control as claimed in claim 2, It is characterized in that Based on the estimated water consumption of the reservoir during the dry season, the water supply of the reservoir under the extreme low water scenario is calculated by using the sliding calculation method for each period as shown in the following formula: Where: W Y (t) is the amount of water that the reservoir should supply during period t.

5. The method for economic operation of a unit based on reservoir drought limit water level control as claimed in claim 2, It is characterized in that The reservoir water level corresponding to the maximum value of the sum of the reservoir water supply and dead storage capacity under the extremely dry scenario and the reservoir water intake implementation elevation are determined as follows: Where: is the amount of water that the reservoir should supply in the i-th period t; W i max is the maximum value of the sum of the water supply and dead storage capacity of the reservoir in the i-th phase; is the reservoir water level corresponding to the maximum value of the sum of the reservoir water supply and dead storage capacity in the i-th phase; Z QS It is the elevation of the reservoir water intake facility; is the drought limit water level of the reservoir in the i-th period.

6. The unit economic operation method based on reservoir drought limit water level control as claimed in claim 1, It is characterized in that The objective function is shown in the following formula: Where: T is the planning period; E(T) is the total power generation of the reservoir during the planning period; U(t) is the number of units that can be put into operation at the tth moment, which is less than or equal to the total number of units; w is the number of the put-in-operation unit, which is less than or equal to U(t); g=L(t,w) is the internal number of the wth put-in-operation unit at the tth moment; N g (t) is the output of unit g in the plant.

7. The method for economic operation of a unit based on reservoir drought limit water level control as claimed in claim 1, It is characterized in that The physical constraints of the reservoir-hydropower station-unit specifically include total water volume constraints, reservoir hydropower station water balance constraints, reservoir water level constraints, unit head constraints, unit output limitations, unit water consumption characteristics, hydropower station total output limitations, comprehensive utilization constraints and initial reservoir water level constraints; wherein the initial reservoir water level is equal to the water level at the end of the reservoir storage period.

8. The method for economic operation of a unit based on reservoir drought limit water level control as claimed in claim 1, It is characterized in that The economic operation model of the unit constructed by the locust optimization algorithm is used to seek the optimal economic operation strategy of the unit in each period under the optimal power generation criterion, which specifically includes the following steps: Set locust algorithm parameters and initialize population; Evaluate the fitness of the initialized population and generate the offspring locust population; The economic operation process of the unit is simulated based on the constructed unit economic operation model, and the physical constraints of the reservoir-hydropower station-unit are met, and the generated locust population is iteratively optimized; The iteration termination situation of the offspring locust population is obtained according to the current number of iterations. When the iteration is terminated, the optimal economic operation strategy of the working units in each period under the optimal power generation criterion is output.

9. A unit economic operation system based on reservoir drought limit water level control, It is characterized in that include: The module for obtaining drought-limited water levels in different periods is used to calculate and obtain the drought-limited water levels of the reservoir in different periods of the dry season by using the sliding calculation method in each period; A unit economic operation model construction module is connected to the phased drought limit water level acquisition module for constructing a unit economic operation model based on the phased drought limit water level of the reservoir, with the objective function of maximizing the total power generation of the reservoir during the planning period and satisfying the physical constraints of the reservoir, hydropower station and unit; The optimal economic operation strategy acquisition module is communicated with the unit economic operation model construction module and is used to seek the optimal economic operation strategy of the unit working in each time period under the optimal power generation criterion by using the locust optimization algorithm based on the constructed unit economic operation model.

10. The unit economic operation system based on reservoir drought limit water level control as claimed in claim 9, It is characterized in that The phased drought limit water level acquisition module includes: The unit for obtaining the water consumption in the dry season of the reservoir is used to follow the principle of "summing up the water intakes that cannot be combined and taking the maximum value of the water intakes that can be combined" to deduce the water consumption in the dry season of the reservoir; A reservoir water supply acquisition unit is connected to the reservoir dry season water consumption acquisition unit for calculating the reservoir water supply under the extreme low water scenario by using a sliding calculation method based on the estimated reservoir dry season water consumption; The phased drought limit water level value acquisition unit is communicatively connected with the reservoir water supply acquisition unit, and is used to determine the phased drought limit water level value by combining the reservoir water level corresponding to the maximum value of the sum of the reservoir water supply and the dead storage capacity under the extreme drought scenario and the reservoir water intake implementation elevation.

Citation Information

Patent Citations

  • Application method of cascade reservoir running water level collaborative floating in flood season

    CN114117956A

  • Cascade reservoir drought limit water level dispatching line optimization method, device and system

    CN114358379A

  • Reservoir drought limit water level optimization and drought resistance scheduling method

    CN115099477A

  • Rural multi-energy complementary energy storage method, device, storage medium and system

    CN116054259A

  • Water economy integrated management and control system

    CN117764414A