Distributed management platform based on clean energy digitization

By collecting and analyzing historical current usage information in the clean energy digital distributed management platform, screening and optimizing targets, predicting electricity consumption, and adjusting the energy supply plan according to the stability of electricity consumption, the electricity consumption prediction error and management of new enterprises have been solved. The problem of incompleteness has achieved efficient management and efficient operation of clean energy.

CN118917809AInactive Publication Date: 2024-11-08ZHEJIANG CARBON SILVER DIGITAL SMART GREEN ENERGY TECH CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411414838.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-11
Publication Date
2024-11-08
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing energy forecasting method in the new enterprise work area has a short energy consumption time and large energy fluctuations, resulting in large prediction errors, which cannot accurately reflect future electricity consumption trends, affecting the energy supply scheduling of distributed energy stations, and the distributed management platform If the management is not sound, it is difficult to improve the energy supply management capabilities of clean energy.

Method used

A distributed management platform based on the digitalization of clean energy was designed, including a data analysis module, a power consumption judgment module and an energy supply regulation module. By collecting and analyzing historical current consumption information, screening and optimizing targets, predicting power consumption, and Adjust the energy supply plan according to the stability of electricity consumption, provide energy storage and energy supply services, and improve the utilization rate and management efficiency of clean energy.

Benefits of technology

By uniformly managing clean energy energy storage equipment, the internal energy supply risk management costs of enterprises are reduced, the transparency and monitoring efficiency of energy supply and energy storage data are improved, the proportion of green electricity use and system operation efficiency are improved, and the digital distribution of clean energy is realized The integrated operation of the management platform has reduced the working pressure of small and micro-enterprise enterprises.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118917809A_ABST
    Figure CN118917809A_ABST
Patent Text Reader

Abstract

The invention discloses a distributed management platform based on clean energy digitization, which comprises a data analysis module, a power consumption judgment module, an energy supply adjustment module and a service module, and is characterized in that the data analysis module is used for distributing clean energy according to a preset strategy; the electricity consumption judgment module is used for judging whether the electricity consumption is stable or not and outputting a corresponding instruction; the energy supply adjusting module is used for adjusting adjustable load resources of the distributed management platform; according to the system and the method, the clean energy storage equipment is managed in a unified manner through the power station, so that the risk management cost and the identification cost of energy supply in the enterprise are reduced; the load adjusting capacity of the distributed management platform for the enterprise working area is exerted, energy supply and energy storage services of peripheral power stations, energy storage facility configuration and the like are utilized, integrated operation of the clean energy digital distributed management platform is achieved, and the clean energy digital distributed management platform has the advantages of being high in energy management capacity and high in energy supply dispatching adaptability.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of energy management technology, and in particular to a distributed management platform based on clean energy digitization. Background Art

[0002] Clean energy digitization is a method of using digital information technology to improve clean energy efficiency, reduce clean energy waste and control clean energy costs. Digital management of clean energy can achieve goals such as automatic monitoring and control of energy use. Clean energy management includes energy monitoring, energy forecasting, energy efficiency optimization and energy planning. Energy forecasting refers to the analysis of energy usage trends to predict future energy usage, which can help make advance plans.

[0003] In order to vigorously develop clean energy business, clean energy enterprises have begun to increase the scale of construction of new energy stations, energy storage stations, clean energy supply power stations and other projects, and continuously improve the clean energy service capabilities of enterprises. However, there are still some problems with the existing energy forecasting methods: when predicting energy usage, it is necessary to adopt some historical energy consumption data of the enterprise work area as reference data. However, since some enterprise work areas belong to new enterprise work areas that have not been using energy for a long time, and the energy consumption during the energy consumption process fluctuates greatly, using the initial current consumption information of the new enterprise work area as reference data for prediction will lead to large prediction errors, and the prediction results obtained do not conform to the future electricity consumption trend, which is not conducive to the distributed energy station to timely dispatch energy supply according to the prediction results. At the same time, the problem of imperfect management of the distributed management platform is gradually exposed. Therefore, how to strengthen the energy supply management capabilities of clean energy, improve the utilization rate of clean energy, and then realize the intelligent management of enterprises is a problem that needs to be solved urgently. Therefore, it is necessary to design a distributed management platform based on clean energy digitization with strong energy management capabilities and high adaptability to energy supply scheduling. Summary of the invention

[0004] The purpose of the present invention is to provide a distributed management platform based on clean energy digitization to solve the problems raised in the above background technology.

[0005] In order to solve the above technical problems, the present invention provides the following technical solutions: a distributed management platform based on the digitization of clean energy, including a data analysis module, a power consumption judgment module, an energy supply adjustment module and a service module, wherein the data analysis module is used to collect historical power consumption information of enterprise work areas, analyze the power consumption time of different enterprise work areas, and screen out optimization targets based on the power consumption time, analyze the power consumption information of the optimization targets, predict the power consumption of the optimization targets when the power consumption tends to be stable, and allocate clean energy according to a preset strategy; the power consumption judgment module is used to judge whether the power consumption is stable, and output corresponding instructions according to the judgment result; the energy supply adjustment module is used to obtain the power supply time period of the power station, and adjust the adjustable load resources of the distributed management platform based on the energy supply usage plan, and the energy supply usage plan is preset by the distributed management platform; the service module is used to provide energy storage services and energy supply services for the enterprise work area according to the power consumption information.

[0006] According to the above technical solution, the data analysis module includes an operation data monitoring module and a peak-shaving auxiliary processing module. The operation data monitoring module is used to receive user operation instructions; the peak-shaving auxiliary processing module is used to manage the baseline load, based on the clearing settlement data, combined with the total electricity consumption information of all groups of enterprise work areas during the power supply period of the power station, and through the distributed management platform. According to the preset strategy, clean energy is allocated, and the allocation information is sent to the equipment associated with each energy user.

[0007] According to the above technical solution, the power consumption judgment module includes a power consumption stability judgment module and a total power detection module. The power consumption stability judgment module is used to collect power consumption time set data of the enterprise work area supplied by the same distributed energy station; retrieve the historical current consumption information of the enterprise work area, and collect the previous power consumption of the enterprise work area once every time interval t; retrieve the power consumption time set data of the enterprise work area, arrange the enterprise work areas in order from short to long according to the power consumption time, and after arrangement, group the enterprise work areas according to the power consumption time, obtain the total power consumption time set of each group of enterprise work areas after grouping in a random grouping method, obtain the grouping result of the best grouping method, and select a group of enterprise work areas with the shortest total power consumption time from the grouping result of the best grouping method as the optimization target, and use the remaining grouped enterprise work areas as non-optimization targets; retrieve the historical power consumption information of the optimization target, Obtain a random set of power consumption of an optimization target, predict the k+1th power consumption of the corresponding optimization target, obtain the power consumption set of the corresponding optimization target after the k+1th time by analogy, count the power consumption difference, and judge whether the power consumption is stable; the total power detection module is used to adjust the initial power consumption of the corresponding optimization target referenced in energy consumption prediction to the hth power consumption, obtain the power consumption set of the corresponding optimization target after the hth time, and predict the power consumption of the corresponding optimization target at the h+cth time; collect historical power consumption data of non-optimization targets, use the limit power consumption set by the system as the initial power consumption of non-optimization targets, predict the power consumption of non-optimization targets in the power supply time period of the power station in the same way, add the predicted power consumption of the optimization targets and non-optimization targets in the power supply time period of the power station, and obtain the total power consumption of all group enterprise work areas powered by the distributed energy station in the power supply time period of the power station.

[0008] According to the above technical solution, the service module includes an energy supply time period detection module and an energy storage and energy supply service module. The energy supply time period detection module is used to obtain the time nodes X1 and X2 of the energy supply time period. When the power supply and power consumption of the power station is controlled to be stable; the energy storage and supply service module is used to obtain the current consumption information of the enterprise work area, the power generation flow information of the enterprise work area and the operation data of the power station; according to the current consumption information of the enterprise work area and the power generation flow information of the enterprise work area, at least one power station that can be used for power storage and power supply is pushed to the enterprise work area; according to the operation data of the power station and the power generation flow information of the enterprise work area, energy storage services are provided to the enterprise work area; according to the operation data of the power station and the current consumption information of the enterprise work area, energy supply services are provided to the enterprise work area.

[0009] According to the above technical solution, the operation method of the distributed management platform based on the digitalization of clean energy includes: Collect historical electricity consumption information of enterprise work areas, analyze the electricity consumption time of different enterprise work areas, select optimization targets based on the electricity consumption time, analyze the electricity consumption information of optimization targets, predict the electricity consumption of optimization targets when electricity consumption tends to be stable, and allocate clean energy according to the preset strategy; Determine whether the power consumption is stable and output corresponding instructions according to the judgment result; Obtaining a power supply time period of the power station, and adjusting the adjustable load resources of the distributed management platform based on the power supply usage plan, wherein the power supply usage plan is preset by the distributed management platform; Provide energy storage and supply services for corporate work areas based on electricity consumption information.

[0010] According to the above technical solution, the clean energy is distributed according to the preset strategy through the distributed management platform, including: Receive a user operation instruction, wherein the user operation instruction is used to instruct the distributed management platform to perform a target operation corresponding to the user operation instruction based on clean energy data of at least one clean energy device and a clean energy device production control device; Among them, user operation instructions are controlled by personnel users, equipment users and user groups. The personnel users are registered users of the system and are responsible for creating and maintaining system components, including databases, forms, equipment users and user groups. The equipment users are used to define energy devices connected to the system and have the function of automatically connecting to the system without providing verification information. The user groups are used to define relevant personnel users and equipment users. The permission operations of the user groups can be simultaneously issued to all personnel users and equipment users included in them. The target operations include: Monitoring the clean energy data; Provide peak load-shaving assistance to various energy equipment and energy users; Control the carbon emissions of various energy equipment; The peak load-shaving auxiliary processing for each of the energy equipment and energy users includes: Real-time monitoring of the operating data of each of the energy devices; Managing the baseline load, which is used to characterize the minute-level average load when the distributed management platform participates in the peak load-shaving auxiliary services of each energy device, and implements demand response and orderly power consumption; The baseline load is obtained by the distributed management platform according to a preset calculation path when participating in the paid peak load-shaving auxiliary service transaction on the power generation side and implementing demand response and orderly power consumption; Based on the clearing and settlement data, combined with the total electricity consumption information of all groups of enterprise work areas during the power supply period of the power station, the clean energy is allocated according to the preset strategy through the distributed management platform, and the stability of the electricity consumption is judged. The allocation information is sent to the equipment associated with each energy user, and the corresponding instructions are output according to the judgment result. The clearing and settlement data is retrieved through the database set in the distributed management platform, and the equipment associated with the energy user is communicated with the distributed management platform.

[0011] According to the above technical solution, the total power consumption information of all group enterprise work areas during the power supply period of the power station is combined, and the clean energy is allocated according to the preset strategy through the distributed management platform, and the stability of the power consumption is judged, and the allocation information is sent to the equipment associated with each energy user, and the corresponding instructions are output according to the judgment result, including: Collect the electricity consumption time aggregate data of the working area of ​​the enterprise supplied by the same distributed energy station. The electricity consumption time aggregate data includes three data items: energy consumption reference value, cumulative electricity consumption on the day, and cumulative electricity consumption on the month. The energy consumption reference value is generated by the average value of electricity in the past month, and the judgment threshold is initially set at ±10% of the energy consumption reference value; Retrieve the historical electricity consumption information of the enterprise work area, and collect the previous electricity consumption of the enterprise work area once every time interval t, wherein the enterprise work area database uses Kettle clusters from various business systems in an ETL manner to collect electricity consumption data in parallel to the enterprise work area database, forming a database buffer layer, a DW layer and an application layer; Retrieve the power usage time collection data of the enterprise workspaces, arrange the enterprise workspaces in order of power usage time from short to long, and after arrangement, group the enterprise workspaces according to power usage time, wherein the power usage time of each enterprise workspace in the first group is shorter than the power usage time of all enterprise workspaces in the second group, obtain the total power usage time set of each group of enterprise workspaces after grouping in a random grouping method, obtain the grouping result of the best grouping method, select the group of enterprise workspaces with the shortest total power usage time from the grouping result of the best grouping method as the optimization target, and set the remaining grouped enterprise workspaces as non-optimization targets; Retrieve the historical electricity consumption information of the optimization target, obtain the electricity consumption set of a random optimization target, where the number of electricity consumption sets is k, predict the electricity consumption of the corresponding optimization target for the k+1th time, and calculate the electricity consumption set of the corresponding optimization target after the k+1th time by analogy, count the electricity consumption difference, the electricity consumption difference between the k+2th time and the k+1th time, set the difference threshold to Q, and judge whether the electricity consumption is stable. If it is counted that the electricity consumption difference is lower than x for n consecutive times starting from the hth time, the information that the electricity consumption of the corresponding optimization target tends to be stable from the hth time will be output, otherwise, the information that the electricity consumption is unstable will be output, where h>k+1; The initial power consumption of the corresponding optimization target referenced in the energy consumption forecast is adjusted to the power consumption of the hth time to obtain the power consumption set of the corresponding optimization target after the hth time, and the power consumption of the corresponding optimization target at the h+cth time is predicted, where c is the number of initial test predictions of power consumption; Collect historical electricity consumption data of non-optimization targets, use the limit electricity consumption set by the system as the initial electricity consumption of the non-optimization targets, predict the electricity consumption of the non-optimization targets during the power supply period of the power station in the same way, add the predicted electricity consumption of the optimization targets and non-optimization targets during the power supply period of the power station, and obtain the total electricity consumption of all group enterprise work areas powered by the distributed energy station during the power supply period of the power station.

[0012] According to the above technical solution, the step of obtaining the power supply time period of the power station includes: When the public lighting system set in the enterprise reaches the start threshold or the detected time node reaches the preset time period between the working hours and the off-get off work hours of the enterprise work area, the detection information is immediately transmitted to the detector set at the entrance of the enterprise work area, so that the detector can count the number of employees entering and leaving the enterprise work area by recognizing the face and the corresponding leg number features; Distinguish the number of people inside and outside the enterprise work area, and predict the number of employees entering and leaving the enterprise work area as a reference; Get the time nodes X1 and X2 of the energy supply time period. When controlling the power supply and power consumption of the power station, the power supply and power consumption of the power station are stable.

[0013] According to the above technical solution, the time nodes X1 and X2 of the energy supply time period are obtained, including: According to the statistical data, two rectangular coordinate systems are drawn with time as the horizontal axis and the number of people entering and leaving the enterprise work area as the vertical axis. The unit of time is per minute. A time node is selected in each of the two rectangular coordinate systems. The time difference between the time node of entering the enterprise work area and the time node of leaving the enterprise work area is greater than the average out-of-office time U of the employees. Among them, the two time nodes correspond to the largest number of people entering and leaving the enterprise work area, which are recorded as X3 and X4, where X1<X2, X3 is marked as the average time node when employees arrive at the enterprise work area, and X4 is marked as the average time node when employees leave the enterprise work area. The range values ​​of the time nodes for obtaining the energy supply time period are respectively , , where Y0 is the average overtime time of the enterprise work area, Y1 is the average early start time of the enterprise work area, G0 is the total workload of the enterprise work area on the previous working day, and G1 is the total workload of the enterprise work area on the current day; Within the range of values ​​of the time nodes of the energy supply time period, a time node is randomly selected as the time nodes X1 and X2 of the energy supply time period, and the corresponding values ​​of the time nodes X1 and X2 selected daily are controlled to be different. At the same time, the ratio of the difference between the selected time node X1 and the average time node when employees arrive at the enterprise work area to the range value of the time node X3 of the energy supply time period corresponding to X1 is controlled to be equal to the ratio of the difference between the selected time node X2 and the average time node X4 when employees leave the enterprise work area to the range value of the time node X2 corresponding to the energy supply time period.

[0014] According to the above technical solution, providing energy storage services and energy supply services for enterprise work areas based on electricity consumption information includes: Acquire the electricity consumption information of the enterprise work area, the power generation flow information of the enterprise work area and the operation data of the power station; push at least one power station that can be used for electricity storage and power supply to the enterprise work area according to the electricity consumption information of the enterprise work area and the power generation flow information of the enterprise work area; provide energy storage services to the enterprise work area according to the operation data of the power station and the power generation flow information of the enterprise work area; provide energy supply services to the enterprise work area according to the operation data of the power station and the electricity consumption information of the enterprise work area; The database uses a new database cluster with MassivelyParallel Processing architecture, and executes database tasks in parallel on multiple nodes. The distributed management platform uses NoSql to store the energy supply service data sent by the power station. At the same time, a cluster method is used to back up redundant energy supply service and energy storage service data in real time. The operation data of the power station includes remaining energy storage capacity data of the power station, and providing the energy storage service to the enterprise work area according to the operation data of the power station and the power generation flow information of the enterprise work area includes: providing the energy storage service to the enterprise work area according to the remaining energy storage capacity data of the power station and the power generation flow information of the enterprise work area; The operating data of the power station includes energy storage data of the power station, and providing energy supply services to the enterprise work area based on the operating data of the power station and the current consumption information of the enterprise work area includes: providing the energy supply service to the enterprise work area based on the energy storage data of the power station and the current consumption information of the enterprise work area.

[0015] Compared with the prior art, the beneficial effects achieved by the present invention are as follows: the present invention uniformly manages clean energy storage equipment through power stations, improves the implementation transparency of clean energy projects through distributed management platforms, and reduces the risk management cost and identification cost of internal energy supply in enterprises; the distributed management platform can analyze and monitor energy supply and storage data in real time, provide support for the regulation and control of power operation monitoring, and provide users, partners and cooperative enterprises with power operation data in the distributed management platform to ensure timely and efficient power operation and maintenance; by giving full play to the load regulation capacity of the distributed management platform for the enterprise work area, rationally utilizing the energy supply and storage services of surrounding power stations, and appropriately configuring energy storage facilities, the proportion of green electricity use and system operation efficiency are increased, the integrated operation of the clean energy digital distributed management platform is realized, the sales and service efficiency of clean energy products is improved, and the work pressure of small and micro entrepreneurial enterprises is reduced. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings: Figure 1 It is a flow chart of a method for operating a distributed management platform based on clean energy digitization provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0017] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0018] See also Figure 1 , the embodiment of the present invention provides a technical solution: a distributed management platform based on the digitization of clean energy, including: Data analysis module, power consumption judgment module, energy supply regulation module and service module. The data analysis module is used to collect historical power consumption information of enterprise work areas, analyze the power consumption time of different enterprise work areas, and screen out optimization targets based on the power consumption time, analyze the power consumption information of optimization targets, predict the power consumption of optimization targets when power consumption tends to be stable, and allocate clean energy according to the preset strategy; the power consumption judgment module is used to judge whether the power consumption is stable, and output corresponding instructions according to the judgment result; the energy supply regulation module is used to obtain the power supply time period of the power station, and adjust the adjustable load resources of the distributed management platform based on the energy supply use plan. The energy supply use plan is preset by the distributed management platform; the service module is used to provide energy storage services and energy supply services for enterprise work areas based on the power consumption information.

[0019] In the embodiments of the present invention, clean energy storage equipment is uniformly managed through power stations, and the implementation transparency of clean energy projects is improved through a distributed management platform, reducing the risk management cost and identification cost of internal energy supply in enterprises; the distributed management platform can analyze and monitor energy supply and storage data in real time, provide support for the regulation and control of power operation monitoring, and provide users, partners and cooperative enterprises with power operation data in the distributed management platform to ensure timely and efficient power operation and maintenance; by giving full play to the load regulation ability of the distributed management platform for the enterprise work area, rationally utilizing the energy supply and storage services of surrounding power stations, and appropriately configuring energy storage facilities, the proportion of green electricity use and system operation efficiency are increased, the integrated operation of the clean energy digital distributed management platform is realized, the sales and service efficiency of clean energy products is improved, and the work pressure of small and micro entrepreneurial enterprises is reduced.

[0020] The data analysis module includes an operation data monitoring module and a peak-shaving auxiliary processing module. The operation data monitoring module is used to receive user operation instructions; the peak-shaving auxiliary processing module is used to manage the baseline load. Based on the clearing settlement data and the total electricity consumption information of all group enterprise work areas during the power supply period of the power station, the clean energy is allocated according to the preset strategy through the distributed management platform, and the allocation information is sent to the equipment associated with each energy user.

[0021] The power consumption judgment module includes a power consumption stability judgment module and a total power detection module. The power consumption stability judgment module is used to collect the power consumption time set data of the enterprise work area supplied by the same distributed energy station; retrieve the historical current consumption information of the enterprise work area, and collect the previous power consumption of the enterprise work area once every time interval t; retrieve the power consumption time set data of the enterprise work area, arrange the enterprise work areas in order from short to long according to the power consumption time, and after arrangement, group the enterprise work areas according to the power consumption time, obtain the total power consumption time set of each group of enterprise work areas after grouping by a random grouping method, obtain the grouping result of the best grouping method, and select the group of enterprise work areas with the shortest total power consumption time from the grouping result of the best grouping method as the optimization target, and use the remaining grouped enterprise work areas as non-optimization targets; retrieve the historical power consumption information of the optimization target, obtain a random The power consumption set of the optimization target is used to predict the power consumption of the corresponding optimization target for the k+1th time. The power consumption set of the corresponding optimization target after the k+1th time is obtained by analogy calculation, and the power consumption difference is counted to determine whether the power consumption is stable; the total power detection module is used to adjust the initial power consumption of the corresponding optimization target referenced during energy consumption prediction to the hth power consumption to obtain the power consumption set of the corresponding optimization target after the hth time, and predict the power consumption of the corresponding optimization target for the h+cth time; collect historical power consumption data of non-optimization targets, use the limit power consumption set by the system as the initial power consumption of non-optimization targets, and predict the power consumption of non-optimization targets within the power supply period of the power station in the same way, add the predicted power consumption of the optimization targets and non-optimization targets within the power supply period of the power station, and obtain the total power consumption of all group enterprise work areas powered by the distributed energy station within the power supply period of the power station.

[0022] The service module includes an energy supply time period detection module and an energy storage and energy supply service module. The energy supply time period detection module is used to obtain the time nodes X1 and X2 of the energy supply time period. When the power supply and power consumption of the power station is controlled to be stable; the energy storage and supply service module is used to obtain the current consumption information of the enterprise work area, the power generation flow information of the enterprise work area and the operation data of the power station; according to the current consumption information of the enterprise work area and the power generation flow information of the enterprise work area, at least one power station that can be used for power storage and power supply is pushed to the enterprise work area; according to the operation data of the power station and the power generation flow information of the enterprise work area, energy storage services are provided to the enterprise work area; according to the operation data of the power station and the current consumption information of the enterprise work area, energy supply services are provided to the enterprise work area.

[0023] In a preferred embodiment, the operation method of the distributed management platform based on the digitization of clean energy is characterized by comprising: Collect historical electricity consumption information of enterprise work areas, analyze the electricity consumption time of different enterprise work areas, select optimization targets based on the electricity consumption time, analyze the electricity consumption information of optimization targets, predict the electricity consumption of optimization targets when electricity consumption tends to be stable, and allocate clean energy according to the preset strategy; Determine whether the power consumption is stable and output corresponding instructions according to the judgment result; Obtain the power supply time period of the power station and adjust the adjustable load resources of the distributed management platform based on the energy supply usage plan. The energy supply usage plan is preset by the distributed management platform; Provide energy storage and supply services for corporate work areas based on electricity consumption information.

[0024] In this embodiment, clean energy is distributed according to a preset strategy through a distributed management platform, including: Receiving a user operation instruction, the user operation instruction is used to instruct the distributed management platform to perform a target operation corresponding to the user operation instruction based on clean energy data of at least one clean energy device and a clean energy device production control device; Among them, user operation instructions are controlled by personnel users, equipment users and user groups. Personnel users are registered users of the system and are responsible for creating and maintaining system components, including databases, forms, equipment users and user groups. Equipment users are used to define energy devices connected to the system and have the function of automatically connecting to the system without providing verification information. User groups are used to define relevant personnel users and equipment users. The permission operations of user groups can be simultaneously issued to all personnel users and equipment users included in them. Target operations include: Monitor clean energy data; Provide peak load-shaving assistance to various energy equipment and energy users; Control the carbon emissions of various energy equipment; Provide peak load assistance to various energy equipment and energy users, including: Real-time monitoring of the operating data of each energy equipment; Manage the baseline load, which is used to represent the minute-level average load when the distributed management platform participates in the peak load-shaving auxiliary services of various energy devices, and implements demand response and orderly power consumption; The baseline load is obtained by the distributed management platform through the minute-level average load when participating in the paid peak load ancillary service transaction on the power generation side and implementing demand response and orderly power consumption according to the preset calculation path; Based on the clearing and settlement data, combined with the total electricity consumption information of all groups of enterprise work areas during the power supply period of the power station, the clean energy is allocated according to the preset strategy through the distributed management platform, and the stability of electricity consumption is judged. The allocation information is sent to the equipment associated with each energy user, and the corresponding instructions are output according to the judgment results. The clearing and settlement data are retrieved through the database set up in the distributed management platform, and the equipment associated with the energy user is connected to the distributed management platform.

[0025] In this embodiment, in combination with the total power consumption information of all group enterprise work areas during the power supply period of the power station, the clean energy is allocated according to the preset strategy through the distributed management platform, and the stability of the power consumption is judged. The allocation information is sent to the equipment associated with each energy user, and the corresponding instructions are output according to the judgment result, including: Collect the electricity consumption time aggregate data of the working area of ​​the enterprise supplied by the same distributed energy station. The electricity consumption time aggregate data includes three data items: energy consumption reference value, cumulative electricity consumption on the day, and cumulative electricity consumption on the month. The energy consumption reference value is generated by the average value of electricity in the past month, and the judgment threshold is initially set at ±10% of the energy consumption reference value; Retrieve the historical electricity consumption information of the enterprise work area, and collect the previous electricity consumption of the enterprise work area once every time interval t. The enterprise work area database uses Kettle clusters from various business systems in ETL mode to collect electricity consumption data in parallel to the enterprise work area database, forming a database buffer layer, DW layer and application layer, which can realize the distributed collection of enterprise work area electricity consumption data; Retrieve the power usage time collection data of the enterprise workspaces, arrange the enterprise workspaces in order of power usage time from short to long, and after arrangement, group the enterprise workspaces according to power usage time, wherein the power usage time of each enterprise workspace in the first group is shorter than the power usage time of all enterprise workspaces in the second group, obtain the total power usage time set of each group of enterprise workspaces after grouping in a random grouping method, obtain the grouping result of the best grouping method, select the group of enterprise workspaces with the shortest total power usage time from the grouping result of the best grouping method as the optimization target, and set the remaining grouped enterprise workspaces as non-optimization targets; Retrieve the historical electricity consumption information of the optimization target, obtain the electricity consumption set of a random optimization target, where the number of electricity consumption sets is k, predict the electricity consumption of the corresponding optimization target for the k+1th time, and calculate the electricity consumption set of the corresponding optimization target after the k+1th time by analogy, count the electricity consumption difference, the electricity consumption difference between the k+2th time and the k+1th time, set the difference threshold to Q, and judge whether the electricity consumption is stable. If it is counted that the electricity consumption difference is lower than x for n consecutive times starting from the hth time, the information that the electricity consumption of the corresponding optimization target tends to be stable from the hth time will be output, otherwise, the information that the electricity consumption is unstable will be output, where h>k+1; The initial power consumption of the corresponding optimization target referenced in the energy consumption forecast is adjusted to the power consumption of the hth time to obtain the power consumption set of the corresponding optimization target after the hth time, and the power consumption of the corresponding optimization target at the h+cth time is predicted, where c is the number of initial test predictions of power consumption; Collect historical electricity consumption data of non-optimization targets, use the limit electricity consumption set by the system as the initial electricity consumption of the non-optimization targets, predict the electricity consumption of the non-optimization targets during the power supply period of the power station in the same way, add the predicted electricity consumption of the optimization targets and non-optimization targets during the power supply period of the power station, and obtain the total electricity consumption of all group enterprise work areas powered by the distributed energy station during the power supply period of the power station.

[0026] This technical solution solves the problem of inaccurate energy supply caused by unstable electricity consumption in the company's work area throughout the day. The distributed management platform can analyze and monitor energy supply and storage data in real time, providing support for the regulation and control of power operation monitoring. At the same time, the distributed management platform improves the transparency of clean energy project implementation and reduces the risk management and identification costs of internal energy supply in the enterprise.

[0027] In this embodiment, obtaining the power supply time period of the power station includes: When the public lighting system in the enterprise reaches the start-up threshold or the detected time node reaches the preset time period between the working hours and the off-get off work hours in the enterprise work area, the detection information is immediately transmitted to the detector set up at the entrance of the enterprise work area, so that the detector can count the number of employees entering and leaving the enterprise work area by recognizing the face and the corresponding leg number features; Distinguish the number of people inside and outside the enterprise work area, and predict the number of employees entering and leaving the enterprise work area as a reference; Get the time nodes X1 and X2 of the energy supply time period. When controlling the power supply and power consumption of the power station, the power supply and power consumption of the power station are stable.

[0028] In this embodiment, obtaining the time nodes X1 and X2 of the energy supply time period includes: According to the statistical data, two rectangular coordinate systems are drawn with time as the horizontal axis and the number of people entering and leaving the enterprise work area as the vertical axis. The unit of time is per minute. A time node is selected in each of the two rectangular coordinate systems. The time difference between the time node of entering the enterprise work area and the time node of leaving the enterprise work area is greater than the average out-of-office time U of the employees. Among them, the two time nodes correspond to the largest number of people entering and leaving the enterprise work area, which are recorded as X3 and X4, where X1 < X2. X3 is marked as the average time node when employees arrive at the enterprise work area, and X4 is marked as the average time node when employees leave the enterprise work area. The range values ​​of the time nodes for obtaining the energy supply time period are respectively , , where Y0 is the average overtime time of the enterprise work area, Y1 is the average early start time of the enterprise work area, G0 is the total workload of the enterprise work area on the previous working day, and G1 is the total workload of the enterprise work area on the current day; Within the range of values ​​of the time nodes of the energy supply time period, a time node is randomly selected as the time nodes X1 and X2 of the energy supply time period, and the corresponding values ​​of the time nodes X1 and X2 selected every day are controlled to be different. At the same time, the ratio of the difference between the selected time node X1 and the average time node when employees arrive at the enterprise work area to the range value of the time node X3 of the energy supply time period corresponding to X1 is controlled to be equal to the ratio of the difference between the selected time node X2 and the average time node X4 when employees leave the enterprise work area to the range value of the time node X2 corresponding to the energy supply time period.

[0029] This technical solution solves the problem of insufficient or overflowing actual energy supply due to irregular working hours of employees in the enterprise work area throughout the day. By monitoring the entry and exit of employees in the enterprise work area throughout the day and adjusting the actual working hours based on the workload of the enterprise employees, the accuracy of energy supply and storage of the distributed management platform is improved.

[0030] In this embodiment, energy storage services and energy supply services are provided for the enterprise work area according to the electricity consumption information, including: Obtaining the electricity consumption information of the enterprise work area, the power generation flow information of the enterprise work area and the operation data of the power station; pushing at least one power station that can be used for power storage and power supply to the enterprise work area based on the electricity consumption information and the power generation flow information of the enterprise work area; providing energy storage services to the enterprise work area based on the operation data of the power station and the power generation flow information of the enterprise work area; providing energy supply services to the enterprise work area based on the operation data of the power station and the electricity consumption information of the enterprise work area; The database uses a new database cluster with MassivelyParallel Processing architecture, and executes database tasks in parallel on multiple nodes. The distributed management platform storage uses NoSql to store the energy supply service data sent by the power station, which can realize the distributed storage of power station data and improve the performance and availability of the entire database system. At the same time, the cluster method is used to back up redundant energy supply service and energy storage service data in real time, which can achieve high availability and data consistency of the enterprise workspace database monitoring power station energy supply and storage. The operation data of the power station includes the remaining energy storage capacity data of the power station. According to the operation data of the power station and the power generation flow information of the enterprise work area, the energy storage service is provided to the enterprise work area, including: according to the remaining energy storage capacity data of the power station and the power generation flow information of the enterprise work area, the energy storage service is provided to the enterprise work area; The operation data of the power station includes the energy storage data of the power station. Providing energy supply services to the enterprise work area based on the operation data of the power station and the current consumption information of the enterprise work area includes: providing energy supply services to the enterprise work area based on the energy storage data of the power station and the current consumption information of the enterprise work area.

[0031] By fully leveraging the distributed management platform's load regulation capabilities for corporate work areas, rationally utilizing the energy supply and storage services of surrounding power stations, and appropriately configuring energy storage facilities, the proportion of green electricity use and system operating efficiency can be increased, and the integrated operation of the clean energy digital distributed management platform can be realized.

[0032] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0033] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A distributed management platform based on clean energy digitization, characterized by: It includes data analysis module, power consumption judgment module, energy supply adjustment module and service module; The data analysis module is used to collect historical electricity consumption information of enterprise work areas, analyze the electricity consumption time of different enterprise work areas, and select optimization targets based on the electricity consumption time, analyze the electricity consumption information of the optimization targets, predict the electricity consumption of the optimization targets when the electricity consumption tends to be stable, and allocate clean energy according to the preset strategy; The power consumption judgment module is used to judge whether the power consumption is stable, and output corresponding instructions according to the judgment result; The energy supply adjustment module is used to obtain the power supply time period of the power station and adjust the adjustable load resources of the distributed management platform based on the energy supply use plan; The service module is used to provide energy storage service and energy supply service for the enterprise work area according to the electricity consumption information.

2. The distributed management platform based on clean energy digitization according to claim 1 is characterized by: The data analysis module includes an operation data monitoring module and a peak-shaving auxiliary processing module. The operation data monitoring module is used to receive user operation instructions; the peak-shaving auxiliary processing module is used to manage the baseline load, based on the clearing settlement data, combined with the total electricity consumption information of all group enterprise work areas during the power supply period of the power station, through the distributed management platform according to the preset strategy to distribute clean energy, and send the distribution information to the equipment associated with each energy user.

3. The distributed management platform based on clean energy digitization according to claim 2 is characterized in that: The power consumption judgment module includes a power consumption stability judgment module and a total power detection module. The power consumption stability judgment module is used to collect power consumption time set data of the enterprise work area supplied by the same distributed energy station; retrieve the historical power consumption information of the enterprise work area, and collect the previous power consumption of the enterprise work area once every time interval t; retrieve the power consumption time set data of the enterprise work area, arrange the enterprise work areas in order from short to long according to the power consumption time, and after arrangement, group the enterprise work areas according to the power consumption time, obtain the total power consumption time set of each group of enterprise work areas after grouping in a random grouping method, obtain the grouping result of the best grouping method, and select a group of enterprise work areas with the shortest total power consumption time from the grouping result of the best grouping method as the optimization target, and select the remaining grouped enterprise work areas as non-optimization targets; Retrieve historical electricity consumption information of the optimization target, obtain a random electricity consumption set of the optimization target, predict the k+1th electricity consumption of the corresponding optimization target, obtain the electricity consumption set of the corresponding optimization target after the k+1th time by analogy calculation, count the electricity consumption difference, and judge whether the electricity consumption is stable; the total electricity detection module is used to adjust the initial electricity consumption of the corresponding optimization target referenced during energy consumption prediction to the hth electricity consumption, obtain the electricity consumption set of the corresponding optimization target after the hth time, and predict the h+cth electricity consumption of the corresponding optimization target; collect historical electricity consumption data of non-optimization targets, use the limit electricity consumption set by the system as the initial electricity consumption of non-optimization targets, predict the electricity consumption of non-optimization targets in the power supply time period of the power station in the same way, add the predicted electricity consumption of the optimization targets and non-optimization targets in the power supply time period of the power station, and obtain the total electricity consumption of all group enterprise work areas powered by the distributed energy station in the power supply time period of the power station.

4. The distributed management platform based on clean energy digitization according to claim 3 is characterized in that: The service module includes an energy supply time period detection module and an energy storage and energy supply service module. The energy supply time period detection module is used to obtain the time nodes X1 and X2 of the energy supply time period. When the power supply and power consumption of the power station is controlled to be stable; the energy storage and power supply service module is used to obtain the current consumption information of the enterprise work area, the power generation flow information of the enterprise work area and the operation data of the power station; According to the electricity consumption information of the enterprise work area and the power generation flow information of the enterprise work area, at least one power station that can be used for power storage and power supply is pushed to the enterprise work area; according to the operation data of the power station and the power generation flow information of the enterprise work area, energy storage services are provided to the enterprise work area; Provide energy supply services to the enterprise work area according to the operation data of the power station and the electricity consumption information of the enterprise work area.

5. The operation method of the distributed management platform based on the digitalization of clean energy is characterized by: include: Collect historical electricity consumption information of enterprise work areas, analyze the electricity consumption time of different enterprise work areas, select optimization targets based on the electricity consumption time, analyze the electricity consumption information of optimization targets, predict the electricity consumption of optimization targets when electricity consumption tends to be stable, and allocate clean energy according to the preset strategy; Determine whether the power consumption is stable and output corresponding instructions according to the judgment result; Obtaining a power supply time period of the power station, and adjusting the adjustable load resources of the distributed management platform based on the power supply usage plan, wherein the power supply usage plan is preset by the distributed management platform; Provide energy storage and supply services for corporate work areas based on electricity consumption information.

6. The operating method of the distributed management platform based on clean energy digitization according to claim 5 is characterized in that: The method of distributing clean energy according to a preset strategy through a distributed management platform includes: Receiving a user operation instruction, the user operation instruction is used to instruct the distributed management platform to perform a target operation corresponding to the user operation instruction based on clean energy data of at least one clean energy device and a clean energy device production control device; Among them, user operation instructions are controlled by personnel users, equipment users and user groups. The personnel users are registered users of the system and are responsible for creating and maintaining system components, including databases, forms, equipment users and user groups. The equipment users are used to define energy devices connected to the system and have the function of automatically connecting to the system without providing verification information. The user groups are used to define relevant personnel users and equipment users. The permission operations of the user groups can be simultaneously issued to all personnel users and equipment users included in them. The target operations include: Monitoring the clean energy data; Provide peak load-shaving assistance to various energy equipment and energy users; Control the carbon emissions of various energy equipment; The peak load-shaving auxiliary processing for each of the energy equipment and energy users includes: Real-time monitoring of the operating data of each of the energy devices; Managing the baseline load, which is used to characterize the minute-level average load when the distributed management platform participates in the peak load-shaving auxiliary services of each energy device, and implements demand response and orderly power consumption; The baseline load is obtained by the distributed management platform according to a preset calculation path when participating in the paid peak load-shaving auxiliary service transaction on the power generation side and implementing demand response and orderly power consumption; Based on the clearing and settlement data, combined with the total electricity consumption information of all groups of enterprise work areas during the power supply period of the power station, the clean energy is allocated according to the preset strategy through the distributed management platform, and the stability of the electricity consumption is judged. The allocation information is sent to the equipment associated with each energy user, and the corresponding instructions are output according to the judgment result. The clearing and settlement data is retrieved through the database set in the distributed management platform, and the equipment associated with the energy user is communicated with the distributed management platform.

7. The method for operating the distributed management platform based on clean energy digitization according to claim 6 is characterized in that: The above-mentioned method combines the total power consumption information of all groups of enterprise work areas during the power supply period of the power station, distributes clean energy according to the preset strategy through the distributed management platform, judges whether the power consumption is stable, sends the distribution information to the equipment associated with each energy user, and outputs the corresponding instructions according to the judgment result, including: Collect the electricity consumption time aggregate data of the working area of ​​the enterprise supplied by the same distributed energy station. The electricity consumption time aggregate data includes three data items: energy consumption reference value, cumulative electricity consumption on the day, and cumulative electricity consumption on the month. The energy consumption reference value is generated by the average value of electricity in the past month, and the judgment threshold is initially set at ±10% of the energy consumption reference value; Retrieve the historical electricity consumption information of the enterprise work area, and collect the previous electricity consumption of the enterprise work area once every time interval t, wherein the enterprise work area database uses Kettle clusters from various business systems in an ETL manner to collect electricity consumption data in parallel to the enterprise work area database, forming a database buffer layer, a DW layer and an application layer; Retrieve the power usage time collection data of the enterprise workspaces, arrange the enterprise workspaces in order of power usage time from short to long, and after arrangement, group the enterprise workspaces according to power usage time, wherein the power usage time of each enterprise workspace in the first group is shorter than the power usage time of all enterprise workspaces in the second group, obtain the total power usage time set of each group of enterprise workspaces after grouping in a random grouping method, obtain the grouping result of the best grouping method, select the group of enterprise workspaces with the shortest total power usage time from the grouping result of the best grouping method as the optimization target, and set the remaining grouped enterprise workspaces as non-optimization targets; Retrieve the historical electricity consumption information of the optimization target, obtain the electricity consumption set of a random optimization target, where the number of electricity consumption sets is k, predict the electricity consumption of the corresponding optimization target for the k+1th time, and calculate the electricity consumption set of the corresponding optimization target after the k+1th time by analogy, count the electricity consumption difference, the electricity consumption difference between the k+2th time and the k+1th time, set the difference threshold to Q, and judge whether the electricity consumption is stable. If it is counted that the electricity consumption difference is lower than x for n consecutive times starting from the hth time, the information that the electricity consumption of the corresponding optimization target tends to be stable from the hth time will be output, otherwise, the information that the electricity consumption is unstable will be output, where h>k+1; The initial power consumption of the corresponding optimization target referenced in the energy consumption forecast is adjusted to the power consumption of the hth time to obtain the power consumption set of the corresponding optimization target after the hth time, and the power consumption of the corresponding optimization target at the h+cth time is predicted, where c is the number of initial test predictions of power consumption; Collect historical electricity consumption data of non-optimization targets, use the limit electricity consumption set by the system as the initial electricity consumption of the non-optimization targets, predict the electricity consumption of the non-optimization targets during the power supply period of the power station in the same way, add the predicted electricity consumption of the optimization targets and non-optimization targets during the power supply period of the power station, and obtain the total electricity consumption of all group enterprise work areas powered by the distributed energy station during the power supply period of the power station.

8. The method for operating the distributed management platform based on clean energy digitization according to claim 7 is characterized in that: The obtaining of the power supply time period of the power station includes: When the public lighting system set in the enterprise reaches the start threshold or the detected time node reaches the preset time period between the working hours and the off-get off work hours of the enterprise work area, the detection information is immediately transmitted to the detector set at the entrance of the enterprise work area, so that the detector can count the number of employees entering and leaving the enterprise work area by recognizing the face and the corresponding leg number features; Distinguish the number of people inside and outside the enterprise work area, and predict the number of employees entering and leaving the enterprise work area as a reference; Get the time nodes X1 and X2 of the energy supply time period. When controlling the power supply and power consumption of the power station, the power supply and power consumption of the power station are stable.

9. The method for operating the distributed management platform based on clean energy digitization according to claim 8 is characterized in that: The time nodes X1 and X2 of the energy supply time period are obtained, including: According to the statistical data, two rectangular coordinate systems are drawn with time as the horizontal axis and the number of people entering and leaving the enterprise work area as the vertical axis. The unit of time is per minute. A time node is selected in each of the two rectangular coordinate systems. The time difference between the time node of entering the enterprise work area and the time node of leaving the enterprise work area is greater than the average out-of-office time U of the employees. Among them, the two time nodes correspond to the largest number of people entering and leaving the enterprise work area, which are recorded as X3 and X4, where X1<X2, X3 is marked as the average time node when employees arrive at the enterprise work area, and X4 is marked as the average time node when employees leave the enterprise work area. The range values ​​of the time nodes for obtaining the energy supply time period are respectively , , where Y0 is the average overtime time of the enterprise work area, Y1 is the average early start time of the enterprise work area, G0 is the total workload of the enterprise work area on the previous working day, and G1 is the total workload of the enterprise work area on the current day; Within the range of values ​​of the time nodes of the energy supply time period, a time node is randomly selected as the time nodes X1 and X2 of the energy supply time period, and the corresponding values ​​of the time nodes X1 and X2 selected daily are controlled to be different. At the same time, the ratio of the difference between the selected time node X1 and the average time node when employees arrive at the enterprise work area to the range value of the time node X3 of the energy supply time period corresponding to X1 is controlled to be equal to the ratio of the difference between the selected time node X2 and the average time node X4 when employees leave the enterprise work area to the range value of the time node X2 corresponding to the energy supply time period.

10. The operating method of the distributed management platform based on clean energy digitization according to claim 9 is characterized in that: The provision of energy storage services and energy supply services for the enterprise work area according to the electricity consumption information includes: Acquire the electricity consumption information of the enterprise work area, the power generation flow information of the enterprise work area and the operation data of the power station; push at least one power station that can be used for electricity storage and power supply to the enterprise work area according to the electricity consumption information of the enterprise work area and the power generation flow information of the enterprise work area; provide energy storage services to the enterprise work area according to the operation data of the power station and the power generation flow information of the enterprise work area; provide energy supply services to the enterprise work area according to the operation data of the power station and the electricity consumption information of the enterprise work area; The database uses a new database cluster with MassivelyParallel Processing architecture, and executes database tasks in parallel on multiple nodes. The distributed management platform uses NoSql to store the energy supply service data sent by the power station. At the same time, a cluster method is used to back up redundant energy supply service and energy storage service data in real time. The operation data of the power station includes remaining energy storage capacity data of the power station, and providing the energy storage service to the enterprise work area according to the operation data of the power station and the power generation flow information of the enterprise work area includes: providing the energy storage service to the enterprise work area according to the remaining energy storage capacity data of the power station and the power generation flow information of the enterprise work area; The operating data of the power station includes energy storage data of the power station, and providing energy supply services to the enterprise work area based on the operating data of the power station and the current consumption information of the enterprise work area includes: providing the energy supply service to the enterprise work area based on the energy storage data of the power station and the current consumption information of the enterprise work area.

Citation Information

Patent Citations

  • Cooperative operation control method and system for power distribution network containing shared energy storage

    CN112787330A

  • Micro-grid demand side control system based on digital twin technology multi-energy utilization

    CN115333230A

  • Intelligent energy digital management system and method applied to cloud platform

    CN116307295A

  • Integrated energy management platform and integrated energy management method

    CN117217497A

  • Intelligent power load prediction system based on big data

    CN118017468A