Remote monitoring self-adaptive power grid low-frequency load shedding system and method
The adaptive low-frequency load shedding system for remote monitoring collects and processes grid data in real time, and combines it with adaptive algorithms to cut off loads. This solves the problems of insufficient remote monitoring and poor adaptability of the low-frequency load shedding function, and realizes rapid recovery and stable control of grid frequency.
Patent Information
- Application Number
- CN202410855185.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-28
- Publication Date
- 2024-11-08
AI Technical Summary
In existing technologies, the low-frequency load shedding function lacks remote monitoring methods, which leads to the device failing to operate normally when there are abnormalities. Furthermore, traditional strategies have poor adaptability, affecting the accuracy and safety of regulation.
An adaptive low-frequency load shedding system for remote monitoring of power grids was designed, comprising a production control area and a management information area. Through components such as a control system, a dispatch data network, a data communication gateway, and a control cloud, real-time data acquisition, processing, and decision-making are achieved. Combined with adaptive algorithms, load shedding is performed to improve monitoring and adaptability.
It enables real-time automatic assessment and adaptive control of low-frequency load shedding, improves the reliability of remote monitoring and the adaptability of low-frequency load shedding schemes, and ensures reasonable control and rapid recovery of power grid frequency.
Smart Images

Figure CN118920492A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of intelligent dispatching and control of distribution networks, and in particular to a remotely monitored adaptive low-frequency load shedding system and method for power grids. Background Art
[0002] Power system underfrequency load shedding refers to an active frequency control method in which the power system starts and cuts off part of the load in response to the system frequency when the power system suffers a large disturbance or a large power shortage occurs, in order to maintain the system power balance and prevent the system frequency from collapsing.
[0003] At present, the low-frequency load shedding function is mainly realized by the low-voltage feeder protection measurement and control integrated device in the substation. On the one hand, there is currently a lack of effective remote monitoring means for the activation and deactivation status of the low-frequency load shedding function. Therefore, when an abnormality occurs in the device, the device is locked for a long time and cannot operate normally. On the other hand, the traditional low-frequency load shedding strategy has fixed criteria, and the load shedding amount depends on offline setting, which has poor adaptability. The above problems can easily lead to a significant decrease in the accuracy of the control personnel's command and judgment, and in severe cases, it can lead to misjudgment. Summary of the invention
[0004] The purpose of the present invention is to overcome the shortcomings of the prior art and to provide a remotely monitored adaptive power grid low-frequency load shedding system and method, which can realize remote monitoring of low-frequency load shedding and improve the low-frequency load shedding effect and adaptability through adaptation, so as to solve the problems of insufficient low-frequency load shedding monitoring capability and poor adaptability.
[0005] A technical solution to achieve the above object is: a remotely monitored adaptive power grid low-frequency load reduction system, including a production control area and a management information area;
[0006] The production control area includes the control system, dispatching data network and data communication gateway;
[0007] The management information area is the control cloud, which includes statistical analysis and comprehensive alarm modules, automatic analysis and judgment modules, real-time data platform and model data platform.
[0008] Furthermore, the control system includes an automatic analysis module, a monitoring and alarm module, a data acquisition module, an equipment modeling module and a basic support platform.
[0009] Furthermore, the automatic analysis module realizes the judgment and decision-making functions of power grid faults; the monitoring and alarm module realizes the strategic monitoring and message alarm of power grid faults; the data acquisition module realizes the transmission, processing and storage of various monitoring status quantities in the power grid; the equipment modeling module realizes the accurate reconstruction of the power grid model; and the basic support platform realizes the visualization and platform support for the above functions.
[0010] Furthermore, the dispatching data network transmits the key data and decision results of the control system to the next-level network communication system, playing the role of data transfer and data security protection.
[0011] Furthermore, the data communication gateway distributes the data sent back by the dispatching data network to the low-frequency load shedding devices of different substations, and instructs the low-frequency load shedding devices to perform corresponding operations.
[0012] Furthermore, the statistical analysis and comprehensive alarm modules realize in-depth data processing and signal transmission in the cloud.
[0013] Furthermore, the automatic analysis module realizes real-time fault analysis.
[0014] Furthermore, the real-time data platform classifies and stores the real-time data transmitted back by the control system.
[0015] Furthermore, the model data platform classifies and stores the equipment models returned by the control system.
[0016] Another technical solution to achieve the above object is: a remotely monitored adaptive power grid low-frequency load reduction method, characterized in that it includes the following steps:
[0017] S1, collects bus voltage and frequency change rate of each node through wide area measurement system;
[0018] S2, convert according to the power of each load and unit, and calculate the actual power shortage and maximum frequency deviation according to the formula;
[0019] S3, monitor the current frequency of the system. If it is found to be lower than the control frequency f1, it means that the system is in a state of serious power shortage, and the load is directly removed according to the traditional low-frequency load reduction strategy adjusted offline; otherwise, go to S4;
[0020] S4, monitor the current frequency of the system. If it is found that it has been lower than the control frequency f2 for a long time, it means that the system is still in a power shortage state, and start the special wheel to help the frequency recover to the expected recovery frequency; otherwise, go to S5;
[0021] S5, judging whether the predicted lowest frequency is lower than the control frequency f1, or whether the predicted steady-state frequency is lower than the control frequency f2. If neither is satisfied, it means that the low-frequency load reduction does not need to be performed, and the process goes to S1 to continue monitoring the system frequency; otherwise, the process goes to S6;
[0022] S6, calculate the load reduction amount by considering the load regulation effect and the system spare capacity; if the frequency is restored, go to S7, otherwise go to S5;
[0023] S7, according to the load priority and frequency-voltage characteristics, distributes the load reduction to the appropriate bus for load reduction.
[0024] Compared with the prior art, the present invention has the following beneficial effects:
[0025] 1. Improve the reliability of remote monitoring and realize real-time automatic analysis and judgment of low-frequency load reduction schemes;
[0026] 2. Improve the adaptability of low-frequency load reduction schemes and achieve reasonable control of grid frequency. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 It is a schematic diagram of the architecture of a remotely monitored adaptive power grid low-frequency load reduction system of the present invention;
[0028] Figure 2 A schematic diagram of a flow chart of a remotely monitored adaptive power grid low-frequency load reduction method of the present invention;
[0029] Figure 3 A wiring diagram of a test system for a specific embodiment;
[0030] Figure 4 A comparison diagram of the frequency recovery curves of the faults in a specific embodiment;
[0031] Figure 5 It is a comparison diagram of frequency recovery curves under fault 2 of a specific embodiment. DETAILED DESCRIPTION
[0032] In order to better understand the technical solution of the present invention, the following is a detailed description through specific embodiments:
[0033] A specific embodiment of the present invention discloses a remote monitoring adaptive power grid low frequency load reduction system, such as Figure 1 shown.
[0034] The remote monitoring adaptive power grid low-frequency load reduction system is divided into two parts: production control area and management information area.
[0035] The production control area includes three parts: control system, dispatching data network and data communication gateway.
[0036] The control system consists of five parts: automatic analysis module, monitoring and alarm module, data acquisition module, equipment modeling module and basic support platform.
[0037] The automatic analysis module realizes the judgment and decision-making functions of power grid faults; the monitoring and alarm module realizes the strategic monitoring and message alarm of power grid faults; the data acquisition module realizes the transmission, processing and storage of various monitoring status quantities in the power grid; the equipment modeling module realizes the accurate reconstruction of the power grid model; the basic support platform realizes the visualization and platform support of the above functions.
[0038] The dispatching data network transmits the key data and decision results of the control system to the next-level network communication system, playing the role of data transfer and data security protection.
[0039] The data communication gateway distributes the data sent back by the dispatching data network to the low-frequency load shedding devices in different substations, and instructs the low-frequency load shedding devices to perform corresponding operations.
[0040] The management information area is mainly the control cloud, which includes four parts: statistical analysis and comprehensive alarm module, automatic analysis module, real-time data platform and model data platform. The control cloud receives real-time data and equipment models sent back by the control system.
[0041] The statistical analysis and comprehensive alarm modules enable in-depth data processing and signal sending in the cloud.
[0042] The automatic analysis module realizes the real-time fault analysis, which is an important difference from the automatic analysis model in the control system. The establishment of the control cloud can transform the traditional post-analysis into real-time analysis, ensuring the timeliness of the analysis.
[0043] The real-time data platform classifies and stores the real-time data sent back by the control system, providing a data basis for real-time analysis and judgment.
[0044] The model data platform classifies and stores the equipment models returned by the control system, providing a model basis for real-time analysis and judgment.
[0045] A specific embodiment of the present invention discloses a remote monitoring adaptive power grid low frequency load reduction method, such as Figure 2 As shown, the details are as follows:
[0046] S1, collects the bus voltage and the frequency change rate of each node through the wide area measurement system.
[0047] S2, convert according to the power of each load and unit, and calculate the actual power shortage and maximum frequency deviation according to the formula.
[0048] Actual power shortage:
[0049]
[0050] Where Hsys is the equivalent total inertia time constant of the system, fsys is the equivalent inertia center frequency of the system, f0 is the rated frequency of the system, and t is the time. Hsys and fsys can be calculated using the following formulas:
[0051]
[0052] Where N represents the total number of system generator nodes, Hi is the inertia of each unit node, fi is the node frequency, S iis the node capacity.
[0053] S3, monitor the current frequency of the system. If it is found to be lower than the control frequency f1, it means that the system is in a state of severe power shortage, and the load is directly removed according to the traditional low-frequency load reduction strategy adjusted offline; otherwise, go to S4.
[0054] S4, monitor the current frequency of the system. If it is found that it has been lower than the control frequency f2 for a long time, it means that the system is still in a power shortage state, and a special wheel is started to help the frequency recover to the expected recovery frequency; otherwise, go to S5.
[0055] S5, judge whether the predicted lowest frequency is lower than the control frequency f1, or whether the predicted steady-state frequency is lower than the control frequency f2. If neither is satisfied, it means that no action is needed for low-frequency load reduction, and go to S1 to continue monitoring the system frequency; otherwise, go to S6.
[0056] S6, calculate the load reduction amount considering the load regulation effect and system spare capacity; if the frequency is restored, go to S7, otherwise go to S5.
[0057] S7, according to the load priority and frequency-voltage characteristics, distributes the load reduction to the appropriate bus for load reduction.
[0058] The mechanism for judging the status of low-frequency load shedding function:
[0059] The low-frequency load shedding function can be divided into two states, namely the engaged state and the exited state. When the functional hard pressure plate, soft pressure plate, and low-frequency load shedding function control word are all engaged, the low-frequency load shedding function is in the engaged state, otherwise it is in the exited state. In view of the fact that the pressure plate status or low-frequency load shedding function control word of some manufacturers' protection devices cannot be collected at present, it is recommended that only the pressure plates and control words that can be collected by the system be considered as the judgment criteria in the algorithm. For example, if a certain interval protection device has only a low-frequency soft pressure plate in the table of four remote information points that have been sent up, and there is no hard pressure plate, the system will no longer consider the hard pressure plate status during the judgment process. Then, when the system detects that the low-frequency soft pressure plate is engaged and the low-frequency load shedding function control word is engaged, it can be judged that the low-frequency function is in the engaged state.
[0060] Low-frequency load shedding device operation alarm analysis mechanism:
[0061] Although the low-frequency load shedding function has been put into operation, defects in the device and secondary circuit during operation may still affect the low-frequency load shedding function, resulting in the low-frequency load shedding function being unable to trip normally during an accident, thus expanding the scope of the accident. In order to better grasp the real-time status of the low-frequency load shedding function, it is necessary to increase the device operation alarm analysis mechanism, that is, when the low-frequency function is normally put into operation and there is no alarm signal affecting the low-frequency function, it can represent that the low-frequency load shedding function is truly in a normal state.
[0062] The device alarm information that affects the low-frequency load reduction function is included in the low-frequency function abnormality analysis mechanism. When the system detects the interval appearance of the above-mentioned alarm signal that affects the low-frequency protection function, the system should determine that the low-frequency load reduction function is in an abnormal exit state.
[0063] Another specific embodiment of the present invention:
[0064] In order to verify the effectiveness of the solution of the present invention, a test system such as Figure 3 As shown. The total system capacity is 1400MW, including 4 generator nodes and 8 load nodes. The load regulation effect coefficient is 1.8, of which the constant impedance load ratio is 52%, the constant current ratio is 17%, and the constant power ratio is 31%.
[0065] Four generator shutdown disturbances are applied to the simulated system as follows:
[0066] Fault 1: Node N2 loses 150MW of active power, N3 loses 170MW of active power, and the power shortage is 320MW
[0067] Fault 2: Node N2 loses 150MW of active power, N4 loses 230MW of active power, and the power shortage is 380MW
[0068] The effects of the traditional load shedding scheme and the load shedding scheme of the present invention are compared as follows. Both load shedding schemes can disconnect appropriate loads after the frequency drops to a certain level, so that the frequency returns to near the rated value. The load shedding scheme proposed by the present invention has a higher starting frequency without false operation, which allows the frequency to recover faster and raises the lowest frequency. Since the improved frequency response model is more accurate in calculating the load shedding amount, the load removed is closer to the actual power shortage, so it has a higher steady-state frequency than the traditional scheme. Figure 4 and Figure 5 shown.
[0069] Those skilled in the art should recognize that the above embodiments are only used to illustrate the present invention, and are not intended to limit the present invention. As long as they are within the spirit of the present invention, any changes or modifications to the above embodiments will fall within the scope of the claims of the present invention.
Claims
1. A remotely monitored adaptive power grid low-frequency load reduction system, characterized in that: Includes production control area and management information area; The production control area includes the control system, dispatching data network and data communication gateway; The management information area is the control cloud, which includes statistical analysis and comprehensive alarm modules, automatic analysis and judgment modules, real-time data platform and model data platform.
2. A remotely monitored adaptive power grid under-frequency load reduction system according to claim 1, characterized in that: The control system includes automatic analysis module, monitoring and alarm module, data acquisition module, equipment modeling module and basic support platform.
3. A remotely monitored adaptive power grid under-frequency load reduction system according to claim 2, characterized in that: The automatic analysis module realizes the judgment and decision-making functions of power grid faults; the monitoring and alarm module realizes the strategic monitoring and message alarm of power grid faults; the data acquisition module realizes the transmission, processing and storage of various monitoring status quantities in the power grid; the equipment modeling module realizes the accurate reconstruction of the power grid model; the basic support platform realizes the visualization and platform support of the above functions.
4. A remotely monitored adaptive power grid under-frequency load reduction system according to claim 1, characterized in that: The dispatching data network transmits the key data and decision results of the control system to the next-level network communication system, playing the role of data transfer and data security protection.
5. The remote monitoring adaptive power grid under-frequency load reduction system according to claim 1, characterized in that: The data communication gateway distributes the data sent back by the dispatching data network to the low-frequency load shedding devices in different substations, and instructs the low-frequency load shedding devices to perform corresponding operations.
6. A remotely monitored adaptive power grid under-frequency load reduction system according to claim 1, characterized in that: The statistical analysis and comprehensive alarm modules enable in-depth data processing and signal sending in the cloud.
7. The remote monitoring adaptive power grid under-frequency load reduction system according to claim 1, characterized in that: The automatic analysis module realizes real-time fault analysis.
8. The remote monitoring adaptive power grid under-frequency load reduction system according to claim 1, characterized in that: The real-time data platform classifies and stores the real-time data sent back by the control system.
9. The remote monitoring adaptive power grid under-frequency load reduction system according to claim 1, characterized in that: The model data platform classifies and stores the equipment models returned by the control system.
10. A remotely monitored adaptive power grid low-frequency load reduction method, characterized in that: The steps include: S1, collects bus voltage and frequency change rate of each node through wide area measurement system; S2, convert according to the power of each load and unit, and calculate the actual power shortage and maximum frequency deviation according to the formula; S3, monitor the current frequency of the system. If it is found to be lower than the control frequency f1, it means that the system is in a state of severe power shortage, and the load is directly removed according to the traditional low-frequency load reduction strategy adjusted offline; Otherwise, go to S4; S4, monitor the current frequency of the system. If it is found that it has been lower than the control frequency f2 for a long time, it means that the system is still in a power shortage state, and start the special wheel to help the frequency recover to the expected recovery frequency; otherwise, go to S5; S5, judging whether the predicted lowest frequency is lower than the control frequency f1, or whether the predicted steady-state frequency is lower than the control frequency f2. If neither is satisfied, it means that the low-frequency load reduction does not need to be performed, and the process goes to S1 to continue monitoring the system frequency; otherwise, the process goes to S6; S6, calculate the load reduction amount by considering the load regulation effect and the system spare capacity; if the frequency is restored, go to S7, otherwise go to S5; S7, according to the load priority and frequency-voltage characteristics, distributes the load reduction to the appropriate bus for load reduction.