Method and device for determining installed capacity of energy system, equipment and medium

By setting the expected goals and constraints of the operation of the energy system, the installed capacity of wind power generation, photovoltaic power generation, hydrogen energy storage and pumped storage is solved, and the problem of difficulty in comprehensively evaluating the performance of the comprehensive energy system in the existing technology is solved, and multi-dimensionality is achieved Optimized and reasonable installation capacity configuration.

CN118920530APending Publication Date: 2024-11-08CHINA THREE GORGES CORPORATION
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411030879.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-30
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

The existing technology is difficult to effectively optimize the installed capacity of wind power generation, photovoltaic power generation, hydrogen energy storage and pumped energy storage in the comprehensive energy system, making it difficult to comprehensively evaluate the system performance and feasibility.

Method used

By determining the expected operation goals and system constraints of the energy system, including system cost goals, load power shortage targets, energy surplus rate targets, hydrogen storage tank capacity constraints, hydrogen storage tank status, water balance, working conditions and storage capacity of the power pumping and storage station Constraint, multiple optimization methods are used to determine the installed capacity that meets these goals.

Benefits of technology

The installed capacity of the energy system is optimized in multiple dimensions such as cost, power shortage rate, and excess rate, which improves the rationality of installed capacity and a comprehensive evaluation of system performance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118920530A_ABST
    Figure CN118920530A_ABST
Patent Text Reader

Abstract

The embodiment of the invention relates to an installed capacity determination method and device of an energy system, equipment and a medium. The method comprises the steps that an operation expectation target of the energy system is determined; wherein the operation expectation target comprises a system cost target, a load power shortage rate target and an energy excess rate target; system constraint conditions of the energy system are determined, and the system constraint conditions comprise a hydrogen storage tank capacity constraint condition, a hydrogen storage tank state constraint condition, a pumped storage power station water balance constraint condition, a pumped storage power station working condition constraint condition and a pumped storage power station storage capacity constraint condition; under the constraint of the system constraint condition, the installed capacity meeting the operation expectation target is determined; wherein the installed capacity comprises the first installed capacity of the wind power generation module, the second installed capacity of the photovoltaic power generation module, the third installed capacity of the hydrogen energy storage module and the fourth installed capacity of the pumped storage module. Therefore, comprehensive constraint conditions and expected targets are set, and the installed capacity of the energy system is determined.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present disclosure relates to the field of energy storage technology, and in particular to a method, device, equipment and medium for determining installed capacity of an energy system. Background Art

[0002] In energy storage technology, hydrogen energy storage is a fast and environmentally friendly power-type energy storage method, and pumped storage is an energy-type energy storage method with low economic cost and relatively mature technology. Combining hydrogen energy storage and pumped storage into hybrid energy storage can give full play to the long-lasting working characteristics of energy-type energy storage and the rapid response capability of power-type energy storage.

[0003] In the related art, wind power generation, photovoltaic power generation, hydrogen energy storage, and pumped storage are combined to obtain a comprehensive energy system. However, there is an urgent need for a method for optimizing and determining the installed capacity of each component in the comprehensive energy system. Summary of the invention

[0004] In order to solve the above technical problems or at least partially solve the above technical problems, the present disclosure provides a method, device, equipment and medium for determining the installed capacity of an energy system.

[0005] The present disclosure provides a method for determining installed capacity of an energy system, including:

[0006] Determine the expected operation goals of the energy system; wherein the energy system includes a wind power generation module, a photovoltaic power generation module, a hydrogen energy storage module, and a pumped storage module; the expected operation goals include a system cost target, a load power shortage rate target, and an energy surplus rate target;

[0007] Determine the system constraints of the energy system, wherein the system constraints include: hydrogen storage tank capacity constraints, hydrogen storage tank state constraints, pumped storage power station water balance constraints, pumped storage power station operating constraints, and pumped storage power station storage capacity constraints;

[0008] Under the constraints of the system constraints, the installed capacity that meets the expected operation target is determined; wherein the installed capacity includes a first installed capacity of the wind power generation module, a second installed capacity of the photovoltaic power generation module, a third installed capacity of the hydrogen energy storage module, and a fourth installed capacity of the pumped storage module.

[0009] The embodiment of the present disclosure also provides a device for determining installed capacity of an energy system, including:

[0010] A target determination module is used to determine the expected operation target of the energy system; wherein the energy system includes a wind power generation module, a photovoltaic power generation module, a hydrogen energy storage module, and a pumped storage module; the expected operation target includes a system cost target, a load power shortage rate target, and an energy surplus rate target;

[0011] A condition determination module, used to determine the system constraints of the energy system, wherein the system constraints include: hydrogen storage tank capacity constraints, hydrogen storage tank state constraints, pumped storage power station water balance constraints, pumped storage power station operating conditions constraints, and pumped storage power station storage capacity constraints;

[0012] A capacity determination module is used to determine the installed capacity that meets the expected operation target under the constraints of the system constraints; wherein the installed capacity includes a first installed capacity of the wind power generation module, a second installed capacity of the photovoltaic power generation module, a third installed capacity of the hydrogen energy storage module, and a fourth installed capacity of the pumped storage module.

[0013] An embodiment of the present disclosure also provides an electronic device, comprising: a processor; a memory for storing executable instructions of the processor; the processor is used to read the executable instructions from the memory and execute the instructions to implement the method for determining the installed capacity of the energy system provided in the embodiment of the present disclosure.

[0014] The embodiment of the present disclosure further provides a computer-readable storage medium, wherein the storage medium stores a computer program, and the computer program is used to execute the method for determining the installed capacity of the energy system provided in the embodiment of the present disclosure.

[0015] The technical solution provided by the embodiments of the present disclosure has the following advantages over the prior art: the installed capacity determination scheme of the energy system provided in the embodiments of the present disclosure, the method comprising: determining the expected operation target of the energy system; wherein the energy system comprises a wind power generation module, a photovoltaic power generation module, a hydrogen energy storage module, and a pumped storage module; the expected operation target comprises a system cost target, a load power shortage rate target, and an energy surplus rate target; determining the system constraints of the energy system, wherein the system constraints comprise: a hydrogen storage tank capacity constraint, a hydrogen storage tank state constraint, a pumped storage power station water balance constraint, a pumped storage power station operating condition constraint, and a pumped storage power station storage capacity constraint; under the constraints of the system constraints, determining the installed capacity that meets the expected operation target; wherein the installed capacity comprises a first installed capacity of the wind power generation module, a second installed capacity of the photovoltaic power generation module, a third installed capacity of the hydrogen energy storage module, and a fourth installed capacity of the pumped storage module. By adopting the above technical scheme, the expected operation goals of the energy system are set in multiple dimensions such as cost, power shortage rate, and surplus rate. Constraints are set for the hydrogen storage tanks in the hydrogen energy storage module in dimensions such as capacity and state. Constraints are set for the pumped storage power station of the pumped storage module in dimensions such as water balance, operating conditions, and storage capacity. Based on the above-mentioned expected operation goals and constraints, the installed capacity of each module in the energy system is optimized. Therefore, more comprehensive constraints are set for the hydrogen energy storage modules and pumped storage modules in the energy system, and more comprehensive expected goals are set. The determination of the installed capacity of the energy system is achieved through multiple optimizations and comprehensive evaluations. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the present disclosure and, together with the description, serve to explain the principles of the present disclosure.

[0017] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative labor.

[0018] Figure 1 A schematic diagram of a flow chart of a method for determining installed capacity of an energy system provided in an embodiment of the present disclosure;

[0019] Figure 2 A schematic diagram of the structure of a device for determining installed capacity of an energy system provided in an embodiment of the present disclosure;

[0020] Figure 3 A schematic diagram of the structure of an electronic device provided in an embodiment of the present disclosure. DETAILED DESCRIPTION

[0021] In order to more clearly understand the above-mentioned objectives, features and advantages of the present disclosure, the scheme of the present disclosure will be further described below. It should be noted that the embodiments of the present disclosure and the features in the embodiments can be combined with each other without conflict.

[0022] In the following description, many specific details are set forth to facilitate a full understanding of the present disclosure, but the present disclosure may also be implemented in other ways different from those described herein; it is obvious that the embodiments in the specification are only part of the embodiments of the present disclosure, rather than all of the embodiments.

[0023] With the increasingly severe challenges of climate change, energy supply, and environmental pollution, a time plan and corresponding technical development path have been formulated for "carbon neutrality". Clean, low-carbon, safe, and efficient power energy systems have become an important direction for energy development, and renewable energy sources such as wind and solar energy have been vigorously developed.

[0024] In energy storage technology, the production of hydrogen with the help of new energy sources such as wind and solar can not only achieve pollution-free and zero-emission hydrogen from production to application, but also solve the problem of energy waste in the development and utilization of wind and solar resources. It is an important direction for the development of hydrogen energy. Hydrogen energy storage is a fast and environmentally friendly power-type energy storage method. Pumped storage is an energy-type energy storage method with low economic cost and relatively mature technology. The combination of the two is hybrid energy storage, which can give play to the characteristics of long-term operation of energy-type energy storage and the rapid response ability of power-type energy storage, which is of great significance to promoting the effective use of energy and meeting the load demand of the energy system. Therefore, it is important and necessary to study the integrated energy system of wind power generation, photovoltaic power generation, hydrogen energy storage, and pumped storage.

[0025] In the field of configuration optimization, for the wind and solar clean energy system constructed by pumped storage and hydrogen energy storage, the potential application value and advantages of pumped storage in this comprehensive energy system have yet to be further explored. In addition, existing research is often limited to single or dual optimization objectives, which usually makes it difficult to fully evaluate system performance and feasibility. Therefore, there is an urgent need for a method to optimize and determine the installed capacity of each component in this comprehensive energy system.

[0026] In order to solve the above problems, an embodiment of the present disclosure provides a method for determining the installed capacity of an energy system, which is introduced below in conjunction with a specific embodiment.

[0027] Figure 1The present invention provides a flow chart of a method for determining the installed capacity of an energy system provided by an embodiment of the present invention. The method for determining the installed capacity of an energy system can be applied to an installed capacity determination device of an energy system. The installed capacity determination device of an energy system can be implemented by software and / or hardware. The installed capacity determination device of an energy system can generally be integrated into an electronic device. Figure 1 As shown, the method for determining the installed capacity of the energy system includes:

[0028] Step 101, determining the expected operation goals of the energy system; wherein the energy system includes a wind power generation module, a photovoltaic power generation module, a hydrogen energy storage module, and a pumped storage module; the expected operation goals include a system cost target, a load power shortage rate target, and an energy surplus rate target.

[0029] The desired operation target may be a target to be achieved for optimizing the installed capacity of the energy system. The wind power generation module may include a wind turbine. The photovoltaic power generation module may include a photovoltaic power generation panel. The hydrogen energy storage module may include an electrolyzer, a hydrogen storage tank, and a fuel cell. The pumped storage module may include a pumped storage power station, which may include an upper reservoir and a lower reservoir.

[0030] In this embodiment, a system cost target is set for the energy system composed of four modules: wind power generation module, photovoltaic power generation module, hydrogen energy storage module, and pumped storage module. The system cost target mainly optimizes the investment cost, operating cost, replacement cost, etc. of the equipment included in the energy system. A load power shortage rate target is also set. The load power shortage rate target takes the load defect rate as the optimization target. The load defect rate can characterize the degree to which the power generation of the energy system meets the load demand of the energy system over a period of time. The load power shortage rate can specifically be the ratio of the missing power to the load demand. In this embodiment, an energy surplus rate target is also set. The energy surplus rate target takes the energy surplus rate as the optimization target. The energy surplus rate can be the ratio of the surplus power of the energy system to the total power generation of the energy system. The above three expected operation targets influence and restrict each other.

[0031] In some embodiments of the present disclosure, the system cost target is to minimize the equivalent annual comprehensive cost of the energy system. The equivalent annual comprehensive cost is determined based on the equipment cost, equipment replacement cost, system recovery factor, and operating cost. Among them, the equivalent annual comprehensive cost can be the annual equivalent cost obtained by converting the various costs of the equipment during the entire use cycle, and the use cycle can be understood as the life cycle of the energy system. Equipment cost is also called investment cost. System recovery factor is also called system capital recovery factor. Operating cost is also called annual operating cost.

[0032] In this embodiment, the calculation of the equivalent annual comprehensive cost is shown in the following formula:

[0033] F1=(C inv +C rep )CRF+C op ;

[0034] In the formula, F1 is the equivalent annual comprehensive cost; C inv is the equipment cost; C rep is the equipment replacement cost; CRF is the system recovery factor; C op For running costs.

[0035] Specifically, the equipment cost is determined according to the unit capacity cost of the wind power generation module, the unit capacity cost of the photovoltaic power generation module, the unit capacity cost of the hydrogen energy storage module, the unit capacity cost of the pumped storage module, the first installed capacity, the second installed capacity, the third installed capacity, and the fourth installed capacity. Among them, the unit capacity cost is also called the unit capacity investment cost, and the unit capacity cost can be the equipment cost corresponding to the energy capacity per unit of the corresponding equipment. The first installed capacity can be the installed capacity of the wind power generation module, the second installed capacity can be the installed capacity of the photovoltaic power generation module, the third installed capacity can be the installed capacity of the hydrogen energy storage module, and the fourth installed capacity can be the installed capacity of the pumped storage module. The third installed capacity can include the installed capacity of the electrolyzer, the installed capacity of the hydrogen storage tank, and the installed capacity of the fuel cell.

[0036] In this embodiment, the calculation of equipment cost is shown as follows:

[0037]

[0038] In the formula, C inv For equipment cost; is the unit capacity cost of wind power module; is the unit capacity cost of photovoltaic power generation module; is the unit capacity cost of the pumped storage module; is the unit capacity cost of the electrolyzer; is the unit capacity cost of the hydrogen storage tank; is the unit capacity cost of the fuel cell. N wind It can be the first installed capacity; N pv Can be the second installed capacity; N chou Can be the fourth installed capacity; N el Can be the installed capacity of the electrolyzer; N tank Can be the installed capacity of the hydrogen storage tank; N fc It can be the installed capacity of the fuel cell.

[0039] Specifically, the equipment replacement cost is determined based on the replacement cost of the wind power generation module, the replacement cost of the photovoltaic power generation module, the replacement cost of the hydrogen energy storage module, and the replacement cost of the pumped storage module. The replacement cost can be the cost consumed by replacement during the use cycle of the energy system.

[0040] In this embodiment, the calculation formula of equipment replacement cost is as follows:

[0041]

[0042] In the formula, C rep The cost of replacing the equipment; is the replacement cost of the wind power module; is the replacement cost of the photovoltaic power generation module; is the replacement cost of the pumped storage module; is the replacement cost of the electrolyzer; is the replacement cost of the hydrogen storage tank; is the replacement cost of the fuel cell.

[0043] Specifically, the system recovery factor is determined according to the discount rate and planning period of the energy system. The discount rate may be the capital discount rate of the energy system, and this embodiment does not limit the discount rate. For example, the discount rate may be a value between 0.03 and 0.07. The planning period may be the planned use period of the energy system.

[0044] In this embodiment, the calculation formula of the system recovery factor CRF is as follows:

[0045]

[0046] In the formula, r CRF is the discount rate and L is the planning period of the system.

[0047] Specifically, the operating cost is determined based on the annual operation and maintenance cost of the energy system, the penalty cost for insufficient power generation, the penalty cost for excess power generation, the cost of purchasing electricity, the income from electricity sales, and the income from hydrogen sales. The annual operation and maintenance cost may be the resource consumption generated by maintaining the normal operation and maintenance of the energy system within one year. The penalty cost for insufficient power generation may be the resource penalty generated for power generation that does not meet the standard. The penalty cost for excess power generation may be the resource penalty generated for excessive power generation. The cost of purchasing electricity may be the cost of purchasing electricity.

[0048] In this embodiment, the annual operating cost C op The calculation formula is as follows:

[0049] C op =C om +C unmet +C exc+C e-buy -C e_sell -C h2 ;

[0050] In the formula, C om is the annual operation and maintenance cost; C unmet Penalty cost for insufficient power generation during the operation of the energy system; C exc The penalty cost for excess power generation during the operation of the energy system; C e-buy The cost of electricity purchased during the operation of the energy system; C e_sell The revenue from electricity sales during the operation of the energy system; C h2 The revenue from hydrogen sales during the operation of the energy system.

[0051] Specifically, the annual operation and maintenance cost is determined based on the operation and maintenance investment ratio coefficient and equipment cost, the penalty cost for insufficient power generation is determined based on the missing electricity and the missing unit penalty cost, the penalty cost for excess power generation is determined based on the excess electricity and the excess unit penalty cost, the electricity purchase cost is determined based on the missing electricity and the unit price of electricity purchase, the electricity sales revenue is determined based on the excess electricity and the unit price of electricity sales, and the hydrogen sales revenue is determined based on the hydrogen sales volume and the unit price of hydrogen sales.

[0052] Among them, the operation and maintenance investment ratio coefficient may be the ratio coefficient of the operation and maintenance cost to the investment cost. The missing electricity may be the electricity missing from the energy system at time t. The missing unit penalty cost may be the unit penalty resource cost for the insufficient power generation of the energy system at time t. The excess electricity may be the excess electricity of the energy system at time t. The excess unit penalty cost may be the unit penalty resource cost for the excess power generation of the energy system at time t. The unit price of electricity sales may be the unit price of electricity sales of the energy system at time t. The hydrogen sales volume may be the hydrogen sales volume of the energy system at time t.

[0053] In this embodiment, the annual operating cost C is calculated op The calculation formulas for each part of are as follows:

[0054] C om =k om C inv ;

[0055]

[0056] In the formula, C om is the annual operation and maintenance cost; k om is the operation and maintenance investment ratio coefficient; C inv is the equipment cost; C unmet Penalty cost for insufficient power generation; P unmet (t) is the power loss of the energy system at time t; is the penalty cost per unit of power loss in the energy system at time t; T is the calculation time period; C excPenalty cost for excess generation; P exc (t) is the excess power of the energy system at time t; C is the excess unit penalty cost of the energy system at time t when there is excess electricity; e-buy The cost of purchasing electricity; is the unit price of electricity purchased by the energy system at time t; C e_sell For the revenue from electricity sales; is the electricity selling price of the energy system at time t; C h2 For the revenue from hydrogen sales; is the unit price of hydrogen sold by the energy system; Q h2 (t) is the amount of hydrogen sold by the energy system at time t.

[0057] In some embodiments of the present disclosure, the missing unit penalty cost or excess unit penalty cost of the power generation in the energy system can be determined by a piecewise function, that is, different missing power intervals can correspond to corresponding missing unit penalty costs, and different excess power intervals can have corresponding excess unit penalty costs. For example, its mathematical expression can be:

[0058]

[0059] Where P unmet,1 , P unmet,2 , ..., P unmet,n-1 are respectively the missing power values ​​as segment boundaries in the piecewise function, and the missing power interval is formed based on two adjacent segment boundaries; are the missing unit penalty costs corresponding to the missing power interval in the piecewise function. The piecewise function corresponding to the excess unit penalty cost of the system's excess power generation is similar and will not be described here.

[0060] In some embodiments of the present disclosure, the load power shortage rate target is to minimize the load power shortage rate of the energy system. Specifically, the load power shortage rate is determined according to the missing power of the energy system and the load demand. The load demand can represent the load demand size of the energy system at time t.

[0061] In this embodiment, the calculation formula of the load power failure rate F2 is as follows:

[0062]

[0063] Where P unmet (t) is the power loss of the energy system at time t; P load (t) is the load demand.

[0064] In some embodiments of the present disclosure, the energy surplus rate target is to minimize the energy surplus rate of the energy system. Specifically, the energy surplus rate is determined based on the power generation of the wind power generation module, the power generation of the photovoltaic power generation module, and the missing power.

[0065] In this embodiment, the calculation formula of the energy surplus rate F3 is as follows:

[0066]

[0067] Where P wind (t) is the power generation of the wind power generation module in the energy system at time t; P pv (t) is the power generation of the photovoltaic power generation module in the energy system at time t; P exc (t) is the excess power of the energy system at time t.

[0068] In the above scheme, the optimization goal is to minimize the equivalent annual comprehensive cost, load power shortage rate, and energy surplus rate, thereby optimizing the installed capacity of the energy system in multiple dimensions such as cost dimension, insufficient power generation, and excess power generation, enriching the dimensions for optimization and improving the rationality of the final installed capacity.

[0069] Step 102, determine the system constraints of the energy system, wherein the system constraints include: hydrogen storage tank capacity constraints, hydrogen storage tank status constraints, pumped storage power station water balance constraints, pumped storage power station operating conditions constraints, and pumped storage power station storage capacity constraints.

[0070] The system constraints may be restrictions or rules imposed on the energy system for optimizing the installed capacity, and the system constraints may be constraints caused by hardware limitations of equipment in the energy system.

[0071] In some embodiments of the present disclosure, the hydrogen storage tank capacity constraint condition includes: the current capacity of the hydrogen storage tank in the hydrogen energy storage module at the current moment is greater than or equal to the minimum capacity, and less than or equal to the maximum capacity. Among them, the current capacity can be the hydrogen capacity stored in the hydrogen storage tank at time t. The minimum capacity can be the lower limit of the hydrogen capacity of the hydrogen storage tank. The maximum capacity can be the upper limit of the hydrogen capacity of the hydrogen storage tank. It should be noted that the capacity can be converted to mass.

[0072] In this embodiment, the hydrogen storage tank capacity constraint condition can be expressed as follows:

[0073] E tank_min ≤E tank (t)≤E tank_max ;

[0074] In the formula, E tank(t) is the current capacity of the hydrogen storage tank at time t; E tank_min is the minimum capacity of the hydrogen storage tank, E tank_max It is the maximum capacity of the hydrogen storage tank.

[0075] Specifically, the current capacity is determined according to the last capacity at the last moment, the hydrogen production capacity at the last moment, and the hydrogen consumption capacity at the last moment. The last capacity may be the hydrogen capacity stored in the hydrogen storage tank at time t-1; the hydrogen production capacity at the last moment may be the hydrogen capacity produced by the electrolyzer at time t-1; and the hydrogen consumption capacity at the last moment may be the hydrogen capacity consumed by the fuel cell at time t-1.

[0076] In this embodiment, the expression of the current capacity of the hydrogen storage tank is as follows:

[0077] E tank (t) = E tank (t-1)+Q el (t-1)-Q fc (t-1);

[0078] In the formula, E tank (t) is the current capacity; E tank (t-1) is the previous capacity; Q el (t-1) is the hydrogen production capacity at the previous moment; Q fc (t-1) is the hydrogen consumption capacity at the previous moment.

[0079] Specifically, the hydrogen production capacity at the last moment is determined according to the input power and time interval of the electrolyzer in the hydrogen energy storage module. Among them, the time interval can be the interval between adjacent moments in the calculation cycle. The hydrogen production capacity at the last moment can be determined according to the input power of the electrolyzer in the hydrogen energy storage module at the last moment, the working efficiency of the electrolyzer, the hydrogen capacity that can be produced by 1 kilowatt-hour of electricity, the output power of the electrolyzer at the last moment, the DC-DC converter efficiency of the electrolyzer, and the time interval.

[0080] In this embodiment, a simplified model of an alkaline electrolyzer is used to simulate the hydrogen production process by electrolysis. The output power of the electrolyzer can be expressed as:

[0081] P el-tank (t-1) = P el (t-1)η el ;

[0082] Where P el-tank (t) is the output power of the electrolytic cell at time t-1; P el (t) is the input power of the electrolytic cell at time t-1; η el The working efficiency of the electrolyzer.

[0083] The hydrogen production capacity of the electrolyzer at the last moment can be expressed as:

[0084] Q el (t-1) = μ el P el_tank (t-1)η el_DC-DC Δt;

[0085] Where, Qel(t-1) is the hydrogen production capacity of the electrolyzer at time t-1; μ el P is the hydrogen capacity that can be produced by 1 kWh of electricity; el-tank (t) is the output power of the electrolytic cell at time t-1; η el_ DC-DC is the DC-DC converter efficiency of the electrolyzer; Δt is the time interval.

[0086] Specifically, the hydrogen consumption capacity at the last moment is determined according to the input power and time interval of the fuel cell in the hydrogen energy storage module. The hydrogen consumption capacity at the last moment can be determined according to the input power of the fuel cell at the last moment, the working efficiency of the fuel cell, the time interval, the electric energy released by 1 kg of hydrogen, the working efficiency of the fuel cell, the working efficiency of the hydrogen storage tank, and the DC-DC converter efficiency of the fuel cell.

[0087] In this embodiment, a proton exchange membrane fuel cell is used as a fuel cell model, and the output power of the fuel cell can be expressed as:

[0088] P fc (t-1) = P tank-fc (t-1)η fc ;

[0089] Where P fc (t-1) is the output power of the fuel cell at time t-1; P tank-fc (t-1) is the input power from the hydrogen storage tank to the fuel cell at time t-1; η fc The efficiency of the fuel cell.

[0090] The expression of the hydrogen consumption capacity of the fuel cell at the last moment is:

[0091]

[0092] In the formula, Q fc (t-1) is the hydrogen consumption capacity of the fuel cell at time t-1; P fc (t-1) is the output power of the fuel cell at time t-1; Δt is the time interval; μ fc is the electrical energy that can be released by 1 kg of hydrogen; η fc is the working efficiency of the fuel cell; η tan k is the working efficiency of the hydrogen storage tank; ηfc_DC-DC is the DC-DC converter efficiency of the fuel cell.

[0093] In the above scheme, the constraints of the hydrogen storage tank in the capacity dimension are described, so that the final configured installed capacity meets the hardware limitations of the hydrogen storage tank in the capacity dimension.

[0094] In some embodiments of the present disclosure, the hydrogen storage tank state constraint condition includes: the equivalent charge state of the hydrogen storage tank in the hydrogen energy storage module is greater than or equal to the minimum charge state value, and less than or equal to the maximum charge state value. The equivalent charge state is determined according to the pressure and maximum pressure of the hydrogen storage tank. Among them, the equivalent charge state can be used to describe the hydrogen storage amount in the hydrogen storage tank, and the equivalent charge state can be a relative representation. The minimum charge state value can be the lower limit value of the equivalent charge state. The maximum charge state value can be the upper limit value of the equivalent charge state.

[0095] In this embodiment, the hydrogen storage tank state constraint condition may be:

[0096] S ohc_min ≤S ohc (t)≤S ohc_max ;

[0097] In the formula, S ohc (t) is the equivalent state of charge of the hydrogen storage tank at time t; S ohc_min is the minimum charge state of the hydrogen storage tank, S ohc_max is the maximum state of charge.

[0098]

[0099] In the formula, S ohc (t) is the equivalent state of charge of the hydrogen storage tank at time t; p sto (t) is the pressure of the hydrogen storage tank at time t; p N is the maximum pressure of the hydrogen storage tank.

[0100] In the above scheme, the constraints of the hydrogen storage tank in the state dimension are described so that the final configured installed capacity meets the hardware limitations of the hydrogen storage tank in the state dimension.

[0101] In some embodiments of the present disclosure, the water balance constraint of the pumped storage power station includes: the current upper reservoir water volume of the upper reservoir in the pumped storage module at the current moment is equal to the sum of the previous upper reservoir water volume at the previous moment and the change water volume of the upper reservoir, and the change water volume of the upper reservoir is the product of the difference between the pumped water volume at the current moment and the power generation water volume at the current moment and the time interval; the current lower reservoir water volume of the lower reservoir in the pumped storage module at the current moment is equal to the sum of the previous lower reservoir water volume at the previous moment and the change water volume of the lower reservoir, and the change water volume of the lower reservoir is the product of the difference between the power generation water volume at the current moment and the pumped water volume at the current moment and the time interval. The pumped water volume at the current moment is determined according to the pumping power at the current moment, and the power generation water volume at the current moment is determined according to the power generation power at the current moment.

[0102] In this embodiment, when the pumped storage module is performing pumped storage or discharging water for power generation, the water volume of the upper reservoir and the lower reservoir will change accordingly. The expressions of the current upper reservoir water volume of the upper reservoir at the current moment and the current lower reservoir water volume of the lower reservoir at the current moment are shown in the following formula:

[0103] V up (t) = V up (t-1)+[Q chou (t)-Q fa (t)]·Δt;

[0104] V down (t) = V down (t-1)+[Q fa (t)-Q chou (t)]·Δt;

[0105] Where V up (t) is the current water volume of the upper reservoir at time t (i.e., the current time); V up (t-1) is the water volume of the previous reservoir at time t-1 (i.e., the previous moment); Q chou (t) is the pumped water volume of the pumped storage module at time t; Q fa (t) is the amount of water generated by the pumped storage module at time t; Δt is the time interval; V down (t) is the current water volume of the lower reservoir at time t; V down (t-1) is the water volume of the upper and lower reservoirs at time t-1.

[0106] In this embodiment, the pumped water volume at the current moment is determined according to the unit conversion parameter, the pumping efficiency of the pumped storage module, the pipeline efficiency, the pumping power at the current moment, the density of water, the acceleration of gravity, and the head height. The power generation water volume at the current moment is determined according to the unit conversion parameter, the power generation power at the current moment, the power generation efficiency, the pipeline efficiency, the density of water, the acceleration of gravity, and the head height. The unit conversion parameter may be a parameter for performing unit conversion.

[0107] Pumping water volume Q chou (t) and the amount of water for power generation Q fa The calculation expression of (t) is as follows:

[0108]

[0109] Where η chou is the pumping efficiency of the pumped storage module; η fa is the power generation efficiency of the pumped storage module; η wp is the pipeline efficiency of the pumped storage module; P chou (t) is the pumping power of the pumped storage module at time t; P fa (t) is the power generation of the pumped storage module at time t; ρ is the density of water; g is the acceleration of gravity; h is the water head height; K chou K is the flow-to-power ratio of the pumped storage module during pumping; fa It is the flow-to-power ratio when the pumped storage module generates electricity; 3600 is the conversion parameter between the time unit of hours and seconds; 1000 is also a parameter introduced when converting units.

[0110] In the above scheme, the constraints of the pumped storage module in the water balance dimension are described, so that the installed capacity finally configured meets the hardware limitations of the pumped storage module in the water balance dimension.

[0111] In some embodiments of the present disclosure, the operating condition constraint of the pumped storage power station includes: at least one of the pumping power of the pumped storage module at time t and the power generation power of the pumped storage module at time t is 0. That is, the pumped storage power station cannot generate electricity and pump water at the same time.

[0112] Specifically, the operating constraints of the pumped storage power station can be expressed as follows:

[0113] P chou (t)·P fa (t) = 0;

[0114] Where P chou (t) is the pumping power of the pumped storage module at time t; P fa (t) is the power generation of the pumped storage module at time t.

[0115] In some embodiments of the present disclosure, the storage capacity constraints of the pumped storage power station include: the water volume of the upper reservoir is between the minimum water volume of the upper reservoir and the maximum water volume of the upper reservoir, and the water volume of the lower reservoir is between the minimum water volume of the lower reservoir and the maximum water volume of the lower reservoir.

[0116] Specifically, the storage capacity constraint of the pumped storage power station can be expressed as follows:

[0117] V up_min ≤V up (t)≤V up_max ;

[0118] V down_min ≤V down (t)≤V down_max ;

[0119] Among them, V up (t) is the water volume of the upper reservoir at time t; V up_min is the minimum water volume of the upper reservoir; V up_max is the maximum water volume of the upper reservoir; V down (t) is the water volume of the lower reservoir at time t; V down_min is the minimum water volume of the lower reservoir; V down_max This is the maximum water volume in the lower reservoir.

[0120] In addition, the maximum pumping power and maximum generating power of pumped storage satisfy the following formula:

[0121]

[0122]

[0123] Where P chou_max (t) is the maximum pumping power of the pumped storage module at time t; V up_max is the maximum water volume of the upper reservoir; V up (t) is the water volume of the upper reservoir at time t; K chou V is the flow-to-power ratio of the pumped storage module during pumping; down (t) is the water volume V of the lower reservoir at time t down_min is the minimum water volume of the lower reservoir; P chou_e is the rated pumping power of the pumped storage module; P fa_max (t) is the maximum power generation of the pumped storage module at time t; V up_min is the minimum water volume of the upper reservoir; V down_max is the maximum water volume of the lower reservoir; K fa P is the flow-to-power ratio when the pumped storage module generates electricity; fa_e It is the rated power generation capacity of pumped storage.

[0124] Step 103, under the constraints of system constraints, determine the installed capacity that meets the expected operation target; wherein the installed capacity includes a first installed capacity of the wind power generation module, a second installed capacity of the photovoltaic power generation module, a third installed capacity of the hydrogen energy storage module, and a fourth installed capacity of the pumped storage module.

[0125] The installed capacity may be the maximum power generation capacity set when the module is designed.

[0126] In this embodiment, the installed capacity determination device of the energy system comprehensively considers multiple targets such as the system cost target, the load power shortage rate target, and the energy surplus rate target of the energy system, and establishes a configuration optimization model of the energy system based on multiple constraints such as the hydrogen storage tank capacity constraint, the hydrogen storage tank state constraint, the pumped storage power station water balance constraint, the pumped storage power station operating condition constraint, and the pumped storage power station storage capacity constraint. The configuration optimization module is solved to obtain the first installed capacity of the wind power generation module, the second installed capacity of the photovoltaic power generation module, the third installed capacity of the hydrogen energy storage module, and the fourth installed capacity of the pumped storage module.

[0127] Specifically, the installed capacity determination device of the energy system can process various data required for solving the configuration optimization model, and use the model solving algorithm to solve the configuration optimization model of the energy system to obtain the initial installed capacity, and the initial installed capacity can be a Pareto solution set. Among them, this embodiment does not limit the model solving algorithm, for example, the model solving algorithm can be a non-dominated sorting genetic algorithm III (NSGA-III) algorithm.

[0128] Furthermore, the initial installed capacity is processed through fuzzy decision theory to determine the final installed capacity of the energy system, which includes a first installed capacity, a second installed capacity, a third installed capacity, and a fourth installed capacity.

[0129] The fuzzy decision theory can quantify the satisfaction of the optimal solution in the initial installed capacity based on the fuzzy membership function, which can be specifically shown as follows:

[0130]

[0131] In the formula, u i represents the satisfaction with the expected goal of the ith operation, F i is the expected target of the ith operation; F imax is the maximum value of the expected target of the ith operation; F imin is the minimum value of the expected target of the ith operation. i =1, indicating that the satisfaction with the i-th operation target has reached the highest level, that is, complete satisfaction; if u i = 0, it means that the satisfaction with the i-th operation expectation goal has reached the lowest level, that is, completely dissatisfied. Then the satisfaction with each operation expectation goal is normalized to obtain the standard satisfaction value, as shown in the following formula:

[0132]

[0133] In the formula, is the standard satisfaction value, so that The expected target with the largest value is the best solution for the corresponding selection; ob The number of targets to be run, which can be 3.

[0134] The present disclosure provides an installed capacity determination scheme for an energy system, the method comprising: determining the expected operation target of the energy system; wherein the energy system comprises a wind power generation module, a photovoltaic power generation module, a hydrogen energy storage module, and a pumped storage module; the expected operation target comprises a system cost target, a load power shortage rate target, and an energy surplus rate target; determining system constraints of the energy system, wherein the system constraints comprise: a hydrogen storage tank capacity constraint, a hydrogen storage tank state constraint, a pumped storage power station water balance constraint, a pumped storage power station operating condition constraint, and a pumped storage power station storage capacity constraint; under the constraints of the system constraints, determining the installed capacity that meets the expected operation target; wherein the installed capacity comprises a first installed capacity of the wind power generation module, a second installed capacity of the photovoltaic power generation module, a third installed capacity of the hydrogen energy storage module, and a fourth installed capacity of the pumped storage module. By adopting the above technical scheme, the expected operation goals of the energy system are set in multiple dimensions such as cost, power shortage rate, and surplus rate. Constraints are set for the hydrogen storage tanks in the hydrogen energy storage module in dimensions such as capacity and state. Constraints are set for the pumped storage power station of the pumped storage module in dimensions such as water balance, operating conditions, and storage capacity. Based on the above-mentioned expected operation goals and constraints, the installed capacity of each module in the energy system is optimized. Therefore, more comprehensive constraints are set for the hydrogen energy storage modules and pumped storage modules in the energy system, and more comprehensive expected goals are set. The determination of the installed capacity of the energy system is achieved through multiple optimizations and comprehensive evaluations.

[0135] In some embodiments of the present disclosure, the system constraint condition also includes a power balance constraint condition of the energy system, in which the first power sum and the second power sum are the same, and the first power sum is the sum of the output power of the wind power generation module, the output power of the photovoltaic power generation module, the power generation power of the pumped storage module, the output power of the fuel cell in the hydrogen energy storage module, and the missing power. The second power sum is the sum of the load demand, the pumping power of the pumped storage module, the input power of the electrolyzer in the hydrogen energy storage module, and the excess power.

[0136] In this embodiment, the power balance constraint of the energy system can be expressed as follows:

[0137] P wind (t)+P pv (t)+P fa (t)+P fc (t)+P unmet (t) = P load (t)+Pchou (t)+P el (t)+P exc (t);

[0138] Among them, P wind (t) is the output power of the wind power generation module at time t; P pv (t) is the output power of the photovoltaic power generation module at time t; P fa (t) is the power generation of the pumped storage module at time t; P fc (t) is the output power of the fuel cell in the hydrogen energy storage module at time t, P unmet (t) is the power loss of the energy system at time t. load (t) is the load demand of the energy system at time t; P chou (t) is the pumping power of the pumped storage module at time t; P el (t) is the input power of the electrolyzer in the hydrogen energy storage module at time t; P exc (t) is the excess power of the energy system at time t.

[0139] In this embodiment, for the wind power generation module, the time lag effect and wake effect of the wind farm in the wind power generation module are not considered, and the output power of the wind power generation module at time t is shown in the following formula:

[0140]

[0141] Where P wind (t) is the output power of the wind power generation module at time t; V w (t) is the real-time wind speed of the wind power module at the hub height at time t; V i V is the cut-in wind speed of the wind turbine in the wind power generation module; rd is the rated wind speed; V o is the cut-out wind speed; C wind is the rated power of the wind turbine.

[0142] In this embodiment, for the photovoltaic power generation module, only the influence of the actual light intensity and the ambient temperature on the output power of the photovoltaic power generation module is considered. The output power of the photovoltaic power generation module is shown in the following formula:

[0143]

[0144] Where P pv (t) is the output power of the photovoltaic panel at time t; C pv is the rated output power of the photovoltaic power generation module; S(t) is the light intensity at time t; S ST is the standard light intensity at time t; η pv_DC-DCis the DC-DC converter efficiency; η loss (t) is the power loss caused by temperature rise at time t.

[0145] Specifically, the power loss η caused by the temperature rise at time t is loss (t) can be expressed as:

[0146] η loss (t) = 1 + λ (T (t) - 25);

[0147]

[0148] Where λ is the temperature coefficient; T(t) is the operating temperature of the photovoltaic panel at time t; T a (t) is the ambient temperature of the photovoltaic panel at time t; S(t) is the light intensity at time t; T N It is the standard operating temperature of photovoltaic panels.

[0149] In some embodiments of the present disclosure, the system constraint condition also includes an installed capacity constraint condition. In the installed capacity constraint condition, the first installed capacity is not greater than the first maximum capacity, the second installed capacity is not greater than the second maximum capacity, and the fourth installed capacity is not greater than the fourth maximum capacity. The third installed capacity includes the installed capacity of the electrolyzer, the installed capacity of the hydrogen storage tank, and the installed capacity of the fuel cell; the installed capacity of the electrolyzer is not greater than the maximum capacity of the electrolyzer, the installed capacity of the hydrogen storage tank is not greater than the maximum capacity of the hydrogen storage tank, and the installed capacity of the fuel cell is not greater than the maximum capacity of the fuel cell.

[0150] Specifically, the installed capacity constraint is as follows:

[0151]

[0152] Where N wind is the first installed capacity; N pv is the second installed capacity; N chou The fourth installed capacity; N el is the installed capacity of the electrolyzer; N tank is the installed capacity of hydrogen storage tank; N fc is the installed capacity of fuel cell; N wind_max is the first maximum capacity; N pv_max is the second largest capacity; N chou_max The fourth largest capacity; N el_max is the maximum installed capacity of the electrolytic cell; N tank_max is the maximum installed capacity of the hydrogen storage tank; N fc_max It is the maximum value of fuel cell installed capacity.

[0153] In some embodiments of the present disclosure, the system constraints also include equipment output constraints.

[0154] Among the equipment output constraints, the output power of the wind power generation module is not greater than the first maximum output power, the output power of the photovoltaic power generation module is not greater than the second maximum output power, the pumping power of the pumped storage module is not greater than the maximum pumping power, the power generation power of the pumped storage module is not greater than the maximum power generation power, the input power of the electrolyzer in the hydrogen energy storage module is not greater than the maximum input power of the electrolyzer, and the output power of the fuel cell in the hydrogen energy storage module is not greater than the maximum output power of the battery.

[0155] Specifically, the equipment output constraint condition is as follows:

[0156]

[0157] Where P wind (t) is the output power of the wind power generation module at time t; P pv (t) is the output power of the photovoltaic power generation module at time t; P chou (t) is the pumping power of the pumped storage module at time t; P fa (t) is the power generation of the pumped storage module at time t; P el (t) is the input power of the electrolyzer in the hydrogen energy storage module at time t; P fc (t) is the output power of the fuel cell in the hydrogen energy storage module at time t. wind_max is the maximum output power of the wind power generation module at time t; P pv_max is the maximum output power of the photovoltaic power generation module at time t; P chou_max (t) The maximum pumping power of the pumped storage module at time t; P fa_max (t) is the maximum power generation capacity of the pumped storage module at time t; P el_max (t) is the maximum input power of the electrolyzer in the hydrogen energy storage module at time t; P fc_max (t) is the maximum output power of the fuel cell in the hydrogen energy storage module at time t.

[0158] In addition, the energy system will not produce hydrogen in the electrolyzer and consume hydrogen in the fuel cell at the same time during operation. The maximum input power of the electrolyzer and the maximum output power of the fuel cell are not only constrained by their own capacity, but also by the remaining hydrogen capacity in the hydrogen storage tank. Specifically, the maximum input power P of the electrolyzer in the hydrogen energy storage module at time t is el_max (t) and the maximum output power P of the fuel cell at time t fc_max (t) can be calculated by the following formula.

[0159]

[0160] E tank_max =0.8C tank ;

[0161] E tank_min =0.2C tank ;

[0162] Where P el_max (t) is the maximum value of the input power of the electrolytic cell at time t; P fc_max (t) is the maximum output power of the fuel cell at time t; C el is the capacity of the electrolytic cell; Δt is the time interval; E tank_max is the upper limit of the hydrogen storage tank capacity; E tank (t) is the current capacity; μ el is the hydrogen capacity that can be produced by 1 kWh of electricity; η el is the working efficiency of the electrolytic cell; η el_DC-DC is the DC-DC converter efficiency of the electrolyzer. fc is the capacity of the fuel cell; E tank_min is the lower limit of the hydrogen storage tank capacity; C tank is the capacity of the hydrogen storage tank; η tank is the working efficiency of the hydrogen storage tank; μ fc is the electrical energy that can be released by 1 kg of hydrogen; η fc is the working efficiency of the fuel cell; η fc_DC-DC is the DC-DC converter efficiency of the fuel cell.

[0163] In some embodiments of the present disclosure, before determining the desired operating target or system constraints, the method for determining the installed capacity of the energy system further includes: analyzing the architecture and coupling characteristics of the energy system, and establishing a mathematical model for major equipment in the energy system.

[0164] Specifically, the topological structure of the energy system is established and the composition of the energy system is analyzed. In this energy system, the power generation subsystem composed of the wind power generation module and the photovoltaic power generation module is the main energy source of the comprehensive energy system, in which the wind power generation module outputs AC power and the photovoltaic power generation module outputs DC power. Connecting the two to the energy system through the inverter can effectively improve the working efficiency of the energy system. The pumped storage module mainly stores energy that the energy system cannot consume in time and serves as an emergency energy device for the energy system. The hydrogen energy storage module can produce hydrogen by electrolysis or generate electricity using fuel cells. The hydrogen energy storage module is a supplementary device for the pumped storage module. The hybrid energy storage composed of the two can give full play to their respective characteristics, take into account the system energy and power requirements, and improve energy utilization and system stability.

[0165] Furthermore, the coupling characteristics of the energy system are analyzed. The system coupling characteristics refer to the characteristics that different energy forms within the energy system interact with each other and realize energy conversion under the control of the corresponding modules. In the energy system, the wind power generation module and photovoltaic power generation module on the supply side are coupled with the electrical load on the load side through the combination of modules in the energy system. The hydrogen energy storage module is an electrical coupling device, and the pumped storage module also has a coupling effect.

[0166] Furthermore, mathematical modeling is performed on the main equipment of the energy system, including the wind turbine of the wind power generation module, the photovoltaic panels of the photovoltaic power generation module, the pumped storage module, and the hydrogen energy storage module.

[0167] The installed capacity determination scheme of the energy system provided in the embodiment of the present disclosure models the energy system including the pumped storage module and the hydrogen energy storage module. The energy system can give full play to the advantages of various energy sources, realize the complementary utilization and efficient configuration of energy, improve energy utilization efficiency, and reduce energy costs. It also helps to promote the optimization and transformation of the energy structure and promote sustainable development. In addition, the system cost target, load power shortage rate target, and energy surplus rate target of the energy system are taken into consideration at the same time, and a configuration optimization model of the energy system is established. The configuration optimization model is solved using the model solving algorithm, and a comprehensive evaluation of the performance and feasibility of the energy system is achieved, and finally the optimal installed capacity of the energy system is determined.

[0168] Figure 2 This is a schematic diagram of the structure of a device for determining the installed capacity of an energy system provided by an embodiment of the present disclosure. The device can be implemented by software and / or hardware, and the device can also be integrated in an electronic device. Figure 2 As shown, the installed capacity determination device of the energy system comprises:

[0169] The target determination module 201 is used to determine the expected operation target of the energy system; wherein the energy system includes a wind power generation module, a photovoltaic power generation module, a hydrogen energy storage module, and a pumped storage module; the expected operation target includes a system cost target, a load power shortage rate target, and an energy surplus rate target;

[0170] The condition determination module 202 is used to determine the system constraints of the energy system, wherein the system constraints include: hydrogen storage tank capacity constraints, hydrogen storage tank state constraints, pumped storage power station water balance constraints, pumped storage power station operating conditions constraints, and pumped storage power station storage capacity constraints;

[0171] The capacity determination module 203 is used to determine the installed capacity that meets the expected operation target under the constraints of the system constraints; wherein the installed capacity includes the first installed capacity of the wind power generation module, the second installed capacity of the photovoltaic power generation module, the third installed capacity of the hydrogen energy storage module, and the fourth installed capacity of the pumped storage module.

[0172] Optionally, the system cost target is to minimize the equivalent annual comprehensive cost of the energy system;

[0173] The equivalent annual comprehensive cost is determined based on equipment cost, equipment replacement cost, system recovery factor, and operating cost;

[0174] The equipment cost is determined according to the unit capacity cost of the wind power generation module, the unit capacity cost of the photovoltaic power generation module, the unit capacity cost of the hydrogen energy storage module, the unit capacity cost of the pumped storage module, the first installed capacity, the second installed capacity, the third installed capacity, and the fourth installed capacity;

[0175] The equipment replacement cost is determined according to the replacement cost of the wind power generation module, the replacement cost of the photovoltaic power generation module, the replacement cost of the hydrogen energy storage module, and the replacement cost of the pumped storage module;

[0176] The system recovery factor is determined based on the discount rate and planning period of the energy system;

[0177] The operating cost is determined based on the annual operation and maintenance cost of the energy system, the penalty cost for insufficient power generation, the penalty cost for excess power generation, the power purchase cost, the power sales revenue, and the hydrogen sales revenue;

[0178] The annual operation and maintenance cost is determined based on the operation and maintenance investment ratio coefficient and the equipment cost, the penalty cost for insufficient power generation is determined based on the missing power and the missing unit penalty cost, the penalty cost for excess power generation is determined based on the excess power and the excess unit penalty cost, the electricity purchase cost is determined based on the missing power and the unit price of electricity purchase, the electricity sales revenue is determined based on the excess power and the unit price of electricity sales, and the hydrogen sales revenue is determined based on the hydrogen sales volume and the hydrogen sales unit price.

[0179] Optionally, the load power shortage rate target is to minimize the load power shortage rate of the energy system;

[0180] The load power shortage rate is determined according to the power shortage of the energy system and the load demand.

[0181] Optionally, the energy surplus rate target is to minimize the energy surplus rate of the energy system;

[0182] The energy surplus rate is determined according to the power generation amount of the wind power generation module, the power generation amount of the photovoltaic power generation module, and the missing power amount.

[0183] Optionally, the hydrogen storage tank capacity constraint condition includes:

[0184] The current capacity of the hydrogen storage tank in the hydrogen energy storage module at the current moment is greater than or equal to the minimum capacity and less than or equal to the maximum capacity;

[0185] The current capacity is determined according to the previous capacity at the previous moment, the hydrogen production capacity at the previous moment, and the hydrogen consumption capacity at the previous moment;

[0186] The hydrogen production capacity at the previous moment is determined according to the input power and time interval of the electrolyzer in the hydrogen energy storage module;

[0187] The hydrogen consumption capacity at the previous moment is determined according to the input power of the fuel cell in the hydrogen energy storage module and the time interval.

[0188] Optionally, the hydrogen storage tank state constraint condition includes:

[0189] The equivalent charge state of the hydrogen storage tank in the hydrogen energy storage module is greater than or equal to the minimum charge state value, and less than or equal to the maximum charge state value;

[0190] The equivalent state of charge is determined according to the pressure and the maximum pressure of the hydrogen storage tank.

[0191] Optionally, the water balance constraint conditions of the pumped storage power station include:

[0192] The current water volume of the upper reservoir in the pumped storage module at the current moment is equal to the sum of the previous water volume of the upper reservoir at the previous moment and the changed water volume of the upper reservoir, and the changed water volume of the upper reservoir is the product of the difference between the pumped water volume at the current moment and the power generation water volume at the current moment and the time interval;

[0193] The current water volume of the lower reservoir in the pumped storage module at the current moment is equal to the sum of the water volume of the previous lower reservoir at the previous moment and the changed water volume of the lower reservoir, and the changed water volume of the lower reservoir is the product of the difference between the power generation water volume at the current moment and the pumping water volume at the current moment and the time interval;

[0194] The pumping water volume at the current moment is determined according to the pumping power at the current moment, and the power generation water volume at the current moment is determined according to the power generation power at the current moment.

[0195] The installed capacity determination device of the energy system provided in the embodiment of the present disclosure can execute the installed capacity determination method of the energy system provided in any embodiment of the present disclosure, and has the corresponding functional modules and beneficial effects of the execution method.

[0196] Figure 3 The structure diagram of an electronic device provided by the embodiment of the present disclosure is shown in FIG. Figure 3 As shown, the electronic device 300 includes one or more processors 301 and a memory 302 .

[0197] The processor 301 may be a central processing unit (CPU) or other forms of processing units having the ability to determine the installed capacity of the energy system and / or the ability to execute instructions, and may control other components in the electronic device 300 to perform desired functions.

[0198] The memory 302 may include one or more computer program products, which may include various forms of computer-readable storage media, such as volatile memory and / or non-volatile memory. The volatile memory may include, for example, random access memory (RAM) and / or cache memory (cache), etc. The non-volatile memory may include, for example, read-only memory (ROM), hard disk, flash memory, etc. One or more computer program instructions may be stored on the computer-readable storage medium, and the processor 301 may run the program instructions to implement the method for determining the installed capacity of the energy system of the embodiment of the present disclosure described above and / or other desired functions. Various contents such as input signals, signal components, noise components, etc. may also be stored in the computer-readable storage medium.

[0199] In one example, the electronic device 300 may further include: an input device 303 and an output device 304 , and these components are interconnected via a bus system and / or other forms of connection mechanisms (not shown).

[0200] In addition, the input device 303 may also include, for example, a keyboard, a mouse, and the like.

[0201] The output device 304 can output various information to the outside, including the determined distance information, direction information, etc. The output device 304 can include, for example, a display, a speaker, a printer, a communication network and a remote output device connected thereto, and the like.

[0202] Of course, to simplify, Figure 3 Only some of the components related to the present disclosure in the electronic device 300 are shown, and components such as a bus, an input / output interface, etc. are omitted. In addition, according to specific application situations, the electronic device 300 may also include any other appropriate components.

[0203] In addition to the above-mentioned methods and devices, the embodiments of the present disclosure may also be a computer program product, which includes computer program instructions, which, when executed by a processor, enable the processor to execute the method for determining the installed capacity of the energy system provided by the embodiments of the present disclosure.

[0204] The computer program product may be written in any combination of one or more programming languages ​​to write program code for performing the operations of the disclosed embodiments, including object-oriented programming languages ​​such as Java, C++, etc., and conventional procedural programming languages ​​such as "C" or similar programming languages. The program code may be executed entirely on the user computing device, partially on the user device, as a separate software package, partially on the user computing device and partially on a remote computing device, or entirely on a remote computing device or server.

[0205] In addition, the embodiments of the present disclosure may also be a computer-readable storage medium having computer program instructions stored thereon, and when the computer program instructions are executed by a processor, the processor executes the method for determining the installed capacity of the energy system provided by the embodiments of the present disclosure.

[0206] The computer readable storage medium can adopt any combination of one or more readable media. The readable medium can be a readable signal medium or a readable storage medium. The readable storage medium can include, for example, but is not limited to, a system, device or device of electricity, magnetism, light, electromagnetic, infrared, or semiconductor, or any combination of the above. More specific examples (non-exhaustive list) of readable storage media include: an electrical connection with one or more wires, a portable disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above.

[0207] It should be noted that, in this article, relational terms such as "first" and "second" are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0208] The above description is only a specific embodiment of the present disclosure, so that those skilled in the art can understand or implement the present disclosure. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present disclosure. Therefore, the present disclosure will not be limited to the embodiments described herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A method for determining the installed capacity of an energy system, characterized in that: include: Determine the expected operation goals of the energy system; wherein the energy system includes a wind power generation module, a photovoltaic power generation module, a hydrogen energy storage module, and a pumped storage module; the expected operation goals include a system cost target, a load power shortage rate target, and an energy surplus rate target; Determine the system constraints of the energy system, wherein the system constraints include: hydrogen storage tank capacity constraints, hydrogen storage tank state constraints, pumped storage power station water balance constraints, pumped storage power station operating constraints, and pumped storage power station storage capacity constraints; Under the constraints of the system constraints, the installed capacity that meets the expected operation target is determined; wherein the installed capacity includes a first installed capacity of the wind power generation module, a second installed capacity of the photovoltaic power generation module, a third installed capacity of the hydrogen energy storage module, and a fourth installed capacity of the pumped storage module.

2. The method according to claim 1, characterized in that The system cost target is to minimize the equivalent annual comprehensive cost of the energy system; The equivalent annual comprehensive cost is determined based on equipment cost, equipment replacement cost, system recovery factor, and operating cost; The equipment cost is determined according to the unit capacity cost of the wind power generation module, the unit capacity cost of the photovoltaic power generation module, the unit capacity cost of the hydrogen energy storage module, the unit capacity cost of the pumped storage module, the first installed capacity, the second installed capacity, the third installed capacity, and the fourth installed capacity; The equipment replacement cost is determined according to the replacement cost of the wind power generation module, the replacement cost of the photovoltaic power generation module, the replacement cost of the hydrogen energy storage module, and the replacement cost of the pumped storage module; The system recovery factor is determined based on the discount rate and planning period of the energy system; The operating cost is determined based on the annual operation and maintenance cost of the energy system, the penalty cost for insufficient power generation, the penalty cost for excess power generation, the power purchase cost, the power sales revenue, and the hydrogen sales revenue; The annual operation and maintenance cost is determined based on the operation and maintenance investment ratio coefficient and the equipment cost, the penalty cost for insufficient power generation is determined based on the missing power and the missing unit penalty cost, the penalty cost for excess power generation is determined based on the excess power and the excess unit penalty cost, the electricity purchase cost is determined based on the missing power and the unit price of electricity purchase, the electricity sales revenue is determined based on the excess power and the unit price of electricity sales, and the hydrogen sales revenue is determined based on the hydrogen sales volume and the hydrogen sales unit price.

3. The method according to claim 1, characterized in that The load power shortage rate target is to minimize the load power shortage rate of the energy system; The load power shortage rate is determined according to the power shortage of the energy system and the load demand.

4. The method according to claim 1, characterized in that: The energy surplus rate target is to minimize the energy surplus rate of the energy system; The energy surplus rate is determined according to the power generation amount of the wind power generation module, the power generation amount of the photovoltaic power generation module, and the missing power amount.

5. The method according to claim 1, characterized in that The hydrogen storage tank capacity constraints include: The current capacity of the hydrogen storage tank in the hydrogen energy storage module at the current moment is greater than or equal to the minimum capacity and less than or equal to the maximum capacity; The current capacity is determined according to the previous capacity at the previous moment, the hydrogen production capacity at the previous moment, and the hydrogen consumption capacity at the previous moment; The hydrogen production capacity at the previous moment is determined according to the input power and time interval of the electrolyzer in the hydrogen energy storage module; The hydrogen consumption capacity at the previous moment is determined according to the input power of the fuel cell in the hydrogen energy storage module and the time interval.

6. The method according to claim 1, characterized in that The hydrogen storage tank state constraints include: The equivalent charge state of the hydrogen storage tank in the hydrogen energy storage module is greater than or equal to the minimum charge state value, and less than or equal to the maximum charge state value; The equivalent state of charge is determined according to the pressure and the maximum pressure of the hydrogen storage tank.

7. The method according to claim 1, characterized in that The water balance constraints of the pumped storage power station include: The current water volume of the upper reservoir in the pumped storage module at the current moment is equal to the sum of the previous water volume of the upper reservoir at the previous moment and the changed water volume of the upper reservoir, and the changed water volume of the upper reservoir is the product of the difference between the pumped water volume at the current moment and the power generation water volume at the current moment and the time interval; The current water volume of the lower reservoir in the pumped storage module at the current moment is equal to the sum of the water volume of the previous lower reservoir at the previous moment and the changed water volume of the lower reservoir, and the changed water volume of the lower reservoir is the product of the difference between the power generation water volume at the current moment and the pumping water volume at the current moment and the time interval; The pumping water volume at the current moment is determined according to the pumping power at the current moment, and the power generation water volume at the current moment is determined according to the power generation power at the current moment.

8. A device for determining installed capacity of an energy system, characterized in that: include: A target determination module is used to determine the expected operation target of the energy system; wherein the energy system includes a wind power generation module, a photovoltaic power generation module, a hydrogen energy storage module, and a pumped storage module; the expected operation target includes a system cost target, a load power shortage rate target, and an energy surplus rate target; A condition determination module, used to determine the system constraints of the energy system, wherein the system constraints include: hydrogen storage tank capacity constraints, hydrogen storage tank state constraints, pumped storage power station water balance constraints, pumped storage power station operating conditions constraints, and pumped storage power station storage capacity constraints; A capacity determination module is used to determine the installed capacity that meets the expected operation target under the constraints of the system constraints; wherein the installed capacity includes a first installed capacity of the wind power generation module, a second installed capacity of the photovoltaic power generation module, a third installed capacity of the hydrogen energy storage module, and a fourth installed capacity of the pumped storage module.

9. An electronic device, characterized in that: The electronic device comprises: processor; a memory for storing instructions executable by the processor; The processor is used to read the executable instructions from the memory and execute the instructions to implement the method for determining the installed capacity of the energy system described in any one of claims 1-7.

10. A computer-readable storage medium, characterized in that: The storage medium stores a computer program, and the computer program is used to execute the method for determining the installed capacity of the energy system described in any one of claims 1 to 7.