Grid connection method for connecting new energy to weak power grid
By building models in the new energy collection station, adjusting the power generation power and voltage, and installing cameras, the instability of the power system caused by the differences in the modes of conventional energy and new energy units is solved, and the safe access to weak power of new energy is achieved The network and fully powered on.
Patent Information
- Application Number
- CN202410966086.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-18
- Publication Date
- 2024-11-08
AI Technical Summary
The existing grid connection method does not consider the different startup modes of local conventional energy units and new energy units, resulting in poor stability of the power system after grid connection.
The PSASP platform is used to build a new energy collection station model, conduct static stability analysis and voltage analysis, determine the maximum output power and maximum capacity of the reactive power compensation device, adjust the power generation power and node operating voltage, and install a camera in the new energy collection station. Ensure that the short-circuit ratio of the new energy collection station meets the threshold and achieve full power-on operation.
By modeling and adjusting the power generation power and node operating voltage of the new energy collection station, installing a camera, fully considering the different startup modes of conventional energy and new energy units, improving the stability of the power system after grid connection and realizing the safety of new energy Connect to the weak power grid.
Smart Images

Figure CN118920575A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a weak power grid connection method. Background Art
[0002] New energy refers to renewable energy that can be developed and utilized, including solar energy, biomass energy, hydropower, wind energy, geothermal energy, wave energy, ocean current energy and tidal energy, as well as thermal cycles between the ocean surface and deep layers; in addition, there are hydrogen energy, biogas, alcohol, methanol, etc., while coal, oil, natural gas, hydropower and other energies that have been widely used are called conventional energy; with the limited nature of conventional energy and the increasing prominence of environmental problems, new energy with the characteristics of environmental protection and renewable energy has received more and more attention; large-scale renewable energy represented by wind power and photovoltaics has been connected to the grid for power generation, and scenes of new energy access to weak AC power grids have appeared in some local areas, and the existing grid-connected methods have not taken into account the different startup modes of local conventional energy units and new energy units, resulting in poor stability of the power system after grid connection. Summary of the invention
[0003] The purpose of the present invention is to solve the problem that the existing grid-connected method does not take into account the different startup modes of local conventional energy units and new energy units, resulting in poor stability of the power system after grid connection, and proposes a grid-connected method for connecting new energy to a weak power grid.
[0004] The method for connecting a new energy source to a weak power grid according to the present invention comprises the following steps:
[0005] Step 1: Use the PSASP platform to build a new energy collection station model based on the parameters of the power generation equipment in the new energy collection station;
[0006] Step 2: Perform static stability analysis on the new energy collection station model constructed in step 1 to determine the maximum output power of the new energy collection station;
[0007] Step 3: Perform voltage analysis on the new energy collection station model constructed in step 1 to determine the maximum capacity of the reactive power compensation device invested in the new energy collection station;
[0008] Step 4: using the maximum output power of the new energy collection station determined in step 2 and the maximum capacity of the reactive power compensation device invested in the new energy collection station determined in step 3, obtain the short-circuit ratio of the new energy collection station;
[0009] Step 5: Determine whether the short-circuit ratio of the new energy collection station obtained in step 4 is greater than the short-circuit ratio threshold; if yes, execute step 7; otherwise, execute step 6;
[0010] Step 6: reduce the power generation of the new energy collection station, and install a phase shifter in the new energy collection station to increase the node operating voltage of the new energy collection station, and return to step 1; wherein the node operating voltage of the new energy collection station is increased to the standard voltage;
[0011] Step 7: The new energy collection station operates in a fully powered-on mode to enable new energy to access the weak power grid.
[0012] Furthermore, the parameters of the power generation equipment in the new energy collection station in step one include the maximum output power of the generator, the rated operating voltage of the transformer, the short-circuit capacity of the commutation bus, the voltage of the commutation bus and the maximum capacity of the reactive power compensation device.
[0013] Furthermore, when performing static stability analysis on the new energy collection station model in step 2, the thermal stability limit of the new energy collection station is used as a constraint condition.
[0014] Furthermore, when performing voltage analysis on the new energy collection station model in step three, maintaining voltage stability at the new energy collection station is a constraint condition.
[0015] Furthermore, the calculation formula of the short-circuit ratio of the new energy collection station in step 4 is:
[0016]
[0017] Among them, MSCR i is the short-circuit ratio of the new energy collection station; P deqi is the maximum output power of the new energy collection station; S aci The maximum capacity of reactive power compensation equipment invested in new energy collection stations.
[0018] Furthermore, the short circuit ratio threshold in step five is 1.5.
[0019] Furthermore, the standard voltage in step six is 225KV to 235KV.
[0020] Compared with the prior art, the present invention has the following beneficial effects:
[0021] By utilizing the grid-connected method for accessing a weak power grid with new energy as described in the present invention, the generated power of the new energy collection station and the node operating voltage of the new energy collection station are adjusted by means of modeling, and a phase shifter is installed in the new energy collection station. The different startup modes of the local conventional energy units and the new energy units are fully considered, thereby improving the stability of the power system after grid connection and realizing the full startup operation of the new energy collection station. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 A flow chart of a method for connecting a new energy source to a weak power grid as described in a specific implementation mode 1;
[0023] Figure 2 Specific embodiment 1 is the short circuit ratio of node G1 and the curve of power generation. DETAILED DESCRIPTION
[0024] Specific implementation method 1. Combination Figure 1 The present embodiment is described. The present embodiment describes a method for connecting a new energy source to a weak power grid, characterized in that the method comprises the following steps:
[0025] Step 1: Use the PSASP platform to build a new energy collection station model based on the parameters of the power generation equipment in the new energy collection station;
[0026] Step 2: Perform static stability analysis on the new energy collection station model constructed in step 1 to determine the maximum output power of the new energy collection station;
[0027] Step 3: Perform voltage analysis on the new energy collection station model constructed in step 1 to determine the maximum capacity of the reactive power compensation device invested in the new energy collection station;
[0028] Step 4: using the maximum output power of the new energy collection station determined in step 2 and the maximum capacity of the reactive power compensation device invested in the new energy collection station determined in step 3, obtain the short-circuit ratio of the new energy collection station;
[0029] Step 5: Determine whether the short-circuit ratio of the new energy collection station obtained in step 4 is greater than the short-circuit ratio threshold; if yes, execute step 7; otherwise, execute step 6;
[0030] Step 6: Reduce the power generation of the new energy collection station, and install a phase shifter in the new energy collection station to increase the node operating voltage of the new energy collection station, and return to step 1; wherein the node operating voltage of the new energy collection station is increased to the standard voltage; the phase shifter is used to transmit no power to the energy collection station, improve the power factor of the new energy collection station, reduce the loss of the energy collection station, and thus achieve the purpose of increasing the node operating voltage of the new energy collection station;
[0031] Step 7: The new energy collection station operates in a fully powered-on mode to enable new energy to access the weak power grid.
[0032] In this implementation, a set of new energy generation methods that are close to actual operation are adjusted according to the power grid conditions, new energy distribution conditions, and load conditions in a certain area; a management plan is formulated for the situation where the short-circuit ratio of the new energy collection station is too low, and the plan includes: adjusting the power generation power of the new energy collection station, adjusting the node operating voltage of the new energy collection station, and installing phase shifters in the new energy collection station; among them, adjusting the power generation power of the new energy collection station has the highest priority; adjusting the node operating voltage of the new energy collection station has the second priority; only when adjusting the power generation power of the new energy collection station and adjusting the node operating voltage of the new energy collection station cannot meet the short-circuit ratio requirements of the new energy collection station, the final choice is to install phase shifters in the new energy collection station, and then meet the requirements of the new energy collection station to operate in a full-power mode and realize the access of new energy to the weak power grid.
[0033] Specific implementation method 2. This implementation method further limits the method for connecting a new energy source to a weak power grid as described in specific implementation method 1. In this implementation method, the parameters of the power generation equipment in the new energy collection station in step 1 include the maximum output power of the generator, the rated working voltage of the transformer, the short-circuit capacity of the commutation bus, the voltage of the commutation bus and the maximum capacity of the reactive compensation device.
[0034] In this embodiment, the maximum output power of the generator affects the maximum output power of the new energy collection station; and the rated working voltage of the transformer, the short-circuit capacity of the commutation bus, the voltage of the commutation bus and the maximum capacity of the reactive compensation device will affect the maximum capacity of the reactive compensation device invested in the new energy collection station.
[0035] Specific implementation method three: This implementation method further limits the grid-connected method of a new energy source to a weak power grid described in specific implementation method one. In this implementation method, when performing static stability analysis on the new energy collection station model in step two, the thermal stability limit of the new energy collection station is used as a constraint condition.
[0036] Specific implementation method four: This implementation method further limits the method for connecting a new energy source to a weak power grid described in specific implementation method three. In this implementation method, when performing voltage analysis on the new energy collection station model in step three, maintaining the voltage stability of the new energy collection station is a constraint condition.
[0037] Specific implementation method 5: This implementation method further limits the method for connecting a new energy source to a weak power grid described in specific implementation method 1. In this implementation method, the calculation formula of the short-circuit ratio of the new energy collection station in step 4 is:
[0038]
[0039] Among them, MSCR i is the short-circuit ratio of the new energy collection station; P deqiis the maximum output power of the new energy collection station; S aci The maximum capacity of reactive power compensation equipment invested in new energy collection stations.
[0040] In this embodiment, the short-circuit ratio is extended and applied to analyze the stability of the new energy grid-connected AC system; and the electrical strength of the grid-connected network point is evaluated by calculating the new energy collection station.
[0041] Specific implementation method 6: This implementation method further limits the method for connecting a new energy source to a weak power grid described in specific implementation method 1. In this implementation method, the short-circuit ratio threshold in step 5 is 1.5.
[0042] In this embodiment, the short-circuit ratio threshold value is 1.5, which is the minimum value that the short-circuit ratio of the new energy collection station can reach when the new energy is connected to the weak power grid. If the short-circuit ratio of the new energy collection station is less than 1.5, it will cause broadband oscillation type grid faults.
[0043] Specific implementation method 7: This implementation method further limits the method for connecting a new energy source to a weak power grid described in specific implementation method 1. In this implementation method, the standard voltage in step 6 is 225KV to 235KV.
[0044] In this implementation, experimental calculations have shown that the output of the new energy collection station has little impact on the nearby 225KV to 235KV transmission lines. Therefore, when the standard voltage is 225KV to 235KV, that is, the closer the node operating voltage of the new energy collection station is to 225KV to 235KV, the better the stability of the new energy collection station, and the more conducive it is to the access of new energy to the weak power grid.
[0045] Embodiment 1:
[0046] Taking the scenario where new energy is connected to a weak AC power grid in a certain area as an example, combined with Figure 2 The grid connection method of a new energy source connected to a weak power grid according to the present invention is described as follows:
[0047] 1. System Overview
[0048] A certain area is a typical new energy collection and transmission system. The new energy collection area has 19 new energy stations, which are collected in 500KV substations and sent out through 500KV lines. The total installed capacity of new energy is 2689MW, including 11 wind farms with an installed capacity of 1179MW and 8 photovoltaic power stations with an installed capacity of 1510MW.
[0049] It is expected to connect to wind power and photovoltaic transmission projects, including a wind power plant with an installed capacity of 700MW and a photovoltaic power station with an installed capacity of 700MW. The voltage will be boosted to 220KV through two stages and connected to a 500KV new energy collection station through a two-circuit grid-connected line, bringing the total installed capacity of new energy in the area to 4089MW.
[0050] 2. Static stability analysis and voltage analysis when the new energy collection station is connected to the grid;
[0051] The static stability analysis and calculation is carried out in the waist-load mode. Under the waist-load mode, all regional renewable energy sources are turned on, with a simultaneous rate of 80%. Wind energy is used as an example of renewable energy. The original units in the region are operated in the minimum mode. The installed capacity of the collection station is large, and it will have an impact on the static stability and voltage after being connected to the system. According to the different powers emitted by the collection station, the stability of the regional power grid is discussed. The specific results of the static stability analysis at different outputs of wind farms are shown in Table 1:
[0052] Table 1 Static stability analysis results of wind farms at different outputs
[0053]
[0054] The voltage results at different wind farm outputs are shown in Table 2;
[0055] Table 2 Voltage results of wind farms at different outputs
[0056]
[0057]
[0058] Comprehensive analysis of Table 1 and Table 2 shows that the output of the new energy collection station has little impact on the nearby 220KV transmission line, and is mainly transmitted through the 500KV line. Therefore, there is no overload on the centralized transmission line of new energy. The output of the new energy collection station has a greater impact on the voltage at each point. As the output of the collection station increases, the absorbed reactive power gradually increases, the voltage of the nearby substation is lowered, and the voltage at its access point and the main transmission line node drops even more deeply; the commissioning of the new energy collection station only accesses the system through a single line, and the line has an N-1 fault, and the collection station needs to be shut down for processing.
[0059] A total of 12 groups of 60Mvar reactive compensation capacitors are configured on the low-voltage side of the two main transformers of the new energy collection station. The output of the new energy collection station is relatively large, which will seriously lower the voltage of the 500KV substation, and reactive compensation devices need to be invested for voltage stabilization. Under the condition of maximum output of the new energy collection station, the voltage is adjusted by switching capacitors. The capacitors configured in the collection station are sufficient to maintain stable operation of the region. The specific situation is shown in Table 3.
[0060] Table 3 The impact of switching capacitors on voltage in new energy generation mode
[0061]
[0062] 3. Analysis of short-circuit ratio of new energy collection station:
[0063] The ratio of new energy collection stations should not be less than 1.5 to ensure that the system does not oscillate and become unstable. With the rapid growth of new energy installed capacity and the number of grid-connected stations, the phenomenon of the short-circuit ratio of the new energy collection station side being lower than 1.5 has gradually increased, posing new challenges to the safe and stable operation of the system. Taking the HH collection station as an example, the PSASP program is used to analyze the influence of the collection station's generated power, the investment and withdrawal of reactive compensation devices, and the installation of phase-shifting phases on the short-circuit ratio of the new energy multi-station side.
[0064] The HH collection station has 8 units with a rated active power of 200MW. The maximum power generation rate of a single unit is 200MW, and the minimum power generation is 0MW. Taking wind turbine G1 as an example, adjust the short-circuit ratio of the unit power generation calculation node G1. Combined with the multi-feed short-circuit ratio calculation formula, the unit power generation not only directly affects the size of the short-circuit ratio as the denominator, but also affects the actual operating voltage U i and short-circuit capacity, which indirectly affects the short-circuit ratio. Figure 2 As shown in the figure, with the increase of the active power of the unit, the short-circuit ratio gradually decreases from 2.42 to 1.47. From the corresponding relationship of the data, with the increase of the generating power of the unit, the speed of reduction of the short-circuit ratio slows down.
[0065] The HH wind farm is connected to the medium voltage side of the No. 1 main transformer of the 500KVHH collection station through a single 220KV line. A total of 6 60Mvar reactive compensation capacitors are configured on the low voltage side of the No. 1 main transformer. The short circuit ratio of multiple stations on the low voltage side of the step-up transformer of the new energy power generation unit should be no less than 1.5. The actual operating voltage of the photovoltaic power station can be changed by switching capacitors, which in turn affects the short circuit ratio. Taking wind farm G1 as an example, when the collection station units are fully generated, all reactive compensation capacitors are put into operation, and the short circuit ratio of the machine end still cannot meet the specified requirements. Taking the machine end short circuit ratio as a constraint, the HH collection station does not have the full output condition under the new energy generation mode. The calculation results are shown in Table 4.
[0066] Table 4 The impact of switching capacitors in new energy collection stations on short-circuit ratio
[0067]
[0068] According to the installation form, phase regulators can be divided into two categories: centralized phase regulators refer to large-capacity phase regulators that are centrally arranged in UHV DC converter stations, generally configured on the AC busbar of the converter station; distributed phase regulators refer to small phase regulators that are dispersedly configured in the stations where new energy is collected, usually configured on the low-voltage side of the new energy collection station or the station grid connection point. Phase regulator 1 is installed on the 35KV collection busbar of new energy, and phase regulator 2 is installed on the low-voltage side of the main transformer of the collection station. The capacity of both phase regulators is 50Mvar. The specific impact of phase regulators on MRSCR is shown in Table 5.
[0069] Table 5 The impact of installing phase regulators in new energy collection stations on short-circuit ratio
[0070]
[0071] Comparing Table 4 and Table 5, it can be clearly seen that the commissioning of distributed phase regulators has a more significant effect on improving the short-circuit ratio. After the installation of phase regulators, the short-circuit capacity of the node is increased, and the impedance matrix of the system node changes, thereby affecting the short-circuit ratio. By comparison, it can be seen that when phase regulators are installed at different locations, the MRSCR improvement effect of each node is different. Among them, phase regulator 1 is installed close to the 35KV collection mother position of node G1, and the short-circuit ratio has a more significant effect, and the MRSCR is raised by 0.4977. Phase regulator 2 is far away from the node, so the lifting effect is small. The installation of phase regulator 1 can help the collection station to achieve full startup. In actual operation, it is necessary to analyze the installation position of the phase regulator in combination with the grid structure, so as to obtain the maximum improvement in the voltage support strength of the power grid by configuring the least phase regulators.
[0072] Based on this, the total installed capacity of the HH new energy collection station is 1400MW, and it is connected to the power grid through a 500KV substation. This embodiment discusses the impact of the collection station on the stable operation of the region after it is connected to the power grid from three aspects: transmission line, substation voltage, and new energy short-circuit ratio:
[0073] (1) Through static stability analysis and calculation, it is found that the power of the new energy collection station is mainly transmitted through the 500KV grid, and the 220KV level only bears a small part of the power transmission pressure, which is not large and will not cause power overload; since the collection station is connected to the system with a single line, once the access line fails, the collection station needs to be shut down for processing. It is recommended to strengthen the grid structure to ensure the safe transmission of power from the new energy collection station.
[0074] (2) The power transmission of the new energy collection station will be accompanied by an increase in the demand for reactive power. The voltage of the nearby substation will be lowered, and the voltage of its access point and the main transmission line node will drop sharply. The new energy collection station is equipped with a total of 12 groups of 60Mvar reactive compensation capacitors. When the output is large, the voltage can be stabilized by putting the reactive compensation device into use. Calculations show that the capacitors configured in the new energy collection station are sufficient to maintain stable operation in the region.
[0075] (3) Under the new energy generation mode, with the short-circuit ratio of the new energy machine end not less than 1.5 as the limiting condition, taking the G1 unit of the new energy collection station as an example, it is calculated that the new energy collection station does not have the conditions for 100% output; after the 6 sets of reactive power compensation capacitors related to the G1 unit are put into use, the limiting conditions cannot be met; phase regulators are planned to be built on different busbars of the new energy collection station to help the new energy collection station achieve full startup, and by calculating the impact of different installation positions of the phase regulators on the short-circuit ratio, a theoretical basis is provided for the actual operating position of the phase regulators.
[0076] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any person skilled in the art can easily think of changes or substitutions within the technical scope disclosed by the present invention, which should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.
Claims
1. A method for connecting new energy to a weak power grid, characterized in that: The grid connection method comprises the following steps: Step 1: Use the PSASP platform to build a new energy collection station model based on the parameters of the power generation equipment in the new energy collection station; Step 2: Perform static stability analysis on the new energy collection station model constructed in step 1 to determine the maximum output power of the new energy collection station; Step 3: Perform voltage analysis on the new energy collection station model constructed in step 1 to determine the maximum capacity of the reactive power compensation device invested in the new energy collection station; Step 4: using the maximum output power of the new energy collection station determined in step 2 and the maximum capacity of the reactive power compensation device invested in the new energy collection station determined in step 3, obtain the short-circuit ratio of the new energy collection station; Step 5: Determine whether the short-circuit ratio of the new energy collection station obtained in step 4 is greater than the short-circuit ratio threshold; if yes, execute step 7; otherwise, execute step 6; Step 6: reduce the power generation of the new energy collection station, and install a phase shifter in the new energy collection station to increase the node operating voltage of the new energy collection station, and return to step 1; wherein the node operating voltage of the new energy collection station is increased to the standard voltage; Step 7: The new energy collection station operates in a fully powered-on mode to enable new energy to access the weak power grid.
2. A method for connecting new energy to a weak power grid according to claim 1, characterized in that: The parameters of the power generation equipment in the new energy collection station in step 1 include the maximum output power of the generator, the rated working voltage of the transformer, the short-circuit capacity of the commutation bus, the voltage of the commutation bus and the maximum capacity of the reactive power compensation device.
3. A method for connecting new energy to a weak power grid according to claim 1, characterized in that: When performing static stability analysis on the new energy collection station model in step 2, the thermal stability limit of the new energy collection station is used as a constraint condition.
4. A method for connecting new energy to a weak power grid according to claim 3, characterized in that: When performing voltage analysis on the new energy collection station model in step 3, the constraint condition is to maintain the voltage stability of the new energy collection station.
5. The method for connecting new energy to a weak power grid according to claim 1, characterized in that: The calculation formula for the short-circuit ratio of the new energy collection station in step 4 is: Among them, MSCR i is the short-circuit ratio of the new energy collection station; P deqi is the maximum output power of the new energy collection station; S aci The maximum capacity of reactive power compensation equipment invested in new energy collection stations.
6. The method for connecting new energy to a weak power grid according to claim 1, characterized in that: The short circuit ratio threshold in step five is 1.
5.
7. A method for connecting new energy to a weak power grid according to claim 1, characterized in that: The standard voltage in step six is 225KV to 235KV.
Citation Information
Cited By
New energy station grid-connected configuration method, device, equipment, storage medium and product
CN120262551A