Energy storage system
By setting the first and second fuses in the energy storage system and fusing the second fuses first under the DC time constant conditions, the problem that the energy storage system cannot effectively protect the short circuit in the prior art is solved, and the battery pack is realized security protection and cost reduction.
Patent Information
- Application Number
- CN202410931108.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-11
- Publication Date
- 2024-11-08
AI Technical Summary
The protection devices of existing energy storage systems cannot effectively short-circuit protection, resulting in serious damage to lithium batteries and other components.
Design an energy storage system to ensure that the arc front joule integral of the first fuse is greater than the second by setting the first and second fuses in the battery pack and the high voltage box, and under the premise that the DC time constant is a preset time The fuse joule integral of the fuse, so that the second fuse is preferred to fuse when the short circuit is shorted, protect the battery pack, and ensure that the first fuse is blown in time when needed.
Effectively protect the battery pack, reduce the risk of battery pack damage, improve the safety of energy storage systems, and reduce the cost of battery pack fuses.
Smart Images

Figure CN118920627A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of battery technology, and in particular to an energy storage system. Background Art
[0002] In the related art, when a short circuit occurs in the energy storage system, the lithium battery and other components in the energy storage system are greatly damaged. Therefore, the selection of protection devices in the energy storage system is particularly important. Generally, the energy storage system is protected from short circuit by installing protection devices in the battery pack and the high-voltage box. However, the protection devices in the battery pack and the high-voltage box cannot be effectively matched, resulting in the inability to effectively protect the energy storage system from short circuit. Summary of the invention
[0003] In view of the deficiencies in the prior art, the present application provides an energy storage system, which aims to solve the technical problem in the prior art that the protection devices of the energy storage system cannot effectively perform short-circuit protection.
[0004] To solve the above problems, the present application provides an energy storage system, which includes at least one power supply branch, a first busbar and a second busbar, one end of the power supply branch is electrically connected to the first busbar, and the other end of the power supply branch is electrically connected to the second busbar, and the power supply branch includes:
[0005] at least one battery pack, the battery pack comprising a first fuse, one end of the first fuse being electrically connected to the first bus bar;
[0006] A high-voltage box, the high-voltage box comprising at least one second fuse, one end of the second fuse being electrically connected to the other end of the first fuse, and the other end of the second fuse being electrically connected to the second busbar;
[0007] Wherein, under the premise that the DC time constant of the energy storage system is a preset first time, the pre-arcing Joule integral of the first fuse is greater than the blowing Joule integral of the second fuse.
[0008] Furthermore, in the energy storage system, under the premise that the short-circuit current of the power supply branch is a preset first current and the DC time constant is a first time, the pre-arcing Joule integral of the first fuse is greater than the blowing Joule integral of the second fuse.
[0009] Further, in the energy storage system, the energy storage system further comprises a combiner cabinet;
[0010] The combiner cabinet includes at least one third fuse, one end of the third fuse is electrically connected to the first end of the combiner cabinet, the first end of the combiner cabinet is electrically connected to the first busbar, the second end of the combiner cabinet is electrically connected to the second busbar, the third end and the fourth end of the combiner cabinet are electrically connected to the target device respectively, and the other end of the third fuse is electrically connected to the third end of the combiner cabinet;
[0011] The product of the pre-arcing Joule integral of the second fuse and the square of the number of power supply branches is greater than the blowing Joule integral of the third fuse.
[0012] Furthermore, in the energy storage system, under the premise that the DC time constant is the first time, the product of the pre-arcing Joule integral of the second fuse and the square of the number of power supply branches is greater than the blowing Joule integral of the third fuse.
[0013] Furthermore, in the energy storage system, under the premise that the short-circuit current of the combiner cabinet is the preset second current and the DC time constant is the first time, the product of the pre-arcing Joule integral of the second fuse and the square of the number of power supply branches is greater than the melting Joule integral of the third fuse.
[0014] Furthermore, in the energy storage system, the combiner cabinet includes two third fuses, namely a main positive combiner cabinet fuse and a main negative combiner cabinet fuse;
[0015] Wherein, one end of the main positive combiner cabinet fuse is electrically connected to the first end of the combiner cabinet, and the other end of the main positive combiner cabinet fuse is electrically connected to the third end of the combiner cabinet;
[0016] One end of the main negative combiner cabinet fuse is electrically connected to the second end of the combiner cabinet, and the other end of the main negative combiner cabinet fuse is electrically connected to the fourth end of the combiner cabinet.
[0017] Further, in the energy storage system, the power supply branch includes two second fuses, namely a main positive high-voltage box fuse and a main negative high-voltage box fuse;
[0018] Among them, one end of the main positive high-voltage box fuse is electrically connected to one end of the first fuse, and the other end of the main positive high-voltage box fuse is electrically connected to the first busbar;
[0019] One end of the main negative high-voltage box fuse is electrically connected to the other end of the first fuse, and the other end of the main negative high-voltage box fuse is electrically connected to the second bus.
[0020] Further, in the energy storage system, the DC time constant is greater than or equal to a preset second time, and less than or equal to a preset third time.
[0021] Further, in the energy storage system, the energy storage system further comprises a plurality of power supply branches, and the energy storage system comprises a plurality of power supply branches;
[0022] One end of each power supply branch is electrically connected to the first busbar, and the other end of each power supply branch is electrically connected to the second busbar.
[0023] Furthermore, in the energy storage system, the short-circuit current of each power supply branch is less than or equal to a preset third current.
[0024] The energy storage system provided in the present application includes at least one power supply branch, a first busbar and a second busbar, one end of the power supply branch is electrically connected to the first busbar, and the other end of the power supply branch is electrically connected to the second busbar. The power supply branch includes at least one battery pack and a high-voltage box. The battery pack includes a first fuse, and the high-voltage box includes at least one second fuse. One end of the first fuse is electrically connected to the first busbar, and the other end of the fuse is electrically connected to one end of the second fuse, and the other end of the second fuse is electrically connected to the second busbar. Under the premise that the DC time constant of the energy storage system is a preset first time, the pre-arcing Joule integral of the first fuse is set to be greater than the blowing Joule integral of the second fuse, so that when the first fuse and the second fuse meet the blowing conditions at the same time, the second fuse can be blown preferentially compared with the first fuse. At the same time, when the first fuse is needed for protection, it can also be ensured that the first fuse can be blown in time, thereby effectively protecting the battery pack and improving the safety of the energy storage system. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0026] Figure 1 A schematic block diagram of an energy storage system provided in an embodiment of the present application.
[0027] Among them, 10 is the power supply branch, 110 is the battery pack, 120 is the high-voltage box, 20 is the first busbar, 30 is the second busbar, 40 is the junction box, 50 is the target device, FU1 is the first fuse, FU2 is the second fuse, and FU3 is the third fuse. DETAILED DESCRIPTION
[0028] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0029] It should be understood that when used in this specification and the appended claims, the terms "include" and "comprises" indicate the presence of described features, integers, steps, operations, elements and / or components, but do not exclude the presence or addition of one or more other features, integers, steps, operations, elements, components and / or combinations thereof.
[0030] It should also be understood that the terms used in this application specification are only for the purpose of describing specific embodiments and are not intended to limit the application. As used in this application specification and the appended claims, unless the context clearly indicates otherwise, the singular forms "a", "an" and "the" are intended to include plural forms.
[0031] It should be further understood that the term “and / or” used in the specification and appended claims refers to any combination and all possible combinations of one or more of the associated listed items, and includes these combinations.
[0032] In the prior art, in order to meet the requirement that the fuse in the high-voltage box 120 blows first and the fuse in the battery pack 110 blows later, when selecting the fuses in the battery pack 110 and the high-voltage box 120, the joule integral I 2 t for selection.
[0033] Although the above selection method can achieve the situation that the fuse in the high-voltage box 120 blows first and the fuse in the battery pack 110 blows later, after adopting this selection method, the configuration of the fuse in the battery pack 110 is relatively large, and there may not be a suitable product. At the same time, when the fuse in the battery pack 110 needs to be blown for protection, since the configuration of the fuse in the battery pack 110 is too large, the actual blowing time of the fuse in the battery pack 110 is relatively long, and the battery pack 110 cannot be effectively protected, resulting in a greater safety risk for the battery pack 110.
[0034] In order to solve the technical problem that the fuse in the battery pack 110 cannot effectively protect the battery pack 110, the present application provides an energy storage system.
[0035] See also Figure 1 , Figure 1 A schematic block diagram of an energy storage system provided in an embodiment of the present application. Figure 1 As shown, the present application provides an energy storage system, which includes at least one power supply branch 10, a first bus 20 and a second bus 30, one end of the power supply branch 10 is electrically connected to the first bus 20, and the other end of the power supply branch 10 is electrically connected to the second bus 30, and the power supply branch 10 includes:
[0036] At least one battery pack 110, the battery pack 110 includes a first fuse FU1, and one end of the first fuse FU1 is electrically connected to the first bus bar 20;
[0037] The high-voltage box 120 includes at least one second fuse FU2, one end of the second fuse FU2 is electrically connected to the other end of the first fuse FU1, and the other end of the second fuse FU2 is electrically connected to the second busbar 30;
[0038] Wherein, under the premise that the DC time constant of the energy storage system is the preset first time, the pre-arcing Joule integral of the first fuse FU1 is greater than the blowing Joule integral of the second fuse FU2.
[0039] The Joule integral is the integral of the square of the current in a given time interval. The formula for the Joule integral can be: Among them, I 2 t is the Joule integral, t is the time, and i is the current.
[0040] Specifically, the pre-arcing Joule integral of a fuse refers to the Joule integral within the pre-arcing time of the fuse, and the blowing Joule integral of a fuse refers to the Joule integral within the actual blowing time of the fuse. Usually, the operation of a fuse includes four stages, namely, the normal conduction stage, the melting / pre-arcing stage, the arcing stage, and the blowing / isolation stage. It can be seen from this that the blowing of a fuse requires four stages, so the pre-arcing in this application refers to the time period between the normal conduction stage and the melting / pre-arcing stage within the pre-arcing time of the fuse, and the actual blowing time of the fuse refers to the time period between the normal conduction stage and the blowing / isolation stage.
[0041] In this embodiment, the pre-arcing Joule integral of the first fuse FU1 in this application is greater than the blowing Joule integral of the second fuse FU2, which is based on the premise that the DC time constant of the energy storage system is the preset first time. That is to say, when selecting the first fuse FU1 and the second fuse FU2, the present application needs to know the DC time constant of the energy storage system, and test the pre-arc Joule integral of the first fuse FU1 and the blowing Joule integral of the second fuse FU2 on the basis of the DC time constant being the preset first time, and ensure that the pre-arc Joule integral of the first fuse FU1 is greater than the blowing Joule integral of the second fuse FU2. At this time, the configuration of the first fuse FU1 selected is smaller than the configuration selected according to the fuse specification sheet, and the selected first fuse FU1 and second fuse FU2 are more suitable for short-circuit protection of the energy storage system. Therefore, when the first fuse FU1 and the second fuse FU2 meet the blowing conditions at the same time, the second fuse FU2 can be blown first compared to the first fuse FU1. At the same time, when the first fuse FU1 is needed for protection, it can also be ensured that the first fuse FU1 can be blown in time.
[0042] The energy storage system provided in the present application includes at least one power supply branch 10, a first busbar 20 and a second busbar 30, one end of the power supply branch 10 is electrically connected to the first busbar 20, and the other end of the power supply branch 10 is electrically connected to the second busbar 30, the power supply branch 10 includes at least one battery pack 110 and a high-voltage box 120, the battery pack 110 includes a first fuse FU1, the high-voltage box 120 includes at least one second fuse FU2, one end of the first fuse FU1 is electrically connected to the first busbar 20, the other end of the fuse is electrically connected to one end of the second fuse FU2, and the other end of the second fuse FU2 is electrically connected to the second busbar 30, and in the energy storage system On the premise that the DC time constant is the preset first time, the pre-arcing Joule integral of the first fuse FU1 is set to be greater than the blowing Joule integral of the second fuse FU2, so that when the first fuse FU1 and the second fuse FU2 meet the blowing conditions at the same time, the second fuse FU2 can be blown preferentially compared with the first fuse FU1, and at the same time, when the first fuse FU1 is needed for protection, it can also ensure that the first fuse FU1 can be blown in time, thereby effectively protecting the battery pack 110, reducing the risk of damage to the battery pack 110, reducing the cost of the fuse in the battery pack 110, and improving the safety of the energy storage system.
[0043] In some embodiments, under the premise that the short-circuit current of the power supply branch 10 is a preset first current and the DC time constant is a first time, the pre-arcing Joule integral of the first fuse FU1 is greater than the blowing Joule integral of the second fuse FU2.
[0044] Specifically, when screening the first fuse FU1 and the second fuse FU2, the present application needs to test the first fuse FU1 and the second fuse FU2 at the same current on the basis of determining the DC time constant of the energy storage system, that is, when it is necessary to ensure that the short-circuit current of the power supply branch 10 is the preset first current, it is necessary to ensure that both the first fuse FU1 and the second fuse FU2 can be blown. The first current can be 12kA.
[0045] It can be understood that when the first current is used to test the first fuse FU1 and the second fuse FU2, it is necessary to ensure that the DC time constant of the energy storage system is the preset first time, and the first current can just be enough for the first fuse FU1 to complete the melting. At this time, the pre-arc Joule integral of the first fuse FU1 can be tested, and at the same time, the first current is used to melt the second fuse FU2, and the melting Joule integral of the second fuse FU2 can be tested. Then, the pre-arc Joule integral of the first fuse FU1 is compared with the melting Joule integral of the second fuse FU2. If the pre-arc Joule integral of the first fuse FU1 is greater than the melting Joule integral of the second fuse FU2, the two fuses can be used as corresponding fuses in the energy storage system.
[0046] It can be understood that the pre-arcing Joule integral of the first fuse FU1 and the blowing Joule integral of the second fuse FU2 mentioned in the present application are Joule integrals obtained during the test process, and are not Joule integrals under the standard specifications of the fuse.
[0047] Furthermore, the pre-arcing time of the first fuse FU1 is greater than the actual blowing time of the second fuse FU2. Specifically, the pre-arcing time of the first fuse FU1 refers to the pre-arcing time of the first fuse FU1 when the short-circuit current of the power supply branch 10 is the first current and the DC time constant of the energy storage system is the first time, and the actual blowing time of the second fuse FU2 refers to the actual blowing time of the second fuse FU2 when the short-circuit current of the power supply branch 10 is the first current and the DC time constant of the energy storage system is the first time.
[0048] In some embodiments, Figure 1 As shown, the energy storage system also includes a junction cabinet 40; wherein, the junction cabinet 40 includes at least one third fuse FU3, one end of the third fuse FU3 is electrically connected to the first end of the junction cabinet 40, the first end of the junction cabinet 40 is electrically connected to the first bus 20, the second end of the junction cabinet 40 is electrically connected to the second bus 30, the third end and the fourth end of the junction cabinet 40 are electrically connected to the target device 50 respectively, and the other end of the third fuse FU3 is electrically connected to the third end of the junction cabinet 40; the product of the pre-arc Joule integral of the second fuse FU2 and the square of the number of power supply branches 10 is greater than the fusing Joule integral of the third fuse FU3.
[0049] Specifically, in order to realize the three-level matching protection mechanism of the energy storage system, the present application can set a combiner cabinet 40 in the energy storage system, and set a fuse in the combiner cabinet 40, that is, a third fuse FU3, so as to further improve the safety of the energy storage system. Among them, when the first fuse FU1, the second fuse FU2 and the third fuse FU3 all reach the melting condition, the third fuse FU3 melts before the second fuse FU2, and the second fuse FU2 melts before the first fuse FU1. Among them, the target device 50 can be a power conversion system (PCS).
[0050] It should be noted that the number of power supply branches 10 mentioned in this application refers to the number of power supply branches 10 connected in parallel in the energy storage system. If the number of power supply branches 10 connected in parallel in the energy storage system is 1, then the square of the number is 1; if the number of power supply branches 10 connected in parallel in the energy storage system is 2, then the square of the number is 4.
[0051] In some embodiments, under the premise that the DC time constant is the first time, the product of the pre-arcing Joule integral of the second fuse FU2 and the square of the number of power supply branches 10 is greater than the melting Joule integral of the third fuse FU3.
[0052] Usually, the three-level matching protection mechanism of the energy storage system needs to meet the requirement that the third fuse FU3 blows before the second fuse FU2, and the second fuse FU2 blows before the first fuse FU1, so the configuration required for the third fuse FU3 is minimal. However, when selecting fuses for the three-level matching protection of the energy storage system, the selection is usually made according to the standard specifications of the fuses, and the third fuse FU3 is selected first. After the third fuse FU3 is determined, the second fuse FU2 is selected. At this time, the screening criteria are: the product of the pre-arc Joule integral of the second fuse FU2 and the square of the number of power supply branches 10 is greater than the blowing Joule integral of the third fuse FU3. After the second fuse FU2 is determined, the first fuse FU1 is finally selected. At this time, the screening criteria are: the pre-arc Joule integral of the first fuse FU1 is greater than the blowing Joule integral of the second fuse FU2. Since the first fuse FU1, the second fuse FU2 and the third fuse FU3 are all screened according to their own specifications, the configuration of the screened first fuse FU1 will be larger, and there may not be a suitable product under this configuration. At the same time, when the product under this configuration is used as the fuse of the battery pack 110, if a short circuit occurs at the battery pack 110 and the first fuse FU1 is required for protection, the configuration of the first fuse FU1 is too large, resulting in the first fuse FU1 failing to meet the melting condition or the actual melting time being too long, thereby causing the battery pack 110 to fail to be effectively protected.
[0053] To this end, when selecting the first fuse FU1, the second fuse FU2 and the third fuse FU3, the present application needs to test the pre-arc Joule integral of the first fuse FU1, the pre-arc Joule integral and the blown Joule integral of the second fuse FU2, and the blown Joule integral of the third fuse FU3 on the basis of the DC time constant, and ensure that the pre-arc Joule integral of the first fuse FU1 is greater than the blown Joule integral of the second fuse FU2, and the product of the pre-arc Joule integral of the second fuse FU2 and the square of the number of power supply branches 10 is greater than the blown Joule integral of the third fuse FU3. The Joule integral of the fuse FU3 is calculated. At this time, the configuration of the selected first fuse FU1 is smaller than the configuration selected according to the fuse specification sheet. The first fuse FU1 has more selectivity, and the selected first fuse FU1, second fuse FU2 and third fuse FU3 are more suitable for short-circuit protection of the energy storage system. Therefore, when a short circuit occurs in the battery pack 110 and the first fuse FU1 is needed for protection, it can ensure that the first fuse FU1 can be blown in time, thereby achieving the purpose of effectively protecting the battery pack 110.
[0054] Furthermore, in some embodiments, under the premise that the short-circuit current of the combiner cabinet 40 is the preset second current and the DC time constant is the first time, the product of the pre-arcing Joule integral of the second fuse FU2 and the square of the number of power supply branches 10 is greater than the melting Joule integral of the third fuse FU3.
[0055] Specifically, when screening the first fuse FU1, the second fuse FU2 and the third fuse FU3, the present application also needs to test the first fuse FU1, the second fuse FU2 and the third fuse FU3 under the same current on the basis of determining the DC time constant of the energy storage system, that is, when it is necessary to ensure that the short-circuit current of the power supply branch 10 is the preset second current, it is necessary to ensure that the first fuse FU1, the second fuse FU2 and the third fuse FU3 can all be blown.
[0056] Furthermore, in some embodiments, the actual blowing time of the third fuse FU3 is less than the pre-arcing time of the second fuse FU2.
[0057] Specifically, the pre-arcing time of the second fuse FU2 refers to the pre-arcing time of the second fuse FU2 when the short-circuit current of the power supply branch 10 is the second current and the DC time constant of the energy storage system is the first time, and the actual melting time of the third fuse FU3 refers to the actual melting time of the third fuse FU3 when the short-circuit current of the power supply branch 10 is the second current and the DC time constant of the energy storage system is the first time.
[0058] In some embodiments, Figure 1 As shown, the combiner cabinet 40 includes two third fuses FU3, namely the main positive combiner cabinet 40 fuse and the main negative combiner cabinet 40 fuse; wherein, one end of the main positive combiner cabinet 40 fuse is electrically connected to the first end of the combiner cabinet 40, and the other end of the main positive combiner cabinet 40 fuse is electrically connected to the third end of the combiner cabinet 40; one end of the main negative combiner cabinet 40 fuse is electrically connected to the second end of the combiner cabinet 40, and the other end of the main negative combiner cabinet 40 fuse is electrically connected to the fourth end of the combiner cabinet 40.
[0059] Specifically, in order to improve the safety performance of the energy storage system, the present application can set a fuse on one side of the first bus 20 and one side of the second bus 30, that is, two third fuses FU3 are set in the junction cabinet 40 respectively, which can be the main positive junction cabinet 40 fuse and the main negative junction cabinet 40 fuse, so as to further improve the reliability of the energy storage system.
[0060] In some embodiments, Figure 1As shown, the power supply branch 10 includes two second fuses FU2, namely the main positive high-voltage box 120 fuse and the main negative high-voltage box 120 fuse; wherein, one end of the main positive high-voltage box 120 fuse is electrically connected to one end of the first fuse FU1, and the other end of the main positive high-voltage box 120 fuse is electrically connected to the first bus 20; one end of the main negative high-voltage box 120 fuse is electrically connected to the other end of the first fuse FU1, and the other end of the main negative high-voltage box 120 fuse is electrically connected to the second bus 30.
[0061] Specifically, in order to improve the safety performance of the energy storage system, the present application can set a fuse on the other side of the first bus 20 and the other side of the second bus 30, that is, two second fuses FU2 can be set in the high-voltage box 120 respectively, which can be the main positive high-voltage box 120 fuse and the main negative high-voltage box 120 fuse, respectively, to further improve the reliability of the energy storage system.
[0062] In some embodiments, the DC time constant is greater than or equal to a preset second time, and less than or equal to a preset third time.
[0063] Specifically, the DC time constant of an energy storage system refers to a measure of the voltage or current response change of an energy storage element (such as a battery). When the energy storage system is connected to a load or power supply, the time required for its voltage or current to change from the initial state to 63.2% of the steady-state value can be called the DC time constant. The DC time constant of the energy storage system mainly depends on the internal resistance and capacitance effect of the battery. Among them, the first time can be set between 1ms and 3ms, the second time can be 1ms, and the third time can be 3ms.
[0064] In some embodiments, Figure 1 As shown, the energy storage system includes a plurality of power supply branches 10 , one end of each power supply branch 10 is electrically connected to the first bus 20 , and the other end of each power supply branch 10 is electrically connected to the second bus 30 .
[0065] In this embodiment, the energy storage system can be formed by multiple parallel power supply branches 10, each power supply branch 10 can be provided with a battery pack 110 and a high-voltage box 120, each battery pack 110 is provided with a first fuse FU1, one end of each first fuse FU1 is electrically connected to the first bus 20, each high-voltage box 120 is provided with a second fuse FU2, one end of each second fuse FU2 is electrically connected to the other end of the first fuse FU1, and the other end of each second fuse FU2 is electrically connected to the second bus 30. At the same time, under the premise that the DC time constant of the energy storage system is the preset first time, the pre-arcing Joule integral of each first fuse FU1 is greater than the melting Joule integral of the second fuse FU2.
[0066] Further, in some embodiments, the short-circuit current of each power supply branch 10 is less than or equal to the preset third current. Specifically, in order to ensure the successful selection of each first fuse FU1 and second fuse FU2 in the energy storage system, the present application needs to ensure that the maximum short-circuit current of each power supply branch 10 is the same on the basis that the DC time constant of the energy storage system is the preset first time, that is, the circuit current of each power supply branch 10 needs to be no greater than the preset third current, and the third current can be the maximum short-circuit current of each power supply branch 10, thereby ensuring that the screened first fuse FU1 and second fuse FU2 are more suitable for providing short-circuit protection for each power supply branch 10 of the energy storage system, so that when the first fuse FU1 and the second fuse FU2 in the corresponding power supply branch 10 reach the fuse condition at the same time, the second fuse FU2 can be blown first compared with the first fuse FU1, and at the same time, when the first fuse FU1 is needed for protection, it can ensure that the first fuse FU1 in the corresponding power supply branch 10 can be blown in time.
[0067] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any technician familiar with the technical field can easily think of various equivalent modifications or replacements within the technical scope disclosed in the present application, and these modifications or replacements should be included in the protection scope of the present application. Therefore, the protection scope of the present application shall be based on the protection scope of the claims.
Claims
1. An energy storage system, characterized in that: The invention comprises at least one power supply branch, a first busbar and a second busbar, wherein one end of the power supply branch is electrically connected to the first busbar, and the other end of the power supply branch is electrically connected to the second busbar, and the power supply branch comprises: at least one battery pack, the battery pack comprising a first fuse, one end of the first fuse being electrically connected to the first bus bar; A high-voltage box, the high-voltage box comprising at least one second fuse, one end of the second fuse being electrically connected to the other end of the first fuse, and the other end of the second fuse being electrically connected to the second busbar; Wherein, under the premise that the DC time constant of the energy storage system is a preset first time, the pre-arcing Joule integral of the first fuse is greater than the blowing Joule integral of the second fuse.
2. The energy storage system according to claim 1, characterized in that: On the premise that the short-circuit current of the power supply branch is a preset first current and the DC time constant is the first time, the pre-arcing Joule integral of the first fuse is greater than the blowing Joule integral of the second fuse.
3. The energy storage system according to claim 1, characterized in that: The energy storage system also includes a combiner cabinet; Wherein, the combiner cabinet comprises at least one third fuse, one end of the third fuse is electrically connected to the first end of the combiner cabinet, the first end of the combiner cabinet is electrically connected to the first bus, the second end of the combiner cabinet is electrically connected to the second bus, the third end and the fourth end of the combiner cabinet are electrically connected to the target device respectively, and the other end of the third fuse is electrically connected to the third end of the combiner cabinet; The product of the pre-arcing Joule integral of the second fuse and the square of the number of the power supply branches is greater than the blowing Joule integral of the third fuse.
4. The energy storage system according to claim 3, characterized in that: On the premise that the DC time constant is the first time, the product of the pre-arcing Joule integral of the second fuse and the square of the number of the power supply branches is greater than the blowing Joule integral of the third fuse.
5. The energy storage system according to claim 4, characterized in that: On the premise that the short-circuit current of the combiner cabinet is a preset second current and the DC time constant is the first time, the product of the pre-arcing Joule integral of the second fuse and the square of the number of the power supply branches is greater than the breaking Joule integral of the third fuse.
6. The energy storage system according to claim 3, characterized in that: The combiner cabinet comprises two third fuses, namely a main positive combiner cabinet fuse and a main negative combiner cabinet fuse; Wherein, one end of the main positive combiner cabinet fuse is electrically connected to the first end of the combiner cabinet, and the other end of the main positive combiner cabinet fuse is electrically connected to the third end of the combiner cabinet; One end of the main negative combiner cabinet fuse is electrically connected to the second end of the combiner cabinet, and the other end of the main negative combiner cabinet fuse is electrically connected to the fourth end of the combiner cabinet.
7. The energy storage system according to any one of claims 1 to 6, characterized in that: The power supply branch includes two of the second fuses, namely a main positive high-voltage box fuse and a main negative high-voltage box fuse; Wherein, one end of the main positive high-voltage box fuse is electrically connected to one end of the first fuse, and the other end of the main positive high-voltage box fuse is electrically connected to the first busbar; One end of the main negative high-voltage box fuse is electrically connected to the other end of the first fuse, and the other end of the main negative high-voltage box fuse is electrically connected to the second bus.
8. The energy storage system according to any one of claims 1 to 6, characterized in that: The DC time constant is greater than or equal to a preset second time, and less than or equal to a preset third time.
9. The energy storage system according to any one of claims 1 to 6, characterized in that: The energy storage system comprises a plurality of power supply branches; One end of each of the power supply branches is electrically connected to the first bus, and the other end of each of the power supply branches is electrically connected to the second bus.
10. The energy storage system according to claim 9, characterized in that: The short-circuit current of each of the power supply branches is less than or equal to a preset third current.