Extraction control method and system
By introducing extraction time calculation and parameter adjustment modules into the coffee machine, the extraction parameters are automatically adjusted, and the problem of inflexible extraction control of existing coffee machines is solved, and the stability and quality improvement of the coffee extraction process is achieved.
Patent Information
- Application Number
- CN202411373151.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-29
- Publication Date
- 2024-11-12
AI Technical Summary
Existing coffee machines lack flexibility in extraction control, and it is difficult to adjust extraction parameters in real time according to specific coffee types or personalized needs, such as extraction pressure, flow rate and powder pressing force, resulting in unstable extraction effect and affecting the quality of coffee.
An extraction control method and system is provided. Through the extraction time calculation module and parameter adjustment module, the extraction liquid time length is generated according to the initial extraction parameters, and the extraction parameters are automatically adjusted in response to the duration deviation to ensure that the extraction process approaches the ideal state.
It is realized that appropriate extraction parameters are determined based on the characteristics of raw materials and expected effects, ensuring the optimization of the basic conditions of the extraction process, timely correcting deviations, simplifying operations, improving extraction efficiency and product quality, and bringing users an excellent user experience and taste.
Smart Images

Figure CN118924117A_ABST
Abstract
Description
Technical Field
[0001] The present disclosure belongs to the technical field of extraction control, and more specifically, to an extraction control method and system. Background Art
[0002] In the field of coffee making, different types of coffee drinks have their own unique requirements for the extraction process in order to achieve flavor differentiation. However, existing coffee machines lack flexibility in extraction control, and it is difficult to adjust extraction parameters such as extraction pressure, flow rate, and powder pressing force in real time according to specific coffee types or personalized needs. Traditional methods mostly rely on fixed parameters or simply adjust the coarseness of grinding, which cannot achieve precise control, resulting in unstable extraction effects and affecting coffee quality. Therefore, there is an urgent need for a control method that can intelligently determine and adjust extraction parameters in real time to optimize the extraction process, improve the quality and taste of coffee products, and meet the increasingly diverse needs of consumers. Summary of the invention
[0003] The purpose of the present disclosure is to provide an extraction control method and system to improve the quality and taste of coffee products.
[0004] A first aspect of an embodiment of the present disclosure provides an extraction control method, which is applied to an extraction machine, comprising: Determine the extraction parameters of the extraction machine; determining a first time period for generating the extract based on the extraction parameters; In response to the first duration not being equal to the second duration, adjusting the extraction parameter; The extractor is controlled based on the adjusted extraction parameters.
[0005] A second aspect of the embodiments of the present disclosure provides an extraction control system, which is applied to an extraction machine, comprising: An extraction time calculation module, used to calculate a first time for generating an extract based on initial extraction parameters, wherein the initial extraction parameters include grinding amount, water injection amount, extraction pressure and powder pressing force; The extraction parameter adjustment module is used to adjust the initial extraction parameter in response to the first time length being greater than the second time length or less than the second time length.
[0006] According to a third aspect of an embodiment of the present disclosure, an electronic device is provided, comprising a memory, a processor, and a computer program stored in the memory and running on the processor, wherein the processor implements the steps of the above-mentioned extraction control method when executing the computer program.
[0007] According to a fourth aspect of the embodiments of the present disclosure, a computer-readable storage medium is provided, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the above-mentioned extraction control method are implemented.
[0008] The beneficial effects of an extraction control method and system provided by the embodiments of the present disclosure are: The disclosed embodiment determines appropriate extraction parameters based on the raw material characteristics and expected effects to ensure that the basic conditions of the extraction process are optimized. Subsequently, the first time duration of generating the extract is recorded through the actual extraction process and compared with the preset ideal time duration (second time duration) to promptly discover and correct deviations in the extraction process. Once the first time duration does not match the second time duration, the extraction parameters are automatically adjusted immediately to ensure that the extraction process always approaches the ideal state. This not only simplifies the extraction operation, but also greatly improves the extraction efficiency and product quality, bringing users a more excellent user experience and taste enjoyment. BRIEF DESCRIPTION OF THE DRAWINGS
[0009] In order to more clearly illustrate the technical solutions in the embodiments of the present disclosure, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present disclosure. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0010] Figure 1 A schematic flow chart of an extraction control method provided in one embodiment of the present disclosure; Figure 2 A diagram of a cloud management page of an extraction control system provided by an embodiment of the present disclosure; Figure 3 A schematic diagram of the structure of an extraction machine provided in one embodiment of the present disclosure; Figure 4 A schematic diagram of the structure of an extractor provided in one embodiment of the present disclosure; Figure 5 A flowchart of an extraction control system provided by an embodiment of the present disclosure; Figure 6 A structural block diagram of an extraction control system provided by an embodiment of the present disclosure; Figure 7 A schematic block diagram of an electronic device provided by an embodiment of the present disclosure. DETAILED DESCRIPTION
[0011] In the following description, specific details such as specific system structures and technologies are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present disclosure. However, it should be clear to those skilled in the art that the present disclosure may be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to avoid obstructing the description of the present disclosure with unnecessary details.
[0012] In order to make the purpose, technical solutions and advantages of the present disclosure more clear, specific embodiments will be described below in conjunction with the accompanying drawings.
[0013] Please refer to Figure 1 , Figure 1 A schematic flow chart of an extraction control method provided in one embodiment of the present disclosure, the method is applied to an extraction machine, comprising: S101: Determine extraction parameters of an extraction machine.
[0014] In this embodiment, the extraction parameters include grinding amount, water injection amount, extraction pressure and powder pressing force. The extraction parameters are initial setting parameters.
[0015] In this embodiment, the coffee beans can be ground according to a set time length.
[0016] For different raw materials to be extracted and taste requirements, it is necessary to determine the appropriate grinding amount. For example, in coffee extraction, if the raw material is coffee beans, the type of coffee beans (such as Arabica or Robusta) and the degree of roasting (light, medium or dark roasting) will affect the choice of grinding amount. Lightly roasted coffee beans may be harder in texture and require a relatively large grinding amount or finer grinding to ensure that there is enough surface area for extracting the effective ingredients in coffee, such as caffeine, oils and flavor substances. If you want a strong flavor and a high concentration of extract, you need a larger grinding amount. Because a larger grinding amount means that more raw materials are involved in the extraction process, thereby increasing the total amount of extractable substances. Conversely, if you want a lighter extract, you can reduce the grinding amount.
[0017] In this embodiment, reference Figure 3-4 The extractor includes a water pump 16. A flow meter 17 is provided at the water inlet of the water pump 16. The passage of water can drive the internal Hall switch to rotate, and a pulse signal will be sent to the control board. Each pulse signal can represent the amount of water (ml) flowing through, so that there is a fixed conversion relationship between the amount of water and the number of pulses. The amount of water is calculated by accumulating the number of pulses. The water pump 16 is powered by the control board. When the number of pulses reaches the preset value of the water volume represented, the control board can cut off the power supply of the water pump 16.
[0018] Take coffee as an example. The amount of water injected into the coffee extraction should not be too little or too much. The flavors of the front, middle and end of the extract are different, and the right amount of water injection will make a cup of coffee with a perfect taste. Too little water injection will result in the inability to fully release the effective ingredients of the coffee, or the flavor will be incomplete; too much water injection will result in too much bad flavor, and more light extract will be mixed in.
[0019] The extraction pressure refers to the pressure in the extraction chamber 4. The extraction pressure directly affects the speed at which water passes through the coffee powder layer and the extraction efficiency. A higher extraction pressure can accelerate the penetration and dissolution of water, improve the extraction efficiency, and make the coffee extract richer in oil; however, too high a pressure may also lead to over-extraction or produce unpleasant flavors.
[0020] During the coffee extraction process, the pressing force can change the bulk density of the raw materials (such as coffee powder) and effectively affect the extraction pressure. Appropriate pressing force can make the coffee powder form a relatively uniform and compact powder cake structure. If the pressing force becomes larger, the powder cake tends to be compact, the extraction pressure becomes higher, the extract will be richer in fat and the flavor will be more mellow; if the pressing force becomes smaller, the powder cake tends to be loose, the extraction pressure becomes lower, the water will pass quickly, the extract will have less fat and a more refreshing taste. Appropriate pressing force helps to achieve the personalized extraction requirements of different types of coffee. By adjusting the pressing force, the flow path and contact time of the solvent (such as water) in the raw materials can be controlled, and finally an extract that meets the quality requirements can be obtained.
[0021] In this embodiment, the extraction parameters are set as initial setting parameters. Reasonable initial setting parameters can ensure that the extraction process is carried out within the expected range, thereby improving the extraction efficiency and product quality.
[0022] S102: Determine a first time duration for generating an extract based on the extraction parameters.
[0023] In this embodiment, the extraction parameters may be input into a terminal device corresponding to the extraction machine. After receiving the extraction parameters, the extraction machine starts to work to generate the extraction liquid and records the time for generating the extraction liquid.
[0024] In this embodiment, if the actual time obtained by timing is different from the standard time, it means that there may be problems in the extraction process. For example, if the extraction speed is too fast, the coffee may taste light, lack oil and aroma, and if the extraction speed is too slow, the coffee may be over-extracted and taste bitter. By recording this time, the extraction parameters can be adjusted to achieve the ideal extraction effect.
[0025] S103: In response to the first time length being not equal to the second time length, adjusting extraction parameters.
[0026] In this embodiment, the second duration is a predetermined ideal extraction duration. The second duration can be determined by experimental data or experience. For example, in the coffee extraction scenario, the second duration is obtained after a large number of experiments and tasting evaluations, and coffee liquid with the best combination of flavor, aroma and taste can be extracted under this duration. When the first duration is not equal to the second duration, the extraction parameters need to be adjusted to approach the ideal extraction state.
[0027] S104: Controlling the extraction machine based on the adjusted extraction parameters.
[0028] In this embodiment, when the extraction parameters are adjusted, the adjusted parameters need to be converted into control instructions that the extractor can recognize and execute. For example, if the adjusted grinding amount changes, the grinding time can be calculated according to the new grinding amount. The change in the water injection amount can be converted into a flow control instruction for the water pump 16 to determine the speed and total amount of water injection.
[0029] In the process of controlling the extractor based on the adjusted extraction parameters, the control system of the extractor can also monitor the extraction process in real time. If the monitoring data shows that the extraction process deviates from expectations, adjustments can be made based on these feedback information. For example, if it is found that the flow rate of the extract is too fast, and this is caused by excessive water injection or too high extraction pressure, this embodiment can appropriately reduce the water injection or extraction pressure according to a preset algorithm. This feedback adjustment mechanism can correct deviations in the extraction process in a timely manner, ensure that the extraction process is always carried out according to the adjusted extraction parameters, and ultimately achieve a near-ideal extraction effect.
[0030] Exemplary, reference Figure 2 , taking making a cup of espresso as an example.
[0031] The extraction standard is: 1. Grind 20 grams of coffee beans; 2. Grinding particle diameter 0.4mm; 3. Add 30ml of water; 4. Extraction pressure 9bar; 5. Extraction flow rate: 30 ml of extraction liquid flows out in 25 seconds.
[0032] The specific implementation is as follows: Step 1: Use the machine, PC, or mobile phone to set the grinding amount, water injection amount, extraction pressure, and powder pressing strength on the extraction machine cloud management page. For example: grinding amount (20g), water injection amount (30ml), extraction pressure (9bar), and powder pressing strength (5 levels).
[0033] The second step is to test the extraction effect and record the total time it takes for 30 ml of coffee liquid to flow out from the liquid outlet 6 of the extractor 8.
[0034] Step 3: If the extraction liquid flows out too fast, the powder pressing force can be increased and the grinding degree can be appropriately adjusted by turning the knob of the grinder 7; if the extraction liquid flows out too slowly, the powder pressing force can be reduced and the grinding degree can be appropriately adjusted by turning the knob of the grinder 7.
[0035] Step 4: Repeat step 2 again and adjust through step 3 until the desired effect is achieved.
[0036] It can be concluded from the above that this embodiment determines appropriate extraction parameters according to the raw material characteristics and expected effects to ensure that the basic conditions of the extraction process are optimized. Subsequently, the first time duration of generating the extract is recorded through the actual extraction process and compared with the preset ideal time duration (second time duration) to promptly discover and correct deviations in the extraction process. Once the first time duration does not match the second time duration, the extraction parameters are automatically adjusted immediately to ensure that the extraction process always approaches the ideal state. This not only simplifies the extraction operation, but also greatly improves the extraction efficiency and product quality, bringing users a more excellent user experience and taste enjoyment.
[0037] In one embodiment of the present disclosure, the extraction parameters include the intensity of powder compression; In response to the first duration not being equal to the second duration, adjusting the extraction parameters includes: In response to the first time duration being not equal to the second time duration, the powder compacting force is adjusted based on a first adjustment step.
[0038] During the extraction process, the force of pressing the powder directly affects the structure of the coffee powder. When the force of pressing the powder is large, the coffee powder is compacted and its internal structure becomes tight. This causes the water penetration path in the coffee powder to become tortuous and the resistance to increase. It is difficult for water to pass through the raw materials quickly, which slows down the diffusion rate of the coffee powder into the water, thus affecting the extraction speed and increasing the time to generate the extract. On the contrary, when the force of pressing the powder is small, the structure of the coffee powder is relatively loose, and the water can flow smoothly in the coffee powder, shortening the time to generate the extract.
[0039] In this embodiment, the first adjustment step is a pre-set unit amount for adjusting the powder pressing force. The setting of the first adjustment step can be based on comprehensive consideration of multiple factors such as the performance of the extraction machine, the characteristics of the raw materials, and the requirements for extraction accuracy. For example, if the extraction machine is highly sensitive to the powder pressing force, the first adjustment step can be set to be smaller to achieve more precise adjustment; if the raw materials have a greater tolerance for changes in the powder pressing force, the first adjustment step can be appropriately increased to speed up the adjustment speed.
[0040] Exemplarily, when the first time length is greater than the second time length (extraction is too slow), the powder pressing force is reduced based on the first adjustment step length. For example, if the first adjustment step length is level 1, the powder pressing force is reduced by 1 level. This makes the raw material structure relatively loose, reduces the resistance to solvent penetration, speeds up the extraction speed, and brings the first time length closer to the second time length.
[0041] When the first time is less than the second time (extraction is too fast), the powder pressing force is increased based on the first adjustment step. For example, the powder pressing force is increased according to the set adjustment step to make the raw material structure more compact, increase the difficulty of solvent penetration, and thus slow down the extraction speed to achieve the ideal extraction time.
[0042] It can be concluded from the above that this embodiment achieves precise control of the extraction speed by flexibly adjusting the powder pressing force during the extraction process based on the difference between the first duration and the second duration. This not only improves the extraction accuracy, but also dynamically adjusts to the optimal extraction state according to different raw material characteristics and extraction machine performance, thereby effectively avoiding quality problems caused by too slow or too fast extraction, and ensuring the consistency and high quality of the extract.
[0043] In one embodiment of the present disclosure, the extraction machine comprises a first motor 9; In response to the first duration not being equal to the second duration, adjusting the powder pressing force based on the first adjustment step, including: In response to the first time length being not equal to the second time length, the power supply current of the first motor 9 is adjusted based on the first adjustment step, and the powder pressing force is adjusted based on the power supply current.
[0044] In this embodiment, when the first time length is not equal to the second time length, it is necessary to adjust the powder pressing force to optimize the extraction process. The extraction machine includes a first motor 9, and the adjustment of the powder pressing force is achieved by adjusting the power supply current of the first motor 9 based on the first adjustment step. The magnitude of the power supply current directly affects the motor's performance such as output power or torque, thereby changing the powder pressing force. If the first time length is greater than the second time length, the power supply current is reduced according to the first adjustment step, the motor output is reduced, and the powder pressing force is reduced to speed up the extraction; if the first time length is less than the second time length, the power supply current is increased, the powder pressing force is increased, and the extraction speed is slowed down.
[0045] Exemplarily, the first motor 9 is powered by a control board, and the control board can detect the operating current of the first motor 9. The powder compaction force is set by the gear, and the gear from low to high corresponds to the stall current value of the first motor 9. The higher the stall current value, the stronger the powder compaction, and the more compact the powder cake will be.
[0046] When the coffee powder falls into the extraction chamber 4 of the brewer from the powder outlet of the grinder 7, the upper plug 12 and the lower plug 11 of the extractor 8 will converge toward the middle driven by the first motor 9, thereby pressing the loose coffee powder in the extraction chamber 4 into a relatively compact powder cake.
[0047] It can be concluded from the above that this embodiment achieves precise control of the powder pressing force by intelligently adjusting the power supply current of the first motor 9 in the extraction machine. This method not only responds quickly, but also can be dynamically adjusted according to the real-time feedback of the extraction time to ensure that the extraction process reaches the optimal state.
[0048] In one embodiment of the present disclosure, the extraction parameters further include extraction pressure; In response to the first duration not being equal to the second duration, adjusting the extraction parameters includes: In response to the first time period not being equal to the second time period, the extraction pressure is adjusted based on a second adjustment step size.
[0049] In this embodiment, when the first time length is not equal to the second time length, it indicates that the extraction process deviates from the ideal state. The second adjustment step is a unit amount preset for adjusting the extraction pressure.
[0050] Exemplarily, if the first time length is greater than the second time length, it means that the extraction is too slow. Based on the second adjustment step, the extraction pressure is increased. The higher pressure can prompt the solvent to penetrate the raw material faster and accelerate the diffusion of the solute, thereby shortening the extraction time. If the first time length is less than the second time length, that is, the extraction is too fast, the extraction pressure is lowered based on the second adjustment step length, the solvent penetration and solute diffusion rates are slowed down, the extraction time is extended, and finally the extraction time is made close to the ideal second time length.
[0051] From the above, it can be concluded that this embodiment effectively solves the problem of extraction time deviating from the ideal value by introducing extraction pressure as an adjustment parameter and combining the second adjustment step to perform precise control. Whether the extraction is too slow or too fast, the extraction process can be optimized by adjusting the extraction pressure in a timely manner to ensure the quality and consistency of the extract.
[0052] In one embodiment of the present disclosure, the extraction machine further comprises a second motor; In response to the first time period not being equal to the second time period, adjusting the extraction pressure based on a second adjustment step, comprising: In response to the first time period not being equal to the second time period, the supply voltage of the second motor is adjusted based on the second adjustment step size, and the extraction pressure is adjusted based on the supply voltage.
[0053] In this embodiment, the extraction pressure is associated with the second motor in the extractor. When the first time length is not equal to the second time length, it indicates that the extraction process has not reached the ideal state. The second adjustment step is a set unit amount for adjusting the extraction pressure. If the first time length is greater than the second time length (the extraction is too slow), the power supply voltage of the second motor is increased based on the second adjustment step. The increase in the power supply voltage can increase the motor output power, thereby increasing the extraction pressure, accelerating the solvent penetration of the raw material and the diffusion of the solute, and shortening the extraction time; if the first time length is less than the second time length (the extraction is too fast), the power supply voltage is reduced based on the second adjustment step, the motor output power is reduced, the extraction pressure is reduced, the solvent penetration and solute diffusion speed are slowed down, the extraction time is extended, and the extraction time is close to the ideal second time length.
[0054] In this embodiment, reference Figure 3 and Figure 5, the water pump 16 is driven by the second motor and controlled and powered by the control board. There is a continuous waterway between the outlet of the water pump 16 and the outlet of the extraction chamber 4, so the pressure is the same at any position. A pressure sensor 15 is provided near the outlet of the water pump 16 for detecting the extraction pressure value. The pressure sensor 15 can output a voltage signal, and the voltage signal can change due to changes in the water pressure flowing through it. The higher the water pressure, the higher the voltage signal it outputs. Therefore, there is a fixed conversion relationship between the water pressure and the voltage signal of the pressure sensor 15. When the water circuit pressure is detected to be higher than the preset value, the control board can control the second motor to slow down until the preset pressure value; when the water circuit pressure is detected to be lower than the preset value, the control board can control the second motor to speed up until the preset pressure value.
[0055] In this embodiment, the extraction pressure refers to the pressure in the extraction chamber 4. From the water outlet of the water pump 16 to the inner side of the liquid outlet 6 of the extraction chamber 4 of the brewer, the pressure is the same and belongs to the same liquid flow pipeline. The pressure sensor 15 is located between the water pump 16 and the brewer to collect the extraction pressure.
[0056] For example, a brushless DC motor can be used as the second motor, and the water pump 16 is driven by the brushless DC motor. The brushless DC motor has an integrated circuit inside, and its external lead terminals include a 24V power supply terminal, a GND ground terminal, and a VSP control terminal. Among them, 24V+ and GND are the power supply lines of the brushless DC motor, and VSP is the control line, and the input voltage range is between 0-5V. When VSP is 0V, the brushless DC motor is in a stopped state; when VSP is 5V, the brushless DC motor reaches the highest speed state, and the VSP voltage is linearly related to the speed of the water pump 16. The speed of the water pump 16 can be adjusted by changing the voltage output from the main control board of the extractor to the VSP terminal of the brushless DC motor.
[0057] At the beginning of the extraction process, the main control board of the extractor outputs voltage to the brushless DC motor via the VSP line. The initial voltage is 0V, and then the voltage is gradually increased to 5V within 1000ms.
[0058] During the gradual increase of the VSP voltage signal, the pipeline pressure is monitored in real time by means of the pressure sensor 15. Once the pressure value reaches the set extraction pressure value during the VSP voltage rise process, the VSP voltage signal will stop increasing.
[0059] During the entire coffee extraction process, the pressure sensor 15 will continuously detect the pipeline pressure value. After the initial 1000ms, if the pressure value in the pipeline increases or decreases, the main control board can respond within 20ms and increase or decrease the VSP voltage by 0.02V at a frequency of once every 20ms until the pipeline pressure value is stabilized and controlled at the set value.
[0060] It can be concluded from the above that this embodiment accurately adjusts the extraction pressure by intelligently controlling the power supply voltage of the second motor, which not only achieves the dynamic balance of the extraction process, but also ensures that the extraction time is highly consistent with the ideal value. By utilizing the linear speed regulation characteristics of the DC brushless motor and the real-time feedback of the pressure sensor 15, the extraction machine can quickly respond to pressure changes and adjust the speed of the water pump 16 to maintain a stable extraction pressure, thereby improving the extraction accuracy and coffee quality.
[0061] In one embodiment of the present disclosure, in response to the first duration being not equal to the second duration, adjusting the extraction parameters further includes: In response to the first time period not being equal to the second time period, the grinding amount is adjusted based on a third adjustment step size.
[0062] In this embodiment, reference Figure 3 Grinding means that coffee beans enter the grinder 7 from the bean inlet 2 at the top of the coffee grinder 7, and a serrated blade 3 for grinding coffee beans is provided in the grinder 7. The grinder 7 is provided with a knob 1 for adjusting the coarseness of grinding.
[0063] In this embodiment, the coffee beans can be ground for a set time. When other conditions such as the rotation speed of the grinder 7 are fixed, the longer the grinding time, the more coffee beans are ground, that is, the larger the grinding amount. This is because as time goes by, more coffee beans are ground into powder by the grinder 7.
[0064] For example, if the grinding speed of the grinder 7 is to grind a certain mass of coffee beans per minute, then the amount of grinding obtained by grinding for 5 minutes is definitely more than the amount of grinding obtained by grinding for 3 minutes.
[0065] When the first time is not equal to the second time, it indicates that the current extraction process deviates from the ideal state. If the first time is greater than the second time, it means that the extraction process is too slow. This may be due to the large amount of grinding, which takes more time to extract the effective ingredients from too much coffee bean powder during extraction. At this time, it is necessary to reduce the amount of grinding to speed up the extraction.
[0066] In this embodiment, the third adjustment step is a pre-set value, which indicates the amplitude of the grinding amount adjustment. The setting of the third adjustment step needs to consider various factors, such as the accuracy of the grinder 7, the characteristics of the coffee beans, and the sensitivity of the extraction process to the change of the grinding amount. For example, if the grinder 7 has a high control accuracy on the grinding time, a smaller third adjustment step can be set to allow for a more precise adjustment of the grinding amount; if the properties of the coffee beans are relatively stable and not very sensitive to the change of the grinding amount, the third adjustment step can be set to be relatively large to speed up the adjustment speed.
[0067] Exemplarily, when the first time length is greater than the second time length, the grinding amount is reduced based on the third adjustment step. If the third adjustment step is set to reduce the grinding time by 10 seconds each time, when the grinding amount needs to be reduced, the grinding time is reduced by 10 seconds. This can reduce the amount of ground coffee bean powder, thereby reducing the total amount of extractable substances during extraction, and speeding up the extraction speed while keeping other extraction parameters unchanged, so that the first time length approaches the second time length. When the first time length is less than the second time length, the grinding amount is increased based on the third adjustment step, that is, the grinding time is increased. For example, increasing the grinding time by 10 seconds according to the set adjustment step can increase the amount of ground coffee bean powder, thereby increasing the total amount of extractable substances and extending the extraction time to achieve the ideal extraction time.
[0068] From the above, it can be concluded that this embodiment introduces an intelligent adjustment mechanism for the grinding amount, combined with the precise control of the third adjustment step, to effectively deal with the problem of the extraction time deviating from the ideal state. When the extraction process is too slow, the grinding amount is reduced to speed up the extraction speed; conversely, the grinding amount is increased to extend the extraction time. This not only improves the response speed and accuracy of the extraction, but also ensures the stability and consistency of the extraction quality.
[0069] In one embodiment of the present disclosure, in response to the first duration being not equal to the second duration, adjusting the extraction parameters further includes: In response to the first time period not being equal to the second time period, adjusting the water injection amount.
[0070] In this embodiment, a flow meter 17 is provided at the water inlet 10 of the water pump 16. The passage of water can drive the internal Hall switch to rotate, thereby sending a pulse signal to the control board. Each pulse signal can represent the amount of water (ml) flowing through, so that there is a fixed conversion relationship between the water volume and the number of pulses. The water volume is calculated by accumulating the number of pulses. The water pump 16 is powered by the control board. When the number of pulses reaches the preset value of the water volume represented, the control board will cut off the power supply of the water pump 16.
[0071] It can be concluded from the above that this embodiment realizes accurate control and dynamic adjustment of the water injection amount by setting the flow meter 17 at the water inlet of the water pump 16. When the extraction time deviates from the ideal value, the extraction process can be quickly responded and optimized by adjusting the water injection amount.
[0072] Corresponding to an extraction control method of the above embodiment, Figure 6 This is a structural block diagram of an extraction control system provided by an embodiment of the present disclosure. For ease of explanation, only the parts related to the embodiment of the present disclosure are shown. Figure 6 The extraction control system 20 is applied to an extraction machine, and includes: a parameter determination module 21, an extraction time determination module 22, a parameter adjustment module 23, and an extraction control module 24.
[0073] Wherein, the parameter determination module 21 is used to determine the extraction parameters of the extraction machine; An extraction time determination module 22, used to determine a first time for generating an extract based on the extraction parameters; a parameter adjustment module 23, configured to adjust an extraction parameter in response to the first duration not being equal to the second duration; The extraction control module 24 is used to control the extraction machine based on the adjusted extraction parameters.
[0074] In one embodiment of the present disclosure, the extraction parameters include the intensity of powder compression; The parameter adjustment module 23 is specifically used for: In response to the first time duration being not equal to the second time duration, the powder compacting force is adjusted based on a first adjustment step.
[0075] In one embodiment of the present disclosure, the extraction machine comprises a first motor 9; The parameter adjustment module 23 is also specifically used for: In response to the first time length being not equal to the second time length, the power supply current of the first motor 9 is adjusted based on the first adjustment step, and the powder pressing force is adjusted based on the power supply current.
[0076] In one embodiment of the present disclosure, the extraction parameters further include extraction pressure; The parameter adjustment module 23 is also specifically used for: In response to the first time period not being equal to the second time period, the extraction pressure is adjusted based on a second adjustment step size.
[0077] In one embodiment of the present disclosure, the extraction machine further comprises a second motor; The parameter adjustment module 23 is also specifically used for: In response to the first time period not being equal to the second time period, the supply voltage of the second motor is adjusted based on the second adjustment step size, and the extraction pressure is adjusted based on the supply voltage.
[0078] In one embodiment of the present disclosure, the extraction parameters further include the amount of grinding; The parameter adjustment module 23 is also specifically used for: In response to the first time period not being equal to the second time period, the grinding amount is adjusted based on a third adjustment step size.
[0079] In one embodiment of the present disclosure, the extraction parameters further include water injection amount; The parameter adjustment module 23 is also specifically used for: In response to the first time period not being equal to the second time period, adjusting the water injection amount.
[0080] See also Figure 7 , Figure 7 A schematic block diagram of an electronic device provided by an embodiment of the present disclosure. Figure 7The electronic device 300 in the embodiment shown may include: one or more processors 301, one or more input devices 302, one or more output devices 303 and one or more memories 304. The processors 301, input devices 302, output devices 303 and memories 304 communicate with each other via a communication bus 305. The memory 304 is used to store computer programs, which include program instructions. The processor 301 is used to execute the program instructions stored in the memory 304. The processor 301 is configured to call the program instructions to execute the functions of the modules in the above-mentioned system embodiments, such as Figure 6 The functions of modules 21 to 24 are shown.
[0081] It should be understood that in the embodiment of the present disclosure, the processor 301 may be a central processing unit (CPU), and the processor may also be other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or the processor may also be any conventional processor, etc.
[0082] The input device 302 may include a touch panel, a fingerprint collection sensor (for collecting the user's fingerprint information and fingerprint direction information), a microphone, etc., and the output device 303 may include a display (LCD, etc.), a speaker, etc.
[0083] The memory 304 may include a read-only memory and a random access memory, and provide instructions and data to the processor 301. A portion of the memory 304 may also include a non-volatile random access memory. For example, the memory 304 may also store information about the device type.
[0084] In a specific implementation, the processor 301, input device 302, and output device 303 described in the embodiments of the present disclosure can execute the implementation methods described in the first and second embodiments of an extraction control method provided in the embodiments of the present disclosure, and can also execute the implementation methods of the electronic device described in the embodiments of the present disclosure, which will not be repeated here.
[0085] In another embodiment of the present disclosure, a computer-readable storage medium is provided, wherein the computer-readable storage medium stores a computer program, wherein the computer program includes program instructions, and when the program instructions are executed by the processor, all or part of the processes in the above-mentioned embodiment method are implemented, and the computer program can also be completed by instructing the relevant hardware through the computer program. The computer program can be stored in a computer-readable storage medium, and when the computer program is executed by the processor, the steps of each of the above-mentioned method embodiments can be implemented. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form, etc. The computer-readable medium can include: any entity or device capable of carrying computer program code, recording medium, U disk, mobile hard disk, magnetic disk, optical disk, computer memory, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), electric carrier signal, telecommunication signal and software distribution medium, etc.
[0086] The computer-readable storage medium may be an internal storage unit of the electronic device of any of the aforementioned embodiments, such as a hard disk or memory of the electronic device. The computer-readable storage medium may also be an external storage device of the electronic device, such as a plug-in hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (SecureDigital, SD) card, a flash card (Flash Card), etc. equipped on the electronic device. Furthermore, the computer-readable storage medium may also include both an internal storage unit of the electronic device and an external storage device. The computer-readable storage medium is used to store computer programs and other programs and data required by the electronic device. The computer-readable storage medium may also be used to temporarily store data that has been output or is to be output.
[0087] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, computer software, or a combination of the two. In order to clearly illustrate the interchangeability of hardware and software, the composition and steps of each example have been generally described in terms of function in the above description. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this disclosure.
[0088] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the electronic devices and units described above can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.
[0089] In the several embodiments provided in the present application, it should be understood that the disclosed electronic device and method can be implemented in other ways. For example, the system embodiments described above are only schematic. For example, the division of units is only a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. In addition, the mutual coupling or direct coupling or communication connection shown or discussed can be an indirect coupling or communication connection through some interfaces or units, or it can be an electrical, mechanical or other form of connection.
[0090] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the embodiments of the present disclosure.
[0091] In addition, each functional unit in each embodiment of the present disclosure may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.
[0092] The above are only specific embodiments of the present disclosure, but the protection scope of the present disclosure is not limited thereto. Any technician familiar with the technical field can easily think of various equivalent modifications or replacements within the technical scope disclosed in the present disclosure, and these modifications or replacements should be included in the protection scope of the present disclosure. Therefore, the protection scope of the present disclosure should be based on the protection scope of the claims.
Claims
1. An extraction control method, characterized in that: Applicable to extraction machines, including: Determine the extraction parameters of the extraction machine; determining a first time period for generating the extract based on the extraction parameters; In response to the first duration not being equal to the second duration, adjusting the extraction parameter; The extractor is controlled based on the adjusted extraction parameters.
2. An extraction control method as claimed in claim 1, characterized in that: The extraction parameters include the intensity of powder compression; In response to the first duration being not equal to the second duration, adjusting the extraction parameter comprises: In response to the first time duration being not equal to the second time duration, the powder compacting force is adjusted based on a first adjustment step.
3. An extraction control method as claimed in claim 2, characterized in that: The extraction machine comprises a first motor; In response to the first duration being not equal to the second duration, adjusting the powder pressing force based on a first adjustment step, comprises: In response to the first time length being not equal to the second time length, the power supply current of the first motor is adjusted based on a first adjustment step, and the powder pressing force is adjusted based on the power supply current.
4. An extraction control method as claimed in claim 1, characterized in that: The extraction parameters also include extraction pressure; In response to the first duration being not equal to the second duration, adjusting the extraction parameter comprises: In response to the first time period not being equal to the second time period, the extraction pressure is adjusted based on a second adjustment step size.
5. An extraction control method as claimed in claim 4, characterized in that: The extraction machine further comprises a second motor; In response to the first time length being not equal to the second time length, adjusting the extraction pressure based on a second adjustment step length comprises: In response to the first time period not being equal to the second time period, the supply voltage of the second motor is adjusted based on a second adjustment step, and the extraction pressure is adjusted based on the supply voltage.
6. An extraction control method as claimed in claim 1, characterized in that: The extraction parameters also include grind size; In response to the first duration being not equal to the second duration, adjusting the extraction parameter further comprises: In response to the first time period not being equal to the second time period, the grinding amount is adjusted based on a third adjustment step.
7. An extraction control method as claimed in claim 1, characterized in that: The extraction parameters also include water injection volume; In response to the first duration being not equal to the second duration, adjusting the extraction parameter further comprises: In response to the first time period not being equal to the second time period, the water injection amount is adjusted.
8. An extraction control system, characterized in that: Applicable to extraction machines, including: A parameter determination module, used for determining extraction parameters of the extraction machine; An extraction time determination module, used to determine a first time for generating an extract based on the extraction parameters; a parameter adjustment module, configured to adjust the extraction parameter in response to the first duration not being equal to the second duration; An extraction control module is used to control the extraction machine based on the adjusted extraction parameters.
9. An electronic device comprising a memory, a processor, and a computer program stored in the memory and running on the processor, characterized in that: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 7 are implemented.
10. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 7 are implemented.