Ship shelf system installation method and ship shelf system
By setting ground rail and sky rail installation lines in the ship compartment chamber and determining the installation reference point, the problem of low installation accuracy of the ship shelf system in limited space is solved, and reasonable planning and high-precision installation are achieved.
Patent Information
- Application Number
- CN202411185112.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-27
- Publication Date
- 2024-11-12
AI Technical Summary
When installing a shelf system in a ship compartment room, the space is limited and it is difficult to determine the appropriate installation position. It is affected by the impact, inclination and vibration of the ocean waves, resulting in high installation accuracy requirements, but the existing technology has not effectively solved these problems.
Use the setting of ground rail and sky rail installation lines as references to define preset installation spaces, determine the installation reference points through relative position measurement method, establish a unified position reference, and then plan a reasonable installation position and sequence to improve the installation of shelf system Accuracy.
By preset installation space, the shelf system occupied space is planned in advance, ensuring the rationality and accuracy of the installation position, and improving the installation accuracy and stability of the shelf system.
Smart Images

Figure CN118928697A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of shipbuilding, and in particular to a ship rack system installation method and a ship rack system. Background Art
[0002] As ship designs continue to evolve, more and more facilities are being installed in ship cabins, such as ship rack systems for storing items.
[0003] The installation process requirements for installing a ship rack system in a ship cabin are different from those for installing a rack system on land. The space in the cabin is limited, and it is difficult to determine the appropriate installation location for the ship rack system. During navigation, the ship may be squeezed, deformed, tilted, and vibrated by the impact of waves, and the ship rack system has many parts and components that are interrelated, so the installation accuracy of the rack system is required to be high.
[0004] Therefore, there is an urgent need to provide a method for installing a ship rack system, establish a unified positioning reference, rationally plan the installation position of the ship rack system, and improve the installation accuracy of the ship rack system. Summary of the invention
[0005] The object of the present invention is to provide a ship rack system installation method and a ship rack system, so as to establish a unified positioning reference, rationally plan the installation position of the ship rack system, and improve the installation accuracy of the ship rack system.
[0006] To achieve this object, the present invention adopts the following technical solutions:
[0007] The present invention provides a ship rack system installation method for installing a ship rack system, and the ship rack system installation method comprises:
[0008] Two floor rail installation lines are set, and two ceiling rail installation lines are set based on the floor rail installation lines, and the end points of the floor rail installation lines and the ceiling rail installation lines are determined and set as installation reference points, thereby obtaining a three-dimensional preset installation space;
[0009] The installation position is determined, the floor rail installation line, the ceiling rail installation line and the installation reference point are marked in the ship cabin as the position reference, and the sliding track and the shelf of the ship shelf system are installed with reference to the position reference.
[0010] As an optional technical solution for a ship rack system installation method, after the ground rail installation line is delineated, a benchmark is erected, and a height reference line is set on the benchmark. The ceiling rail installation line is delineated based on the ground rail installation line and the height reference line.
[0011] As an optional technical solution for a method of installing a ship rack system, a plurality of leveling plates with different thicknesses are arranged at the ground rail installation line so that the top surfaces of all the leveling plates are at the same preset height for supporting the sliding rail.
[0012] As an optional technical solution for a ship rack system installation method, a pad positioning line parallel to and spaced from the ground rail installation line is defined at the ground rail installation line, and side edges of multiple leveling pads are aligned with the pad positioning line.
[0013] As an optional technical solution for the installation method of a ship rack system, before setting the leveling pad, a preset height is set and the pad installation point is marked on the ground rail installation line, and the height difference between each pad installation point and the preset height is measured to determine the thickness value of the leveling pad.
[0014] As an optional technical solution for the installation method of a ship shelf system, a preset pad is placed at the pad installation point, the height difference from the four corners of the preset pad to the preset height is measured, and the processing thickness value of the leveling pad is calculated.
[0015] As an optional technical solution for a ship rack system installation method, after the ground rail installation line is delineated, a ground rail inspection line parallel to the ground rail installation line is drawn on one side of the ground rail installation line, and the ground rail installation line and the ground rail inspection line maintain a preset interval.
[0016] As an optional technical solution for a ship rack system installation method, the sliding rail is installed at the ground rail installation line as a ground rail, and the sliding rail is preliminarily positioned at the ceiling rail installation line, and a prefabricated tooling is used for simulated operation, and after the operation, the sliding rail is welded and fixed as a ceiling rail.
[0017] As an optional technical solution for a method of installing a ship rack system, the installation theoretical line and positioning point are delineated by a relative position measurement method with reference to the installation line or installation reference point of the preset installation space;
[0018] The feet and columns of the shelf are installed at the positioning points, and the crossbeams of the shelf are installed according to the installation theoretical line.
[0019] The present invention provides a ship rack system which is installed by adopting the ship rack system installation method. The ship rack system is arranged between a cabin roof and a deck.
[0020] Beneficial effects:
[0021] The present invention provides a ship rack system installation method, which is used to install the ship rack system, set two ground rail installation lines, set two ceiling rail installation lines based on the ground rail installation line, determine the end point positions of the ground rail installation line and the ceiling rail installation line and set them as installation reference points, and then obtain a three-dimensional preset installation space. Through the preset installation space, the installation space occupied by the rack system can be preliminarily planned in advance according to the ceiling rail and the ground rail, which is conducive to checking in advance whether the space in the ship cabin meets the requirements and planning a reasonable installation position. After determining the installation position, the ground rail installation line, the ceiling rail installation line and the installation reference point are delineated in the ship cabin. The installation lines (ground rail installation line and ceiling rail installation line) and the installation reference point can be used as a unified reference position reference, thereby completing the installation of the sliding track and the shelf of the ship rack system, so that the sliding track and the shelf maintain an accurate spatial relative position relationship, thereby improving the installation accuracy of the shelf system.
[0022] The present invention provides a ship rack system, which is installed between a cabin roof and a deck of a ship by using the ship rack system installation method, which can effectively plan the occupied space of the ship rack system and effectively improve the installation accuracy of the ship rack system. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 This is a schematic diagram of the installation of the ship rack system provided by the embodiment of the present invention. Figure 1 ;
[0024] Figure 2 This is a schematic diagram of the installation of the ship rack system provided by the embodiment of the present invention. Figure 2 ;
[0025] Figure 3 This is a schematic diagram of the installation of the ship rack system provided by the embodiment of the present invention. Figure 3 ;
[0026] Figure 4 yes Figure 3 A partial enlarged view of point I in the middle;
[0027] Figure 5 is a front view of a shelf provided by an embodiment of the present invention;
[0028] Figure 6 is a top view of a shelf provided by an embodiment of the present invention;
[0029] Figure 7 It is a left view of the shelf provided by the embodiment of the present invention.
[0030] In the figure:
[0031] 11. Cabin roof; 12. Deck; 13. Top support frame;
[0032] 21. Overhead rail; 22. Floor rail; 23. Rack rail; 24. Stopper; 25. Drag chain; 26. Rack;
[0033] 31. Anchor; 32. Crossbeam; 331. Vertical bracket; 332. Horizontal bracket; 34. Column; 35. Connector. DETAILED DESCRIPTION
[0034] The present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are only used to explain the present invention, rather than to limit the present invention. It should also be noted that, for ease of description, only parts related to the present invention, rather than all structures, are shown in the accompanying drawings.
[0035] In the description of the present invention, unless otherwise clearly specified and limited, the terms "connected", "connected", and "fixed" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0036] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.
[0037] In the description of this embodiment, the terms "upper", "lower", "right", etc., directions or positional relationships are based on the directions or positional relationships shown in the drawings, and are only for the convenience of description and simplification of operation, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as limiting the present invention. In addition, the terms "first" and "second" are only used to distinguish in the description and have no special meaning.
[0038] The present invention provides a ship rack system installation method and a ship rack system. The ship rack system includes a sliding track and a rack, and is installed by using the ship rack system installation method. The ship rack system installation method specifically includes the following steps:
[0039] Step S1, set two floor rail installation lines, set two ceiling rail installation lines based on the floor rail installation lines, determine the end points of the floor rail installation lines and the ceiling rail installation lines and set them as installation reference points, and then obtain a three-dimensional preset installation space.
[0040] Specifically, the ship rack system includes a sliding track and a rack. The sliding track is arranged around the rack, and the automatic cargo transfer device can cooperate with the sliding track to complete the movement.
[0041] See also Figures 1 to 4 In this embodiment, the ship rack system includes four sliding rails, two of which are arranged side by side on the deck 12 as ground rails 22, and two of which are arranged side by side on the cabin roof 11 as ceiling rails 21; the ship rack system also includes a rack rail 23, which is arranged on the deck 12 and located near the ground rail 22, and is used to cooperate with the ground rail 22 to guide the movement of the automatic cargo transfer device.
[0042] It is understandable that when installing the ship rack system, attention should be paid to the width, height, straightness and flatness deviation between the two ground rails 22 or the two overhead rails 21 , and the height, width and parallelism deviation between the sliding rail and the rack rail 23 .
[0043] Since the space in the ship cabin is limited, the present embodiment adopts a method of predetermining a three-dimensional preset installation space, planning and measuring the cabin space in advance, so as to ensure that the ship shelf system can be smoothly installed in a suitable position.
[0044] Step S11: preliminarily set two ground rail installation lines.
[0045] It is necessary to use a total station to preliminarily mark the lines in order to set the ground rail installation line. It is necessary to ensure that the two ground rail installation lines remain parallel, and the distance between the two ground rail installation lines needs to meet the actual required distance between the two sliding tracks.
[0046] Step S12: After the ground rail installation line is preliminarily set, two ceiling rail installation lines are preliminarily set based on the ground rail installation line and the height reference line.
[0047] Setting the ceiling rail installation line is similar to setting the ground rail installation line, except that the position of the ground rail installation line needs to be referenced when setting. There is a ground rail center line between the two ground rail installation lines, and there is a ceiling rail center line between the two ceiling rail installation lines. A laser total station is used to ensure that the ceiling rail center line and the ground rail center line are coplanar, thereby ensuring the relative position of the ceiling rail installation line and the ground rail installation line.
[0048] Step S13: determine the end points of the floor rail installation line and the ceiling rail installation line and set them as installation reference points, thereby obtaining a three-dimensional preset installation space.
[0049] The length of the sliding track is set according to the actual required length, two ground rail installation reference points are determined on each ground rail installation line, and two ceiling rail installation reference points are determined on each ceiling rail installation line, resulting in eight installation reference points; the connection lines of the eight installation reference points constitute a three-dimensional preset installation space. According to the actual space in the cabin, the required preset installation space is compared to determine the appropriate installation position.
[0050] Step S2, determine the installation position, mark the ground rail installation line, the ceiling rail installation line and the installation reference point in the ship cabin as the position reference, and install the sliding track and the shelf of the ship shelf system with reference to the position reference.
[0051] Step S21, determine the installation position, and mark the ground rail installation line, the ceiling rail installation line and the installation reference point in the ship cabin as the position reference.
[0052] After the installation position is determined, the set floor rail installation line, ceiling rail installation line and installation reference point are finally defined in the ship cabin according to the above steps S11, S12 and S13.
[0053] It can be understood that the pre-set steps involved in step S1 can be preliminarily delineated in the ship cabin. After the preliminary delineation, if the actual cabin space is not suitable, the setting position of the shelf system can be readjusted until the installation position that adapts to the actual cabin space is obtained, and then the final delineated floor rail installation line, ceiling rail installation line and installation reference point are naturally obtained accordingly; it is also possible to theoretically set a three-dimensional preset installation space according to step S1, and preferentially determine the installation position according to the actual cabin size, and then delineate the floor rail installation line, ceiling rail installation line and installation reference point in the cabin according to the installation position.
[0054] In this embodiment, after the ground rail installation line is delineated in the cabin, a benchmark is erected, and a height reference line is set on the benchmark, and the ceiling rail installation line is delineated based on the ground rail installation line and the height reference line. By erecting a benchmark and setting the height reference line, the height of the ceiling rail installation line can be accurately determined according to the height reference line, thereby improving the accuracy of the delineation position of the ceiling rail installation line.
[0055] In this embodiment, the three-dimensional preset installation space is in the shape of a quadrangular pyramid; 1-1' and 2-2' are two ceiling rail installation lines, and 3-3' and 4-4' are two floor rail installation lines; after selecting the four ceiling rail installation reference points 1, 1', 2 and 2', it is necessary to use a tape measure to check the width A, width B, diagonal distance C, diagonal distance C1, diagonal distance D, diagonal distance D1 and height H to verify and adjust the preset installation space to make it consistent with the actual required space.
[0056] Width A, width B, diagonal distance C, diagonal distance C1, diagonal distance D, diagonal distance D1 and height H1 are all the actual required dimensional values. When checking with a ruler, width A matches the 3'-4' length, width B matches the 1'-2' length, diagonal distance C matches the 2'-4' length, diagonal distance C1 matches the 1'-3' length, diagonal distance D matches the 1'-4' length, diagonal distance D1 matches the 2'-3' length, and height H1 matches the height h; if the values of the above parameters are all in compliance, it means that the selected positions of the installation line and the installation reference point are accurate, and the benchmark can be locked as the height reference for the subsequent installation of the Sky Rail 21.
[0057] Step S22: installing the slide rails and shelves of the ship shelf system with reference to the position reference.
[0058] Step S221, installing the slide track of the ship rack system with reference to the position reference.
[0059] In this embodiment, the slide rail, the rack rail 23 and the shelf need to be installed in sequence; first, the slide rail is installed on the deck 12 as the ground rail 22, and then the slide rail is installed on the cabin roof 11 as the ceiling rail 21, then the rack rail 23 is installed on the deck 12, and finally the shelf is installed. The installation order of the ground rail 22 and the ceiling rail 21 can be reversed.
[0060] When the sliding track is installed on the ground rail installation line, the sliding track will cover the ground rail installation line, making it difficult to observe the exact position of the ground rail installation line during the subsequent installation process. To solve this problem, after the ground rail installation line is delineated, a ground rail inspection line parallel to the ground rail installation line is drawn on one side of the ground rail installation line, and the ground rail installation line and the ground rail inspection line maintain a preset interval. By setting the ground rail inspection line, the inspection line can be used as a reference when the rack rail 23 is subsequently installed.
[0061] See also Figure 3 In this embodiment, a total station is used for marking, and the two ground rail installation lines are respectively the first positioning line EF and the second positioning line GH. The first positioning line EF, the first inspection line E'F', the second positioning line GH and the second inspection line G'H' are drawn on the deck 12; the first inspection line E'F' is horizontally offset by 300 mm toward the stern direction from the first positioning line EF, and the second inspection line G'H' is horizontally offset by 300 mm toward the stern direction from the second positioning line GH.
[0062] It is understandable that the distance between the first positioning line EF and the second positioning line GH can be adjusted according to the actual space in the cabin; the distance between the first positioning line EF and the first inspection line E'F' can be adjusted according to the width of the slide track or the pad used for the slide track.
[0063] It should be noted that before installing the floor rail 22, it is necessary to conduct a goods inspection on the floor rail 22 and related installation accessories, such as checking the quantity, model, integrity, dimensional accuracy, and whether it is damaged, etc. In this embodiment, the goods inspection is first performed, and after the goods inspection, the installation line and the installation reference point are delineated in the ship cabin.
[0064] In this embodiment, the benchmark is a gantry type positioning benchmark; multiple groups of benchmarks are provided, and two adjacent groups of benchmarks are spaced at an appropriate distance; a laser detector is used to mark the height on the benchmark to obtain a height reference line; wherein the height reference line is located higher than the height of the upper surface of the ground rail 22. When positioning the sliding track, the left and right sides of the benchmark can be connected with detachable angle steel or a flat plate according to the height reference line, and a steel wire (the diameter of the steel wire can be 0.6 mm) can be stretched and a heavy object can be hung on the steel wire to assist in positioning the sliding track. The principle belongs to the prior art and will not be repeated here.
[0065] Since the surface of the deck 12 of the ship is uneven, it is necessary to install a leveling pad on the deck 12 before installing the sliding track as the ground rail 22. There are multiple leveling pads with different thicknesses, and the multiple leveling pads are arranged along the ground rail installation line. The multiple leveling pads are all arranged on the deck 12 and the top surfaces are at the same preset height to support the sliding track. By arranging leveling pads of different thicknesses, the sliding track is arranged on the top surface of the leveling pads, ensuring the stability of the sliding track installation.
[0066] Furthermore, before setting the leveling pad, a preset height is set and the pad installation point is marked on the ground rail installation line, and the height difference between each pad installation point and the preset height is measured to determine the thickness value of the leveling pad. By first setting the pad installation point, the setting position of the leveling pad is preliminarily determined, and then the actual deck 12 is measured according to the preset height to obtain the thickness value of the leveling pad required at each pad installation point, and the leveling pad is processed according to the thickness value, thereby ensuring that the setting of the leveling pad can adapt to the surface of the deck 12.
[0067] Among them, the pad installation point needs to be set according to the ground rail installation line and the ground rail installation reference point. The two ground rail installation reference points are the two end point positions of the ground rail installation line. The installation positions of the two stop seats 24 are respectively delineated at the two ground rail installation reference points. The stop seats 24 are used to be set at the ends of the sliding rails to play a limiting role; with the positions of the two stop seats 24 as the starting point and the end point, combined with the ground rail installation line, the pad installation points are delineated at even intervals.
[0068] In this embodiment, a preset pad is placed at the pad installation point, the height difference from the four corners of the preset pad to the preset height is measured, and the processing thickness value of the leveling pad is calculated. The processing thickness value of the leveling pad is obtained by respectively measuring the height difference from the four corners of the preset pad to the preset height, and then calculating the processing thickness value of the leveling pad through a formula, and the leveling pad is processed according to the processing thickness value.
[0069] Optionally, a pad installation line parallel to and spaced from the ground rail installation line is defined at the ground rail installation line, and the side edges of multiple leveling pads are aligned with the pad positioning line. By setting the pad installation line, the pad installation line is used as a reference when installing multiple leveling pads. When the side edges of multiple leveling pads are aligned with the pad positioning line, the setting positions of multiple leveling pads can be on the same straight line. Among them, multiple leveling pads are installed sequentially from the bow to the stern; the distance between the pad installation line and the ground rail installation line is adaptively adjusted according to the size of the actual leveling pad.
[0070] See also Figure 4 In this embodiment, the slide track is first arranged on the leveling pad, and then the rack track 23 is installed based on the first inspection line E'F' and the second inspection line G'H'; during installation, the center line of the slide track should be aligned with the first positioning line EF or the second positioning line GH, and the upper plane of the slide track is positioned with reference to the benchmark; after positioning, the horizontality, straightness, and height are detected. After the detection values meet the installation requirements, the slide track is welded. Symmetrical welding is required during welding, and the benchmark is used for inspection during the welding process to avoid distortion of the track caused by heat. Among them, after each installation of two slide tracks, the width, height, straightness, and parallelism of the two slide tracks need to be checked in time.
[0071] After the rack rail 23 is installed, the rack positioning line is marked on the upper surface of the rack rail 23; the fixed rack 26 is installed in sequence according to the rack positioning line, and the clearance between the two sliding rails (ground rails) is checked and adjusted with the rack 26 as the reference. After the rack 26 is positioned (if the rack 26 needs to be adjusted, it needs to be processed by cold cutting or grinding), the printing hole position is preliminarily determined according to the position of the required rack bolt hole, and the holes are drilled on site according to the printing hole data and the drawings, and the bolts are installed and tightened as required. After the torque is inspected, the loosening mark is made with a paint pen.
[0072] In this embodiment, after installing two sliding rails as the ground rails 22 and installing the rack 26, it is necessary to conduct an accuracy inspection; use an accuracy inspection table to check whether the accuracy of the sliding rails and the rack 26 after installation meets the requirements; then install the stopper 24 and the drag chain 25 for protecting and pulling the cable at both ends of the ground rail 22. In this embodiment, after the ground rail 22 is installed, the ceiling rail 21 is installed; the positioning method of the ceiling rail 21 is the same as the positioning method of the ground rail 22, that is, the positioning of the ceiling rail 21 is achieved by using the ceiling rail installation line drawn on the cabin roof 11, and since there is no need to set a rack rail on the cabin roof 11, there is no need to draw a ceiling rail inspection line.
[0073] After installing the sliding rail as the ground rail 22 at the ground rail installation line, the sliding rail is preliminarily positioned at the ceiling rail installation line, and the prefabricated tooling is used for simulated operation. After the operation, the sliding rail is welded and fixed as the ceiling rail 21. In this embodiment, a top support frame 13 is provided on the top plate 11 of the ship cabin, and a ceiling rail connecting seat is provided on the top support frame 13. The ceiling rail 21 is hoisted under the ceiling rail connecting seat, and after adjusting the ceiling rail 21, bolts are used to fix it to achieve preliminary positioning, and the welding of the ceiling rail 21 is completed after the prefabricated tooling simulates the operation.
[0074] Step S222: installing the racks of the ship rack system with reference to the position reference.
[0075] See also Figures 5 to 7 In this embodiment, the shelf includes a foot 31, a crossbeam 32, a bracket, a column 34, a shelf body and a connector 35. Before installing the shelf, it is necessary to check whether the construction environment in the cabin meets the installation requirements to avoid other factors affecting the operation; measure the elevation, row and column straightness of the relevant parts of the shelf in advance, and compare them with the drawings to ensure that the measured values are consistent with the drawing requirements.
[0076] An installation coordinate system is established based on the installed ceiling rail 21 and floor rail 22, and the installation theoretical line and positioning point are delineated using the relative position detection method; the shelf's feet 31 and columns 34 are installed at the positioning point, and the shelf's crossbeam 32 is installed according to the installation theoretical line.
[0077] First, pre-install the foot 31 according to the positioning point, spot weld the foot 31, and then perform full welding after checking the size and accuracy; install the column 34 and connect the column 34 with the foot 31; after the column 34 and the foot 31 are installed, use manual installation (pulley, hoist, etc.) according to the height and weight of the shelf body, set up the shelf bracket (vertical bracket 331 and horizontal bracket 332) and install a certain number of beams 32 and connectors 35, connect the top hanging point of the shelf to form a stable structure. The shelves are installed row by row, and the orientation and size of each column needs to be checked after installation, and the elevation, vertical and horizontal adjustments need to be made. If there are other accessories, they need to be installed one by one; during the installation process, always ensure that the overall horizontal and vertical adjustments of the shelf are checked until they meet the installation standards.
[0078] It can be understood that the installation of the shelf is based on the installation coordinate system established by the installed ceiling rail 21 and floor rail 22 (i.e. the floor rail installation line, ceiling rail installation line and installation reference point delineated in the ship cabin), and the shelf is positioned using the relative position detection method. As for the specific structure of the shelf and the installation order of the specific parts of the shelf, they can be adaptively adjusted according to actual conditions.
[0079] By presetting the installation space, the installation space occupied by the shelf system can be preliminarily planned in advance according to the ceiling rail 21 and the floor rail 22, which is conducive to checking in advance whether the space in the ship cabin meets the requirements and planning a reasonable installation position; after determining the installation position, the floor rail installation line, the ceiling rail installation line and the installation reference point are delineated in the ship cabin. The installation lines (floor rail installation line and ceiling rail installation line) and the installation reference points can be used as a unified reference position benchmark, and the installation sequence is sorted out (first install the sliding rail, and then install the shelf based on the sliding rail), so as to complete the installation of the sliding rail and the shelf of the ship shelf system, so that the sliding rail and the shelf maintain an accurate spatial relative position relationship, thereby improving the installation accuracy of the shelf system.
[0080] Obviously, the above embodiments of the present invention are merely examples for clearly illustrating the present invention, and are not intended to limit the embodiments of the present invention. For those skilled in the art, various obvious changes, readjustments and substitutions can be made without departing from the protection scope of the present invention. It is not necessary and impossible to list all the embodiments here. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the claims of the present invention.
Claims
1. The installation method of the ship rack system is characterized by: Used to install a ship rack system, the ship rack system installation method includes: Two floor rail installation lines are set, and two ceiling rail installation lines are set based on the floor rail installation lines, and the end points of the floor rail installation lines and the ceiling rail installation lines are determined and set as installation reference points, thereby obtaining a three-dimensional preset installation space; The installation position is determined, the floor rail installation line, the ceiling rail installation line and the installation reference point are marked in the ship cabin as the position reference, and the sliding track and the shelf of the ship shelf system are installed with reference to the position reference.
2. The method for installing a ship rack system according to claim 1, characterized in that: After the ground rail installation line is delineated, a benchmark is erected, and a height reference line is set on the benchmark. The ceiling rail installation line is delineated based on the ground rail installation line and the height reference line.
3. The method for installing a ship rack system according to claim 1, characterized in that: A plurality of leveling pads with different thicknesses are arranged at the ground rail installation line so that the top surfaces of all the leveling pads are at the same preset height for supporting the sliding rail.
4. The method for installing a ship rack system according to claim 3, characterized in that: At the floor rail installation line, a pad positioning line is defined which is parallel to and spaced from the floor rail installation line, and the side edges of the plurality of leveling pads are aligned with the pad positioning line.
5. The method for installing a ship rack system according to claim 3, characterized in that: Before setting the leveling pad, a preset height is set and pad installation points are marked on the ground rail installation line, and the height difference between each pad installation point and the preset height is measured to determine the thickness value of the leveling pad.
6. The method for installing a ship rack system according to claim 5, characterized in that: A preset pad is placed at the pad installation point, and the height difference from the four corners of the preset pad to the preset height is measured to calculate the processing thickness value of the leveling pad.
7. The method for installing a ship rack system according to claim 1, characterized in that: After the floor rail installation line is delineated, a floor rail inspection line parallel to the floor rail installation line is drawn on one side of the floor rail installation line, and a preset interval is maintained between the floor rail installation line and the floor rail inspection line.
8. The method for installing a ship rack system according to claim 1, characterized in that: The slide rail is installed at the floor rail installation line as a floor rail (22), and the slide rail is preliminarily positioned at the ceiling rail installation line, and simulated operation is performed using prefabricated tooling, and after operation, the slide rail is welded and fixed as a ceiling rail (21).
9. The method for installing a ship rack system according to claim 1, characterized in that: Using the installation line or installation reference point of the preset installation space as a reference, a relative position measurement method is used to define the installation theoretical line and positioning point; The feet (31) and the columns (34) of the shelf are installed at the positioning points, and the crossbeams (32) of the shelf are installed according to the installation theoretical line.
10. A ship rack system, installed by the ship rack system installation method according to any one of claims 1 to 9, characterized in that: The ship rack system is arranged between a cabin roof (11) and a deck (12).
