Air pipe explosion-proof device for saturation pressurization cabin

By using explosion-proof components and reinforcement rod design at the connection port of the saturated pressurized chamber, the radial stress is shared and the reinforcement rod status is monitored in real time, the problem of bursting of the connection port of the environmental control machine is solved and the bulkhead pressure bearing capacity is improved and security.

CN118928705AActive Publication Date: 2024-11-12CHINA STATE SHIPBUILDING CORP LTD RESEARCH INSTITUTE 719
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202410976316.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-19
Publication Date
2024-11-12
Estimated Expiration
2044-07-19

AI Technical Summary

Technical Problem

The connection between the air inlet and return air outlet of the existing saturated pressurized chamber ring control machine is prone to burst under high pressure environment, resulting in significant losses.

Method used

Using an explosion-proof assembly including a first mounting member and a second compression ring, the bulkhead at the connection port is secured by inserting the air pipe into the cabin and fitting with the outer peripheral wall of the cabin. Pressure bearing capacity, and real-time monitoring of the reinforcement rod status through infrared receivers and wireless signal devices to promptly relieve pressure and prevent bursting.

Benefits of technology

It effectively improves the pressure bearing capacity of bulkheads at the connection port, prevents bursting, and ensures the safety of the tank through real-time monitoring and pressure relief mechanisms, avoiding potential losses caused by bending of reinforcement rods.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118928705A_ABST
    Figure CN118928705A_ABST
Patent Text Reader

Abstract

The invention relates to an air pipe explosion-proof device for a saturation pressurization cabin, and relates to the field of saturation pressurization cabin safety equipment.The air pipe explosion-proof device comprises a cabin body and an explosion-proof assembly, the cabin body is provided with a connecting port connected with an air pipe, and the explosion-proof assembly comprises a first mounting piece, a second pressing ring and other parts and is used for providing explosion-proof protection at the connecting port; by means of the unique structural design, effective explosion-proof protection on the connecting opening of the pressurization cabin is achieved, and the safety performance of equipment is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of safety equipment for saturated pressurized cabins, and in particular to an air duct explosion-proof device for saturated pressurized cabins. Background Art

[0002] Deep saturation diving refers to long-term diving work in which divers are directly exposed to more than 120 meters underwater. In this operation mode, divers must first stay in a high-pressure chamber for a long time to adapt to the high-pressure environment of deep underwater, and then directly enter and exit the deep underwater to carry out work, which can last up to 1 month. According to diving medicine, the gas in such a high-pressure chamber is generally composed of a mixture of helium, oxygen, a small amount of carbon dioxide, water, and nitrogen. The pressure in the chamber will generally exceed 120 atmospheres (even up to 300-500 meters) as needed. When divers adapt to the high-pressure environment and rest in the high-pressure chamber, they need to take in oxygen and exhale carbon dioxide to maintain their own health needs; the environmental control machine is a device that realizes the functions of temperature control, harmful gas removal, dehumidification, etc. in the high-pressure chamber.

[0003] The air inlet and return air outlet of the existing environmental control machine are connected to the cabin through pipelines. The environmental control machine forces air to be pumped into the cabin, thereby achieving temperature control, harmful gas removal, dehumidification and other functions for the passing gas.

[0004] Since the pressure inside the cabin is relatively high, connecting ports need to be opened at the connection points between the air inlet and outlet ducts of the environmental control machine and the cabin. Therefore, stress is concentrated at the connecting ports, which are prone to bursting under high-pressure conditions, causing significant losses. Summary of the invention

[0005] In order to prevent the explosion at the connecting port of the cabin, the present application provides an explosion-proof device for an air duct of a saturated pressurized cabin, which adopts the following technical solution:

[0006] An air duct explosion-proof device for a saturated pressurized cabin comprises a cabin body, wherein the cabin body is provided with two connection ports for connecting the air duct;

[0007] And an explosion-proof component for explosion-proofing the connection port, the explosion-proof component includes a first mounting member and a second clamping ring, the first mounting member includes an air pipe with one end inserted into the connection port, the air pipe is located in the cabin and has one end fixed with a fitting ring that fits the inner wall of the cabin, and the other end is connected to the air duct; the second clamping ring is sleeved on the air pipe and fits the outer peripheral wall of the cabin, and the second clamping ring is detachably fixed to the air pipe.

[0008] By adopting the above technical solution, personnel push the air pipe out of the cabin from the inside of the cabin to make the fitting ring fit with the inner wall of the cabin, and then install the second clamping ring on the air pipe from the outside of the cabin. After the second clamping ring fits with the outer wall of the cabin, the second clamping ring is fixed to the air pipe, so that the cabin wall near the connection port is clamped between the second clamping ring and the fitting ring, thereby improving the pressure-bearing capacity of the cabin wall at the connection port.

[0009] Optionally, a plurality of reinforcement rods are provided on one side of the second clamping ring close to the outer wall of the cabin, and the plurality of reinforcement rods are circumferentially distributed with the trachea axis as the center line. A plurality of first plug holes are circumferentially opened on the outer peripheral wall of the cabin with the trachea axis as the center line, and the reinforcement rods are plugged into the first plug holes.

[0010] By adopting the above technical solution, when the bulkhead at the connection port is subjected to radial stress with the connection port as the center, the radial stress is shared to the second clamping ring through the reinforcement rod, thereby reducing the pressure on the bulkhead.

[0011] Optionally, the first plug hole penetrates the thickness of the cabin wall, and the fitting ring is provided with a plurality of second plug holes on one side close to the inner wall of the cabin, each of the second plug holes corresponds one-to-one with each of the second plug holes, and the reinforcement rod is inserted into the second plug holes.

[0012] By adopting the above technical solution, the fitting ring and the second compression ring are subjected to force on the bulkhead at the same time.

[0013] Optionally, it further comprises a third mounting ring disposed between the cabin body and the second clamping ring, wherein the third mounting ring is provided with a plurality of third plug holes, and one of the third plug holes is used to connect one of the first plug holes with one of the second plug holes;

[0014] An extrusion cavity is provided inside the third mounting ring, and the extrusion cavity is communicated with the third plug hole. A plurality of first vent holes are provided on the circumference of the trachea, and the extrusion cavity is communicated with the first vent holes. A sliding groove coaxial with the third plug hole is provided on the side of the extrusion cavity close to the cabin body, and a sliding groove is provided at each of the third plug holes. A sliding ring sliding in the sliding groove is sleeved on each of the reinforcement rods, and the peripheral wall of the sliding ring abuts against the peripheral wall of the sliding groove. A side of the sliding ring away from the second clamping ring, the side wall of the sliding groove and the peripheral wall of the reinforcement rod form a sliding cavity. An exhaust channel is provided on the reinforcement rod, and one end of the exhaust channel is communicated with the sliding cavity, and the other end is communicated with the outside.

[0015] A certain tolerance is reserved in the connection mode between the second clamping ring and the trachea so that the second clamping ring can slide on the trachea along the axial direction of the trachea.

[0016] By adopting the above technical solution, when the air pressure in the cabin increases, the air pressure in the extrusion chamber also increases. Since the air pressure in the sliding chamber is connected to the outside, the sliding ring will slide toward the side where the volume of the sliding chamber becomes smaller, thereby driving the second clamping ring to slide toward the side of the cabin, so that the third mounting ring is squeezed against the side wall of the cabin. Therefore, when there is pressure in the cabin, the second clamping ring is always subjected to the extrusion force moving toward the cabin, ensuring that the second clamping ring will not loosen.

[0017] Optionally, a sealing ring is embedded on the circumferential side of the sliding ring.

[0018] By adopting the above technical solution, the pressure reduction in the cabin caused by the gap between the slip ring and the slip groove is prevented.

[0019] Optionally, a second air hole connected to the first air hole is opened on the inner side wall of the extrusion cavity, and a connecting tube is provided at the second air hole. The peripheral wall of the connecting tube abuts against the side wall of the second air hole, and the connecting tube elastically slides in the second air hole along the axial direction of the second air hole. Under normal circumstances, one end of the connecting tube is located in the extrusion cavity, and the other end is located in the first air hole.

[0020] By adopting the above technical solution, when installing the third mounting ring, the personnel press the connecting tube into the third mounting ring, and then put the third mounting ring on the air pipe and slide it toward the cabin body. When the third mounting ring slides to abut against the cabin body, the connecting tube automatically pops out and is inserted into the first vent. The connecting tube seals the gap between the third mounting ring and the air pipe at the first air hole.

[0021] Optionally, an infrared transmitter and an infrared receiver receiving the light source emitted by the infrared transmitter are installed in the exhaust passage, and the infrared receiver sends the received signal to an external controller in real time via a wireless signal transmitter.

[0022] By adopting the above technical solution, when the bulkhead changes and causes the reinforcement rod to bend, the infrared receiver cannot receive the infrared rays emitted by the infrared transmitter, and this information is sent to the controller through the wireless signal device, and the controller sends this signal to outsiders through sound and light.

[0023] Optionally, a pressure relief valve connected to the extrusion chamber is installed on the third mounting ring, and the pressure relief valve is controlled by a controller.

[0024] By adopting the above technical solution, after the infrared receiver transmits the signal to the controller, the controller controls the pressure relief valve to release the pressure in time through judgment to prevent further explosion. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1This is a schematic diagram of the overall structure of an air duct explosion-proof device for a saturated pressurized cabin according to an embodiment of the present application;

[0026] Figure 2 is a cross-sectional view of an air duct explosion-proof device for a saturated pressurized cabin according to an embodiment of the present application;

[0027] Figure 3 yes Figure 2 A magnified schematic diagram of part A.

[0028] Figure numerals: 01, environmental control machine; 02, air duct; 1, cabin; 11, connecting port; 12, first plug hole; 2, explosion-proof component; 21, first mounting piece; 211, air pipe; 2111, first vent hole; 212, fitting ring; 2121, second plug hole; 22, second clamping ring; 221, fixing ring; 222, reinforcement rod; 2221, exhaust channel; 223, sliding ring; 224, sealing ring; 225, sliding cavity; 23, third mounting ring; 231, third plug hole; 232, extrusion cavity; 233, sliding groove; 234, second vent hole; 235, connecting pipe; 24, infrared transmitter; 25, infrared receiver; 26, pressure relief valve. DETAILED DESCRIPTION

[0029] The following is combined with Figure 1-3 This application is described in further detail.

[0030] An embodiment of the present application discloses an air duct explosion-proof device for a saturated pressurized cabin.

[0031] Reference Figure 1 , Figure 2 and Figure 3 A duct explosion-proof device for a saturated pressurized cabin includes a cabin 1 and an explosion-proof assembly 2. The cabin 1 is provided with a connection port 11 connected to the air duct of an environmental control machine. In the present application, the cabin 1 is a cylindrical cabin 1, and the connection port 11 is provided on the peripheral wall;

[0032] The explosion-proof component 2 is installed at the connection port 11 to prevent the connection port 11 from bursting. The explosion-proof component 2 includes a first mounting member 21 and a second clamping ring 22. The first mounting member 21 includes an air pipe 211 with one end inserted into the connection port 11. The air pipe 211 is located in the cabin 1. One end is fixed with a fitting ring 212 that fits the inner wall of the cabin 1, and the other end is connected to the air duct. In this application, a flange connection is adopted; the second clamping ring 22 is sleeved on the air pipe 211 and fits the outer peripheral wall of the cabin 1. The second clamping ring 22 is detachably fixedly connected to the air pipe 211;

[0033] Personnel push the air pipe 211 out of the cabin 1 from the inside of the cabin 1 to make the fitting ring 212 fit with the inner wall of the cabin 1, and then install the second clamping ring 22 on the air pipe 211 from the outside of the cabin 1. After the second clamping ring 22 fits with the outer wall of the cabin 1, the second clamping ring 22 and the air pipe 211 are fixed, so that the cabin 1 wall near the connecting port 11 is clamped between the second clamping ring 22 and the fitting ring 212, thereby improving the pressure-bearing capacity of the cabin 1 wall at the connecting port 11.

[0034] Reference Figure 3 In the present application, a fixing ring 221 is fixed on the second clamping ring 22, and the fixing ring 221 and the air pipe 211 are fixed by bolts.

[0035] Reference Figure 3 In order to improve the radial bearing capacity of the bulkhead at the connection port 11 with the connection port 11 as the center, a plurality of reinforcing rods 222 are provided on the side of the second clamping ring 22 close to the outer wall of the cabin body 1. The plurality of reinforcing rods 222 are circumferentially distributed with the axis of the air pipe 211 as the center line. In the present application, the preferred number of reinforcing rods 222 is six. A plurality of first plug holes 12 are circumferentially opened on the outer peripheral wall of the cabin body 1 with the axis of the air pipe 211 as the center line. The reinforcing rods 222 are plugged into the first plug holes 12.

[0036] In this way, when the bulkhead at the connection port 11 is subjected to radial stress with the connection port 11 as the center, the radial stress is shared by the reinforcing rod 222 to the second clamping ring 22, thereby reducing the pressure on the bulkhead.

[0037] Reference Figure 3 , further improving the radial pressure bearing capacity of the bulkhead at the connection port 11 with the connection port 11 as the center, the first plug hole 12 penetrates the wall thickness of the cabin body 1, and a plurality of second plug holes 2121 are opened on the side of the fitting ring 212 close to the inner wall of the cabin body 1, each second plug hole 2121 corresponds to each second plug hole 2121 one by one, and the reinforcement rod 222 is inserted into the second plug hole 2121;

[0038] The fitting ring 212, the second clamping ring 22 and the bulkhead are stressed at the same time.

[0039] Reference Figure 3 During the use of the cabin body 1, the vibration of the body may cause the connection between the second clamping ring 22 and the cabin body 1 to gradually loosen. In order to prevent this phenomenon from occurring, the explosion-proof device further includes a third mounting ring 23 disposed between the cabin body 1 and the second clamping ring 22. The third mounting ring 23 is provided with a plurality of third plug holes 231. A third plug hole 231 is used to connect a first plug hole 12 with a second plug hole 2121.

[0040] An extrusion cavity 232 is provided inside the third mounting ring 23, and the extrusion cavity 232 is communicated with the third plug hole 231. A plurality of first vent holes 2111 are provided around the air pipe 211, and the extrusion cavity 232 is communicated with the first vent holes 2111. A sliding groove 233 coaxial with the third plug hole 231 is provided on the side of the extrusion cavity 232 close to the cabin body 1, and a sliding groove 233 is provided at each third plug hole 231. A sliding ring 223 sliding in the sliding groove 233 is sleeved on each reinforcement rod 222, and the peripheral wall of the sliding ring 223 abuts against the peripheral wall of the sliding groove 233. A sliding cavity 225 is formed on one side of the sliding ring 223 away from the second clamping ring 22, the side wall of the sliding groove 233 and the peripheral wall of the reinforcement rod 222. An exhaust channel 2221 is provided on the reinforcement rod 222, and one end of the exhaust channel 2221 is communicated with the sliding cavity 225, and the other end is communicated with the outside world.

[0041] A certain tolerance is left in the connection method between the second clamping ring 22 and the trachea 211 so that the second clamping ring 22 can slide on the trachea 211 along the axial direction of the trachea 211. The specific method of the present application is to change the hole shape between the bolt and the fixing ring 221, and change the round hole into a waist-shaped hole;

[0042] In this way, when the air pressure in the cabin body 1 rises, the air pressure in the extrusion chamber 232 rises. Since the air pressure in the sliding chamber 225 is connected to the outside, the sliding ring 223 will slide toward the side where the volume of the sliding chamber 225 becomes smaller, thereby driving the second clamping ring 22 to slide toward the side of the cabin body 1, so that the third mounting ring 23 is squeezed against the side wall of the cabin body 1. Therefore, when there is pressure in the cabin body 1, the second clamping ring 22 is always subjected to the extrusion force moving toward the cabin body 1, ensuring that the second clamping ring 22 will not loosen.

[0043] Reference Figure 3 In order to prevent the cavity pressure between the second plug hole 2121 and the reinforcement rod 222 from increasing, an air hole connected to the exhaust channel 2221 is opened at one end of the reinforcement rod 222 away from the second clamping ring 22.

[0044] Reference Figure 3 In order to prevent the pressure in the cabin 1 from being reduced due to the gap between the sliding ring 223 and the sliding groove 233 , a sealing ring 224 is embedded around the sliding ring 223 .

[0045] Reference Figure 3In order to prevent the pressure in the cabin 1 from being reduced due to the gap between the third mounting ring 23 and the air pipe 211, a second vent hole 234 communicating with the first vent hole 2111 is provided on the inner wall of the extrusion cavity 232, and a connecting pipe 235 is provided at the second vent hole 234. The peripheral wall of the connecting pipe 235 abuts against the side wall of the second vent hole 234, and the connecting pipe 235 elastically slides in the second vent hole 234 along the axial direction of the second vent hole 234. In normal state, one end of the connecting pipe 235 is located in the extrusion cavity 232, and the other end is located in the first vent hole 2111;

[0046] When installing the third mounting ring 23, the personnel presses the connecting tube 235 into the third mounting ring 23, and then puts the third mounting ring 23 on the air pipe 211 and slides it toward the cabin body 1. When the third mounting ring 23 slides to abut against the cabin body 1, the connecting tube 235 automatically pops out and is inserted into the first air hole 2111. The connecting tube 235 blocks the gap between the third mounting ring 23 and the air pipe 211 at the first air hole 2111.

[0047] Reference Figure 3 In order to enable personnel to detect the situation of the bulkhead at the connection port 11 in real time, an infrared transmitter 24 and an infrared receiver 25 receiving the light source emitted by the infrared transmitter 24 are installed in the exhaust passage 2221. The infrared receiver 25 sends the received signal to the external controller in real time through a wireless signal device;

[0048] In this way, when the bulkhead changes and causes the reinforcement rod 222 to bend, and the infrared receiver 25 cannot receive the infrared rays emitted by the infrared transmitter 24, the information is sent to the controller through the wireless signal device, and the controller sends the signal to outsiders through sound and light.

[0049] Reference Figure 3 , to further prevent the bulkhead at the connection port 11 from bursting, a pressure relief valve 26 connected to the extrusion chamber 232 is installed on the third mounting ring 23, and the pressure relief valve 26 is controlled by a controller;

[0050] When the infrared receiver 25 transmits the signal to the controller, the controller controls the pressure relief valve 26 to release the pressure in time through judgment to prevent further explosion.

[0051] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. An explosion-proof device for an air duct in a saturated pressurized cabin, characterized in that: include: A cabin body (1), wherein the cabin body (1) is provided with two connection ports (11) for connecting to air ducts; And an explosion-proof component (2) for explosion-proofing the connection port (11), the explosion-proof component (2) comprising a first mounting member (21) and a second clamping ring (22), the first mounting member (21) comprising an air pipe (211) with one end inserted into the connection port (11), one end of the air pipe (211) located in the cabin (1) is fixed with a fitting ring (212) that fits the inner wall of the cabin (1), and the other end is connected to the air duct; the second clamping ring (22) is sleeved on the air pipe (211) and fits the outer wall of the cabin (1), and the second clamping ring (22) is detachably fixedly connected to the air pipe (211).

2. The air duct explosion-proof device for a saturated pressurized cabin according to claim 1, characterized in that: A plurality of reinforcing rods (222) are provided on one side of the second clamping ring (22) close to the outer wall of the cabin body (1), and the plurality of reinforcing rods (222) are circumferentially distributed with the axis of the air pipe (211) as the center line. A plurality of first plug holes (12) are circumferentially opened on the outer wall of the cabin body (1) with the axis of the air pipe (211) as the center line, and the reinforcing rods (222) are plugged into the first plug holes (12).

3. The explosion-proof device for an air duct used in a saturated pressurized cabin according to claim 2, characterized in that: The first plug-in hole (12) passes through the wall thickness of the cabin body (1), and the fitting ring (212) is provided with a plurality of second plug-in holes (2121) on the side close to the inner wall of the cabin body (1), each of the second plug-in holes (2121) corresponds one-to-one with each of the second plug-in holes (2121), and the reinforcement rod (222) is inserted into the second plug-in hole (2121).

4. The air duct explosion-proof device for a saturated pressurized cabin according to claim 3, characterized in that: It also includes a third mounting ring (23) disposed between the cabin body (1) and the second clamping ring (22), wherein the third mounting ring (23) is provided with a plurality of third plug holes (231), and one of the third plug holes (231) is used to connect one of the first plug holes (12) with one of the second plug holes (2121); An extrusion cavity (232) is provided inside the third mounting ring (23), and the extrusion cavity (232) is communicated with the third plug hole (231). A plurality of first ventilation holes (2111) are provided around the air pipe (211), and the extrusion cavity (232) is communicated with the first ventilation holes (2111). A sliding groove (233) coaxial with the third plug hole (231) is provided on a side of the extrusion cavity (232) close to the cabin body (1), and each of the third plug holes (231) is provided with a sliding groove (233). A sliding ring (223) is sleeved on the reinforcement rod (222) and slides in the sliding groove (233). The peripheral wall of the sliding ring (223) abuts against the peripheral wall of the sliding groove (233). A sliding cavity (225) is formed by a side of the sliding ring (223) away from the second clamping ring (22), the side wall of the sliding groove (233) and the peripheral wall of the reinforcement rod (222). An exhaust channel (2221) is provided on the reinforcement rod (222). One end of the exhaust channel (2221) is connected to the sliding cavity (225), and the other end is connected to the outside. A certain tolerance is reserved in the connection method between the second clamping ring (22) and the air pipe (211) so that the second clamping ring (22) can slide on the air pipe (211) along the axial direction of the air pipe (211).

5. The explosion-proof device for air ducts used in a saturated pressurized cabin according to claim 4, characterized in that: A sealing ring (224) is embedded on the circumference of the sliding ring (223).

6. The explosion-proof device for air ducts used in a saturated pressurized cabin according to claim 4, characterized in that: A second vent hole (234) connected to the first vent hole (2111) is provided on the inner wall of the extrusion cavity (232); a connecting tube (235) is provided at the second vent hole (234); a peripheral wall of the connecting tube (235) abuts against a side wall of the second vent hole (234); and the connecting tube (235) elastically slides in the second vent hole (234) along the axial direction of the second vent hole (234); in a normal state, one end of the connecting tube (235) is located in the extrusion cavity (232), and the other end is located in the first vent hole (2111).

7. The explosion-proof device for air ducts used in a saturated pressurized cabin according to claim 4, characterized in that: An infrared transmitter (24) and an infrared receiver (25) for receiving light emitted by the infrared transmitter (24) are installed in the exhaust passage (2221), and the infrared receiver (25) sends the received signal to an external controller in real time via a wireless signal device.

8. The explosion-proof device for air ducts used in a saturated pressurized cabin according to claim 7, characterized in that: A pressure relief valve (26) connected to the extrusion chamber (232) is mounted on the third mounting ring (23), and the pressure relief valve (26) is controlled by a controller.

Citation Information

Patent Citations

  • Modular pipeline draws a mouthful device

    CN205136910U

  • Lining pipeline and connecting pipe integrated structure

    CN211175842U

  • High-pressure anti-explosion porous pipe fitting

    CN216344587U

  • Explosion-proof three-way assembly suitable for high voltage

    CN218468492U

  • Pipeline anti-explosion pressure release valve

    CN219911882U