Urban road pipe ditch pipeline installation device and method
By designing walking mechanisms and lifting mechanisms in the installation of urban road trench pipelines, the problem of large space occupied by machinery and vehicles is solved, efficient lifting and resettlement of pipelines is achieved, traffic congestion and time waste are reduced, and installation efficiency is improved.
Patent Information
- Application Number
- CN202411315343.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-20
- Publication Date
- 2024-11-12
AI Technical Summary
During urban road construction, the work of mechanical vehicles while installing pipe trenches and pipes leads to a large space occupied by the site, causing traffic congestion and waste of time.
A urban road trench pipeline installation device is designed, including a walking mechanism, a lifting mechanism and a lifting passage. The lifting and placement of the pipeline is realized through the lifting mechanism arranged on the walking mechanism and the inclined support plate perpendicular to the pipe, thereby reducing machinery. Vehicles are working simultaneously. The device includes first, second and third lifting components, respectively for stable pulling, hoisting and placement of the pipe, combining the roller set and the fastening components to ensure stability and accuracy of the work.
It effectively reduces the space occupied by mechanical vehicles, reduces congestion and waste of time caused by frequent vehicle movement, and improves the stability and efficiency of the installation process.
Smart Images

Figure CN118929434A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of engineering construction, and in particular to a device and method for installing a pipe trench pipeline on a town road. Background Art
[0002] The integrated water supply project involves a large number of pipeline types and quantities, and there are many trenches and pipelines on the roads with long pipelines. Municipal urban and rural roads are narrow and have heavy traffic, requiring a larger site for mechanical positioning. However, after the vehicles are positioned, they affect traffic or frequently move vehicles, causing congestion and waste of time. Summary of the invention
[0003] In order to overcome the deficiencies of the prior art, the technical problem to be solved by the present invention is: how to reduce the mechanical standing space of the site.
[0004] The technical solution adopted by the present invention to solve its technical problem is:
[0005] A pipe installation device for a pipe trench in a town road, comprising a traveling mechanism, the traveling mechanism being provided with a hoisting channel corresponding to the pipe trench, a hoisting mechanism being provided at the upper end of the traveling mechanism and supporting plates being provided perpendicularly to both sides of the pipe trench and inclined downward, the hoisting mechanism being used to move the pipe from one side of the supporting plate through the supporting plate and the hoisting channel to the pipe trench;
[0006] The lifting mechanism includes a mounting frame arranged at the upper end of the walking mechanism, the mounting frame is provided with a first lifting assembly, the first lifting assembly is located above the lifting channel, the lifting end of the first lifting assembly is connected to the lifting frame, the lifting frame is provided with a second lifting assembly, the second lifting assembly and the support plate are on the same side of the walking mechanism, a tensioning assembly is provided on the side of the walking mechanism away from the support plate, the driving end of the tensioning assembly is connected to an end of the lifting frame away from the second lifting assembly; a third lifting assembly is provided at the lower end of the lifting frame, and the third lifting assembly is located above the lifting channel.
[0007] Furthermore, a vertical guide frame is provided at the lower end of the lifting frame, the walking mechanism is provided with a vertical guide rail slidably matched with the vertical guide frame, and a fastening component is provided between the vertical guide frame and the vertical guide rail.
[0008] Furthermore, the vertical guide frame is provided with a roller group, and the roller group is in rolling cooperation with the inner wall of the vertical guide rail.
[0009] Furthermore, a stopper assembly detachably connected to the walking mechanism is provided at the bottom of the hoisting channel.
[0010] Furthermore, an adjusting member for adjusting the inclination angle of the baffle is provided between the support plate and the walking mechanism.
[0011] Furthermore, a plurality of conveying rollers are rotatably arranged on the plate surface of the support plate.
[0012] Furthermore, the walking mechanism is symmetrically arranged on both sides of the hoisting channel.
[0013] Furthermore, the first lifting assembly is a winch, and the second lifting assembly, the tensioning assembly and the third lifting assembly are all hand winches.
[0014] The present invention also proposes a method for installing a pipe trench in a town road, comprising the following steps:
[0015] S1: Move the walking mechanism to the designated trench section, move the pipe to be installed to the ground on the side of the support plate away from the moving mechanism, and connect the lifting end of the second lifting assembly to the pipe;
[0016] S2: Start the first lifting assembly and drive the lifting frame to move up and down, and when the lifting frame rises to the point where the extension direction of the lifting end of the second lifting assembly is parallel to the support plate surface, stop the first lifting assembly;
[0017] S3: Start the second lifting assembly to pull the pipe upward along the support plate, and when the support plate is pulled to the upper end of the walking mechanism on the side of the support plate, stop the second lifting assembly;
[0018] S4: loosen the connection between the lifting end of the second lifting assembly and the pipeline, connect the lifting end of the third lifting assembly to the pipeline, start the third lifting assembly to lift the pipeline above the lifting channel, adjust the first lifting assembly to descend until the bottom end contacts the upper end of the walking mechanism and then stop, control the lifting end of the third lifting assembly to carry the pipeline down to the trench;
[0019] S5: Loosen the connection between the pipeline and the third lifting assembly, move the walking mechanism to the next working point, and install the pipeline that has been hoisted in the trench at the same time.
[0020] Furthermore, in step S2 and step S4, the tensioning assembly is adjusted so that the posture of the lifting frame remains horizontal and the third lifting assembly is always aligned with the position of the lifting channel.
[0021] The beneficial effects of the present invention are:
[0022] (1) By setting up a walking mechanism, and the lifting mechanism, support plate and lifting channel arranged on the walking mechanism, it is possible to realize the lifting and placement process of the pipeline by an integrated mechanical structure, thereby avoiding the problem of mechanical vehicles occupying a large space due to mechanical vehicles working at the same time on both sides of the trench in the prior art, and reducing the congestion and time waste caused by frequent vehicle movement.
[0023] (2) During operation, the first lifting assembly lifts the lifting frame to a position that matches the inclination angle of the support plate, ensuring that the second lifting assembly stably pulls the pipeline to move on the support plate. The third lifting assembly can stably move the pipeline to the upper end of the walking mechanism and above the lifting channel, and stably place the pipeline in the trench. The three lifting assemblies of the entire structure cooperate with each other, and the working process has high stability and accuracy, which can effectively improve the efficiency of the entire working process. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 The structure of the present invention is schematically shown Figure 1 ;
[0025] Figure 2 The structure of the present invention is schematically shown Figure 2 ;
[0026] Figure 3 The structure of the present invention is schematically shown Figure 3 ;
[0027] Marked in the figure are, 1-travel mechanism, 2-lifting channel, 3-support plate, 4-mounting frame, 5-first lifting assembly, 6-lifting frame, 7-tensioning assembly, 8-second lifting assembly, 9-third lifting assembly, 10-vertical guide frame, 11-vertical guide rail, 12-roller group, 13-stop assembly, 14-adjusting part, 15-conveyor roller, 100-pipe trench, 200-pipeline. DETAILED DESCRIPTION
[0028] according to Figure 1-Figure 3 As shown, the embodiment of the present application proposes a pipeline installation device for a town road trench, comprising a walking mechanism 1, the walking mechanism 1 is provided with a lifting channel 2 corresponding to the trench 100, a lifting mechanism is provided at the upper end of the walking mechanism 1 and downwardly inclined support plates 3 are provided perpendicular to both sides of the trench 100, and the lifting mechanism is used to move the pipeline 200 from one side of the support plate 3 through the support plate 3 and the lifting channel 2 to the trench 100;
[0029] The lifting mechanism includes a mounting frame 4 arranged at the upper end of the walking mechanism 1, the mounting frame 4 is provided with a first lifting assembly 5, the first lifting assembly 5 is located above the lifting channel 2, the lifting end of the first lifting assembly 5 is connected to a lifting frame 6, the lifting frame 6 is provided with a second lifting assembly 8, the second lifting assembly 8 and the support plate 3 are on the same side of the walking mechanism 1, a tensioning assembly 7 is provided on the side of the walking mechanism 1 away from the support plate 3, the driving end of the tensioning assembly 7 is connected to the end of the lifting frame 6 away from the second lifting assembly 8; a third lifting assembly 9 is provided at the lower end of the lifting frame 6, and the third lifting assembly 9 is located above the lifting channel 2.
[0030] First of all, it should be stated that by setting up the walking mechanism 1, and the lifting mechanism and support plate 3 and the lifting channel 2 set on the walking mechanism 1, it is possible to realize the lifting and placement process of the pipeline 200 by an integrated mechanical structure, avoiding the problem of mechanical vehicles on both sides of the trench 100 working at the same time in the prior art, which causes the mechanical vehicles to occupy a large space, and reducing the congestion and time waste caused by frequent vehicle movement. When working, the first lifting component 5 lifts the lifting frame 6 to adapt to the inclination angle of the support plate 3, ensuring that the second lifting component 8 stably pulls the pipeline 200 to move on the support plate 3, and the third lifting component 9 can stably move to the upper end of the walking mechanism 1 and above the lifting channel 2, and stably place the pipeline 200 in the trench 100. The three lifting components of the entire structure cooperate with each other, and the working process has high stability and accuracy, which can effectively improve the efficiency of the entire working process.
[0031] The above-mentioned walking mechanism 1 is specifically a trolley with a working plane. The working plane of the trolley is provided with a lifting channel 2, which is used to stably and accurately place the pipeline 200 in the trench 100 through the lifting channel 2. One end of the support plate 3 is rotatably connected to one end of the trolley, and the other end is used to abut the ground. The ground on one side of the support plate 3 is used to unload the pipeline 200 in advance, so as to facilitate the installation of the pipeline 200. The above-mentioned walking mechanism 1 is symmetrically arranged on both sides of the above-mentioned lifting channel 2 to ensure the overall force stability.
[0032] During operation, the stretching end of the second lifting component 8 is connected to the pipe 200. At this time, the first stretching component is adjusted so that the lifting frame 6 is at a reasonable height. At this time, the second lifting component 8 and the support plate 3 are in a reasonable relative position. At this time, the second lifting component 8 is started to pull the pipe 200 from the support plate 3 to the upper end of the walking mechanism 1. At this time, the connection between the second lifting component 8 and the pipe 200 is disconnected, so that the lifting end of the third lifting component 9 is connected to the pipe 200, and the third lifting component 9 is started to lift the pipe 200 above the lifting channel 2, and then the first lifting component 5 is adjusted to descend to the bottom and contact the upper end of the walking mechanism 1 and then stop, and the lifting end of the third lifting component 9 is controlled to carry the pipe 200 down to the trench 100 to complete the installation process of the pipe 200.
[0033] In order to further ensure the stability of the lifting frame 6 during the up and down movement process, a vertical guide frame 10 is provided at the lower end of the lifting frame 6, and the walking mechanism 1 is provided with a vertical guide rail 11 slidably matched with the vertical guide frame 10, and a fastening component is provided between the vertical guide frame 10 and the vertical guide rail 11, that is, when the first lifting component 5 applies an upward force to the lifting frame 6, the vertical guide frame 10 slides upward, and when the first lifting component 5 drives the lifting frame 6 to move downward, the vertical guide frame 10 slides down along the vertical guide rail 11, and the entire driving process prevents the lifting frame 6 from shaking.
[0034] The vertical guide frame 10 is provided with a roller group 12, which rolls with the inner wall of the vertical guide rail 11. The roller group 12 prevents the vertical guide rail 11 and the vertical guide frame 10 from getting stuck due to large friction, thereby further improving the stability of the entire lifting process.
[0035] In actual work, the lifting channel 2 is directly connected to the pipe trench 100, which may cause some trolley parts or some tools to fall into the pipe trench 100 easily during some use stages, making them difficult to pick up. In order to avoid this situation, a stopper assembly 13 detachably connected to the above-mentioned walking mechanism 1 is provided at the bottom of the lifting channel 2, which can be specifically a baffle horizontally plugged into the bottom of the walking mechanism 1. When the pipe 200 has been lifted into the lifting channel 2, the baffle is manually pulled out, and then the pipe 200 is lifted into the pipe trench 100.
[0036] In some usage conditions, it is necessary to adjust the angle of the support plate 3 at any time to ensure the best lifting effect. An adjustment member 14 for adjusting the inclination angle of the baffle is provided between the support plate 3 and the walking mechanism 1. The specific adjustment member 14 can be a telescopic column arranged at the lower end of the support plate 3, and the other end of the telescopic column abuts against the ground. The telescopic structure of the telescopic column is a connection structure of a thread and a screw sleeve to ensure stability.
[0037] A plurality of conveying rollers 15 are rotatably arranged on the plate surface of the support plate 3, which can reduce friction, increase lifting efficiency and reduce energy consumption when the pipeline 200 is lifted on the support plate 3.
[0038] In order to further reduce the occupied area of the overall lifting mechanism, the first lifting component 5 is a winch, and the second lifting component 8, the tensioning component 7 and the third lifting component 9 are all hand winches. Through such a configuration, the best space configuration can be achieved, and each working link is convenient to control and operate.
[0039] This embodiment also proposes a method for installing a pipe trench in a town road, comprising the following steps:
[0040] S1: Move the walking mechanism 1 to a designated section of the pipe trench 100, move the pipe 200 to be installed to the ground on a side of the support plate 3 away from the moving mechanism, and connect the lifting end of the second lifting assembly 8 to the pipe 200.
[0041] S2: Start the first lifting component 5 and drive the lifting frame 6 to rise and fall. When the lifting frame 6 rises to the point where the extension direction of the lifting end of the second lifting component 8 is parallel to the surface of the support plate 3, stop the first lifting component 5; adjust the tensioning component 7 to keep the posture of the lifting frame 6 horizontal and keep the third lifting component 9 aligned with the position of the lifting channel 2.
[0042] S3: Start the second lifting assembly 8 to pull the pipe 200 upward along the support plate 3. When the support plate 3 is pulled to the upper end of the walking mechanism 1 on the side of the support plate 3, stop the second lifting assembly 8.
[0043] S4: Loosen the connection between the lifting end of the second lifting component 8 and the pipeline 200, connect the lifting end of the third lifting component 9 to the pipeline 200, start the third lifting component 9 to lift the pipeline 200 above the lifting channel 2, and then adjust the first lifting component 5 to descend to the bottom and contact the upper end of the walking mechanism 1 and then stop, control the lifting end of the third lifting component 9 to carry the pipeline 200 and move down into the trench 100; adjust the tensioning component 7 to keep the posture of the lifting frame 6 horizontal and make the third lifting component 9 always align with the position of the lifting channel 2.
[0044] S5: Loosen the connection between the pipeline 200 and the third lifting assembly 9, move the walking mechanism 1 to the next working point, and install the pipeline 200 that has been hoisted in the trench 100 at the same time.
[0045] In summary, in order to speed up the work efficiency, reduce the impact of the mechanical position, and solve the installation problem of pipeline 200, combined with the actual situation on site, an urban road trench pipeline installation device and method are invented to solve the installation problem of pipeline 200. On the premise of ensuring the construction period, safety and quality, in order to ensure the smooth implementation of the project, a walking, traction and lifting mechanism integrated device is developed. The device can utilize on-site materials, has low cost, is easy to use and can be reused.
Claims
1. A pipe installation device for urban road trenches, characterized in that: It comprises a walking mechanism (1), the upper end of the walking mechanism (1) is provided with a lifting channel (2) corresponding to and communicating with the pipe trench (100), the upper end of the walking mechanism (1) is provided with a lifting mechanism and two sides perpendicular to the pipe trench (100) are provided with downwardly inclined support plates (3), the lifting mechanism is used to move the pipeline (200) from one side of the support plate (3) via the support plate (3) and the lifting channel (2) to the pipe trench (100); The lifting mechanism comprises a mounting frame (4) arranged at the upper end of the walking mechanism (1), the mounting frame (4) being provided with a first lifting assembly (5), the first lifting assembly (5) being located above the lifting channel (2), the lifting end of the first lifting assembly (5) being connected with a lifting frame (6), the lifting frame (6) being provided with a second lifting assembly (8), the second lifting assembly (8) and the support plate (3) being located on the same side of the walking mechanism (1), a tensioning assembly (7) being provided on the side of the walking mechanism (1) away from the support plate (3), the driving end of the tensioning assembly (7) being connected to one end of the lifting frame (6) away from the second lifting assembly (8); a third lifting assembly (9) being provided at the lower end of the lifting frame (6), the third lifting assembly (9) being located above the lifting channel (2).
2. A pipe installation device for urban road trenches according to claim 1, characterized in that: A vertical guide frame (10) is provided at the lower end of the lifting frame (6), the walking mechanism (1) is provided with a vertical guide rail (11) slidably matched with the vertical guide frame (10), and a fastening component is provided between the vertical guide frame (10) and the vertical guide rail (11).
3. A pipe installation device for urban road trenches according to claim 2, characterized in that: The vertical guide frame (10) is provided with a roller group (12), and the roller group (12) is in rolling engagement with the inner wall of the vertical guide rail (11).
4. The urban road trench pipe installation device according to claim 1, characterized in that: A stopper assembly (13) detachably connected to the walking mechanism (1) is provided at the bottom of the hoisting channel (2).
5. The urban road trench pipe installation device according to claim 1, characterized in that: An adjusting member (14) for adjusting the inclination angle of the baffle is provided between the support plate (3) and the walking mechanism (1).
6. The urban road trench pipe installation device according to claim 1, characterized in that: A plurality of conveying rollers (15) are rotatably arranged on the plate surface of the support plate (3).
7. The urban road trench pipe installation device according to claim 1, characterized in that: The walking mechanism (1) is symmetrically arranged on both sides of the hoisting channel (2).
8. The urban road trench pipe installation device according to claim 1, characterized in that: The first lifting component (5) is a winch, and the second lifting component (8), the tensioning component (7) and the third lifting component (9) are all hand winches.
9. A method for installing a pipeline in a town road trench, characterized in that: The following steps are involved: S1: moving the walking mechanism (1) to a designated section of the pipe trench (100), moving the pipe (200) to be installed to the ground on a side of the support plate (3) away from the moving mechanism, and connecting the lifting end of the second lifting assembly (8) to the pipe (200); S2: starting the first lifting assembly (5) and driving the lifting frame (6) to move up and down, and when the lifting frame (6) rises to the point where the extension direction of the lifting end of the second lifting assembly (8) is parallel to the surface of the support plate (3), stopping the first lifting assembly (5); S3: starting the second lifting assembly (8) to pull the pipe (200) upward along the support plate (3), and when the support plate (3) is pulled to the upper end of the walking mechanism (1) on the side close to the support plate (3), stopping the second lifting assembly (8); S4: loosening the connection between the lifting end of the second lifting assembly (8) and the pipeline (200), connecting the lifting end of the third lifting assembly (9) to the pipeline (200), starting the third lifting assembly (9) to lift the pipeline (200) above the lifting channel (2), adjusting the first lifting assembly (5) to descend until the bottom end contacts the upper end of the walking mechanism (1) and then stop, controlling the lifting end of the third lifting assembly (9) to carry the pipeline (200) and move down into the pipeline trench (100); S5: Loosen the connection between the pipeline (200) and the third lifting assembly (9), move the walking mechanism (1) to the next working point, and install the pipeline (200) that has been hoisted in the trench (100).
10. The urban road trench pipe installation device according to claim 9, characterized in that: In step S2 and step S4, the tensioning assembly (7) is adjusted so that the posture of the lifting frame (6) remains horizontal and the third lifting assembly (9) is always aligned with the position of the lifting channel (2).