Lifting device for engineering construction and using method thereof
By using multi-stage telescopic rods and rotational adjustment components in the tower crane, the safety hazards caused by the swing of building materials during the tower crane lifting and the problem of excessive load of steel cables is solved, and the stable installation of building materials and the long life of steel cables are achieved. .
Patent Information
- Application Number
- CN202411427768.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-14
- Publication Date
- 2024-11-12
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
During the lifting process of existing tower cranes, the swing of building materials may cause safety hazards for personnel, and excessive load of steel cables may lead to fracture, which cannot effectively prevent the building materials from being controlled and rotated uncontrollably.
A lifting device for engineering construction was designed, using multi-stage telescopic rods to fix the sliding base and the hoisting base. By rotating the adjustment component and the load sharing component, it ensures that the building materials do not have uncontrolled rotation when adjusting the installation angle, and Disperse the tension of the steel cable and extend the service life of the steel cable.
It effectively prevents the damage to personnel caused by swinging of building materials during installation, and improves the service life of steel cables by sharing components, ensuring the stability of building materials and the accuracy of installation.
Smart Images

Figure CN118929443A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of cranes, and in particular to a lifting device for engineering construction and a method of using the same. Background Art
[0002] Prefabricated buildings are a new type of construction method. By transferring a large number of on-site operations in traditional construction methods to factories, it achieves high efficiency, environmental protection and sustainable development of buildings. Specifically, prefabricated buildings process and manufacture building components and accessories (such as floor slabs, wall panels, stairs, balconies, etc.) in factories, and then transport these components and accessories to the construction site for assembly and installation through reliable connection methods, ultimately forming a complete building.
[0003] Tower crane, also known as tower crane, is the most commonly used lifting equipment on construction sites. It is constructed by extending the length (height) of each section (referred to as "standard section") to build the fuselage, and is mainly used to lift the steel bars, wooden slats, concrete, steel pipes and other raw materials required for construction. Tower cranes originated in Western Europe and are the product of France and Germany. With the development of technology, they have now become an indispensable lifting equipment in modern construction. Tower cranes have strong carrying capacity and high work efficiency, and can quickly and accurately complete the lifting and transportation tasks of components. In prefabricated buildings, a large number of prefabricated components need to be accurately installed in designated locations. The high efficiency of tower cranes can significantly speed up the construction progress.
[0004] The installation of prefabricated buildings usually involves using a tower crane to lift precast concrete building materials, and then manually adjusting the position of the building materials to ensure that the building materials can be placed in a fixed position. However, during the lifting and moving process of the existing tower crane, the building materials may swing during the movement due to the weight of the building materials themselves and external factors. When the position of the beam is manually adjusted, it is very likely that the building materials will hit people due to the swinging of the building materials, posing a great safety hazard. Therefore, it does not meet the existing needs, and we have proposed a lifting device for engineering construction and a method for using the same. Summary of the invention
[0005] The present invention provides a lifting device for engineering construction and a method for using the same, which has the beneficial effect of fixing a sliding base and a lifting base through a multi-stage telescopic rod to ensure that an object lifted by the lifting base will not rotate uncontrollably, causing harm to personnel, and solves the problem mentioned in the above background technology that when steel cables are used to lift building materials, they may swing, causing casualties to personnel.
[0006] The present invention provides the following technical solution: a lifting device for engineering construction, including a lifting assembly, the lifting assembly including a sliding base, the bottom of the sliding base is fixedly connected to a connecting column, the other end of the connecting column is fixedly connected to a relay plate, a rigid component is installed at the bottom of the relay plate, and the sliding base and the relay plate are hollow in between.
[0007] The rigid component comprises a multi-stage telescopic rod, the upper end of which is mounted on the bottom of the relay plate, the other end of which is fixedly connected to a hanging base, and the multi-stage telescopic rod is made of high-strength materials such as aluminum alloy.
[0008] As an optional scheme for a lifting device for engineering construction described in the present invention, wherein: an upper steel cable pulley is installed in the sliding base, the upper steel cable pulley is connected to a lifting pulley through a steel cable, the lifting pulley is installed in the lifting base, a threaded groove is opened at the bottom of the lifting base, a threaded rod is installed in the threaded groove, the bottom of the threaded rod is fixedly connected to a floor lifting bottom shell, and a hook is installed in the floor lifting bottom shell.
[0009] As an optional solution for a lifting device for engineering construction described in the present invention, the multi-stage telescopic rod includes an inner tube arranged at the bottom of the relay plate, the inner tube is slidably connected in the middle tube, the middle tube is slidably connected in the outer tube, and one end of the outer tube is fixedly connected to the side wall of the lifting base.
[0010] As an optional scheme for a lifting device for engineering construction described in the present invention, wherein: a rotating ring groove is opened in the relay plate, a rotating ring is rotatably connected in the rotating ring groove, a lifting groove is opened in the rotating ring, a lifting plate is slidably connected in the lifting groove, a lifting high-strength spring is installed at the bottom of the upper end of the lifting plate, the other end of the lifting high-strength spring is fixedly connected in the lifting groove, an extrusion ring is installed in the rotating ring groove, a connecting folding rod is fixedly connected to the side wall of the extrusion ring, the connecting folding rod is slidably connected in the connecting slide groove, the connecting slide groove is opened in the relay plate, the other end of the connecting folding rod is installed on the side wall of the inner cylinder, the rotating ring and the lifting plate are T-shaped in cross-section, the high-strength spring has a strength that can support all components fixedly connected to it, and the connecting folding rod is C-shaped.
[0011] As an optional solution for a lifting device for engineering construction described in the present invention, a rotation adjustment component is provided at the bottom of the relay plate, and the rotation adjustment component includes a mounting plate fixedly connected to the bottom of the relay plate, an angle adjustment motor is installed in the mounting plate, a worm is fixedly connected to the output end of the angle adjustment motor, a worm wheel is provided on the side wall of the worm wheel, and the worm wheel is fixedly connected to the outside of the inner cylinder.
[0012] As an optional solution for a lifting device for engineering construction described in the present invention, a load sharing component is arranged in the relay plate, and the load sharing component includes a slide groove opened in the relay plate, a slider is slidably connected in the slide groove, a sliding spring is fixedly connected to one side of the slider, and the other end of the sliding spring is fixedly connected to the slide groove, a lead tube is fixedly connected to the side wall of the slider, and both ends of the lead tube are designed with rounded corners.
[0013] As an optional scheme of a lifting device for engineering construction described in the present invention, wherein: a pressurizing component is arranged in the relay plate, and the pressurizing component includes a pressurizing slide groove opened in the relay plate, a pressurizing drive rod is slidably connected in the pressurizing slide groove, the other end of the pressurizing drive rod is fixedly connected to the side wall of the lead tube, a No. 1 wedge groove is opened on the side wall of the pressurizing drive rod, a pressurizing block is arranged in the No. 1 wedge groove, the pressurizing block is used to apply pressure to the extrusion ring, a No. 1 reset plate is fixedly connected to the side wall of the pressurizing block, the No. 1 reset plate is slidably connected in the No. 1 reset groove, the No. 1 reset groove is opened in the relay plate, a No. 1 reset spring is fixedly connected to the lower surface of the No. 1 reset plate, and the other end of the No. 1 reset spring is fixedly connected in the No. 1 reset groove.
[0014] As an optional scheme for a lifting device for engineering construction described in the present invention, wherein: an extrusion fixing component is arranged in the floor slab lifting bottom shell, and the extrusion fixing component includes a placement groove, a sliding groove, a No. 1 driving groove and a No. 2 reset groove which are opened in the floor slab lifting bottom shell, an extrusion plate is arranged in the placement groove, a driving wedge block is arranged in the sliding groove, a driving rod is slidably connected in the No. 1 driving groove, the extrusion plate is fixedly connected to the driving wedge block, the bottom of the driving rod abuts against the driving wedge block, a No. 2 reset spring is fixedly connected to one side of the extrusion plate, the other end of the No. 2 reset spring is installed in the No. 2 reset groove, and the driving rod is C-shaped.
[0015] As an optional solution for a lifting device for engineering construction described in the present invention, a driving slide rod is fixedly connected to the top of the driving rod, the other end of the driving slide rod is fixedly connected to the bottom of the intermediate tube, the driving slide rod is slidably connected in a No. 2 driving groove, and the No. 2 driving groove is opened in the outer shell tube.
[0016] The present invention also discloses a method for using a lifting device for engineering construction, which further comprises the following steps, wherein: S1. Ensure that the tower crane is firmly installed and all parts are in good condition. Check and prepare the lifting rigging, hooks, etc. to ensure that they meet safety standards and are in good condition. S2. Develop a detailed lifting plan based on the weight, size and lifting position of the object to be lifted, determine the lifting route, lifting point and safety measures, and ensure that there are no people or obstacles around; S3. Use appropriate lifting rigging to tie objects, ensure that the tying is firm and stable, and pay attention to protecting the surface of the object to avoid scratches or damage; S4. Operate the lifting device to lift the object steadily. During transportation, pay attention to controlling the speed and stability to avoid shaking or collision. Ensure that the operator and the commander have smooth communication and operate according to the instructions; S5. After arriving at the designated location, unload the object smoothly. Check whether the object is intact, remove the binding, clean up the site, organize the lifting tools, ensure that the lifting device is in a safe state, and prepare for the next use.
[0017] The present invention has the following beneficial effects: 1. The lifting device for engineering construction and the method of using the same, the opening of the rotating ring groove allows the multi-stage telescopic rod and the lifting base and floor lifting bottom shell fixedly connected thereto to rotate under the drive of the rotating adjustment component, and the angle adjustment motor is driven by the angle adjustment motor to rotate, which can further drive the worm to drive the multi-stage telescopic rod to rotate, and the self-locking characteristics of the worm gear and worm gear make the worm gear not rotate due to external factors, thereby ensuring that the multi-stage telescopic rod will not rotate due to external factors, ensuring the stability of the rigid connection between the relay plate and the lifting base, and the design of rigidly connecting the relay plate and the lifting base through the multi-stage telescopic rod makes the rotation of the lifting base always under the stable control of the angle adjustment motor, thereby ensuring that when adjusting the installation angle of the building materials, there will be no uncontrolled rotation resulting in casualties.
[0018] 2. The lifting device for construction and the method of using the same can transfer the load on the steel cable to the relay plate through the design of the load sharing component, and the relay plate is connected to the sliding base and the tower crane through the connecting column. Through this design, the tension on the steel cable can be further dispersed to ensure the service life of the steel cable. Since the steel cable passes through the lead tube, when the steel cable is tightened, the lead tube will drive the slider to slide inward. When the slider slides to the other end of the slide groove, it will no longer slide. At this time, the tension on the steel cable will be transmitted to the middle through the lead tube and the slider. The vertical tension on the steel cable is dispersed to the relay plate laterally, thereby increasing the service life of the steel cable. When the lead tube slides inward, the pressure driving rod fixedly connected to the lead tube slides inward synchronously. At this time, the No. 1 wedge groove on one side of the pressure driving rod drives the pressure block to slide downward, thereby driving the pressure block to apply pressure to the extrusion ring at its bottom. Through this design, the fixing effect of the rotating ring can be further improved, thereby ensuring that uncontrolled rotation will not occur when adjusting the installation angle of the building materials, resulting in casualties.
[0019] 3. The lifting device for engineering construction and its use method are as follows: when the building materials are lifted upward, the outer shell cylinder slides upward first, and at this time the driving slide bar slides downward relative to the floor hoisting bottom shell, thereby driving the driving rod fixedly connected thereto to slide downward, thereby driving the driving rod to squeeze the driving wedge, thereby driving the extrusion plate to slide outward; after the extrusion plate completely clamps the building materials, the driving rod will be stuck and will no longer slide downward; at this time the outer shell cylinder remains stationary relative to the middle cylinder; when the building materials are lowered downward, the outer shell cylinder slides downward first, and at this time the driving slide bar slides upward relative to the floor hoisting bottom shell, at this time the bottom of the driving rod no longer squeezes the driving wedge, and at this time the extrusion plate is reset under the action of the No. 2 reset spring; through this design, the stability of the building materials during the movement can be guaranteed, while at the same time ensuring that when the building materials are installed and aligned, it does not affect the staff's ability to fine-tune the building materials, thereby ensuring the accuracy of the installation. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 The overall structure of the present invention is shown in FIG. Figure 1 .
[0021] Figure 2 It is a bottom view structural schematic diagram of the present invention.
[0022] Figure 3 It is a schematic diagram of the structure of the present invention viewed from above.
[0023] Figure 4 For the present invention Figure 3 Schematic diagram of the cross-section structure of section 1-1.
[0024] Figure 5 For the present invention Figure 3 Schematic diagram of the cross-section structure of section 2-2.
[0025] Figure 6 For the present invention Figure 2 Enlarged structural diagram at A in the middle.
[0026] Figure 7 For the present invention Figure 4 Enlarged structural diagram at B in the middle.
[0027] Figure 8 For the present invention Figure 7 Enlarged structural diagram at point C in the middle.
[0028] Fig. 9 For the present invention Figure 5 Schematic diagram of the local structure.
[0029] Fig.10 For the present invention Figure 5 Enlarged structural diagram at D in the middle.
[0030] In the figure: 1. Lifting assembly; 11. Sliding base; 12. Upper cable pulley; 13. Connecting column; 14. Relay plate; 15. Lifting base; 16. Lifting pulley; 17. Floor lifting bottom shell; 18. Threaded groove; 19. Threaded rod; 110. Hook; 2. Rigid assembly; 21. Multi-stage telescopic rod; 211. Inner cylinder; 212. Intermediate cylinder; 213. Outer cylinder; 22. Rotating ring; 23. Rotating ring groove; 24. Lifting groove; 25. Lifting plate; 26. Lifting high-strength spring; 27. Extrusion ring; 28. Connecting folding rod; 29. Connecting slide; 3. Rotating adjustment assembly; 31. Mounting plate; 32. Angle Degree adjustment motor; 33, worm; 34, worm wheel; 4, load sharing assembly; 41, slide; 42, slider; 43, sliding spring; 44, lead tube; 5, pressurizing assembly; 51, pressurizing slide; 52, pressurizing drive rod; 53, No. 1 wedge groove; 54, pressurizing block; 55, No. 1 reset groove; 56, No. 1 reset plate; 57, No. 1 reset spring; 6, extrusion fixing assembly; 61, extrusion plate; 62, placement groove; 63, sliding groove; 64, driving wedge block; 65, No. 1 driving groove; 66, driving rod; 67, No. 2 reset groove; 68, No. 2 reset spring; 69, No. 2 driving groove; 610, driving slide rod. DETAILED DESCRIPTION
[0031] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0032] Example 1: This example is intended to help solve the problem of swinging when lifting building materials with steel cables, which may cause casualties. Please refer to Figures 1 to 10 A lifting device for engineering construction includes a lifting component 1, which includes a sliding base 11. The bottom of the sliding base 11 is fixedly connected to a connecting column 13, the other end of the connecting column 13 is fixedly connected to a relay plate 14, and a rigid component 2 is installed at the bottom of the relay plate 14.
[0033] The rigid component 2 includes a multi-stage telescopic rod 21 . The upper end of the multi-stage telescopic rod 21 is mounted on the bottom of the relay plate 14 , and the other end of the multi-stage telescopic rod 21 is fixedly connected to the hanging base 15 .
[0034] The lifting component 1 provides power support for the lifting process. The lifting and lowering of the bottom lifting base 15 can be controlled by the sliding of the steel cable (unmarked). The lifting of building materials can be achieved through this control. The rigid component 2 is designed with a multi-stage telescopic rod 21, so that the angle of the lifting base 15 is always consistent with the sliding base 11. This design can effectively ensure that the angle of the building materials hoisted by the lifting base 15 is always consistent with the sliding base 11. However, the angle at which the building materials need to be installed is not necessarily consistent with the angle of the sliding base 11, and the sliding base 11 is installed on the tower crane, and its angle is not changeable, which leads to an incorrect installation angle of the building materials. Therefore, it is necessary to change the angle of the building materials through the design of the rigid component 2 and the rotation adjustment component 3 to ensure that the building materials can be installed at the correct angle.
[0035] The multi-stage telescopic rod 21 includes an inner tube 211 arranged at the bottom of the relay plate 14, the inner tube 211 is slidably connected in the middle tube 212, the middle tube 212 is slidably connected in the outer tube 213, and one end of the outer tube 213 is fixedly connected to the side wall of the lifting base 15.
[0036] An upper steel cable pulley 12 is installed in the sliding base 11, and the upper steel cable pulley 12 is connected to a lifting pulley 16 through a steel cable. The lifting pulley 16 is installed in a lifting base 15. A threaded groove 18 is provided at the bottom of the lifting base 15, and a threaded rod 19 is installed in the threaded groove 18. The bottom of the threaded rod 19 is fixedly connected to a floor lifting bottom shell 17, and a hook 110 is installed in the floor lifting bottom shell 17.
[0037] The telescopic design of the multi-stage telescopic rod 21 ensures that the connection between the relay plate 14 and the lifting base 15 can still be guaranteed to be consistent when the lifting base 15 is lifted or lowered. The design of the upper end steel cable pulley 12 and the lifting pulley 16 ensures the normal lifting and lowering of the lifting base 15. The design of the threaded groove 18 and the threaded rod 19 ensures the stability of the installation between the floor lifting bottom shell 17 and the lifting base 15. The hook 110 arranged in the floor lifting bottom shell 17 is used to lift building materials. However, the connection between the hook 110 and the building materials is usually connected by rope. This connection method still causes a certain amount of sliding of the building materials. The inverted U design of the floor lifting bottom shell 17 can reduce the shaking of the building to a certain extent. However, in order to adapt to the sizes of various building materials, the opening at the bottom of the floor lifting bottom shell 17 is usually very large. Therefore, the design of the extrusion fixing component 6 is used to solve this problem.
[0038] A rotating ring groove 23 is provided in the relay plate 14, and a rotating ring 22 is rotatably connected in the rotating ring groove 23. A lifting groove 24 is provided in the rotating ring 22, and a lifting plate 25 is slidably connected in the lifting groove 24. A lifting high-strength spring 26 is installed at the upper bottom of the lifting plate 25, and the other end of the lifting high-strength spring 26 is fixedly connected in the lifting groove 24. An extrusion ring 27 is installed in the rotating ring groove 23, and a connecting folding rod 28 is fixedly connected to the side wall of the extrusion ring 27. The connecting folding rod 28 is slidably connected in the connecting slide groove 29. The connecting slide groove 29 is provided in the relay plate 14, and the other end of the connecting folding rod 28 is installed on the side wall of the inner cylinder 211.
[0039] A rotation adjustment component 3 is provided at the bottom of the relay plate 14, and the rotation adjustment component 3 includes a mounting plate 31 fixedly connected to the bottom of the relay plate 14, an angle adjustment motor 32 is installed in the mounting plate 31, a worm 33 is fixedly connected to the output end of the angle adjustment motor 32, a worm wheel 34 is provided on the side wall of the worm wheel 33, and the worm wheel 34 is fixedly connected to the outer side of the inner cylinder 211.
[0040] The opening of the rotating ring groove 23 allows the multi-stage telescopic rod 21 and the lifting base 15 and the floor lifting bottom shell 17 fixedly connected thereto to rotate under the drive of the rotating adjustment component 3. By driving the angle adjustment motor 32 to rotate, the worm 33 can be further driven to drive the multi-stage telescopic rod 21 to rotate. Through its self-locking characteristics, the worm wheel 34 will not rotate due to external factors, thereby ensuring that the multi-stage telescopic rod 21 will not rotate due to external factors, and ensuring the stability of the rigid connection between the relay plate 14 and the lifting base 15. Through this design, the rotation of the lifting base 15 is always stably controlled by the angle adjustment motor 32, thereby ensuring that when adjusting the installation angle of the building materials, there will be no uncontrolled rotation resulting in casualties.
[0041] After the building materials to be hoisted are installed at the bottom of the floor hoisting bottom shell 17, the crane controls the floor hoisting bottom shell 17 to slide upward. At the moment when the building materials are suspended in the air, the lifting high-strength spring 26 used to support the floor hoisting bottom shell 17, the hoisting base 15 and the multi-stage telescopic rod 21 begins to be compressed. At this time, as the upper end steel cable pulley 12 is driven upward, the lifting plate 25 at the top of the multi-stage telescopic rod 21 slides downward relative to the lifting groove 24. In this process, the connecting folding rod 28 located on the side wall of the inner tube 211 drives the extrusion ring 27 slides downward in the rotating ring groove 23, and then begins to squeeze the top of the rotating ring 22. At this time, the weight of the building material is transmitted to the rotating ring 22 by the squeezing ring 27 through the multi-stage telescopic rod 21 and the connecting folding rod 28. At this time, the squeezing of the squeezing ring 27 makes it impossible for the rotating ring 22 to slide in the rotating ring groove 23. Through this design, the stability of the multi-stage telescopic rod 21 can be further guaranteed, and it can be further guaranteed that when the installation angle of the building material is adjusted, there will be no uncontrolled rotation resulting in casualties.
[0042] Embodiment 2: This embodiment is intended to promote the solution of the problem that the steel cable used to drive the lifting base 15 to rise and fall may break due to excessive load. This embodiment is an explanation based on Embodiment 1. For details, please refer to Figures 1 to 10 A load sharing component 4 is provided in the relay plate 14, and the load sharing component 4 includes a slide groove 41 opened in the relay plate 14, a slider 42 is slidably connected in the slide groove 41, a sliding spring 43 is fixedly connected to one side of the slider 42, and the other end of the sliding spring 43 is fixedly connected in the slide groove 41, and a lead tube 44 is fixedly connected to the side wall of the slider 42.
[0043] A pressurizing assembly 5 is provided in the relay plate 14, and the pressurizing assembly 5 includes a pressurizing slide groove 51 opened in the relay plate 14, a pressurizing driving rod 52 is slidably connected in the pressurizing slide groove 51, the other end of the pressurizing driving rod 52 is fixedly connected to the side wall of the lead tube 44, a No. 1 wedge groove 53 is opened on the side wall of the pressurizing driving rod 52, a pressurizing block 54 is provided in the No. 1 wedge groove 53, the pressurizing block 54 is used to apply pressure to the extrusion ring 27, a No. 1 reset plate 56 is fixedly connected to the side wall of the pressurizing block 54, the No. 1 reset plate 56 is slidably connected in the No. 1 reset groove 55, the No. 1 reset groove 55 is opened in the relay plate 14, a No. 1 reset spring 57 is fixedly connected to the lower surface of the No. 1 reset plate 56, and the other end of the No. 1 reset spring 57 is fixedly connected in the No. 1 reset groove 55.
[0044] When hoisting building materials, the steel cable is pulled, and the relaxed steel cable will begin to tighten, and then move to the middle to ensure the connection. Through the design of the load sharing component 4, the load on the steel cable can be transferred to the relay plate 14, and the relay plate 14 is connected to the sliding base 11 and the tower crane through the connecting column 13. Through this design, the tension on the steel cable can be further dispersed to ensure the service life of the steel cable. Since the steel cable passes through the lead tube 44, when the steel cable is tightened, the lead tube 44 will drive the slider 42 to slide inward. When the slider 42 slides to the other end of the slide groove 41, it will no longer slide. At this time, the tension on the steel cable will be transmitted through the lead tube 44 and the slider 42 are transmitted to the relay plate 14, thereby dispersing the vertical tension exerted on the steel cable horizontally to the relay plate 14, thereby increasing the service life of the steel cable. While the lead tube 44 slides inwardly, the pressure driving rod 52 fixedly connected to the lead tube 44 slides inwardly synchronously. At this time, the No. 1 wedge groove 53 opened on one side of the pressure driving rod 52 drives the pressure block 54 to slide downward, thereby driving the pressure block 54 to apply pressure to the extrusion ring 27 at its bottom. Through this design, the fixing effect of the rotating ring 22 can be further improved, thereby ensuring that uncontrolled rotation will not occur when adjusting the installation angle of the building materials, resulting in casualties.
[0045] Embodiment 3, this embodiment is intended to promote the solution of the problem that the bottom opening of the floor hoisting bottom shell 17 is usually very large in order to adapt to the sizes of various building materials, resulting in a small sliding of the building materials hoisted in the floor hoisting bottom shell 17. This embodiment is an explanation based on the second embodiment. For details, please refer to Figures 1 to 10 An extrusion fixing assembly 6 is provided in the floor slab hoisting bottom shell 17, and the extrusion fixing assembly 6 includes a placement groove 62, a sliding groove 63, a No. 1 driving groove 65 and a No. 2 reset groove 67 which are opened in the floor slab hoisting bottom shell 17. An extrusion plate 61 is provided in the placement groove 62, a driving wedge 64 is provided in the sliding groove 63, a driving rod 66 is slidably connected in the No. 1 driving groove 65, the extrusion plate 61 is fixedly connected to the driving wedge 64, the bottom of the driving rod 66 abuts against the driving wedge 64, a No. 2 reset spring 68 is fixedly connected to one side of the extrusion plate 61, and the other end of the No. 2 reset spring 68 is installed in the No. 2 reset groove 67.
[0046] The top of the driving rod 66 is fixedly connected to a driving slide rod 610 , and the other end of the driving slide rod 610 is fixedly connected to the bottom of the intermediate tube 212 . The driving slide rod 610 is slidably connected in the No. 2 driving groove 69 , and the No. 2 driving groove 69 is opened in the outer shell tube 213 .
[0047] By adjusting the strength of the spring inside the multi-stage telescopic rod 21, the outer shell 213 moves first when the multi-stage telescopic rod 21 is extended and retracted. When the building material is lifted upward, the outer shell 213 slides upward first, and the driving slide rod 610 slides downward relative to the floor hoisting bottom shell 17, thereby driving the driving rod 66 fixedly connected thereto to slide downward, thereby driving the driving rod 66 to squeeze the driving wedge 64, thereby driving the squeezing plate 61 to slide outward. After the squeezing plate 61 completely clamps the building material, the driving rod 66 will be stuck and will no longer slide downward. The outer shell tube 213 remains stationary relative to the middle tube 212. When the building materials are lowered, the outer shell tube 213 slides downward first. At this time, the driving slide rod 610 slides upward relative to the floor hoisting bottom shell 17. At this time, the bottom of the driving rod 66 no longer squeezes the driving wedge block 64. At this time, the squeezing plate 61 is reset under the action of the No. 2 reset spring 68. Through this design, the stability of the building materials during the movement can be guaranteed. At the same time, it is ensured that when the building materials are installed and aligned, it will not affect the staff's ability to fine-tune the building materials, thereby ensuring the accuracy of the installation.
[0048] This embodiment also discloses a method for using a lifting device for engineering construction, comprising the following steps: Ensure that the tower crane is firmly installed and all parts are in good condition. Check and prepare the lifting rigging, hooks, etc. to ensure that they meet safety standards and are in good condition. According to the weight, size and lifting position of the object to be lifted, formulate a detailed lifting plan, determine the lifting route, lifting point and safety measures, and ensure that there are no people or obstacles around; Use appropriate lifting rigging to tie objects, ensure that the tying is firm and stable, and pay attention to protecting the surface of the object to avoid scratches or damage; Operate the lifting device to lift objects steadily. During transportation, pay attention to controlling the speed and stability to avoid shaking or collision. Ensure smooth communication between the operator and the commander, and operate according to instructions; After arriving at the designated location, unload the object smoothly, check whether the object is intact, remove the binding, clean up the site, organize the lifting tools, and ensure that the lifting device is in a safe state and ready for the next use.
[0049] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0050] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.
Claims
1. A lifting device for construction engineering, comprising a lifting assembly (1), characterized in that: The lifting assembly (1) comprises a sliding base (11), the bottom of the sliding base (11) is fixedly connected to a connecting column (13), the other end of the connecting column (13) is fixedly connected to a relay plate (14), and the bottom of the relay plate (14) is installed with a rigid assembly (2); The rigid component (2) comprises a multi-stage telescopic rod (21), the upper end of the multi-stage telescopic rod (21) is mounted on the bottom of the relay plate (14), and the other end of the multi-stage telescopic rod (21) is fixedly connected to a hanging base (15).
2. A lifting device for engineering construction according to claim 1, characterized in that: An upper steel cable pulley (12) is installed in the sliding base (11), and the upper steel cable pulley (12) is connected to a lifting pulley (16) via a steel cable. The lifting pulley (16) is installed in the lifting base (15). A threaded groove (18) is provided at the bottom of the lifting base (15), and a threaded rod (19) is installed in the threaded groove (18). The bottom of the threaded rod (19) is fixedly connected to a floor lifting bottom shell (17), and a lifting hook (110) is installed in the floor lifting bottom shell (17).
3. A lifting device for engineering construction according to claim 2, characterized in that: The multi-stage telescopic rod (21) comprises an inner tube (211) arranged at the bottom of the relay plate (14); the inner tube (211) is slidably connected inside an intermediate tube (212); the intermediate tube (212) is slidably connected inside an outer tube (213); and one end of the outer tube (213) is fixedly connected to the side wall of the hanging base (15).
4. A lifting device for engineering construction according to claim 3, characterized in that: The relay plate (14) is provided with a rotating ring groove (23), a rotating ring (22) is rotatably connected in the rotating ring groove (23), a lifting groove (24) is provided in the rotating ring (22), a lifting plate (25) is slidably connected in the lifting groove (24), a lifting high-strength spring (26) is installed at the bottom of the upper end of the lifting plate (25), the other end of the lifting high-strength spring (26) is fixedly connected in the lifting groove (24), an extrusion ring (27) is installed in the rotating ring groove (23), a connecting folding rod (28) is fixedly connected to the side wall of the extrusion ring (27), the connecting folding rod (28) is slidably connected in a connecting slide groove (29), the connecting slide groove (29) is provided in the relay plate (14), and the other end of the connecting folding rod (28) is installed on the side wall of the inner cylinder (211).
5. A lifting device for engineering construction according to claim 4, characterized in that: A rotation adjustment component (3) is provided at the bottom of the relay plate (14), the rotation adjustment component (3) comprising a mounting plate (31) fixedly connected to the bottom of the relay plate (14), an angle adjustment motor (32) being installed in the mounting plate (31), a worm (33) being fixedly connected to the output end of the angle adjustment motor (32), a worm wheel (34) being provided on the side wall of the worm wheel (33), and the worm wheel (34) being fixedly connected to the outside of the inner cylinder (211).
6. A lifting device for engineering construction according to claim 4, characterized in that: A load sharing component (4) is arranged in the relay plate (14), and the load sharing component (4) comprises a slide groove (41) provided in the relay plate (14), a slider (42) is slidably connected in the slide groove (41), a sliding spring (43) is fixedly connected to one side of the slider (42), the other end of the sliding spring (43) is fixedly connected in the slide groove (41), and a lead tube (44) is fixedly connected to the side wall of the slider (42).
7. A lifting device for engineering construction according to claim 6, characterized in that: The relay plate (14) is provided with a pressurizing assembly (5), the pressurizing assembly (5) comprising a pressurizing slide groove (51) provided in the relay plate (14), a pressurizing driving rod (52) being slidably connected in the pressurizing slide groove (51), the other end of the pressurizing driving rod (52) being fixedly connected to the side wall of the lead tube (44), a No. 1 wedge groove (53) being provided in the side wall of the pressurizing driving rod (52), a pressurizing block (54) being provided in the No. 1 wedge groove (53), the pressurizing The block (54) is used to apply pressure to the extrusion ring (27); a side wall of the pressure block (54) is fixedly connected to a No. 1 reset plate (56); the No. 1 reset plate (56) is slidably connected in a No. 1 reset groove (55); the No. 1 reset groove (55) is arranged in the relay plate (14); a lower surface of the No. 1 reset plate (56) is fixedly connected to a No. 1 reset spring (57); the other end of the No. 1 reset spring (57) is fixedly connected in the No. 1 reset groove (55).
8. A lifting device for engineering construction according to claim 3, characterized in that: An extrusion fixing assembly (6) is arranged in the floor slab hoisting bottom shell (17), and the extrusion fixing assembly (6) comprises a placement groove (62), a sliding groove (63), a first driving groove (65) and a second reset groove (67) which are arranged in the floor slab hoisting bottom shell (17); an extrusion plate (61) is arranged in the placement groove (62); a driving wedge block (64) is arranged in the sliding groove (63); a driving rod (66) is slidably connected in the first driving groove (65); the extrusion plate (61) is fixedly connected to the driving wedge block (64); the bottom of the driving rod (66) abuts against the driving wedge block (64); a second reset spring (68) is fixedly connected to one side of the extrusion plate (61); and the other end of the second reset spring (68) is installed in the second reset groove (67).
9. A lifting device for engineering construction according to claim 8, characterized in that: The top of the driving rod (66) is fixedly connected to a driving slide rod (610), the other end of the driving slide rod (610) is fixedly connected to the bottom of the intermediate tube (212), the driving slide rod (610) is slidably connected in a No. 2 driving groove (69), and the No. 2 driving groove (69) is opened in the outer shell tube (213).
10. A method for using a lifting device for engineering construction, using the lifting device for engineering construction according to claims 1-9, characterized in that: The following steps are also included: S1. Ensure that the tower crane is firmly installed and all parts are in good condition. Check and prepare the lifting rigging, hooks, etc. to ensure that they meet safety standards and are in good condition. S2. Develop a detailed lifting plan based on the weight, size and lifting position of the object to be lifted, determine the lifting route, lifting point and safety measures, and ensure that there are no people or obstacles around; S3. Use appropriate lifting rigging to tie objects, ensure that the tying is firm and stable, and pay attention to protecting the surface of the object to avoid scratches or damage; S4. Operate the lifting device to lift the object steadily. During transportation, pay attention to controlling the speed and stability to avoid shaking or collision. Ensure that the operator and the commander have smooth communication and operate according to the instructions; S5. After arriving at the designated location, unload the object smoothly. Check whether the object is intact, remove the binding, clean up the site, organize the lifting tools, ensure that the lifting device is in a safe state, and prepare for the next use.