Carrying tool and carrying method for large wind power hub
By using lifting mechanism and rotatable cross rail design in large-scale wind turbine hub transportation, the problem of inconvenience in the transportation of wheel hubs is solved, the stability of center of gravity and transportation efficiency is improved, and the loading process is simplified.
Patent Information
- Application Number
- CN202411042287.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-31
- Publication Date
- 2024-11-12
AI Technical Summary
During the transportation of medium and large wind turbine hubs in the prior art, the suspended workpiece and the hub center of gravity are not easy to remain in the same line, resulting in inconvenience in transportation, prone to deviation, tilt or rollover, which is difficult to meet the long-distance transportation needs.
A carrier tool including a base, a lifting part and a support part is designed. The lifting mechanism is used to force at the opening of the windward end of the wheel hub to ensure the stability of the center of gravity, and the suspension height is controlled by the lifting part, combining rotatable transverse rails and elastic telescopic retractability. Rod support unit for more stable transportation.
The center of gravity stability of large wind turbine hubs during long-term transportation and the uniformity of the loading tooling are achieved, which reduces ultra-high and obstacle damage, improves transportation efficiency and safety, and simplifies the transportation and installation process.
Smart Images

Figure CN118929516A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of wind turbine transport, and specifically provides a transport tool and a transport method for a large wind turbine hub. Background Art
[0002] Wind energy is a clean and renewable energy source. Wind power generation is the main form of wind energy utilization. It is also one of the most mature power generation methods in terms of technology, large-scale development conditions and commercial development prospects among the current renewable energy sources, except for hydropower.
[0003] As the main part that connects the wind turbine impeller to the main shaft drive chain, the fan hub is usually transported to the site by a flatbed truck. As the global large-scale wind power industry continues to develop rapidly, the demand for low wind speed and large impeller fans continues to increase, and the size and weight of the hub are also increasing. For large hubs, the conventional transportation method of placing the rollers directly on the flatbed truck is gradually unable to meet the traffic height limit requirements.
[0004] In the prior art, large wheel hubs are generally transported in the air by the suspension method, such as the Chinese patent CN112810527A, which places the wheel hub between the front and rear flatbed trucks, connects the flange for installing the impeller through a bracket to support the wheel hub, and makes the wheel hub suspended. However, since the flange plane connected to the three impellers of the wheel hub is a three-axis centering structure, the suspension tooling is fixedly connected to the impeller interface of the wheel hub, and it is difficult to keep the center of gravity of the front and rear flatbed trucks and the wheel hub in the same straight line. In the process of long-distance wheel hub transportation, due to the uncertainty of road conditions, it is inevitable that there will be bumpy, obstacles and other sections that are difficult to drive. This transportation method can easily cause the wheel hub to deviate, causing scratches on the wheel hub. In severe cases, the wheel hub may even roll over, causing safety accidents. Therefore, the suspension transportation tooling used for large wheel hubs in the prior art can generally only be used for short-distance transportation on smooth sections.
[0005] Therefore, there is an urgent need for a transport tool and a transport method for a wind turbine hub that can be transported over long distances. Summary of the invention
[0006] The present invention aims to provide a transport tool and a transport method for a large wind turbine hub, so as to solve the problem of inconvenient transportation of a large wind turbine hub.
[0007] The technical solution of the present invention is as follows:
[0008] A transport tool for a large wind turbine hub comprises a base, a lifting part and a support part. The base is mounted on a flatbed truck, the lower end of the lifting part is fixedly connected to the base, and the upper end of the lifting part is connected to the support part. When the lifting part lifts the support part, the support part lifts the hub from the opening at the windward end of the hub.
[0009] In this solution, the stress point of the wheel hub is at the opening of the wind end, which can ensure the stability of the center of gravity of the wheel hub during transportation, and the force on the carrying tooling is more even, ensuring that the wheel hub will not tilt, roll over, or other dangerous situations during long-term transportation. At the same time, the suspended height of the wheel hub can be adjusted in real time through the lifting part, which can reduce the occurrence of overheight situations and avoid damage to the wheel hub by obstacles on the bottom or gravel pressed up by the tires.
[0010] Preferably, the support portion includes a cross rail, the cross rail connects the two carts, a lifting mechanism is provided on the cross rail, the lifting mechanism includes a lifting plate and a positioning plate, the positioning plate is provided on the cross rail, and the lifting plate is connected to the wheel hub.
[0011] It should be noted that the cross rail is not set above the windward end of the hub. Since the hub is spherical as a whole, the cross rail can be set on both sides of the highest point of the hub and the height is lower than the highest point of the hub, thereby avoiding affecting the height limit of the hub. It is only necessary to ensure that the positioning plate is above the opening of the windward end to achieve the lifting action. At the same time, because the hub is suspended and loaded through the lifting mechanism, it can ensure that the center of gravity of the hub is on the line connecting the two bases, ensuring that the force of the two plate carts is uniform and the hub is stable when loaded.
[0012] Preferably, the lifting plate is connected to the positioning plate via a lifting column, and support units are arranged in a circumferential array on the lifting plate. The lifting plate extends into the hub from the windward opening of the hub, and the support units abut against the inner wall of the hub.
[0013] In this solution, the wheel hub is directly lifted with a lifting plate, and there is no need to additionally connect the support part to the wheel hub. The transportation, installation and lifting operations are simpler and more efficient than the existing method of connecting flange holes with bolts, while also ensuring the stability of the lifted wheel hub.
[0014] Preferably, the support unit is obliquely arranged on the lifting plate, and the support unit comprises an elastic telescopic rod, and a support block is rotatably connected to the elastic telescopic rod.
[0015] In this solution, the tilted support unit can better fit the inner wall of the hub, and the support unit with an elastic telescopic rod can adapt to hubs of different arc sizes through telescoping, thereby ensuring the fit of the support unit while improving the adaptability of the support part.
[0016] It should be noted that the area enclosed by the support units arranged in a circular array must be larger than the size of the opening at the windward end of the hub to ensure that the support units can fully abut the inner wall of the hub. Therefore, when installing the transport tooling, the lifting plate needs to be connected to the positioning plate outside the windward end opening inside the hub. To this end, the area enclosed by the support units arranged in a circular array on the lifting plate must be smaller than the size of the opening of the hub impeller flange to ensure that the lifting plate can be put in and out of the hub.
[0017] Preferably, the lifting part includes a lifting column, an oil cylinder is arranged in the lifting column, a connecting platform is arranged at the output end of the lifting column, the supporting part is arranged on the connecting platform, an auxiliary fixing plate and an auxiliary connecting plate are arranged on the connecting platform, a sliding groove is vertically arranged on the auxiliary connecting plate, the auxiliary fixing plate is slidably arranged on the auxiliary connecting plate through the sliding groove, and the auxiliary fixing plate can be detachably connected to the wheel hub.
[0018] In this solution, since the support part is not fixedly connected to the hub, in order to prevent the hub from rotating during transportation, the hub is simply fixed by an auxiliary fixing plate to reduce the hub from rotating around the support part. Preferably, the auxiliary fixing plate is connected to the flange hole on the hub for installing the impeller by bolts. At the same time, in order to adapt to hubs of different sizes, the auxiliary fixing plate can slide on the auxiliary connecting plate and can be aligned with the flange hole for connection by sliding.
[0019] Preferably, the cross rail is a middle horizontal arch bridge structure, the cross rail is rotatably arranged on the connecting platform, and the rotation axis direction of the cross rail is parallel to the length direction of the middle horizontal section of the cross rail.
[0020] In this solution, the cross rail is set to an arch bridge type, which can withstand higher tangential forces. At the same time, the cross rail is set to be rotatable, so that after the wheel hub is transported to the destination, the cross rail only needs to be rotated to release the vertical limit of the wheel hub, so that the wheel hub can be directly connected to the positioning table and lifted and transported by the lifting equipment; and the arch bridge structure can further avoid the interference of the cross rail and the wheel hub during the rotation process, thereby adapting to more wheel hubs of different sizes and models.
[0021] Preferably, a limiting block is detachably connected to the connecting platform, and the limiting block can limit the rotation of the cross rail when it is arranged on the connecting platform.
[0022] In this solution, since the cross rail cannot move or deflect when supporting the lifting mechanism, a limit block is provided in the rotation direction of the cross rail to block the rotation of the cross rail and ensure the stability of the wheel hub during operation.
[0023] Preferably, at least three expansion units are provided on the positioning plate, and the expansion units include a distance-adjusting rod and a top block slidably arranged on the distance-adjusting rod, and the top block can be fixed at any length of the distance-adjusting rod.
[0024] It should be noted that since the lifting mechanism is not connected to the wheel hub, in order to prevent the wheel hub from being shaken and tilted during transportation, a flaring unit is provided on the positioning plate. When the lifting mechanism lifts the wheel hub, the top block of the flaring unit abuts against the opening of the windward end of the wheel hub, that is, the positioning plate props up the opening of the windward end through the flaring unit, ensuring that the lifting mechanism is always in the center position of the windward end opening, effectively preventing the wheel hub from shaking and tilting.
[0025] Preferably, the positioning plate is arranged on the cross rail through a connecting plate; the base is rotatably arranged on the trolley; the lifting part also includes a guide column, which is arranged beside the lifting column and slidably penetrates the connecting platform; the positioning plate is slidably arranged on the cross rail, and a locking unit is arranged on the positioning sliding cover plate.
[0026] In this solution, the area of the positioning plate can be smaller than the opening size of the windward end of the hub. At this time, a sufficiently strong connection is required between the positioning plate and the cross rail to further avoid the support part affecting the overall height of the hub. A method for transporting a wind turbine hub is required to be described, based on the above-mentioned large wind turbine hub transport tooling, including the steps of:
[0027] S1. Place the hub with the windward opening facing upward between the two carts, unfold the cross rail, and set the positioning plate on the cross rail, and the lifting unit controls the lifting column to fall from the hub windward opening into the hub;
[0028] S2. Connect the lifting plate and the positioning plate from the inside of the hub, and adjust the length of the flaring unit so that the top block abuts against the wall of the windward opening of the hub;
[0029] S3. After the control lifting unit is raised so that the support unit completely abuts against the inner wall of the hub, the auxiliary fixing plate is fixedly connected to the hub;
[0030] S4. The lifting portion is further raised, so that the wheel hub is 0.15 to 0.5 m off the ground according to different road conditions;
[0031] S5. After the wheel hub is transported to the destination, a lifting device is used to connect the positioning plate, lift and place the wheel hub.
[0032] Beneficial effects of the present invention:
[0033] 1. The present invention loads the wheel hub in the air by lifting, and the wheel hub is stressed at the opening of the windward end, so that the center of gravity of the wheel hub can be on the connecting line of the front and rear carts, ensuring that the force of the two carts is even and the wheel hub is stable when loaded; at the same time, the lifting part can also be used to adjust the suspended height of the wheel hub in real time, reducing the occurrence of overheight, and preventing obstacles on the road or gravel pressed by tires from damaging the wheel hub;
[0034] 2. The lifting mechanism of the present invention is not connected to the wheel hub. The wheel hub is lifted by the lifting mechanism, which ensures the stability of the wheel hub and reduces the labor intensity of installing the wheel hub on the transport tooling;
[0035] 3. The lifting mechanism provided in the present invention cooperates with the rotatable cross rail. After the wheel hub is transported to the destination, the lifting mechanism can be lifted by the lifting equipment, and then the wheel hub can be directly transported to the designated placement position without the steps of disassembling the carrying tooling and reconnecting the lifting equipment, which greatly improves the transportation and placement efficiency of the wheel hub and reduces the labor intensity of the workers. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] In order to more clearly illustrate the technical solution of the present invention, the drawings required for describing the embodiments are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0037] Figure 1 It is a schematic diagram of the present invention when loaded;
[0038] Figure 2 It is a schematic top view of the present invention when loaded;
[0039] Figure 3 It is a partial cross-sectional view of the present invention when loaded;
[0040] Figure 4 is a schematic diagram of the lifting mechanism of the present invention;
[0041] Figure 5 For the present invention Figure 2 Enlarged view of point A in the middle
[0042] Figure 6 For the present invention Figure 2 Schematic diagram of another state at B;
[0043] Figure 7 It is a front view of the auxiliary positioning plate of the present invention;
[0044] Figure 8 Flow chart of the method of the present invention.
[0045] In the above drawings, the corresponding reference numerals are as follows:
[0046] 1-base, 2-lifting part, 21-lifting column, 22-cylinder, 23-connecting platform, 24-auxiliary fixing plate, 25-auxiliary connecting plate, 26-limiting block, 27-guide column, 3-support part, 31-cross rail, 32-lifting mechanism, 321-lifting plate, 322-positioning plate, 323-lifting column, 33-support unit, 331-elastic telescopic rod, 332-support block, 34-expansion unit, 341-adjustable distance rod, 342-top block, 35-connecting plate, 4-cart, 5-wheel hub, 51-windward end opening. DETAILED DESCRIPTION
[0047] In conjunction with the accompanying drawings, the technical solution of the present invention is clearly and completely described through the specific implementation methods of the embodiments of the present invention.
[0048] Embodiment 1:
[0049] like Figures 1 to 7 As shown, a transport tool for a large wind turbine hub 5 includes a base 1, a lifting part 2 and a supporting part 3. The base 1 is installed on a cart 4, the lower end of the lifting part 2 is fixedly connected to the base 1, and the upper end of the lifting part 2 is connected to the supporting part 3. When the lifting part 2 lifts the supporting part 3, the supporting part 3 lifts the hub 5 from the opening 51 at the windward end of the hub 5.
[0050] Specifically, the stress point of the wheel hub 5 is at the opening of the wind end, which can ensure that the center of gravity of the wheel hub 5 is stable during transportation, and the force on the carrying tooling is more even, ensuring that the wheel hub 5 will not tilt, roll over, or other dangerous situations during long-term transportation; at the same time, the suspended height of the wheel hub 5 can be adjusted in real time through the lifting part 2, which can reduce the occurrence of over-height situations and avoid damage to the wheel hub 5 by obstacles on the bottom or gravel pressed up by tires.
[0051] It should be noted that the base 1 is rotatably mounted on the cart 4 to facilitate turning during transportation. The size and specific structure of the hub 5 of different models and brands are slightly different, but the hub 5 of a large fan is generally provided with five holes, three flange holes for installing the impeller, an opening at the windward end, and a main shaft opening connected to the rotor room, and the opening at the windward end is relatively small. The force applied here can ensure that the support part 3 has a good load-bearing capacity even when the volume is small. The setting method of the support part 3 and the hub 5 includes but is not limited to flange connection, magnetic fixation, etc. This embodiment provides a preferred setting method, as follows.
[0052] Furthermore, the support part 3 includes a cross rail 31, which connects the two carts 4. A lifting mechanism 32 is provided on the cross rail 31. The lifting mechanism 32 includes a lifting plate 321 and a positioning plate 322. The positioning plate 322 is provided on the cross rail 31, and the lifting plate 321 is connected to the wheel hub 5.
[0053] It should be noted that the cross rail 31 is not directly arranged above the windward end of the hub 5. Since the hub 5 is spherical as a whole, the cross rail 31 can be arranged on both sides of the highest point of the hub 5 and the height is lower than the highest point of the hub 5, thereby avoiding affecting the height limit of the hub 5. It is only necessary to ensure that the positioning plate 322 is above the windward end opening 51 to achieve the lifting action. At the same time, since the hub 5 is suspended and loaded by the lifting mechanism 32, it can ensure that the center of gravity of the hub 5 is on the connecting line of the two bases 1, ensure that the force of the two carts 4 is uniform and the hub 5 is stable when loaded. At the same time, the positioning plate 322 can be fixedly installed on the cross rail 31, or it can be buckled on the cross rail 31. The preferred positioning plate 322 is buckled on the cross rail 31 in an n-type.
[0054] Furthermore, the lifting plate 321 is connected to the positioning plate 322 via a lifting column 323 , and a supporting unit 33 is provided in a circumferential array on the lifting plate 321 . The lifting plate 321 extends into the wheel hub 5 from the windward opening of the wheel hub 5 , and the supporting unit 33 abuts against the inner wall of the wheel hub 5 .
[0055] Specifically, the wheel hub 5 is directly lifted by the lifting plate 321, and there is no need to connect the support part 3 to the wheel hub 5. The carrying, installation and lifting operations are simpler and more efficient than the existing method of connecting the flange holes by bolts, and the stability of the lifting wheel hub 5 is also ensured. At the same time, the lifting column 323 is preferably set as a buffer column with a damper to reduce the degree of bumps when lifting the wheel hub 5. At the same time, the bottom surface of the lifting column 323 is provided with a flange hole for installing the lifting plate 321.
[0056] Furthermore, the support unit 33 is tiltedly arranged on the lifting plate 321, and the support unit 33 includes an elastic telescopic rod 331, and a support block 332 is rotatably connected to the elastic telescopic rod 331. The tilted support unit 33 can better fit the inner wall of the hub 5, and the support unit 33 with the elastic telescopic rod 331 can adapt to hubs 5 of different sizes of arcs through telescoping, thereby ensuring the fit of the support unit 33 and improving the adaptability of the support portion 3.
[0057] It should be noted that the area enclosed by the support units 33 arranged in a circumferential array needs to be larger than the size of the opening 51 at the windward end of the hub 5 to ensure that the support units 33 can fully abut the inner wall of the hub 5. Therefore, when the transport tool is installed, the lifting plate 321 needs to be connected to the positioning plate 322 outside the windward end opening 51 inside the hub 5. To this end, the area enclosed by the support units 33 arranged in a circumferential array on the lifting plate 321 needs to be smaller than the size of the opening of the impeller flange of the hub 5 to ensure that the lifting plate 321 can put in and take out the hub 5.
[0058] Furthermore, the lifting part 2 includes a lifting column 21, in which an oil cylinder 22 is provided, and a connecting platform 23 is provided at the output end of the lifting column 21. The supporting part 3 is arranged on the connecting platform 23, and an auxiliary fixing plate 24 and an auxiliary connecting plate 25 are arranged on the connecting platform 23. A sliding groove is vertically provided on the auxiliary connecting plate 25, and the auxiliary fixing plate 24 is slidably arranged on the auxiliary connecting plate 25 through the sliding groove, and the auxiliary fixing plate 24 can be detachably connected to the wheel hub 5.
[0059] Specifically, the oil cylinder 22 in the lifting column 21 preferably adopts a self-locking electric oil cylinder 22, and a small pump station is loaded on the flatbed to provide power for the oil cylinder 22. Since the support part 3 is not fixedly connected to the wheel hub 5, in order to prevent the wheel hub 5 from rotating during transportation, the wheel hub 5 is simply fixed by the auxiliary fixing plate 24 to reduce the situation where the wheel hub 5 rotates around the support part 3. Preferably, the auxiliary fixing plate 24 is connected to the flange hole on the wheel hub 5 for installing the impeller by bolts. At the same time, in order to adapt to different sizes of wheel hubs 5, the auxiliary fixing plate 24 can slide on the auxiliary connecting plate 25, and can be connected by sliding to align with the flange hole.
[0060] It should be noted that, since the flange planes connected to the three impellers of the hub 5 are three-axis centering structures, it is preferred to use only one end of the auxiliary fixing plate 24 to connect one flange plane, such as Figure 3 shown.
[0061] Furthermore, the cross rail 31 is a middle horizontal arch bridge structure, and the cross rail 31 is rotatably arranged on the connecting platform 23 , and the rotation axis direction of the cross rail 31 is parallel to the length direction of the middle horizontal section of the cross rail 31 .
[0062] Specifically, the cross rail 31 is configured to be an arch bridge type, which can withstand higher tangential forces. At the same time, the cross rail 31 is configured to be rotatable, so that after the wheel hub 5 is transported to the destination, the cross rail 31 only needs to be rotated to release the limitation of the wheel hub 5 in the vertical direction, so that the wheel hub 5 can be directly connected to the positioning plate 322 and lifted and transported by the lifting equipment; and the arch bridge type structure can enclose a larger circle when rotating, further avoiding interference between the cross rail 31 and the wheel hub 5 during rotation, thereby adapting to more wheel hubs 5 of different sizes and models.
[0063] Furthermore, a limiting block 26 is detachably connected to the connecting platform 23 , and the limiting block 26 can limit the rotation of the cross rail 31 when it is arranged on the connecting platform 23 .
[0064] Specifically, the limit block 26 is preferably a dovetail mounting block, and a dovetail groove is provided on the connecting platform 23. When the cross rail 31 rotates, it passes through the dovetail groove. After the limit block 26 as the dovetail mounting block is installed in the dovetail groove, the cross rail 31 continues to rotate. The dovetail groove is easy to install and has a strong enough bearing capacity. While blocking the rotation of the cross rail 31, it ensures the stability of the wheel hub 5 during operation.
[0065] Furthermore, at least three expansion units 34 are provided on the positioning plate 322 , and the expansion unit 34 includes a distance adjusting rod 341 and a top block 342 slidably provided on the distance adjusting rod 341 , and the top block 342 can be fixed at any length of the distance adjusting rod 341 .
[0066] Specifically, since the lifting mechanism 32 is not connected to the wheel hub 5, in order to prevent the wheel hub 5 from being bumped and deflected during transportation, a flaring unit 34 is provided on the positioning plate 322. When the lifting mechanism 32 lifts the wheel hub 5, the top block 342 of the flaring unit 34 abuts against the windward end opening 51 of the wheel hub 5, that is, the positioning plate 322 props up the windward end opening 51 through the flaring unit 34, ensuring that the lifting mechanism 32 is always at the center of the windward end opening 51, effectively preventing the wheel hub 5 from shaking and tilting. The top block 342 has a vertical surface that contacts the windward end opening 51 and has a certain height. At the same time, the top block 342 can also be fixed at different positions on the pitch rod 341 by bolts, nuts or other fastening methods to adapt to the windward end openings 51 of respective sizes.
[0067] Furthermore, the positioning plate 322 is arranged on the cross rail 31 through a connecting plate; the base 1 is rotatably arranged on the trolley 4; the lifting part 2 also includes a guide column 27, which is arranged beside the lifting column 21 and slidably penetrates the connecting platform 23; the positioning plate 322 is slidably arranged on the cross rail 31, and a locking unit is arranged on the positioning sliding cover plate.
[0068] Specifically, the area of the positioning plate 322 can be smaller than the size of the opening 51 at the windward end of the hub 5. In this case, the positioning plate 322 and the cross rail 31 need to be connected with sufficient strength to further prevent the support part 3 from affecting the overall height of the hub 5. At the same time, the guide column 27 is arranged in parallel with the lifting column 21. The lifting column 21 provides the lifting power for the support part 3. The guide column 27 can share part of the torque for the lifting column 21 while guiding the lifting direction. On this basis, a vertical slide groove can be provided on the guide column 27, and a hole adapted to the vertical slide groove is also provided on the connecting platform 23. When the connecting platform 23 slides and rises to a certain position on the guide column 27, the position of the connecting platform 23 can be positioned by bolts, so that the guide column 27 also plays a certain load-bearing role, thereby reducing the load of the oil cylinder 22 in the lifting column 21. Further improve the load-bearing capacity and service life of the tooling.
[0069] Embodiment 2:
[0070] like Figure 8 The method for transporting a wind turbine hub 5 shown in the figure is based on a transport tool for a large wind turbine hub 5 provided in the first embodiment, and comprises the following steps:
[0071] S1. Place the hub 5 with its windward opening facing upward between the two carts 4, unfold the cross rail 31, and set the positioning plate 322 on the cross rail 31. The lifting part 2 controls the lifting column 323 to fall into the hub 5 from the windward opening of the hub 5.
[0072] S2. Connect the lifting plate 321 to the positioning plate 322 from the inside of the hub 5, and adjust the length of the expansion unit 34 so that the top block 342 abuts against the wall of the windward opening of the hub 5;
[0073] Specifically, the worker connects the lifting plate 321 to the lifting column 323 by flange from the inside of the hub 5 , and slides the top block 342 of the flaring unit 34 to ensure that the lifting column 323 is at the center of the windward end opening 51 .
[0074] S3. After the control lifting unit 2 is raised so that the support unit 33 is completely in contact with the inner wall of the hub 5, the auxiliary fixing plate 24 is fixedly connected to the hub 5;
[0075] In this step, the lifting part 2 is raised, and the lifting plate 321 is controlled to rise, so that the support unit 33 on the lifting plate 321 is compressed and fits the inner wall of the hub 5. At this time, the top block 342 also has a certain height, and the top block 342 can always contact the windward end opening 51 during lifting. When the support unit 33 completely abuts the inner wall of the hub 5, the distance between the positioning plate 322 and the lifting plate 321 will not change. At this time, the position of the auxiliary fixing plate 24 on the auxiliary connecting plate 25 is adjusted to connect it to the flange plane at one end of the hub 5 for installing the impeller.
[0076] S4. The lifting portion 2 is further raised, and the wheel hub 5 is 0.15 to 0.5 m off the ground according to different road conditions;
[0077] Specifically, the height of the wheel hub 5 from the ground is controlled according to the height limit requirement. When on a gravel section or an uneven section, the wheel hub 5 is raised. When encountering a height limit pole or other height limit indicators, the wheel hub 5 can be kept as close to the ground as possible.
[0078] S5. After the wheel hub 5 is transported to the destination, a lifting device is used to connect the positioning plate 322 to lift and place the wheel hub 5.
[0079] In this step, when the positioning plate 322 is buckled on the cross rail 31, a hook can be set on the top of the positioning plate 322 for direct connection of the lifting equipment. The lifting equipment can directly lift the positioning plate 322 slightly, and then flip and lower the cross rail 31. Then, the lifting equipment can be directly connected to the wheel hub 5 and lifted up. There is no need to disassemble the carrying tooling and reconnect the lifting equipment, which greatly improves the transportation and placement efficiency of the wheel hub 5 and reduces the labor intensity of workers.
[0080] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments, and the above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, and these changes and improvements all fall within the scope of the present invention.
Claims
1. A transport tool for a large wind turbine hub, characterized in that: The invention comprises a base (1), a lifting part (2) and a supporting part (3); the base (1) is mounted on a cart (4); the lower end of the lifting part (2) is fixedly connected to the base (1); the upper end of the lifting part (2) is connected to the supporting part (3); when the lifting part (2) lifts the supporting part (3), the supporting part (3) lifts the wheel hub (5) from the windward end opening (51) of the wheel hub (5).
2. A transport tool for a large wind turbine hub according to claim 1, characterized in that: The support portion (3) comprises a transverse rail (31), wherein the transverse rail (31) connects the two carts (4), a lifting mechanism (32) is arranged on the transverse rail (31), and the lifting mechanism (32) comprises a lifting plate (321) and a positioning plate (322), wherein the positioning plate (322) is arranged on the transverse rail (31), and the lifting plate (321) is connected to the wheel hub (5).
3. A transport tool for a large wind turbine hub according to claim 2, characterized in that: The lifting plate (321) is connected to the positioning plate (322) via a lifting column (323); support units (33) are arranged in a circumferential array on the lifting plate (321); the lifting plate (321) extends into the wheel hub (5) from the windward opening of the wheel hub (5); and the support units (33) abut against the inner wall of the wheel hub (5).
4. A transport tool for a large wind turbine hub according to claim 3, characterized in that: The support unit (33) is tiltedly arranged on the lifting plate (321), and the support unit (33) comprises an elastic telescopic rod (331), and a support block (332) is rotatably connected to the elastic telescopic rod (331).
5. A transport tool for a large wind turbine hub according to claim 4, characterized in that: The lifting part (2) comprises a lifting column (21), wherein an oil cylinder (22) is arranged in the lifting column (21), a connecting platform (23) is arranged at the output end of the lifting column (21), the supporting part (3) is arranged on the connecting platform (23), an auxiliary fixing plate (24) and an auxiliary connecting plate (25) are arranged on the connecting platform (23), a sliding groove is vertically arranged on the auxiliary connecting plate (25), the auxiliary fixing plate (24) is slidably arranged on the auxiliary connecting plate (25) through the sliding groove, and the auxiliary fixing plate (24) can be detachably connected to the wheel hub (5).
6. A transport tool for a large wind turbine hub according to claim 5, characterized in that: The cross rail (31) is a middle horizontal arch bridge structure. The cross rail (31) is rotatably arranged on the connecting platform (23). The rotation axis direction of the cross rail (31) is parallel to the length direction of the middle horizontal section of the cross rail (31).
7. A transport tool for a large wind turbine hub according to claim 6, characterized in that: A limiting block (26) is detachably connected to the connecting platform (23); when the limiting block (26) is arranged on the connecting platform (23), the rotation of the transverse rail (31) can be limited.
8. A transport tool for a large wind turbine hub according to any one of claim 7, characterized in that: At least three expansion units (34) are arranged on the positioning plate (322), and the expansion units (34) include a distance-adjusting rod (341) and a top block (342) slidably arranged on the distance-adjusting rod (341), and the top block (342) can be fixed at any length of the distance-adjusting rod (341).
9. A transport tool for a large wind turbine hub according to claim 8, characterized in that: The positioning plate (322) is arranged on the transverse rail (31) through a connecting plate (35); the base (1) is rotatably arranged on the trolley (4); the lifting part (2) also includes a guide column (27), which is arranged beside the lifting column (21) and slidably penetrates the connecting platform (23).
10. A method for transporting a large wind turbine hub, based on the transport tooling for a large wind turbine hub according to claim 9, characterized in that: Included steps S1. The hub (5) is placed between the two carts (4) with the windward opening facing upward, the cross rail (31) is unfolded, and the positioning plate (322) is set on the cross rail (31), and the lifting part (2) controls the lifting column (323) to fall from the windward opening of the hub (5) into the hub (5); S2. Connecting the lifting plate (321) to the positioning plate (322) from the inside of the wheel hub (5), and adjusting the length of the expansion unit (34) so that the top block (342) abuts against the wall of the windward opening of the wheel hub (5); S3. The control lifting part (2) is raised so that the support unit (33) completely abuts against the inner wall of the wheel hub (5), and then the auxiliary fixing plate (24) is fixedly connected to the wheel hub (5); S4. The lifting portion (2) is further raised to complete the installation of the transport tooling of the wheel hub (5), and the wheel hub (5) is lifted 0.15 to 1 m from the ground according to different road conditions; S5. After the wheel hub (5) is transported to the destination, a lifting device is used to connect the positioning plate (322) to lift and place the wheel hub (5).