Wide steel-concrete composite beam and construction method thereof

By adopting core steel beams and cantilever steel beams with open box structures, combined with high-performance concrete materials, and partially erected and wet joint technology, the construction equipment of wide-width steel-concrete composite beams in the existing technology is large in scale and high in construction difficulty. Due to the problem of long construction time, a more efficient and safe construction method is achieved, and it is suitable for bridges with a single width of more than 20m.

CN118932845APending Publication Date: 2024-11-12HENAN PROVINCIAL COMM PLANNING & DESIGN INST CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411228411.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-03
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

When constructing wide-width steel-concrete composite beams, the equipment scale is huge, the cost is high, the construction is difficult, and the prefabricated bridge deck with a single width exceeding 20m is large in size, which is prone to cracking, and the construction time is long, so it cannot be effectively supported. Bridge erecting machine, and wet joint maintenance time is long.

Method used

The core steel beam and cantilever steel beam with an open box structure are combined with the bridge deck panels of UHPC and C55 concrete. Through partial erecting and wet joint technology, the scale of bridge erecting machine equipment is reduced, the construction difficulty is reduced, the construction time is shortened, and the construction time is improved. Combined with efficiency.

Benefits of technology

The construction of bridges with a single width of more than 20m has been achieved, which simplifies the equipment scale, reduces construction costs, improves construction quality and speed, shortens the construction cycle, reduces the risk of cracking bridge panels, and reduces construction time.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118932845A_ABST
    Figure CN118932845A_ABST
Patent Text Reader

Abstract

The invention discloses a wide steel-concrete composite beam which comprises a core steel beam arranged on a lower structure of a bridge. The cantilever steel beams are arranged on two sides of the core steel beam; the bridge deck slab comprises a core bridge deck slab and a cantilever bridge deck slab which are connected through a wet joint. During construction, a bridge substructure is constructed, and a first hole core steel beam is erected through a bridge girder erection machine; core bridge deck slabs are installed, core steel beams are temporarily lifted, then wet joint concrete is poured between the adjacent core bridge deck slabs, and then a bridge girder erection machine passes through holes; cantilever steel beams are installed on the two sides of the core steel beam through a crane, cantilever bridge deck slabs are installed on the cantilever steel beams, then wet joint concrete is poured, and erection of a first hole combination beam is completed; and according to the steps, the composite beam is erected hole by hole until construction of the whole bridge is completed. The structure is simple, stress is reasonable, safety and stability are achieved, the split erecting mode is adopted, the construction cost is saved, and the construction difficulty is lowered.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of steel-concrete composite beam construction, in particular to a wide steel-concrete composite beam and a construction method thereof. Background Art

[0002] At present, conventional width steel-concrete composite beams have been widely used in highways, railways, municipal engineering and other fields, but wide steel-concrete composite beams are affected by construction technology and equipment, and the construction difficulty is relatively large, which limits their large-scale application. For example, patents such as CN110820573A (Construction method of steel-concrete composite beams for high-pier and large-span bridges in mountainous areas), CN110344334A (Construction method of two-span steel-concrete composite bridges using back-cable bridge erection machines), and CN115467239A (Method for constructing large-span steel-concrete composite beams based on bridge erection machines) propose construction methods based on bridge erection machines to erect whole-hole steel beams, which have good applicability for steel-concrete composite beams with a single width of less than 20m. However, when the single width increases to more than 20m, the following problems will be faced: 1. The construction equipment scale of the bridge erection machine to erect wide steel beams is very large and the cost is high, and the weight and size of the wide steel beams are very large, making construction difficult. 2. Since wide steel beams need to be erected on the piers by using a bridge erection machine, the size of the pier top cap beam must be large enough to support the bridge erection machine. In addition, ordinary concrete is often used for precast bridge decks and wet joints of steel-concrete composite beams, and the steel beams are temporarily pulled after the precast bridge decks are installed to apply prestressing stress to increase the compressive stress level and compression range of the bridge decks and improve the bonding efficiency of the steel beams and bridge decks. For bridges with a single width of more than 20m, the precast bridge decks are large in size, and cracks are very likely to occur when the steel beams are pulled, but reducing the pulling force cannot achieve the above purpose. In addition, after pouring the wet joints, it takes 7 to 21 days of curing to meet the strength requirements, and the construction time is relatively long. Summary of the invention

[0003] In order to solve the above problems, the present invention provides a wide steel-concrete composite beam and a construction method thereof, which can specifically adopt the following technical solutions: The wide steel-concrete composite beam of the present invention comprises Core steel beams, set on the bridge substructure; Cantilever steel beams are arranged on both sides of the core steel beam; A bridge deck comprises a core bridge deck and a cantilever bridge deck connected by wet joints, wherein the core bridge deck is arranged above a core steel beam, and the cantilever bridge deck is arranged above the cantilever steel beam.

[0004] The core steel beam is an open box-type structure, including a bottom plate, web plates arranged at both ends of the bottom plate, and top plates respectively arranged on top of the web plates.

[0005] The bottom plate and the web plate are perpendicular to each other, and a first diagonal brace extending toward the tops of the web plates on both sides is arranged at the center of the bottom plate.

[0006] The bottom plate is provided with bottom plate longitudinal stiffening ribs, and the web plate is provided with web plate longitudinal stiffening ribs.

[0007] The cantilever steel beam comprises a cantilever flange screwed to the web and a second diagonal brace, the cantilever flange is horizontally arranged and extends outward, and the second diagonal brace is inclined upward and connected to the end of the cantilever flange.

[0008] The wet joints include longitudinal wet joints provided between the core bridge deck and the cantilever bridge deck, and transverse wet joints provided between adjacent core bridge decks and transverse wet joints between adjacent cantilever bridge decks.

[0009] The center of the top plate is connected to the top of the web plate, the boundary line between the core bridge deck and the longitudinal wet joint is set corresponding to the outer edge of the top plate, and the outer edge of the cantilever bridge deck is aligned with the outer edge of the cantilever flange.

[0010] In the area outside the bridge's center support, there is one cantilever bridge deck for every two core bridge decks.

[0011] The core bridge deck and wet joints are made of UHPC, and the cantilever bridge deck is made of C55 concrete.

[0012] The wide steel-concrete composite beam construction method of the present invention comprises the following steps: S1, prefabricate the steel beam segments that make up the core steel beam and the cantilever steel beam in the steel plant; S2, assembling the whole-hole core steel beam in the prefabrication yard, and prefabricating the core bridge deck and cantilever bridge deck; S3, constructing the bridge substructure, and moving the bridge erecting machine to the first span of the bridge; S4, transport the whole-hole core steel beam to the bridge erection machine by using a beam transport vehicle; S5, using a bridge erection machine to erect the first core steel beam; S6, installing the core bridge deck and temporarily lifting the core steel beams, and then pouring wet joint concrete between adjacent core bridge decks; S7, after the cast-in-place wet joint concrete reaches the required strength, the temporary lifting force is unloaded and the bridge erection machine is passed through the hole; S8: Use a crane to install cantilever steel beams on both sides of the core steel beam, and install cantilever bridge decks on the cantilever steel beams. Then, pour wet joint concrete between adjacent cantilever bridge decks and between adjacent cantilever bridge decks and core bridge decks to complete the erection of the first span composite beam. S9, according to the method of step 4 to step 8, the composite beams are installed hole by hole until the construction of the entire bridge is completed.

[0013] The wide steel-concrete composite beam provided by the present invention is suitable for bridges with a single width of more than 20m. It has a simple structure, reasonable force, safety and stability. During construction, it is erected in parts, which reduces the scale of the bridge erection machine and the pier top cap beam, saves construction costs, reduces construction difficulty, improves construction quality, shortens construction period, and has broad application prospects.

[0014] Compared with the prior art, the advantages of the present invention are specifically embodied in: 1) The bridge erection machine used in the present invention is small in scale and can reduce the width of the pier top cap beam, which is economical; 2) The steel beams are erected in sections, which have small geometric dimensions, light weight, and convenient installation, thus reducing potential safety hazards during construction; 3) UHPC is used in the core bridge deck and wet joints to reduce the risk of bridge deck cracking during the steel beam lifting process; 4) UHPC can reach the strength level of ordinary concrete after 2-3 days of curing, shortening the construction time; 4) The entire bridge deck is split into a core bridge deck and a cantilever bridge deck, reducing the hoisting weight; 5) After unloading the lifting force, the cantilever bridge deck can be installed and the next core steel beam can be erected simultaneously, which speeds up the construction; 6) Except for the middle support area, every two core bridge decks correspond to one cantilever bridge deck, which shortens the hoisting time of the cantilever bridge deck. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a structural schematic diagram of the wide steel-concrete composite beam of the present invention.

[0016] Figure 2a-2f It is a schematic diagram of the construction process of the wide steel-concrete composite beam described in the present invention on site.

[0017] Figure 3 yes Figure 2c AA section view in.

[0018] Figure 4 yes Figure 2f Schematic diagram of part of the structure of the first span of the bridge.

[0019] Figure 5 yes Figure 4 Top view of the . DETAILED DESCRIPTION

[0020] The following is a detailed description of an embodiment of the present invention in conjunction with the accompanying drawings. This embodiment is implemented on the premise of the technical solution of the present invention, and a detailed implementation method and a specific construction process are given, but the protection scope of the present invention is not limited to the following embodiment.

[0021] A wide steel-concrete composite beam with a span of 5×100m has an overall height of 5m and a width of 25.56m, i.e., the wide steel-concrete composite beam structure described in the present invention is adopted. Specifically, it includes a core steel beam arranged on the lower structure of the bridge, cantilever steel beams arranged on both sides of the core steel beam, and a bridge deck arranged above the core steel beam and the cantilever steel beam. Among them, the core bridge deck is arranged above the core steel beam, the cantilever bridge deck is arranged above the cantilever steel beam, and the core bridge deck and the cantilever bridge deck are connected by a wet joint.

[0022] like Figure 1 As shown, the core steel beam is an open box-type structure, including a bottom plate 1 and a web plate 2 perpendicular to each other, the web plates 2 are located at both ends of the bottom plate 1, and a horizontal top plate 3 is respectively arranged on the top of each web plate 2, and each top plate 3 is symmetrically arranged around the web plate 2. In order to enhance the structural stability, two first diagonal braces 4 extending to the tops of the web plates 2 on both sides are arranged at the center of the bottom plate 1, bottom plate longitudinal stiffening ribs 5 are arranged on the bottom plate 1, and web plate longitudinal stiffening ribs 6 are arranged on the web plate 2.

[0023] The cantilever steel beam comprises a cantilever flange 7 and a second diagonal brace 8 which are bolted to the web 2 . The cantilever flange 7 is horizontally arranged and extends outwards. The second diagonal brace 8 is inclined upward and connected to the end of the cantilever flange 7 .

[0024] The wet joints include longitudinal wet joints 11 provided between adjacent core bridge decks 9 and cantilever bridge decks 10, and transverse wet joints 12 provided between adjacent core bridge decks 9 and adjacent cantilever bridge decks 10. The boundary between the core bridge deck 9 and the longitudinal wet joint 11 is provided corresponding to the outer edge of the top plate 3, and the outer edge of the cantilever bridge deck 10 is aligned with the outer edge of the cantilever flange 7. That is, the width of the core bridge deck 9 is the width of the bottom plate 1 plus the width of the top plate 3, and the width of the cantilever bridge deck 10 is the width of the cantilever flange 7 minus half the width of the top plate 3 minus the width of the longitudinal wet joint 11.

[0025] In this embodiment, the top plate 3 has a thickness of 40 mm and a width of 2.8 m. The web 2 has a thickness of 28 mm and a height of 4.644 m. The bottom plate 1 has a thickness of 36 mm and a width of 11 m. The web longitudinal stiffening rib 6 has a thickness of 21 mm and a height of 24 cm, with one provided every 1 m, for a total of 8 ribs. The bottom plate longitudinal stiffening rib 5 has a thickness of 21 mm and a height of 24 cm, with one provided every 0.8 m, for a total of 13 ribs. The diameters of the first diagonal brace 4 and the second diagonal brace 8 are both 203 mm, and the wall thicknesses are both 16 mm. The width of the core bridge deck 9 is 13.8 m, the width of the cantilever flange 7 is 7.28 m, the width of the longitudinal wet joint 11 is 0.5 m, and the width of the cantilever bridge deck 10 is 5.38 m.

[0026] The above-mentioned steel members are made of Q345q steel, the core bridge deck 9 and the wet joints are made of UHPC, and the cantilever bridge deck 10 is made of C55 concrete.

[0027] like Figure 4 As shown, the whole-span steel beam has a total of 12 segments with three length specifications of 2m, 4.5m and 10m. Solid cross beams are set at the support points, and a hollow cross beam is set every 4m in the mid-span area. A web vertical stiffening rib is set between two hollow cross beams.

[0028] like Figure 5 As shown, the length of each core bridge deck 9 is 3.5 m, and the length of each cantilever bridge deck 10 is 7.5 m. Except for the support area in the bridge, every two core bridge decks 9 correspond to one cantilever bridge deck 10. The width of the transverse wet joint 12 is 0.5 m.

[0029] The above wide steel-concrete composite beam is constructed in the following steps: S1, prefabricate the steel beam segments that make up the core steel beam and the cantilever steel beam in the steel plant; S2, assemble the whole-hole core steel beam in the prefabrication yard, and prefabricate the core bridge deck 9 and the cantilever bridge deck 10. The deck should be stored for more than 6 months before use; S3, construct the bridge substructure K, and make the bridge erection machine Q move through the approach bridge M to the first span of the bridge (see Figure 2a ); S4, use beam transport vehicle Y to transport the core steel beam of the whole hole to the bridge erection machine Q (see Figure 2b ); S5, use the bridge erection machine Q to erect the first core steel beam (see Figure 2c , Figure 3 ); S6, install the core bridge deck 9, temporarily lift the core steel beam, and then pour the transverse wet joint concrete 12 between the adjacent core bridge decks 9 (see Figure 2d ); S7, after the cast-in-place wet joint concrete reaches the required strength, unload the temporary lifting force and pass the bridge erection machine Q through the hole (see Figure 2e ); S8, use crane R to install cantilever steel beams on both sides of the core steel beam, and install cantilever bridge decks 10 on the cantilever steel beams, then pour transverse wet joint concrete 12 between adjacent cantilever bridge decks 10, and pour longitudinal wet joint concrete 11 between adjacent cantilever bridge decks 10 and core bridge deck 9, completing the erection of the first span composite beam (see Figure 2f ); S9, according to the method of step 4 to step 8, the composite beams are installed hole by hole until the construction of the entire bridge is completed.

[0030] It should be noted that, in the description of the present invention, terms indicating orientation or positional relationships, such as "front", "rear", "left", "right", "vertical", "horizontal", "inside", "outside", etc., are based on the orientation or positional relationships shown in the drawings and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.

Claims

1. A wide steel-concrete composite beam, characterized in that: include Core steel beams, set on the bridge substructure; Cantilever steel beams are arranged on both sides of the core steel beam; A bridge deck comprises a core bridge deck and a cantilever bridge deck connected by wet joints, wherein the core bridge deck is arranged above a core steel beam, and the cantilever bridge deck is arranged above the cantilever steel beam.

2. The wide steel-concrete composite beam according to claim 1 is characterized in that: The core steel beam is an open box-type structure, including a bottom plate, web plates arranged at both ends of the bottom plate, and top plates respectively arranged on top of the web plates.

3. The wide steel-concrete composite beam according to claim 2 is characterized in that: The bottom plate and the web plate are perpendicular to each other, and a first diagonal brace extending toward the tops of the web plates on both sides is arranged at the center of the bottom plate.

4. The wide steel-concrete composite beam according to claim 2 is characterized in that: The bottom plate is provided with bottom plate longitudinal stiffening ribs, and the web plate is provided with web plate longitudinal stiffening ribs.

5. The wide steel-concrete composite beam according to claim 2 is characterized in that: The cantilever steel beam comprises a cantilever flange screwed to the web and a second diagonal brace, the cantilever flange is horizontally arranged and extends outward, and the second diagonal brace is inclined upward and connected to the end of the cantilever flange.

6. The wide steel-concrete composite beam according to claim 5, characterized in that: The wet joints include longitudinal wet joints provided between the core bridge deck and the cantilever bridge deck, and transverse wet joints provided between adjacent core bridge decks and transverse wet joints between adjacent cantilever bridge decks.

7. The wide steel-concrete composite beam according to claim 6 is characterized in that: The center of the top plate is connected to the top of the web plate, the boundary line between the core bridge deck and the longitudinal wet joint is set corresponding to the outer edge of the top plate, and the outer edge of the cantilever bridge deck is aligned with the outer edge of the cantilever flange.

8. The wide steel-concrete composite beam according to claim 1 is characterized in that: In the area outside the bridge's center support, there is one cantilever bridge deck for every two core bridge decks.

9. The wide steel-concrete composite beam according to claim 1, characterized in that: The core bridge deck and wet joints are made of UHPC, and the cantilever bridge deck is made of C55 concrete.

10. The method for constructing wide steel-concrete composite beams according to claim 1, characterized in that: The steps include: S1, prefabricate the steel beam segments that make up the core steel beam and the cantilever steel beam in the steel plant; S2, assembling the whole-hole core steel beam in the prefabrication yard, and prefabricating the core bridge deck and cantilever bridge deck; S3, constructing the bridge substructure, and moving the bridge erecting machine to the first span of the bridge; S4, transport the whole-hole core steel beam to the bridge erection machine by using a beam transport vehicle; S5, using a bridge erection machine to erect the first core steel beam; S6, installing the core bridge deck and temporarily lifting the core steel beams, and then pouring wet joint concrete between adjacent core bridge decks; S7, after the cast-in-place wet joint concrete reaches the required strength, the temporary lifting force is unloaded and the bridge erection machine is passed through the hole; S8: Use a crane to install cantilever steel beams on both sides of the core steel beam, and install cantilever bridge decks on the cantilever steel beams. Then, pour wet joint concrete between adjacent cantilever bridge decks and between adjacent cantilever bridge decks and core bridge decks to complete the erection of the first span composite beam. S9, according to the method of step 4 to step 8, the composite beams are installed hole by hole until the construction of the entire bridge is completed.