Adjustable inner mold platform for hollow pier
By designing an adjustable hollow pier inner formwork platform, the problem of difficulty in adjusting the inner formwork platform caused by changes in the height of thin-walled hollow pier columns was solved, achieving efficient concrete curing and construction safety, adapting to the construction needs of variable cross-section pier columns, and improving construction quality and efficiency.
Patent Information
- Application Number
- CN202411083559.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-08
- Publication Date
- 2024-11-12
AI Technical Summary
In bridge construction, the height variation of thin-walled hollow piers makes it impossible to adjust the inner formwork platform, and traditional concrete curing methods are inefficient, affecting construction progress and quality.
Design an adjustable internal formwork platform for hollow piers, including sliding adjustable beams and crossbeams, equipped with a spraying device and chain hoist. The platform height is adjusted by bolts, the chain hoist lifts the platform, the spray head angle and water output are adjustable, and the air pump precisely adjusts the platform position, so as to achieve construction and efficient maintenance of piers with variable cross-sections.
It provides a safe and stable operating platform, improves construction quality and efficiency, adapts to the construction needs of variable cross-section piers, reduces water waste, and protects the internal formwork structure.
Smart Images

Figure CN118932865A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of bridge construction, and in particular to an adjustable inner formwork platform for a hollow pier. Background Art
[0002] At present, when the height of bridge piers in the main structure of railway bridges exceeds 20m, thin-walled hollow piers are generally used. Thin-walled hollow piers are generally designed as variable-section piers. During the construction process, the size of the hollow space inside the pier changes continuously with the height of the pier, which makes it difficult to set up an operating platform inside the pier, and the concrete maintenance work after the concrete pouring is also relatively difficult.
[0003] The operating platform in a conventional hollow pier uses a steel pipe bracket directly placed on the inner formwork rib plate, which cannot be adjusted in height and cannot adapt to the construction of variable-section piers. In addition, the traditional process of concrete curing in the pier generally adopts the method of brushing curing agent, and spraying curing cannot be performed, which is not conducive to the construction of the hollow pier and affects the construction progress. Summary of the invention
[0004] In order to solve the above problems existing in the prior art, an adjustable inner mold platform of a hollow pier is provided.
[0005] The technical solution adopted by the present invention to solve its technical problem is:
[0006] The present invention proposes an adjustable inner mold platform for a hollow pier, comprising two longitudinal beams arranged in parallel, wherein one longitudinal beam is connected to an adjusting beam, and the other longitudinal beam is connected to a cross beam, and the adjusting beam and the cross beam are slidably connected; a bendable water pipe is connected between the two longitudinal beams, and the water pipe is connected to a plurality of sprinkler heads, and the two longitudinal beams are also connected to a plurality of chain hoists that can drive the longitudinal beams to rise.
[0007] Preferably, the two longitudinal beams are connected with a plurality of suspension rods for fixing the longitudinal beams, and the suspension rods are detachably connected through the corbels and the inner mold of the hollow pier.
[0008] Preferably, the bottom end of the boom and the bottom end of the chain hoist are connected to the longitudinal beam via a connector.
[0009] Preferably, the adjusting beam and the cross beam are both provided with a plurality of threaded holes for bolts to be screwed into.
[0010] Preferably, the water pipe is connected to a plurality of water outlet pipes, the water outlet pipe is rotatably connected to a rotating shaft, the rotating shaft is fixedly connected to the sprinkler head, and the water outlet pipe is communicated with the sprinkler head.
[0011] Preferably, the water pipe is slidably connected to a water control plate, and when the water control plate slides, the size of the water outlet pipe and the water pipe connecting port can be controlled to adjust the water output.
[0012] Preferably, the water pipe sliding sleeve is provided with a slip ring, the slip ring is connected to the water pipe via a first spring, and the slip ring is connected to a magnet that can drive the water control plate to move.
[0013] Preferably, the rotating shaft fixing sleeve is provided with a rope collecting wheel, the rope collecting wheel is wound with a sub-pull rope, and the sub-pull rope is connected to the slip ring; it also includes a fixing sleeve in which the sliding sleeve is arranged on the adjusting beam and the cross beam, and the fixing sleeve is connected to the slip ring through the main pull rope.
[0014] Preferably, it also includes an air pump arranged between the longitudinal beam and the inner mold of the hollow pier, the air pump is slidably connected with a push rod, the push rod is connected to the air pump through a second spring, and the air pump is also provided with an air outlet pipe and an air inlet pipe.
[0015] Preferably, the push rod is fixedly connected with a ratchet, and the air pump is slidably connected with a pawl cooperating with the ratchet. The pawl is connected to the air pump through a third spring. When air is pumped into the air pump through the air intake pipe, the pawl can be driven to move in a direction close to the ratchet.
[0016] Compared with the prior art, the present invention has the following beneficial effects:
[0017] 1. The present application is provided with an adjusting beam and a cross beam which can slide relative to each other. The limiting work after the adjusting beam and the cross beam are adjusted is realized by bolts. The operating platform can be raised and lowered by the arranged chain hoist, so that the spraying device installed on the platform can spray and maintain the concrete which has been completed at the lower part. The operation is convenient, and the application is suitable for the construction of variable-section piers. A safe and stable operating platform and concrete curing conditions can be provided to ensure the construction safety and improve the construction quality.
[0018] 2. The present application is provided with a pull rope. When the length between the longitudinal beams becomes longer, the water pipe is bent, and the pull rope can drive the magnet to move, and the magnet drives the water control plate to move, so that the connectivity between the water outlet pipe and the water pipe is increased. When spraying in a wider range, the water output can be increased to increase the spray range, so that the spray range and the hollow pier are matched. At the same time, the pull rope drives the sprinkler head to rotate around the water outlet pipe, so that the angle of the sprinkler head can always be in a matched state with the hollow pier, thereby better realizing spraying, improving the efficiency and quality of concrete maintenance, and effectively reducing secondary construction, thereby saving water resources.
[0019] 3. The present application is provided with an air pump, which can drive the push rod to move by pumping air. After the push rod contacts the inner mold of the hollow pier and the longitudinal beam, it can drive the cross beam and the adjusting beam to slide relative to each other. By slowly pumping air, the push rod can move a smaller distance each time to achieve precise adjustment, which is convenient for the bolts to be screwed into the threaded holes of the adjusting beam and the cross beam. The push is achieved by air pressure, which can effectively reduce the damage to the inner mold of the hollow pier and play a protective role. When resetting, only the pressure needs to be released, and the spring can drive the pawl and ratchet to automatically disengage, so that the push rod can be automatically reset, which is easy to operate. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] The above and / or additional aspects and advantages of the present invention will become apparent and easily understood from the description of the embodiments in conjunction with the following drawings, in which:
[0021] Figure 1 It is an overall stereogram of the present invention;
[0022] Figure 2 It is the overall front view of the present invention;
[0023] Figure 3 is an overall top view of the present invention;
[0024] Figure 4 yes Figure 1 Schematic diagram of the structure of the middle crossbeam;
[0025] Figure 5 yes Figure 1 Schematic diagram of the structure of the middle sprinkler head;
[0026] Figure 6 It is a partial structural front view of the air pump in the present invention.
[0027] Description of reference numerals:
[0028] 1. Corbel; 2. Hanging rod; 3. Chain hoist; 4. Connector; 5. Longitudinal beam; 6. Cross beam; 7. Main pull rope; 8. Water pipe; 9. Water supply pipe; 10. Sprinkler head; 11. Hollow pier inner mold; 12. Adjusting beam; 13. Bolt; 14. Water control plate; 15. Water outlet pipe; 16. Rope reel; 17. Slip ring; 18. First spring; 19. Pull rope; 20. Magnet; 21. Air pump; 22. Guide rod; 23. Push rod; 24. Piston; 25. Air outlet pipe; 26. Air inlet pipe; 27. Ratchet; 28. Paw. DETAILED DESCRIPTION
[0029] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.
[0030] like Figure 1-Figure 6 As shown, this embodiment proposes an adjustable inner mold platform for a hollow pier, including two longitudinal beams 5 arranged in parallel, one of which is connected to an adjusting beam 12, and the other longitudinal beam 5 is connected to a cross beam 6, and the adjusting beam 12 and the cross beam 6 are slidably connected.
[0031] The longitudinal beam 5 and the hollow pier inner mold 11 are in a parallel state, the adjusting beam 12 and the cross beam 6 are located between the hollow pier inner mold 11, the adjusting beam 12 and the cross beam 6 are arranged in parallel, and the adjusting beam 12 and the cross beam 6 are arranged perpendicular to the longitudinal beam 6. By sliding the adjusting beam 12 and the cross beam 6, the distance between the two longitudinal beams 6 can be adjusted, which can be suitable for the construction of variable-section piers.
[0032] Both the adjusting beam 12 and the cross beam 6 are provided with a plurality of threaded holes into which the bolts 3 can be screwed. There can be a plurality of threaded holes. After the bolts 3 pass through the threaded holes on the cross beam 6, they are screwed into the threaded holes of the adjusting beam 12. The plurality of threaded holes are aligned and a plurality of bolts 3 can be screwed in, thereby providing a safe and stable operating platform and concrete curing conditions, ensuring construction safety, and improving construction quality.
[0033] A bendable water pipe 8 is connected between the two longitudinal beams 5, and the water pipe 8 is connected to a plurality of sprinkler heads 10. The two longitudinal beams 5 are also connected to a plurality of chain hoists 3 that can drive the longitudinal beams 5 to rise, and also include a water supply pipe 9, which is connected to a water supply mechanism. The water supply pipe 9 and the water pipe 8 are connected to realize water supply.
[0034] The two longitudinal beams 5 are connected with a plurality of suspension rods 2 for fixing the longitudinal beams 5. The suspension rods 2 are detachably connected through the corbels 1 and the hollow pier inner mold 11. The bottom ends of the suspension rods 2 and the bottom ends of the chain hoists 3 are connected to the longitudinal beams 5 through connectors 4. The connectors 4 can be welded to the longitudinal beams 5. The bottom ends of the suspension rods 2 and the bottom ends of the chain hoists 3 can be threadedly connected to the connectors 4.
[0035] The longitudinal beam 5 is provided with 8 suspension rods 2 and 4 chain hoists 3. When used as an operating platform, it can be fixed on the hollow pier inner mold 11 through the suspension rods 2, and the height position of the operating platform can be adjusted up and down through the suspension rods 2. When used as a spraying device, it can be moved up and down on the hollow pier inner mold 11 through the chain hoist 3, so that the spraying device installed on the operating platform can spray and maintain the concrete that has been constructed at the lower part.
[0036] The water pipe 8 is connected to a plurality of water outlet pipes 15, and the water outlet pipes 15 are rotatably connected to a rotating shaft, and the rotating shaft is fixedly connected to the sprinkler head 10, and the water outlet pipes 15 are connected to the sprinkler head 10, and the water outlet pipes 15 are connected to the sprinkler head 10 through a retractable hose, so that when the sprinkler head 10 rotates, the hose retracts and contracts accordingly, and the water outlet pipes 15 and the sprinkler head 10 are always in a connected state, and the sprinkler head 10 rotates around the rotating shaft.
[0037] The water pipe 8 is slidably connected to a water control plate 14. When the water control plate 14 slides, it can control the size of the connecting port between the water outlet pipe 15 and the water pipe 8 to adjust the water output. The water control plate 14 is arranged inside the water pipe 8. When the water control plate 14 moves, the amount of water entering the water outlet pipe 15 from the water pipe 8 can be adjusted, thereby realizing the adjustment of the spray size.
[0038] The sliding sleeve of the water pipe 8 is provided with a slip ring 17, which is connected to the water pipe 8 through a first spring 18. The slip ring 17 is connected to a magnet 20 that can drive the water control plate 14 to move. The first spring 18 is sleeved on the water pipe 8, one end of the first spring 18 is connected to the water pipe 8, and the other end is connected to the slip ring 17.
[0039] The water control plate 14 is made of iron material, so when the magnet 20 moves, the magnet 20 has an attraction effect on the water control plate 14, which can drive the water control plate 14 to move at the same time. In the initial state, under the elastic force of the first spring 18, the position of the magnet 20 makes the water control plate 14 block the water outlet pipe 15.
[0040] The rotating shaft fixing sleeve is provided with a rope collecting wheel 16, and the rope collecting wheel 16 is wound with a sub-pull rope 19, and the sub-pull rope 19 is connected to the slip ring 17. When the slip ring 17 moves, the rope collecting wheel 16 can be driven to rotate through the sub-pull rope 19, thereby driving the sprinkler head 10 to rotate around the water outlet pipe 15.
[0041] It also includes a fixed sleeve that is slidingly mounted on the adjusting beam 12 and the cross beam 6. The fixed sleeve guides the movement of the adjusting beam 12 and the cross beam 6. The position of the fixed sleeve remains unchanged. The adjusting beam 12 and the cross beam 6 can slide relative to the fixed sleeve. After the position is adjusted, the connection between the fixed sleeve and the adjusting beam 12 and the cross beam 6 is achieved through bolts 13.
[0042] The fixed sleeve is connected to the slip ring 17 through the main pull rope 7. When the spacing between the longitudinal beams 5 increases, the water pipe 8 bends. Since the position of the fixed sleeve is fixed, as the water pipe 8 bends, the magnet 20 will be pulled to move through the main pull rope 7, so that the connectivity between the water outlet pipe 15 and the water pipe 8 is increased, thereby increasing the water output. The main pull rope 7 is set on both sides of the water pipe 8, thereby increasing the water output of the sprinkler heads 10 on both sides.
[0043] When spraying in a wider range, the water output can be increased to increase the spray range so that the spray range and the hollow pier are compatible. The pull rope 19 drives the spray head 10 to rotate around the water outlet pipe 15, so that the angle of the spray head 10 can always be in a state of adaptation with the hollow pier inner mold 11, thereby better realizing spraying, improving the efficiency and quality of concrete maintenance, and effectively reducing secondary construction, thereby playing a role in saving water resources.
[0044] It also includes an air pump 21 arranged between the longitudinal beam 5 and the hollow pier inner mold 11. The air pump 21 is slidably connected with a push rod 23. The push rod 23 is connected to the air pump 21 through a second spring. The air pump 21 is also provided with an air outlet pipe 25 and an air inlet pipe 26. The air outlet pipe 25 and the air inlet pipe 26 are both threadedly connected with sealing plugs. By unscrewing the sealing plug, the air pump 21 can be exhausted and inflated.
[0045] A piston 24 is slidably connected inside the air pump 21, one end of the piston 24 is fixedly connected to the push rod 23, one end of the push rod 23 passes through the air pump 21, the other end of the piston 24 is fixedly connected to the guide rod 22, the guide rod 22 and the air pump 21 are slidably connected, a second spring is sleeved on the guide rod 22, one end of the second spring is connected to the piston 24, and the other end is connected to the air pump 21. In the initial state, under the action of the second spring, the push rod 23 moves out of the air pump 21 for a shorter length.
[0046] The push rod 23 is fixedly connected with a ratchet 27, and the air pump 21 is slidably connected with a pawl 28 that cooperates with the ratchet 27. The pawl 28 is connected to the air pump 21 through a third spring. When air is pumped into the air pump 21 through the air intake pipe 26, the pawl 28 can be driven to move in a direction close to the ratchet 27.
[0047] The third spring is sleeved on the pawl 28, and the air pump 21 is also slidably connected to a small piston. The left end of the small piston is fixedly connected to the right end of the pawl 28, the right end of the third spring is connected to the air pump 21, and the left end of the third spring is connected to the small piston. In the initial state, under the action of the elastic force of the third spring, the pawl 28 is located on one side of the ratchet 27, and at this time the pawl 28 will not have a limiting effect on the ratchet 27.
[0048] On the right side of the small piston is the air intake channel, which is connected to the air intake pipe 26. By connecting the air intake pipe 26 and the pumping mechanism, gas can be transported into the air pump 21 through the air intake pipe 26. At this time, the gas can push the small piston to move through the air intake channel, so that the ratchet 27 and the pawl 28 are in a mating state. At this time, the pawl 28 has a limiting effect on the ratchet 27, so that the push rod 23 can only slide outward and will not reset under the action of the second spring.
[0049] A method for using an adjustable inner mold platform for a hollow pier, using the above-mentioned adjustable inner mold platform for a hollow pier, comprises the following steps:
[0050] When the cross section of the hollow pier inner mold 11 becomes smaller, the air pump 21 is placed between the hollow pier inner mold 11 and the longitudinal beam 5. When the cross section of the hollow pier inner mold 11 becomes larger, the air pump 21 is placed between the longitudinal beams 5 to achieve relative sliding between the cross beam 6 and the adjustment beam 12.
[0051] Air is pumped into the air pump 21 through the air inlet pipe 26, and the gas drives the ratchet 28 and the ratchet 27 to be in a mating state. At the same time, the gas pushes the push rod 23 to move, so that the length of the air pump 21 and the push rod 23 increases, thereby causing relative sliding between the cross beam 6 and the adjusting beam 12. After adjusting the designated position, the bolt 13 is screwed into the threaded holes of the cross beam 6 and the adjusting beam 12 to achieve relative fixing of the cross beam 6 and the adjusting beam 12;
[0052] During spraying protection, when the spacing between the longitudinal beams 5 becomes larger, the main pull rope 7 pulls the magnet 20 to move, and the magnet 20 drives the water control plate 14 to move, so that the connectivity between the water outlet pipe 15 and the water pipe 8 increases. At this time, the water output increases, and the spraying range increases. At the same time, the magnet 20 drives the rope-collecting wheel 16 to rotate through the sub-pull rope 19, and the rope-collecting wheel 16 drives the spray head 10 to rotate around the water outlet pipe 15, so that the spray head 10 is adapted to the surface of the hollow pier inner mold 11, and then water is injected into the water pipe 8 to achieve spraying maintenance of the concrete.
[0053] The limiting work after the adjustment beam 12 and the cross beam 6 are adjusted is achieved through the bolt 13, and the operating platform can be raised and lowered through the set chain hoist 3, so that the spraying device installed on the platform can spray and maintain the completed concrete at the lower part. The operation is convenient, and it can be applied to the construction of variable-section piers. It can provide a safe and stable operating platform and concrete maintenance conditions, ensure construction safety, and improve construction quality.
[0054] When the length between the longitudinal beams 5 becomes longer, the water pipe 8 is bent, the main pull rope 7 drives the magnet 20 to move, and the magnet 20 drives the water control plate 14 to move, so that the connectivity between the water outlet pipe 15 and the water pipe 8 is increased. When spraying in a wider range, the water output can be increased to increase the spraying range so that the spraying range and the hollow pier are matched. At the same time, the sub-pull rope 19 drives the sprinkler head 10 to rotate around the water outlet pipe 15, so that the angle of the sprinkler head 15 can always be in a state of adaptation with the hollow pier, thereby better realizing spraying, improving the efficiency and quality of concrete maintenance, and effectively reducing secondary construction, thereby playing a role in saving water resources.
[0055] The push rod 23 can be driven to move by pumping air. After the push rod 23 contacts the hollow pier inner mold 11 and the longitudinal beam 5, the cross beam 6 and the adjusting beam 12 can be driven to slide relative to each other. By slowly pumping air, the push rod 23 can be moved a smaller distance each time to achieve precise adjustment, which is convenient for the bolt 13 to be screwed into the threaded holes of the adjusting beam 12 and the cross beam 6. The push is achieved by air pressure, which can effectively reduce the damage to the hollow pier inner mold 11 and play a protective role. When resetting, only the pressure needs to be released, and the third spring can drive the pawl 28 and the ratchet 27 to automatically disengage, and the second spring can realize the automatic resetting of the push rod 21, which is easy to operate.
[0056] Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the claims and their equivalents.
Claims
1. An adjustable inner mold platform for a hollow pier, characterized in that: The invention comprises two longitudinal beams (5) arranged in parallel, wherein one longitudinal beam (5) is connected to an adjusting beam (12), and the other longitudinal beam (5) is connected to a cross beam (6), and the adjusting beam (12) and the cross beam (6) are slidably connected; a bendable water pipe (8) is connected between the two longitudinal beams (5), and the water pipe (8) is connected to a plurality of spray heads (10); and the two longitudinal beams (5) are also connected to a plurality of chain hoists (3) capable of driving the longitudinal beams (5) to rise.
2. The adjustable inner mold platform of a hollow pier according to claim 1, characterized in that: The two longitudinal beams (5) are connected with a plurality of suspension rods (2) for fixing the longitudinal beams (5), and the suspension rods (2) are detachably connected via the corbels (1) and the hollow pier inner mold (11).
3. The adjustable inner mold platform of a hollow pier according to claim 2, characterized in that: The bottom end of the suspension rod (2) and the bottom end of the chain hoist (3) are connected via a connector (4) and a longitudinal beam (5).
4. The adjustable inner mold platform of a hollow pier according to claim 1, characterized in that: The adjusting beam (12) and the cross beam (6) are both provided with a plurality of threaded holes into which the bolts (3) can be screwed.
5. The adjustable inner mold platform of a hollow pier according to claim 1, characterized in that: The water pipe (8) is connected to a plurality of water outlet pipes (15), the water outlet pipes (15) are rotatably connected to a rotating shaft, the rotating shaft is fixedly connected to the spray head (10), and the water outlet pipes (15) are in communication with the spray head (10).
6. The adjustable inner mold platform of a hollow pier according to claim 5, characterized in that: The water pipe (8) is slidably connected to a water control plate (14), and when the water control plate (14) slides, the size of the communication port between the water outlet pipe (15) and the water pipe (8) can be controlled to adjust the water output.
7. The adjustable inner mold platform of a hollow pier according to claim 6, characterized in that: The water pipe (8) sliding sleeve is provided with a slip ring (17), the slip ring (17) is connected to the water pipe (8) via a first spring (18), and the slip ring (17) is connected to a magnet (20) that can drive the water control plate (14) to move.
8. The adjustable inner mold platform of a hollow pier according to claim 7, characterized in that: The rotating shaft fixing sleeve is provided with a rope collecting wheel (16), a sub-pull rope (19) is wound around the rope collecting wheel (16), and the sub-pull rope (19) is connected to the slip ring (17); it also includes a fixing sleeve which is slidingly sleeved on the adjusting beam (12) and the cross beam (6), and the fixing sleeve is connected to the slip ring (17) through a main pull rope (7).
9. The adjustable inner mold platform of a hollow pier according to claim 1, characterized in that: It also includes an air pump (21) arranged between the longitudinal beam (5) and the hollow pier inner mold (11), the air pump (21) is slidably connected to a push rod (23), the push rod (23) is connected to the air pump (21) through a second spring, and the air pump (21) is also provided with an air outlet pipe (25) and an air inlet pipe (26).
10. The adjustable inner mold platform of a hollow pier according to claim 9, characterized in that: The push rod (23) is fixedly connected with a ratchet (27), and the air pump (21) is slidably connected with a ratchet pawl (28) that matches the ratchet pawl (27). The ratchet pawl (28) is connected to the air pump (21) via a third spring. When air is pumped into the air pump (21) via an air inlet pipe (26), the ratchet pawl (28) can be driven to move in a direction close to the ratchet pawl (27).