Assembly type cross beam capable of being adjusted and installed in multiple directions and cross beam assembly method
Through the multi-directional adjustment of the assembled beam design, the deformation error and steel beam installation accuracy requirements in concrete bridge construction are solved, the construction flexibility and efficiency are improved, and the application scope is expanded , realize the industrial construction of bridges.
Patent Information
- Application Number
- CN202411275361.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-12
- Publication Date
- 2024-11-12
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In traditional bridge design, the contradiction between deformation and error in concrete beam construction and high-precision installation requirements of steel beams leads to the limited application of steel beams in concrete bridges, and the on-site construction quality is difficult to control, which is prone to cracking and damage. etc.
A multi-directional adjustment assembled cross beam is designed, adopting a box-assembly structure and a multi-directional bolt hole design. Through the bolt connection between the first and second flanges and the main beam, the horizontal and vertical displacement of the cross beam is achieved. Adjustment to adapt to construction deformation and fixing through locking and welding of the sleeve bolts, ensuring flexible adjustment and final fixation of the beam length.
Improve the flexibility and efficiency of steel beam construction, reduce installation accuracy requirements, broaden its application range in precast concrete structures, achieve the goal of industrial bridge construction, solve the quality control problems and steel beams in concrete beam construction Contradictory installation accuracy.
Smart Images

Figure CN118932876A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of bridge design and construction, and in particular to an assembled crossbeam capable of being adjusted and installed in multiple directions, and a crossbeam assembly method. Background Art
[0002] In traditional bridge design, precast concrete bridges usually use concrete beams. According to years of application experience, the quality of concrete beam construction on site is difficult to control, which can easily lead to cracking, breakage and other defects during operation. In contrast, steel beams can be processed in the factory, with less on-site workload and higher quality assurance, which is in line with the trend of industrialized bridge construction. However, the contradiction between the large deformation and error in the construction of concrete main beams and the high-precision installation requirements of steel beams often leads to difficulties in the installation of steel beams, limiting their application in concrete bridges. Summary of the invention
[0003] 1. Technical issues to be solved
[0004] The present invention is expected to at least partially solve one of the above technical problems.
[0005] 2. Technical Solution
[0006] The first aspect of the present invention provides an assembled beam that can be adjusted in multiple directions, including: a beam body; a first flange, fixed to the end of the beam body close to the first side, and having a first bolt hole arranged in the circumferential direction thereof, and the first bolt hole extends in the first direction on the vertical plane; a second flange, fixed to the end of the beam body close to the second side, and having a second bolt hole arranged in the circumferential direction thereof, and the second bolt hole extends in the second direction on the vertical plane; wherein the vertical plane is perpendicular to the extension direction of the beam body; and the angle between the first direction and the second direction is between 60° and 120°.
[0007] In some embodiments of the present invention, the first flange and the first main beam on the first side are fixed by a first bolt passing through a first bolt hole, wherein: when the first bolt is not tightened, the relative position of the beam body and the first main beam along the first direction is adjustable; when the first bolt is locked, the relative position of the beam body and the first main beam along the first direction is fixed; the second flange and the second main beam on the second side are fixed by a second bolt passing through a second bolt hole; wherein: when the second bolt is not tightened, the relative position of the beam body and the second main beam along the second direction is adjustable; when the second bolt is locked, the relative position of the beam body and the second main beam along the second direction is fixed.
[0008] In some embodiments of the present invention, a first bolt sleeve is embedded in the first main beam, and the first bolt passes through the first bolt hole on the first flange and is fixed to the first bolt sleeve in the first main beam; a second bolt sleeve is embedded in the second main beam, and the second bolt passes through the second bolt hole on the second flange and is fixed to the second bolt sleeve in the second main beam.
[0009] In some embodiments of the present invention, one of the following two methods is adopted: ① Prefabricated cross beams are provided on both sides of the main beam; the bolt sleeve is a bolt sleeve that penetrates the main beam; the bolt passes through the bolt sleeve and is locked with the flanges on both sides; ② The main beam is only provided with a prefabricated cross beam on one side; the bolt sleeve is a bolt sleeve with a single-side opening and a thread is provided inside; the bolt is screwed into the bolt sleeve and locked; wherein the main beam is the first main beam, the bolt sleeve is the first bolt sleeve, and the bolt is the first bolt; or, the main beam is the second main beam, the bolt sleeve is the second bolt sleeve, and the bolt is the second bolt.
[0010] In some embodiments of the present invention, the angle between the first direction and the second direction is 90°.
[0011] In some embodiments of the present invention, the vertical cross-section of the beam body is one of the following shapes: square, rectangle, regular hexagon, circle, ellipse.
[0012] In some embodiments of the present invention, the shapes of the first flange and the second flange correspond to the shape of the beam body, and the radial extension dimension T2 of the first flange and the second flange and the radial extension dimension T1 of the beam body satisfy: 0.67T1≤T2≤1.5T1;
[0013] In some embodiments of the present invention, the vertical cross-section of the beam body is: a rectangle; one of the first direction and the second direction is along the horizontal direction; the other is along the vertical direction; the radius R of the bolt satisfies: ① to meet the shear strength requirement, the design value of the bearing capacity of each bolt is calculated according to the following formula: Nv=0.16P; where: Nv is the design value of the shear bearing capacity of the bolt; P is the design value of the pre-tension of the bolt, which is between 3R and 6R; ② to meet the tensile strength requirement, the bearing capacity of each bolt is calculated according to the following formula: Nt=0.8P; where: Nt is the design value of the tensile force of the bolt; P is the design value of the pre-tension of the bolt, which is between 3R and 6R; Among them, the unit of R is mm, and the unit of P, Nv, and Nt is kN; the extension length of the bolt hole satisfies: the length L1 of the bolt hole extending in the horizontal direction satisfies: R+3mm≤L1≤2.5R; the length L2 of the bolt hole extending in the vertical direction satisfies: R+3mm≤L2≤2.5R; the arrangement of the bolt holes satisfies: the distance between the bolt hole and the center of the beam body is between 6R and 16R; the distance between the center of the bolt hole and the edge of the beam body is between 3R and 8R; the flange is the first flange or the second flange; the bolt is the first bolt or the second bolt; the bolt hole is the first bolt hole or the second bolt hole.
[0014] In some embodiments of the present invention, the fabricated beam is a steel beam.
[0015] In some embodiments of the present invention, the first main beam and the second main beam are concrete main beams.
[0016] In some embodiments of the present invention, multiple bolt holes are arranged in the circumferential direction, and the number is greater than or equal to 4, and the connection center of two symmetrical bolt holes is consistent with the center of gravity of the vertical surface of the beam body, wherein the bolt hole is a first bolt hole, and the circumferential direction is the circumferential direction of the first flange; and / or, the bolt hole is a second bolt hole, and the circumferential direction is the circumferential direction of the second flange.
[0017] In some embodiments of the present invention, bolt pads are provided at the following positions: between the first bolt and the first flange; between the second bolt and the second flange.
[0018] In some embodiments of the present invention, the beam body is a sleeve box combination, including: N sleeve boxes that are sequentially sleeved and connected, N≥2, wherein the overlapping parts of at least two adjacent sleeve boxes among the N sleeve boxes are provided with sleeve box bolt holes along the extension direction of the beam body, and the two adjacent sleeve boxes are fixed by sleeve box bolts passing through the sleeve box bolt holes: wherein: when the sleeve box bolts are not locked, the relative positions of the two adjacent sleeve boxes along the extension direction of the beam body are adjustable; when the sleeve box bolts are locked, the relative positions of the two adjacent sleeve boxes along the extension direction of the beam body are fixed; wherein, multiple sleeve box bolt holes are arranged in the circumferential direction of the sleeve boxes, and the number is greater than or equal to 4, and the connection center of two symmetrical sleeve box bolt holes is consistent with the center of gravity of the vertical surface of the beam body.
[0019] In some embodiments of the present invention, N=2, and the beam body includes: a first box and a second box that are fitted together, wherein the second box is fitted into the first box; a first flange is arranged at the end of the first box away from the second box; a second flange is arranged at the end of the second box away from the first box; and box bolt holes are arranged at the overlapping part of the first box and the second box.
[0020] In some embodiments of the present invention, N=3, and the beam body includes: a first casing, an intermediate casing, and a second casing which are sequentially connected; the two ends of the intermediate casing are respectively inserted into the first casing and the second casing; wherein the first flange is arranged at the end of the first casing away from the second casing; the second flange is arranged at the end of the second casing away from the first casing; casing bolt holes are arranged at the overlapping part of the first casing and the intermediate casing; casing bolt holes are arranged at the overlapping part of the second casing and the intermediate casing.
[0021] A second aspect of the present invention provides a beam assembly method, comprising:
[0022] Step A, prepare N sets of boxes constituting the beam body in the above assembled beam, wherein:
[0023] A sleeve bolt hole is provided along the extension direction of the crossbeam body at a preset overlapping portion of at least two adjacent sleeves;
[0024] A first flange is welded on the outer side of the first side casing of the casing assembly; a second flange is welded on the outer side of the second side casing;
[0025] Step B, pre-embedding a first bolt sleeve and a second bolt sleeve at preset flange connection positions of the first main beam and the second main beam on both sides respectively;
[0026] Step C, sequentially fitting N sleeves to pre-connect the beam body, wherein the sleeve bolts passing through the sleeve bolt holes are kept in a semi-tightened state;
[0027] Step D, adjusting the position of the crossbeam body so that the following conditions are met: the first bolt sleeve on the first main beam can be aligned with a specific position of a first bolt hole extending along a first direction on the first flange; the second bolt sleeve on the second main beam can be aligned with a specific position of a second bolt hole extending along a second direction on the second flange;
[0028] Step E, installing and tightening the first bolt to fix the first flange to the first main beam, thereby fixing the relative position of the beam body and the first main beam along the first direction; installing and tightening the second bolt to fix the second flange to the second main beam, thereby fixing the relative position of the beam body and the second main beam along the second direction;
[0029] Step F, completely tighten the casing bolts to fix the relative positions of adjacent casings in the casing assembly along the extension direction of the crossbeam, thereby fixing the length of the crossbeam body along its own extension direction.
[0030] In some embodiments of the present invention, step F further includes:
[0031] Step G, welding and fixing the casing bolts to the corresponding casing, welding and fixing the first bolts to the first flange, and welding and fixing the second bolts to the second flange.
[0032] 3. Beneficial Effects
[0033] It can be seen from the above technical solution that the present invention has at least one of the following beneficial effects compared with the prior art:
[0034] 1. In the present invention, in the first flange, the first bolt hole is a horizontal slot hole, and the first bolt can move left and right in the first bolt hole in the unlocked state to achieve horizontal displacement adjustment of the steel beam. The second flange is located at the outer end of the small steel box, and is connected to the first main beam through a high-strength second bolt. The second bolt hole is a vertical slot hole, and the second bolt can move left and right in the second bolt hole in the unlocked state to achieve vertical displacement adjustment of the steel beam.
[0035] In this case, even if there is a deformation difference in the construction of the main beams on both sides, the deformation difference can be compensated by the extension length of the first bolt hole and the second bolt hole in the corresponding direction, which can better adapt to the deformation difference in the construction of the main beams on both sides, thereby improving the flexibility and efficiency of the steel beam construction; at the same time, since the limitations caused by excessively high installation accuracy requirements are reduced, the application scope of steel beams in precast concrete structures is broadened, which is of great significance to promoting the application of steel beams in prefabricated bridges and accelerating the realization of industrialized bridge construction.
[0036] 2. In some embodiments of the present invention, the first direction is 45° to the horizontal plane; the second direction is perpendicular to the first direction. Compared with the first embodiment of the assembled beam, the advantages of this embodiment are: it is more convenient for the bolts to find a suitable position, and when locking or welding, the bolts can also provide a certain support for the steel beam, which is beneficial to construction.
[0037] 3. In the present invention, the cross beam body is a steel sleeve structure, including: N sleeves connected in sequence, N ≥ 2. Among the N sleeves, the overlapping part of at least two adjacent sleeves is provided with sleeve bolt holes along the extension direction of the cross beam body, and the adjacent sleeves are fixed by sleeve bolts passing through the sleeve bolt holes, thereby realizing the adjustable overall length of the cross beam body.
[0038] During the actual construction process, the length of the steel casing along the extension direction of the beam body can be flexibly adjusted, and the length of the beam body can be kept adjustable during construction; at the end of the construction, the large steel box and the small steel box are locked by the casing bolts to fix the length of the beam body, which greatly facilitates the construction.
[0039] It is particularly important to note that a slightly shorter steel beam will bring great convenience during the hoisting process, the alignment process of the first bolt hole and the first bolt sleeve, the installation of the first bolt, the alignment process of the second bolt hole and the second bolt sleeve, and the installation of the second bolt. After installing the first bolt and the second bolt, the steel beam is restored to its normal length through the sleeve bolt, compensating for the error in the main beam construction.
[0040] 4. In some embodiments of the present invention, the cross beam body includes: a large steel box and a small steel box. The small steel box is partially inserted into the large steel box 11, and a bolt hole for the box is provided at the overlapping portion of the large steel box and the small steel box. The bolt hole for the box is designed as a slot hole along the extending direction of the cross beam body. In the slot hole, the overlapping portion is connected or welded by a high-strength box bolt. This cross beam body has a simple structure, is easy to transport and assemble, has a higher strength than other structures, and has a strong practical value.
[0041] 5. In some embodiments of the present invention, the crossbeam body is a two-side sleeve structure, including: a first sleeve, an intermediate sleeve, and a second sleeve that are sleeved and connected in sequence; the two ends of the intermediate sleeve are respectively sleeved into the first sleeve and the second sleeve. The overlapping part of the first sleeve and the intermediate sleeve is provided with sleeve bolt holes; the overlapping part of the second sleeve and the intermediate sleeve is provided with sleeve bolt holes. Among them, the first flange is provided at the end of the first sleeve away from the second sleeve; the second flange is provided at the end of the second sleeve away from the first sleeve. Compared with the first embodiment of the assembled crossbeam, the advantages of this embodiment are: the crossbeam body can be longer, the symmetry will be better, the load-bearing capacity will be better, and it will be more beautiful.
[0042] 6. In the present invention, multi-directional installation and adjustment of the beam body are achieved by designing slots in three different directions between the sleeves and between the two flanges and the main beam, which solves the quality control problem in the construction of traditional concrete beams and overcomes the contradiction between accuracy and error in the installation process of steel beams, providing an efficient, stable and industrialized solution for bridge construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0043] Figure 1 It is a three-dimensional schematic diagram of an assembled crossbeam that can be adjusted in multiple directions according to an embodiment of the present invention.
[0044] Figure 2 and Figure 3 They are Figure 1 Elevation and plan views of the fabricated beam shown.
[0045] Figure 4A and Figure 4B They are Figure 1 A cross-sectional view of the connection between the first and second flanges on both sides of the assembled crossbeam and the corresponding main beam is shown.
[0046] Figure 5 The figure is a flow chart of a beam assembly method according to an embodiment of the present invention. DETAILED DESCRIPTION
[0047] The purpose of the present invention is to provide a prefabricated steel cross beam that can be adjusted in multiple directions to improve the tolerance of construction and installation, simplify the installation process, and improve the quality of the bridge structure as a whole.
[0048] In order to make the objectives, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with specific implementation methods and with reference to the accompanying drawings.
[0049] A first aspect of the present invention provides an assembled crossbeam that can be adjusted in multiple directions. Figure 1 It is a three-dimensional schematic diagram of an assembled crossbeam that can be adjusted in multiple directions according to an embodiment of the present invention. Figure 2 and Figure 3 They are Figure 1 The elevation and plan views of the fabricated beams are shown. Figure 1 , Figure 2 , Figure 3 The assembled crossbeam that can be adjusted in multiple directions in this embodiment includes:
[0050] The crossbeam body 10 is a sleeve box combination, including: N sleeve boxes that are sequentially sleeved and connected, N≥2;
[0051] A first flange 20 is fixed to the end of the beam body close to the first side, and is provided with first bolt holes 21 in the circumferential direction thereof. The first bolt holes 21 extend along the first direction O1 on the vertical plane;
[0052] A second flange 30 is fixed to the end of the beam body close to the second side, and is provided with second bolt holes 31 in the circumferential direction. The second bolt holes 31 extend along the second direction O2 on the vertical plane;
[0053] The vertical plane is perpendicular to the extension direction O3 of the beam body; on the vertical plane, the angle between the first direction O1 and the second direction O2 is between 60° and 120°.
[0054] The various components of the assembled crossbeam that can be adjusted in multiple directions in this embodiment are described in detail below.
[0055] In an actual construction environment, the assembled cross beam is installed between the first main beam A and the second main beam B on both sides. The first main beam A and the second main beam B are concrete main beams. The assembled cross beam is a steel cross beam.
[0056] Those skilled in the art should understand that the main beams on both sides may be made of other materials, and the main beams may also be other structures that perform a fixing function. These deformation methods can also implement the present invention and are also within the protection scope of the present invention.
[0057] Please continue to refer to Figure 1 to Figure 3 The cross beam body 10 is a steel casing, including: a large steel box 11 and a small steel box 12. The small steel box 12 is partially inserted into the large steel box 11. It should be noted that a casing bolt hole 13 is provided at the overlapping portion of the large steel box 11 and the small steel box 12. The casing bolt hole 13 is designed as a slot along the extending direction O3 of the cross beam body. In the slot, the overlapping portion is connected or welded by a high-strength casing bolt 14, wherein:
[0058] ① When the sleeve bolt 14 is not locked, the relative positions of the large steel box 11 and the small steel box 12 along the extension direction O3 of the crossbeam body can be adjusted;
[0059] ② When the sleeve bolts 14 are locked, the large steel box 11 and the small steel box 12 are fixed in relative positions along the extension direction O3 of the beam body.
[0060] The locking includes: threading and / or welding. The crossbeam body of this embodiment has a simple structure, is easy to transport and assemble, has a higher strength than other structures, and has great practical value.
[0061] During the actual construction process, the length of the steel casing along the extension direction of the beam body can be flexibly adjusted, and the length of the beam body can be kept adjustable during construction; at the end of the construction, the large steel box and the small steel box are locked by the casing bolts to fix the length of the beam body, which greatly facilitates the construction.
[0062] It is particularly important to note that a slightly shorter steel beam will bring great convenience during the hoisting process, the alignment process of the first bolt hole and the first bolt sleeve, the installation of the first bolt, the alignment process of the second bolt hole and the second bolt sleeve, and the installation of the second bolt. After installing the first bolt and the second bolt, the steel beam is restored to its normal length through the sleeve bolt, compensating for the error in the main beam construction.
[0063] It should be noted that, although the crossbeam body 10 of this embodiment includes: a large steel box 11 and a small steel box 12, that is, the crossbeam body has two sleeves. However, the present invention is not limited to this. In other embodiments of the present invention, the crossbeam body may also include: N sleeves connected in sequence, N ≥ 2. Among the N sleeves, the overlapping parts of at least two adjacent sleeves are provided with sleeve bolt holes along the extension direction of the crossbeam body, and the two adjacent sleeves are fixed by sleeve bolts passing through the sleeve bolt holes, thereby realizing the adjustable length of the crossbeam body. These deformation methods can also realize the present invention and are also within the protection scope of the present invention.
[0064] In particular, in the second embodiment of the assembled crossbeam of the present invention, N=3, that is, the crossbeam body is a two-side sleeve structure, including: a first sleeve, an intermediate sleeve, and a second sleeve that are sleeved and connected in sequence; the two ends of the intermediate sleeve are respectively sleeved into the first sleeve and the second sleeve. The overlapping part of the first sleeve and the intermediate sleeve is provided with sleeve bolt holes; the overlapping part of the second sleeve and the intermediate sleeve is provided with sleeve bolt holes. Among them, the first flange is provided at the end of the first sleeve away from the second sleeve; the second flange is provided at the end of the second sleeve away from the first sleeve. Compared with the first embodiment of the assembled crossbeam, the advantages of this embodiment are: the crossbeam body can be longer, the symmetry will be better, the load-bearing capacity will be better, and it will be more beautiful.
[0065] Figure 4A and Figure 4B They are Figure 1 A cross-sectional view of the connection between the first and second flanges on both sides of the assembled crossbeam and the corresponding main beam is shown.
[0066] Please continue to refer to Figure 1 to Figure 3 , Figure 4A , Figure 4B The first flange 20 is located at the outer end of the large steel box and is connected to the first main beam through a high-strength first bolt 23. The second flange 30 is located at the outer end of the small steel box and is connected to the second main beam through a high-strength second bolt 33.
[0067] In this embodiment, the vertical cross section of the cross beam is a rectangle, and the corresponding longitudinal cross sections of the first flange 11 and the second flange 12 are also rectangles. However, the present invention is not limited to this. In other embodiments of the present invention, the vertical cross section of the cross beam can also be a regular hexagon, a circle, an ellipse, etc., and the first flange and the second flange can be designed into corresponding shapes. Preferably, considering the structural strength and convenience of the flange, the radial extension dimension T2 of the first flange and the second flange satisfies the radial extension dimension T1 of the cross beam body: 0.67T1≤T2≤1.5T1.
[0068] Please continue to refer to Figure 1 to Figure 3 , Figure 4A In the first flange 20, the first bolt hole 21 is a horizontal slot. In the unlocked state, the first bolt 23 can move left and right in the first bolt hole 21 to achieve horizontal displacement adjustment of the steel beam. Please continue to refer to Figure 1 to Figure 3 , Figure 4B The second flange 30 is located at the outer end of the small steel box and is connected to the first main beam through a high-strength second bolt. The second bolt hole 31 is a vertical slot. In the unlocked state, the second bolt 33 can move left and right in the second bolt hole 31 to achieve vertical displacement adjustment of the steel beam. Wherein:
[0069] ① The first flange 21 is fixed to the first main beam A by the first bolt 23 passing through the first bolt hole.
[0070] Wherein, when the first bolt 23 is not locked, the relative position of the beam body 10 and the first main beam A along the first direction is adjustable; when the first bolt 23 is locked, the relative position of the beam body 10 and the first main beam A along the first direction is fixed;
[0071] ② The second flange is fixed to the second main beam by the second bolt passing through the second bolt hole.
[0072] Among them, when the second bolt 33 is unlocked, the relative position of the beam body 10 and the second main beam B along the second direction is adjustable; when the second bolt 33 is locked, the relative position of the beam body 10 and the second main beam B along the second direction is fixed.
[0073] In this embodiment, even if there is a deformation difference in the construction of the main beams on both sides, the deformation difference can be compensated by the extension length of the first bolt hole 21 and the second bolt hole 31 in the corresponding direction, thereby improving the flexibility and efficiency of the steel beam construction, and can better adapt to the deformation difference in the construction of the main beams on both sides; at the same time, since the limitations caused by excessively high installation accuracy requirements are reduced, the application scope of steel beams in precast concrete structures is broadened, which is of great significance to promoting the application of steel beams in prefabricated bridges and accelerating the realization of industrialized bridge construction.
[0074] Please continue to refer to Figure 1 to Figure 3 In this embodiment, the angle between the first direction O1 and the second direction O2 is 90°, that is, the first bolt hole 21 is a horizontal slot, and the second bolt hole 31 is a vertical slot. However, the present invention is not limited to this. In other embodiments of the present invention, the angle between the first direction O1 and the second direction O2 can be between 60° and 120°. These deformation modes can also realize the present invention and are also within the protection scope of the present invention.
[0075] In particular, in the third embodiment of the assembled beam of the present invention, the first direction is 45° to the horizontal plane; the second direction is perpendicular to the first direction. Compared with the first embodiment of the assembled beam, the advantages of this embodiment are: it is more convenient for the bolts to find a suitable position, and when locking or welding, the bolts can also provide a certain support for the steel beam, which is beneficial to construction.
[0076] For the bolt holes and corresponding bolts on the first flange, the second flange, and the crossbeam sleeve, the following aspects also need to be explained:
[0077] (1) Number and location of bolt holes / bolts
[0078] like Figure 1 to Figure 3 As shown, in the overlapping part of the large steel box and the small steel box, 6 bolt holes / bolts are set on the two horizontal planes, and 4 bolt holes / bolts are set on the two longitudinal planes. Figure 4A and Figure 4B There are 8 bolt holes / bolts in the first and second flanges.
[0079] Those skilled in the art should understand that the above are only preferred embodiments of the present invention. In other embodiments of the present invention, the number of bolt holes / bolts can be reasonably set according to the results of structural calculation.
[0080] In a preferred embodiment of the present invention, the bolt holes are evenly distributed in the circumferential direction, and the number of the bolt holes is greater than or equal to 4.
[0081] (2) Multiple bolt holes / bolt locations
[0082] In a preferred embodiment of the present invention, the connection center of the two symmetrical bolt holes is consistent with the center of gravity of the vertical surface of the beam body, and the distance between the bolt hole and the center of the beam body is between 6R and 16R; the distance between the center of the bolt hole and the edge of the beam body is between 3R and 8R.
[0083] (3) Radius of the bolt
[0084] For each bolt, the shear force and tensile stress it bears can be obtained through structural calculation. After obtaining the shear force and tensile stress, the radius R of the bolt is calculated in combination with the strength parameters of the bolt material. Specifically, the radius R of the bolt satisfies:
[0085] ① To meet the shear strength requirements, the design value of the bearing capacity of each bolt is calculated as follows: Nv = 0.16P; where: Nv is the design value of the shear bearing capacity of the bolt; P is the design value of the pre-tension of the bolt, which is between 3R and 6R;
[0086] ② To meet the tensile strength requirements, the bearing capacity of each bolt is calculated according to the following formula: Nt=0.8P; where: Nt is the design value of the bolt's tensile force; P is the design value of the bolt's pre-tension force, which ranges from 3R to 6R.
[0087] Among them, the unit of R is mm, and the unit of P, Nv, and Nt is kN.
[0088] (4) Extension length of bolt hole
[0089] The larger the bolt hole extension length is, the larger the main beam construction error that can be compensated is, but it also means a reduction in the structural strength of the flange. Therefore, it is necessary to comprehensively consider the specific construction conditions and the size of the steel beam for setting. Based on many years of construction experience, in the present invention, the bolt hole extension length satisfies:
[0090] ① The length L1 of the first bolt hole 21 extending in the horizontal direction satisfies: R+3mm≤L1≤2.5R;
[0091] ② The length L2 of the second bolt hole 31 extending in the vertical direction satisfies: R+3mm≤L2≤2.5R;
[0092] (5) Anchoring of bolts.
[0093] In this embodiment, a bolt washer is provided between the bolt and the flange to improve the stability and bearing capacity of the connection. Specifically, a sleeve bolt washer is provided between the sleeve bolt and the large steel box; a first bolt washer 24 is provided between the first bolt and the first flange, and a second bolt washer 34 is provided between the second bolt and the second flange.
[0094] Furthermore, in order to improve the anchoring force of the steel beam on the concrete main beam, bolt sleeves are embedded in the first / second main beam to enhance the integrity and stability of the structure. Specifically:
[0095] ① The first bolt sleeve 22 is embedded in the first main beam A
[0096] The first bolt 23 passes through the first bolt hole 21 on the first flange and is fixed to the first bolt sleeve 22 in the first main beam;
[0097] ②The second bolt sleeve 32 is embedded in the second main beam B
[0098] The second bolt 33 passes through the second bolt hole 31 on the second flange and is fixed to the second bolt sleeve 32 in the second main beam.
[0099] In response to the different positions of the first / second main beam, the bolt sleeve is set differently, and specifically one of the following two methods is adopted:
[0100] ① Such as Figure 3 As shown in the first main beam A in the figure, both sides of the first main beam are provided with assembled cross beams; the first bolt sleeve 22 is a bolt sleeve that penetrates the first main beam A; the first bolt 23 passes through the first bolt sleeve and is locked with the second flange 30' on the other side, and the second flange 30' is welded to the other cross beam body 10';
[0101] ② If Figure 3 As shown in the second main beam B in the figure, the second main beam is provided with an assembled cross beam only on one side; the second bolt sleeve 32 is a bolt sleeve with a single-side opening, and a thread is provided inside the bolt sleeve; the second bolt 33 is screwed into the bolt sleeve and locked.
[0102] In this embodiment, multi-directional installation and adjustment of the beam body is achieved by designing slots in three different directions between the sleeves and between the two flanges and the main beam, which solves the quality control problem in the construction of traditional concrete beams and overcomes the contradiction between accuracy and error in the installation process of steel beams, providing an efficient, stable and industrialized solution for bridge construction.
[0103] Based on the above-mentioned assembled crossbeam, a second aspect of the present invention provides a crossbeam assembly method during the construction phase. Figure 5 This is a flow chart of the crossbeam assembly method according to an embodiment of the present invention. Figure 1 to Figure 3 , Figure 4A , Figure 4B , Figure 5 As shown, the beam assembly method of this embodiment includes:
[0104] Step A, preparing N sleeves constituting the beam body in the assembled beam of the above embodiment; wherein sleeve bolt holes are arranged along the extending direction of the beam body at the preset overlapping part of two adjacent sleeves; a first flange is welded on the outer side of the first side sleeve of the sleeve assembly; and a second flange is welded on the outer side of the second side sleeve;
[0105] Step B, pre-embedding a first bolt sleeve and a second bolt sleeve at preset flange connection positions of the first main beam and the second main beam on both sides respectively;
[0106] Step C, sequentially assembling N sleeves to pre-connect the beam body, wherein the sleeve bolts passing through the sleeve bolt holes are kept in a semi-tightened state;
[0107] It should be noted that the "semi-locked state" here means that the relative positions of the large box and the small box are basically fixed, but not completely locked, and can be disassembled to adjust the position of the box bolts in the box bolt holes without much effort.
[0108] Step D, adjusting the position of the crossbeam body so that the following conditions are met: the first bolt sleeve on the first main beam can be aligned with a specific position of a first bolt hole extending along a first direction on the first flange; the second bolt sleeve on the second main beam can be aligned with a specific position of a second bolt hole extending along a second direction on the second flange;
[0109] Step E, installing and tightening the first bolt to fix the first flange to the first main beam, thereby fixing the relative position of the beam body and the first main beam along the first direction; installing and tightening the second bolt to fix the second flange to the second main beam, thereby fixing the relative position of the beam body and the second main beam along the second direction;
[0110] Step F, completely tightening the casing bolts to fix the relative positions of adjacent casings in the casing assembly along the extension direction of the crossbeam, thereby fixing the length of the crossbeam body along its own extension direction;
[0111] Step G, welding and fixing the casing bolts to the corresponding casing, welding and fixing the first bolts to the first flange, and welding and fixing the second bolts to the second flange.
[0112] The following is a detailed description of each step of the beam assembly method of this embodiment.
[0113] For step A, it is divided into the following two sub-steps:
[0114] Sub-step A1: manufacturing steel casing
[0115] In this embodiment, the N sets of boxes are: a large set of boxes 11 and a small set of boxes 12.
[0116] In actual engineering, high-strength steel is used to manufacture the large steel box 11 and the small steel box 12 in the factory. Slots are set in the predetermined connection area of the large steel box 11 along the beam direction; round holes are set in the predetermined connection area of the small steel box 12 for subsequent high-strength bolt connection.
[0117] Sub-step A2: Manufacturing flange
[0118] In actual engineering, the first flange 20 and the second flange 30 are manufactured and welded to the corresponding steel box. The first flange 20 is welded and fixed to the outer end of the small steel box 12; the second flange 30 is welded and fixed to the outer end of the large steel box 11. Among them, the first flange 20 is provided with slots in the horizontal direction to accommodate the adjustment of the steel beam in the horizontal direction. The second flange 30 is provided with slots in the vertical direction to accommodate the adjustment of the steel beam in the vertical direction. After the steel beam is manufactured, it is transported to the construction site and positioned at a predetermined position between two concrete main beams - the first main beam A and the second main beam B.
[0119] In step B, concrete main beams A and B are prefabricated in the factory, and bolt sleeves are embedded in the pre-connection position of the steel beam. The side beam embeds the first bolt sleeve 22, and the middle beam embeds the second bolt sleeve 32 to meet the connection requirements of the steel beam. The first bolt sleeve is a bolt sleeve with a single-side opening, and the second bolt sleeve is a bolt sleeve that penetrates the main beam.
[0120] Steps C to G are the installation process of the steel beam. During the installation process, the reserved slots are used to adjust the position of the high-strength bolts according to the actual measurement results of the concrete main beam to adapt to the deformation and error of the main beam. Bolt pads are placed between the high-strength bolts and the slots, and the high-strength bolts are gradually tightened to ensure a firm connection between the steel beam and the concrete main beam, while achieving the required multi-directional adjustment.
[0121] It should be noted that during the installation of the steel beam, the sleeve bolts are first half-tightened. During the hoisting process, the installation process of aligning the first bolt hole and the first bolt sleeve, installing the first bolt, aligning the second bolt hole and the second bolt sleeve, and installing the second bolt, a slightly shorter steel beam will bring great convenience and improve safety. After installing the first and second bolts, the sleeve bolts are used to restore the steel beam to its normal length, compensating for the error in the main beam construction.
[0122] At this point, the various embodiments of the present invention have been introduced. According to the above description, those skilled in the art should have a clear understanding of the present invention.
[0123] It should be noted that, unless explicitly indicated to the contrary, the numerical parameters in the specification and claims of the present invention may be approximate values and may be changed according to the content of the present invention. Specifically, all the numbers indicating the content of the composition, reaction conditions, etc. recorded in the specification and claims should be understood to be modified by the term "about" in all cases, and the meaning of the expression is to include a change of ±10% from a specific number in some embodiments.
[0124] The ordinal numbers used in the specification and claims, such as "first", "second", "third", "primary", "secondary", as well as Arabic numerals, letters, etc., to modify the corresponding elements (or steps), are intended only to clearly distinguish an element (or step) with a certain name from another element (or step) with the same name, and do not mean that the element (or step) has any ordinal number, nor do they represent the order of one element (or step) and another element (or step).
[0125] It should also be noted that the directional terms mentioned in the embodiments, such as "center", "lateral", "longitudinal", "top", "bottom", "up", "down", "front", "back", "left", "right", "inside", "outside", etc., indicate positions or positional relationships based only on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. Moreover, throughout the drawings, the same elements are represented by the same or similar reference numerals. Moreover, the shapes and sizes of the components in the drawings do not reflect the actual size and proportion, but only illustrate the contents of the embodiments of the present invention.
[0126] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "connected" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to specific circumstances.
[0127] Those skilled in the art should understand that in the claims and description of the present invention, the word "comprising" does not exclude the existence of elements (or steps) not listed in the claims. The word "a" or "an" preceding an element (or step) does not exclude the existence of multiple such elements (or steps).
[0128] For certain implementations, if they are not the key content of the present invention and are well known to ordinary technicians in the relevant technical field, they are not described in detail in the drawings or text of the specification due to space limitations. In this case, reference can be made to relevant existing technologies for understanding.
[0129] Furthermore, the above embodiments are provided merely to enable the present invention to satisfy legal requirements, and the present invention may be embodied in many different forms and should not be construed as limited to the embodiments set forth herein.
[0130] Similarly, it should be understood that in order to simplify the present invention, in the above description of the exemplary embodiments of the present invention, the various features of the present invention are sometimes grouped together into a single embodiment, figure, or description thereof. However, the method of the invention should not be interpreted as reflecting the following intention: the claimed invention requires more features than the features explicitly stated in each claim. More specifically, as reflected in the claims, each inventive aspect lies in less than all the features of the previous single embodiment. Moreover, the embodiments can be mixed and matched with each other or with other embodiments based on design and reliability considerations, that is, the technical features in different embodiments can be freely combined to form more embodiments. Therefore, the claims following the specific embodiment are hereby explicitly incorporated into the specific embodiment, wherein each claim itself serves as a separate embodiment of the present invention.
[0131] The above specific embodiments provide a detailed description of the objectives, technical means and beneficial effects of the present invention. It should be understood that the purpose of the detailed description is to enable those skilled in the art to understand the present invention more clearly, and it is not used to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. An assembled crossbeam that can be adjusted in multiple directions, characterized in that: include: Beam body; A first flange, fixed to an end of the beam body close to the first side, and provided with a first bolt hole in the circumferential direction thereof, the first bolt hole extending in a first direction on a vertical plane; A second flange is fixed to the end of the beam body close to the second side, and is provided with a second bolt hole in the circumferential direction, and the second bolt hole extends along the second direction on the vertical plane; Wherein, the vertical surface is perpendicular to the extension direction of the beam body; and the angle between the first direction and the second direction is between 60° and 120°.
2. The assembled crossbeam according to claim 1, characterized in that: The first flange is fixed to the first main beam on the first side by a first bolt passing through a first bolt hole, wherein when the first bolt is not locked, the relative position of the cross beam body and the first main beam along the first direction is adjustable; when the first bolt is locked, the relative position of the cross beam body and the first main beam along the first direction is fixed; The second flange is fixed to the second main beam on the second side by a second bolt passing through a second bolt hole; wherein: when the second bolt is not tightened, the relative position of the beam body and the second main beam along the second direction is adjustable; when the second bolt is locked, the relative position of the beam body and the second main beam along the second direction is fixed.
3. The assembled crossbeam according to claim 2, characterized in that: A first bolt sleeve is embedded in the first main beam, and the first bolt passes through a first bolt hole on the first flange and is fixed to the first bolt sleeve in the first main beam; A second bolt sleeve is embedded in the second main beam, and the second bolt passes through the second bolt hole on the second flange and is fixed to the second bolt sleeve in the second main beam.
4. The assembled crossbeam according to claim 3, characterized in that: Use one of the following two methods: ① Both sides of the main beam are provided with assembled cross beams; the bolt sleeve is a bolt sleeve that penetrates the main beam; the bolt passes through the bolt sleeve and is locked with the flanges on both sides; ②Only one side of the main beam is provided with an assembled crossbeam; the bolt sleeve is a bolt sleeve with a single-side opening and a thread is provided inside; the bolt is screwed into the bolt sleeve and locked; Among them, the main beam is the first main beam, the bolt sleeve is the first bolt sleeve, and the bolt is the first bolt; or, the main beam is the second main beam, the bolt sleeve is the second bolt sleeve, and the bolt is the second bolt.
5. The assembled crossbeam according to claim 3, characterized in that: The angle between the first direction and the second direction is 90°; and / or, the vertical cross-section of the beam body is one of the following shapes: square, rectangle, regular hexagon, circle, ellipse; and / or, the shapes of the first flange and the second flange correspond to the shape of the crossbeam body, and the radial extension dimensions T2 of the first flange and the second flange and the radial extension dimension T1 of the crossbeam body satisfy: 0.67T1≤T2≤1.5T1; And / or, the vertical cross section of the beam body is: a rectangle; One of the first direction and the second direction is in a horizontal direction; the other is in a vertical direction; The radius R of the bolt meets the following requirements: ① To meet the shear strength requirements, the design value of the bearing capacity of each bolt is calculated as follows: Nv = 0.16P; where Nv is the design value of the shear bearing capacity of the bolt; P is the design value of the pre-tension of the bolt, which is between 3R and 6R; ② To meet the tensile strength requirements, the bearing capacity of each bolt is calculated as follows: Nt = 0.8P; where Nt is the design value of the tensile force of the bolt; P is the design value of the pre-tension of the bolt, which is between 3R and 6R; where R is in mm, and P, Nv, and Nt are in kN; The extension length of the bolt hole meets the following requirements: the horizontal extension length L1 of the bolt hole meets the following requirements: R+3mm≤L1≤2.5R; the vertical extension length L2 of the bolt hole meets the following requirements: R+3mm≤L2≤2.5R; the arrangement of the bolt holes meets the following requirements: the distance between the bolt hole and the center of the beam body is between 6R and 16R; the distance between the center of the bolt hole and the edge of the beam body is between 3R and 8R; Wherein, the flange is the first flange or the second flange; the bolt is the first bolt or the second bolt; and the bolt hole is the first bolt hole or the second bolt hole.
6. The assembled crossbeam according to claim 3, characterized in that: The fabricated cross beam is a steel cross beam; And / or, the first main beam and the second main beam are concrete main beams; and / or, a plurality of bolt holes are arranged in a circumferential direction, and the number of the bolt holes is greater than or equal to 4, and the connection center of two symmetrical bolt holes is consistent with the center of gravity of the vertical surface of the crossbeam body, wherein the bolt hole is a first bolt hole, and the circumferential direction is the circumferential direction of the first flange; and / or, the bolt hole is a second bolt hole, and the circumferential direction is the circumferential direction of the second flange; And / or, a bolt pad is arranged at the following positions: between the first bolt and the first flange; between the second bolt and the second flange.
7. The assembled crossbeam according to claim 3, characterized in that: The crossbeam body is a sleeve-box combination, comprising: N sleeve boxes that are sequentially sleeved and connected, N≥2, wherein the overlapping portion of at least two adjacent sleeve boxes among the N sleeve boxes is provided with sleeve box bolt holes along the extension direction of the crossbeam body, and the two adjacent sleeve boxes are fixed by sleeve box bolts passing through the sleeve box bolt holes: Wherein: when the sleeve bolts are not locked, the relative positions of the two adjacent sleeves along the extension direction of the beam body are adjustable; when the sleeve bolts are locked, the relative positions of the two adjacent sleeves along the extension direction of the beam body are fixed; Among them, a plurality of casing bolt holes are arranged in the circumferential direction of the casing, and the number is greater than or equal to 4, and the connection center of two symmetrical casing bolt holes is consistent with the center of gravity of the vertical surface of the beam body.
8. The assembled crossbeam according to claim 7, characterized in that: N=2, the crossbeam body comprises: a first set box and a second set box which are connected in a sleeved manner, wherein the second set box is sleeved into the first set box; a first flange is arranged at an end of the first set box away from the second set box; a second flange is arranged at an end of the second set box away from the first set box; and a sleeve bolt hole is arranged at the overlapping portion of the first set box and the second set box; Or, N=3, the beam body includes: a first casing, an intermediate casing, and a second casing which are sequentially connected; the two ends of the intermediate casing are respectively inserted into the first casing and the second casing; wherein the first flange is arranged at the end of the first casing away from the second casing; the second flange is arranged at the end of the second casing away from the first casing; casing bolt holes are arranged at the overlapping part of the first casing and the intermediate casing; casing bolt holes are arranged at the overlapping part of the second casing and the intermediate casing.
9. A beam assembly method, characterized in that: include: Step A, preparing N sets of boxes constituting the beam body in the assembled beam as claimed in claim 7, wherein: A sleeve bolt hole is provided along the extension direction of the crossbeam body at a preset overlapping portion of at least two adjacent sleeves; A first flange is welded on the outer side of the first side casing of the casing assembly; a second flange is welded on the outer side of the second side casing; Step B, pre-embedding a first bolt sleeve and a second bolt sleeve at preset flange connection positions of the first main beam and the second main beam on both sides respectively; Step C, sequentially fitting N sleeves to pre-connect the beam body, wherein the sleeve bolts passing through the sleeve bolt holes are kept in a semi-tightened state; Step D, adjusting the position of the crossbeam body so that the following conditions are met: the first bolt sleeve on the first main beam can be aligned with a specific position of a first bolt hole extending along a first direction on the first flange; the second bolt sleeve on the second main beam can be aligned with a specific position of a second bolt hole extending along a second direction on the second flange; Step E, installing and tightening the first bolt to fix the first flange to the first main beam, thereby fixing the relative position of the beam body and the first main beam along the first direction; installing and tightening the second bolt to fix the second flange to the second main beam, thereby fixing the relative position of the beam body and the second main beam along the second direction; Step F, completely tighten the casing bolts to fix the relative positions of adjacent casings in the casing assembly along the extension direction of the crossbeam, thereby fixing the length of the crossbeam body along its own extension direction.
10. The beam assembly method according to claim 9, characterized in that: The step F also includes: Step G, welding and fixing the casing bolts to the corresponding casing, welding and fixing the first bolts to the first flange, and welding and fixing the second bolts to the second flange.
Citation Information
Patent Citations
Prefabricated assembled UHPC composite beam and rapid construction method
CN108385522A
Three-point adjustable steel truss type T-beam transverse partition beam
CN109778661A
Rigid connection joint structure of steel secondary beam and prefabricated concrete main beam and construction method
CN113957999A
Steel truss continuous beam bridge gusset plate pre-embedding positioning device and working method thereof
CN115559189A
Error-adaptive fabricated triangular beam bridge steel diaphragm
CN117552319A