Municipal rigid frame bridge corbel bracket mechanism and finished bridge linear control method thereof

By using the combined design of embedded shearing steel rods and fine-rolled rebars, pin connection components and limit rings in municipal bridge corrupt leg brackets, the time-consuming and labor-intensive and linear deformation control of corrupt leg brackets during construction is solved. The difficult problem has achieved the safety and stability of construction and improved construction efficiency and safety.

CN118932879APending Publication Date: 2024-11-12THE FIRST COMPARY OF CHINA EIGHTH ENG BUREAU LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411320931.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-23
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

During the construction of municipal bridges, the prefabricated corundle bracket needs to be assembled on the ground and lifted to the top of the pier during construction. The lifting process is time-consuming and labor-intensive, and it is difficult to control linear deformation, and safety after installation is difficult to ensure.

Method used

A municipal rigid bridge ox leg bracket mechanism is designed, including concrete pier body, bracket assembly and limit assembly. Through embedded shearing steel rods and fine-rolled rebar, the pin connection assembly and limit ring are used for rapid use. Assemble and securely fix, the rotary control screw ring and arc restraint block are used to prevent falling off limits, and the adjustment seat and oblique support arms are adjusted to the angle and strength of the bracket to achieve convenience and stability of lifting and installation.

Benefits of technology

It improves the safety and convenience of construction, eliminates the bracket gap through pre-pressure and deformation monitoring, ensures the stability and safety of the structure, and reduces construction time and labor intensity.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118932879A_ABST
    Figure CN118932879A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of bridge construction, in particular to a bracket bracket mechanism of a municipal rigid frame bridge and a bridge forming linear control method of the bracket bracket mechanism of the municipal rigid frame bridge. An upper support, a middle support and a lower support are sequentially and horizontally arranged on one side of a large-mileage overhanging part and a small-mileage overhanging part of the concrete pier body from top to bottom, the bracket bracket is rapidly assembled through a pin connecting assembly before being installed, and the bracket bracket and the concrete pier body are fixedly installed through hoisting equipment after assembly is completed. The pin connecting assembly is safely limited through the limiting assembly before hoisting, construction safety and operation convenience are improved, gaps and inelastic deformation of vertical rod pieces of the bracket under the prepressing load effect are eliminated through prepressing and deformation monitoring after the bracket bracket is installed, control over the construction process is facilitated, pouring on the bracket bracket is completed in three times, and the construction efficiency is improved. The structure is safe and stable.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of bridge construction, in particular to a municipal rigid frame bridge corbel bracket mechanism and a bridge line shape control method thereof. Background Art

[0002] At present, with the continuous development of municipal bridge engineering construction and the unstoppable development of prefabrication and assembly technology, steel structure beams are gradually replacing reinforced concrete structure beams. With their advantages of lightweight and standardized construction, they play a vital role in important bridge node locations, such as curved ramps and large-span bridge spans.

[0003] At present, the size of the cable-reinforced prestressed concrete continuous rigid frame beam is relatively large, and the one-time cast cantilever bracket is mainly an assembled corbel bracket. The one-time cast cantilever bracket is prone to linear deformation during the construction process, and its safety is difficult to control after construction and installation. In addition, the municipal assembled corbel bracket needs to be assembled on the ground during construction, and then hoisted to the pier top for installation. During the hoisting period, the pin shaft used as the assembly connection of the corbel bracket needs to be temporarily fixed by welding with a small steel plate. After connecting with the pier body, the small steel plate is cut off, and then the corbel bracket is adapted and adjusted. This process is time-consuming and labor-intensive to operate and inconvenient to use. Summary of the invention

[0004] The object of the present invention is to provide a municipal rigid frame bridge corbel bracket mechanism and a bridge line shape control method thereof, so as to solve the problems raised in the above-mentioned background technology.

[0005] To achieve the above object, the present invention provides the following technical solution: a municipal rigid frame bridge corbel bracket mechanism, the rigid frame bridge corbel bracket mechanism comprising:

[0006] A concrete pier body, wherein an upper support, a middle support and a lower support are horizontally arranged in sequence from top to bottom on one side of the cantilevered portion of the concrete pier body;

[0007] A plurality of bracket assemblies, wherein the plurality of bracket assemblies are arranged on one side of the upper support, the middle support and the lower support, the bracket assemblies include a mounting vertical beam, a horizontal beam, a first diagonal bracing arm and a second diagonal bracing arm, the mounting vertical beam and the horizontal beam, one side of the mounting vertical beam and the horizontal beam is movably connected through a pin connection assembly, and both sides of the first diagonal bracing arm and the second diagonal bracing arm are respectively movably connected to one side of the mounting vertical beam and the horizontal beam through a pin connection assembly, and the pin connection assembly includes a first matching pin and a second matching pin;

[0008] The limiting assembly is arranged on one side of the installation vertical beam and the horizontal beam close to the pin connection assembly, and the limiting assembly includes a limiting ring, a control screw ring and two arc-shaped constraint blocks.

[0009] Preferably, the concrete pier body is located on one side of the upper support, the middle support and the lower support, all of which are pre-embedded with shear steel bars and have a number of tensioned fine-rolled steel channels, and the tensioned fine-rolled steel channels are horizontally inserted with fine-rolled threaded steel bars, one side of the several fine-rolled threaded steel bars are respectively penetrated through the upper support, the middle support and the lower support by tension bolts, and one side of the several shear steel bars are respectively horizontally inserted into the upper support, the middle support and the lower support.

[0010] Preferably, the shear-resistant steel rod is a Φ90mm steel rod made of 40Cr material, and the shear-resistant steel rod penetrates 135cm into the concrete pier body.

[0011] Preferably, the mounting vertical beam includes a fixed mounting beam and a movable support beam, a fine-tuning guide column is provided at the upper end of the movable support beam, the upper end of the fine-tuning guide column is movably connected to the lower end of the movable support beam, the fixed mounting beam is fixedly connected to one side of the upper support by bolts, a plurality of adjustment seats are provided on one side of the lower support, the lower end of the movable support beam is fixedly connected to the adjustment plate of the adjustment seat, and two side baffles are provided on one side of the middle support close to the movable support beam, and the two side baffles are respectively in contact with both sides of the movable support beam.

[0012] Preferably, a first pin hole is formed through one side of the upper end of the fixed mounting beam and both sides of the movable supporting beam and the horizontal beam, a connecting ear is provided on one side of the lower end of the horizontal beam, the connecting ear is plugged into the upper end of the fixed mounting beam and is arranged corresponding to the pin hole, and second pin holes are formed through both sides of the first diagonal support arm and the second diagonal support arm, both sides of the first diagonal support arm and the second diagonal support arm are movably plugged into one side of the movable supporting beam and the horizontal beam, and the second pin holes are arranged corresponding to the first pin holes.

[0013] Preferably, a plurality of expansion and deformation plates are provided in a circular array on one side of the first mating pin, one side of the expansion and deformation plate of the first mating pin passes through the first pin hole and is inserted into the second pin hole, the second mating pin passes through the first pin hole on the other side and is inserted into the second pin hole, the second mating pin is placed in the second pin hole and one side of the expansion and deformation plates is inserted into the first mating pin, and the outer side surfaces of the plurality of expansion and deformation plates are respectively in contact with the inner walls of the first pin hole and the second pin hole.

[0014] Preferably, a guide stabilization groove is provided at the center of the second mating pin near the first mating pin, a reinforcing guide rod is horizontally provided on one side of the first mating pin, and the reinforcing guide rod is inserted into the guide stabilization groove of the second mating pin.

[0015] Preferably, the installation vertical beam and horizontal beam are both provided with a limit ring on one side of the first pin hole, and protrusions are provided on both sides of the limit ring. One side of the first matching pin and the second matching pin respectively movably penetrate the limit ring, and a telescopic groove is opened in the limit ring on one side of the protrusion, and the arc-shaped constraint block is movably arranged in the telescopic groove, and an annular limit groove is opened on one side of the first matching pin and the second matching pin close to the arc-shaped constraint block, and one side of the arc-shaped constraint block penetrates the telescopic groove and is inserted into the annular limit groove.

[0016] Preferably, a spring groove is provided on one side of the protrusion of the limiting ring near the telescopic groove, a storage groove is provided on one side of the protrusion near the spring groove, a rod groove is provided in the storage groove that passes through the spring groove and connects to the telescopic groove, a pushing rod is movably inserted in the rod groove, the pushing rod is placed in one side of the telescopic groove and is connected to the center of one side of the arc-shaped constraint block, a pushing block is provided on one side of the pushing rod placed in the storage groove, a control screw ring is provided on one side of the limiting ring through a threaded sleeve, a pushing ring is provided on one side of the control screw ring, the pushing ring surrounds the protrusion of the limiting ring, one side of the pushing block is in contact with the inner circumference of the pushing ring, the side of the pushing block near the pushing ring and the side of the pushing ring near the pushing block are both conical structures, and a return spring is provided on one side of the push rod located in the spring groove through a pressure plate sleeve.

[0017] A bridge line shape control method for a municipal rigid frame bridge corbel bracket mechanism, the bridge line shape control method for a municipal rigid frame bridge corbel bracket mechanism is applied to the municipal rigid frame bridge corbel bracket mechanism, comprising the following steps:

[0018] Step 1: When pouring the concrete pier body, pre-embed the shear steel bars and draw the fine-rolled steel channels in the concrete pier body in advance, roughen the top of the concrete pier body, and straighten the shear steel bars;

[0019] Step 2: Install the upper, middle and lower supports of the corbel bracket through the fine-rolled threaded steel. Before installing the corbel bracket, check whether the embedded parts of the corbel bracket are firmly buried and whether the bottom concrete is dense. When installing, first install the corbel bracket according to the requirements of the construction design drawing;

[0020] Step 3: The brackets of the cantilevered parts of the tower column are pre-assembled on the site in advance. The pre-assembly site must be flat and laid out in advance. The positioning and assembly are strictly carried out according to the designed angle. After the assembly is completed, the control screw ring is rotated to make the conical surface of the push ring of the control screw ring push the push block and the arc constraint block to move. At this time, the arc constraint block is inserted into the annular limiting groove of the first matching pin and the second matching pin, and the first matching pin and the second matching pin are prevented from falling off to avoid loosening and falling off during hoisting and stability in later use. The brackets are hoisted one by one during hoisting. When hoisted to a suitable position, they are fixedly connected to the fine-rolled threaded steel bars of the upper support and the lower support respectively. The adjustment seat is a common bracket in the prior art. The hydraulic or screw rod is used to push the adjustment support during assembly. When the adjustment plate of the fine-rolled threaded steel bar moves up and down, the distance between the movable support beam and the fixed installation beam is driven to change. At this time, the movable support beam can adjust the horizontal angle and support strength of the horizontal beam through the first diagonal support arm and the second diagonal support arm;

[0021] Step 4: After the trusses and corbel brackets are installed, pre-stressing and deformation observations are carried out, and then demoulding pads, beams, and racks are installed layer by layer.

[0022] Compared with the prior art, the present invention has the following beneficial effects:

[0023] Before the installation of the corbel bracket, it is quickly assembled and assembled through the pin-connecting components. After the assembly is completed, it is fixed and installed with the concrete pier body through the lifting equipment. Before lifting, the pin-connecting components are safely limited by the limiting components to improve the construction safety and operation convenience. After the installation of the corbel bracket, the pre-stressing and deformation monitoring are carried out to eliminate the gaps and inelastic deformations of the vertical rods of the bracket under the action of the pre-stressing load, which is beneficial to the control of the construction process. The corbel bracket is cast in three times, and the structure is safe and stable. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is the construction flow chart of the present invention;

[0025] Figure 2 It is a partial structural schematic diagram of the present invention;

[0026] Figure 3 For the present invention Figure 2 Schematic diagram of part A;

[0027] Figure 4 This is a schematic diagram of the structure of a concrete pier body 1 of the present invention;

[0028] Figure 5 For the present invention Figure 4 Schematic diagram of part B;

[0029] Figure 6 It is a schematic diagram of the structure of the bracket assembly of the present invention;

[0030] Figure 7 It is a partial side cut schematic diagram of the bracket assembly of the present invention;

[0031] Figure 8 For the present invention Figure 7 Schematic diagram of the C part;

[0032] Fig. 9 For the present invention Figure 8 Schematic diagram of the D part;

[0033] Fig.10 It is an exploded schematic diagram of the pin connection assembly of the present invention.

[0034] In the figure: concrete pier body 1, upper support 2, middle support 3, lower support 4, shear steel rod 5, tensioned fine-rolled steel channel 6, fine-rolled threaded steel 7, adjustment seat 8, installation vertical beam 9, horizontal beam 10, fixed installation beam 11, movable support beam 12, fine-tuning guide column 13, first diagonal support arm 14, second diagonal support arm 15, limiting ring 16, first matching pin 17, second matching pin 18, strengthening guide rod 19, expansion and deformation plate 20, telescopic groove 21, annular limiting groove 22, arc constraint block 23, push rod 24, reset spring 25, push block 26, control screw ring 27. DETAILED DESCRIPTION

[0035] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0036] Please see attached Figure 1-10 , this application provides the following technical solutions.

[0037] Embodiment 1: A bracket mechanism for a municipal rigid frame bridge, comprising a concrete pier body 1, wherein an upper support 2, a middle support 3 and a lower support 4 are horizontally arranged in sequence from top to bottom on one side of the large and small mileage cantilevered parts of the concrete pier body 1, and a shear steel bar 5 is pre-embedded on one side of the upper support 2, the middle support 3 and the lower support 4, and a plurality of tensioning fine-rolled steel holes 6 are opened, and fine-rolled threaded steel bars 7 are horizontally inserted in the tensioning fine-rolled steel holes 6, and one side of the plurality of fine-rolled threaded steel bars 7 is respectively penetrated through the upper support 2, the middle support 3 and the lower support 4 by tensioning bolts, and one side of the plurality of shear steel bars 5 is respectively horizontally inserted into the upper support 2, the middle support 3 and the lower support 4, and the shear steel bars 5 are Φ90mm steel bars made of 40Cr material, and the shear steel bars 5 penetrate 135cm into the concrete pier body, so as to facilitate the installation of the bracket and improve the strength after installation;

[0038] A plurality of bracket components are arranged on one side of the upper support 2, the middle support 3 and the lower support 4, the bracket component includes an installation vertical beam 9, a horizontal beam 10, a first diagonal bracing arm 14 and a second diagonal bracing arm 15, the installation vertical beam 9 and the horizontal beam 10, one side of the installation vertical beam 9 and the horizontal beam 10 is movably connected through a pin connection component, the first diagonal bracing arm 14 and the second diagonal bracing arm 15 are respectively movably connected to one side of the installation vertical beam 9 and the horizontal beam 10 through a pin connection component, the pin connection component includes a first matching pin 17 and a second matching pin 18, the installation vertical beam 9 includes a fixed installation beam 11 and a movable support beam 12, the upper end of the movable support beam 12 is provided with a fine-tuning guide column 13, and the upper end of the fine-tuning guide column 13 is movably plugged into the movable support beam The lower end of 12 is set, the fixed mounting beam 11 is fixedly connected to one side of the upper support 2 by bolts, and a plurality of adjustment seats 8 are provided on one side of the lower support 4. The lower end of the movable support beam 12 is fixedly connected to the adjustment plate of the adjustment seat 8. The middle support 3 is provided with two side baffles on one side close to the movable support beam 12, and the two side baffles are respectively in contact with the two sides of the movable support beam 12. The fixed mounting beam 11 is fixed to the upper support 2, and the movable support beam 12 can be adjusted up and down. The side baffles guide and align the postures of the movable support beam 12 and the fixed mounting beam 11 to facilitate installation and positioning. The adjustment seat 8 is a common adjustment seat of the assembled bracket in the prior art, and the adjustment power can be a screw or hydraulic power

[0039] A first pin hole is provided through one side of the upper end of the fixed mounting beam 11, and both sides of the movable supporting beam 12 and the horizontal beam 10. A connecting ear is provided on one side of the lower end of the horizontal beam 10. The connecting ear is plugged into the upper end of the fixed mounting beam 11 and is arranged corresponding to the pin hole. A second pin hole is provided through both sides of the first diagonal bracing arm 14 and the second diagonal bracing arm 15. Both sides of the first diagonal bracing arm 14 and the second diagonal bracing arm 15 are respectively movably plugged into one side of the movable supporting beam 12 and the horizontal beam 10, and the second pin holes are respectively arranged corresponding to the first pin holes. After the connection position is connected by an assembled pin, it is convenient for on-site assembly and use and later adaptive adjustment.

[0040] A plurality of expansion and deformation plates 20 are provided in a circular array on one side of the first matching pin 17. One side of the expansion and deformation plate 20 of the first matching pin 17 passes through the first pin hole and is inserted into the second pin hole. The second matching pin 18 passes through the first pin hole on the other side and is inserted into the second pin hole. The second matching pin 18 is placed in the expansion and deformation plates 20 of the second pin hole and one side of which is inserted into the first matching pin 17. The outer side surfaces of the expansion and deformation plates 20 are respectively fitted with the inner walls of the first pin hole and the second pin hole. When the expansion and deformation plate 20 of the first matching pin 17 is located and sleeved with the second matching pin 18, the combined diameter of the expansion and deformation plates 20 is slightly smaller than the diameter of the first axial hole and the second axial hole. When the second matching pin 18 is inserted between the expansion and deformation plates 20 of the first matching pin 17, the expansion and deformation plate 20 is squeezed and expanded by the second matching pin 18 and slightly deformed, so that the expansion and deformation plate 20 fits with the inner walls of the first axial hole and the second axial hole, thereby maintaining the stable connection of the installation of the vertical beam 9, the horizontal beam 10, the first diagonal support arm 14 and the second diagonal support arm 15.

[0041] Embodiment 2, on the basis of embodiment 1, a limit assembly is set to limit the assembled pin-connecting assembly to avoid danger to the bracket assembly during the hoisting process. The limit assembly is arranged on the side of the installation vertical beam 9 and the horizontal beam 10 close to the pin-connecting assembly, and the limit assembly includes a limit ring 16, a control screw ring 27 and two arc-shaped constraint blocks 23. The installation vertical beam 9 and the horizontal beam 10 are both provided with a limit ring 16 on one side of the first pin hole, and both sides of the limit ring 16 are provided with protrusions. The first matching pin 17 and the second matching pin 18 are respectively movable through the limit The positioning ring 16, the limiting ring 16 is provided with a telescopic groove 21 on one side of the protrusion, the arc-shaped constraint block 23 is movably arranged in the telescopic groove 21, the first matching pin 17 and the second matching pin 18 are provided with an annular limiting groove 22 on one side close to the arc-shaped constraint block 23, and one side of the arc-shaped constraint block 23 penetrates the telescopic groove 21 and is inserted into the annular limiting groove 22. When the arc-shaped constraint block 23 is inserted into the annular limiting groove 22, the first matching pin 17 and the second matching pin 18 can be prevented from being separated from the first pin hole. At this time, the structure of the bracket assembly is safe and stable when it is hoisted and assembled;

[0042] A spring groove is provided on one side of the projection of the limiting ring 16 near the telescopic groove 21, a receiving groove is provided on one side of the projection near the spring groove, a rod groove is provided in the receiving groove that penetrates the spring groove and connects to the telescopic groove 21, a push rod 24 is movably inserted in the rod groove, the push rod 24 is placed in the telescopic groove 21 and is connected to the center of one side of the arc-shaped constraint block 23, a push block 26 is provided on one side of the push rod 24 placed in the storage groove, a control screw ring 27 is provided on one side of the limiting ring 16 through a threaded sleeve, a push ring is provided on one side of the control screw ring 27, the push ring surrounds the projection of the limiting ring 16, and one side of the push block 26 is connected to the push block 26 The inner circumference of the moving ring is in contact with each other, and the side of the pushing block 26 close to the pushing ring and the side of the pushing ring close to the pushing block 26 are both conical structures, and the pushing rod 24 is located in the spring groove and is provided with a return spring 25 through a pressure plate sleeve on one side. The pushing block 26 controls the arc constraint block 23 to be inserted into the annular limit groove 22 by controlling the threaded push of the screw ring 27, and the position of the first mating pin 17 and the second mating pin 18 is locked. Anti-slip teeth can be provided on the side of the arc constraint block 23 that contacts the annular limit groove 22 to avoid mechanical vibration of the first mating pin 17 and the second mating pin 18 during later use.

[0043] A bridge line shape control method for a municipal rigid frame bridge bracket mechanism comprises the following steps:

[0044] Step 1: When pouring the concrete pier body 1, pre-embed the shear steel rod 5 and the tensile fine-rolled steel channel 6 on the concrete pier body 1 in advance, roughen the top of the concrete pier body 1, and straighten the shear steel rod 5. The shear steel rod 5 penetrates 35 cm into the concrete;

[0045] Step 2: Install the upper support 2, the middle support 3 and the lower support 4 of the corbel bracket. The corbel support is a finished weldment, which is mainly welded by steel plates and steel sections. The support is anchored to the concrete pier body 1 by three precision-rolled threaded steel bars 7, and the precision-rolled threaded steel bars 7 are tensioned. Before installing the corbel bracket, check whether the embedded parts of the corbel bracket are firmly buried and whether the bottom concrete is dense;

[0046] Step 3: The brackets of the cantilevered parts of the tower columns are pre-assembled on site in advance. The pre-assembly site must be flat and laid out in advance. The positioning and assembly are strictly carried out according to the designed angle. After the assembly is completed, the control screw ring 27 is rotated to make the conical surface of the push ring of the control screw ring 27 push the push block 26 and the arc constraint block 23 to move. At this time, the arc constraint block 23 is inserted into the annular limiting groove 22 of the first matching pin 17 and the second matching pin 18, and the first matching pin 17 and the second matching pin 18 are prevented from falling off and limited to avoid loosening and falling off during hoisting and later The brackets are used for stability during the hoisting period. When hoisting, the brackets are hoisted one by one. When hoisted to a suitable position, they are fixedly connected to the fine-rolled threaded steel bars 7 of the upper support 2 and the lower support 4 respectively. The adjustment seat 8 is a common bracket in the prior art. The adjustment seat is pushed by hydraulic pressure or a screw rod during assembly. When the adjustment plate of the fine-rolled threaded steel bar 7 moves up and down, the distance between the movable support beam 12 and the fixed installation beam 11 is driven to change. At this time, the movable support beam 12 can adjust the horizontal angle and support strength of the horizontal beam 10 through the first diagonal support arm 14 and the second diagonal support arm 15;

[0047] Step 4: After the truss and corbel bracket are installed, deformation observation is carried out, and then demoulding pads, beams, and racks are installed layer by layer. The installation process must strictly follow the design requirements. Thin steel plates are used for padding and welding and fixing of gaps. Beams are made of steel sections, corbel brackets and steel trusses are used as formwork supports. The outer formwork of the tower column uses the outer formwork of the climbing formwork and trusses. The inner and outer formworks of the beam body are all made of large steel formworks. The casting is completed on the bracket in three times, and the cantilever bracket is safe and stable.

[0048] Deformation observation: During construction, for some main support points of the load, use a level to observe before loading, after loading, and during preloading to understand their deformation, in order to facilitate the control of the construction process.

[0049] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A bracket mechanism for a municipal rigid frame bridge, characterized in that: The rigid frame bridge bracket mechanism comprises: A concrete pier body (1), wherein an upper support (2), a middle support (3) and a lower support (4) are horizontally arranged in order from top to bottom on one side of the large and small mileage cantilevered parts of the concrete pier body (1); A plurality of bracket assemblies, wherein the plurality of bracket assemblies are arranged on one side of the upper support (2), the middle support (3) and the lower support (4), the bracket assemblies comprising a mounting vertical beam (9), a horizontal beam (10), a first diagonal bracing arm (14) and a second diagonal bracing arm (15), the mounting vertical beam (9) and the horizontal beam (10), one side of the mounting vertical beam (9) and the horizontal beam (10) being movably connected via a pin connection assembly, both sides of the first diagonal bracing arm (14) and the second diagonal bracing arm (15) being movably connected to one side of the mounting vertical beam (9) and the horizontal beam (10) via a pin connection assembly, and the pin connection assembly comprising a first matching pin (17) and a second matching pin (18); A limit assembly is provided on a side of the installation vertical beam (9) and the horizontal beam (10) close to the pin connection assembly, and the limit assembly comprises a limit ring (16), a control screw ring (27) and two arc-shaped constraint blocks (23).

2. A municipal rigid frame bridge bracket mechanism according to claim 1, characterized in that: The concrete pier body (1) is pre-embedded with shear-resistant steel bars (5) and a plurality of tension-finished steel channels (6) on one side of the upper support (2), the middle support (3) and the lower support (4), and fine-rolled threaded steel bars (7) are horizontally inserted in the tension-finished steel channels (6). One side of the fine-rolled threaded steel bars (7) is respectively penetrated through the upper support (2), the middle support (3) and the lower support (4) by tension bolts, and one side of the plurality of shear-resistant steel bars (5) is respectively horizontally inserted into the upper support (2), the middle support (3) and the lower support (4).

3. A municipal rigid frame bridge bracket mechanism according to claim 2, characterized in that: The shear-resistant steel rod (5) is a Φ90 mm steel rod made of 40Cr material, and the shear-resistant steel rod (5) penetrates 135 cm into the concrete pier body.

4. A municipal rigid frame bridge bracket mechanism according to claim 3, characterized in that: The installation vertical beam (9) comprises a fixed installation beam (11) and a movable support beam (12); a fine-tuning guide column (13) is provided at the upper end of the movable support beam (12); the upper end of the fine-tuning guide column (13) is movably plugged into the lower end of the movable support beam (12); the fixed installation beam (11) is fixedly connected to one side of the upper support (2) by bolts; a plurality of adjustment seats (8) are provided on one side of the lower support (4); the lower end of the movable support beam (12) is fixedly connected to the adjustment plate of the adjustment seat (8); two side baffles are provided on one side of the middle support (3) close to the movable support beam (12), and the two side baffles are respectively in close contact with the two sides of the movable support beam (12).

5. A municipal rigid frame bridge bracket mechanism according to claim 4, characterized in that: A first pin hole is provided through one side of the upper end of the fixed mounting beam (11), the movable support beam (12) and the two sides of the horizontal beam (10); a connecting ear is provided on one side of the lower end of the horizontal beam (10); the connecting ear is plugged into the upper end of the fixed mounting beam (11) and is arranged corresponding to the pin hole; a second pin hole is provided through both sides of the first oblique support arm (14) and the second oblique support arm (15); both sides of the first oblique support arm (14) and the second oblique support arm (15) are movably plugged into one side of the movable support beam (12) and the horizontal beam (10), and the second pin holes are arranged corresponding to the first pin holes.

6. A municipal rigid frame bridge bracket mechanism according to claim 5, characterized in that: A plurality of expansion and deformation plates (20) are arranged in a circular array on one side of the first matching pin (17); one side of the expansion and deformation plate (20) of the first matching pin (17) passes through the first pin hole and is inserted into the second pin hole; the second matching pin (18) passes through the first pin hole on the other side and is inserted into the second pin hole; the second matching pin (18) is placed in the second pin hole and is inserted into the plurality of expansion and deformation plates (20) of the first matching pin (17); and the outer side surfaces of the plurality of expansion and deformation plates (20) are respectively in contact with the inner walls of the first pin hole and the second pin hole.

7. A municipal rigid frame bridge bracket mechanism according to claim 6, characterized in that: A guide stabilizing groove is provided at the center of the second matching pin (18) near the first matching pin (17), a reinforcing guide rod (19) is horizontally provided on one side of the first matching pin (17), and the reinforcing guide rod (19) is plugged into the guide stabilizing groove of the second matching pin (18).

8. The municipal rigid frame bridge bracket mechanism according to claim 7, characterized in that: The installation vertical beam (9) and the horizontal beam (10) are both provided with a limiting ring (16) on one side of the first pin hole, and protrusions are provided on both sides of the limiting ring (16). One side of the first matching pin (17) and the second matching pin (18) are respectively movably passed through the limiting ring (16), and a telescopic groove (21) is provided in the limiting ring (16) on one side of the protrusion. The arc-shaped constraint block (23) is movably arranged in the telescopic groove (21), and the first matching pin (17) and the second matching pin (18) are both provided with an annular limiting groove (22) on one side close to the arc-shaped constraint block (23), and one side of the arc-shaped constraint block (23) passes through the telescopic groove (21) and is inserted into the annular limiting groove (22).

9. A municipal rigid frame bridge bracket mechanism according to claim 8, characterized in that: A spring groove is provided on one side of the projection of the limiting ring (16) close to the telescopic groove (21); a receiving groove is provided on one side of the projection close to the spring groove; a rod groove is provided in the receiving groove penetrating the spring groove and connected to the telescopic groove (21); a push rod (24) is movably inserted in the rod groove; one side of the push rod (24) is arranged in the telescopic groove (21) and is connected to the center of one side of the arc-shaped constraint block (23); one side of the push rod (24) is arranged in the receiving groove and a push block (26) is provided; one side of the limiting ring (16) is provided with a control screw ring (27) through a threaded sleeve; one side of the control screw ring (27) is provided with a push ring; the push ring surrounds the projection of the limiting ring (16); one side of the push block (26) is in contact with the inner circumference of the push ring; one side of the push block (26) close to the push ring and one side of the push ring close to the push block (26) are both conical structures; and one side of the push rod (24) located in the spring groove is provided with a return spring (25) through a pressure plate sleeve.

10. A bridge line shape control method for a municipal rigid frame bridge bracket mechanism, characterized in that: The bridge line shape control method for the municipal rigid frame bridge corbel bracket mechanism is applied to the municipal rigid frame bridge corbel bracket mechanism described in any one of claims 1 to 9, comprising the following steps: Step 1: When pouring the concrete pier body (1), pre-embed the shear steel bars (5) and draw the fine-rolled steel channels (6) on the concrete pier body (1), roughen the top of the concrete pier body (1), and straighten the shear steel bars (5); Step 2: Install the upper support (2), the middle support (3) and the lower support (4) of the corbel bracket through the fine-rolled threaded steel (7). Before installing the corbel bracket, check whether the embedded parts of the corbel bracket are firmly buried and whether the bottom concrete is dense. During installation, first install the corbel bracket according to the requirements of the construction design drawing; Step 3: The brackets of the cantilevered parts of the tower column are pre-assembled on site in advance. The pre-assembly site must be flat and laid out in advance. The positioning and assembly are strictly carried out according to the designed angle. After the assembly is completed, the control screw ring (27) is rotated to make the conical surface of the push ring of the control screw ring (27) push the push block (26) and the arc-shaped constraint block (23) to move. At this time, the arc-shaped constraint block (23) is inserted into the annular limiting groove (22) of the first matching pin (17) and the second matching pin (18), and the first matching pin (17) and the second matching pin (18) are prevented from falling off and limited to avoid loosening and falling off during hoisting and later The utility model is stable in use, and is hoisted one by one by means of the bracket brackets. When hoisted to a suitable position, the bracket brackets are fixedly connected to the fine-rolled threaded steel bars (7) of the upper support (2) and the lower support (4) respectively. The adjustment seat (8) is a common bracket bracket in the prior art. The adjustment seat is pushed by hydraulic pressure or a screw rod during assembly. When the adjustment plate of the fine-rolled threaded steel bar (7) moves up and down, the distance between the movable support beam (12) and the fixed installation beam (11) is driven to change. At this time, the movable support beam (12) can adjust the horizontal angle and the support strength of the horizontal beam (10) through the first diagonal support arm (14) and the second diagonal support arm (15); Step 4: After the trusses and corbel brackets are installed, pre-stressing and deformation observations are carried out, and then demoulding pads, beams, and racks are installed layer by layer.