Construction method for newly building water-saving ship lock beside built ship lock
By building a double-row underground continuous wall structure of the newly built water-provincial lock next to the built ship lock, the problems of earth and stone excavation and land acquisition in the construction of the newly built water-provincial lock have been solved, and the water resource recycling and construction costs have been reduced, and the surrounding environment has been reduced. disturbance.
Patent Information
- Application Number
- CN202411051694.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-01
- Publication Date
- 2024-11-12
AI Technical Summary
When building a new water-saving lock next to the built lock, a large amount of earth and stone is required to excavate and requisition, resulting in high project costs and great disturbances to the surrounding environment.
A double row underground continuous wall structure is adopted, continuous walls are built at different distances of the built locks, and excavated downward layer by layer to the elevation of the foundation laying surface, pouring the main structure of the gate chamber to form a water-saving pool, and realizing water circulation through water transport components Utilize and reduce land acquisition and project costs.
Through the double-row underground continuous wall structure, the distance between the newly built water-saving ship lock and the built ship lock is reduced, the number of land acquisition is reduced, the underground continuous wall is reused as a support structure, the secondary support costs are reduced, and the anti-seepage curtain project is eliminated, and the improvement of the improvement of the Construction efficiency and safety.
Smart Images

Figure CN118932962A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of ship locks, in particular to a construction method for building a new water-saving ship lock next to an existing ship lock. Background Art
[0002] Water resources are particularly precious in areas where water resources are scarce or in canal areas where pumping costs are high. A water-saving ship lock is a ship lock that has a water-saving tank on one or both sides of the lock chamber. The water-saving tank is used to receive part of the water flow when the lock chamber is released, and refill the water back into the lock chamber when needed later, thereby reducing the need to pump water from external water sources. By recycling the water in the water-saving tank, the total amount of water required for the passage of ships can be significantly reduced. Water-saving ship locks not only help save water resources, but also reduce energy consumption and operating costs caused by pumping and draining water. For example, domestic and foreign canals (such as the Hunan-Guangxi Canal) need to build new water-saving ship locks next to existing lock hubs.
[0003] At present, if a new water-saving ship lock is built next to an existing ship lock, especially a second-line, third-line, or fourth-line water-saving ship lock with a navigation capacity larger than that of the existing ship lock, the conventional method is to arrange the lock chamber section of the entire existing ship lock and the new water-saving ship lock within the same cofferdam for excavation. Restricted by the boundary conditions of the existing ship lock hub, the axial distance between the new ship lock and the existing ship lock is generally more than 100m. Building a new water-saving ship lock directly next to the existing ship lock requires a large amount of earth and stone excavation and land acquisition, with high engineering costs. Some new construction areas may involve environmentally sensitive points, with extremely narrow construction space and great disturbance to the surrounding environment.
[0004] In view of this, it is necessary to propose a construction method for building a new water-saving ship lock next to an existing ship lock to solve or at least alleviate the above-mentioned defects. Summary of the invention
[0005] The main purpose of the present invention is to provide a construction method for a new water-saving ship lock next to an existing ship lock, so as to solve the technical problem in the prior art that a new water-saving ship lock is built next to an existing ship lock, and the lock chamber section of the entire existing ship lock and the new water-saving ship lock are arranged in the same cofferdam for excavation, which requires a large amount of earth and stone excavation and land acquisition, and has high engineering costs.
[0006] To achieve the above object, the present invention provides a construction method for a new water-saving ship lock next to an existing ship lock, comprising the steps of:
[0007] S1, first construct a first underground continuous wall at a first preset distance from a first lock chamber wall of an existing ship lock, and construct a second underground continuous wall at a second preset distance from the first lock chamber wall of the existing ship lock; wherein the second preset distance is greater than the first preset distance;
[0008] S2, constructing a third underground continuous wall at a third preset distance from the first lock chamber wall of the built ship lock, and constructing a fourth underground continuous wall at a fourth preset distance from the first lock chamber wall of the built ship lock; wherein the fourth preset distance is greater than the third preset distance, and the third preset distance is greater than the second preset distance;
[0009] S3, excavating downward layer by layer in the area between the second underground continuous wall and the third underground continuous wall, and applying corresponding support components layer by layer, until the excavation reaches the foundation surface elevation of the lock chamber section of the newly built water-saving ship lock;
[0010] S4, pouring concrete of the main structure of the lock chamber of the newly built water-saving ship lock layer by layer from the elevation of the foundation surface upward to obtain the lock chamber section of the newly built water-saving ship lock; wherein the lock chamber section includes a second lock chamber wall close to the second underground continuous wall and a third lock chamber wall close to the third underground continuous wall;
[0011] S5, excavating and constructing a first water-saving pool in the area between the first underground continuous wall and the second underground continuous wall, and excavating and constructing a second water-saving pool in the area between the third underground continuous wall and the fourth underground continuous wall; wherein the first water-saving pool is connected to the first water-transfer corridor located in the wall of the second lock chamber through a first water-transfer component, and the second water-saving pool is connected to the second water-transfer corridor located in the wall of the third lock chamber through a second water-transfer component;
[0012] S6, construct other conventional structures of the newly built water-saving ship lock to obtain the newly built water-saving ship lock.
[0013] Preferably, the step S5 of excavating the area between the first underground continuous wall and the second underground continuous wall and constructing the first water-saving pool specifically comprises the following steps:
[0014] The first underground continuous wall and the second underground continuous wall are used as the side walls of the first water saving pool, and the area between the first underground continuous wall and the second underground continuous wall is excavated downward layer by layer;
[0015] During the excavation process, a first lateral support structure for connecting the first underground continuous wall and the second underground continuous wall is constructed layer by layer.
[0016] After constructing the bottom plate of the first water-saving pool, the first transverse supporting structure is gradually removed to obtain the first water-saving pool.
[0017] Preferably, in step S5, excavating the area between the third underground continuous wall and the fourth underground continuous wall and constructing the second water saving pool specifically comprises the following steps:
[0018] The third underground continuous wall and the fourth underground continuous wall are used as the side walls of the second water saving pool, and the area between the third underground continuous wall and the fourth underground continuous wall is excavated downward layer by layer;
[0019] During the excavation process, a corresponding second transverse support structure for connecting the third underground continuous wall and the fourth underground continuous wall is constructed layer by layer;
[0020] After constructing the bottom plate of the second water-saving pool, the second transverse supporting structure is gradually removed to obtain the second water-saving pool.
[0021] Preferably, the first water delivery component includes a first water delivery hole opened on the second underground continuous wall and a second water delivery hole opened on the second gate chamber wall; wherein, one end of the first water delivery hole is connected to the first water saving tank, one end of the second water delivery hole is connected to the first water delivery corridor, and the other end of the second water delivery hole is connected to the first water delivery hole through a pipeline.
[0022] Preferably, the second water transfer assembly includes a third water transfer hole opened on the third underground continuous wall and a fourth water transfer hole opened on the third gate chamber wall; wherein, one end of the third water transfer hole is connected to the second water saving tank, one end of the fourth water transfer hole is connected to the second water transfer corridor, and the other end of the fourth water transfer hole is connected to the third water transfer hole through a pipeline.
[0023] Preferably, after step S1, the step further includes: applying a third lateral support structure for connecting the first underground continuous wall and the second underground continuous wall at the top between the first underground continuous wall and the second underground continuous wall;
[0024] The step S2 further includes the following steps: applying a fourth lateral support structure for connecting the third underground continuous wall and the fourth underground continuous wall to the top between the third underground continuous wall and the fourth underground continuous wall;
[0025] Preferably, the step S3 of applying the corresponding support components layer by layer specifically includes the steps of: applying a fifth transverse support structure for connecting the second underground continuous wall and the third underground continuous wall, and a vertical support structure for supporting the corresponding fifth transverse support structure layer by layer.
[0026] Preferably, the step S5 further includes the following steps:
[0027] A fifth water conveyance hole is opened in the first underground continuous wall, and a sixth water conveyance hole is opened in the first lock chamber wall of the built ship lock, wherein one end of the fifth water conveyance hole is connected to the first water saving tank, one end of the sixth water conveyance hole is connected to the third water conveyance gallery located in the first lock chamber wall, and the other end of the sixth water conveyance hole is connected to the fifth water conveyance hole through a connecting component.
[0028] Preferably, the first water delivery hole is higher than the bottom plate of the first water saving tank, the bottom plate of the gate chamber section is higher than the bottom plate of the first water saving tank, and the height difference between the first output hole and the bottom plate of the first water saving tank is set between 1 and 2 meters.
[0029] Preferably, the second water delivery hole is higher than the bottom plate of the second water saving tank, the bottom plate of the gate chamber section is higher than the bottom plate of the second water saving tank, and the height difference between the second output hole and the bottom plate of the second water saving tank is set between 1 and 2 meters.
[0030] Compared with the prior art, the present invention has the following beneficial effects:
[0031] The present invention provides a construction method for a new water-saving ship lock next to an existing ship lock, comprising the following steps: constructing a first underground continuous wall, a second underground continuous wall, a third underground continuous wall and a fourth underground continuous wall, excavating downwards layer by layer in an area between the second underground continuous wall and the fourth underground continuous wall, and constructing corresponding support components layer by layer until the excavation reaches the foundation surface elevation of a lock chamber section of the new water-saving ship lock, pouring concrete of a lock chamber main structure of the new water-saving ship lock upwards layer by layer from the foundation surface elevation to obtain the lock chamber section of the new water-saving ship lock, excavating and constructing a first water-saving pool in an area between the first underground continuous wall and the second underground continuous wall, and excavating and constructing a second water-saving pool in an area between the third underground continuous wall and the fourth underground continuous wall, and constructing other conventional structures of the new water-saving ship lock to obtain the new water-saving ship lock.
[0032] This application innovatively adopts double-row underground continuous walls, which can greatly reduce the axial distance between the newly built water-saving ship lock and the existing ship lock, so as to reduce the amount of land acquisition and demolition. The double-row underground continuous walls can be reused twice, and can be used as the support structure of the lock chamber section and the water-saving pool of the newly built water-saving ship lock respectively, thereby reducing the secondary support cost; the double-row underground continuous walls are used as the side walls of the water-saving pool, and after the support structure is completed, the casting of the water-saving pool is also completed; the double-row underground continuous walls also serve as the anti-seepage curtain of the newly built water-saving ship lock, eliminating the need for the anti-seepage curtain project that needs to be constructed on the lock wall itself. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the structures shown in these drawings without paying creative work.
[0034] Figure 1 It is a schematic diagram of a construction method flow in one embodiment of the present invention;
[0035] Figure 2 It is a schematic diagram of the structure after step S2 is completed in one embodiment of the present invention;
[0036] Figure 3 It is a schematic diagram of the structure after step S4 is completed in one embodiment of the present invention;
[0037] Figure 4 It is a schematic diagram of the structure after step S5 is completed in one embodiment of the present invention;
[0038] Figure 5 FIG. 1 is a schematic diagram of a structure after step S6 is completed in one embodiment of the present invention.
[0039] The purpose, features and advantages of the present invention will be further described with reference to the accompanying drawings in conjunction with the embodiments.
[0040] Description of Figure Numbers:
[0041] 10. Existing ship lock; 110. First lock chamber wall; 210. First underground continuous wall; 220. Second underground continuous wall; 230. First lateral support structure; 240. Third lateral support structure; 250. Third underground continuous wall; 260. Fourth underground continuous wall; 270. Second lateral support structure; 280. Fourth lateral support structure; 30. Support assembly; 310. Fifth lateral support structure; 320. Vertical support structure; 40. Newly built water-saving ship lock; 410. Lock chamber section; 411. Second lock chamber wall; 412. Third lock chamber wall; 420. First water-saving pool; 430. Second water-saving pool; 440. First water transfer assembly; 441. First water transfer hole; 442. Second water transfer hole; 450. Second water transfer assembly; 451. Third water transfer hole; 452. Fourth water transfer hole. DETAILED DESCRIPTION
[0042] It should be understood that the specific embodiments described herein are only used to explain the present invention, and are not used to limit the present invention.
[0043] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0044] It should be noted that all directional indications in the embodiments of the present invention (such as up, down, left, right, front, back, etc.) are only used to explain the relative position relationship, movement status, etc. between the components under a certain specific posture (as described in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.
[0045] In addition, the descriptions of "first", "second", etc. in the present invention are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, the technical solutions between the various embodiments can be combined with each other, but they must be based on the ability of ordinary technicians in the field to implement them. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such a combination of technical solutions does not exist and is not within the scope of protection required by the present invention.
[0046] Please see attached Figures 1 to 5 In one embodiment of the present invention, a construction method for building a new water-saving ship lock next to an existing ship lock comprises the following steps:
[0047] S1, first construct a first underground continuous wall 210 at a first preset distance from the first lock chamber wall 110 of the existing ship lock 10, and construct a second underground continuous wall 220 at a second preset distance from the first lock chamber wall 110 of the existing ship lock 10; wherein the second preset distance is greater than the first preset distance;
[0048] S2, constructing a third underground continuous wall 250 at a third preset distance from the first lock chamber wall 110 of the built ship lock 10, and constructing a fourth underground continuous wall 260 at a fourth preset distance from the first lock chamber wall 110 of the built ship lock 10; wherein the fourth preset distance is greater than the third preset distance, and the third preset distance is greater than the second preset distance;
[0049] Specifically, the present application is to build a new water-saving ship lock 40 beside the existing ship lock 10. Different from the prior art that adopts the method of arranging the lock chamber section 410 of the entire existing ship lock 10 and the new water-saving ship lock 40 in the same cofferdam for excavation, the present application does not use a cofferdam, and constructs a first underground continuous wall 210, a second underground continuous wall 220, a third underground continuous wall 250 and a fourth underground continuous wall 260 at different distances beside the existing ship lock 10 to form two double-row underground continuous wall forms in space, wherein the area between the first underground continuous wall 210 and the second underground continuous wall 220 is used to form a first water-saving pool 420, the area between the third underground continuous wall 250 and the fourth underground continuous wall 260 is used to form a second water-saving pool 430, and the area between the second underground continuous wall 220 and the third underground continuous wall 250 is used to form the main structure of the new water-saving ship lock 40.
[0050] Among them, the specific values of the first preset distance, the second preset distance, the third preset distance, and the fourth preset distance need to be set according to actual needs. Preferably, the spacing between the first underground continuous wall 210 and the second underground continuous wall 220 is determined according to the width of the first water-saving pool 420, and the spacing between the third underground continuous wall 250 and the fourth underground continuous wall 260 is determined according to the width of the second water-saving pool 430. The positions of the first underground continuous wall 210, the second underground continuous wall 220, the third underground continuous wall 250 and the fourth underground continuous wall 260 are set under the condition that they do not affect the wall structure of the existing ship lock 10 and the newly built water-saving ship lock 40.
[0051] S3, excavating downward layer by layer in the area between the second underground continuous wall 220 and the third underground continuous wall 250, and applying corresponding support assemblies 30 layer by layer, until the excavation reaches the foundation surface elevation of the lock chamber section 410 of the newly built water-saving ship lock 40;
[0052] It is worth noting that the area between the second underground continuous wall 220 and the third underground continuous wall 250 is the area where the main structure of the newly built water-saving ship lock 40 is located. The second underground continuous wall 220 of the present application can not only be used as a supporting structure for the first water-saving pool 420 and the lock chamber section 410 of the newly built water-saving ship lock 40 during the construction phase, but can also be used as a permanent side wall of the first water-saving pool 420, and can also be used as an anti-seepage curtain of the newly built water-saving ship lock 40, eliminating the need for an anti-seepage curtain project that needs to be constructed on the lock wall itself. Similarly, the third underground continuous wall 250 of the present application can not only be used as a supporting structure for the second water-saving pool 430 and the lock chamber section 410 of the newly built water-saving ship lock 40 during the construction phase, but can also be used as a permanent side wall of the second water-saving pool 430, and can also be used as an anti-seepage curtain of the newly built water-saving ship lock 40, eliminating the need for an anti-seepage curtain project that needs to be constructed on the lock wall itself.
[0053] Specifically, the present application excavates the area between the second underground continuous wall 220 and the third underground continuous wall 250 by excavating downward layer by layer. This excavation helps to better control the construction progress and quality and ensure the smooth progress of construction activities. In particular, the second underground continuous wall 220 and the third underground continuous wall 250 can be used as support structures to provide a support foundation for the corresponding support assembly 30, thereby greatly reducing the secondary support cost while ensuring the safety of the support.
[0054] Furthermore, the step S3 of applying the corresponding support assembly 30 layer by layer specifically includes the steps of: applying layer by layer a fifth lateral support structure 310 for connecting the second underground continuous wall 220 and the third underground continuous wall 250, and a vertical support structure 320 for supporting the corresponding fifth lateral support structure 310. The fifth lateral support structure 310 and the vertical support structure 320 preferably adopt a steel pipe support system.
[0055] S4, pouring concrete of the main structure of the lock chamber of the newly built water-saving ship lock 40 layer by layer upward from the foundation surface elevation to obtain the lock chamber section 410 of the newly built water-saving ship lock 40; wherein the lock chamber section 410 includes a second lock chamber wall 411 close to the second underground continuous wall 220 and a third lock chamber wall 412 close to the third underground continuous wall 250;
[0056] like Figure 3 As shown, starting from the foundation surface elevation, the main structure concrete of the lock chamber of the newly built water-saving ship lock 40 is poured upward layer by layer to obtain the lock chamber section 410 of the newly built water-saving ship lock 40. The lock chamber section 410 includes a second lock chamber wall 411 close to the second underground continuous wall 220 and a third lock chamber wall 412 close to the third underground continuous wall 250. The spacing between the second lock chamber wall 411 and the second underground continuous wall 220 and the spacing between the third lock chamber wall 412 and the third underground continuous wall 250 can be set according to actual needs, and are set under the condition that the lock wall structure of the existing ship lock 10 and the newly built water-saving ship lock 40 is not affected.
[0057] S5, excavating and constructing a first water-saving pool 420 in the area between the first underground continuous wall 210 and the second underground continuous wall 220, and excavating and constructing a second water-saving pool 430 in the area between the third underground continuous wall 250 and the fourth underground continuous wall 260; wherein the first water-saving pool 420 is connected to the first water delivery corridor located in the second lock chamber wall 411 through the first water delivery component 440, and the second water-saving pool 430 is connected to the second water delivery corridor located in the third lock chamber wall 412 through the second water delivery component 450;
[0058] As a preferred embodiment, the excavation of the area between the first underground continuous wall 210 and the second underground continuous wall 220 and the construction of the first water-saving pool 420 in step S5 specifically include the following steps:
[0059] The first underground continuous wall 210 and the second underground continuous wall 220 are used as the side walls of the first water-saving pool 420, and the area between the first underground continuous wall 210 and the second underground continuous wall 220 is excavated downward layer by layer; in the process of excavating layer by layer, the corresponding first transverse supporting structure 230 for connecting the first underground continuous wall 210 and the second underground continuous wall 220 is constructed layer by layer; after constructing the bottom plate of the first water-saving pool 420, the first transverse supporting structure 230 is gradually dismantled to obtain the first water-saving pool 420.
[0060] The step S5 of excavating the area between the third underground continuous wall 250 and the fourth underground continuous wall 260 and constructing the second water saving pool 430 specifically includes the following steps:
[0061] The third underground continuous wall 250 and the fourth underground continuous wall 260 are used as the side walls of the second water-saving pool 430, and the area between the third underground continuous wall 250 and the fourth underground continuous wall 260 is excavated downward layer by layer; in the process of excavating layer by layer, the corresponding second transverse supporting structure 270 for connecting the third underground continuous wall 250 and the fourth underground continuous wall 260 is constructed layer by layer; after constructing the bottom plate of the second water-saving pool 430, the second transverse supporting structure 270 is gradually dismantled to obtain the second water-saving pool 430.
[0062] It is worth noting that the newly built first water saving pool 420 and second water saving pool 430 of the present application are used to receive part of the water flow when the lock chamber is discharged, and refill the water back into the lock chamber when needed later, thereby reducing the need to pump water from an external water source. Specifically, in the process of excavating the first water saving pool 420, the first underground continuous wall 210 and the second underground continuous wall 220 are used as support structures, and a support foundation is provided for the first transverse support structure 230. In the process of excavating the second water saving pool 430, the third underground continuous wall 250 and the fourth underground continuous wall 260 are used as support structures, and a support foundation is provided for the second transverse support structure 270. The layer-by-layer excavation method is conducive to improving construction efficiency and safety. As the excavation depth increases, the excavated space can be used layer by layer for subsequent operations, such as support and reinforcement. Among them, the first transverse support structure 230 and the second transverse support structure 270 preferably adopt a steel pipe support system.
[0063] It is also worth noting that please combine Figure 4As shown, the first underground continuous wall 210 and the second underground continuous wall 220, in addition to being the supporting structure during the construction process, can also be used as the permanent structural side wall of the first water saving pool 420, and can also be used as an anti-seepage curtain to reduce or prevent water seepage in the built ship lock 10. Similarly, the third underground continuous wall 250 and the fourth underground continuous wall 260, in addition to being the supporting structure during the construction process, can also be used as the permanent structural side wall of the second water saving pool 430, and can also be used as an anti-seepage curtain to reduce or prevent water seepage in the built ship lock 10.
[0064] S6, construct other conventional structures of the newly built water-saving ship lock 40 to obtain the newly built water-saving ship lock 40. Specifically, after constructing the lock chamber section 410 of the newly built water-saving ship lock 40, other conventional structures, such as the upper navigation wall section, the upper lock head section, the lower lock head section, the lower navigation wall section, the auxiliary facilities of the water-saving tank, etc., can be constructed in a conventional manner, which will not be described in detail here.
[0065] In the present application scheme, by adopting a double-row underground continuous wall, the axial distance between the newly built water-saving ship lock 40 and the existing ship lock 10 can be greatly reduced to reduce the amount of land acquisition and demolition. The double-row underground continuous wall can be reused twice, and can be used as the support structure of the lock chamber section 410 and the water-saving pool of the newly built water-saving ship lock 40 respectively, thereby reducing the secondary support cost; the double-row underground continuous wall is used as the side wall of the water-saving pool, and after the support structure is completed, the casting of the water-saving pool is also completed; the double-row underground continuous wall also serves as the anti-seepage curtain of the newly built water-saving ship lock 40, eliminating the need for the anti-seepage curtain project that needs to be constructed on the ship lock wall itself.
[0066] As a preferred embodiment, the first water conveyance component 440 includes a first water conveyance hole 441 opened on the second underground continuous wall 220, and a second water conveyance hole 442 opened on the second gate chamber wall 411; wherein, one end of the first water conveyance hole 441 is connected to the first water-saving tank 420, one end of the second water conveyance hole 442 is connected to the first water conveyance corridor, and the other end of the second water conveyance hole 442 is connected to the first water conveyance hole 441 through a pipeline.
[0067] As another preferred embodiment, the second water delivery component 450 includes a third water delivery hole 451 opened on the third underground continuous wall 250 and a fourth water delivery hole 452 opened on the third lock chamber wall 412; wherein one end of the third water delivery hole 451 is connected to the second water saving tank 430, one end of the fourth water delivery hole 452 is connected to the second water delivery corridor, and the other end of the fourth water delivery hole 452 is connected to the third water delivery hole 451 through a pipeline. The first water delivery corridor and the second water delivery corridor are conventional structures of a ship lock, and the first water delivery component 440 can realize the flow of water between the lock chamber section 410 and the first water saving tank 420, and the second water delivery component 450 can realize the flow of water between the lock chamber section 410 and the second water saving tank 430.
[0068] For details, please refer to the attached Figure 5 The specific process of water inflow and water discharge of the water saving tank is described. Water inflow process: Before the ship is ready to enter the ship lock, the water level in the lock chamber is usually close to the water level of the water area connected to each other (upstream or downstream). At this time, the gate of the ship lock is in a closed state to isolate the upstream and downstream water areas. When the ship enters the ship lock and docks, the water inflow process will begin. First, the control mechanism will open the water inflow gate connected to the upstream reservoir (it may be a gate directly connected to the upstream reservoir, or it may be a gate that enters the water saving tank first) to allow water to flow into the ship lock or water saving tank. The water inflow process will first fill the water saving tank. The design of the water saving tank can optimize the use of water resources and reduce the amount of water directly discharged downstream. As the water level in the water saving tank gradually rises, the water will further enter the lock chamber of the ship lock through other gates or channels. As water continues to flow into the ship lock chamber, the water level in the lock chamber gradually rises. In this process, the water-saving tank may play the role of storing water in stages, that is, first fill a part of the water into the water-saving tank, and then gradually release it to the lock chamber to control the speed and amplitude of the water level rise in the lock chamber. When the water level in the lock chamber rises to a level close to the water level of the upstream reservoir, the water intake process ends. At this time, the gate of the ship lock will remain closed, waiting for the ship to pass. The discharge process is the opposite. The water flow is first discharged from the water-saving tank and then gradually lowers the water level in the lock chamber. This design not only optimizes the utilization of water resources but also improves the operation efficiency and safety of the ship lock.
[0069] Furthermore, after step S1, the method further includes the following steps: applying a third lateral support structure 240 for connecting the first underground continuous wall 210 and the second underground continuous wall 220 at the top between the first underground continuous wall 210 and the second underground continuous wall 220;
[0070] The step S2 further includes the following steps: applying a fourth lateral support structure 280 for connecting the third underground continuous wall 250 and the fourth underground continuous wall 260 to the top between the third underground continuous wall 250 and the fourth underground continuous wall 260;
[0071] Specifically, the third transverse support structure 240 and the fourth transverse support structure 280 preferably adopt a steel pipe support system, which is dismantled after the construction of the first water-saving tank 420 and the second water-saving tank 430 is completed. The construction of the third transverse support structure 240 can improve the structural strength between the first underground continuous wall 210 and the second underground continuous wall 220, and the construction of the fourth transverse support structure 280 can improve the structural strength between the third underground continuous wall 250 and the fourth underground continuous wall 260.
[0072] As a preferred embodiment, the step S5 further includes the following steps:
[0073] A fifth water conveyance hole (not shown) is opened in the first underground continuous wall 210, and a sixth water conveyance hole (not shown) is opened in the first lock chamber wall 110 of the built ship lock 10, wherein one end of the fifth water conveyance hole is connected to the first water saving tank 420, one end of the sixth water conveyance hole is connected to the third water conveyance corridor (not shown) located in the first lock chamber wall 110, and the other end of the sixth water conveyance hole is connected to the fifth water conveyance hole through a connecting component (not shown).
[0074] It is worth noting that the combination Figure 5 As shown, in this embodiment, a fifth water delivery hole can be opened in the first underground continuous wall 210, and a sixth water delivery hole can be opened in the first lock chamber wall 110 of the existing ship lock 10, and the water can flow between the first water saving tank 420 and the existing ship lock 10 through the fifth water delivery hole, the sixth water delivery hole and the connecting component (such as a pipeline). In other words, in a preferred example, the first water saving tank 420 can supply water to the lock chamber section 410 of the newly built water-saving ship lock 40, and can also supply water to the existing ship lock 10, which can play multiple effects and can be controlled according to actual needs when used.
[0075] Further, the first water delivery hole 441 is higher than the bottom plate of the first water-saving tank 420, the bottom plate of the lock chamber section 410 is higher than the bottom plate of the first water-saving tank 420, and the height difference between the first output hole and the bottom plate of the first water-saving tank 420 is set between 1 and 2 meters. The second water delivery hole 442 is higher than the bottom plate of the second water-saving tank 430, the bottom plate of the lock chamber section 410 is higher than the bottom plate of the second water-saving tank 430, and the height difference between the second output hole and the bottom plate of the second water-saving tank 430 is set between 1 and 2 meters. Specifically, the actual height difference is based on the requirements of the model test of the ship lock water delivery system, and is based on the premise that it does not affect the berthing conditions of ships moored in the lock chamber during filling and discharge.
[0076] The above are only preferred embodiments of the present invention, and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. A construction method for building a new water-saving ship lock next to an existing ship lock, characterized in that: Includes steps: S1, first construct a first underground continuous wall at a first preset distance from a first lock chamber wall of an existing ship lock, and construct a second underground continuous wall at a second preset distance from the first lock chamber wall of the existing ship lock; wherein the second preset distance is greater than the first preset distance; S2, constructing a third underground continuous wall at a third preset distance from the first lock chamber wall of the built ship lock, and constructing a fourth underground continuous wall at a fourth preset distance from the first lock chamber wall of the built ship lock; wherein the fourth preset distance is greater than the third preset distance, and the third preset distance is greater than the second preset distance; S3, excavating downward layer by layer in the area between the second underground continuous wall and the third underground continuous wall, and applying corresponding support components layer by layer, until the excavation reaches the foundation surface elevation of the lock chamber section of the newly built water-saving ship lock; S4, pouring concrete of the main structure of the lock chamber of the newly built water-saving ship lock layer by layer from the elevation of the foundation surface upward to obtain the lock chamber section of the newly built water-saving ship lock; wherein the lock chamber section includes a second lock chamber wall close to the second underground continuous wall and a third lock chamber wall close to the third underground continuous wall; S5, excavating and constructing a first water-saving pool in the area between the first underground continuous wall and the second underground continuous wall, and excavating and constructing a second water-saving pool in the area between the third underground continuous wall and the fourth underground continuous wall; wherein the first water-saving pool is connected to the first water-transfer corridor located in the wall of the second lock chamber through a first water-transfer component, and the second water-saving pool is connected to the second water-transfer corridor located in the wall of the third lock chamber through a second water-transfer component; S6, construct other conventional structures of the newly built water-saving ship lock to obtain the newly built water-saving ship lock.
2. The construction method of a new water-saving ship lock next to an existing ship lock according to claim 1, characterized in that: The step S5 of excavating the area between the first underground continuous wall and the second underground continuous wall and constructing the first water saving pool specifically includes the following steps: The first underground continuous wall and the second underground continuous wall are used as the side walls of the first water saving pool, and the area between the first underground continuous wall and the second underground continuous wall is excavated downward layer by layer; During the excavation process, a first lateral support structure for connecting the first underground continuous wall and the second underground continuous wall is constructed layer by layer. After constructing the bottom plate of the first water-saving pool, the first transverse supporting structure is gradually removed to obtain the first water-saving pool.
3. The construction method of a new water-saving ship lock next to an existing ship lock according to claim 2, characterized in that: The step S5 of excavating the area between the third underground continuous wall and the fourth underground continuous wall and constructing the second water saving pool specifically includes the following steps: The third underground continuous wall and the fourth underground continuous wall are used as the side walls of the second water saving pool, and the area between the third underground continuous wall and the fourth underground continuous wall is excavated downward layer by layer; During the excavation process, a corresponding second transverse support structure for connecting the third underground continuous wall and the fourth underground continuous wall is constructed layer by layer; After constructing the bottom plate of the second water-saving pool, the second transverse supporting structure is gradually removed to obtain the second water-saving pool.
4. The construction method of a new water-saving ship lock next to an existing ship lock according to claim 3, characterized in that: The first water delivery component includes a first water delivery hole opened on the second underground continuous wall and a second water delivery hole opened on the wall of the second gate chamber; wherein, one end of the first water delivery hole is connected to the first water saving tank, one end of the second water delivery hole is connected to the first water delivery corridor, and the other end of the second water delivery hole is connected to the first water delivery hole through a pipeline.
5. The construction method of a new water-saving ship lock next to an existing ship lock according to claim 3, characterized in that: The second water transfer assembly includes a third water transfer hole opened on the third underground continuous wall and a fourth water transfer hole opened on the wall of the third gate chamber; wherein, one end of the third water transfer hole is connected to the second water saving tank, one end of the fourth water transfer hole is connected to the second water transfer corridor, and the other end of the fourth water transfer hole is connected to the third water transfer hole through a pipeline.
6. The construction method of a new water-saving ship lock next to an existing ship lock according to claim 1, characterized in that: The step S1 further includes: applying a third lateral support structure for connecting the first underground continuous wall and the second underground continuous wall at the top between the first underground continuous wall and the second underground continuous wall; The step S2 further includes the step of applying a fourth lateral support structure for connecting the third underground continuous wall and the fourth underground continuous wall to the top between the third underground continuous wall and the fourth underground continuous wall.
7. The construction method of a new water-saving ship lock next to an existing ship lock according to claim 1, characterized in that: The step S3 of applying the corresponding support components layer by layer specifically includes the steps of: applying the fifth horizontal support structure for connecting the second underground continuous wall and the third underground continuous wall layer by layer, and the vertical support structure for supporting the corresponding fifth horizontal support structure.
8. The construction method of a new water-saving ship lock next to an existing ship lock according to claim 4, characterized in that: The step S5 further includes the following steps: A fifth water conveyance hole is opened in the first underground continuous wall, and a sixth water conveyance hole is opened in the first lock chamber wall of the built ship lock, wherein one end of the fifth water conveyance hole is connected to the first water saving tank, one end of the sixth water conveyance hole is connected to the third water conveyance gallery located in the first lock chamber wall, and the other end of the sixth water conveyance hole is connected to the fifth water conveyance hole through a connecting component.
9. The construction method of a new water-saving ship lock next to an existing ship lock according to claim 4, characterized in that: The first water delivery hole is higher than the bottom plate of the first water saving tank, the bottom plate of the gate chamber section is higher than the bottom plate of the first water saving tank, and the height difference between the first output hole and the bottom plate of the first water saving tank is set between 1 and 2 meters.
10. The construction method of a new water-saving ship lock next to an existing ship lock according to claim 5, characterized in that: The second water delivery hole is higher than the bottom plate of the second water saving tank, the bottom plate of the gate chamber section is higher than the bottom plate of the second water saving tank, and the height difference between the second output hole and the bottom plate of the second water saving tank is set between 1 and 2 meters.