A zero-land-acquisition, traffic light-free, three-dimensional traffic separation structure for urban intersections

The three-dimensional, layered urban intersection structure, which eliminates land acquisition and traffic lights, solves the problems of low traffic efficiency and single-function facilities at urban intersections. It enables uninterrupted traffic flow in all directions, prioritizes public transportation, and makes comprehensive use of space, while reducing construction and maintenance costs.

CN123064070APending Publication Date: 2026-11-10梁卫华
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611191065.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-06
Publication Date
2026-11-10

AI Technical Summary

Technical Problem

Existing urban intersections suffer from low traffic efficiency, long traffic light waiting times, large land acquisition and demolition requirements for overpass reconstruction, inconvenience for pedestrians and non-motorized vehicles, limited facility functions, high operation and maintenance costs, and a lack of consideration for public transport priority and comprehensive space utilization.

Method used

The city intersection adopts a three-dimensional traffic diversion structure with zero land acquisition and no traffic lights. By arranging traffic and pedestrian flow in each direction in a three-dimensional layer, traffic light control is eliminated. Motor vehicle overpass platforms or underground tunnel structures are configured. Combined with real-time positioning of buses, priority passage is achieved for buses, and space is reserved for future commercial operation.

Benefits of technology

It enables uninterrupted and continuous traffic flow in all directions, improves traffic efficiency, reduces construction and maintenance costs, ensures the safety of pedestrians and non-motorized vehicles, supports public transport priority, enhances the comprehensive utilization of space, and adapts to various application scenarios.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure FT_1
    Figure FT_1
  • Figure FT_2
    Figure FT_2
  • Figure FT_3
    Figure FT_3
Patent Text Reader

Abstract

This invention discloses a zero-land-acquisition, traffic-light-free, three-dimensional traffic separation structure for urban intersections, belonging to the field of municipal transportation bridge technology. This structure requires no additional land acquisition or intersection widening. Through a three-dimensional, layered layout, it separates motor vehicles, non-motor vehicles, and pedestrians, eliminating the need for traffic lights. It manages truck traffic according to urban traffic restriction rules and dynamically predicts traffic flow based on real-time bus location data, implementing the principle of bus priority. The intersection is equipped with a motor vehicle overpass platform or underground tunnel to optimize the layout of vehicle and pedestrian walkways. The overpass platform is 42m long and offers two box girder structure options, with a clearance of 4.6m–4.8m for motor vehicles and 2.8m–3.0m for pedestrian and non-motor vehicle walkways. Simultaneously, the unused space within the structure can be used to plan commercial areas, offsetting construction costs with revenue. This invention boasts excellent safety performance, high traffic efficiency, low implementation difficulty, and long-term operational capability, making it suitable for the upgrading and renovation of various urban intersections.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the technical field of municipal roads, bridge engineering and urban traffic facilities. Specifically, it relates to a zero-land-acquisition, traffic light-free three-dimensional diversion urban intersection structure that requires no land acquisition, no traffic lights, is suitable for large vehicle passage, supports public transport priority and commercial operation of ancillary spaces. Background Technology

[0002] With the acceleration of urbanization and the continuous growth of urban motor vehicle ownership, urban road intersections, as the convergence and conversion nodes of road network traffic flow, have become a major bottleneck restricting road traffic efficiency. Existing at-grade intersections generally rely on traffic lights to organize the alternating flow of traffic in different directions. Vehicles frequently start, stop, and idle at intersections, which not only significantly reduces the intersection's capacity but also exacerbates fuel consumption and exhaust emissions, making traffic congestion particularly prominent during morning and evening rush hours.

[0003] To improve intersection efficiency, some cities have adopted the construction of grade-separated interchanges to achieve three-dimensional separation of traffic flow. However, conventional grade-separated interchanges require large land areas and high construction costs, often necessitating large-scale land acquisition and demolition, making them difficult to implement in existing, older intersections in urban areas. Furthermore, existing grade-separated intersection designs often prioritize vehicular traffic efficiency, neglecting the needs of pedestrians and non-motorized vehicles. The layout of pedestrian and non-motorized vehicle crossings is often irrational, resulting in persistent issues of mixed pedestrian and vehicular traffic and motorized / non-motorized vehicle traffic, posing significant safety hazards. Simultaneously, existing intersection renovation plans generally lack comprehensive consideration of public transport priority and the utilization of commercial facilities at intersections. The intersection facilities are functionally limited, leading to high maintenance costs and hindering the unification of social and economic benefits in traffic management.

[0004] Therefore, the industry urgently needs to develop an urban intersection structure that requires no additional land acquisition, eliminates traffic light control, can simultaneously consider the traffic efficiency of motor vehicles, non-motor vehicles and pedestrians, and has comprehensive space utilization value. Summary of the Invention

[0005] Purpose of the invention The purpose of this invention is to overcome the shortcomings of existing technologies in urban intersections, such as low traffic efficiency, long traffic light waiting times, large land acquisition and demolition costs for overpass reconstruction, inconvenience for pedestrians and non-motorized vehicles, limited functionality of intersection facilities, and high operation and maintenance costs. This invention provides a zero-land-acquisition, traffic light-free, three-dimensional traffic separation structure for urban intersections. Without requiring additional land acquisition, this invention achieves uninterrupted and conflict-free passage for vehicle and pedestrian traffic in all directions through a three-dimensional, layered layout, while also prioritizing public transport and facilitating the commercial use of intersection space.

[0006] The applicant had previously filed a utility model patent application for a similar intersection traffic structure. This proposal initially suggested a signal-free intersection design, but the overall structure was relatively simplified, resulting in several shortcomings in practical application: It failed to differentiate between dedicated routes for large trucks and small vehicles, leading to potential congestion and collisions for large vehicles; it lacked a dedicated bus lane, hindering efficient public transportation operation; it did not reserve space for future traffic expansion, making on-site upgrades difficult as traffic volume increases; and it failed to fully utilize the intersection's three-dimensional space, lacking market-based revenue streams, making it difficult to balance project construction and maintenance funding, thus limiting its practical implementation. Technical solution

[0007] To achieve the above-mentioned objectives, the present invention adopts the following technical solution: a zero-land-acquisition, traffic light-free, three-dimensional traffic separation urban intersection structure. The intersection organizes the flow of motor vehicles, non-motor vehicles, and pedestrians in each direction through a three-dimensional, layered approach, completely eliminating traffic light control at the intersection. The intersection reconstruction and construction fully utilize the existing land area of ​​the intersection, requiring no additional land acquisition. The intersection is equipped with a combination of a motor vehicle overpass platform or an underground tunnel structure, and an overpass above the pedestrian and non-motor vehicle entrances and exits. The total length of the overpass platform is set at 42m, with two box girder structure options. The clearance height of the motor vehicle passage area is 4.6m to 4.8m, and the clearance height of the pedestrian and non-motor vehicle passage is 2.8m to 3.0m. No traffic lights are required throughout the intersection, enabling uninterrupted continuous passage of vehicles in all directions.

[0008] Furthermore, the cross-line platform adopts a combination structure of single-span prefabricated box girder beams and / or double-span prefabricated box girder beams; the calculated span of the single-span prefabricated box girder beam is 18m to 32m, and the calculated span of the single span of the double-span prefabricated box girder beam is 12m to 18m. The corresponding span parameters and structural forms can be selected according to the site geological conditions and the adaptability to the urban highway grade.

[0009] Furthermore, the preferred calculated span of the single-span prefabricated box girder is 28m, adopting a single-span cast-in-place box girder structure without intermediate piers, with a transverse clear span of 28m; the height of the main structure of the box girder is 1.4m to 1.6m, and the top surface of the box girder is paved with an asphalt concrete pavement layer with a thickness of 0.08m.

[0010] Furthermore, the preferred single-span calculated span of the double-span prefabricated box girder is 14m. An intermediate pier is added in the middle of the cross-line platform to divide the transverse passage into a double-span structure, and a cast-in-place small box girder structure is adopted. The height of the main structure of the box girder is 0.7m to 0.9m, and the top surface of the box girder is also covered with an asphalt concrete pavement layer with a thickness of 0.08m.

[0011] Furthermore, pedestrian and non-motorized vehicle lanes are arranged in the middle of the transverse lanes and connected to the ground street through corresponding pedestrian and non-motorized vehicle entrances and exits; the transverse main road and pedestrian and non-motorized vehicle entrances and exits are combined with overpasses to form a three-dimensional traffic diversion structure; the space under the overpasses is for pedestrian and non-motorized vehicle passage, seamlessly connected with the ground pedestrian and non-motorized vehicle lanes, and the bridge is for transverse motorized vehicle passage; the clearance height from the bottom of the bridge to the ground road surface is 2.8m to 3.0m; the overpasses adopt a cast-in-place reinforced concrete solid slab structure, the main body thickness of the solid slab is 0.40m to 0.50m, and the top surface of the slab is covered with a 0.08m thick asphalt concrete pavement layer.

[0012] Furthermore, the turning radius of the lanes at the intersection, the design standard of the overpass load, and the slope of the road approach are all set according to the traffic standards for large urban buses and heavy freight vehicles, which can accommodate the smooth passage of heavy-duty large vehicles.

[0013] Furthermore, large trucks must strictly adhere to the city's existing truck traffic restrictions during designated hours.

[0014] Furthermore, bus stops are set up in both the upper and lower areas of the overpass platform, and the vehicle-road cooperative system enables real-time and accurate positioning of buses, and completes intelligent scheduling of bus priority passage in the absence of traffic light control.

[0015] Furthermore, the overpass platform has reserved regular idle space above and below it, which can be used to arrange public service facilities, intelligent transportation supporting equipment and compliant commercial operation points, so as to achieve long-term operation and maintenance of intersection facilities through market-oriented operation.

[0016] Furthermore, the overall structure of this invention is adaptable to various application scenarios such as the renovation of old urban intersections, urban renewal construction, construction of main roads in towns and villages, and design of intersections for newly built roads in new cities.

[0017] Furthermore, depending on the site landscape requirements, land conditions, and construction environment, the overall structure of the overpass or the underground passage tunnel structure can be selectively adopted for design and construction. When the underground passage tunnel structure is adopted, the ground plane is used as the equivalent overpass platform, and the traffic flow and pedestrian flow in the underground tunnel are consistent with the traffic flow under the overpass platform. Beneficial effects

[0018] Compared with the prior art, the present invention has the following significant advantages: 1. Zero land acquisition and low cost: This invention makes full use of the existing land area of ​​the intersection for three-dimensional layering, without the need for additional land acquisition and demolition work, which greatly reduces the land cost, construction cost and social coordination cost of the intersection renovation project. It is especially suitable for the upgrading and renovation of high-density old intersections in urban areas.

[0019] 2. Eliminating traffic lights and achieving extremely high traffic efficiency: Through a three-dimensional layered layout, complete three-dimensional isolation is achieved for motor vehicle flow, non-motor vehicle flow, and pedestrian flow in all directions. No traffic lights are required throughout the entire process, and vehicles can pass through continuously without interruption. This significantly improves the traffic capacity and efficiency of intersections, completely eliminates the time loss and fuel waste caused by waiting at traffic lights, and reduces exhaust emissions.

[0020] 3. Double box girder scheme, flexible and widely adaptable: The overpass platform is equipped with two structural schemes: single-span box girder and double-span box girder. The type can be flexibly selected according to the site geological conditions, highway grade and construction conditions. The span parameter coverage is reasonable and can adapt to the needs of urban intersection reconstruction with different widths and working conditions.

[0021] 4. Complete separation of pedestrians and vehicles, ensuring high traffic safety: Pedestrian and non-motorized vehicle lanes are centrally located in the middle of the transverse lanes, and pedestrians, non-motorized vehicles, and motorized vehicles are separated in three dimensions through overpasses. This completely eliminates the safety hazards of mixed pedestrian and vehicle traffic at traditional intersections, and significantly improves the safety and comfort of pedestrians and non-motorized vehicles crossing the street.

[0022] 5. Support public transport priority and promote green travel: By combining vehicle-road cooperative systems with real-time bus positioning technology, intelligent scheduling of public transport priority can be achieved under conditions without traffic lights, effectively improving the efficiency of public transport and guiding green and low-carbon travel in the city.

[0023] 6. High space utilization rate and market-oriented operation and maintenance: The overpass platform has reserved regular idle space above and below, which can be used to set up convenient service facilities, smart supporting equipment and compliant commercial operation points, revitalize idle space resources at the intersection, create market-oriented economic benefits, offset the operation and maintenance costs of the intersection, and achieve long-term independent operation and maintenance.

[0024] 7. Strong adaptability and wide applicability: The overall structure can be flexibly selected in the form of above-ground overpass or underground tunnel, which is suitable for a variety of application scenarios such as the renovation of old urban intersections, urban renewal, construction of main roads in towns and villages, and newly built roads in new cities.

[0025] 8. Suitable for large and heavy-duty vehicles: Overcomes the shortcomings of traditional flat roundabouts where large trucks have difficulty turning, are prone to scratches, and experience traffic jams. The entire road is designed with heavy-duty vehicle standards in terms of road alignment and structural load, which can meet the normal traffic needs of large vehicles in suburban freight corridors and urban main road intersections. Attached Figure Description

[0026] Figure 1 This is a schematic diagram of the overall plan layout of the zero-land-acquisition, traffic light-free, three-dimensional traffic diversion urban intersection structure of the present invention; Figure 2 This is a schematic diagram of the planar layout structure below the overpass platform of the present invention; Figure 3This is a schematic cross-sectional view of a single-span box girder structure according to Embodiment 1 of the present invention; Figure 4 This is a schematic cross-sectional view of the double-span box girder structure in Embodiment 2 of the present invention; Figure 5 This is a schematic diagram of the equivalent planar structure of the underground tunnel scheme of the present invention.

[0027] Attached diagram labels: 1-Transverse main road, 2-Vertical main road, 3-Bus lane, 4-Overpass platform, 5-Right turn lane, 6-Left turn lane, 7-Pedestrian and non-motorized vehicle lane, 8-Underpass commercial reserved area, 9-Abovepass commercial reserved area, 10-Large vehicle U-turn lane, 11-Pedestrian and non-motorized vehicle lane entrance / exit, 12-Underpass bus stop, 13-Abovepass bus stop, 14-Bridge pier, 15-Bridge, 16-Asphalt concrete pavement layer, 17-Sunken pedestrian and non-motorized vehicle lane entrance / exit, 18-Underground commercial reserved area, 19-Aboveground commercial reserved area, 20-Underground bus stop, 21-Aboveground bus stop, 22-Sunken longitudinal main road. Detailed Implementation

[0028] The present invention will now be described in further detail with reference to the accompanying drawings and specific embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the scope of protection of the invention. Example

[0029] like Figure 1 , Figure 2 , Figure 3 As shown, this embodiment provides a zero-land-acquisition, traffic-light-free, three-dimensional traffic separation urban intersection structure. This intersection organizes the flow of motor vehicles, non-motor vehicles, and pedestrians in all directions through a three-dimensional, layered approach, eliminating the need for traffic lights throughout the intersection. The intersection reconstruction and construction fully utilizes the existing intersection area, requiring no additional land acquisition.

[0030] The intersection is equipped with a combined three-dimensional structure consisting of a vehicular overpass platform and overpasses above pedestrian and non-motorized vehicle entrances / exits. The total length of the overpass platform is 42m, and this embodiment adopts a single-span box girder structure. The clearance height for vehicular traffic is 4.6m–4.8m, and the clearance height for pedestrian and non-motorized vehicle passages is 2.8m–3.0m. The intersection operates without traffic lights, allowing for uninterrupted and continuous traffic flow in all directions.

[0031] like Figure 3As shown, in this embodiment, the overpass platform adopts a single-span prefabricated box girder structure, with a preferred calculated span of 28m. It employs a single-span cast-in-place box girder structure without intermediate piers, with a clear transverse span of 28m. The main structure height of the box girder is 1.4m to 1.6m, and the top surface of the box girder is paved with a 0.08m thick asphalt concrete layer. This single-span pierless design offers a wide field of vision, regular space under the bridge, and high space utilization, making it suitable for typical urban intersections with moderate width and good geological conditions.

[0032] It should be noted that the calculated span of the single-span box girder of this invention ranges from 18m to 32m, and 28m is selected as the preferred implementation parameter in this embodiment. Designers can adaptively select span parameters within the range of 18m to 32m based on factors such as actual intersection width, geological bearing capacity, and highway grade, all of which fall within the protection scope of this invention.

[0033] Pedestrian and non-motorized vehicle lanes are located in the middle of the transverse lanes and connect to the ground-level street via pedestrian and non-motorized vehicle entrances / exits. The transverse main road and the pedestrian / non-motorized vehicle entrances / exits are combined via overpasses to form a three-dimensional traffic separation structure. The overpass is dedicated to transverse motorized vehicle traffic, while the space beneath is for pedestrians and non-motorized vehicles, seamlessly connecting with the ground-level pedestrian and non-motorized vehicle lanes, thus completely achieving three-dimensional separation of motorized, non-motorized, and pedestrian traffic. The clearance height from the bottom of the bridge to the ground surface is 2.8m to 3.0m, meeting the standards for pedestrian and non-motorized vehicle traffic. The overpass uses a cast-in-place reinforced concrete solid slab structure, with a main slab thickness of 0.40m to 0.50m, and a 0.08m thick asphalt concrete pavement layer on the top surface of the slab.

[0034] In this embodiment, the turning radius of the intersection lanes, the load standard of the overpass, and the slope of the approach ramps are all set according to the traffic standards for large urban buses and heavy freight vehicles, which can accommodate the smooth passage of heavy-duty large vehicles. Large trucks strictly follow the city's existing traffic restriction periods, and at the same time, dynamic traffic prediction is made in combination with the real-time location information of buses to achieve priority passage for buses in traffic light-free conditions.

[0035] Corresponding bus stops are set up in the areas above and below the overpass platform. Combined with the vehicle-road cooperative system, precise positioning of buses is achieved, enabling intelligent scheduling of bus priority passage in the absence of traffic lights. At the same time, regular idle spaces are reserved above and below the overpass platform, which can be used to set up public service facilities, smart transportation facilities, and compliant commercial operation sites, so as to achieve long-term operation and maintenance of intersection facilities through market-oriented operation. Example

[0036] like Figure 4 As shown, the core difference between this embodiment and embodiment 1 is that the cross-line platform adopts a double-span box girder structure. The rest of the structural layout, passage mode, functional configuration, and parameter standards are the same as those in embodiment 1, and will not be repeated here.

[0037] In this embodiment, the overpass platform adopts a double-span prefabricated box girder structure, with a preferred single-span calculated span of 14m. An intermediate pier is added in the middle of the overpass platform to divide the transverse passage into two spans. The entire structure adopts a cast-in-place small box girder structure. The height of the main structure of the box girder is 0.7m to 0.9m, and the top surface of the box girder is covered with a 0.08m thick asphalt concrete pavement layer.

[0038] The double-span design, by adding intermediate piers, effectively reduces the span and structural height of a single-span beam, resulting in stronger overall structural stability. It is suitable for intersections with wide widths, flexible under-bridge clearance requirements, or limited geological conditions. The calculated single-span diameter of the double-span box girder in this invention ranges from 12m to 18m. This embodiment selects 14m as the preferred implementation parameter. Designers can flexibly select parameters within this range based on actual site conditions, all of which fall within the scope of this invention. Example

[0039] like Figure 5 As shown, this embodiment is an equivalent replacement scheme for underground tunnels according to the present invention.

[0040] Based on site landscape requirements, construction conditions, and urban planning needs, an underground tunnel structure can be used instead of an above-ground overpass structure for design and construction. When using an underground tunnel structure, the ground level is considered the overpass platform, and the traffic flow in the underground tunnel is consistent with that under the overpass platform. Specifically, lateral main road vehicles can pass unimpeded at ground level, while longitudinal vehicle traffic is diverted through the underground tunnel; pedestrians and non-motorized vehicles connect to the ground street through sunken entrances and exits, crossing the longitudinal lanes from the middle of the lateral lanes. Vehicle, pedestrian, and non-motorized vehicle traffic flows do not interfere with each other, achieving the same zero-land-acquisition, traffic light-free, and uninterrupted continuous traffic effect as the above-ground overpass solution.

[0041] The underground tunnel design has no elevated structure above ground, and does not obstruct the urban landscape. It is suitable for historical and cultural blocks, urban core business districts, and other scenarios where the urban landscape is highly demanding and elevated structures are not suitable.

[0042] Application Scenario Description The overall structure of this invention is adaptable to various engineering application scenarios, including but not limited to the renovation of old urban intersections, urban renewal and upgrading, construction of main road intersections in towns and villages, and design of intersections for newly built roads in new cities. Those skilled in the art can make conventional adaptive adjustments within the framework of this invention's technical solution based on site conditions, traffic flow, geological conditions, investment scale, and landscape requirements, all of which can achieve the core technical effects of zero land acquisition, no traffic lights required, three-dimensional separation of motorized, non-motorized, and pedestrian traffic, public transport priority, and integrated spatial operation.

[0043] The above description is merely a preferred embodiment of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the scope of protection of the present invention.

Claims

1. A three-dimensional traffic separation structure for urban intersections requiring zero land acquisition and no traffic lights, characterized in that: The flow of motor vehicles, non-motor vehicles, and pedestrians in all directions is organized in a three-dimensional, layered manner, and traffic lights at intersections are eliminated. The intersection renovation utilizes the existing intersection area, requiring no additional land acquisition; the intersection is equipped with a combination structure of a motor vehicle overpass platform or underground tunnel, and an overpass above the pedestrian and non-motorized vehicle entrances and exits; The overpass platform is 42m long and has two box girder structure options. The clearance for motor vehicle passage is 4.6m to 4.8m, and the clearance for pedestrian and non-motorized vehicle passage is 2.8m to 3.0m. No traffic lights are required at the intersection, allowing for uninterrupted and continuous vehicle passage.

2. The zero-land-acquisition, traffic-light-free, three-dimensional traffic separation urban intersection structure according to claim 1, characterized in that: The overpass platform adopts a single-span prefabricated box girder structure and / or a double-span prefabricated box girder structure; the calculated span of the single-span prefabricated box girder is 18-32m, and the calculated span of the single span of the double-span prefabricated box girder is 12-18m. The span is selected adaptively according to geological conditions and highway grade.

3. The zero-land-acquisition, traffic-light-free, three-dimensional traffic separation urban intersection structure according to claim 2, characterized in that: The calculated span of the single-span prefabricated box girder is 28m. It adopts a single-span cast-in-place box girder structure without intermediate piers, with a transverse clear span of 28m. The height of the main structure of the box girder is 1.4m to 1.6m, and the top surface of the box girder is paved with an asphalt concrete pavement layer with a thickness of 0.08m.

4. The zero-land-acquisition, traffic-light-free, three-dimensional traffic separation urban intersection structure according to claim 2, characterized in that: The single-span calculated span of the double-span prefabricated box girder is 14m. An intermediate pier is added in the middle of the cross-line platform to divide it into two spans laterally. The structure adopts a cast-in-place small box girder structure. The height of the main structure of the box girder is 0.7m to 0.9m, and the top surface of the box girder is paved with an asphalt concrete pavement layer with a thickness of 0.08m.

5. The zero-land-acquisition, traffic-light-free, three-dimensional traffic separation urban intersection structure according to claim 1, characterized in that: Pedestrian and non-motorized vehicle lanes are located in the middle of the transverse lanes and connected to the street through pedestrian and non-motorized vehicle entrances and exits; the transverse main road and the pedestrian and non-motorized vehicle entrances and exits are combined through an overpass to form a three-dimensional structure; pedestrians and non-motorized vehicles pass under the bridge and connect with the pedestrian and non-motorized vehicle lanes, while lateral motorized vehicles travel on the bridge; the clearance height from the bottom of the bridge to the ground surface is 2.8m to 3.0m; the overpass adopts a cast-in-place reinforced concrete solid slab structure, the main body thickness of the solid slab is 0.40m to 0.50m, and the top surface of the slab is covered with a 0.08m thick asphalt concrete pavement layer.

6. The zero-land-acquisition, traffic-light-free, three-dimensional traffic separation urban intersection structure according to claim 1, characterized in that: The turning radius of the intersection lanes, the load standard of the overpass, and the slope of the approach ramps are all set according to the traffic standards for large urban buses and heavy freight vehicles, so as to facilitate the smooth passage of heavy-duty large vehicles.

7. The zero-land-acquisition, traffic-light-free, three-dimensional traffic separation urban intersection structure according to claim 1, characterized in that: Large trucks will be allowed to travel during the city's existing restricted hours, while traffic will be dynamically predicted based on real-time bus location information to ensure priority for buses.

8. The zero-land-acquisition, traffic-light-free, three-dimensional traffic separation urban intersection structure according to claim 1, characterized in that: Bus stops are set up on the overpass platform, and the vehicle-road cooperative system is used to accurately locate buses, enabling priority bus traffic scheduling in the absence of traffic lights.

9. The zero-land-acquisition, traffic-light-free, three-dimensional traffic separation urban intersection structure according to claim 1, characterized in that: The overpass platform is reserved with regular idle space above and below it to arrange convenient service facilities, smart facilities and compliant commercial operation points, so as to realize the market-oriented operation and maintenance of intersection facilities.

10. The zero-land-acquisition, traffic-light-free, three-dimensional traffic separation urban intersection structure according to claim 1, characterized in that: The overall structure is suitable for urban old intersection renovation, urban renewal, rural main roads, and newly built roads in new towns.

11. The zero-land-acquisition, traffic-light-free, three-dimensional traffic separation urban intersection structure according to claim 1, characterized in that: The design and construction shall be carried out using an overall structure of either an overpass or an underground tunnel, depending on the site conditions. When an underground tunnel structure is adopted, the ground level shall be regarded as the platform of the overpass, and the traffic mode of the underground tunnel shall be the same as the traffic mode under the platform of the overpass.