Directional drilling cluster centralized arrangement grouting filling method in goaf area
By setting up a cluster grouting filling method on the goaf, the existing grouting filling method has solved the problem of large area covering the ground, the reduction of the ground area and uniformity of grouting are achieved, and the cost is reduced. .
Patent Information
- Application Number
- CN202410405750.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-03
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2044-04-03
AI Technical Summary
The existing grouting and filling methods cover a large area, resulting in difficulty in land acquisition and high cost.
The grouting filling method is adopted to drill the main pipe above the goaf and set up a first-open drilling group and a second-open drilling group to form a radial multiple Secondly, drilling holes are opened to reduce the floor area of the drilling holes, and grouting pipelines are arranged in these drilling holes to achieve uniform grouting and filling.
It effectively reduces the floor area, ensures uniformity of grouting, and reduces grouting costs.
Smart Images

Figure CN118242135B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of coal mining, and in particular to a method for grouting and filling in a goaf area by centrally arranging clusters of directional drilling holes. Background Art
[0002] Slurry filling technology refers to the process of crushing, grinding and other technical means to make coal-based solid waste generated during the production process of coal mines or power plants into powder with a certain particle size, and then mixing it with water in a specific proportion to form a slurry. The gangue slurry is transported to the top of the working surface to be filled through a filling pump and a pre-laid ground filling pipeline, and the gangue slurry is injected into the goaf by directional drilling on the ground. However, the grouting filling method in the related art occupies a large area when implemented, and there are difficulties in land acquisition during the current specific implementation process, resulting in relatively high grouting costs. Therefore, there is an urgent need for a grouting filling method that is centrally arranged on the ground with a small ground acquisition area. Summary of the invention
[0003] The present invention aims to solve one of the technical problems in the related art at least to a certain extent.
[0004] To this end, the embodiment of the present invention proposes a method for grouting filling in a goaf area by directional drilling cluster centralized arrangement, which has a small land acquisition area.
[0005] The method for directional drilling cluster centralized arrangement of grouting filling in goaf of the embodiment of the present invention comprises the following steps: step 1: according to the geological conditions of the coal mine and the distribution area of the goaf, drilling the main pipeline above the goaf is implemented; step 2: determining the parameters of a group of openings of the main pipeline that need to be opened, the parameters of the group of openings of the main pipeline include the setting area of the group of openings of the main pipeline, the angle between each of the multiple openings of the group of openings of the main pipeline and the horizontal direction, and the terminal hole position, and implementing the drilling of the multiple openings of the group of openings of the main pipeline. Hole; Step 3: Determine the parameters of the second opening borehole corresponding to each first opening borehole, wherein the parameters of each second opening borehole include the angle between the second opening borehole and the horizontal direction and the final hole position, and drill the second opening borehole at the final hole position of each first opening borehole, and multiple second opening boreholes are radially drilled into the goaf; Step 4: Lay grouting pipelines in the main pipeline, the first opening borehole and the second opening borehole, and the grouting pipeline is a pipeline for pumping filling slurry to implement grouting filling operations into the goaf.
[0006] The method for grouting and filling in goaf with directional drilling clusters arranged in a centralized manner according to the embodiment of the present invention ensures the uniformity of grouting by drilling multiple radially dispersed double-opening boreholes so that the final hole openings of the multiple double-opening boreholes are evenly dispersed in the goaf. In addition, the multiple single-opening boreholes connected to the multiple double-opening boreholes are distributed in clusters, which greatly reduces the floor space occupied by ground drilling compared to the vertically downward drilling of branch channels in the related art. Therefore, the method for grouting and filling in goaf with directional drilling clusters arranged in a centralized manner according to the embodiment of the present invention has the advantage of a smaller land acquisition area.
[0007] Therefore, the method for grouting and filling in goaf areas by directional drilling cluster centralized arrangement according to the embodiment of the present invention has the advantage of a smaller land acquisition area.
[0008] In some embodiments, the step 1 further includes: detecting the goaf using a high-density electrical method and / or a three-dimensional laser scanner; and the main pipeline is arranged to be located directly above the goaf.
[0009] In some embodiments, step 3 further includes: after the first borehole is drilled a first preset distance, rock debris is collected to identify geological stratification; if the bedrock is entered, a first casing is set in the first borehole and cementing is performed.
[0010] In some embodiments, step 2 further comprises: when drilling the first drilling hole and the borehole passes through the aquifer overlying the coal seam, an annular waterproof seal is provided between the aquifer and the first casing.
[0011] In some embodiments, step 3 also includes: determining multiple preset target centers in the goaf, the multiple preset target centers are arranged in an array in the goaf to cover the goaf, and the multiple target centers correspond one by one to the end hole positions of the multiple second-opening drilling holes.
[0012] In some embodiments, step 3 also includes: setting a second casing in the borehole, the second casing including an inclined elbow, the inclined elbow contacting the bottom wall of the second borehole, setting a high-pressure hose in the second casing, and connecting a self-propelled drill bit to the bottom of the high-pressure hose; using the self-propelled drill bit to drill along the direction of the casing elbow toward the preset target center corresponding to the second borehole until drilling into the preset target center, and then stop drilling.
[0013] In some embodiments, the radius of each preset target center is 10m. If the distance between the final hole of the second drilling corresponding to the preset target center and the target center is less than or equal to 10m, it is considered to be a hit.
[0014] In some embodiments, step 3 further includes: geologically cataloguing, stratifying and numbering the cores, and sampling and analyzing rock layers greater than or equal to 1 m.
[0015] In some embodiments, when sampling the core, when the rock layer thickness is greater than or equal to 1m and less than 10m, the rock samples collected in each layer are greater than or equal to one group; when the rock layer thickness is greater than or equal to 10m, the rock samples collected in each layer are greater than or equal to 2 groups, and the length of each rock sample is greater than or equal to 200mm.
[0016] In some embodiments, step 4 includes: opening the slurry inlet of the grouting pipe, performing grouting operations on the goaf, recording grouting volume parameters, and adjusting the grouting filling speed, filling time and grouting volume according to the compaction characteristics of the formation. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 The schematic diagram of the ore body structure shows a method for grouting filling in a goaf area using a cluster of directional drilling holes arranged in a centralized manner according to an embodiment of the present invention.
[0018] Figure 2 The present invention is a flow chart of a method for grouting and filling in a goaf area using a cluster of directional drilling holes arranged in a centralized manner.
[0019] Reference numerals:
[0020] Goaf 100; main pipeline 1; primary borehole 2; secondary borehole 3; grouting main pipeline 4; grouting branch pipeline 5; bull's eye 6; ground 200. DETAILED DESCRIPTION
[0021] Embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings. The embodiments described below with reference to the accompanying drawings are exemplary and intended to be used to explain the present invention, but should not be understood as limiting the present invention.
[0022] The following describes a method for grouting and filling in a goaf area using a cluster of directional drilling holes arranged in a centralized manner according to an embodiment of the present invention with reference to the accompanying drawings.
[0023] like Figure 1-Figure 2 As shown, the method for grouting and filling in a goaf area with a cluster of directional drilling holes arranged in a centralized manner according to an embodiment of the present invention comprises the following steps:
[0024] Step 1: According to the geological conditions of the coal mine and the distribution area of the goaf 100. Specifically, the overburden stratum subsidence curve of the mining face is constructed using the mine roof masonry beam theory, the subsidence law of the overburden stratum in the goaf 100, the distribution state and stress characteristics of the rock blocks in the goaf 100. According to the overburden stratum subsidence curve of the mine, the stress relationship between the falling rock blocks and the advancement time of the mining face is derived, and then the relationship between the stability coefficient of the goaf 100 and the advancement time of the mining face is determined. According to the relationship between the stability coefficient of the goaf 100 and the advancement time of the mining face, a model of the direction and inclination of the goaf 100 is constructed, and finally the fillable area of the goaf 100 is determined according to the direction and inclination of the goaf 100. Drilling of the main pipeline 1 is carried out above the goaf 100.
[0025] Step 2: Determine the parameters of the 2 sets of drill holes that need to be opened in the main pipeline 1, the parameters of the 2 sets of drill holes include the setting area of the 2 sets of drill holes, the angle between each of the multiple drill holes 2 in the 2 sets of drill holes and the horizontal direction and the final hole position, and implement drilling of the multiple drill holes 2 in the 2 sets of drill holes. It should be noted that the 2 sets of drill holes are set directly above the goaf 100, and the number of the drill holes 2 in the 2 sets of drill holes, the angle between each drill hole 2 and the horizontal direction and the final hole position all need to be determined according to the specific situation of the goaf 100, and are not limited here.
[0026] Step 3: Determine the parameters of the secondary borehole 3 corresponding to each primary borehole, wherein the parameters of each secondary borehole 3 include the angle between the secondary borehole 3 and the horizontal direction and the final hole position, and drill the secondary borehole 3 at the final hole position of each primary borehole. Multiple secondary boreholes 3 are radially drilled into the goaf 100 so that the final hole positions of multiple secondary boreholes 3 can be evenly distributed in the goaf 100. Determine the spacing between the final hole positions of multiple secondary boreholes 3 and the final hole positions of adjacent secondary boreholes 3 according to the diffusivity of the fluidized slurry so that the slurry can evenly fill the goaf 100.
[0027] Step 4: Lay out grouting pipelines in the main pipeline 1 , the first borehole 2 and the second borehole 3 . The grouting pipelines are pipelines for pumping filling slurry to implement grouting filling operations into the goaf 100 .
[0028] The following describes a specific implementation of the method for grouting and filling in a goaf area with a cluster of directional drilling holes arranged in a centralized manner according to an embodiment of the present invention with reference to the accompanying drawings.
[0029] The distribution area of the goaf 100 is determined, and a main pipeline 1 is drilled into the ground 200 above the goaf 100 , wherein the extension direction of the main pipeline 1 is consistent with the extension direction of the goaf 100 .
[0030] A group of 2 holes are drilled into the wall of the main pipeline 1 toward the goaf 100 below, that is, each of the 2 holes is connected to the main pipeline 1, and the group of 2 holes is located directly above the goaf 100. There are multiple holes 2 in the group of 2 holes, and each hole 2 is drilled vertically downward into the goaf 100. For example, the multiple holes 2 are divided into multiple rows, and the multiple rows of holes 2 are spaced apart in the extension direction of the goaf 100, and the multiple holes 2 in each row are spaced apart in the width direction of the goaf 100.
[0031] The final hole position of each secondary borehole 3 is determined, and drilling is started at the bottom wall of each primary borehole 2 toward the preset final hole position of the corresponding secondary borehole 3, and the drilling stops at the preset final hole position of the secondary borehole 3, so that the secondary borehole 3 and the corresponding primary borehole 2 form a branch pipeline. Multiple secondary boreholes 3 are drilled in sequence until multiple branch pipelines are formed.
[0032] A grouting main pipeline 4 is arranged in the main pipeline 1 from a grouting station on the ground 200, and a plurality of grouting branch pipelines 5 are arranged one by one in a plurality of branch pipelines, so that one end of each grouting branch pipeline 5 is connected to the grouting main pipeline 4, and the other end of each grouting branch pipeline 5 is connected to the goaf 100. Slurry is introduced into the grouting main pipeline 4 to evenly fill the goaf 100 through the plurality of grouting branch pipelines 5. The grouting pressure of the grouting main pipeline 4 is monitored, and if the grouting pressure rises significantly, it is determined that the goaf 100 has been completely filled, and the grouting operation is stopped.
[0033] The grouting filling method in the related art first drills a main channel on the ground above the goaf, wherein the extension direction of the main channel is consistent with the extension direction of the goaf. Then, multiple rows of branch channels are drilled on the corresponding upper ground of the goaf, and the multiple rows of branch channels are spaced apart in the extension direction of the goaf. The two branch channels in each row of branch channels are spaced apart in the width direction of the goaf, and one end of each branch channel is connected to the main channel, and the other end of each branch channel is connected to the goaf. The spacing distance between the two branch channels in the width direction of the goaf is roughly consistent with the width of the goaf, so as to evenly grout the goaf. Therefore, the area of land required for the grouting filling method in the related art to implement drilling is roughly consistent with the area of the ground corresponding to the goaf, so that a large area is occupied during implementation, and a large area of land needs to be requisitioned during the specific implementation process, resulting in a high cost of grouting operation.
[0034] Compared with the related art, the method for grouting and filling in goaf with directional drilling clusters in the embodiment of the present invention ensures the uniformity of grouting by drilling multiple radially dispersed secondary boreholes 3 so that the final hole openings of the multiple secondary boreholes 3 are evenly dispersed in the goaf 100. In addition, the multiple primary boreholes 2 connected to the multiple secondary boreholes 3 are distributed in clusters, which greatly reduces the floor space of ground drilling compared to the vertical downward drilling of branch channels in the related art. Therefore, the method for grouting and filling in goaf with directional drilling clusters in the embodiment of the present invention has the advantage of a smaller land acquisition area.
[0035] Therefore, the method for grouting and filling in goaf areas by directional drilling cluster centralized arrangement according to the embodiment of the present invention has the advantage of a smaller land acquisition area.
[0036] In order to make the present application easier to understand, the following takes the example that the extension direction of the goaf 100 is consistent with the left-right direction and the example that the width direction of the goaf 100 is consistent with the front-back direction to further describe the goaf directional drilling cluster centralized grouting filling method of an embodiment of the present invention.
[0037] In some embodiments, step 1 further includes: using a high-density electrical method and / or a three-dimensional laser scanner to detect the goaf 100, and the main pipeline 1 is arranged directly above the goaf 100, thereby ensuring the safety of the drilling operation.
[0038] In some embodiments, step 3 further includes: after the first borehole 2 is drilled into the first preset distance, rock debris is collected to determine the geological stratification. If the bedrock is entered, a first casing is set in the first borehole 2 and cementing is performed. For example, after the first borehole 2 is drilled into 15m, rock debris is collected to determine the stratification, and after entering the bedrock for 5m, the first casing is lowered and cementing is performed. The type of rock stratum is determined based on the collected rock debris samples, such as sandstone, mudstone or shale, so as to determine the parameters such as the drilling speed, drilling angle, and pressure of the first borehole 2.
[0039] In some embodiments, step 2 further includes: when drilling a borehole and the borehole passes through the aquifer overlying the coal seam, an annular waterproof seal is placed between the aquifer and the first casing. For example, the aperture of the borehole 2 is Φ152mm, and the casing is a Φ133*6mm seamless steel pipe. Thus, by filling and sealing between the aquifer and the first casing, water from the aquifer is prevented from being introduced into the goaf 100 along the borehole 2, thereby ensuring the safety of the filling operation.
[0040] In some embodiments, step 3 further includes: determining a plurality of preset bullseyes 6 in the goaf 100, the plurality of preset bullseyes 6 are arranged in an array in the goaf 100 to cover the goaf 100, and the plurality of bullseyes 6 correspond one by one to the final hole positions of the plurality of secondary boreholes 3. In other words, before the drilling operation of the secondary borehole 3 is performed, the final hole bullseyes 6 of the plurality of secondary boreholes 3 are determined one by one in the goaf 100, so as to implement the drilling operation of each secondary borehole 3 according to the position of the bullseye 6.
[0041] Specifically, a plurality of single-opening boreholes 2 are drilled into the wall surface of the main pipeline 1 toward the goaf 100 below, and each single-opening borehole 2 is drilled vertically downward into the goaf 100. The plurality of single-opening boreholes 2 are arranged in multiple rows in the left-right direction, for example Figure 1 As shown, three rows of single-opening boreholes 2 are drilled into the wall of the main pipeline 1, each row includes three single-opening boreholes 2, and the three single-opening boreholes 2 are spaced apart in the front-to-back direction. Among them, the spacing distance between adjacent single-opening boreholes 2 is 5m-10m.
[0042] A plurality of bullseyes 6 are set in the left-right direction, and the plurality of bullseyes 6 are arranged in multiple rows in the left-right direction, and the plurality of bullseyes 6 correspond one-to-one to the plurality of drill holes 2. The spacing distance between the bullseyes 6 located in the front and the bullseyes 6 located in the rear of each row is suitable to be substantially consistent with the width of the goaf 100, so as to ensure that the goaf 100 can be uniformly grouted.
[0043] For example Figure 1 As shown, three rows of target eyes 6 spaced apart in the left-right direction are provided in the goaf 100 , with the interval between two adjacent rows of target eyes 6 being 200 m, and the interval between two adjacent target eyes 6 in each row being 120 m, which is substantially consistent with the extended length and width of the goaf 100 .
[0044] Specifically, the radius of each preset target center 6 is 10 m, and if the final hole distance of the secondary drilling hole 3 corresponding to the preset target center 6 is less than or equal to 10 m, the target is hit, thereby ensuring the accuracy of the secondary drilling hole 3 .
[0045] Furthermore, step 3 also includes: setting a second casing in the borehole, the second casing including an inclined elbow, the inclined elbow contacts the bottom wall of the second borehole 3, setting a high-pressure hose in the second casing, and connecting a self-feeding drill bit to the bottom of the high-pressure hose. The self-feeding drill bit is used to drill along the casing elbow direction toward the preset target center 6 corresponding to the second borehole 3 until the preset target center 6 is drilled into, and the drilling is stopped.
[0046] In other words, by further drilling the bottom wall of the first borehole 2 using a self-propelled drill bit, an inclined second borehole 3 is drilled, so that multiple second boreholes 3 are radially drilled into the goaf 100 to ensure uniform grouting into the goaf 100.
[0047] In some embodiments, step 3 further includes: geologically cataloguing, stratifying and numbering the cores, and sampling and analyzing rock layers greater than or equal to 1 m.
[0048] Specifically, when sampling the core, when the thickness of the rock layer is greater than or equal to 1m and less than 10m, the rock samples collected from each layer are greater than or equal to one group; when the thickness of the rock layer is greater than or equal to 10m, the rock samples collected from each layer are greater than or equal to 2 groups, and the length of each rock sample is greater than or equal to 200mm. The type of rock layer is determined based on the collected rock cuttings samples, such as sandstone, mudstone or shale, so as to determine the drilling speed, drilling angle, pressure and other parameters of the first borehole 2.
[0049] In some embodiments, step 4 includes: opening the slurry inlet of the grouting pipe, performing grouting operations on the goaf 100, recording grouting volume parameters, and adjusting the grouting filling speed, filling time and grouting volume according to the compaction characteristics of the formation.
[0050] Specifically, a stop valve is set at the end of the grouting pipeline, which is used to adjust the slurry flow rate to prevent the slurry from being too dense or too thin. The porous grouting pipe is passed through the plug with a steel needle and closed, the slurry inlet of the grouting pipeline is opened, and the grouting operation is performed according to the predetermined slurry feeding method, strength and speed, and the parameters such as the grouting volume are recorded. When the slurry enters the formation, the speed, time and amount of grouting filling are adjusted according to the compaction characteristics of the formation to ensure that the filling coverage area of each grouting pipe is completely consistent, and the grouting effect is uniform and stable, which is conducive to improving the strength of the geological layer and avoiding deformation, subsidence and collapse of the formation.
[0051] Specifically, at the beginning of grouting, a water injection pressure test method is used to determine whether the separation layer is formed, so as to determine the timing of the first grouting. When the coal seam is mined to a certain distance from the grouting pipeline set in the first drilling hole 2, the second drilling hole 3 and the grouting main pipeline 4, for example, 15m-60m. Inject clean water into the grouting pipeline, and control the pressure to be consistent with the upper formation pressure; when the pressure drops below 0.5Mpa and the water injection volume reaches a certain flow rate, grouting begins, for example, the water injection volume is 10-20m 3 / h.
[0052] When the volume of injected compacted fly ash reaches 35-60% of the mined volume, the ratio of grouting pressure to natural formation pressure is 1.3-1.5, and within a certain period of time, for example, 36 hours, the single hole ash injection volume is less than 50t / d, the grouting is terminated.
[0053] In the description of the present invention, it is to be understood that the terms “center”, “longitudinal”, “lateral”, “length”, “width”, “thickness”, “up”, “down”, “front”, “back”, “left”, “right”, “vertical”, “horizontal”, “top”, “bottom”, “inside”, “outside”, “clockwise”, “counterclockwise”, “axial”, “radial”, “circumferential”, etc., indicating orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.
[0054] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0055] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection, an electrical connection, or communication with each other; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0056] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.
[0057] In the present invention, the terms "one embodiment", "some embodiments", "examples", "specific examples", or "some examples" etc. mean that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the described specific features, structures, materials or characteristics may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.
[0058] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present invention.
Claims
1. A method for grouting and filling in goaf areas by directional drilling cluster centralized arrangement, characterized in that: The following steps are involved: Step 1: According to the geological conditions of the coal mine and the distribution area of the goaf, a main pipeline is drilled above the goaf, and the extension direction of the main pipeline is consistent with the extension direction of the goaf; The overburden stratum subsidence curve of the mining face is constructed by using the mine roof masonry beam theory, the subsidence law of the overburden stratum in the goaf, the distribution state of the rock blocks in the goaf and the stress characteristics. The stress relationship between the falling rock blocks and the advancement time of the mining face is derived based on the overburden stratum subsidence curve of the mine, and then the relationship between the stability coefficient of the goaf and the advancement time of the mining face is determined. According to the relationship between the stability coefficient of the goaf and the advancement time of the mining face, a model of the direction and inclination of the goaf is constructed. Finally, the filling area of the goaf is determined based on the direction and inclination of the goaf. Step 2: Determine the parameters of a drill hole group to be opened in the main pipeline, wherein the parameters of the drill hole group include the setting area of the drill hole group, the angle between each of the multiple drill holes in the drill hole group and the horizontal direction, and the terminal hole position, and drill the multiple drill holes in the drill hole group; Step 3: Determine the parameters of the second opening borehole corresponding to each first opening borehole, wherein the parameters of each second opening borehole include the angle between the second opening borehole and the horizontal direction and the final hole position, and drill the second opening borehole at the final hole position of each first opening borehole, and multiple second opening boreholes are radially drilled into the goaf; Step 4: laying out grouting pipelines in the main pipeline, the first borehole and the second borehole, wherein the grouting pipelines are pipelines for pumping filling slurry to implement grouting filling into the goaf; The step 3 further includes: determining a plurality of preset target points in the goaf, the plurality of preset target points being arranged in an array in the goaf to cover the goaf, the plurality of target points corresponding one by one to the end hole positions of the plurality of second opening boreholes; The step 3 further comprises: arranging a second casing in the borehole, the second casing comprising an inclined elbow, the inclined elbow being in contact with the bottom wall of the second borehole, arranging a high-pressure hose in the second casing, the bottom of the high-pressure hose being connected to a self-feeding drill bit; Using the self-propelled drill bit to drill along the direction of the casing elbow toward the preset target center corresponding to the second borehole until drilling into the preset target center, and then stopping drilling; The plurality of drill holes are arranged in multiple rows in the left-right direction, and the interval distance between adjacent drill holes is 5m-10m. Three rows of target eyes spaced apart in the left-right direction are provided in the goaf, and the interval between two adjacent rows of target eyes is 200m, and the interval between two adjacent target eyes in each row is 120m, which is generally consistent with the extension length and width of the goaf.
2. The method for grouting and filling in goaf areas by directional drilling cluster centralized arrangement according to claim 1 is characterized in that: The step 1 also includes: using a high-density electrical method and / or a three-dimensional laser scanner to detect the goaf; and the main pipeline is arranged to be located directly above the goaf.
3. The method for grouting and filling in goaf areas by directional drilling cluster centralized arrangement according to claim 1 or 2, characterized in that: The step 3 also includes: After the first borehole is drilled for a first preset distance, rock debris is collected to identify geological stratification; After entering the bedrock, a first casing is set in the drill hole and cementing is carried out.
4. The method for grouting and filling in goaf areas by directional drilling cluster centralized arrangement according to claim 3 is characterized in that: The step 2 also includes: when drilling into the first drilling and the borehole passes through the aquifer overlying the coal seam, an annular waterproof seal is provided between the aquifer and the first casing.
5. The method for grouting and filling in goaf areas by directional drilling cluster centralized arrangement according to claim 1 is characterized in that: The radius of each preset target center is 10m. If the distance between the final hole of the second drilling corresponding to the preset target center and the target center is less than or equal to 10m, it is considered as hitting the target.
6. The method for grouting and filling in goaf areas with directional drilling cluster centralized arrangement according to any one of claims 1-2, characterized in that: The step 3 also includes: geologically cataloguing, stratifying and numbering the cores, and sampling and analyzing rock layers greater than or equal to 1 m.
7. The method for grouting and filling in goaf areas by directional drilling cluster centralized arrangement according to claim 1, characterized in that: When sampling the core, When the thickness of the rock layer is greater than or equal to 1m and less than 10m, the rock samples collected from each layer are greater than or equal to one group; When the rock layer thickness is greater than or equal to 10m, the number of rock samples collected from each layer is greater than or equal to 2 groups, and the length of each rock sample is greater than or equal to 200mm.
8. The method for grouting and filling in goaf areas with directional drilling cluster centralized arrangement according to any one of claims 1-2, characterized in that: The step 4 includes: opening the slurry inlet of the grouting pipeline, performing grouting operation on the goaf, recording the grouting volume parameters, and adjusting the grouting filling speed, filling time and grouting volume according to the compaction characteristics of the formation.