Foundation pit inrush karst cave path approaching searching drilling positioning method
By using the drilling and positioning method for the drilling and positioning of foundation pit path proximity in karst geological sites, the problem of exploration and water blocking of foundation pit proximity in foundation pit proximity in karst geological sites is solved, and rapid and accurate cut-off of cave channels and blocking water is achieved, reducing emergency rescue costs and time.
Patent Information
- Application Number
- CN202411189720.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-28
- Publication Date
- 2024-11-12
AI Technical Summary
In the complex geological sites of karst development, the exploration of foundation pit burst caves and water blocking existing technologies are difficult to effectively solve, resulting in high probability of bursting from the bottom of deep foundation pits, serious waste of water blocking materials, long rescue time, and difficult to get the root cause Cut off the cave passage.
The drilling positioning method is used to search and drilling positioning method for the drilling layout plan grid diagram, locally encrypted drilling grid, determine the boundary line and path direction line of the cave channel, and cut off the water blocking of the cave channel, accurately locate and cut off the cave channel. Reduce blindness, shorten rescue time, and save materials.
It has achieved rapid identification of the direction and connection relationship of the cave within the foundation pit, improved the success rate of water blockage, reduced the economic losses of engineering rescue, high accuracy, quick construction, and saved the amount of sealing materials.
Smart Images

Figure CN118933048A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of civil and traffic engineering, and specifically relates to a foundation pit sudden karst cave path approximation search drilling positioning method. Background Art
[0002] In complex geological sites with karst development, the exploration workload is greater than that in geological sites without karst development. Not only drilling methods but also a large number of geophysical methods are used for comprehensive exploration to find out the distribution pattern of karst caves, but the ideal effect is often not achieved. The probability of sudden surges at the bottom of deep foundation pits is relatively high. Once a sudden surge occurs, the first thing to do is to backfill the foundation pit. Then, it takes a lot of time and a lot of engineering to try your luck in finding a karst cave connected to the sudden surge point in the foundation pit.
[0003] This conventional approach mainly focuses on finding the connected caves around the existing sudden burst points and sealing the sudden bursts, rather than comprehensively analyzing and exploring the cave development path. This results in a failure to fundamentally and efficiently solve the sudden burst problem, which is prone to being time-consuming and labor-intensive, delaying the time for cave water sealing and rescue operations, and causing a huge waste of water sealing materials.
[0004] Based on this, the present invention provides a method for approaching and searching for drilling and positioning of sudden karst cave paths in foundation pits to overcome the above-mentioned defects. Summary of the invention
[0005] The purpose of the present invention is to provide a method for searching and drilling for the approach of the path of sudden gushing karst caves in foundation pits. The method has a simple principle and can quickly find out the direction and connectivity of karst caves in the foundation pit, and is very effective in plugging water in sudden gushing karst caves in foundation pits. At the same time, the method is easy to operate and has reliable positioning, which can reduce the blindness of searching for karst caves, shorten the time for water plugging and rescue, save grouting materials for plugging karst caves, and reduce the economic losses caused by engineering rescue.
[0006] The present invention adopts the following technical solution: a method for approaching and searching for drilling and positioning of sudden erosion cave paths in foundation pits, which comprises the following steps:
[0007] S01. Draw a grid map of the drilling layout: distinguish and mark the detailed cave drilling holes, detailed non-cave drilling holes and the locations of the sudden surge points;
[0008] S02, local intensification of drilling grid: taking the midpoint of the detailed exploration karst cave borehole and the adjacent detailed exploration non-karst cave borehole as the center, locally intensify the drilling line parallel to the original drilling grid; at the same time, taking the surge point as the center, locally intensify the drilling grid parallel to the original drilling grid;
[0009] S03, approach and search for karst caves around the drilling holes and sudden surge points in the detailed survey;
[0010] S04, determine the boundary line of the cave;
[0011] S05. Determine the direction of the cave path;
[0012] S06. Determine the scope of the karst cave outside the foundation pit water-stop curtain;
[0013] S07. Determine the distribution of caves in depth;
[0014] S08. Cut off the water in the cave channel outside the foundation pit water-stop curtain.
[0015] Further, in step S03, the method of searching for the karst caves by approaching around the karst cave drilling holes and the sudden surge points is as follows:
[0016] Drill holes at the intersection of the detailed cave borehole and the surrounding area of the surge point that is closest to the encrypted drilling grid. If a cave is encountered, continue drilling holes at the intersection of the drilling grid adjacent to the new cave borehole until no cave is drilled. Mark the corresponding drilling points with the search for boreholes without caves and the search for boreholes with caves.
[0017] Further, in step S04, a method for determining the boundary line of a cave is as follows:
[0018] The midpoints of the detailed cave survey borehole or the search borehole for caves or the sudden surge point and the adjacent detailed non-cavern borehole or the search borehole for no caves are taken as the cave boundary points, and the adjacent boundary points are connected with smooth curves to form the cave boundary line.
[0019] Furthermore, when the distance between the cave drill hole or the outburst point and the adjacent non-cave drill hole is greater than 5m, an approximate search drill hole is set at the midpoint between the cave drill hole or the outburst point and the adjacent non-cave drill hole to control the cave boundary error to be less than 1.25m.
[0020] Further, in step S05, a method for determining the direction line of the cave path is as follows:
[0021] The sudden surge point and no less than two adjacent karst cave boreholes, or three adjacent karst cave boreholes, are connected into a straight line using the linear regression method, and the line is extended outside the foundation pit to determine the karst cave path strike line.
[0022] Furthermore, for continuously distributed caves, three adjacent cave boreholes distributed in a straight line are divided into a group. If the linear regression coefficient between a certain cave borehole point and two adjacent cave borehole points is less than 0.9, this cave borehole point is used as the turning point, and the adjacent straight line segments are connected from the turning point to both sides, and multiple broken lines are connected to form the trend line of the continuously distributed cave path.
[0023] Further, step S06, a method for determining the scope of the karst cave outside the foundation pit water-stop curtain:
[0024] Drill holes at the intersection of the parallel lines with preset spacing outside the water-stop curtain and the direction line of the cave path, and at 3m to 5m on both sides of the intersection. If a cave is encountered, continue drilling outward. If no cave is encountered, stop drilling to determine the scope of the cave outside the pit.
[0025] Furthermore, if there are few drill holes in the karst caves outside the foundation pit water-stop curtain, it is necessary to arrange no less than three drill holes within 5m to 10m on the left and right of the karst cave path strike line outside the foundation pit, including searching for drill holes without karst caves and searching for drill holes with karst caves, and searching for the location of karst caves.
[0026] Further, step S07, a method for determining the distribution of caves in depth:
[0027] A profile is made along the strike line of the cave path, the top and bottom positions of each cave drill hole are marked on the profile, and the top and bottom points of the cave at each cave drill hole are connected into smooth curves to obtain the cave distribution in the depth direction.
[0028] Further, step S08, a method for blocking water in the karst cave channel outside the foundation pit water-stop curtain:
[0029] Repeat the above steps S01 to S07, continue to approach and search for the location of the caves outside the pit, until all the caves outside the pit connected to the sudden surge point are found, and then the caves outside the water-stop curtain are blocked by double-liquid grouting of cement and water glass; after the grouting of the caves outside the water-stop curtain is completed, the caves in the foundation pit are blocked by double-liquid grouting.
[0030] Compared with the prior art, the present invention has the following beneficial effects:
[0031] The present invention provides a method for searching and locating the path of a sudden gushing karst cave close to the foundation pit. The method adopts a linear regression method to connect the sudden gushing point with no less than two adjacent karst cave boreholes, or three adjacent karst cave boreholes, into a straight line, and extends the straight line to the outside of the pit in sections. The method has a simple principle, can quickly find out the direction and connectivity of the karst caves within the foundation pit, and is very effective in plugging water from sudden gushing karst caves in the foundation pit. At the same time, the method is easy to operate and reliable in positioning, which can reduce the blindness of searching for karst caves, shorten the time for water plugging and rescue, save grouting materials for plugging karst caves, and reduce the economic losses caused by engineering rescue.
[0032] At the same time, compared with the geophysical exploration method, the three-point drilling method for locating caves is more accurate, quicker to construct, and shortens the time for searching caves.
[0033] In addition, compared with the traditional method of blocking water around the sudden surge point in the foundation pit, the present invention aims to search for the caves outside the foundation pit water-stop curtain that are connected to the sudden surge point in the pit, first block the caves flowing around the foundation pit water-stop curtain, and then block the caves in the foundation pit. The success rate of blocking water is higher, and after fundamentally cutting off the cave passage, grouting is then performed in the foundation pit, which can greatly save the amount of grouting materials used for blocking the caves. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0035] Figure 1 It is a plan grid diagram of drilling arrangement in a specific embodiment of the present invention;
[0036] Figure 2 In the specific embodiment of the present invention, the drilling grid is locally encrypted and a drilling location map is added to search for the presence or absence of karst caves;
[0037] Figure 3 It is a location map of the karst cave path trend line and the karst cave boundary line in a specific embodiment of the present invention;
[0038] Figure 4 for Figure 3 Sectional view at AA;
[0039] Figure 5 for Figure 3 Sectional view at the middle BB;
[0040] Figure 6 for Figure 3 Cross-section at CC;
[0041] Among them: 1—detailed investigation of non-cavern boreholes, 2—detailed investigation of cave boreholes, 301—search for boreholes without caves, 302—search for boreholes with caves, 4—caves, 5—support structure, 501—water-stop curtain, 6—surge point, 7—bottom of foundation pit. DETAILED DESCRIPTION
[0042] The following will be combined with the accompanying drawings in the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work belong to the protection scope of the present invention.
[0043] The following is combined with Figure 1 To Attachment Figure 6 And specific embodiments, the present invention is described in detail:
[0044] like Figure 1-6 As shown, the present invention provides a method for approaching and searching for drilling and positioning of a sudden gushing cave path in a foundation pit, which comprises the following steps:
[0045] S01, draw a plan grid diagram of drilling arrangement: set up a support structure 5 around the foundation pit, and set up a water-stop curtain 501 along the outer wall of the support structure 5; then draw a plan grid diagram of drilling arrangement in the foundation pit, and distinguish and mark the positions of the detailed exploration karst cave borehole 2, the detailed exploration non-karst cave borehole 1 and the sudden surge point 6, and the sudden surge point 6 is at the bottom of the foundation pit 7; specifically, create a plan grid diagram, such as Figure 1 As shown, the actual geological survey data are distinguished and marked on the grid map, and the specific locations of the detailed exploration karst cave borehole 2, the detailed exploration non-karst cave borehole 1 and the sudden surge point 6 are clearly presented on the grid map;
[0046] S02. Locally encrypted drilling grid: With the midpoint of the detailed exploration karst cave borehole 2 and the adjacent detailed exploration non-karst cave borehole 1 as the center, locally encrypt the drilling line parallel to the original drilling grid; at the same time, with the sudden surge point 6 as the center, locally encrypt the drilling grid parallel to the original drilling grid; specifically, with the midpoint of the detailed exploration karst cave borehole 2 and the adjacent detailed exploration non-karst cave borehole 1, and the sudden surge point 6 as the key reference points of the locally encrypted drilling grid, starting from the above two points, locally encrypt the drilling grid line along the direction parallel to the original drilling grid, and the locally encrypted grid diagram is as follows: Figure 2 As shown, it is possible to conduct more precise exploration of specific areas in a targeted manner;
[0047] S03, approaching and searching for a karst cave around the detailed exploration karst cave borehole 2 and the sudden surge point 6; specifically, the method for approaching and searching for a karst cave around the detailed exploration karst cave borehole 2 and the sudden surge point 6 is:
[0048] Drill holes at the intersection of the detailed cave borehole 2 and the surge point 6 that is closest to the dense drilling grid. If a cave 4 is encountered, continue drilling holes at the intersection of the drilling grid adjacent to the new cave borehole until the cave 4 is no longer drilled. At the same time, mark the corresponding drilling points with the search for boreholes without caves 301 and the search for boreholes with caves 302.
[0049] Specifically, drill holes at the intersection of the detailed cave borehole 2 and the surge point 6 that is closest to the encrypted drilling grid. If a cave 4 is encountered, mark the search for borehole 302 with a cave at the drilling point, and continue to drill holes at the intersection of the drilling grids adjacent to the search point for borehole 302 with a cave. If a cave 4 is encountered, mark the search for borehole 302 with a cave at the drilling point, and continue to repeat the above operations. If no cave is encountered, mark the search for borehole 301 without a cave at the drilling point, and stop drilling.
[0050] S04. Determine the boundary line of the cave. Specifically, the method for determining the boundary line of the cave is:
[0051] The midpoints of the detailed cave exploration borehole 2 or the search borehole 302 or the gushing point 6 and the adjacent detailed non-cavern exploration borehole 1 and the search borehole 301 are used as cave boundary points, and the adjacent boundary points are connected by a smooth curve to form a cave boundary line. It should be noted that for the convenience of description, the detailed cave exploration borehole 2 and the search borehole 302 for karst caves are collectively referred to as cave boreholes.
[0052] Furthermore, when the distance between the cave borehole or the outburst point and the adjacent non-cave borehole is greater than 5m, an approximate search borehole is set at the midpoint of the cave borehole or the outburst point and the adjacent non-cave borehole to control the cave boundary error to be less than 1.25m. The cave boundary error is controlled to ensure a more accurate depiction of the cave boundary, reduce the uncertainty caused by the error, and provide a more reliable basis for subsequent engineering design and construction. At the same time, accurate boundary information helps to more reasonably formulate construction plans, select appropriate treatment measures, etc., avoid decision-making errors caused by inaccurate boundaries, and in addition, it helps to rationally plan and utilize resources, avoid waste or shortage of resources caused by unclear boundaries, and improve resource utilization efficiency.
[0053] S05. Determine the direction line of the karst cave path. Specifically, the method for determining the direction line of the karst cave path is:
[0054] The sudden surge point and no less than two adjacent karst cave boreholes, or three adjacent karst cave boreholes, are connected into a straight line using the linear regression method, and the line is extended outside the foundation pit to determine the karst cave path strike line.
[0055] For continuously distributed karst caves, if the foundation pit has an irregular curved trend line, the three adjacent straight-line distributed karst cave boreholes are divided into one group. If the linear regression coefficient between a certain karst cave borehole point and two adjacent karst cave borehole points is less than 0.9, the karst cave borehole point is used as the inflection point, and the adjacent straight line segments are connected from the inflection point to both sides, and multiple broken lines are connected to form a continuously distributed karst cave path trend line. Specifically, how to connect three points into a straight line by linear regression method belongs to the prior art and will not be repeated here.
[0056] S06. Determine the scope of the karst cave outside the foundation pit water-stop curtain. Specifically, the method for determining the scope of the karst cave outside the foundation pit water-stop curtain is as follows:
[0057] Drill holes at the intersection of the parallel lines with preset spacing outside the water-stop curtain and the cave path trend line, and at 3m to 5m on both sides of the intersection. If a cave is encountered, continue drilling to the outside. If no cave is encountered, stop drilling, thereby determining the range of caves outside the pit, and correspondingly mark the search for holes without caves 301 and the search for holes with caves 302. Specifically, in this embodiment, a parallel line is set at 0.5m to 1.0m outside the water-stop curtain, that is, the preset spacing is about 0.5m to 1.0m.
[0058] It should be noted that when there are fewer holes drilled outside the foundation pit water-stop curtain, the cave 4 may not be precisely located on the path of the cave. It is necessary to arrange no less than 3 holes (including the search holes 301 for searching for no caves and the search holes 302 for searching for caves) within 5m to 10m around the path of the cave outside the foundation pit to search for the location of the cave. Expanding the search range can more accurately determine the location and range of the cave, avoid omissions or misjudgments, and at the same time, through the information of multiple holes, the morphology and characteristics of the cave can be better understood, providing a more reliable basis for subsequent engineering design and construction.
[0059] S07. Determine the distribution of karst caves in depth. Specifically, the method for determining the distribution of karst caves in depth is as follows:
[0060] A profile is made along the strike line of the cave path, the top and bottom positions of each cave drill hole are marked on the profile, and the top and bottom points of the cave at each cave drill hole are connected into smooth curves to obtain the cave distribution in the depth direction.
[0061] S08. Cut off the karst cave passage and block the water outside the foundation pit water-stopping curtain 501. Specifically, the method of cutting off the karst cave passage and blocking the water outside the foundation pit water-stopping curtain 501 is as follows:
[0062] Repeat the above steps S01 to S07, continue to approach and search for the location of the cave outside the pit, until all the caves outside the pit connected to the sudden surge point are found, and then cement and water glass double liquid grouting is used to block the water in the cave outside the water-stop curtain 501, and the flow time of the slurry in the channel is extended; after the grouting and blocking of the cave outside the water-stop curtain 501 is completed, the double liquid grouting is used to block the water in the cave in the foundation pit. Specifically, the characteristics of the two materials of cement and water glass are used to achieve effective blocking of the cave. During the grouting process, the cement slurry and the water glass solution are mixed in a certain proportion, and the mixed slurry is injected into the cave through the grouting equipment. The purpose of this is to extend the flow time of the slurry in the channel, so as to better fill and block the gaps and channels of the cave. At the same time, the combination of cement and water glass can give play to their respective advantages and improve the performance of the slurry, such as extending the flow time and enhancing the bonding strength.
[0063] The present invention provides a method for searching and locating the path of a sudden gushing karst cave close to the foundation pit. The method adopts a linear regression method to connect the sudden gushing point with no less than two adjacent karst cave boreholes, or three adjacent karst cave boreholes, into a straight line, and extends the straight line to the outside of the pit in sections. The method has a simple principle, can quickly find out the direction and connectivity of the karst caves within the foundation pit, and is very effective in plugging water from sudden gushing karst caves in the foundation pit. At the same time, the method is easy to operate and reliable in positioning, which can reduce the blindness of searching for karst caves, shorten the time for water plugging and rescue, save grouting materials for plugging karst caves, and reduce the economic losses caused by engineering rescue.
[0064] At the same time, compared with the geophysical exploration method, the three-point drilling method for locating caves is more accurate, quicker to construct, and shortens the time for searching caves.
[0065] In addition, compared with the traditional method of blocking water around the sudden surge point in the foundation pit, the present invention aims to search for the caves outside the foundation pit water-stop curtain that are connected to the sudden surge point in the pit, first block the caves flowing around the foundation pit water-stop curtain, and then block the caves in the foundation pit. The success rate of blocking water is higher, and after fundamentally cutting off the cave passage, grouting is then performed in the foundation pit, which can greatly save the amount of grouting materials used for blocking the caves.
[0066] The present invention is further described above with the aid of specific embodiments. However, it should be understood that the specific description here should not be construed as limiting the essence and scope of the present invention. Various modifications made to the above embodiments by ordinary technicians in the field after reading this specification are all within the scope of protection of the present invention.
Claims
1. A method for approaching and searching for drilling and positioning of sudden erosion cave paths in foundation pits, characterized in that: It includes the following steps: S01. Draw a grid map of the drilling layout: distinguish and mark the detailed cave drilling holes, detailed non-cave drilling holes and the locations of the sudden surge points; S02, local intensification of drilling grid: taking the midpoint of the detailed exploration karst cave borehole and the adjacent detailed exploration non-karst cave borehole as the center, locally intensify the drilling line parallel to the original drilling grid; at the same time, taking the surge point as the center, locally intensify the drilling grid parallel to the original drilling grid; S03, approach and search for karst caves around the drilling holes and sudden surge points in the detailed survey; S04, determine the boundary line of the cave; S05. Determine the direction of the cave path; S06. Determine the scope of the karst cave outside the foundation pit water-stop curtain; S07. Determine the distribution of caves in depth; S08. Cut off the water in the cave channel outside the foundation pit water-stop curtain.
2. The method for approaching and searching the drilling position of the sudden erosion cave path in the foundation pit according to claim 1 is characterized by: Step S03, the method of searching for the karst caves by approaching around the karst cave drilling holes and the sudden surge points is as follows: Drill holes at the intersection of the detailed cave borehole and the surrounding area of the surge point that is closest to the encrypted drilling grid. If a cave is encountered, continue drilling holes at the intersection of the drilling grid adjacent to the new cave borehole until no cave is drilled. Mark the corresponding drilling points with the search for boreholes without caves and the search for boreholes with caves.
3. The pit burst cave path approaching search drilling positioning method according to claim 2 is characterized by: Step S04, method for determining the boundary line of the cave: The midpoints of the detailed cave survey borehole or the search borehole for caves or the sudden surge point and the adjacent detailed non-cavern borehole or the search borehole for no caves are taken as the cave boundary points, and the adjacent boundary points are connected with smooth curves to form the cave boundary line.
4. The pit burst cave path approaching search drilling positioning method according to claim 3 is characterized by: When the distance between the cave borehole or the outburst point and the adjacent non-cave borehole is greater than 5m, an approximate search borehole is set at the midpoint of the cave borehole or the outburst point and the adjacent non-cave borehole to control the cave boundary error to be less than 1.25m.
5. The pit burst cave path approaching search drilling positioning method according to claim 3 is characterized by: Step S05, method for determining the direction line of the cave path: The sudden surge point and no less than two adjacent karst cave boreholes, or three adjacent karst cave boreholes, are connected into a straight line using the linear regression method, and the line is extended outside the foundation pit to determine the karst cave path strike line.
6. The pit burst cave path approaching search drilling positioning method according to claim 5 is characterized by: For continuously distributed caves, three adjacent straight-line-distributed cave boreholes are divided into one group. If the linear regression coefficient between a certain cave borehole point and two adjacent cave borehole points is less than 0.9, this cave borehole point is taken as the turning point, and the adjacent straight line segments are connected from the turning point to both sides. Multiple broken lines are connected to form the trend line of the continuously distributed cave path.
7. The pit burst cave path approaching search drilling positioning method according to claim 5 is characterized by: Step S06: Method for determining the scope of the karst cave outside the foundation pit water-stop curtain: Drill holes at the intersection of the parallel lines with preset spacing outside the water-stop curtain and the direction line of the cave path, and at 3m to 5m on both sides of the intersection. If a cave is encountered, continue drilling outward. If no cave is encountered, stop drilling to determine the scope of the cave outside the pit.
8. The method for approaching and searching for drilling and positioning a pit-bursting karst cave path according to claim 7 is characterized in that: If there are few drill holes in the karst caves outside the foundation pit water-stop curtain, it is necessary to arrange no less than three drill holes within 5m to 10m on the left and right of the karst cave path line outside the foundation pit, including searching for drill holes without karst caves and searching for drill holes with karst caves, and searching for the location of karst caves.
9. The pit burst cave path approaching search drilling positioning method according to claim 7 is characterized by: Step S07: Method for determining the distribution of caves in depth: A profile is made along the strike line of the cave path, the top and bottom positions of each cave drill hole are marked on the profile, and the top and bottom points of the cave at each cave drill hole are connected into smooth curves to obtain the cave distribution in the depth direction.
10. The pit burst cave path approaching search drilling positioning method according to claim 9, characterized in that: Step S08, a method for blocking water in the karst cave channel outside the foundation pit water-stop curtain: Repeat the above steps S01 to S07, continue to approach and search for the location of the caves outside the pit, until all the caves outside the pit connected to the sudden surge point are found, and then the caves outside the water-stop curtain are blocked by double-liquid grouting of cement and water glass; after the grouting of the caves outside the water-stop curtain is completed, the caves in the foundation pit are blocked by double-liquid grouting.
