Service health monitoring method for piles with branches and / or trays

By designing the support and/or disk structure on the pile and detecting the internal force changes in the pile section using the internal force detector, the problem of inaccurate detection of friction pile bearing performance in the prior art is solved, and high-quality monitoring and early warning of engineering facilities are achieved , reducing economic losses.

CN118933090APending Publication Date: 2024-11-12BEIJING ZHIPAN DIGONG TECH DEV CENT
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310522633.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-05-10
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The prior art is difficult to accurately detect the bearing performance of friction piles, resulting in the inability to predict damage to engineering facilities and economic losses.

Method used

By designing the support and/or disk structure on the pile, the internal force measuring device is used to detect the internal force changes in the pile cross-section, ensuring that the soil is pressed and sediment-free, and independently tested by force-bearing unit to achieve accurate load-bearing performance evaluation.

Benefits of technology

Accurate and reliable detection of pile bearing performance, early warning to prevent damage, reduce economic losses, and meet the requirements of high-quality engineering facilities.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933090A_ABST
    Figure CN118933090A_ABST
Patent Text Reader

Abstract

According to the service health monitoring method for the pile with the support and / or the disc, damage to engineering facilities of the pile under the service condition can be predicted by detecting the internal force of the pile, the damage is avoided, and the brought huge economic loss is greatly reduced. The method comprises the following steps: S1) designing a pile with a support and / or a disc; (S2) a pile hole is formed, the hole wall is extruded, and a stable cavity for a support and / or a disc is formed; s3) detecting residual sediment in the cavity, and judging whether the state of the sediment is qualified or not; s3A) if not, cleaning residual sediment until the sediment is qualified, and performing S4); s3B) if qualified, performing S4); (4) a reinforcement cage with an internal force measuring device is placed in the pile hole, and concrete is poured; and 5) applying a load to the pile, and obtaining internal force data of a position where the pile is located through the internal force measurer, the position being the section position of the pile where the internal force of the branch and / or the disc is obtained.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of civil engineering, and in particular to a detection technology for the bearing performance of piles. Background Art

[0002] In the past, engineering facilities such as roads, bridges, and buildings often used friction pile foundations. For these friction piles, there is often sediment at the pile end and mud on the pile body. As a result, the friction between the pile body and the soil is greatly affected, and the bearing capacity of the pile end is also greatly affected. Regardless of the test inspection of the pile top just after the construction of the pile foundation is completed, or even in the case of burying strain gauges inside the pile to destroy the pile structure and still testing the bearing performance of the pile, the bearing performance is inaccurately tested and the bearing capacity data obtained is unreliable. As a result, it is impossible to predict in advance the occurrence of damage to engineering facilities and buildings, which often causes huge economic losses. Summary of the invention

[0003] The object of the present invention is to provide a service health monitoring method for piles with branches and / or discs. According to the service health monitoring method for piles with branches and / or discs, by accurately detecting the internal force or its change in the cross section of the piles with branches and / or discs under long-term tracking service conditions, it is possible to correctly, reliably and accurately predict or warn in advance of damages, disasters, injuries and the like to buildings and various engineering facilities with piles with branches and / or discs under service conditions, avoid the actual occurrence of the above-mentioned damages, meet the contemporary requirements for high quality of various engineering facilities, and greatly reduce or prevent as much as possible the huge economic losses caused by the damage of the above-mentioned buildings and various engineering facilities.

[0004] In order to achieve the above-mentioned object of the present invention, a first solution of the present invention relates to a service health monitoring method of a pile with branches and / or discs, and the service health monitoring method of a pile with branches and / or discs comprises the following steps:

[0005] Step S1) designing the pile with branches and / or plates on the pile body according to geological survey information;

[0006] Step S2) forming a pile hole in the foundation to form a stable cavity for the support and / or the plate, thereby compressing the hole wall of the pile hole in such a way that the soil around the cavity becomes a hardened soil;

[0007] Step S3) detecting the residual sediment and / or residual suspended matter in the cavity for the support and / or the disk to determine whether the residual sediment and / or residual suspended matter is in a qualified state;

[0008] Step S3A) If the detected residual sediment and / or residual suspended matter is not in a qualified state, the residual sediment and / or residual suspended matter is cleaned up until the detected residual sediment and / or residual suspended matter is in a qualified state, and then the following step S4) is performed;

[0009] Step S3B) If the detected residual sediment and / or residual suspended matter is in a qualified state, proceed to the following step S4);

[0010] Step S4) placing a rigid force transmission component with an internal force measuring device in the pile hole, pouring concrete into the cavity for the support and / or the plate and the pile hole forming the pile body, and the internal force measuring device is positioned on the rigid force transmission component in a manner capable of measuring the internal force of the cross section where the support and / or the plate is located;

[0011] Step S5) During the operation and service stage after all construction acceptances are completed, a service load is applied to the pile, and the internal force data at the cross-sectional position of the pile where the internal force measuring device is located is obtained through the above-mentioned internal force measuring device. The internal force data is used to obtain the bearing capacity of the pile under the service load conditions. The cross-sectional position of the pile where the internal force measuring device is located refers to the cross-sectional position of the pile where the internal force of the support and / or the disc can be obtained.

[0012] According to the first scheme of the present invention, since the method of the present invention is provided with step S2), the cavity for the support and / or the plate is a stable cavity, and the soil surrounding the cavity has become a hardened soil. Since step S3 is provided, it is ensured that the cavity for the support and / or the plate is free of loose soil or sediment, and thus steps S2) and S3) jointly guarantee that a high-quality support and / or plate for bearing will eventually be formed. In addition, since the support and / or the plate in the pile with support and / or the plate are independent structures in terms of force, that is, each of the support and / or the plate forms a separate force-bearing or bearing unit, this is completely different from the pile body of the ordinary pile without support and / or the plate, which is not an independent structure (a single force-bearing structure) in terms of force (friction force) (bearing friction force at different sections). Although multiple support and / or multiple plates are formed on the pile body, each support and / or each plate is independently loaded and stressed. In addition, in the method of the present invention, the detection object is a pile with branches and / or disks whose stress is completely different from that of ordinary friction piles. A special detection mode for the stress of piles forming such independent stress-bearing structural units is adopted, so that the stress conditions of each independent stress-bearing unit structure, that is, each branch and / or disk, can be understood individually, that is, the bearing capacity of each detailed unit of the pile, that is, each stress-bearing unit of the pile, can be clearly known. In summary, the method of the present invention, by setting step S2) (forming a stable cavity by squeezing and hardening the soil) and step 3) (no sediment) and adopting piles with branches and / or discs (having independent force-bearing units), and adopting an internal force detection mechanism for the independent force-bearing units in the piles with branches and / or discs, can obtain accurate and reliable bearing conditions of the independent force-bearing units inside the piles, thereby judging the saturation and unsaturation conditions of the bearing performance of each independent force-bearing unit, thereby judging the safety redundancy or safety margin of the overall bearing performance of the piles. Due to continuous detection, the stability of the internal force or the change of the internal force can be predicted in advance before the piles and buildings are destroyed, and an early alarm can be issued when the internal force is unstable or changes greatly, and countermeasures can be taken to prevent accidents of destruction of buildings or engineering facilities and avoid huge economic losses.

[0013] It should be noted here that, through the method for detecting the stability of the branch-disc cavity used in the construction of concrete piles with branches and / or discs invented by the inventor, the soil can be hardened to form a strong end-bearing force of the soil on the branches and discs, thereby forming a stable branch-disc cavity.

[0014] According to the first scheme of the present invention, since the internal force measuring device is arranged inside the pile, the settlement stability or settlement change of the pile with branches and / or discs depends on the stability or change of the internal force at the cross section where the structure such as the branches and / or discs are located. Therefore, the stability or change of the internal force or the stability at the cross section where the structure such as the branches and / or discs are located of the pile with branches and / or discs can be accurately understood over time, thereby accurately understanding the change or stability of the settlement of the pile with branches and / or discs over time, so that the internal force prediction can be made, and the instability or drastic change of the internal force can be responded to, thereby issuing a warning of the danger level in advance before the engineering facility is damaged, which can well meet the high quality requirements of piles under long-term service conditions (i.e., normal use conditions) or the high quality requirements of long-term service construction facilities with the piles.

[0015] According to the first scheme of the present invention, since the internal force measuring device is arranged inside the pile to continuously monitor the service load at the top of the pile during long-term service and / or the load of accidental natural disasters such as earthquakes and typhoons, it is possible to understand the internal parts of the pile under the service load conditions, such as the specific bearing capacity of the supports and / or plates at corresponding positions, such as the change of pressure with time, so as to understand the internal force conditions of the pile under the service load conditions, and accurately and correctly know the corresponding changes in the internal stress conditions of the pile with the change of time, that is, the change of the internal stress conditions of the pile as a function of time can be observed.

[0016] Furthermore, according to the first embodiment of the present invention, since the internal force measuring device is arranged inside the pile, the bearing capacity of the pile under the test load condition in the pile-making stage, the bearing capacity of the pile under the in-work load condition in the in-work stage, and the bearing capacity of the pile under the service load condition after the construction can be observed, that is, the change of the bearing capacity under different load conditions with time function can be monitored. Moreover, compared with the conventional bearing capacity measuring method of piles with branches and / or plates, the first embodiment of the present invention can also continuously observe the change of the bearing capacity of a certain type of pile under the service load condition, for example, during the service period.

[0017] In addition, according to the first scheme of the present invention, since the internal force measuring device is arranged inside the pile, not only the overall bearing capacity of the pile at a certain point in time can be obtained, but also the internal stress condition of the pile at a certain point in time can be accurately and correctly observed.

[0018] In addition, according to the first scheme of the present invention, since there is a step S3 for detecting the residual sediment and / or residual suspended matter in the cavity for the support and / or the disc to determine whether the state of the residual sediment and / or the residual suspended matter is qualified, compared with the conventional method for detecting the bearing performance of ordinary piles without supports and / or discs (since the pile hole wall is covered with mud and sediment at the bottom of the pile, it is impossible to accurately and reliably detect the bearing performance during the service stage during pile formation, during work and after work, or the detection is invalid), it can be ensured that the amount of residual sediment and / or residual suspended matter in the cavity is less than the specified amount, meets the quality requirements, and ensures the quality of the cavity. Therefore, the forming quality of the support and / or disc can be ensured, and the bearing performance of the structure of the support and / or disc can be well exerted. Based on this, whether the bearing performance of the structure of the support and / or disc is effectively exerted (that is, The detection of full utilization (referring to the good forming quality of the branch and / or disk, but the branch and / or disk is fully stressed), partial utilization (referring to the good forming quality of the branch and / or disk, but the branch and / or disk is only partially stressed), or no utilization (referring to the good forming quality of the branch and / or disk, but the branch and / or disk is not stressed)) is accurate and precise. Therefore, not only can the detection of the overall bearing capacity of the pile with branches and / or disks be guaranteed to be accurate, reliable and precise, but the longitudinal force changes of the pile can be understood at a glance, the safety redundancy of the bearing capacity of the pile with branches and / or disks can be clearly understood, and the future changes in the bearing capacity of the pile can be accurately predicted. As a result, corresponding technical measures can be taken in advance before the safety redundancy of the bearing capacity of the pile is insufficient, so as to avoid huge economic losses caused by great damage to buildings or engineering facilities.

[0019] In addition, the second scheme of the present invention relates to the in-service health monitoring method of the pile with branches and / or disks described in the first scheme of the present invention, wherein, in step S1), based on geological survey information, the pile with branches and / or disks is designed in such a way that the bearing capacity of the branches and / or disks after deducting the bearing capacity of the pile end or the pile end branches or the pile end disk is greater than the design bearing capacity of the pile.

[0020] According to the second scheme of the present invention, in step S1), based on geological survey information, the pile with branches and / or disks is designed in such a way that the bearing capacity of the branches and / or disks after deducting the bearing capacity of the pile end or the pile end branches or the pile end disks is greater than the designed bearing capacity of the pile, and the internal force measuring device is arranged inside the pile. Therefore, the branches and / or disks in the pile with branches and / or disks constitute bearing branches and / or bearing disks, and the pile end or the pile end branches or the pile end disks do not bear any load. Regardless of whether there is loose soil or sediment under the pile end or the pile end branches or the pile end disks, the bearing capacity of the pile is independent of the bearing capacity of the pile end or the pile end branches or the pile end disks. The method of the present invention combines the bearing capacity of the pile with the bearing capacity of the pile end or the pile end branches or the pile end disks. The fact that the pile end support or pile end plate has nothing to do with the bearing performance of the support and / or plate cavity outside the pile end and the fact that there is no loose soil inside, and the internal force detection is carried out on an independent bearing unit, can facilitate the construction of the pile without having to take into account the thorny problem of loose soil at the pile end. The internal force and the bearing performance of the pile can be known more accurately and reliably (in contrast, the monitoring data of places with loose soil at the pile end is inaccurate and unreliable), and the future safety redundancy level or hazard level of the pile can be predicted or warned more accurately, so as to prevent accidents before they happen and avoid the huge economic losses caused by the destruction of engineering facilities, buildings, etc.

[0021] The third scheme of the present invention relates to the service health monitoring method of the pile with branches and / or discs as described in the first or second scheme of the present invention, wherein the method also includes step S5A, which performs a test load-bearing test on the pile with branches and / or discs. The step S5A applies a test load at the top of the pile after the pile is formed during the period between the above-mentioned steps S4) and S5), and obtains the internal force data at the cross-sectional position of the pile where the internal force measuring device is located through the above-mentioned internal force measuring device. The internal force data is used to obtain the bearing performance of the pile under the test load conditions. The cross-sectional position of the pile where the internal force measuring device is located refers to the cross-sectional position of the pile where the internal force of the branches and / or discs can be obtained.

[0022] According to the third scheme of the present invention, since step S5A is provided, not only the health monitoring of the piles in long-term service can be carried out, but also the test and inspection after the piles are formed can be inserted into the process of the method, thereby increasing the functionality of the method.

[0023] In addition, according to the third scheme of the present invention, since the internal force measuring device is arranged inside the pile, if the test load is not released, it is possible to understand the internal parts of the pile under the test load conditions, such as the specific bearing performance of the supports and / or plates at the corresponding positions, and the change of pressure with time, so as to understand the internal force conditions of the pile under the test load conditions, and accurately, correctly and reliably know the corresponding changes in the internal stress conditions of the pile with the change of time, that is, the change of the internal stress conditions of the pile as a function of time can be observed.

[0024] In addition, according to the third scheme of the present invention, since the internal force measuring device is arranged inside the pile, the internal force measuring device can measure the bearing capacity of the branches and / or plates, so the contribution of the corresponding branches and / or plates to the bearing capacity of the pile can be understood, and the functional relationship between the different soil layers along the longitudinal direction of the pile and the structure of the branches and / or plates can be known. In other words, it can be specifically understood which branches and / or plates among the multiple branches and / or plates play how much role when the test load is applied.

[0025] In addition, the fourth scheme of the present invention relates to the service health monitoring method of piles with branches and / or discs described in the first to third schemes of the present invention, wherein the method also includes step S5B, which performs an in-work force detection of structures other than the piles after the piles with branches and / or discs are formed. During the period between the above steps S4) to S5), during the in-work period of the structures other than the piles after the piles are formed, in any one of the multiple construction stages above the pile top, an in-work load is applied at the top of the pile, and internal force data at the cross-sectional position of the pile where the internal force measuring device is located is obtained through the above-mentioned internal force measuring device, and the internal force data is used to obtain the bearing capacity of the pile under the in-work period load condition, and the cross-sectional position of the pile where the internal force measuring device is located refers to the cross-sectional position of the pile where the internal force of the branches and / or discs can be obtained.

[0026] According to the fourth scheme of the present invention, since step S5B is provided, not only the health monitoring of the piles in long-term service can be carried out, but also the occasion of in-work force detection of structures other than the piles after the piles are formed can be inserted into the process of the method, that is, the cumulative in-work load monitoring of the top of the pile during the in-work period of the structures other than the piles after the piles are formed can be carried out. Therefore, it is possible to understand the internal parts of the pile under the in-work load conditions, such as the specific bearing performance of the supports and / or plates at the corresponding positions, such as the change of pressure with time, so as to understand the internal force status of the pile under the in-work load conditions, and accurately and correctly know the changes with time, the pile The corresponding changes in the internal stress conditions, that is, the changes in the internal stress conditions of the piles as a function of time can be observed. This method is particularly suitable for the period after the piles are formed and before the entire project is completely completed, when the environmental conditions are poor, such as in the rainy season, in the slope projects of roads crossing mountainous areas, and in the construction of supporting piles for large foundation pits. It is required to closely predict the changes in the internal forces of the piles, and thus it is necessary to frequently predict the hazards of the project, such as landslides, and estimate the safety reserve of the pile's bearing capacity, so as to know at any time whether the safety reserve of the pile's bearing capacity is exhausted, and to take preventive measures in advance before the safety reserve of the pile's bearing capacity is exhausted.

[0027] In addition, according to the fourth scheme of the present invention, since the internal force measuring device is arranged inside the pile, the internal force measuring device can measure the bearing capacity of the branches and / or plates. Therefore, the contribution of the corresponding branches and / or plates to the bearing capacity of the pile under the working load conditions can be understood, and the functional relationship between the different soil layers along the longitudinal direction of the pile and the structure of the branches and / or plates can be known. That is to say, it can be specifically understood which branches and / or plates among the multiple branches and / or plates play how much role when the working load is applied.

[0028] Furthermore, the fifth scheme of the present invention relates to a service health monitoring method for piles with branches and / or discs as described in any one of the first to fourth schemes of the present invention, wherein in the above step 3), the action of detecting residual sediment and / or residual suspended matter in the cavity for the branches and / or discs is performed by scanning the cross-section of the cavity, and the action of judging whether the state of the residual sediment and / or residual suspended matter in the cavity for the branches and / or discs is qualified is performed in the following manner: comparing the cross-sectional shape of the cavity obtained by scanning with the designed cross-sectional shape of the cavity.

[0029] According to the fifth scheme of the present invention, since the action of detecting the residual sediment and / or residual suspended matter in the cavity for the support and / or the disk in the above step S3) is performed by scanning the cross-section of the cavity, the action of judging whether the state of the residual sediment and / or residual suspended matter in the cavity for the support and / or the disk is qualified is performed in the following manner, which is: comparing the cross-sectional shape of the cavity obtained by scanning with the designed cross-sectional shape of the cavity, the smoothness of the inner surface of the cavity can be known by obtaining the cross-section of the cavity with the help of a scanner, thereby obtaining the state of the residual sediment and / or residual suspended matter, thereby quickly and conveniently completing the judgment.

[0030] In addition, the sixth scheme of the present invention relates to a method for monitoring the in-service health of a pile with branches and / or discs as described in any one of the first to fourth schemes of the present invention, wherein, in step S3A), the cleaning of residual sediment and / or residual suspended matter is carried out by jetting water to clear the cavity.

[0031] According to the sixth scheme of the present invention, since in step S3A), the cleaning of residual sediment and / or residual suspended matter is carried out by jetting water to clear the cavity, the cleaning effect is good and the cleaning speed is fast.

[0032] In addition, the seventh scheme of the present invention relates to a method for monitoring the in-service health of a pile with branches and / or discs as described in any one of the first to fourth schemes of the present invention, wherein, in step S3A), the cleaning of residual sediment and / or residual suspended matter is carried out by circulating mud in the cavity.

[0033] According to the seventh embodiment of the present invention, since in step S3A), the cleaning process of the residual sediment and / or the residual suspended matter is performed by circulating the slurry in the chamber, the cleaning effect is better.

[0034] The eighth scheme of the present invention relates to the in-service health monitoring method of a pile with branches and / or discs as described in any one of the first to fourth schemes of the present invention, wherein, in step S3A), the cleaning of residual sediment and / or residual suspended matter is carried out by re-squeezing the soil in the cavity.

[0035] According to the eighth scheme of the present invention, in step S3A), the cleaning of residual sediment and / or residual suspended matter is carried out by re-squeezing the soil in the cavity, and the operation of squeezing the soil is familiar to the construction personnel, so it is more convenient in the construction process.

[0036] The ninth scheme of the present invention relates to a method for monitoring the in-service health of piles with supports and / or discs as described in any one of the first to eighth schemes of the present invention, wherein the rigid force transmission components are steel cages, steel sections, or carbon fiber parts.

[0037] According to the ninth scheme of the present invention, since the above-mentioned rigid force transmission components are steel cages, steel sections, and carbon fiber parts, which are conventional rigid force transmission components, they are more convenient in practice.

[0038] The tenth scheme of the present invention relates to a method for monitoring the in-service health of a pile with branches and / or discs as described in any one of the first to ninth schemes of the present invention, wherein the internal force measuring device is a fiber grating sensor or a steel bar stress strain gauge.

[0039] According to the tenth embodiment of the present invention, since the internal force measuring device is a fiber grating sensor or a steel bar stress gauge, which are commonly used measuring devices, it is more convenient in practice.

[0040] The 11th scheme of the present invention relates to the in-service health monitoring method of piles with branches and / or discs as described in any one of the 1st to 10th schemes of the present invention, wherein the above-mentioned internal force is the pressure value borne by the cross section, which is calculated through strain.

[0041] According to the 11th scheme of the present invention, since the above-mentioned internal force is the pressure value borne by the cross section, it is calculated through strain, so the pressure value can be obtained through a strain gauge or a strain gauge, which makes it more convenient to measure in practical use of the measuring device.

[0042] Furthermore, the twelfth aspect of the present invention relates to the method for measuring the bearing capacity of a pile with branches and / or discs as described in any one of the first to eleventh aspects of the present invention, wherein the internal force measuring device is a cross-section bearing pressure value measuring device.

[0043] According to the twelfth embodiment of the present invention, since the internal force measuring device is a cross-section bearing pressure value measuring device, the pressure value can be directly measured without conversion during the measurement.

[0044] In addition, the 13th scheme of the present invention relates to the in-service health monitoring method of a pile with branches and / or discs as described in any one of the above-mentioned schemes 1 to 12 of the present invention, wherein, viewed from the longitudinal direction, the above-mentioned internal force measuring device is located at each position of the branches and / or discs in the pile body.

[0045] According to the 13th scheme of the present invention, since the internal force measuring device is located at each position of the branches and / or plates in the pile body, the stress condition of the cross section at each position of the branches and / or plates can be known, and the stress condition of which branches and / or plates in which soil layer can be understood, for example, all the branches and / or plates that participate in the stress, the branches and / or plates that partially participate in the stress, and the branches and / or plates that do not participate in the stress. In other words, it is possible to truly and clearly reflect the stress conditions of the structures of each branch and / or plate in the longitudinal direction of the pile, thereby understanding the bearing potential, safety reserve or safety redundancy of the pile.

[0046] The 14th scheme of the present invention relates to a method for measuring the bearing capacity of a pile with branches and / or disks as described in any one of the above-mentioned schemes 1 to 13 of the present invention, wherein, viewed from the longitudinal direction, the above-mentioned internal force measuring device is located at the junction of the branch and the pile body in the pile body.

[0047] According to the 14th scheme of the present invention, since the internal force measuring device is located at the junction of the support and the pile body in the pile body when viewed from the longitudinal direction, the force (i.e., friction, end bearing) condition of the support structure can be measured more accurately, and the contribution of the measured support structure (i.e., the friction between the soil and the support, the end bearing force of the soil on the support) to the bearing capacity of the pile can be reflected more accurately.

[0048] In addition, the 15th scheme of the present invention relates to the service health monitoring method of a pile with supports and / or disks as described in any one of the above-mentioned schemes 1 to 14 of the present invention, wherein, viewed from the longitudinal direction, the above-mentioned internal force measuring devices are located at the top and bottom of the disk in the pile body.

[0049] According to the 15th scheme of the present invention, since the internal force measuring devices are located at the top and bottom of the disk in the pile body when viewed from the longitudinal direction, the stress condition of the disk structure can be measured more accurately, and the contribution of the measured disk structure to the bearing performance of the pile can be reflected more accurately.

[0050] Furthermore, the 16th scheme of the present invention relates to a service health monitoring method for a pile with branches and / or discs as described in any one of the 1st to 15th schemes of the present invention, wherein, in step S5, a service load is applied to the top of the pile.

[0051] According to the sixteenth embodiment of the present invention, since the service load is applied to the pile top in step S5, it is more adaptable to many applications where a service load is applied to the pile top during service use.

[0052] Furthermore, the 17th aspect of the present invention relates to the service health monitoring method of a pile with branches and / or discs as described in any one of the 1st to 16th aspects of the present invention, wherein in step S5, a service load is applied to the pile body.

[0053] According to the seventeenth embodiment of the present invention, since the service load is applied to the pile top in step S5, it is more adaptable to many applications in which a service load is applied to the pile body during service use.

[0054] In addition, the 18th scheme of the present invention relates to the in-service health monitoring method of piles with supports and / or discs as described in any one of the schemes 1 to 17 of the present invention, wherein, in step S5, accidental loads are also applied to the pile body, and the accidental loads include wind loads caused by typhoons and loads caused by earthquakes.

[0055] According to the 18th scheme of the present invention, since in step S5, an accidental load is also applied to the pile body, and the accidental load includes the wind load of typhoon and the load caused by earthquake, it is possible to better carry out safety monitoring in the current world where environmental disasters occur frequently and super-limit loads are increasing, so as to take countermeasures in advance to cope with frequent disasters.

[0056] In addition, the 19th scheme of the present invention relates to a service health monitoring method for piles with branches and / or disks as described in any one of the schemes 1 to 18 of the present invention, wherein, in step S1), the pile is designed in a manner of having a plurality of branches and / or a plurality of disks on the pile body based on geological survey information.

[0057] According to the 19th scheme of the present invention, in step S1), according to the geological survey information, the pile is designed in a manner of having a plurality of branches and / or a plurality of plates on the pile body, and the branches and / or plates in the pile with branches and / or plates together with the pile body as a whole constitute a complete pile structure, forming a multi-structure system, that is, the branches and / or plates are independent load-bearing structural units, but a plurality of independent load-bearing structures together constitute the overall pile structure, and the overall pile structure has a plurality of load-bearing structural units. When viewed from the longitudinal direction of the pile, a plurality of load-bearing structural units with a large to a small bearing capacity are formed from top to bottom, thereby ensuring the safety redundancy of the pile's bearing performance, that is, safety redundancy. In this way, the safety redundancy design can be carried out, that is, the design can be carried out safely and richly, so as to be able to cope with sudden loads and extreme natural disasters during the long-term service use stage. Since the internal force measuring device is arranged at the cross-sectional position of the branches and / or plates, it is possible to understand the contribution of the corresponding branches and / or plates to the bearing performance of the pile, and the interaction relationship between different soil layers along the longitudinal direction of the pile and the structure of the branches and / or plates can be known. In other words, it is possible to specifically understand which branches and / or plates among multiple branches and / or plates play how much role when applying the service load. BRIEF DESCRIPTION OF THE DRAWINGS

[0058] Figure 1 is a flow chart showing a method for monitoring the in-service health of a pile with branches and / or discs as a first embodiment of the present invention;

[0059] Figure 2 is a flow chart showing a method for monitoring the in-service health of a pile with branches and / or discs as a second embodiment of the present invention;

[0060] Figure 3 is a flow chart showing a method for monitoring the in-service health of a pile with branches and / or discs as a third embodiment of the present invention;

[0061] Figure 4 A schematic elevation view of a specific example of a pile with branches and / or discs to be measured by the in-service health monitoring method of the pile with branches and / or discs of the present invention;

[0062] Figure 5 A schematic elevation view showing a specific example of the arrangement of the steel bar strain gauges on the pile with the support and / or the plate;

[0063] Figure 6 A cross-sectional view showing the force reference point of the pile top of the pile with a support and / or a plate, which shows the layout position of the steel bar strain gauge on the cross section of the pile;

[0064] Figure 7 A cross-sectional view showing a pile body of the pile with a support and / or a plate, wherein the cross-sectional view shows the arrangement position of the steel bar strain gauge on the cross section of the pile;

[0065] Figure 8 It is a curve diagram showing the changes in the end bearing forces of supports and plates under various levels of test load conditions. DETAILED DESCRIPTION

[0066] Figure 1 It is a flowchart showing the in-service health monitoring method of a pile with branches and / or discs as the first embodiment of the present invention.

[0067] like Figure 1 As shown in the figure, as a first embodiment of the present invention, the service health monitoring method of a pile with branches and / or discs comprises the following steps:

[0068] Step S1) designing the pile with a support and / or a plate on the pile body according to the geological survey information;

[0069] Step S2) forming a pile hole in the foundation to form a stable cavity for the support and / or the plate, thereby compressing the hole wall of the pile hole in such a way that the soil around the cavity becomes a hardened soil;

[0070] Step S3) detecting the residual sediment and / or residual suspended matter in the cavity for the support and / or the disk to determine whether the residual sediment and / or residual suspended matter is in a qualified state;

[0071] Step S3A) If the detected residual sediment and / or residual suspended matter is not in a qualified state, the residual sediment and / or residual suspended matter is cleaned up until the detected residual sediment and / or residual suspended matter is in a qualified state, and then the following step S4) is performed;

[0072] Step S3B) If the detected residual sediment and / or residual suspended matter is in a qualified state, proceed to the following step S4);

[0073] Step S4) placing a steel cage with a steel strain gauge as an internal force measuring device in the pile hole, pouring concrete into the cavity for the support and / or plate and the pile hole forming the pile body, and the steel strain gauge is positioned on the rigid force transmission component in a manner that can measure the internal force of the cross section where the support and / or plate is located;

[0074] Step S5) In the operational service stage after all construction acceptances are completed, a service load is applied to the pile, and the internal force data at the cross-sectional position of the pile where the steel bar strain gauge is located is obtained through the above-mentioned steel bar strain gauge. The internal force data is used to obtain the bearing performance of the pile under the service load conditions. The cross-sectional position of the pile where the steel bar strain gauge is located refers to the cross-sectional position of the pile where the internal force of the support and / or the plate can be obtained.

[0075] Figure 2It is a flowchart showing a method for monitoring the in-service health of a pile with branches and / or discs as a second embodiment of the present invention.

[0076] like Figure 2 As shown in FIG. 1 , as a second embodiment of the present invention, a method for monitoring the service health of a pile with branches and / or disks comprises the following steps:

[0077] Step S1) designing the pile with a support and / or a plate on the pile body according to the geological survey information;

[0078] Step S2) forming a pile hole in the foundation to form a stable cavity for the support and / or the plate, thereby compressing the hole wall of the pile hole in such a way that the soil around the cavity becomes a hardened soil;

[0079] Step S3) detecting the residual sediment and / or residual suspended matter in the cavity for the support and / or the disk to determine whether the residual sediment and / or residual suspended matter is in a qualified state;

[0080] Step S3A) If the detected residual sediment and / or residual suspended matter is not in a qualified state, the residual sediment and / or residual suspended matter is cleaned up until the detected residual sediment and / or residual suspended matter is in a qualified state, and then the following step S4) is performed;

[0081] Step S3B) If the detected residual sediment and / or residual suspended matter is in a qualified state, proceed to the following step S4);

[0082] Step S4) placing a steel cage with a steel strain gauge as an internal force measuring device in the pile hole, pouring concrete into the cavity for the support and / or plate and the pile hole forming the pile body, and positioning the steel strain gauge on the steel cage in a manner capable of measuring the bearing capacity of the cross section where the support and / or plate is located;

[0083] Step S5A, in which a test load-bearing test of a pile with a branch and / or a disk is performed. In this step S5A, a test load is applied to the top of the pile after the pile is formed during the period between the above step S4) and the following step S5), and internal force data at the cross-sectional position of the pile where the steel bar strain gauge is located is obtained by the above internal force measuring device. The internal force data is used to obtain the bearing performance of the pile under the test load condition. The cross-sectional position of the pile where the steel bar strain gauge is located refers to the cross-sectional position of the pile where the internal force of the branch and / or the disk can be obtained;

[0084] Step S5) In the operational service stage after all construction acceptances are completed, a service load is applied to the pile, and the internal force data at the cross-sectional position of the pile where the steel bar strain gauge is located is obtained through the above-mentioned steel bar strain gauge. The internal force data is used to obtain the bearing performance of the pile under the service load conditions. The cross-sectional position of the pile where the steel bar strain gauge is located refers to the cross-sectional position of the pile where the internal force of the support and / or the plate can be obtained.

[0085] Figure 3 It is a flowchart showing a method for monitoring the in-service health of a pile with branches and / or discs as a third embodiment of the present invention.

[0086] like Figure 3 As shown in FIG. 1 , as a second embodiment of the present invention, a method for monitoring the service health of a pile with branches and / or disks comprises the following steps:

[0087] Step S1) designing the pile with a support and / or a plate on the pile body according to the geological survey information;

[0088] Step S2) forming a pile hole in the foundation to form a stable cavity for the support and / or the plate, thereby compressing the hole wall of the pile hole in such a way that the soil around the cavity becomes a hardened soil;

[0089] Step S3) detecting the residual sediment and / or residual suspended matter in the cavity for the support and / or the disk to determine whether the residual sediment and / or residual suspended matter is in a qualified state;

[0090] Step S3A) If the detected residual sediment and / or residual suspended matter is not in a qualified state, the residual sediment and / or residual suspended matter is cleaned up until the detected residual sediment and / or residual suspended matter is in a qualified state, and then the following step S4) is performed;

[0091] Step S3B) If the detected residual sediment and / or residual suspended matter is in a qualified state, proceed to the following step S4);

[0092] Step S4) placing a steel cage with a steel strain gauge as an internal force measuring device in the pile hole, pouring concrete into the cavity for the support and / or plate and the pile hole forming the pile body, and positioning the steel strain gauge on the steel cage in a manner capable of measuring the bearing capacity of the cross section where the support and / or plate is located;

[0093] Step S5B, in which step S5B, after the pile with the support and / or the disk is formed, the in-work force detection of the structure other than the pile is performed. In the period between the above steps S4) and S5), during the in-work period of the structure other than the pile after the pile is formed, in any one of the multiple construction stages above the pile top, an in-work load is applied at the pile top, and the internal force data at the cross-sectional position of the pile where the steel bar strain gauge is located is obtained by the above steel bar strain gauge. The internal force data is used to obtain the bearing capacity of the pile under the in-work period load condition. The cross-sectional position of the pile where the steel bar strain gauge is located refers to the cross-sectional position of the pile where the internal force of the support and / or the disk can be obtained;

[0094] Step S5) In the operational service stage after all construction acceptances are completed, a service load is applied to the pile, and the internal force data at the cross-sectional position of the pile where the steel bar strain gauge is located is obtained through the above-mentioned steel bar strain gauge. The internal force data is used to obtain the bearing performance of the pile under the service load conditions. The cross-sectional position of the pile where the steel bar strain gauge is located refers to the cross-sectional position of the pile where the internal force of the support and / or the plate can be obtained.

[0095] As a specific embodiment, the detection object involved in the detection method of the present invention is a pile with branches and / or discs, for example, Figure 4 As shown, the pile includes a pile body 1 on which three discs 2 are arranged. In addition, a group of supports 3 is arranged at an elevation between the first disc 2 and the second disc 2 of the pile body 1.

[0096] Figure 4 The schematic elevation view of a pile with branches and / or discs is an object to be measured by the in-service health monitoring method of a pile with branches and / or discs of the present invention.

[0097] Figure 5 The figure is a schematic elevation view showing a specific example of the arrangement of the steel bar strain gauges on the pile with branches and / or plates.

[0098] like Figure 4 As shown in FIG. 1 , when viewed from the top of the pile with the support and / or the plate, four steel bar strain gauges 4 are arranged on the cross section of the pile with the support and / or the plate, and the four steel bar strain gauges 4 are fixed on the steel bar cage, and the steel bar cage is Figure 1 The steel cage is placed in the pile hole in step S4 of the service health monitoring method of the pile with branches and / or plates according to the first embodiment of the present invention; or Figure 1 The steel cage is placed in the pile hole in step S4 of the service health monitoring method of the pile with branches and / or plates according to the second embodiment of the present invention; or Figure 2 The steel cage is placed in the pile hole in step S4 of the service health monitoring method of the pile with branches and / or plates in the second embodiment shown in FIG. Figure 3 The third embodiment of the present invention is shown in step S4 of the service health monitoring method of the pile with branches and / or disks. It should be explained here that Figure 5 The steel bar strain gauge 4 shown is schematically shown in order to indicate its longitudinal position, and it should actually be arranged on the steel bar cage inside the pile body 1 .

[0099] Figure 6 A cross-sectional view showing the force reference point of the pile top of the pile with branches and / or plates, which shows the layout position of the steel bar strain gauge on the cross section of the pile.

[0100] Figure 7 The cross-sectional view is a cross-sectional view of the pile body with the above-mentioned support and / or disk, and the cross-sectional view shows the arrangement position of the steel bar strain gauge on the cross section of the pile.

[0101] like Figure 5 and 6 As shown in FIG. 7, from the cross-sectional view of the pile body with the support and / or the plate, four steel bar strain gauges 4 are arranged on the cross section of the pile body 1 of the pile with the support 3 and / or the plate 2. The four steel bar strain gauges 4 are fixed on the steel cage, and the steel cage is Figure 1 The steel cage is placed in the pile hole in step S4 of the service health monitoring method of the pile with branches and / or plates according to the first embodiment of the present invention; or Figure 2 The pile with support and / or disk according to the embodiment of the present invention is placed in the pile hole in step S4 of the method for measuring the bearing capacity of the pile; or the steel cage is Figure 3 The pile with support and / or disk according to the embodiment of the present invention is placed in the pile hole in step S4 of the method for measuring the bearing capacity of the pile; or the steel cage is Figure 3 In the service health monitoring method of the pile with branches and / or disks according to the third embodiment of the present invention shown in FIG. 1 , the pile with branches and / or disks is placed in the pile hole in step S4.

[0102] The following is an explanation of the monitoring of the bearing capacity of the compression test piles with reference to a test example in project A.

[0103] Purpose of the test

[0104] The following objectives were achieved by testing the bearing capacity of reinforced concrete piles with supports and plates as the foundation piles of a bridge in Project A:

[0105] The bearing characteristics of the test pile as a reinforced concrete pile with branches and plates are analyzed, the characteristic value of the vertical bearing capacity of a single compression pile is determined, and the axial force distribution of the compression pile is determined.

[0106] Test subjects

[0107] Test parameters

[0108] A group of reinforced concrete piles with supports and plates in the foundation piles of a bridge of Project A were selected for the anchor pile method bearing capacity test. A compression pile was set at Pier 12, and two anchor piles were set at both sides of the pile at a distance of about 5.4m from the center. The compressive bearing capacity of the test pile was tested, and the internal force monitoring data of the pile body was collected at the same time.

[0109] The compression test pile is called compression test pile 12-0#. The structure of the support and plate on the pile is as follows: Figure 4 shown.

[0110] Table 1

[0111]

[0112] Table 1 is the parameter table of compression test pile 12-0#.

[0113] Table 2

[0114]

[0115] Table 2 is the design parameter table of compression test pile 12-0#.

[0116] Table 3

[0117]

[0118] Table 3 is the construction parameter table of compression test pile 12-0#.

[0119] Table 4

[0120]

[0121] Table 4 is the table of construction parameters for the expansion and squeezing of the support and plate of the compression test pile 12-0# during construction.

[0122] In Table 4, Figure 4 As shown,

[0123] The first plate refers to the uppermost plate 2 located on the pile body 1 in descending order.

[0124] The second plate refers to the plate 2 located below the first plate on the pile body 1 in descending order.

[0125] The first branch refers to the first group of branches located at the top of the pile body 1 in a downward order, surrounding the pile body 1 along the horizontal direction, and the first group of branches includes 8 branches 3.

[0126] The second branch refers to the second group of branches located below the first group of branches on the pile body 1 in a downward order, surrounding the pile body 1 along the horizontal direction, and the first group of branches 2 includes 6 branches 3.

[0127] The third branch refers to the third group of branches located below the second group of branches on the pile body 1 in a downward order, surrounding the pile body 1 along the horizontal direction, and the third group of branches 2 includes 6 branches 3.

[0128] The fourth branch refers to the fourth group of branches located below the third group of branches on the pile body 1 in a downward order, surrounding the pile body 1 along the horizontal direction, and the fourth group of branches 2 includes 6 branches 3.

[0129] The 5th branch refers to the 5th group of branches located below the 4th group of branches on the pile body 1 in a downward order, and surrounds the pile body 1 along the horizontal direction. The 5th group of branches 2 includes 6 branches 3.

[0130] Pile internal force test

[0131] The internal force of the compression test pile 12-0# was tested to obtain the axial force of the compression test pile. For the compression test pile with branches and plates, a steel bar gauge was arranged 25 cm above and below each branch and plate. When the pile is subjected to load, the stress gauge deforms, thereby changing the vibration frequency of the vibrating wire. The frequency circulates through the cable to the reading device, the vibrating wire reader, and the stress on the steel bar can be measured. According to the average stress value of the steel bar gauge of each test section, the average strain value of the section can be inferred, and then the axial force of the section can be calculated based on the area of ​​the section.

[0132] Sensor placement

[0133] The test uses vibrating wire steel stress gauges, which are welded on the main bars of the steel cage. The vibrating wire steel stress gauges are distributed 25 cm above and below the "branch" and "plate". Two vibrating wire steel stress gauges are evenly arranged on each cross section. Among them, the top two sections are arranged at 2.0m and 4.0m from the top of the pile. Four vibrating wire steel stress gauges are arranged on the cross section as the calibration section. Two vibrating wire steel stress gauges are arranged 1m from the bottom of the steel cage to detect the reaction force at the bottom of the pile. Its layout is as follows: Figures 5 to 7 As shown, it is particularly noted here that Figure 5 It does not represent the arrangement of the support and plate of the real compression test pile 12-0#. The arrangement of the support and plate of the real compression test pile 12-0# is as follows Figure 4 As shown, Figure 5 It is just a schematic diagram showing the elevation of a vibrating wire steel stress gauge on a reinforced concrete pile with branches and plates.

[0134] This test uses the Changsha Jinma JMZX-432AT intelligent string-type digital steel bar stress meter.

[0135] Table 5

[0136]

[0137]

[0138] Table 5 shows the layout positions of the vibrating wire steel stress gauges for the compression test pile 12-0#.

[0139] In Table 5, Figure 4 As shown,

[0140] The first plate refers to the top of the plate 2 located at the top on the pile body 1 in descending order.

[0141] The first bottom plate refers to the bottom plate of the uppermost plate 2 on the pile body 3 in descending order.

[0142] The second disk upper part indicates the disk top of the disk 2 which is below the disk 2 which is below the first disk on the pile body 1 in a descending order.

[0143] The second plate bottom refers to the plate bottom of the plate 2 which is below the plate 2 which is below the first plate on the pile body 1 in a descending order.

[0144] The first branch refers to the top of the first group of branches located at the top on the pile body 1 in a downward order, which surrounds the pile body 1 along the horizontal direction. The first group of branches includes 8 branches 3.

[0145] The first branch bottom refers to the bottom of the first group of branches located at the top on the pile body 1 in descending order.

[0146] The second branch refers to the top of the second group of branches located below the first group of branches on the pile body 1 in a downward order, surrounding the pile body 1 along the horizontal direction. The first group of branches 2 includes 6 branches 3.

[0147] The second branch bottom refers to the bottom of the second group of branches located below the first group of branches on the pile body 1 in a descending order.

[0148] The third branch refers to the top of the third group of branches located below the second group of branches on the pile body 1 in a downward order, surrounding the pile body 1 along the horizontal direction. The third group of branches 2 includes 6 branches 3.

[0149] The third branch bottom refers to the bottom of the third group of branches located below the second group of branches on the pile body 1 in a descending order.

[0150] The 4th branch refers to the top of the 4th group of branches below the 3rd group of branches on the pile body 1 in a downward order, which surrounds the pile body 1 along the horizontal direction. The 4th group of branches 2 includes 6 branches 3.

[0151] The 4th branch bottom refers to the bottom of the 4th group of branches located below the 3rd group of branches on the pile body 1 in a descending order.

[0152] The 5th branch refers to the top of the 5th group of branches located below the 4th group of branches on the pile body 1 in a downward order, and surrounds the pile body 1 along the horizontal direction. The 5th group of branches 2 includes 6 branches 3.

[0153] The 5th branch bottom refers to the bottom of the 5th group of branches located below the 4th group of branches on the pile body 1 in a descending order.

[0154] Table 6

[0155]

[0156] Table 6 shows the bearing capacity of compression test pile 12-0#.

[0157] Test results and analysis

[0158] Through this test, the internal force test data of compression test pile 12-0# was obtained, and the analysis results are described as follows. In this process, it is assumed that the pile tops of the two anchor piles evenly share each level of load of the compression test pile.

[0159] Bearing capacity and displacement test results of each test pile

[0160] The maximum loading value of the compression test pile 12-0# is 10662kN (bearing pressure), the total settlement is 6.10mm, the rebound rate is 70.7%, the ultimate bearing capacity is ≥10662, and the characteristic value of bearing capacity is ≥5331kN, which meets the design requirements.

[0161] Table 7

[0162]

[0163]

[0164] Table 7 shows the axial forces of the corresponding test sections at the branches and plates of the compression test pile 12-0# under various load conditions.

[0165] In Table 7, Figure 4 As shown,

[0166] The first plate refers to the top of the plate 2 located at the top on the pile body 1 in descending order.

[0167] The first bottom plate refers to the bottom plate of the uppermost plate 2 on the pile body 3 in descending order.

[0168] The second disk upper part indicates the disk top of the disk 2 which is below the disk 2 which is below the first disk on the pile body 1 in a descending order.

[0169] The second plate bottom refers to the plate bottom of the plate 2 which is below the plate 2 which is below the first plate on the pile body 1 in a descending order.

[0170] The first branch refers to the top of the first group of branches located at the top on the pile body 1 in a downward order, which surrounds the pile body 1 along the horizontal direction. The first group of branches includes 8 branches 3.

[0171] The first branch bottom refers to the bottom of the first group of branches located at the top on the pile body 1 in descending order.

[0172] The second branch refers to the top of the second group of branches located below the first group of branches on the pile body 1 in a downward order, surrounding the pile body 1 along the horizontal direction. The first group of branches 2 includes 6 branches 3.

[0173] The second branch bottom refers to the bottom of the second group of branches located below the first group of branches on the pile body 1 in a descending order.

[0174] The third branch refers to the top of the third group of branches located below the second group of branches on the pile body 1 in a downward order, surrounding the pile body 1 along the horizontal direction. The third group of branches 2 includes 6 branches 3.

[0175] The third branch bottom refers to the bottom of the third group of branches located below the second group of branches on the pile body 1 in a descending order.

[0176] The 4th branch refers to the top of the 4th group of branches below the 3rd group of branches on the pile body 1 in a downward order, which surrounds the pile body 1 along the horizontal direction. The 4th group of branches 2 includes 6 branches 3.

[0177] The 4th branch bottom refers to the bottom of the 4th group of branches located below the 3rd group of branches on the pile body 1 in a descending order.

[0178] The 5th branch refers to the top of the 5th group of branches located below the 4th group of branches on the pile body 1 in a downward order, and surrounds the pile body 1 along the horizontal direction. The 5th group of branches 2 includes 6 branches 3.

[0179] The 5th branch bottom refers to the bottom of the 5th group of branches located below the 4th group of branches on the pile body 1 in a descending order.

[0180] Table 8

[0181]

[0182]

[0183] Table 8 shows the bearing capacity of each support plate in the compression test pile 12-0# under various load conditions.

[0184] Table 9

[0185]

[0186] Table 9 shows the percentage of the bearing capacity of each branch and plate of the compression test pile 12-0# under various load conditions to the total bearing capacity of the branch and plate.

[0187] In Table 8 and Table 9, Figure 4 As shown,

[0188] The first plate refers to the uppermost plate 2 located on the pile body 1 in descending order.

[0189] The second plate refers to the plate 2 located below the first plate on the pile body 1 in descending order.

[0190] The first branch refers to the first group of branches located at the top of the pile body 1 in a downward order, surrounding the pile body 1 along the horizontal direction, and the first group of branches includes 8 branches 3.

[0191] The second branch refers to the second group of branches located below the first group of branches on the pile body 1 in a downward order, surrounding the pile body 1 along the horizontal direction, and the first group of branches 2 includes 6 branches 3.

[0192] The third branch refers to the third group of branches located below the second group of branches on the pile body 1 in a downward order, surrounding the pile body 1 along the horizontal direction, and the third group of branches 2 includes 6 branches 3.

[0193] The fourth branch refers to the fourth group of branches located below the third group of branches on the pile body 1 in a downward order, surrounding the pile body 1 along the horizontal direction, and the fourth group of branches 2 includes 6 branches 3.

[0194] The 5th branch refers to the 5th group of branches located below the 4th group of branches on the pile body 1 in a downward order, and surrounds the pile body 1 along the horizontal direction. The 5th group of branches 2 includes 6 branches 3.

[0195] In the compression test pile 12-0#, under various load conditions, the percentage of the bearing capacity shared by each branch plate to the bearing capacity of the total branch plate is shown in Table 8 and Table 9. Under the maximum load value of 10662kN, the bearing capacity contributed by the branch plate is 7297.9kN, and the sharing percentage is 68.4%.

[0196] The variation curve of the bearing capacity shared by each support plate under each load level is as follows: Figure 8As shown in the figure. It can be seen from the figure that during the entire load application process (from 0 to the maximum load value of 10662kN), the bearing capacity of each branch plate is in a continuous growth trend, and the bearing capacity of the branch plate requires a certain displacement of the bottom of the plate, and is gradually exerted from top to bottom. The specific rules are: 1. The end bearing capacity of the plate is much greater than that of the branch; 2. The end bearing capacity exerted by the first plate is greater than the end bearing capacity exerted by the second plate. This is because the displacement of the first plate is larger and the end bearing capacity stimulated is more sufficient; 3. Since the bearing capacity of the first and second plates is exerted first (close to the top of the pile and in the fine sand layer), the upper load is significantly reduced when it is transmitted to below the second plate, and the bearing capacity of the first, second, third, fourth, and fifth branches is not fully stimulated.

[0197] The percentage curve of the bearing capacity shared by each support plate in the total support plate bearing capacity under each load level is as follows: Figure 8 As shown in the figure, when the load is small, the bearing capacity contributed by the two plates close to the pile top accounts for a higher percentage of the total branch plate bearing capacity, and the bearing capacity contributed by the branch far from the pile top accounts for a lower percentage; with the increase of load, the percentage of the bearing capacity contributed by the branch plates to the total branch plate bearing capacity changes continuously, the percentage of the bearing capacity shared by the two upper plates, i.e., the first and second plates, to the total branch plate bearing capacity decreases slightly, and the percentage of the bearing capacity shared by each branch to the total branch plate bearing capacity gradually increases.

Claims

1. A method for monitoring the service health of a pile with a branch and / or a disk, the method comprising the following steps: Step S1) designing the pile with branches and / or plates on the pile body according to geological survey information; Step S2) forming a pile hole in the foundation to form a stable cavity for the support and / or the plate, thereby compressing the hole wall of the pile hole in such a way that the soil around the cavity becomes a hardened soil; Step S3) detecting the residual sediment and / or residual suspended matter in the cavity for the support and / or the disk to determine whether the residual sediment and / or residual suspended matter is in a qualified state; Step S3A) If the detected residual sediment and / or residual suspended matter is not in a qualified state, the residual sediment and / or residual suspended matter is cleaned up until the detected residual sediment and / or residual suspended matter is in a qualified state, and then the following step S4) is performed; Step S3B) If the detected residual sediment and / or residual suspended matter is in a qualified state, proceed to the following step S4); Step S4) placing a rigid force transmission component with an internal force measuring device in the pile hole, pouring concrete into the cavity for the support and / or the plate and the pile hole forming the pile body, and the internal force measuring device is positioned on the rigid force transmission component in a manner capable of measuring the internal force of the cross section where the support and / or the plate is located; Step S5) During the operation and service stage after all construction acceptances are completed, a service load is applied to the pile, and the internal force data at the cross-sectional position of the pile where the internal force measuring device is located is obtained through the above-mentioned internal force measuring device. The internal force data is used to obtain the bearing capacity of the pile under the service load conditions. The cross-sectional position of the pile where the internal force measuring device is located refers to the cross-sectional position of the pile where the internal force of the support and / or the disc can be obtained.

2. The in-service health monitoring method of a pile with branches and / or discs according to claim 1, wherein: In step S1), based on geological survey information, the pile with branches and / or disks is designed in such a way that the bearing capacity of the branches and / or disks after deducting the bearing capacity of the pile end or the pile end branches or the pile end disks is greater than the design bearing capacity of the pile.

3. The in-service health monitoring method of a pile with branches and / or discs according to claim 1 or 2, wherein: The method also includes step S5A, which performs a test load-bearing test on the pile with branches and / or discs. During the period between the above-mentioned steps S4) and S5), the test load is applied to the top of the pile after the pile is formed, and the internal force data at the cross-sectional position of the pile where the internal force measuring device is located is obtained through the above-mentioned internal force measuring device. The internal force data is used to obtain the bearing performance of the pile under the test load conditions. The cross-sectional position of the pile where the internal force measuring device is located refers to the cross-sectional position of the pile where the internal force of the branches and / or discs can be obtained.

4. The in-service health monitoring method of a pile with branches and / or discs according to any one of claims 1 to 3, wherein: The method also includes step S5B, which performs an in-work force detection on structures other than the piles after the piles with branches and / or discs are formed. During the period between the above steps S4) and S5), during the in-work period of the structures other than the piles after the piles are formed, in any one of the multiple construction stages above the pile top, an in-work load is applied to the pile top, and internal force data at the cross-sectional position of the pile where the internal force measuring device is located is obtained by the above internal force measuring device. The internal force data is used to obtain the bearing capacity of the pile under the in-work period load condition. The cross-sectional position of the pile where the internal force measuring device is located refers to the cross-sectional position of the pile where the internal force of the branches and / or discs can be obtained.

5. The in-service health monitoring method of a pile with branches and / or discs according to any one of claims 1 to 4, wherein: In the above step 3), the action of detecting the residual sediment and / or residual suspended matter in the cavity for the support and / or the disk is performed by scanning the cross-section of the cavity, and the action of judging whether the state of the residual sediment and / or residual suspended matter in the cavity for the support and / or the disk is qualified is performed in the following manner: comparing the cross-sectional shape of the cavity obtained by scanning with the designed cross-sectional shape of the cavity.

6. The in-service health monitoring method of a pile with branches and / or discs according to any one of claims 1 to 5, wherein: In step S3A), the cleaning of residual sediment and / or residual suspended matter is performed by jetting water to clear the cavity.

7. The in-service health monitoring method of a pile with branches and / or discs according to any one of claims 1 to 5, wherein: In step S3A), the cleaning of residual sediment and / or residual suspended matter is performed by circulating mud in the chamber.

8. The in-service health monitoring method of a pile with branches and / or discs according to any one of claims 1 to 5, wherein: In step S3A), the cleaning of the residual sediment and / or the residual suspended matter is performed by re-squeezing the soil in the cavity.

9. The in-service health monitoring method of a pile with branches and / or discs according to any one of claims 1 to 8, wherein: The above-mentioned rigid force transmission components are steel cages, steel sections and carbon fiber parts.

10. The in-service health monitoring method of a pile with branches and / or discs according to any one of claims 1 to 9, wherein: The internal force measuring devices are fiber grating sensors and steel bar stress gauges.

11. The in-service health monitoring method of a pile with branches and / or discs according to any one of claims 1 to 10, wherein: The internal force measuring device is a device for measuring the cross-section bearing pressure value.

12. The in-service health monitoring method of a pile with branches and / or discs according to any one of claims 1 to 11, wherein: The above internal force is the pressure value that the cross section bears, which is calculated through strain.

13. The in-service health monitoring method of a pile with branches and / or discs according to any one of claims 1 to 12, wherein: Viewed from the longitudinal direction, the internal force measuring device is located at each position of the support and / or the plate in the pile body.

14. The in-service health monitoring method of a pile with branches and / or discs according to any one of claims 1 to 13, wherein: Viewed from the longitudinal direction, the internal force measuring device is located at the junction of the support and the pile body.

15. The in-service health monitoring method of a pile with branches and / or discs according to any one of claims 1 to 14, wherein: Viewed from the longitudinal direction, the internal force measuring devices are located at the top and bottom of the plate in the pile body.

16. The in-service health monitoring method of a pile with branches and / or discs according to any one of claims 1 to 15, wherein: In step S5, a service load is applied to the pile top.

17. The in-service health monitoring method of a pile with branches and / or discs according to any one of claims 1 to 16, wherein: In step S5, a service load is applied to the pile.

18. The in-service health monitoring method of a pile with branches and / or discs according to claims 1 to 17, wherein: In step S5, accidental loads are also applied to the pile body, and the accidental loads include wind loads caused by typhoons and loads caused by earthquakes.

19. The in-service health monitoring method of a pile with branches and / or discs according to any one of claims 1 to 18, wherein: In step S1), the pile is designed according to geological survey information in a manner of having a plurality of branches and / or a plurality of disks on the pile body.