Drainage pipe network arrangement method based on expressway technology

By adopting mountain-shaped drainage pipe layout method and separation and convergence technology on the expressway, the problem that traditional drainage pipe network cannot treat hillside clean water and road sewage separately is solved, and the separation of sewage and rainwater is achieved, which avoids environmental pollution and promotes Reuse of resources.

CN118933142APending Publication Date: 2024-11-12GUIYANG CHENGFA PROJECT MANAGEMENT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411133611.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-19
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

Traditional highway drainage pipelines cannot separate the clear water on the hillside and the road surface sewage, resulting in inconvenience in the environment and subsequent treatment.

Method used

The mountain-shaped drainage pipe layout method is adopted. By digging drainage ditches, setting up intercept ditches and permeable layers, the confluent road sewage and natural water confluence are separated to avoid mixed flow, and emergency accident collection pools and sewage treatment equipment are set up downstream to treat sewage and rainwater.

Benefits of technology

The separation and treatment of sewage and rainwater has been achieved, environmental pollution and difficulties in sewage treatment have been avoided, and the reuse of sewage and rainwater has been promoted.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933142A_ABST
    Figure CN118933142A_ABST
Patent Text Reader

Abstract

The invention provides a drainage pipe network arrangement method based on an expressway technology. Comprising the following steps: digging a drainage ditch on the side of an expressway into a shape corresponding to an E-shaped drainage pipe to facilitate the installation of the E-shaped drainage pipe, cancelling a cover plate on an excavated road section, taking a roadbed side ditch as a sewage ditch, collecting road surface sewage, and then intensively draining the sewage into an emergency accident treatment pond through the drainage ditch; for side slope catchment of the excavation road section, a gravel permeable layer is laid on the lower portion of the broken falling table and serves as a blind ditch for permeating first-stage side slope catchment and second-stage and third-stage or above side slope catchment, and a platform intercepting ditch is formed in the upper portion of the excavation side slope catchment table. According to the drainage pipe network arrangement method based on the expressway technology, sewage on an expressway and rainwater seeping from a hillside are separately conveyed through the E-shaped drainage side ditches, the sewage is conveyed into the sewage treatment pond, and the rainwater is conveyed into the rainwater system to facilitate subsequent treatment and recycling.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of highway drainage pipe networks, and in particular to a drainage pipe network layout method based on highway technology. Background Art

[0002] Expressway, abbreviated as freeway, refers to a road specially designed for high-speed driving of automobiles. Expressways have different regulations in different countries and regions, different eras and different scientific research and academic fields. Expressways are multi-lane roads specially designed for automobiles to travel in different directions and lanes, with full access control.

[0003] In order to facilitate drainage on the highway during the rainy season, a drainage network will be laid on both sides of the highway. That is, side ditches will be opened on both sides of the highway, and drainage pipes will be laid inside the side ditches, so that rainwater and road sewage can be collected and discharged into the reservoir for subsequent treatment.

[0004] The traditional highway drainage network has a single drainage trough inside the drainage pipe, which cannot separate the clean water from the hillside and the sewage from the road. If the sewage contains harmful substances, it will pollute the environment. The mixing of rainwater and sewage is also inconvenient for subsequent sewage treatment.

[0005] Therefore, it is necessary to provide a drainage network layout method based on highway technology to solve the above technical problems. Summary of the invention

[0006] The present invention provides a drainage network layout method based on highway technology, which solves the problem that a single drainage trough cannot separate the sewage from the hillside Qingshui River and the road surface, which poses a risk of polluting the environment and is inconvenient for subsequent sewage treatment.

[0007] In order to solve the above technical problems, the drainage network layout method based on highway technology provided by the present invention comprises the following steps:

[0008] S1. First, dig the drainage ditch on the side of the highway into a shape corresponding to the mountain-shaped drainage pipe to facilitate the installation of the mountain-shaped drainage pipe. Remove the cover plate on the excavated road section and use the roadbed ditch as a sewage ditch to collect road sewage, and then drain it to the emergency accident treatment pool through the drainage ditch; for the slope water collection of the excavated road section, lay a layer of crushed stone permeable layer at the bottom of the broken platform as a blind ditch for infiltration of the first-level slope water collection, and the second and third-level and above slope water collection, set a platform intercepting ditch on the upper part of the broken platform of the excavated slope, and set a cutting top intercepting ditch on the top of the slope;

[0009] S2. Then, a fill slope interception ditch is set at the top of the fill slope to intercept the sewage of the fill section in advance, and then it is concentrated and drained to the emergency accident treatment pool through the drainage ditch to prevent it from flowing into the fill slope and polluting the surrounding environment. If there is a retaining wall section, a drainage ditch is set on the inside of the retaining wall to move the retaining wall outward to collect the road surface sewage from the retaining wall section. The collected water of the interception ditch of the excavation platform is concentrated to flow into the interception ditch on the top of the cutting, and then into the drainage ditch, and finally into the local drainage network;

[0010] S3. In the drainage ditch section leading out of the roadbed, a mountain-shaped drainage ditch is set up to separate the converging road sewage and natural water to avoid mixed flow. In the process of water transportation inside the mountain-shaped drainage ditch, in order to ensure its anti-seepage needs and avoid nearby environmental pollution due to leakage, the drainage ditch adopts high-grade concrete cast-in-place technology, and at the same time, anti-seepage asphalt is applied inside the ditch body;

[0011] S4. According to different drainage needs, the drainage system is divided into multiple sections, and emergency accident collection pools are set up at appropriate locations downstream. For tunnel construction sewage treatment, a four-level concrete sedimentation tank is used at the entrance, and the sewage pipe is made of φ400 steel belt corrugated pipe, which is welded by hot melt and pre-buried along the construction access road, bypassing the reservoir water source protection area, and a concrete centralized treatment pool is designed. The sewage quantity equipment uses sewage treatment equipment dedicated to tunnel sewage;

[0012] S5. The sewage and rainwater that finally enter the drainage network will be transported to the rainwater system and sewage treatment pool respectively for treatment and reuse.

[0013] Also included: roadbed;

[0014] A side ditch is provided on the top of the roadbed, and a seepage pipe is installed on one side of the side ditch;

[0015] The shape of the top of the roadbed is the same as that of the U-shaped drainage pipe, which makes it convenient to install the U-shaped drainage pipe inside the side ditch, and the seepage pipe can realize the circulation of water.

[0016] Preferably, a water collection trough is provided on the top of the roadbed, and the interior of the water collection trough comprises a grading layer, a lower water-stable layer and an upper water-stable layer from bottom to top.

[0017] A method for arranging a drainage network based on highway technology is included, and further includes: a drainage pipe;

[0018] A partition plate is installed at the bottom of the inner wall of the drain pipe, and a cover plate is installed at the top of the inner wall of the drain pipe;

[0019] The partition plate divides the drainage pipe into two parts, one for draining sewage and the other for draining rainwater. The partition plate is used to form the drainage pipe into a mountain shape.

[0020] Preferably, the top of the cover plate is provided with water seepage ports near both sides, and the top of the cover plate is provided with two sewage cleaning ports near one end;

[0021] The positions of the sewage cleaning port and the sewage cleaning pipe correspond to each other.

[0022] Preferably, a sealing plug is provided inside the sewage cleaning port, and a buckle is provided on the top of the sealing plug;

[0023] The draw buckle is used to facilitate taking out the sealing plug from the interior of the sewage cleaning port, and the sealing plug is inserted into the interior of the sewage cleaning port.

[0024] Preferably, a group of slide rails are installed at the bottom of the cover plate near both sides, a filter frame is installed between each group of slide rails through a limit bar, and a sewage cleaning pipe is installed on one side of the filter frame;

[0025] The limiting strip is inserted into the interior of the slide rail, the sewage cleaning pipe and the filter frame are connected, and the other end of the sewage cleaning pipe is connected to the sewage cleaning port.

[0026] Preferably, a filter plate is installed inside the filter frame, a drain port is provided at the bottom and one side of the filter frame, and a filter hole is provided at the other side of the filter frame;

[0027] The top of the filter plate is connected to one side of the inner wall of the filter frame, and the other side of the filter plate is connected to the middle position of the bottom of the inner wall of the filter frame, so that the filter plate has a slope.

[0028] Preferably, a first docking frame is installed at one end of the drain pipe, and a first mounting groove is provided on the outer surface of the first docking frame;

[0029] The first docking frame is inserted into the inner surface of the second docking frame.

[0030] Preferably, a second docking frame is installed at the other end of the drain pipe, a second mounting groove is provided on the inner surface of the second docking frame, and a sealing strip is provided inside the second mounting groove;

[0031] The sealing strip is made of silicone material.

[0032] Compared with the related art, the drainage pipe network layout method based on highway technology provided by the present invention has the following beneficial effects:

[0033] The present invention provides a drainage network layout method based on highway technology. In order to realize that the drainage network of the highway can separate sewage and rainwater, the present invention removes the cover plate in the excavated section, uses the roadbed ditch as a sewage ditch, collects the road surface sewage, and then centrally drains it to the emergency accident treatment pool through the drainage ditch; for the slope water collection of the excavated section, a layer of crushed stone permeable layer is laid at the bottom of the broken platform as a blind ditch for infiltrating the first-level slope water collection, the second and third-level and above slope water collection, a platform intercepting ditch is set at the upper part of the broken platform of the excavated slope, a cutting top intercepting ditch is set at the top of the slope, and then a fill slope intercepting ditch is set at the top of the fill slope to intercept the sewage of the fill section in advance, and then collect it through the drainage ditch. The water is diverted to the emergency accident treatment pool to prevent it from flowing into the fill slope and polluting the surrounding environment. The water collected by the cut-off ditch on the excavation platform is concentrated into the cut-off ditch on the top of the cut, and then into the drainage ditch, and finally into the local drainage network. In the drainage ditch section outside the roadbed, a mountain-shaped drainage ditch is set to separate the converging road sewage and natural water to avoid mixed flow. According to drainage needs, the drainage system is divided into multiple sections, and an emergency accident collection pool is set at a suitable location downstream. Through this design, the mountain-shaped drainage ditch is used to separately transport the sewage on the highway and the rainwater seepage from the hillside. The sewage is transported to the sewage treatment pool, and the rainwater is transported to the rainwater system for subsequent treatment and reuse. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] Figure 1 A schematic diagram of a first embodiment of a drainage pipe network layout method based on highway technology provided by the present invention;

[0035] Figure 2 A schematic diagram of a side ditch is provided for the present invention;

[0036] Figure 3 A schematic structural diagram of a second embodiment of a drainage network layout method based on highway technology provided by the present invention;

[0037] Figure 4 A structural schematic diagram of a first docking frame is provided for the present invention;

[0038] Figure 5 A structural schematic diagram of a sewage cleaning pipe is provided for the present invention;

[0039] Figure 6 The present invention provides Figure 4 An enlarged view of point A is shown;

[0040] Figure 7 The present invention provides Figure 4 An enlarged view of point B is shown;

[0041] Figure 8 The present invention provides Figure 5 An enlarged view of point C is shown;

[0042] Fig. 9 A structural schematic diagram of a filter plate is provided for the present invention.

[0043] Numbers in the figure: 1. drain pipe, 2. partition plate, 3. seepage port, 4. cover plate, 5. seepage pipe, 6. draw buckle, 7. sealing plug, 8. sewage outlet, 9. filter frame, 10. first docking frame, 11. second docking frame, 12. sewage pipe, 13. filter plate, 14. limit strip, 15. filter hole, 16. slide rail, 17. first mounting groove, 18. second mounting groove, 19. sealing strip, 20. drain port, 21. side ditch, 22. roadbed, 23. grading layer, 24. lower water stabilizer, 25. upper water stabilizer, 26. water collection trough. DETAILED DESCRIPTION

[0044] The present invention will be further described below in conjunction with the accompanying drawings and implementation modes.

[0045] First embodiment

[0046] Please refer to Figure 1 , Figure 2 ,in, Figure 1 A schematic diagram of a first embodiment of a drainage pipe network layout method based on highway technology provided by the present invention; Figure 2 A schematic diagram of a side ditch is provided for the present invention. The drainage pipe network layout method based on highway technology comprises the following steps:

[0047] S1. First, dig the drainage ditch on the side of the highway into a shape corresponding to the mountain-shaped drainage pipe to facilitate the installation of the mountain-shaped drainage pipe. Remove the cover plate on the excavated road section and use the roadbed ditch as a sewage ditch to collect road sewage, and then drain it to the emergency accident treatment pool through the drainage ditch; for the slope water collection of the excavated road section, lay a layer of crushed stone permeable layer at the bottom of the broken platform as a blind ditch for infiltration of the first-level slope water collection, and the second and third-level and above slope water collection, set a platform intercepting ditch on the upper part of the broken platform of the excavated slope, and set a cutting top intercepting ditch on the top of the slope;

[0048] S2. Then, a fill slope interception ditch is set at the top of the fill slope to intercept the sewage of the fill section in advance, and then it is concentrated and drained to the emergency accident treatment pool through the drainage ditch to prevent it from flowing into the fill slope and polluting the surrounding environment. If there is a retaining wall section, a drainage ditch is set on the inside of the retaining wall to move the retaining wall outward to collect the road surface sewage from the retaining wall section. The collected water of the interception ditch of the excavation platform is concentrated to flow into the interception ditch on the top of the cutting, and then into the drainage ditch, and finally into the local drainage network;

[0049] S3. In the drainage ditch section leading out of the roadbed, a mountain-shaped drainage ditch is set up to separate the converging road sewage and natural water to avoid mixed flow. In the process of water transportation inside the mountain-shaped drainage ditch, in order to ensure its anti-seepage needs and avoid nearby environmental pollution due to leakage, the drainage ditch adopts high-grade concrete cast-in-place technology, and at the same time, anti-seepage asphalt is applied inside the ditch body;

[0050] S4. According to different drainage needs, the drainage system is divided into multiple sections, and emergency accident collection pools are set up at appropriate locations downstream. For tunnel construction sewage treatment, a four-level concrete sedimentation tank is used at the entrance, and the sewage pipe is made of φ400 steel belt corrugated pipe, which is welded by hot melt and pre-buried along the construction access road, bypassing the reservoir water source protection area, and a concrete centralized treatment pool is designed. The sewage quantity equipment uses sewage treatment equipment dedicated to tunnel sewage;

[0051] S5. The sewage and rainwater that finally enter the drainage network will be transported to the rainwater system and sewage treatment pool for separate treatment and reuse;

[0052] In order to achieve continuous rainwater and sewage treatment of the project, the project sets up water collection ditches in the excavated section to collect sewage from the road surface, sets up assembled drainage ditches and gravel blind ditches at the foot of the excavated slope, and adds transverse street pipes on the road to drain the rainwater from the central dividing strip into the intercepting ditch on the fill slope, and then drain it to the drainage system at the foot of the slope through the platform intercepting ditch; sets up a collection pit at the entrance and exit of the tunnel, and drains the water in the tunnel to the sewage treatment pool through the ditch or pipe, and then drains it to the municipal sewage pipe or transports it to the sewage treatment plant by closed tank trucks, and drains the surface water on the tunnel and the slope into the tertiary sedimentation tank through the ditch. After sedimentation, a part of it is recycled for road dust reduction, car wash pool flushing, etc., and the excess water is discharged to the municipal rainwater system. The specific contents of implementation include road rainwater drainage ditches, sewage drainage ditches, accident emergency treatment pools; car wash pools, rainwater tertiary sedimentation tanks, sewage treatment pools, sewage treatment equipment, rainwater and sewage ditches or sewage pipes.

[0053] Also included: roadbed 22;

[0054] A side ditch 21 is provided on the top of the roadbed 22, and a seepage pipe 5 is installed on one side of the side ditch 21;

[0055] The top of the roadbed 22 has the same shape as the U-shaped drainage pipe, so it is convenient to install the U-shaped drainage pipe inside the side ditch 21, and the seepage pipe 5 can realize the circulation of water.

[0056] A water collection trough 26 is provided on the top of the roadbed 22, and the interior of the water collection trough 26 comprises a grading layer 23, a lower water-stable layer 24 and an upper water-stable layer 25 from bottom to top;

[0057] After the construction of the upper water-stabilizing agent of the pavement project is completed, a water collection trough 26 is set on the water collection side, and the surface water on the road is discharged in time through the drainage holes on the inner side of the side ditch. The seepage pipe 5 is set at a spacing of 20 meters to reduce the impact of road water damage. After the upper water-stabilizing agent is paved, the water collection trough is immediately excavated manually, and then a gravel blind ditch template is laid. After the water-stabilizing agent layer is compacted according to the rolling process, the template is removed to form a water collection trough 26. The interlayer water is collected in the water collection trough 26 and flows into the side ditch through the drainage holes reserved in the side ditch, thereby achieving the same path treatment as the road water.

[0058] The working principle of the drainage pipe network layout method based on highway technology provided by the present invention is as follows:

[0059] In the excavation section, the cover plate is removed and the roadbed ditch is used as a sewage ditch to collect the road sewage, which is then concentrated and drained to the emergency accident treatment pool through the drainage ditch; for the slope water collection of the excavation section, a layer of crushed stone permeable layer is laid at the bottom of the debris platform as a blind ditch for infiltration of the first-level slope water collection, and the second and third-level slope water collection, a platform intercepting ditch is set at the upper part of the debris platform of the excavation slope, a cutting top intercepting ditch is set at the top of the slope, and then a fill slope intercepting ditch is set at the top of the fill slope to deal with the sewage of the fill section in advance. The water is intercepted and then concentratedly drained to the emergency accident treatment pool through the drainage ditch to prevent it from flowing into the fill slope and polluting the surrounding environment. The water collected by the intercepting ditch on the excavation platform is concentrated into the intercepting ditch on the top of the cutting, and then into the drainage ditch, and finally into the local drainage network. In the drainage ditch section outside the roadbed, a mountain-shaped drainage ditch is set to separate the converging road sewage and natural water to avoid mixing. According to the drainage needs, the drainage system is divided into multiple sections, and an emergency accident collection pool is set at an appropriate location downstream.

[0060] Compared with the related art, the drainage pipe network layout method based on highway technology provided by the present invention has the following beneficial effects:

[0061] In order to achieve the separation of sewage and rainwater in the drainage network of highways, the cover plate is removed in the excavated section, and the roadbed ditch is used as a sewage ditch to collect the road sewage, and then it is concentrated and drained to the emergency accident treatment pool through the drainage ditch; for the slope water collection of the excavated section, a layer of crushed stone permeable layer is laid at the bottom of the debris platform as a blind ditch for infiltration of the first-level slope water collection, the second and third-level and above slope water collection, a platform intercepting ditch is set at the upper part of the excavated slope debris platform, a cutting top intercepting ditch is set at the top of the slope, and then a fill slope intercepting ditch is set at the top of the fill slope to intercept the sewage of the fill section in advance, and then it is concentrated and drained to the emergency accident treatment pool through the drainage ditch to avoid It flows to the fill slope, thereby polluting the surrounding environment, while the water collected by the cut-off ditch on the excavation platform is concentrated into the cut-off ditch on the top of the cutting, then into the drainage ditch, and finally into the local drainage network. In the drainage ditch section outside the roadbed, a mountain-shaped drainage ditch is set to separate the converging road sewage and natural water to avoid mixed flow. According to drainage needs, the drainage system is divided into multiple sections, and an emergency accident collection pool is set at a suitable location downstream. Through this design, the mountain-shaped drainage ditch is used to separately transport the sewage on the highway and the rainwater seeping from the hillside. The sewage is transported to the sewage treatment pool, and the rainwater is transported to the rainwater system for subsequent treatment and reuse.

[0062] Second embodiment

[0063] Please refer to Figure 3 , Figure 4 , Figure 5 , Figure 6 , Figure 7 , Figure 8 and Fig. 9 , Figure 3 A schematic structural diagram of a second embodiment of a drainage network layout method based on highway technology provided by the present invention;

[0064] Figure 4 A structural schematic diagram of a first docking frame is provided for the present invention; Figure 5 A structural schematic diagram of a sewage cleaning pipe is provided for the present invention; Figure 6 The present invention provides Figure 4 An enlarged view of point A is shown; Figure 7 The present invention provides Figure 4 An enlarged view of point B is shown; Figure 8 The present invention provides Figure 5 An enlarged view of point C is shown; Fig. 9 The present invention provides a structural schematic diagram of a filter plate; based on the drainage network layout method based on highway technology provided in the first embodiment of the present application, the second embodiment of the present application proposes another drainage network layout method based on highway technology. The second embodiment is only a preferred embodiment of the first embodiment, and the implementation of the second embodiment will not affect the independent implementation of the first embodiment.

[0065] Specifically, the drainage pipe network arrangement method based on highway technology provided in the second embodiment of the present application is different in that it also includes: a drainage pipe 1;

[0066] A partition plate 2 is installed at the bottom of the inner wall of the drain pipe 1, and a cover plate 4 is installed at the top of the inner wall of the drain pipe 1;

[0067] The partition plate 2 divides the drain pipe 1 into two parts, one for draining sewage and the other for draining rainwater. The partition plate 2 is used to form the drain pipe 1 into a mountain shape, and the top of the inner wall of the drain pipe 1 is provided with an opening for the cover plate 4 to be inserted.

[0068] The top of the cover plate 4 is provided with water seepage ports 3 near both sides, and the top of the cover plate 4 is provided with two sewage cleaning ports 8 near one end;

[0069] The positions of the sewage cleaning ports 8 are close to the two sides of the cover plate 4 , and the positions of the sewage cleaning ports 8 and the sewage cleaning pipes 12 correspond to each other.

[0070] The interior of the cleaning port 8 is provided with a sealing plug 7, and the top of the sealing plug 7 is provided with a buckle 6;

[0071] The drawstring 6 is used to facilitate taking out the sealing plug 7 from the interior of the cleaning port 8 , and the sealing plug 7 is inserted into the interior of the cleaning port 8 .

[0072] A set of slide rails 16 are installed at the bottom of the cover plate 4 near both sides, and a filter frame 9 is installed between each set of the slide rails 16 through a limit bar 14, and a cleaning pipe 12 is installed on one side of the filter frame 9;

[0073] The limiting strip 14 is inserted into the interior of the slide rail 16 , so that the filter frame 9 can be located below the water seepage port 3 .

[0074] A filter plate 13 is installed inside the filter frame 9, a drain port 20 is opened at the bottom and one side of the filter frame 9, and a filter hole 15 is opened on the other side of the filter frame 9;

[0075] The top of the filter plate 13 is connected to one side of the inner wall of the filter frame 9, and the other side of the filter plate 13 is connected to the bottom middle position of the inner wall of the filter frame 9, so that the filter plate 13 has a slope. Fig. 9 , the drain port 20 is located below the filter plate 13 .

[0076] A first docking frame 10 is installed at one end of the drain pipe 1, and a first mounting groove 17 is formed on the outer surface of the first docking frame 10;

[0077] The first docking frame 10 is inserted into the inner surface of the second docking frame 11. Figure 4 .

[0078] A second docking frame 11 is installed at the other end of the drain pipe 1. A second mounting groove 18 is provided on the inner surface of the second docking frame 11. A sealing strip 19 is provided inside the second mounting groove 18.

[0079] The sealing strip 19 is made of silicone material and has the characteristics of corrosion resistance, high and low temperature resistance and good sealing performance.

[0080] Compared with the related art, the drainage pipe network layout method based on highway technology provided by the present invention has the following beneficial effects:

[0081] In order to avoid water seepage at the connection of the laid highway drainage pipes and to avoid clogging of the drainage pipes, a first docking frame 10 and a second docking frame 11 are respectively installed at both ends of each mountain-shaped drainage pipe 1 composed of a partition plate 2, and a first installation groove 17 is opened on the outer surface of the first docking frame 10, and a second installation groove 18 is opened on the inner surface of the second docking frame 11, and a sealing strip 19 is installed inside the second installation groove 18. When the drainage pipe 1 is laid, the first docking frame 10 at one end of another drainage pipe 1 is inserted into the inside of the second docking frame 11 at one end of the previous drainage pipe 1, and the sealing strip 19 is respectively inserted into the inside of the first installation groove 17 and the second installation groove 18. The sealing of the sealing strip 19 can ensure that the connection between the two drainage pipes 1 will not seep water, and a cover plate 4 with a seepage port 3 is installed on the top of the inner wall of the drainage pipe 1 to prevent debris from entering the drainage pipe 1 through the seepage port 3 along with water. 13, and the filter frame 9 with the filter plate 13 is installed between each set of slide rails 16. In actual work, rainwater or sewage containing debris enters the interior of the filter frame 9 through the seepage port 3, and is filtered by the filter plate 13 with a slope. The water will be discharged from the drain port 20 into the interior of the drain pipe 1, and the debris will be retained in the filter frame 9. Since the filter plate 13 has a slope, the impact of the water flow will not allow the debris to remain on the filter plate 13, and the clogging of the filter plate 13 is also avoided. In the later stage, the staff only needs to regularly insert the suction pipe from the cleaning pipe 12 into the interior of the filter frame 9 to suck out the debris. The design increases the sealing performance of the connection between the two drain pipes 1, avoids environmental pollution caused by water seepage, and uses the filter frame 9 to filter the debris to avoid the debris directly entering the interior of the drain pipe 1 and causing blockage.

[0082] The above descriptions are merely embodiments of the present invention and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.

Claims

1. A drainage network layout method based on highway technology, characterized in that: The following steps are involved: S1. First, dig the drainage ditch on the side of the highway into a shape corresponding to the mountain-shaped drainage pipe to facilitate the installation of the mountain-shaped drainage pipe. Remove the cover plate on the excavated road section and use the roadbed ditch as a sewage ditch to collect road sewage, and then drain it to the emergency accident treatment pool through the drainage ditch; for the slope water collection of the excavated road section, lay a layer of crushed stone permeable layer at the bottom of the broken platform as a blind ditch for infiltration of the first-level slope water collection, and the second and third-level and above slope water collection, set a platform intercepting ditch on the upper part of the broken platform of the excavated slope, and set a cutting top intercepting ditch on the top of the slope; S2. Then, a fill slope interception ditch is set at the top of the fill slope to intercept the sewage of the fill section in advance, and then it is concentrated and drained to the emergency accident treatment pool through the drainage ditch to prevent it from flowing into the fill slope and polluting the surrounding environment. If there is a retaining wall section, a drainage ditch is set on the inside of the retaining wall to move the retaining wall outward to collect the road surface sewage from the retaining wall section. The collected water of the interception ditch of the excavation platform is concentrated to flow into the interception ditch on the top of the cutting, and then into the drainage ditch, and finally into the local drainage network; S3. In the drainage ditch section leading out of the roadbed, a mountain-shaped drainage ditch is set up to separate the converging road sewage and natural water to avoid mixed flow. In the process of water transportation inside the mountain-shaped drainage ditch, in order to ensure its anti-seepage needs and avoid nearby environmental pollution due to leakage, the drainage ditch adopts high-grade concrete cast-in-place technology, and at the same time, anti-seepage asphalt is applied inside the ditch body; S4. According to different drainage needs, the drainage system is divided into multiple sections, and emergency accident collection pools are set up at appropriate locations downstream. For tunnel construction sewage treatment, a four-level concrete sedimentation tank is used at the entrance, and the sewage pipe is made of φ400 steel belt corrugated pipe, which is welded by hot melt and pre-buried along the construction access road, bypassing the reservoir water source protection area, and a concrete centralized treatment pool is designed. The sewage quantity equipment uses sewage treatment equipment dedicated to tunnel sewage; S5. The sewage and rainwater that finally enter the drainage network will be transported to the rainwater system and sewage treatment pool respectively for treatment and reuse.

2. The drainage network layout method based on highway technology according to claim 1 is characterized in that: Also includes: roadbed; A side ditch is arranged on the top of the roadbed, and a seepage pipe is installed on one side of the side ditch.

3. The drainage network layout method based on highway technology according to claim 2 is characterized in that: A water collection trough is arranged on the top of the roadbed, and the interior of the water collection trough comprises a grading layer, a lower water-stable layer and an upper water-stable layer from bottom to top.

4. The drainage network layout method based on highway technology according to claim 1 is characterized in that: A method for arranging a drainage network based on highway technology is included, and further includes: a drainage pipe; A partition plate is installed at the bottom of the inner wall of the drain pipe, and a cover plate is installed at the top of the inner wall of the drain pipe.

5. The drainage network layout method based on highway technology according to claim 4 is characterized in that: The top of the cover plate is provided with water seepage openings near both sides, and the top of the cover plate is provided with two sewage cleaning openings near one end.

6. The drainage network layout method based on highway technology according to claim 5 is characterized in that: The interior of the sewage cleaning port is provided with a sealing plug, and the top of the sealing plug is provided with a draw buckle.

7. The drainage network layout method based on highway technology according to claim 4 is characterized in that: A group of slide rails are installed at the bottom of the cover plate near both sides, and a filter frame is installed between each group of slide rails through a limit strip, and a sewage cleaning pipe is installed on one side of the filter frame.

8. The drainage network layout method based on highway technology according to claim 7 is characterized in that: A filter plate is installed inside the filter frame, a drain port is provided at the bottom and one side of the filter frame, and a filter hole is provided at the other side of the filter frame.

9. The drainage network layout method based on highway technology according to claim 4 is characterized in that: A first docking frame is installed at one end of the drain pipe, and a first installation groove is formed on the outer surface of the first docking frame.

10. The drainage network layout method based on highway technology according to claim 4, characterized in that: A second docking frame is installed at the other end of the drain pipe, a second mounting groove is formed on the inner surface of the second docking frame, and a sealing strip is arranged inside the second mounting groove.