Stone dry-hanging fixing structure and stone dry-hanging rapid construction method

By using the fixed structure of frame, anti-demount plate and spring components in stone dry hanging construction, combined with BIM modeling technology, the noise, efficiency and stability problems in existing dry hanging construction are solved, achieving efficient and accurate Stone panel installation and replacement.

CN118933243APending Publication Date: 2024-11-12SHANGHAI ERSHIYE CONSTR CO LTD +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411128693.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-16
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The existing dry-hanging stone construction process has problems such as noise and dust pollution, low construction efficiency, difficult to guarantee processing accuracy, unstable pendants and stone, and inconvenient replacement of stone.

Method used

The stone dry-hanging fixed structure including frame, anti-detachment plate, spring assembly and slit slot is adopted. The stone plate is stablely installed through the matching of the bent portion and the slit slot and the elastic action of the spring assembly, and the BIM modeling technology is used to guide it. Construction ensures the precise customization and installation order of stone slabs.

Benefits of technology

It improves construction efficiency and the stability of stone slabs, simplifies the process of replacing stone slabs, ensures installation accuracy and overall stability, and reduces the need and labor costs of on-site grooves.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933243A_ABST
    Figure CN118933243A_ABST
Patent Text Reader

Abstract

The invention relates to a stone dry hanging fixing structure which comprises a frame and two rows of connecting pieces. The two rows of connecting pieces are fixed to the upper portion and the lower portion of the frame respectively. Each connecting piece comprises two anti-disengaging hanging plates and a spring assembly. The two anti-drop hanging plates are symmetrically arranged up and down, one end of each anti-drop hanging plate is fixedly connected with the frame, and the other end of each anti-drop hanging plate is bent outwards and towards the frame to form a bent part; the spring assembly is fixed between the two anti-falling hanging plates; the upper end face and the lower end face of the stone plate are each provided with a clamping groove, and the clamping grooves are matched with the bent parts. When the stone plate continues to move until the clamping groove is aligned with the bent part, the bent part is clamped into the clamping groove under the elastic action of the spring assembly, the upper end and the lower end of the stone plate are clamped and fixed through the two anti-disengaging hanging plates, operation is convenient, the construction efficiency is high, the clamping groove of the stone plate is matched with the bent part, the stone plate can be prevented from shaking, and the stone plate can be conveniently detached. And meanwhile, the contact area of the anti-falling hanging plate and the stone plate can be increased through clamping connection of the bending part and the clamping groove, and the overall stability of the stone plate is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of building construction, and particularly relates to a stone dry hanging fixing structure and a stone dry hanging rapid construction method. Background Art

[0002] Dry hanging stone is a new type of wall stone decoration construction technology. Its basic principle is to set metal hangers on the main structure of the building as the main force point, and directly hang the decorative stone slabs on the wall or steel frame through the hangers, without the need for traditional wet grouting and pasting, thus forming a beautiful and durable stone curtain wall. This technology can effectively reduce the amount of wet work and shorten the construction period, and has good application prospects.

[0003] At present, the mainstream practice of dry hanging stone construction is to transport the stone slabs to the construction site, and then the on-site construction personnel use cutting equipment to open slots on the stone for placing the hangers. After the cutting is completed, the L-shaped or T-shaped metal hangers are fixed on the preset metal keel on the wall surface, and then the placement slots of the stone slabs are fitted on the hangers, and the weight of the stone and the support of the hangers are used to hang it firmly on the wall to complete the installation.

[0004] Although this conventional dry-hanging construction process is an improvement over the traditional wet operation, there are still some problems that cannot be ignored: first, on-site cutting operations will generate a lot of noise and dust, affecting the construction environment; second, on-site processing efficiency is low, workers need to operate one piece at a time, the construction progress is slow, and the labor cost is high; third, the on-site grooving processing accuracy and quality are difficult to guarantee, the grooves and hangers cannot be accurately matched, there is a risk of shaking, and irregular grooving will also pose hidden dangers to the subsequent installation, maintenance and replacement of stone.

[0005] In addition, the L-shaped or T-shaped hangers currently used are usually anchored to the wall keel with bolts, and the stone groove is supported by the extended end. The contact area between the hanger and the stone is small, which is easy to produce local stress concentration and affect the overall stability. Moreover, this type of hanger needs to be dismantled and reinstalled when replacing the stone, which makes it inconvenient to replace the stone. Summary of the invention

[0006] The main purpose of the invention is to propose a stone dry hanging fixing structure and a stone dry hanging rapid construction method, which can effectively solve the problems in the background technology.

[0007] To achieve the above objectives, the present invention is implemented through the following technical solutions:

[0008] A stone dry hanging fixing structure is used to fix stone slabs, comprising:

[0009] frame;

[0010] Two rows of connecting members are fixed to the upper and lower parts of the frame respectively, and the connecting members include

[0011] Two anti-drop hanging plates are arranged symmetrically in an upper and lower manner, one end of which is fixedly connected to the frame, and the other end is bent outwardly and toward the frame to form a bent portion;

[0012] A spring assembly is fixed between the two anti-drop hanging plates;

[0013] Wherein, the upper and lower end surfaces of the stone plate are both provided with clamping grooves, and the clamping grooves are matched with the bending parts.

[0014] Preferably, the bending portion includes a first bending section and a second bending section in sequence, the bending angle of the first bending section is 30°, and the second bending section is bent inwardly to be in a vertical state.

[0015] Preferably, the spring assembly includes a spring metal plate, connecting blocks are fixed at both ends of the spring metal plate, an axle is fixedly passed through the connecting block, and support seats are rotatably connected to both ends of the axle, and the support seats at both ends are fixedly connected to the two anti-detachment hanging plates respectively.

[0016] Preferably, the frame is a rectangular structure comprising

[0017] Two fixing plates are symmetrically arranged up and down, and the connecting member is fixed on the fixing plates;

[0018] Two reinforcing plates are respectively connected to two ends of the fixing plate.

[0019] Preferably, an angle iron is fixed inside the connection between the fixing plate and the reinforcing plate.

[0020] A stone dry hanging fast construction method, using any of the above-mentioned stone dry hanging fixing structures, specifically comprises the following steps:

[0021] S10, making a stone dry hanging fixed structure;

[0022] S20, install the keel;

[0023] S30, installing a stone dry-hanging fixing structure, wherein a plurality of stone dry-hanging fixing structures are fixed on corresponding keels through their frames, wherein two anti-detachment hanging plates opposite to each other on the inner sides of two connecting pieces in the same stone dry-hanging fixing structure are used to install one stone board, and the anti-detachment hanging plate on the outer side of the connecting piece in the stone dry-hanging fixing structure is matched with the anti-detachment hanging plate on the outer side of the connecting piece in another stone dry-hanging fixing structure to install another stone board;

[0024] S40, when installing the stone slab, move the rear surface of the stone slab toward the frame;

[0025] S50, during the movement, the stone plate contacts and squeezes the bending portion, one end of the squeezed bending portion of the anti-detachment hanging plate bends toward the other anti-detachment hanging plate, and the spring assembly is compressed and deformed;

[0026] S60, when the stone plate continues to move until its slot is aligned with the bent portion, the bent portion is inserted into the slot under the elastic action of the spring assembly, and the two anti-detachment hanging plates are clamped and fixed to the upper and lower ends of the stone plate, completing the dry hanging installation of the stone plate.

[0027] 7. A stone dry hanging rapid construction method according to claim 6, characterized in that: when making the stone dry hanging fixed structure, the pre-construction preparation is completed, and the pre-construction preparation specifically includes the following steps:

[0028] S1: Prepare dry hanging stone construction plan according to construction drawings and relevant specifications, and measure and locate the building structure;

[0029] S2: Establish a BIM three-dimensional model. According to the curtain wall construction drawings and measured data, the BIM model is established. In the model, the stone curtain wall project is divided into several small units, and the installation position of each stone hanging fixed structure and the specifications, dimensions, slot positions and other information of each stone board are determined. The specific information of the stone board is extracted into a table to guide the stone manufacturer to process the stone board;

[0030] S3: Conduct visual briefings with project managers and stone manufacturers based on the established BIM 3D model diagram and material list, print out the arranged models and paste them to the corresponding locations on site for easy review by stone installation workers, clarify the methods of each node and the arrangement order of stone slabs, use the BIM model to display the construction sequence, determine the locations of internal and external shapes and connection points, and coordinate the on-site keel installation positions, stone dry hanging fixed structure installation positions, and stone slab installation positions.

[0031] The present invention provides a stone dry hanging fixing structure and a stone dry hanging rapid construction method, which have the following beneficial effects:

[0032] 1. When the stone slab is installed, the stone slab contacts and squeezes the bent part, and one end of the squeezed bent part of the anti-slip hanging plate bends toward the other anti-slip hanging plate, and the spring assembly is compressed and deformed. When the stone slab continues to move until its slot is aligned with the bent part, the bent part is inserted into the slot under the elastic action of the spring assembly, and the two anti-slip hanging plates are clamped and fixed to the upper and lower ends of the stone slab, which is easy to operate and has high construction efficiency. The slot of the stone slab is matched with the bent part to prevent the stone slab from shaking. At the same time, the contact area between the anti-slip hanging plate and the stone slab can be increased by clamping the bent part with the slot to prevent local stress concentration, thereby ensuring the overall stability of the stone slab.

[0033] 2. When the stone slab needs to be replaced, the construction personnel can use tools to pressurize the spring assembly to deform it, and the bending parts of the two anti-detachment hanging plates of the connecting piece are bent close to each other, and the bending parts are separated from the card slots, and the stone slab can be taken out from the end. When the stone slab of the present invention is replaced, there is no need to dismantle the stone dry hanging fixing structure, and the stone slab is easy to replace.

[0034] 3. The stone slab of the present invention is produced by factory customization, and no on-site grooving is required, which can ensure the accuracy of grooving and improve the on-site construction efficiency. The present invention also uses BIM modeling technology to assist in guiding the production and installation of stone slabs, which is beneficial to improving the overall construction quality and construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] Figure 1 It is a structural schematic diagram of the stone dry hanging fixing structure of the present invention;

[0036] Figure 2 It is a structural schematic diagram of the connecting piece of the present invention;

[0037] Figure 3 It is a schematic diagram of the installation structure of the stone plate of the present invention.

[0038] In the figure: 1, frame; 11, fixing plate; 12, reinforcement plate; 13, angle iron; 2, connecting piece; 21, anti-drop hanging plate; 211, bending part; 2111, first bending section; 2112, second bending section; 22, spring assembly; 221, spring metal plate; 222, connecting block; 223, shaft rod; 224, support seat; 10, stone plate; 101, slot. DETAILED DESCRIPTION

[0039] In order to make the purpose, technical solutions and advantages of the present invention more clear, the technical solutions of the present invention will be clearly and completely described below in conjunction with the accompanying drawings of the present invention.

[0040] The technical solution of the present invention will be clearly and completely described below in conjunction with the embodiments. Obviously, the described embodiments are part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0041] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.

[0042] In addition, the terms "first" and "second" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, "multiple" means two or more, unless otherwise clearly and specifically defined. In addition, the terms "installed", "connected" and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal connection of two components. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0043] Example

[0044] Reference Figure 1-3 A stone dry hanging fixing structure is used to fix a stone plate 10, which includes a frame 1 and two rows of connecting members 2; the two rows of connecting members 2 are respectively fixed on the upper and lower parts of the frame 1.

[0045] The connecting member 2 includes two anti-drop hanging plates 21 and a spring assembly 22;

[0046] The two anti-drop hanging plates 21 are arranged symmetrically up and down, one end of which is fixedly connected to the frame 1, and the other end is bent outward and toward the frame 1 to form a bent portion 211;

[0047] The spring assembly 22 is fixed between the two anti-detachment hanging plates 21, and the spring assembly 22 is used to support the two anti-detachment hanging plates 21 to ensure that the two anti-detachment hanging plates 21 will not approach each other without human intervention;

[0048] The upper and lower end surfaces of the stone plate 10 are both provided with a clamping groove 101 , and the clamping groove 101 is matched with the bending portion 211 .

[0049] The present invention also provides a stone dry hanging rapid construction method, which utilizes the stone dry hanging fixing structure and specifically includes the following steps:

[0050] S10, making a stone dry hanging fixed structure;

[0051] S20, install the keel;

[0052] S30, installing a stone dry-hanging fixing structure, wherein a plurality of stone dry-hanging fixing structures are fixed on corresponding keels through their frames 1, wherein two anti-detachment hanging plates 21 opposite to each other on the inner sides of two connecting members 2 in the same stone dry-hanging fixing structure are used to install one stone board 10, and the anti-detachment hanging plate 21 on the outer side of the connecting member 2 in the stone dry-hanging fixing structure is matched with the anti-detachment hanging plate 21 on the outer side of the connecting member 2 in another stone dry-hanging fixing structure to install another stone board 10;

[0053] S40, when installing the stone plate 10, the rear surface of the stone plate 10 is directed toward the frame 1 and moved toward it;

[0054] S50, during the movement, the stone plate 10 contacts and squeezes the bending portion 211, and one end of the squeezed bending portion 211 of the anti-detachment hanging plate 21 bends toward the other anti-detachment hanging plate 21, and the spring assembly 22 is compressed and deformed;

[0055] S60, when the stone board 10 continues to move until its slot 101 is aligned with the bent portion 211, the bent portion 211 is inserted into the slot 101 under the elastic action of the spring assembly 22, and the two anti-detachment hanging plates 21 clamp and fix the upper and lower ends of the stone board 10, completing the dry hanging installation of the stone board 10.

[0056] In this embodiment, three connecting members 2 are arranged in a row, and three slots 101 are correspondingly provided on the upper and lower end surfaces of the stone plate 10 . The frame 1 is fixed to the keel by expansion bolts or fastening screws.

[0057] In a specific implementation scheme, the pre-construction preparation is completed when making the stone dry hanging fixed structure, and the pre-construction preparation specifically includes the following steps:

[0058] S1: Prepare dry hanging stone construction plan according to construction drawings and relevant specifications, and measure and locate the building structure;

[0059] S2: Establish a BIM three-dimensional model. Establish a BIM model based on the curtain wall construction drawings and measured data. In the model, divide the stone curtain wall project into several small units, determine the installation position of each stone dry hanging fixed structure and the specifications, dimensions, slot positions and other information of each stone board 10, and extract the specific information of the stone board 10 into a table to guide the stone manufacturer to process the stone board 10;

[0060] S3: Conduct visual briefings to project managers and stone manufacturers based on the established BIM three-dimensional model diagram and material list, print out the arranged models and paste them to the corresponding locations on site for the convenience of stone installation workers to check, clarify the methods of each node and the arrangement order of the stone slabs 10, use the BIM model to display the construction sequence, determine the positions of internal and external shapes and connection points, and make the on-site keel installation position, stone dry hanging fixed structure installation position and stone slab 10 installation position consistent.

[0061] The stone slab 10 of the present invention is produced in a factory-customized manner without on-site grooving, which can ensure the accuracy of grooving and improve on-site construction efficiency. The present invention also uses BIM modeling technology to assist in guiding the production and installation of the stone slab 10, which is beneficial to improving the overall construction quality and construction efficiency.

[0062] When the stone plate 10 is installed, the stone plate 10 contacts and squeezes the bent portion 211, and one end of the squeezed bent portion 211 of the anti-slip hanging plate 21 bends toward the other anti-slip hanging plate 21, and the spring assembly 22 is compressed and deformed. When the stone plate 10 continues to move until its slot 101 is aligned with the bent portion 211, the bent portion 211 is snapped into the slot 101 under the elastic action of the spring assembly 22, and the two anti-slip hanging plates 21 are snapped and fixed to the upper and lower ends of the stone plate 10, which is easy to operate and has high construction efficiency. The slot 101 of the stone plate 10 is adapted to the bent portion 211 to prevent the stone plate 10 from shaking. At the same time, the contact area between the anti-slip hanging plate 21 and the stone plate 10 can be increased by snapping the bent portion 211 with the slot 101 to prevent local stress concentration, thereby ensuring the overall stability of the stone plate 10.

[0063] When the stone slab 10 needs to be replaced, the construction personnel can use tools to apply pressure to the spring assembly 22 to deform it, and the bending portions 211 of the two anti-detachment hanging plates 21 of the connecting piece 2 bend close to each other, and the bending portions 211 are separated from the slot 101, and the stone slab 10 can be taken out from this end. When the stone slab 10 of the present invention is replaced, there is no need to dismantle the stone dry-hanging fixing structure, and the stone slab 10 is easy to replace.

[0064] In a specific embodiment, the bending portion includes a first bending section 2111 and a second bending section 2112 in sequence. The bending angle of the first bending section 2111 is 30°, and the second bending section 2112 is bent inward to be in a vertical state. The vertical second bending section 2112 can ensure the supporting area of ​​the end of the bending portion 211 for the slot 101.

[0065] In a specific embodiment, the spring assembly 22 includes a spring metal plate 221, and connecting blocks 222 are fixed at both ends of the spring metal plate 221. An axle rod 223 is fixedly inserted into the connecting block 222. Both ends of the axle rod 223 are rotatably connected with support seats 224. The support seats 224 at both ends are respectively fixedly connected to the two anti-slip hanging plates 21. The spring metal plate 221 and the anti-slip hanging plate 21 are flexibly connected through the axle rod 223 and the support seat 224 to ensure the connection strength between the two.

[0066] In a specific embodiment, the frame 1 is a rectangular structure, which includes two fixing plates 11 and two reinforcement plates 12; the two fixing plates 11 are symmetrically arranged up and down, and the connecting member 2 is fixed on the fixing plates 11; the two reinforcement plates 12 are respectively connected to the two ends of the fixing plates 11.

[0067] In a specific embodiment, an angle iron 13 is fixed inside the connection between the fixing plate 11 and the reinforcing plate 12 to strengthen the connection strength of the frame 1 .

[0068] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A stone dry hanging fixing structure, used for fixing stone slabs, characterized by: include frame; Two rows of connecting members are fixed to the upper and lower parts of the frame respectively, and the connecting members include Two anti-drop hanging plates are arranged symmetrically in an upper and lower manner, one end of which is fixedly connected to the frame, and the other end is bent outwardly and toward the frame to form a bent portion; A spring assembly is fixed between the two anti-drop hanging plates; Wherein, the upper and lower end surfaces of the stone plate are both provided with clamping grooves, and the clamping grooves are matched with the bending parts.

2. A stone dry hanging fixing structure according to claim 1, characterized in that: The bending portion includes a first bending section and a second bending section in sequence, the bending angle of the first bending section is 30°, and the second bending section is bent inwardly to be in a vertical state.

3. The stone dry hanging fixing structure according to claim 1 is characterized in that: The spring assembly includes a spring metal plate, connecting blocks are fixed at both ends of the spring metal plate, a shaft rod is fixedly passed through the connecting block, and support seats are rotatably connected to both ends of the shaft rod. The support seats at both ends are fixedly connected to the two anti-detachment hanging plates respectively.

4. The stone dry hanging fixing structure according to claim 1, characterized in that: The frame is a rectangular structure, which includes Two fixing plates are symmetrically arranged up and down, and the connecting member is fixed on the fixing plates; Two reinforcing plates are respectively connected to two ends of the fixing plate.

5. The stone dry hanging fixing structure according to claim 4 is characterized in that: Angle iron is fixed inside the connection between the fixing plate and the reinforcing plate.

6. A stone dry hanging fast construction method, using the stone dry hanging fixing structure according to any one of claims 1, characterized in that: The specific steps include: S10, making a stone dry hanging fixed structure; S20, install the keel; S30, installing a stone dry-hanging fixing structure, wherein a plurality of stone dry-hanging fixing structures are fixed on corresponding keels through their frames, wherein two anti-detachment hanging plates opposite to each other on the inner sides of two connecting pieces in the same stone dry-hanging fixing structure are used to install one stone board, and the anti-detachment hanging plate on the outer side of the connecting piece in the stone dry-hanging fixing structure is matched with the anti-detachment hanging plate on the outer side of the connecting piece in another stone dry-hanging fixing structure to install another stone board; S40, when installing the stone slab, move the rear surface of the stone slab toward the frame; S50, during the movement, the stone plate contacts and squeezes the bending portion, one end of the squeezed bending portion of the anti-detachment hanging plate bends toward the other anti-detachment hanging plate, and the spring assembly is compressed and deformed; S60, when the stone plate continues to move until its slot is aligned with the bent portion, the bent portion is inserted into the slot under the elastic action of the spring assembly, and the two anti-detachment hanging plates are clamped and fixed to the upper and lower ends of the stone plate, completing the dry hanging installation of the stone plate.

7. A stone dry hanging rapid construction method according to claim 6, characterized in that: When making the stone dry hanging fixed structure, the pre-construction preparation is completed. The pre-construction preparation specifically includes the following steps: S1: Prepare dry hanging stone construction plan according to construction drawings and relevant specifications, and measure and locate the building structure; S2: Establish a BIM three-dimensional model. According to the curtain wall construction drawings and measured data, the BIM model is established. In the model, the stone curtain wall project is divided into several small units, and the installation position of each stone hanging fixed structure and the specifications, dimensions, slot positions and other information of each stone board are determined. The specific information of the stone board is extracted into a table to guide the stone manufacturer to process the stone board; S3: Conduct visual briefings with project managers and stone manufacturers based on the established BIM 3D model diagram and material list, print out the arranged models and paste them to the corresponding locations on site for easy review by stone installation workers, clarify the methods of each node and the arrangement order of stone slabs, use the BIM model to display the construction sequence, determine the locations of internal and external shapes and connection points, and coordinate the on-site keel installation positions, stone dry hanging fixed structure installation positions, and stone slab installation positions.