Hoisting construction method for reaming of roof panel

By successively setting up lifting molds and using lifting embedded parts, the problems of reaming and closing of lifting holes are solved, the construction efficiency and quality are improved, and it is suitable for lifting large-scale equipment, reducing costs and leakage risks.

CN118933364APending Publication Date: 2024-11-12CHINA NUCLEAR IND HUAXING CONSTR
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202411012635.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-26
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

In construction projects, it is difficult to fully anticipate the actual size of the equipment, resulting in the original lifting hole being retracted. The traditional hole retracting method has problems such as high difficulty in restoring concrete, high material usage, high cost and difficulty in demolition.

Method used

The construction plan of successively erecting the first and second lifting molds is adopted, and the holes are gradually expanded and closed through the support structure and high-strength pull rod support, and the construction efficiency and quality are ensured by using the lifting embedded parts and waterproof structures.

Benefits of technology

It improves construction efficiency, reduces costs, ensures the waterproof performance of the closed structure of the lifting holes, and is suitable for lifting construction of large-scale equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933364A_ABST
    Figure CN118933364A_ABST
Patent Text Reader

Abstract

The invention discloses a roof panel reaming and hoisting construction method which comprises the steps that a hoisting hole is reamed, a first hoisting formwork is erected on the hoisting hole, the first hoisting formwork comprises a supporting structure, a first keel structure and a plurality of high-strength pull rods, and the supporting structure is erected around the hoisting hole and connected to pass through the upper portion of the hoisting hole; a plurality of high-strength pull rods longitudinally penetrate through the hoisting holes through the supporting structures; mounting a first keel structure at the bottom of the high-strength pull rod; a hoisting hole side mold is erected, and concrete around the hoisting hole is poured; the hoisting hole side mold is dismantled, and a second hoisting mold is erected in the first hoisting mold; the second hanging formwork is of a second keel structure erected on the first hanging formwork in the hanging hole. Hoisting embedded parts are installed in the hoisting holes; a closed structure side mold is erected around the second hoisting mold, and concrete above the hoisting hole is poured to form a closed structure; the first hanging formwork and the second hanging formwork are dismantled; and constructing a waterproof structure. According to the method, the field construction efficiency can be effectively improved, the construction quality is guaranteed, the strength is reliable, and the hidden danger of water leakage is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of equipment hoisting construction, and in particular to a roof panel hole enlarging hoisting construction method. Background Art

[0002] In the structural design of construction projects, it is often necessary to set up post-cast lifting holes due to the need to consider the lifting of equipment. The lifting holes can only be closed after the equipment is lifted and introduced, so the cycle is relatively long. The reserved size of the lifting holes is affected by the size of the equipment, but the actual size of the equipment that needs to be lifted later cannot be fully anticipated during the construction of the lifting holes. When the actual equipment body is a large and integral structure that cannot be disassembled, such as the lifting of some larger nuclear power plant equipment, the original lifting holes are no longer applicable and need to be enlarged.

[0003] The traditional approach is to expand the original lifting hole in all directions so that the equipment can be lifted smoothly through the lifting hole. After expansion, the lifting hole needs to be repaired by formwork and concrete pouring around it, and the closed structure needs to be rebar-planted. However, there are a large number of reinforcing steel bars around the lifting hole opening, and it is difficult to plant reinforcement on the side within the roof panel range. There is equipment directly below the lifting hole, and the roof panels on both sides of the post-cast lifting hole are temporarily supported. Before pouring the post-cast lifting hole, two more formworks are set up, and the secondary formwork system of the conventional post-cast lifting hole mostly uses a floor-standing support frame, which consumes a lot of materials, is difficult to dismantle laterally, and has a high cost. Summary of the invention

[0004] The purpose of the present invention is to provide a roof panel hole enlargement and hoisting construction method to solve the problem that the hoisting hole cannot meet the hole enlargement and subsequent structural closure required for equipment hoisting, improve construction efficiency and speed up construction progress.

[0005] To achieve the above purpose, the technical solution provided by the present invention is:

[0006] A roof panel hole enlargement and hoisting construction method comprises the following steps:

[0007] The hoisting hole is enlarged, and a first hanging mold is supported on the hoisting hole. The first hanging mold includes a supporting structure, a first keel structure and a plurality of high-strength tie rods. The supporting structure is erected around the hoisting hole and connected to pass above the hoisting hole. The plurality of high-strength tie rods are longitudinally passed through the hoisting hole through the supporting structure; the first keel structure is installed at the bottom of the high-strength tie rod;

[0008] Set up the side formwork of the lifting hole and pour concrete around the lifting hole;

[0009] The side formwork of the hanging hole is removed, and a second hanging formwork is supported inside the first hanging formwork; the second hanging formwork is a second keel structure erected on the first hanging formwork in the hanging hole;

[0010] Install the lifting embedded parts in the lifting holes;

[0011] A closed structure side form is set up around the second hanging formwork, and concrete is poured above the hanging hole to form a closed structure;

[0012] Dismantle the first hanging formwork and the second hanging formwork;

[0013] Construction of waterproof structure.

[0014] To optimize the above technical solutions, the specific measures taken also include:

[0015] The supporting structure includes four pipe columns erected on the upper parts of both sides of the lifting hole and steel beams connecting the four pipe columns on both sides. The single steel beam is welded into a shape by two channel steels. The upper part of the high-strength tie rod passes through the gap between the two channel steels and is fixed on the channel steel by a first set of three-claw nuts.

[0016] Furthermore, the first keel structure and the second keel structure are respectively fixed to the high-strength tie rod through three-claw nuts. First, the second group of three-claw nuts for fixing the second keel structure are passed through the high-strength tie rod from the bottom end of the high-strength tie rod, and then the first keel structure is installed and fixed under the lifting hole through the third group of three-claw nuts. Finally, the second keel structure is placed on the second group of three-claw nuts and fixed; the second group of three-claw nuts and the third group of three-claw nuts are both used in conjunction with U-shaped buckles.

[0017] In a disclosed solution of the present invention, the first keel structure includes a first hanging mold main keel, a first hanging mold secondary keel and a first hanging mold plywood; the second keel structure includes a second hanging mold main keel, a second hanging mold secondary keel, a second hanging mold conversion beam and a second hanging mold plywood.

[0018] In the scheme disclosed by the present invention, before pouring concrete around the lifting hole, a layer of interface bonding agent is firstly applied on the original concrete bonding surface.

[0019] In a disclosed solution of the present invention, a water stop ring is provided at the portion of the high-strength tie rod located in the closed structure to be cast.

[0020] In a disclosed solution of the present invention, before pouring concrete above the lifting hole to form a closed structure, reinforcement is planted on the roof panel around the lifting hole, and main reinforcement is tied in the area where the closed structure is to be poured, so that the planted reinforcement extends into the closed structure to be poured and is connected to the main reinforcement as a whole.

[0021] In a disclosed solution of the present invention, the top surface of the second keel structure is at the same elevation as the roof panels around the hanging holes, and the closed structure forms a roof panel area that is integrated with the surrounding roof panels; the removal of the first hanging formwork and the second hanging formwork is to cut off the high-strength tie rods outside the top and bottom surfaces of the closed structure, and remove the remaining structure except for the part of the high-strength tie rods remaining in the closed structure.

[0022] In a disclosed scheme of the present invention, the lifting embedded parts include embedded steel plates, steel plate lifting ears and steel anchor bars installed on the embedded steel plates, the steel plate lifting ears are welded on the surface of the embedded steel plates, and two stiffening ribs are welded on both sides of the steel plate lifting ears; the elevation of the embedded steel plate surface is the same as the elevation of the bottom of the roof panel, the steel anchor bars are anchored in the roof panel area formed by the closed structure, and the steel plate lifting ears extend out of the bottom of the roof panel area.

[0023] In a disclosed solution of the present invention, after removing the first hanging formwork and the second hanging formwork, a roof waterproofing layer is laid above the closed structure, and a reverse slope is added on the water-facing surface of the closed structure; the roof waterproofing layer includes a slope layer, a leveling layer, a waterproof membrane, an isolation layer, a bonding layer and a protective layer from bottom to top.

[0024] Compared with the prior art, the present invention has the following beneficial effects:

[0025] The present invention proposes a roof panel hole expansion and hoisting construction method, designs a construction plan of successively setting up a first hanging formwork and a second hanging formwork, the first hanging formwork can not only be used as a bottom formwork for concrete repair and pouring of the original hoisting hole, but also can be used as a side formwork support and operation platform for concrete repair around the hole opening; when the second hanging formwork is supported, the first hanging formwork is not dismantled, and the first hanging formwork is used as the second hanging formwork support and operation platform, which solves the needs of concrete repair templates and closed structure templates around the hole after the hoisting hole is expanded.

[0026] The roof panel hoisting hole expansion and closed structure construction method of the present invention has an easier construction process, stronger applicability, and more outstanding flexibility, avoiding the problem that traditional bottom preinstalled equipment uses steel support and is difficult to dismantle later, effectively improving on-site construction efficiency, ensuring construction quality, reliable strength, and no hidden dangers of water leakage, and is particularly suitable for the hoisting construction of large equipment that requires waterproofing. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 It is a schematic diagram of the hole expansion of the roof panel hoisting hole of the present invention.

[0028] Figure 2 It is a schematic plan view of the closed structure of the roof panel hoisting hole of the present invention.

[0029] Figure 3 It is a schematic diagram of the AA cross-sectional structure of the roof panel hoisting hole closing structure of the present invention.

[0030] Figure 4 It is a schematic diagram of the BB cross-sectional structure of the roof panel hoisting hole closing structure of the present invention.

[0031] Figure 5 It is a schematic diagram of the lifting embedded parts of the present invention.

[0032] Figure 6 It is a schematic plan view of the construction of the roof panel closed structure template of the present invention.

[0033] Figure 7 It is a schematic diagram of the CC cross-sectional structure of the first hanging formwork construction of the roof panel closed structure of the present invention.

[0034] Figure 8 It is a schematic diagram of the DD cross-sectional structure of the first hanging formwork construction of the roof panel closed structure of the present invention.

[0035] Fig. 9 It is a schematic diagram of the CC cross-sectional structure of the second hanging formwork construction of the roof panel closed structure of the present invention.

[0036] Fig.10 It is a schematic diagram of the DD cross-sectional structure of the second hanging formwork construction of the roof panel closed structure of the present invention.

[0037] Fig.11 It is a schematic diagram of the local structure of the first hanging formwork and the second hanging formwork supporting the closed structure of the roof panel of the present invention.

[0038] Fig.12 It is a schematic diagram of the U-shaped buckle of the first hanging mold and the second hanging mold of the present invention.

[0039] In the figure, 1. Embedded steel bars; 2. Lifting embedded parts; 3. Steel plate lifting lugs; 4. Stiffening ribs; 5. Main steel bars; 6. Slope layer; 7. Leveling layer; 8. Waterproof membrane; 9. Isolation layer; 10. Bonding layer; 11. Protective layer; 12. The first set of three-claw nuts; 13. High-strength tie rods; 14. Water stop rings; 15. Four pipe columns; 16. Steel beams; 17. The first hanging formwork main keel; 18. The first hanging formwork secondary keel; 19. 1. The first hanging formwork U-shaped buckle; 20. The first hanging formwork plywood; 21. The scaffolding steel pipe; 22. The reverse slope; 23. The water stop strip; 24. The second set of three-claw nuts; 25. The second hanging formwork U-shaped buckle; 26. The second hanging formwork main keel; 27. The second hanging formwork conversion beam; 28. The second hanging formwork secondary keel; 29. ​​The second hanging formwork plywood; 30. The side formwork of the lifting hole; 31. The closed structure side formwork; 32. The third set of three-claw nuts. DETAILED DESCRIPTION

[0040] The above contents of the present invention are further described in detail below in the form of embodiments, but this should not be understood as the scope of the above subject matter of the present invention being limited to the following embodiments, and all technologies realized based on the above contents of the present invention belong to the scope of the present invention.

[0041] The present invention provides a roof panel hole enlargement and hoisting construction method, comprising the following steps:

[0042] The hoisting hole is enlarged, and a first hanging mold is supported on the hoisting hole. The first hanging mold includes a supporting structure, a first keel structure and a plurality of high-strength tie rods. The supporting structure is erected around the hoisting hole and connected to pass above the hoisting hole. The plurality of high-strength tie rods are longitudinally passed through the hoisting hole through the supporting structure; the first keel structure is installed at the bottom of the high-strength tie rod;

[0043] Set up the side formwork of the lifting hole and pour concrete around the lifting hole;

[0044] The side formwork of the hanging hole is removed, and a second hanging formwork is supported inside the first hanging formwork; the second hanging formwork is a second keel structure erected on the first hanging formwork in the hanging hole;

[0045] Install the lifting embedded parts in the lifting holes;

[0046] A closed structure side form is set up around the second hanging formwork, and concrete is poured above the hanging hole to form a closed structure;

[0047] Dismantle the first hanging formwork and the second hanging formwork;

[0048] Construction of waterproof structure.

[0049] The present invention can quickly solve the problem that the hoisting hole cannot meet the need for hole enlargement and subsequent structural closure for equipment hoisting, reduce construction costs, and ensure the waterproof performance of the hoisting hole closed structure.

[0050] The present invention is further described in detail below in conjunction with specific embodiments:

[0051] The original hoisting hole is in the shape of a "concave" character, and needs to be expanded into a "mouth" shape for hoisting equipment. The specific steps for the construction method of the roof panel hoisting hole expansion and closed structure are as follows:

[0052] S1 hoisting hole expansion and closing structure design;

[0053] The design is as follows: the original lifting hole is a "U"-shaped hole with tongue and groove on all sides. The equipment needs to be hoisted into the room through the lifting hole. The change in equipment size causes the original lifting hole to fail to meet the requirements. Through the design change, the tongue and groove concrete around the original lifting hole is chiseled out, the tongue and groove steel bars around the hole are cut off to expand the hole, and the concrete around the hole is repaired into a "mouth" shape; reinforcement is embedded on the roof panels around the lifting hole, and the embedded reinforcement steel bar 1 is L-shaped. The embedded reinforcement steel bar 1 extends into the closed structure and is connected with the main reinforcement 5; the closed structure and the surrounding roof panels form a "convex" shape, and a roof waterproof layer is laid on top. The building surface layer adds a reverse slope 22 on the water-facing side of the closed structure to ensure smooth drainage and prevent rainwater from gathering at the closed structure.

[0054] S2 Construction preparation: organize and deploy construction personnel, materials, and construction machinery and equipment according to the construction organization design, and make good preparations for the early construction.

[0055] S3 sets up protective scaffolding above the equipment, roughens the original lifting holes, cuts off the mechanical joints of the steel bars, and expands the holes.

[0056] S4 The first hanging formwork and the side formwork of the hanging hole are supported;

[0057] The upper system of the first hanging formwork consists of four pipe columns 15 and steel beams 16. A single steel beam is welded into a [] shape by two channel steels. A gap of at least 20 mm is left between the two channel steels to allow the high-strength tie rods 13 to pass through. The four pipe columns 15 are connected and reinforced with the cast roof panels by expansion bolts, and the four pipe columns 15 are connected into a whole by scaffolding steel pipes 21.

[0058] The first hanging form bottom system is composed of the first hanging form main keel 17, the first hanging form secondary keel 18, the first hanging form U-shaped buckle 19, and the first hanging form plywood 20. The first hanging form bottom system and the upper system are tied together by a high-strength tie rod 13 and fastened by the upper first set of three-claw nuts 12. The high-strength tie rod 13 is welded with a water stop ring 14 at the middle elevation of the closed structure.

[0059] The first hanging formwork support: first, four-tube columns 15 are set up on the roof panel, the bottom of the four-tube columns 15 are reinforced on the roof panel with expansion bolts, and the longitudinal and transverse scaffolding steel pipes 21 are used to connect and reinforce them into a whole, and the steel beam 16 is fixed to the top of the four-tube columns 15 with bolts; the high-strength tie rod 13 passes through the middle of the steel beam 15 and is fixed to the steel beam 15 with the first set of three-claw nuts 12; before installing the first hanging formwork bottom system, the second hanging formwork U-shaped buckle 25 and the second set of three-claw nuts 24 need to be screwed into the high-strength tie rod 13 in advance, and then the first hanging formwork U-shaped buckle 19 of the first hanging formwork bottom system and the third set of three-claw nuts 32 at the bottom are installed, and finally the first hanging formwork main keel 17, the first hanging formwork secondary keel 18, and the first hanging formwork plywood 20 are installed; after the first hanging formwork support is completed, the side formwork of the hoisting hole is supported.

[0060] S5 pours concrete on the four sides of the lifting hole;

[0061] In order to strengthen the overall bonding between new and old concrete, a layer of interface binder with high bonding performance is applied on the original concrete bonding surface before pouring the concrete.

[0062] The side formwork of S6 lifting hole is removed.

[0063] S7 second hanging formwork support;

[0064] When the second hanging formwork is supported, the first hanging formwork is not dismantled and is used as a supporting platform. The first hanging formwork and the second hanging formwork share a four-tube column 15 and a steel beam 16 system, wherein the second set of three-claw nuts 24 and U-shaped buckles used in the second hanging formwork need to be installed in place before the first hanging formwork is supported, specifically:

[0065] Adjust the elevation of the second hanging formwork U-shaped buckle 25 and the second set of three-claw nuts 24, and install the second hanging formwork main keel 26, the second hanging formwork conversion beam 27, the second hanging formwork secondary keel 28, and the second hanging formwork plywood 29; the second hanging formwork conversion beam is placed perpendicular to the direction of the stiffening rib to avoid the influence of the steel plate lifting ear; the second hanging formwork secondary keel is placed parallel to the direction of the stiffening rib and is disconnected at both sides of the steel plate lifting ear; grooves are cut on the second hanging formwork plywood according to the positions of the embedded steel plate lifting ears and stiffening ribs to facilitate the installation of the embedded parts.

[0066] S8 lifting embedded parts installation;

[0067] The steel bar anchor bar to be anchored into the roof panel is installed behind the steel plate of the hoisting embedded part 2, the steel plate lifting lug 3 is welded on the surface of the steel plate of the hoisting embedded part 2, and two stiffening ribs 4 are welded on both sides of the steel plate lifting lug, all of which are made of Q355B. After processing, the welds between the steel plate of the hoisting embedded part 2 and the steel plate lifting lug 3 / stiffening rib 4 are subjected to 100% VT: visual inspection + 100% PT: penetration non-destructive inspection + 100% UT: ultrasonic non-destructive inspection. The hoisting embedded part 2 is located at the bottom of the plate, and the elevation of the embedded steel plate surface is the elevation of the bottom of the plate. The steel plate lifting lug 3 and stiffening rib 4 of the hoisting embedded part 2 extend out from the bottom of the roof panel.

[0068] S9 rebar planting, steel bar tying, water stop strip installation, closed structure side formwork support;

[0069] Selection of embedded steel bars 1 The depth of the rebar shall be no less than 460mm, the distance between the rebar edge and the hole edge shall be 250mm, and the spacing shall be 470mm. The rebar glue shall be a special grade A glue for structural reinforcement. After the rebar is inserted, it shall not be disturbed again. The rebar binding can be carried out only after the curing period of the rebar glue is over. In principle, the original floor slab rebar shall not be cut off when the rebar is planted. When it collides with the main rebar 5, the spacing of the rebar can be adjusted appropriately. A water stop strip 23 is placed between the contact surface between the closed structure and the surrounding roof panels.

[0070] S10 closed structure concrete pouring;

[0071] S11 The first and second hanging molds are removed;

[0072] S12 waterproofing construction and reverse slope construction.

[0073] The closed structure waterproofing is composed of a slope layer 6, a leveling layer 7, a waterproof membrane 8, an isolation layer 9, a bonding layer 10, and a protective layer 11. The building surface layer is constructed with a reverse slope 22 on the water-facing side of the closed structure.

[0074] Among them, the second group of three-claw nuts 24 are used in conjunction with the second hanging mold U-shaped buckle 25, and the third group of three-claw nuts 32 are used in conjunction with the first hanging mold U-shaped buckle 19: a through hole is provided in the center of the U-shaped buckle, and the high-strength pull rod passes through the through hole of the U-shaped buckle, and the three-claw nut is screwed into the high-strength pull rod. The U-shaped buckle is seated on the three-claw nut, and the keel structure of the hanging mold is set up on the U-shaped buckle.

[0075] The first keel structure includes, from bottom to top, a first hanging mold main keel 17, a first hanging mold secondary keel 18 and a first hanging mold plywood 20; the second keel structure includes, from bottom to top, a second hanging mold main keel 26, a second hanging mold conversion beam 27, a second hanging mold secondary keel 28 and a second hanging mold plywood 29, and the second hanging mold conversion beam 27 is directly laid on the second hanging mold main keel 26 and is perpendicular to the direction of the second hanging mold main keel 26; the first hanging mold secondary keel 18 and the second hanging mold conversion beam 27 are both made of engineered wood or wooden squares.

[0076] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Any technician familiar with the profession, without departing from the scope of the technical solution of the present invention, according to the technical essence of the present invention, any simple modification, equivalent replacement and improvement made to the above embodiment still falls within the protection scope of the technical solution of the present invention.

Claims

1. A roof panel hole enlargement and hoisting construction method, characterized in that: The following steps are involved: The hoisting hole is enlarged, and a first hanging mold is supported on the hoisting hole. The first hanging mold includes a supporting structure, a first keel structure and a plurality of high-strength tie rods. The supporting structure is erected around the hoisting hole and connected to pass above the hoisting hole. The plurality of high-strength tie rods are longitudinally passed through the hoisting hole through the supporting structure; the first keel structure is installed at the bottom of the high-strength tie rod; Set up the side formwork of the lifting hole and pour concrete around the lifting hole; The side formwork of the hanging hole is removed, and a second hanging formwork is supported inside the first hanging formwork; the second hanging formwork is a second keel structure erected on the first hanging formwork in the hanging hole; Install the lifting embedded parts in the lifting holes; A closed structure side form is set up around the second hanging formwork, and concrete is poured above the hanging hole to form a closed structure; Dismantle the first hanging formwork and the second hanging formwork; Construction of waterproof structure.

2. The roof panel hole enlargement and hoisting construction method according to claim 1 is characterized in that: The supporting structure includes four pipe columns erected on the upper parts of both sides of the lifting hole and steel beams connecting the four pipe columns on both sides. The single steel beam is welded into a shape by two channel steels. The upper part of the high-strength tie rod passes through the gap between the two channel steels and is fixed on the channel steel by a first set of three-claw nuts.

3. The roof panel hole enlargement and hoisting construction method according to claim 2 is characterized in that: The first keel structure and the second keel structure are respectively fixed on the high-strength tie rod through three-claw nuts. First, the second group of three-claw nuts used to fix the second keel structure are passed through the high-strength tie rod from the bottom end of the high-strength tie rod, and then the first keel structure is installed and fixed under the lifting hole through the third group of three-claw nuts. Finally, the second keel structure is placed on the second group of three-claw nuts and fixed. The second group of three-claw nuts and the third group of three-claw nuts are both used in conjunction with U-shaped buckles.

4. The roof panel hole enlargement and hoisting construction method according to claim 1 is characterized in that: The first keel structure includes a first hanging mold main keel, a first hanging mold secondary keel and a first hanging mold plywood; the second keel structure includes a second hanging mold main keel, a second hanging mold secondary keel, a second hanging mold conversion beam and a second hanging mold plywood.

5. The roof panel hole enlargement and hoisting construction method according to claim 1 is characterized in that: Before pouring concrete around the lifting holes, apply a layer of interface bonding agent on the original concrete bonding surface.

6. The roof panel hole enlargement and hoisting construction method according to claim 1 is characterized in that: The portion of the high-strength tie rod located within the closed structure to be cast is provided with a water stop ring.

7. The roof panel hole enlargement and hoisting construction method according to claim 1 is characterized in that: Before pouring concrete above the lifting hole to form a closed structure, rebar is planted on the roof panel around the lifting hole, and main steel bars are tied in the area where the closed structure is to be poured, so that the planted rebars extend into the closed structure to be poured and are connected to the main steel bars as a whole.

8. The roof panel hole enlargement and hoisting construction method according to claim 1 is characterized in that: The top surface of the second keel structure is at the same elevation as the roof panels around the lifting holes, and the closed structure forms a roof panel area that is integrated with the surrounding roof panels; the removal of the first hanging formwork and the second hanging formwork is to cut off the high-strength tie rods outside the top and bottom surfaces of the closed structure, and remove the remaining structure except the part of the high-strength tie rods left in the closed structure.

9. The roof panel hole enlargement and hoisting construction method according to claim 8, characterized in that: The hoisting embedded parts include embedded steel plates, steel plate lifting ears and steel anchor bars installed on the embedded steel plates. The steel plate lifting ears are welded on the surface of the embedded steel plates, and two stiffening ribs are welded on both sides of the steel plate lifting ears. The elevation of the embedded steel plate surface is the same as the elevation of the bottom of the roof panel. The steel anchor bars are anchored in the roof panel area formed by the closed structure, and the steel plate lifting ears extend out of the bottom of the roof panel area.

10. The roof panel hole enlargement and hoisting construction method according to claim 1, characterized in that: After removing the first hanging formwork and the second hanging formwork, a roof waterproofing layer is laid on the closed structure, and a reverse slope is added on the water-facing surface of the closed structure; the roof waterproofing layer includes a slope layer, a leveling layer, a waterproof membrane, an isolation layer, a bonding layer and a protective layer from bottom to top.

Citation Information

Patent Citations

  • Formwork hoisting device and filling construction method for hoisting hole

    CN110486042A

  • Template lifting tool used for assembly type prefabricated composite floor slab cast-in-place slab strip template

    CN111706072A

  • Formwork hanging structure system for nuclear power reactor cabin top plate and construction method of formwork hanging structure system

    CN115419256A

  • Formwork lifting device for lifting hole

    CN210738580U

  • Structure post-pouring hole-sealing suspended formwork construction structure

    CN216476350U