Deepwater abrupt slope bare rock bored pile construction device and method
The continuous detection of the diameter of the drilling pile holes and automatic sludge removal are achieved through the combination device of the cylinder and rotary rod, which solves the problems of low detection efficiency and inconvenient sludge treatment in the prior art, and improves construction efficiency.
Patent Information
- Application Number
- CN202411196141.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-29
- Publication Date
- 2024-11-12
AI Technical Summary
During the movement of the existing drilling pile hole diameter detection device, due to the collision between the telescopic member and the hole wall, the rise speed is slow, the working efficiency is reduced, and multiple adjustments are required to accurately detect the hole diameter.
The cylinder and rotary rod combination device are used to detect the hole diameter through the transmission assembly and angle sensor. The rotary rod and roller are automatically adjusted under the push of the inner wall to achieve continuous detection, combining the pressure sensor and the sewage extraction system to detect the sludge and quickly extract it.
The efficiency of drilling pile hole diameter detection is improved, the number of multiple adjustments is reduced, the working efficiency is enhanced, and the sludge treatment process is simplified through the automatic sewage extraction system.
Smart Images

Figure CN118933562A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of construction engineering, and relates to a deep-water steep slope bare rock bored pile construction device and method. Background Art
[0002] In the field of construction engineering, bored pile foundation is increasingly used. Bored pile foundation is a safe, reliable and stable foundation. In the drilling stage, in order to ensure the quality of bored pile foundation holes, especially bored piles with steel cages have more stringent hole diameter requirements for bored pile final holes. Therefore, after the construction of the bored pile final hole and before the steel cage is placed, the diameter of the bored pile final hole needs to be detected to check whether the bored pile hole meets the requirements of the next process.
[0003] A bored pile hole diameter detection device and a method of use disclosed in Chinese patent CN117308853A comprises a support member and at least one telescopic member group, wherein the telescopic member group comprises a plurality of telescopic members, the support member comprises six vertical poles and two circular members, the two circular members are arranged vertically opposite to each other, the vertical pole is vertically connected between the two circular members, and the six telescopic members are arranged radially in the transverse direction. The telescopic members connected to the two circular members are arranged correspondingly.
[0004] When the bored pile hole diameter detection device is in use, the elongation of the telescopic member is adjusted according to the hole diameter design value of the bored pile, so that the end of the telescopic member can fit the hole wall of the bored pile. The support member and the telescopic member are probed downwards using a lifting device until the support member and the telescopic member can no longer move downwards. The length of the telescopic member after adjustment is fixed, so that the diameter of the hole to be probed downwards is fixed. If the diameter of the hole changes during the movement, the entire device needs to be lifted upwards and readjusted before it can be probed downwards again. Moreover, in the process of lifting the device upwards, since the end of the telescopic member fits the hole wall, the end of the telescopic assembly is prone to collide with the hole wall and shake, which slows down the rising speed of the device and reduces work efficiency.
[0005] In order to solve the above problems, the present invention proposes a deep-water steep slope bare rock bored pile construction device and method. Summary of the invention
[0006] In order to solve the problems existing in the background technology, the present invention proposes a deep-water steep slope bare rock bored pile construction device and method.
[0007] In order to achieve the above-mentioned object, the technical solution adopted by the present invention is as follows: comprising a cylinder, a plurality of groups of mounting parts are fixedly connected to the outer surface of the cylinder, the plurality of groups of mounting parts are distributed in a circular array about the cylinder, a rotating rod is rotatably arranged on each group of mounting parts, and a roller is rotatably connected to one end of the rotating rod away from the cylinder;
[0008] A sliding rod is coaxially and vertically slidably arranged inside the cylinder, and a transmission assembly is arranged on the sliding rod. When the sliding rod moves up and down, the transmission assembly drives the rotating rod to rotate.
[0009] Furthermore, each group of mounting parts includes two mounting frames, and the two mounting frames of each group correspond vertically up and down, and each mounting frame is composed of two mounting plates, and the mounting plates are fixed through the side of the cylinder, and the first gear and the second gear are rotatably connected between the two corresponding mounting plates, and the first gear and the second gear are meshed;
[0010] The first gear is located at one end of the mounting plate extending into the inner cavity of the cylinder, and the second gear is located at one end of the mounting plate extending out of the cylinder;
[0011] One end of the rotating rod is fixedly connected to the outer surface of the second gear.
[0012] Furthermore, the second gear is rotatably connected to the corresponding two mounting plates via a rotating shaft, a torsion spring is sleeved on the rotating shaft, one end of the torsion spring is fixedly connected to the side surface of the second gear, and the other end of the torsion spring is fixedly connected to the side surface of the corresponding mounting plate, and an angle sensor is provided on the other side surface of the second gear away from the torsion spring.
[0013] Furthermore, a plurality of adapting holes are provided on the side surface of the cylinder, the number of the adapting holes is equal to the number of the rotating rods, the adapting holes correspond to the second gears one by one, and the adapting holes are located at the top of the corresponding second gears.
[0014] Furthermore, the transmission assembly includes a plurality of racks, the bottom ends of which are fixedly connected to the outer surface of the sliding rod, and each two racks form a group. The two racks in each group correspond vertically to each other, and the two racks in several groups are distributed in a circular array about the cylinder. The racks correspond to the first gears one by one, and the racks are meshed with the corresponding first gears.
[0015] Furthermore, a retaining ring is fixedly connected in the inner cavity of the cylinder, both ends of the retaining ring are fixedly connected to the inner wall of the cylinder, a through hole adapted to the slide rod is opened inside the retaining ring, and the slide rod is slidably arranged in the through hole;
[0016] Two symmetrical limiting protrusions are fixedly connected to the inner wall of the through hole, and two sliding grooves are arranged on the outer surface of the sliding rod. The sliding grooves are arranged vertically, and the limiting protrusions are slidably connected to the corresponding sliding grooves.
[0017] Furthermore, a stopper is fixedly connected to the outer surface of the slide rod, and the stopper is located above the stopper ring.
[0018] Furthermore, the bottom end of the inner cavity of the cylinder is fixedly connected to a bottom plate, the bottom of the slide rod slides through the bottom plate, the bottom end of the slide rod is fixedly connected to a base, and the bottom surface of the bottom plate is evenly fixedly connected to a plurality of magnets, which attract the base.
[0019] Furthermore, the base is in a cover shape, a plurality of drainage holes are evenly opened at the bottom of the side of the base, a drainage channel is opened on the bottom surface of the slide rod, and the bottom end of the drainage channel is connected to the inner cavity of the base;
[0020] A sewage pump is fixedly installed on the outer surface of the slide bar, an input end of the sewage pump is fixedly connected to a sewage hose, the other end of the sewage hose is fixed on the outer surface of the slide bar, and the other end of the sewage hose is connected to the sewage channel;
[0021] The bottom surface of the base is fixedly connected with a pressure sensor, and the cylinder is externally connected with a controller, which is connected with the pressure sensor and the sewage pump.
[0022] A deep-water steep slope bare rock bored pile construction method, using the deep-water steep slope bare rock bored pile construction device as described above, comprises the following steps:
[0023] S1. Diameter detection, i.e., detection of the diameter of the bored pile hole, specifically: the cylinder is moved into the hole, the inner wall of the hole will squeeze the rotating rod, so that the rotating rod and the corresponding second gear rotate, and the diameter of the hole can be detected according to the angle detected by the angle sensor on the second gear;
[0024] S2. Silt detection, that is, to detect whether there is silt accumulated at the bottom of the bored pile hole, specifically:
[0025] When the base moves toward the bottom of the hole, if there is silt at the bottom, the detection pressure of the pressure sensor will suddenly increase at the moment of contact with the silt, and then continue to change, and stop changing after a period of time;
[0026] If there is no silt at the bottom, the pressure sensor contacts the rock at the bottom of the hole and there is no change after the pressure suddenly increases.
[0027] S3. Pumping out the sludge at the bottom of the bored pile hole, specifically: start the sewage pump, so that the sludge passes through the sewage hole, the inner cavity of the base, and the sewage channel into the sewage hose, and finally is discharged into the cylinder by the sewage pump and falls on the top of the bottom plate;
[0028] S4. Drainage, that is, moving the cylinder out of the bored pile hole. Specifically, after the sludge is pumped out, the base is located on the bottom surface of the hole, and the cylinder continues to move downward, so that the magnet is attracted to the base, and the first gear moves downward at the same time. Under the action of the transmission assembly, the rotating rod is rotated to the corresponding adapter hole, so that the roller leaves the inner wall of the hole, and the cylinder can be directly moved upward out.
[0029] Compared with the prior art, the present invention has the following beneficial effects:
[0030] 1. The deep-water steep slope bare rock bored pile construction device is provided with a rotating rod, and the end of the rotating rod away from the cylinder is rotatably connected to a roller. When the cylinder is moved into the hole of the bored pile, the inner wall of the hole will push the rotating rod upward, causing the second gear to rotate, which will cause the torsion spring to twist. The torsion spring has an outward thrust on the rotating rod, causing the roller to abut against the inner wall of the hole. As a result, when the rotating rod moves with the cylinder, if the inner wall of the hole becomes uneven or the diameter changes, the rotating rod will rotate with the change, and the angle sensor will detect the rotation angle during rotation, so that the hole diameter can be detected all the time, and there is no need to move the cylinder upward multiple times, thereby improving work efficiency.
[0031] 2. The deep-water steep slope bare rock bored pile construction device is provided with a rack. After the rotating rod completes the detection of the hole diameter, the cylinder continues to move downward, and the rack drives the first gear to rotate, so that the second gear and the rotating rod rotate, and the rotating rod is rotated into the corresponding adapter hole, so that the diameter of the device is reduced, which is convenient for directly moving the cylinder upward. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] Figure 1 It is a three-dimensional structural schematic diagram of the present invention;
[0033] Figure 2 It is a schematic diagram of the structure inside the cylinder in the present invention;
[0034] Figure 3 The present invention Figure 2 The enlarged structural diagram of the middle B part;
[0035] Figure 4 It is a schematic diagram of the structure of the rotating rod in the present invention;
[0036] Figure 5 It is a structural schematic diagram of the retaining ring in the present invention;
[0037] Figure 6 It is a structural schematic diagram of the base in the present invention;
[0038] Figure 7 It is a schematic diagram of the structure of the magnet in the present invention;
[0039] Figure 8 The present invention Figure 1 Schematic diagram of the structure with the A part in the middle enlarged.
[0040] In the figure: 1. Cylinder; 2. Lifting ring; 3. Adapter hole; 4. Mounting plate; 5. First gear; 6. Second gear; 7. Rotating rod; 8. Roller; 9. Bottom plate; 10. Sliding rod; 11. Rack; 12. Retaining ring; 13. Limiting protrusion; 14. Slide groove; 15. Retaining block; 16. Base; 17. Sewage extraction hole; 18. Pressure sensor; 19. Sewage extraction channel; 20. Sewage extraction hose; 21. Sewage extraction pump; 22. Magnet. DETAILED DESCRIPTION
[0041] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0042] like Figure 1-Figure 8 As shown, the technical solution adopted by the present invention is as follows: a deep-water steep slope bare rock bored pile construction device comprises a cylinder 1, and a lifting ring 2 is fixedly connected to the top of the cylinder 1.
[0043] Several groups of mounting parts are fixedly connected to the outer surface of the cylinder 1, and the several groups of mounting parts are distributed in a circumferential array about the cylinder 1. A rotating rod 7 is rotatably arranged on each group of mounting parts, and a roller 8 is rotatably connected to the end of the rotating rod 7 away from the cylinder 1.
[0044] Each group of mounting parts includes two mounting frames, and the two mounting frames of each group correspond vertically up and down. Each mounting frame is composed of two mounting plates 4, and the mounting plates 4 are fixed through the side of the cylinder 1, and there is a gap between the two corresponding mounting plates 4. The first gear 5 and the second gear 6 are rotatably connected between the two corresponding mounting plates 4, and the first gear 5 and the second gear 6 are meshed.
[0045] The first gear 5 is located at one end of the mounting plate 4 extending into the inner cavity of the cylinder 1 , and the second gear 6 is located at one end of the mounting plate 4 extending out of the cylinder 1 .
[0046] One end of the rotating rod 7 is fixedly connected to the outer surface of the second gear 6, so that the rotating rod 7 can rotate outside the cylinder 1.
[0047] The second gear 6 is rotationally connected to the corresponding two mounting plates 4 via a rotating shaft, the rotating shaft is rotationally connected between the corresponding two mounting plates 4, and the second gear 6 is fixedly sleeved on the middle part of the rotating shaft.
[0048] A torsion spring is sleeved on the rotating shaft, one end of the torsion spring is fixedly connected to the side of the second gear 6, and the other end of the torsion spring is fixedly connected to the side of the corresponding mounting plate 4. An angle sensor is arranged on the other side of the second gear 6 away from the torsion spring.
[0049] A slide bar 10 is coaxially and vertically slidably arranged inside the cylinder 1. The cylinder 1 and the slide bar 10 are both arranged vertically.
[0050] A retaining ring 12 is fixedly connected in the inner cavity of the cylinder 1, and both ends of the retaining ring 12 are fixedly connected to the inner wall of the cylinder 1. A through hole matching the slide bar 10 is provided inside the retaining ring 12, and the slide bar 10 is slidably arranged in the through hole.
[0051] Two symmetrical limiting protrusions 13 are fixedly connected to the inner wall of the through hole, and two slide grooves 14 are provided on the outer surface of the slide bar 10. The slide grooves 14 are arranged vertically, and the limiting protrusions 13 are slidably connected in the corresponding slide grooves 14. The slide bar 10 is limited so that the slide bar 10 can only slide vertically up and down.
[0052] A stopper 15 is fixedly connected to the outer surface of the slide rod 10 , and the stopper 15 is located above the stop ring 12 .
[0053] The slide bar 10 is provided with a transmission assembly, and the slide bar 10 drives the rotating rod 7 to rotate through the transmission assembly when the slide bar 10 moves up and down.
[0054] The transmission assembly includes a plurality of racks 11, the bottom ends of which are fixedly connected to the outer surface of the slide bar 10. Every two racks 11 form a group, and the two racks 11 of each group correspond vertically up and down. The two racks 11 of the plurality of groups are distributed in a circular array about the cylinder 1, and the racks 11 correspond to the first gears 5 one by one, and the racks 11 mesh with the corresponding first gears 5. The racks 11 will move up and down with the slide bar 10, and will mesh with the first gears 5 when the racks 11 come into contact with them.
[0055] A plurality of adapting holes 3 are provided on the side of the cylinder 1, and the number of the adapting holes 3 is equal to the number of the rotating rods 7. The adapting holes 3 correspond to the second gears 6 one by one, and the adapting holes 3 are located at the top of the corresponding second gears 6. The space at the second gear 6 is connected to the corresponding adapting hole 3, so that the rotating rod 7 can rotate into the corresponding adapting hole 3.
[0056] The bottom end of the inner cavity of the cylinder 1 is fixedly connected with a bottom plate 9, the bottom of the slide rod 10 slides through the bottom plate 9, and the bottom end of the slide rod 10 is fixedly connected with a base 16. The bottom surface of the bottom plate 9 is evenly fixedly connected with a plurality of magnets 22, and the magnets 22 attract the base 16.
[0057] The base 16 is in a cover shape. A plurality of drainage holes 17 are evenly provided at the bottom of the side of the base 16 , and a drainage channel 19 is provided at the bottom surface of the slide bar 10 , and the bottom end of the drainage channel 19 is communicated with the inner cavity of the base 16 .
[0058] A sewage pump 21 is fixedly mounted on the outer surface of the slide bar 10, and a sewage hose 20 is fixedly connected to the input end of the sewage pump 21. The other end of the sewage hose 20 is fixed on the outer surface of the slide bar 10, and the other end of the sewage hose 20 is connected to the sewage channel 19.
[0059] The bottom surface of the base 16 is fixedly connected with a pressure sensor 18, and the cylinder 1 is externally connected with a controller, which is connected with the pressure sensor 18 and the sewage pump 21. The controller selects whether to start the sewage pump 21 according to the value change of the pressure sensor 18, and the controller is prior art.
[0060] A deep-water steep slope bare rock bored pile construction method, using the deep-water steep slope bare rock bored pile construction device as described above, comprises the following steps:
[0061] S1. Diameter detection, i.e., detecting the diameter of the bored pile hole, specifically: moving the cylinder 1 into the hole, the inner wall of the hole will squeeze the rotating rod 7, causing the rotating rod 7 and the corresponding second gear 6 to rotate, and the diameter of the hole can be detected according to the angle detected by the angle sensor on the second gear 6.
[0062] S2. Silt detection, that is, to detect whether there is silt accumulated at the bottom of the bored pile hole, specifically:
[0063] When the base 16 moves toward the bottom of the hole, if there is silt at the bottom, the detection pressure of the pressure sensor 18 will suddenly increase at the moment of contacting the silt, and then continue to change, and stop changing after a period of time.
[0064] If there is no silt at the bottom, the pressure sensor 18 contacts the rock at the bottom of the hole and the pressure does not change after the sudden increase.
[0065] S3. Sewage extraction, that is, extracting the sludge at the bottom of the bored pile hole, specifically: starting the sewage pump 21, so that the sludge passes through the sewage extraction hole 17, the inner cavity of the base 16, and the sewage extraction channel 19 into the sewage extraction hose 20, and is finally discharged into the cylinder 1 by the sewage pump 21 and falls on the top of the bottom plate 9.
[0066] S4. Drainage, i.e., moving the cylinder 1 out of the bored pile hole. Specifically, after the sludge is pumped out, the base 16 is located on the bottom surface of the hole, and the cylinder 1 continues to move downward, so that the magnet 22 is attracted to the base 16, and at the same time, the first gear 5 moves downward. Under the action of the transmission assembly, the rotating rod 7 is rotated to the corresponding adapter hole 3, so that the roller 8 leaves the inner wall of the hole, and the cylinder 1 can be directly moved upward out.
[0067] Working principle:
[0068] When in use, use a crane to fix one end of a suspension rope on the suspension ring 2. Operate the crane to make the suspension rope lift the cylinder 1, pull the base 16 downward, and make the base 16 leave the magnet 22.
[0069] At the same time, the slide bar 10 will also slide downward through the bottom plate 9, the top end of the slide bar 10 will slide in the retaining ring 12, and the limiting protrusions 13 will slide downward in the corresponding slide grooves 14, driving the stopper 15 to move downward until the stopper 15 is located at the top of the retaining ring 12. At this time, the distance between the base 16 and the magnet 22 increases, and the magnet 22 has no suction force on the base 16.
[0070] The slide bar 10 drives the rack 11 to move downward, so that the first gear 5 rotates, the second gear 6 rotates, and the rotating rod 7 rotates out of the adapting hole 3, until the racks 11 leave the corresponding first gears 5 respectively.
[0071] After the rack 11 leaves the corresponding first gear 5, the torsion spring gradually returns to a natural state and continues to drive the second gear 6 to rotate until the rotating rod 7 is perpendicular to the cylinder 1, that is, the rotating rod 7 is in a horizontal state.
[0072] The crane is operated to extend the lifting rope downwards, and the cylinder 1 moves downwards under the action of gravity. The cylinder 1 can be moved into the bored pile hole. The base 16 first moves downwards into the bored pile hole, and when the top of the bored pile hole contacts the rotating rod 7, the rotating rod 7 is pushed upwards, causing the rotating rod 7 to rotate upwards. Figure 3 As shown, the rotating rod 7 gradually approaches the corresponding adapting hole 3.
[0073] The rotating rod 7 rotates the second gear 6, which in turn rotates the first gear 5. The angle sensor measures the rotation angle of the second gear 6 until the roller 8 contacts the inner wall of the hole. The rotation of the second gear 6 causes the torsion spring to twist, and the torsion spring has a force to restore the original state, causing the roller 8 to contact the inner wall of the hole.
[0074] The cylinder 1 continues to move downward until all the rollers 8 are located on the inner wall of the hole. When the cylinder 1 moves downward, the rollers 8 rotate on the inner wall of the hole. If there is a protruding part on the inner wall of the hole, the rollers 8 will be pushed toward the side close to the slide bar 10, so that the rotating rod 7 continues to rotate toward the corresponding adapter hole 3. At this time, the torsion spring continues to twist.
[0075] If a concave portion appears on the inner wall of the hole, the torsion spring will push the second gear 6 to rotate the rotating rod 7 to the side away from the cylinder 1, so that the roller 8 continues to abut against the inner wall of the hole.
[0076] Then the rotating rod 7 is rotated along with the change, and the angle sensor detects the angle of rotation during the rotation, so that the hole diameter can be detected all the time.
[0077] The base 16 will move to the bottom of the hole, and if there is silt at the bottom of the hole, the detection pressure of the pressure sensor 18 will suddenly increase at the moment of contacting the silt, and then will change continuously, and stop changing after a period of time. At this time, the base 16 is located in the silt.
[0078] The controller starts the sewage pump 21 , so that the sludge enters the sewage hose 20 through the sewage hole 17 , the inner cavity of the base 16 , and the sewage channel 19 , and is finally discharged into the cylinder 1 by the sewage pump 21 and falls on the top of the bottom plate 9 .
[0079] After extraction, if the pressure sensor 18 contacts the rock at the bottom of the hole, the cylinder 1 continues to move downward, and the pressure will not change after the sudden increase.
[0080] At this time, the cylinder body 1 continues to move downward, the bottom plate 9 will slide downward on the slide rod 10 , the retaining ring 12 will slide downward on the slide rod 10 , and the retaining ring 12 will leave the stopper 15 .
[0081] The cylinder 1 drives the first gear 5 to move downward, and when the first gear 5 contacts the corresponding rack 11, the first gear 5 continues to move downward, and the rack 11 drives the first gear 5 to rotate, so that the second gear 6 rotates, and the rotating rod 7 rotates toward the corresponding adapter hole 3.
[0082] As the distance between the bottom plate 9 and the base 16 shortens, the magnet 22 attracts the base 16 and fixes the base 16 to the bottom of the bottom plate 9. At the same time, the rotating rod 7 also rotates into the corresponding adapter hole 3, so that the diameter of the device is reduced, which facilitates the direct lifting of the cylinder 1 upwards.
[0083] Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments, or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A deep-water steep slope bare rock bored pile construction device, characterized in that: It comprises a cylinder (1), wherein a plurality of groups of mounting parts are fixedly connected to the outer surface of the cylinder (1), the plurality of groups of mounting parts are distributed in a circular array about the cylinder (1), a rotating rod (7) is rotatably arranged on each group of mounting parts, and a roller (8) is rotatably connected to one end of the rotating rod (7) away from the cylinder (1); A sliding rod (10) is coaxially and vertically slidably arranged inside the cylinder (1), and a transmission assembly is arranged on the sliding rod (10). When the sliding rod (10) moves up and down, the transmission assembly drives the rotating rod (7) to rotate.
2. The deep-water steep slope bare rock bored pile construction device according to claim 1 is characterized by: Each group of mounting parts comprises two mounting frames, the two mounting frames of each group correspond vertically up and down, each mounting frame is composed of two mounting plates (4), the mounting plates (4) are fixed and penetrate the side of the cylinder (1), and a first gear (5) and a second gear (6) are rotatably connected between the two corresponding mounting plates (4), and the first gear (5) and the second gear (6) are meshed; The first gear (5) is located at one end of the mounting plate (4) extending into the inner cavity of the cylinder (1), and the second gear (6) is located at one end of the mounting plate (4) extending outside the cylinder (1); One end of the rotating rod (7) is fixedly connected to the outer surface of the second gear (6).
3. The deep-water steep slope bare rock bored pile construction device according to claim 2 is characterized by: The second gear (6) is rotatably connected to the two corresponding mounting plates (4) via a rotating shaft, a torsion spring is sleeved on the rotating shaft, one end of the torsion spring is fixedly connected to the side surface of the second gear (6), and the other end of the torsion spring is fixedly connected to the side surface of the corresponding mounting plate (4), and an angle sensor is arranged on the other side surface of the second gear (6) away from the torsion spring.
4. The deep-water steep slope bare rock bored pile construction device according to claim 2 is characterized by: A plurality of adapting holes (3) are provided on the side of the cylinder (1), the number of the adapting holes (3) being equal to the number of the rotating rods (7), the adapting holes (3) corresponding to the second gears (6) one by one, and the adapting holes (3) being located at the top of the corresponding second gears (6).
5. The deep-water steep slope bare rock bored pile construction device according to claim 2 is characterized by: The transmission assembly comprises a plurality of racks (11), the bottom ends of the racks (11) are fixedly connected to the outer surface of the slide rod (10), two racks (11) form a group, the two racks (11) in each group correspond vertically, and the two racks (11) in a plurality of groups are distributed in a circular array about the cylinder (1), the racks (11) correspond one by one to the first gears (5), and the racks (11) are meshed with the corresponding first gears (5).
6. The deep-water steep slope bare rock bored pile construction device according to claim 1 is characterized by: A retaining ring (12) is fixedly connected in the inner cavity of the cylinder (1), both ends of the retaining ring (12) are fixedly connected to the inner wall of the cylinder (1), a through hole matching the sliding rod (10) is opened inside the retaining ring (12), and the sliding rod (10) is slidably arranged in the through hole; Two symmetrical limiting protrusions (13) are fixedly connected to the inner wall of the through hole, and two sliding grooves (14) are provided on the outer surface of the sliding rod (10). The sliding grooves (14) are arranged vertically, and the limiting protrusions (13) are slidably connected to the corresponding sliding grooves (14).
7. The deep-water steep slope bare rock bored pile construction device according to claim 6 is characterized by: A stopper (15) is fixedly connected to the outer surface of the slide bar (10), and the stopper (15) is located above the stopper ring (12).
8. The deep-water steep slope bare rock bored pile construction device according to claim 1 is characterized by: The bottom end of the inner cavity of the cylinder (1) is fixedly connected to a bottom plate (9), the bottom of the slide rod (10) slides through the bottom plate (9), the bottom end of the slide rod (10) is fixedly connected to a base (16), and the bottom surface of the bottom plate (9) is evenly fixedly connected to a plurality of magnets (22), and the magnets (22) attract the base (16).
9. The deep-water steep slope bare rock bored pile construction device according to claim 8, characterized in that: The base (16) is in the shape of a cover, a plurality of sewage extraction holes (17) are evenly arranged at the bottom of the side of the base (16), a sewage extraction channel (19) is arranged on the bottom surface of the slide rod (10), and the bottom end of the sewage extraction channel (19) is connected to the inner cavity of the base (16); A sewage pump (21) is fixedly mounted on the outer surface of the slide bar (10); an input end of the sewage pump (21) is fixedly connected to a sewage hose (20); the other end of the sewage hose (20) is fixed on the outer surface of the slide bar (10); and the other end of the sewage hose (20) is connected to the sewage channel (19); A pressure sensor (18) is fixedly connected to the bottom surface of the base (16), and a controller is externally connected to the cylinder (1), and the controller is connected to the pressure sensor (18) and the sewage pump (21).
10. A method for constructing deep-water steep slope bare rock bored piles, characterized in that: Using the deep-water steep slope bare rock bored pile construction device as described in any one of claims 1 to 9, The following steps are involved: S1. Diameter detection, i.e., detection of the diameter of the bored pile hole, specifically: the cylinder (1) is moved into the hole, the inner wall of the hole squeezes the rotating rod (7), so that the rotating rod (7) and the corresponding second gear (6) rotate, and the diameter of the hole can be detected according to the angle detected by the angle sensor on the second gear (6); S2. Silt detection, that is, to detect whether there is silt accumulated at the bottom of the bored pile hole, specifically: When the base (16) moves toward the bottom of the hole, if there is silt at the bottom, the detection pressure of the pressure sensor (18) will suddenly increase at the moment of contact with the silt, and then continue to change, and stop changing after a period of time; If there is no silt at the bottom, the pressure sensor (18) contacts the rock at the bottom of the hole, and the pressure does not change after a sudden increase; S3. Pumping out the sewage, that is, pumping out the sludge at the bottom of the bored pile hole, specifically: starting the sewage pump (21), so that the sludge passes through the sewage pumping hole (17), the inner cavity of the base (16), and the sewage pumping channel (19) into the sewage pumping hose (20), and finally is discharged into the cylinder (1) by the sewage pump (21), and falls to the top of the bottom plate (9); S4. Drainage, i.e., moving the cylinder (1) out of the bored pile hole. Specifically, after the sludge is pumped out, the base (16) is located on the bottom surface of the hole, and the cylinder (1) continues to move downward, so that the magnet (22) is attracted to the base (16), and at the same time, the first gear (5) moves downward. Under the action of the transmission assembly, the rotating rod (7) is rotated into the corresponding adapter hole (3), so that the roller (8) leaves the inner wall of the hole, and the cylinder (1) can be directly moved upward out.
Citation Information
Cited By
Drilling device for pile foundation construction and construction method thereof
CN120925786A
A pile foundation construction drilling device and a construction method thereof
CN120925786B