Method for mining inclined medium-thickness ore body with hanging wall broken

By arranging an approximate diamond mine house on the upper plate and setting up spray anchor net support, combined with shock absorber holes and trackless shoveling machines, the problem of difficulty in taking into account the stability and efficiency of the middle and upper plate surrounding rocks in traditional inclined medium-thick ore body mining is solved. , achieving efficient and safe mining.

CN118933759AActive Publication Date: 2024-11-12NORTHEASTERN UNIV CHINA

Patent Information

Application Number
CN202411203619.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-30
Publication Date
2024-11-12
Estimated Expiration
2044-08-30

AI Technical Summary

Technical Problem

During the mining of traditional inclined medium-thick ore bodies, it is difficult to take into account the stability and mining efficiency of the upper plate rock, and the mining cost is high, resulting in low efficiency, reduced safety, and large engineering volume.

Method used

A rhombus mining room is arranged on the upper plate of the ore body, and one-step mining room and two-step mining room are set up along the ore body direction. The anchor net support and shock-absorbing holes are used to maintain the stability of the surrounding rock, and the sectional transportation tunnels and exits are carried out. The mine-pass tunnel achieves continuous mining, and combines a trackless shovel to improve mining efficiency.

Benefits of technology

Effectively maintain the stability of upper plate surrounding rocks, improve mining efficiency, reduce mining costs, and ensure the economy and safety of the mine.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933759A_ABST
    Figure CN118933759A_ABST
Patent Text Reader

Abstract

The invention relates to a mining method for an inclined medium-thickness ore body with a broken hanging wall. The method comprises the steps that S1, a stope is arranged; s2, a segmented slope ramp is excavated upwards from the preset horizontal position of the haulage roadway in the current stage to reach all the segments, and the level of the haulage roadway in the upper stage is reached; segmental haulage roadways in the trend are tunneled on the haulage roadway level and each segmental level in the current stage, rock drilling roadways parallel to the segmental haulage roadways are tunneled at the positions close to the footwall boundary of the ore body, and ore removal roadways are tunneled from the segmental haulage roadways to the rock drilling roadways every preset distance; a contact transverse drift roadway is excavated from the segmented haulage roadway corresponding to the center line position of each panel pillar to the hanging wall of the ore body to the boundary of the hanging wall, and a filling top protection roadway in the trend is excavated along the boundary of the hanging wall of the ore body; an inclined stage haulage roadway draw shaft is dug at the position away from the footwall boundary, and all the sections are communicated; s3, top protection; s4, cutting is conducted; s5, stoping is carried out; and S6, filling. The method has the beneficial effects that the mining efficiency is effectively improved and the mining cost is reduced while the safety is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of mining, in particular to a mining method for an inclined medium-thick ore body with a broken upper wall. Background Art

[0002] With the development of social economy, the intensity of mineral resource development continues to increase. Some high-grade, easy-to-mine thick ore bodies are consumed in large quantities, and the proportion of ore deposits with relatively poor mining conditions is gradually increasing. For example, inclined medium-thick ore bodies are recognized as difficult-to-mine ore bodies both at home and abroad. Such ore deposits are usually mined using methods such as upward horizontal layered filling, upward approach filling, and segmented mine chamber methods. These methods generally have problems such as low efficiency or large mining and cutting workload, and large pillar losses. Especially under the condition of upper wall crushing, the exposed area of ​​the mine chamber upper wall is further limited, mining efficiency and safety are reduced, and mining costs are increased. In the context of the promotion and popularization of green mining concepts and environmental protection policies, it is necessary to develop new mining plans and mining engineering layout forms to take into account the stability of the upper wall surrounding rock and mining efficiency as much as possible in order to meet the mining economy and safety of such ore deposits. Summary of the Invention

[0003] Technical problems to be solved

[0004] In view of the above-mentioned shortcomings and deficiencies of the prior art, the present invention provides a mining method for inclined medium-thick ore bodies with broken upper plates, which solves the technical problems that it is difficult to balance the stability of the upper plate surrounding rock and the mining efficiency in the traditional mining process of inclined medium-thick ore bodies, and the mining cost is high.

[0005] Technical Solution

[0006] In order to achieve the above objectives, the main technical solutions adopted by the present invention include:

[0007] The present invention provides a mining method for an inclined medium-thick ore body with a broken hanging wall, comprising:

[0008] S1. Stope layout: The ore body is divided into stage transport lanes at predetermined intervals in the vertical direction. The stage transport lanes are divided into sections at predetermined intervals. Diamond-shaped mine rooms are arranged on each section along the inclined direction of the stage transport lanes. Each mine room is mined and backfilled from bottom to top. The mine rooms in the same section are divided into first-step and second-step mining rooms along the strike of the ore body. The first-step and second-step mining rooms are arranged at intervals. Triangular bottom pillars are left between the stage transport lanes, but no top pillars are set between the stage transport lanes. Every predetermined interval along the strike of the ore body is a panel, and panel pillars are left between the panels.

[0009] S2. Mining: From the predetermined position of the current stage haulage roadway level, a segmented ramp is excavated upward to reach each segment and the upper stage haulage roadway level; at the current stage haulage roadway level and each segment level, a segmented haulage roadway is excavated along the strike direction away from the predetermined position of the footwall, a rock drilling roadway is excavated close to the footwall boundary of the ore body parallel to the segmented haulage roadway, and an exit roadway is excavated from the segmented haulage roadway to the rock drilling roadway at predetermined intervals; from the segmented haulage roadway corresponding to the centerline of the ore pillar in each panel area, a connecting vein roadway is excavated to the boundary of the hanging wall, and a filling and roof protection roadway is excavated along the strike direction along the boundary of the ore body hanging wall; an inclined stage haulage roadway chute is excavated away from the footwall boundary to connect each segment, and two chutes are arranged in each panel area along the strike direction of the ore body;

[0010] S3. Roof protection: Use shotcrete mesh to support the stage transport tunnel and the hanging wall filling roof protection tunnel at each segment level to maintain the stability of the hanging wall surrounding rock;

[0011] S4. Cutting: After the mining and backfilling of the corresponding chambers in the lower sections are completed, a cutting shaft is first excavated upwards at the intersection of each chamber, the vein-crossing connecting roadway and the rock drilling roadway. Then, using the cutting shaft as the free surface, upward blastholes are drilled in the mine exit roadway and the vein-crossing connecting roadway located on the center line, and the cutting grooves are formed by simultaneous staged blasting.

[0012] S5. Mining: Drill upward fan-shaped blastholes in the rock drilling tunnel, and blast the ore in batches using the cutting groove as the blasting free surface. First, use an electric scraper from the segmented transport tunnel to enter each mining tunnel to shovel the ore, pour it into the nearest chute, and recover the ore in the mining room. In the later stage of mining, use a remote-controlled scraper from the mining tunnel to enter the rock drilling tunnel to shovel the ore; along the direction of the ore body, first mine the first mining room, carry out backfilling and maintenance, and then mine the adjacent second mining room;

[0013] S6. Filling: Filling is carried out after each stope is mined.

[0014] Preferably, in S1, the stage transport tunnel height is 40m-60m, the segment height is 10m-15m, and along the ore body strike, the width of the first-step mining room is controlled at 15m-20m, and the second-step mining room is controlled at 20m-30m; 3-4 first-step mining rooms and 4-5 second-step mining rooms are used as a panel, the panel length is 100m-120m, and the panel pillar width is 10m-15m.

[0015] Preferably, in S2, the segmented transport tunnel is arranged at a distance of 10m-15m from the bottom wall boundary, and the distance between the mining tunnels is 8m-10m.

[0016] Preferably, in S3, the cross-section of the filling and roof protection tunnel at the upper wall boundary is 2.5m×25m, smooth blasting is used during excavation, and the advance is controlled at 1.5m each time. After the surrounding rock is exposed, the first grouting is carried out with a grouting thickness of 30mm-50mm, and then the shotcrete anchor mesh support is carried out, and the secondary grouting thickness is 50mm-100mm. The anchor rods are resin anchor rods with a length of 2m and a support row spacing of 1.5m; shock-absorbing blastholes are drilled upward on the side of the ore body in the filling and roof protection tunnel at the upper wall boundary, with a blasthole spacing of 2m.

[0017] Preferably, in S4, the cutting shaft is connected from the rock drilling tunnel upward to the upper wall roof protection and filling tunnel, the cross-sectional size is 2.5m in length along the strike direction of the ore body, and 2m in length in the dip direction, the cutting blasthole is an inclined blasthole, the hole bottom distance is controlled at 1.8m-2.0m, and there are two parallel blastholes in each row of cutting blastholes. The blasthole depth is determined according to the boundary of the mine room required to be blasted in the corresponding section, and the distance from the bottom of the blasthole on the upper wall to the ore rock boundary of the upper wall is controlled at 2m.

[0018] Preferably, in S5, the bottom distance of the fan-shaped blastholes is controlled at 2.2m-2.5m, the row spacing of the blastholes is 2m, which is consistent with the row spacing of the shock-absorbing blastholes in the upper plate protection and filling tunnels, the first-step mining room recovery blastholes are blasted once, and the second-step mining room recovery blastholes are blasted in batches. The first blasting is 3 rows of blastholes, and the number of blasting rows can be increased thereafter, and all blasting is completed in 3-4 times; the number of blasting rows of the shock-absorbing blastholes is consistent with the recovery blastholes, the amount of explosives in the shock-absorbing blastholes is less than that in the recovery blastholes, the shock-absorbing blastholes are blasted first, and the recovery blastholes are blasted later.

[0019] Preferably, in S5, the mining chambers in the panel area are mined in the order of the first-step mining chamber and the second-step mining chamber from both ends to the middle along the strike direction. The premise for the mining of the second-step mining chamber is that part of the mining chambers on both sides have been filled and reached the curing time.

[0020] Preferably, in S6, before filling, filling retaining walls need to be set at the exit positions of both ends of the corresponding mine exit tunnel and rock drilling tunnel; filling is carried out from the filling pipeline set up from the plate area pillar to the mine room, the ash-sand ratio of the first-step mining room is 1:4, and the ash-sand ratio of the second-step mining room is 1:12; the mine room is filled with filling pipelines arranged from the connecting tunnel of the center line of the adjacent mine room of the upper section of the mine room to be filled-the upper plate filling roof protection tunnel, and filling is carried out from both ends to the mine room.

[0021] Beneficial effects

[0022] The beneficial effects of the present invention are as follows: the mining method of an inclined medium-thick ore body with a broken upper plate of the present invention has a cross-sectional shape of a mine chamber that is approximately rhombus-shaped, which is conducive to bearing ground pressure and maintaining the stability of the upper plate, and by excavating and filling a roof protection tunnel at the boundary of each segmented upper plate, the upper plate surrounding rock is supported in advance in the tunnel, and at the same time, shock-absorbing blastholes approximately parallel to the boundary of the upper plate are drilled in the ore body close to the upper plate to reduce the crushing of the upper plate surrounding rock by the mine chamber blasting, thereby ensuring the stability of the upper plate surrounding rock during the mining process; in addition, the vertical fan-shaped medium-deep hole ore dropping and the lower plate ore-exiting through the vein tunnel recovery system are retained, and in conjunction with a trackless scraper, the mining efficiency of such ore bodies can be effectively improved. A mining arrangement without leaving any pillars and "mining one every other" is adopted along the direction of the ore body to form continuous mining of the ore body in the plate area, further improving the mining efficiency of such ore bodies. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 This is an operating principle diagram of a method for mining a medium-thick ore body with crushed upper wall provided by the present invention;

[0024] Figure 2 The present invention provides a method for mining a medium-thick ore body by crushing the upper plate Figure 1 Ⅱ-Ⅱ sectional view;

[0025] Figure 3 The present invention provides a method for mining a medium-thick ore body by crushing the upper plate Figure 1 Ⅲ-Ⅲ cross-sectional view;

[0026] Figure 4 The present invention provides a cutting method and a cutting blasthole for mining a medium-thick ore body with a broken upper plate.

[0027] Description of Reference Numerals

[0028] 1-stage transport tunnel; 2-segmented transport tunnel; 3-mine exit tunnel; 4-connecting vein tunnel; 5-upper plate filling and roof protection tunnel; 6-rock drilling tunnel; 7-ramp connecting tunnel; 8-segmented ramp; 9-chute; 10-triangular base pillar; 11-roof protection anchor rod; 12-shock-absorbing blasthole; 13-mining blasthole; 14-first-step mining room; 15-second-step mining room; 16-first-step mining filling body; 17-second-step mining filling body; 18-panel area pillar; 19-cutting shaft; 20-filling retaining wall; 21-filling pipeline; 22-cutting blasthole. DETAILED DESCRIPTION

[0029] In order to better explain the present invention and facilitate understanding, the present invention is described in detail below through specific implementation methods in conjunction with the accompanying drawings.

[0030] In the context of the popularization of green mining concepts and environmental protection policies, it is necessary to develop new mining plans and mining engineering layouts to take into account the stability of the upper wall rock and mining efficiency as much as possible to meet the mining economy and safety of such deposits.

[0031] Therefore, an embodiment of the present invention proposes a mining method for an inclined medium-thick ore body with a broken upper plate, in which multiple sections are arranged in the stage transportation tunnel, a rock drilling tunnel is arranged close to the lower plate position in each section, vertical fan-shaped blastholes are used for ore dropping, and segmented ore removal through veins and trackless scrapers are used for ore removal to ensure the mining efficiency; a mine room cross-section is formed, which is beneficial to the stability of the mine room, and in addition, the safety of mining is ensured by measures such as early support of the filling and roof protection tunnels on the top of each mine room and shock-absorbing blastholes; after the mining of each mine room is completed, filling is carried out from the upper plate filling and roof protection tunnels located at the top of both ends of the mine room; along the strike direction of the ore body, the first-step mining room and the second-step mining room are arranged at intervals, without leaving inter-mine room pillars, every 100-120m is used as a mining panel, and panel area pillars are left, the mine rooms in the panel area and the mine rooms between the panel areas can be mined at the same time, thereby improving the continuity of mining and further improving the mining efficiency.

[0032] To better understand the above technical solutions, exemplary embodiments of the present invention will be described in more detail below with reference to the accompanying drawings. Although exemplary embodiments of the present invention are shown in the accompanying drawings, it should be understood that the present invention can be implemented in various forms and should not be limited by the embodiments described herein. Instead, these embodiments are provided to enable a clearer and more thorough understanding of the present invention and to fully convey the scope of the present invention to those skilled in the art.

[0033] Reference Figure 1 、 Figure 2 、 Figure 3 、 Figure 4 Among them, direction a is the dip direction of the ore body, direction b is the strike direction, c represents the vertical direction, d represents the hanging wall direction of the ore body, and e represents the footwall direction of the ore body; the length of the mine room refers to the length along the strike direction, the width is the length in the inclination direction, and the height is the length in the vertical direction.

[0034] This embodiment provides a mining method for an inclined medium-thick ore body with a broken hanging wall, comprising:

[0035] S1. Stope Layout: The ore body is divided vertically into staged transport tunnels 1 at predetermined intervals. Each staged transport tunnel 1 is then divided into sections at predetermined intervals. Within each section of the staged transport tunnel 1, approximately diamond-shaped chambers are arranged along the incline. Each chamber performs mining and backfilling from bottom to top. Within each section, chambers are divided into first-stage and second-stage chambers 15 along the strike of the ore body. First-stage chambers 14 and second-stage chambers 15 are arranged at intervals. Triangular bottom pillars 10 are placed between staged transport tunnels 1. No top pillars are placed between staged transport tunnels 1. Predetermined intervals along the strike of the ore body form a panel, and panel pillars 18 are placed between the panels.

[0036] S2. Mining Approval: From the pre-determined position of the current stage haulage tunnel level, a segmented ramp 8 is excavated upward to reach each segment and the upper stage haulage tunnel level. At the current stage haulage tunnel level and each segment level, a segmented haulage tunnel 2 is excavated along the strike direction away from the pre-determined position of the footwall. A rock drilling tunnel 6 is excavated parallel to the segmented haulage tunnel 2, close to the orebody footwall boundary. Exit tunnels 3 are excavated from the segmented haulage tunnel 2 to the rock drilling tunnel 6 at pre-determined intervals. From the segmented haulage tunnel 2 corresponding to the centerline of each panel pillar 18, a connecting through-vein tunnel 4 is excavated toward the orebody hanging wall to the hanging wall boundary. A backfill and roof guard tunnel is excavated along the orebody hanging wall boundary. Inclined segmented haulage tunnel chutes 9 are excavated away from the footwall boundary, connecting each segment. Two chutes 9 are arranged for each panel along the orebody strike direction.

[0037] S3. Roof protection: Sprayed anchor nets are used for support in the stage transport tunnel and the upper wall filling and roof protection tunnel 5 at each segment level to maintain the stability of the upper wall surrounding rock.

[0038] S4. Cutting: After the mining and filling of the corresponding ore rooms in the lower sections are completed, first, a cutting shaft 19 is excavated upward at the intersection of each type of ore room, the vein-penetrating connecting roadway and the rock drilling roadway 6. Then, using the cutting shaft 19 as the free surface, upward blastholes are drilled in the mining roadway 3 and the vein-penetrating connecting roadway located on the center line, and the cutting grooves are formed by simultaneous segmented detonation.

[0039] S5. Mining: In the drilling tunnel 6, upward fan-shaped blastholes are drilled, and blasting is carried out in batches with the cutting groove as the free blasting surface. First, an electric scraper is used to enter each mining tunnel 3 from the segmented transportation tunnel 2 to shovel the ore, and pour it into the nearest chute 9. In the later stage of mining of the ore room, a remote-controlled scraper can be used to enter the drilling tunnel 6 from the mining tunnel 3 to shovel the ore; along the direction of the ore body, the first-step mining room 14 is mined first, and after filling and maintenance, the adjacent second-step mining room 15 is mined.

[0040] S6. Filling: After the mining is completed in each stope, filling is carried out.

[0041] This embodiment provides a mining method for inclined medium-thick ore bodies with broken upper walls. The cross-section of the mine room is approximately rhombus-shaped, which is conducive to bearing ground pressure and maintaining the stability of the upper wall. A roof protection tunnel is excavated and filled at the boundary of each segmented upper wall, and the upper wall surrounding rock is supported in advance in the tunnel. At the same time, shock-absorbing blastholes 12 approximately parallel to the boundary of the upper wall are drilled in the ore body near the upper wall to reduce the crushing of the upper wall surrounding rock by the mine room blasting, thereby ensuring the stability of the upper wall surrounding rock during the mining process. In addition, the mining system of vertical fan-shaped medium-deep holes and lower wall ore exit through vein tunnels is retained. In combination with trackless scrapers, the mining efficiency of such ore bodies can be effectively improved. A mining arrangement without pillars and "mining one every other" is adopted along the direction of the ore body to form continuous mining of the ore body within the disk area, further improving the mining efficiency of such ore bodies.

[0042] Preferably, in S1,

[0043] The height of the stage transportation tunnel is 40m-60m, and the segment height is 10m-15m. Along the direction of the ore body, the width of the first-step mining room 14 is controlled at 15m-20m, and the second-step mining room 15 is controlled at 20m-30m; 3-4 first-step mining rooms 14 and 4-5 second-step mining rooms 15 are used as a panel area, the length of the panel area is 100m-120m, and the width of the panel area pillar 18 is 10m-15m.

[0044] Reference Figure 2 and Figure 3 The first-step mining filling body 16 and the second-step mining filling body 17 are used to fill the mine room that has been mined. The main purpose is to support the upper plate ore body, maintain the stability of the mine structure, and prevent collapse or collapse.

[0045] Properly setting the height and width of each section can improve mining efficiency and ensure more orderly mining of the ore body. Appropriate section height and width can better control ore body fragmentation and reduce difficulties encountered during mining. Setting the height of the stage transport tunnel and the section height helps to better utilize ore resources and ensure comprehensive mining of the ore body. This setting can more effectively address ore body fragmentation and stability issues. Controlling the width of the first-stage mining chamber 14 and the second-stage mining chamber 15 helps maintain the stability of the ore body and prevent excessive fragmentation or collapse. Proper width control helps maintain the structural stability of the ore body during mining. Properly setting the width of the pillar helps maintain the stability of the support structure during mining. Pillars of appropriate width can effectively distribute the stress generated during mining and reduce the risk of deformation or collapse of the ore body. By controlling the width of the mining chamber and pillars, the risk of surface subsidence can be reduced. This is crucial for protecting surface structures and the environment. Proper mining chamber layout and pillar design can improve ore recovery and mining efficiency, thereby enhancing overall economic benefits.

[0046] Preferably, in S2,

[0047] The segmented transport tunnel 2 is arranged at a distance of 10m-15m from the bottom wall boundary to ensure that the scraper can fully accommodate the ore loading in the mining tunnel 3. The spacing between the mining tunnels 3 is 8m-10m.

[0048] Preferably, in S2,

[0049] Two chutes 9 are arranged in one panel area, and the ore volume on the left and right sides should be ensured to be basically the same.

[0050] Preferably, in S3,

[0051] The cross-section of the filling and roof protection tunnel at the upper wall boundary is 2.5m×25m. Smooth blasting is used during excavation, and the advance is controlled at 1.5m each time. The first grouting is carried out after the surrounding rock is exposed, with a grouting thickness of 30mm-50mm, and then the shotcrete anchor net support is carried out. The secondary grouting thickness is 50mm-100mm. The roof protection anchor rod 11 is a resin anchor rod with a length of 2m and a support row spacing of 1.5m. In the filling and roof protection tunnel at the upper wall boundary, shock-absorbing blast holes 12 are drilled upward on the side of the ore body, with a blast hole spacing of 2m.

[0052] Installing shock-absorbing blastholes 12 within the top-filled tunnel at the boundary of the hanging wall releases stress in the rock mass, reduces post-blast vibration, and reduces rock instability. This effectively minimizes potential rock fragmentation during tunneling, improving tunnel stability. It also helps control and mitigate sudden rock collapse caused by stress concentration, thereby improving tunneling safety. Optimizing surrounding rock conditions enhances the effectiveness of shotcreting and support, thereby increasing tunneling efficiency.

[0053] Preferably, in S4,

[0054] The cutting shaft 19 is connected to the upper wall roof protection and filling tunnel from the rock drilling tunnel 6. The cross-sectional size is 2.5m in length along the strike direction of the ore body and 2m in length in the dip direction. The cutting blasthole 22 is an inclined blasthole with a bottom distance controlled at 1.8m-2.0m. There are two parallel blastholes in each row of the cutting blasthole 22. The depth of the blasthole is determined according to the boundary of the mine room required to be blasted in the corresponding section. The bottom of the blasthole on the upper wall to the ore rock boundary of the upper wall is controlled at 2m.

[0055] The inclined blastholes in cutter shaft 19 more effectively fragment the ore body, making it easier to mine and transport. Controlling the hole bottom distance between 1.8m and 2.0m ensures the optimal release of blasting energy, helps precisely cut the ore body boundary, and reduces the impact of excessive blasting on the ore body and surrounding rock. Controlling the blasthole depth and the distance from the hole bottom to the hanging wall ore-rock boundary helps ensure the integrity of the ore body, improve ore recovery and economic value. Properly designed blastholes can reduce the risk of collapse in unstable rock masses and improve mining safety.

[0056] Preferably, in S5,

[0057] The bottom distance of the fan-shaped blast holes is controlled at 2.2m-2.5m, the row spacing of the blast holes is 2m, which is consistent with the row spacing of the shock-absorbing blast holes 12 of the upper plate protection and filling tunnels. The first-step mining room 14 and the mining blast holes 13 are blasted once, and the second-step mining room 15 and the mining blast holes 13 are blasted in batches. The first blasting is 3 rows of blast holes, and the number of blasting rows can be increased thereafter, and all blasting is completed in 3-4 times; the number of blasting rows of the shock-absorbing blast holes 12 is consistent with the mining blast holes 13, and the charge of the shock-absorbing blast holes 12 is less than that of the mining blast holes 13. The shock-absorbing blast holes 12 are blasted first, and the mining blast holes 13 are blasted later.

[0058] The charge of the shock-absorbing blasthole 12 is small, and it is blasted before the recovery blasthole 13, which can effectively reduce the impact of the vibration during the main blasting process on the ore body and surrounding rocks, thereby reducing the displacement and collapse risk of the ore body. By keeping the spacing of the shock-absorbing blasthole 12 and the recovery blasthole 13 consistent, it is possible to ensure that the energy distribution during the blasting process is uniform, avoiding the problem of excessive concentration or excessive dispersion of energy, thereby improving the crushing effect and recovery rate of the ore body. Blasting the recovery blasthole 13 in batches instead of all at once can better control the movement of the ore body during the blasting process, making the crushing of the ore body more uniform and reducing the need for secondary blasting. The first blasting of the shock-absorbing blasthole 12 helps to control and reduce the vibration intensity of the main blasting, thereby reducing the potential risks to the mine structure and mining personnel. By rationally allocating the number of blasting times and charge, the utilization efficiency of the ore body can be optimized, ore loss and unnecessary mining costs can be reduced, thereby improving the overall economic benefits.

[0059] Preferably, in S5,

[0060] The mining order of the first-step mining chamber 14 and the second-step mining chamber 15 in the panel area is from both ends to the middle along the strike direction. The premise for the mining of the second-step mining chamber 15 is that part of the mining chambers on both sides have been filled and reached the maintenance time.

[0061] By first mining the one-step mining chamber 14 at both ends and filling it, the ore body and the mine chamber structure can be stabilized, the impact of subsequent mining on the stability of the mine can be prevented, and the risk of collapse can be reduced. After the mining chambers on both sides are filled and reach the curing time, the two-step mining chamber 15 is mined to ensure that the filling material has solidified and provides good support, thereby avoiding the problem of incomplete filling or insufficient strength. Mining from both ends to the middle can avoid the difficulty of mining due to the inclination or uneven degree of crushing of the ore body, and ensure the uniformity of the mining process and the recovery rate of the ore. Mining in stages through the transport tunnel and ensuring that the curing of the filling material is completed can reduce the impact of ground pressure and vibration on the mine structure, thereby improving the overall safety of mining. Mining the middle part after completing the filling and curing on both sides can effectively reduce the later repair work and ore body loss caused by incomplete filling.

[0062] In S6,

[0063] Before filling, retaining walls 20 are installed at the exits of the corresponding chamber exit tunnels 3 and drilling tunnels 6. Filling is carried out from the chambers via filling pipes 21, which are installed from the panel pillars 18. The lime-sand ratio in the first-stage chamber 14 is 1:4, and in the second-stage chamber 15, it is 1:12. The chambers are filled from the top, i.e., from the connecting tunnel (the hanging wall filling roof tunnel 5) along the centerline of the adjacent chambers to be filled. Filling is carried out from both ends of the chambers.

[0064] Filling from the top can ensure that the filling material is evenly distributed from top to bottom, effectively filling every gap in the mine room and improving the filling quality. The filling pipeline 21 is arranged from the top and fills the mine room from both ends, which helps to establish a stable support on the top of the mine room and reduce the risk of ore body sinking or collapse. A higher ash-sand ratio (such as 1:12) can usually provide better fluidity and filling effect in the two-step mining chamber 15, reduce material waste and save costs. Filling from both ends to the middle can make the material fill the entire mine room more evenly, accelerate the filling process and improve work efficiency. The provision of a filling retaining wall 20 can effectively control the flow direction and speed of the filling material, prevent material leakage or overflow, and ensure the smooth progress of the filling work.

[0065] In the description of the present invention, each embodiment focuses on the differences from other embodiments, and reference can be made to the same or similar parts between the embodiments. For the devices disclosed in the embodiments, since they correspond to the methods disclosed in the embodiments, the description is relatively simple, and the relevant parts can be referred to the method description.

[0066] In the description of the present invention, relational terms such as first and second are merely used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply the existence of any such actual relationship or order between these entities or operations. In the description of the present invention, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined. Moreover, the term "comprises", "comprising" or any other variant thereof is intended to cover non-exclusive inclusion, so that the process, method, article or equipment comprising a series of elements includes not only those elements, but also includes other elements not clearly listed, or also includes elements inherent to such process, method, article or equipment. In the absence of further restrictions, the elements defined by the statement "comprising a ..." do not exclude the presence of other identical elements in the process, method, article or equipment comprising the elements.

[0067] In the present invention, unless otherwise expressly specified or limited, when a first feature is "above" or "below" a second feature, it may mean that the first and second features are in direct contact, or that the first and second features are in indirect contact through an intermediate medium. Furthermore, when a first feature is "above," "above," or "above" a second feature, it may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is at a higher level than the second feature. When a first feature is "below," "below," or "below" a second feature, it may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is at a lower level than the second feature.

[0068] In the description of this specification, the terms "one embodiment", "some embodiments", "embodiments", "examples", "specific examples" or "some examples" refer to the specific features, structures, materials or characteristics described in conjunction with the embodiment or example and included in at least one embodiment or example of the present invention. In this specification, the schematic expressions of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine different embodiments or examples described in this specification and features of different embodiments or examples, unless they are mutually inconsistent.

[0069] Although the embodiments of the present invention have been shown and described above, it will be understood that the above embodiments are illustrative and are not to be construed as limitations on the present invention. A person skilled in the art may alter, modify, replace and modify the above embodiments within the scope of the present invention.

Claims

1. A mining method for an inclined medium-thick ore body with a broken upper plate, characterized in that: include: S1. Layout of the mining area: The ore body is divided into a stage transportation tunnel at a predetermined distance in the vertical direction, and the stage transportation tunnel is divided into sections at a predetermined distance. In the stage transportation tunnel, a diamond-shaped mine room is arranged on each section along the inclined direction. Each mine room is mined and filled from bottom to top. The mine rooms in the same section are divided into one-step mining and two-step mining rooms along the ore body. The one-step mining room and the two-step mining room are arranged at intervals. A triangular bottom pillar is set between the stage transportation tunnels, and no top pillar is set between the stage transportation tunnels. Every predetermined distance along the ore body is a panel area, and panel area pillars are set between the panel areas. S2, Mining: From the predetermined position of the current stage transport tunnel level, dig a segmented ramp upward to reach each segment and the upper stage transport tunnel level; at the current stage transport tunnel level and each segment level, dig a segmented transport tunnel along the strike direction away from the predetermined position of the lower wall, dig a rock drilling tunnel parallel to the segmented transport tunnel at a position close to the lower wall boundary of the ore body, and dig an exit tunnel from the segmented transport tunnel to the rock drilling tunnel at predetermined intervals; dig a connecting vein tunnel to the upper wall boundary of the ore body from the segmented transport tunnel corresponding to the center line position of the ore pillar in each wall area, and dig a filling and top protection tunnel along the strike direction along the upper wall boundary of the ore body; Dig inclined stage transport tunnel chutes away from the footwall boundary and connect the various sections, arranging two chutes in each panel area along the ore body strike; S3, roof protection: sprayed anchor nets are used for support in the stage transport tunnel and the upper wall filling and roof protection tunnels at each segment level to maintain the stability of the upper wall surrounding rock; S4, cutting: After the mining and filling of the corresponding ore rooms in the lower sections are completed, firstly, a cutting shaft is excavated upwards at the intersection of each type of ore room, the vein-penetrating connecting tunnel and the rock drilling tunnel. Then, with the cutting shaft as the free surface, upward blastholes are drilled in the mine exit tunnel and the vein-penetrating connecting tunnel located on the center line, and the cutting grooves are formed by detonation in the same section. S5. Mining: In the rock drilling tunnel, upward fan-shaped blast holes are drilled, and the blasting is carried out in batches with the cutting groove as the blasting free surface. First, an electric scraper is used to enter each mining tunnel from the segmented transportation tunnel to shovel the ore, pour it into the nearest chute, and recover the ore room. In the later stage of mining, a remote-controlled scraper is used to enter the rock drilling tunnel from the mining tunnel to shovel the ore; along the direction of the ore body, the first step mining room is mined first, and after filling and maintenance, the adjacent second step mining room is mined; S6. Filling: Filling is carried out after the mining is completed in each mining area.

2. The mining method of a medium-thick ore body with a broken upper wall according to claim 1, characterized in that: In S1, the stage transport tunnel height is 40m-60m, the segment height is 10m-15m, and along the direction of the ore body, the width of the first-step mining room is controlled at 15m-20m, and the second-step mining room is controlled at 20m-30m; 3-4 first-step mining rooms and 4-5 second-step mining rooms are regarded as a panel area, the panel area length is 100m-120m, and the panel area pillar width is 10m-15m.

3. The mining method for inclined medium-thick ore bodies with broken upper walls according to claim 2 is characterized in that: In S2, the segmented transport tunnels are arranged at a distance of 10m-15m from the lower wall boundary, and the distance between the mine exit tunnels is 8m-10m.

4. The mining method for inclined medium-thick ore bodies with broken upper walls according to claim 3 is characterized in that: In S3, the cross-section of the filling and roof protection tunnel at the boundary of the upper plate is 2.5m×25m. Smooth blasting is used during excavation, and the advance is controlled at 1.5m each time. The first grouting is carried out after the surrounding rock is exposed, with a thickness of 30mm-50mm, and then sprayed anchor mesh support is carried out. The secondary grouting thickness is 50mm-100mm. Resin anchors are selected as anchors with a length of 2m and a support row spacing of 1.5m. In the filling and roof protection tunnel at the boundary of the upper plate, shock-absorbing blastholes are drilled upward on the side of the ore body, with a blasthole spacing of 2m.

5. The mining method for inclined medium-thick ore bodies with broken upper walls according to claim 4 is characterized in that: In S4, the cutting shaft is connected from the rock drilling tunnel to the upper wall roof protection and filling tunnel. The cross-sectional size is 2.5m in length along the strike direction of the ore body and 2m in length in the dip direction. The cutting blastholes are inclined blastholes with a bottom distance of 1.8m-2.0m. There are two parallel blastholes in each row of cutting blastholes. The depth of the blastholes is determined according to the boundary of the mine room to be blasted in the corresponding section. The distance from the bottom of the blasthole on the upper wall to the ore rock boundary on the upper wall is controlled at 2m.

6. The mining method for inclined medium-thick ore bodies with broken upper walls according to claim 5 is characterized in that: In S5, the hole bottom distance of the fan-shaped blastholes is controlled at 2.2m-2.5m, the row spacing of the blastholes is 2m, which is consistent with the row spacing of the shock-absorbing blastholes in the upper plate protection and filling tunnels. The first-step mining room recovery blastholes are blasted once, and the second-step mining room recovery blastholes are blasted in batches. The first blasting is 3 rows of blastholes, and the number of blasting rows can be increased thereafter, and all blasting is completed in 3-4 times; the number of blasting rows of the shock-absorbing blastholes is consistent with the recovery blastholes, the amount of explosives in the shock-absorbing blastholes is less than that in the recovery blastholes, the shock-absorbing blastholes are blasted first, and the recovery blastholes are blasted later.

7. The mining method for inclined medium-thick ore bodies with broken upper walls according to claim 6 is characterized in that: In S5, the mining chambers in the panel area are mined in the order of one-step mining chamber and two-step mining chamber from both ends to the middle along the strike direction. The premise for the mining of the two-step mining chamber is that one part of the mining chambers on both sides have been filled and reached the maintenance time.

8. The mining method for inclined medium-thick ore bodies with broken upper walls according to claim 7 is characterized in that: In S6, before filling, filling retaining walls are required to be set up at the exit positions of the corresponding mine exit tunnels and both ends of the rock drilling tunnels; filling is carried out from the filling pipelines set up by the plate area pillars to the mine room, the ash-sand ratio of the first-step mining room is 1:4, and the ash-sand ratio of the second-step mining room is 1:12; the mine room is filled with filling pipelines arranged from the connecting tunnel of the center line of the adjacent mine room of the upper section of the mine room to be filled-the upper plate filling roof protection tunnel, and filling is carried out from both ends to the mine room.

Citation Information

Patent Citations

  • Mining method for hanging wall surrounding rock broken inclined medium thick orebody

    CN108612530A

  • Gently inclined medium thick ore body safe and efficient mining method

    CN109083644A

  • Gently inclined medium-thick ore body pre-controlled roof efficiently mining method

    CN110259451A

  • Panel type sublevel rock drilling stage ore removal subsequent filling mining method

    CN115929309A

  • Mining method for steeply inclined medium-thickness ore body with broken footwall

    CN117927243A

Cited By

  • Mining method for gently inclined medium-thickness ore body with hanging wall surrounding rock and ore body broken

    CN119531877A

  • Mining method for gently inclined medium-thick-thick ore body with broken hanging wall surrounding rock

    CN119686732A

  • A mining method for gently inclined medium-thick to thick ore bodies with broken hanging wall surrounding rock

    CN119686732B