Stair flight propelling mining method for stoping top and bottom pillars of metal mine
Through shallow hole rock drilling blasting and multi-layer support technology, combined with brilliance and full tailings backfilling, the problems of support difficulties and high costs during the back mining of top and bottom columns of metal ore are solved, and a safer and more economical mining process is achieved.
Patent Information
- Application Number
- CN202410784471.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-18
- Publication Date
- 2024-11-12
AI Technical Summary
The existing metal ore top and bottom column mining methods have problems such as support operation difficulties, safety hazards and high costs, especially when the empty ceiling height is too high or the support space is insufficient.
The shallow hole rock drilling blasting method is used to carry out ladder section propulsion mining, including return to false bottom, propulsion cutting and mining, pipe joint type anchor support, double-layer round steel support and anchor bolt-plugging combined support, combined Backfilling of matte stone and full tailings sand gradually realizes the recovery of the top and bottom columns.
The support operation space and safety are improved, and the costs are reduced. Through large-area brute stone backfill and full-tailed sand filling, the improvement and filling costs are reduced, achieving a safer and more economical recovery process.
Smart Images

Figure CN118933774A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a mining method, in particular to a step-propelling mining method for top and bottom pillar recovery of metal mines. Background Art
[0002] In the process of metal mining, after mining the upper middle section of the ore body, when mining the next middle section of the ore body from bottom to top, there are often 5.0-5.5m high top and bottom pillars left in the mining area that need to be mined.
[0003] In the prior art, there are two options for mining the top and bottom columns. One option is to divide the top and bottom columns into two layers and mine from the bottom to the top. The bottom layer has a mining height of 3 meters. After mining, cement filling is required, and the filling cost is high. In addition, the top layer has a height of only 2-2.5 meters. During support operations, the working space is small, which affects the normal operation of the shovel equipment, making it difficult to carry out support operations and posing a safety hazard. The other option is to mine one layer with an empty top height of 5.0-5.5m. The empty top height is too high, which is not easy to support safely, posing a large safety hazard, and is not easy to carry out daily top and side maintenance.
[0004] In view of the above problems, there is an urgent need in the prior art for a mining method for recovering top and bottom pillars of metal mines that is easier to support and operate, has higher safety, and lower costs. Summary of the invention
[0005] The purpose of the present invention is to overcome the shortcomings of the prior art and provide a step-by-step mining method for top and bottom pillar recovery of metal mines which is easier to support and operate, has higher safety and lower cost.
[0006] The object of the present invention is achieved through the following technical solution: a step-by-step mining method for top and bottom pillar recovery of metal mines, comprising the following steps: Step 1: Enter the tunnel in an inclined manner upwards, use shallow hole rock drilling and blasting, and mine to the false bottom; Step 2: Use shallow hole drilling and blasting to mine the 3.5m thick ore body below the false bottom to expose the false bottom; Step 3: After mining to the ore body boundary, the remaining ore body at the bottom is mined by shallow hole drilling and blasting to carry out push-type bottom mining, from the bottom plate to the upper surface of the lower layered cement body; Step 4: After all the mining of the access road is completed, the mining area is backfilled with rough stones. After the backfilling is completed, a closed board wall is made on the side of the roadway, and the tailings are filled to the top of the empty area; Step 5: Use the above method to carry out mining from the upper plate to the lower plate in sequence.
[0007] In step two, pipe-seam type anchor support is used on both sides, and double-layer round steel support is used under the false bottom of the top plate. The left and right ends of the round steel of the double-layer round steel support extend into the side wall of the tunnel. A round log frame is used to connect the double-layer round steel support and the false bottom of the top plate. The left and right ends of the bottom of the double-layer round steel support are fixedly connected to the pipe-seam type anchor support.
[0008] The log frame is formed by connecting three layers of logs, each layer of logs is formed by a plurality of log segments arranged side by side, and the log segments of two adjacent layers are perpendicular to each other.
[0009] In step three, pipe-seam anchor support is carried out on both sides.
[0010] In step three, a combined support method of anchor rods and threaded belts is used at the locations where joints are developed on both sides.
[0011] The beneficial effects of the present invention are as follows: in the present invention, the support operation space is sufficient, the operation is convenient for personnel, and the safety is higher. Large-area rough stone backfilling is carried out to reduce the rough stone lifting cost. Full tailings filling is adopted to save the cementing filling cost and reduce the cost. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 It is a schematic diagram of the structure of the present invention; Figure 2 yes Figure 1 Schematic diagram of the cross-sectional structure along the AA direction Figure 1 ; Figure 3 yes Figure 1 Schematic diagram of the cross-sectional structure along the AA direction Figure 2 ; Figure 4 yes Figure 1 Schematic diagram of the cross-sectional structure along the BB direction.
[0013] In the figure; 1-connecting tunnel; 2-entry tunnel; 3-false bottom; 4-lower stratified cementation body; 5-upper ore body; 6-lower ore body; 7-double-layer round steel support; 8-tunnel side wall; 9-log frame; 10-blasting hole; 11-horizontal round steel; 12-vertical round steel. DETAILED DESCRIPTION
[0014] The present invention is described in detail below with reference to the accompanying drawings.
[0015] like Figure 1-4 As shown, a step-by-step mining method for top and bottom pillar recovery of a metal mine comprises the following steps: Step 1: The entry tunnel 2 beside the joint tunnel 1 is inclined upward, and shallow hole rock drilling and blasting are used to recover to the false bottom 3, see Figure 2 ; Step 2: Use shallow hole drilling and blasting (see blasting hole 10) to mine the 3.5m thick ore body below the false bottom 3 (i.e., the upper ore body 5) to expose the false bottom 3 (see Figure 2 ), the two sides are supported by pipe-seam anchor rods, and the double-layer round steel support 7 is adopted under the false bottom 3 of the roof. The left and right ends of the round steel of the double-layer round steel support 7 extend into the side wall 8 of the tunnel. The double-layer round steel support 7 and the false bottom 3 of the roof are connected by a log frame 9. The left and right ends of the lower side of the double-layer round steel support 7 are fixedly connected with the pipe-seam anchor rod support. The support combination set on the roof not only serves the current construction, but also serves as a permanent support when the remaining ore body at the bottom is mined in step three to maintain the roof; Step 3: After mining to the ore body boundary, the remaining ore body at the bottom (i.e., the lower ore body 6) is mined by shallow hole drilling and blasting (see blasting hole 10) to carry out push-type bottom mining, from the bottom plate to the upper surface of the lower layer cementation body 4 (see Figure 3 ), pipe-seam anchor support is carried out on both sides, and the combined support method of anchor and belt is adopted at the joints of both sides; Step 4: After all the mining of the access road is completed, the mined-out area is backfilled with rough stones to reduce the underground rough stone storage and rough stone lifting volume. After the backfilling is completed, a closed board wall is made on the side of the tunnel, and the tailings are filled to the top of the empty area to reduce the cement filling input and save the filling cost; Step 5: Use the above method to carry out mining from the upper plate to the lower plate in sequence.
[0016] like Figure 2-4 As shown, the log frame 9 is formed by connecting at least two layers of logs, each layer of logs is formed by a plurality of log segments arranged side by side, and the log segments of the two adjacent layers are perpendicular to each other.
[0017] The double-layer round steel support 7 is composed of two layers of transverse round steels 11 arranged side by side, and a vertical round steel 12 is fixedly connected between the upper transverse round steel 11 and the lower transverse round steel 11 .
[0018] Finally, it should be noted that the above content is only used to illustrate the technical solution of the present invention, rather than to limit the scope of protection of the present invention. Simple modifications or equivalent substitutions of the technical solution of the present invention by ordinary technicians in this field do not deviate from the essence and scope of the technical solution of the present invention.
Claims
1. A step-by-step mining method for recovering top and bottom pillars of a metal mine, characterized in that The steps include: Step 1: Enter the tunnel in an inclined manner upwards, use shallow hole rock drilling and blasting, and mine to the false bottom; Step 2: Use shallow hole drilling and blasting to mine the 3.5m thick ore body below the false bottom to expose the false bottom; Step 3: After mining to the ore body boundary, the remaining ore body at the bottom is mined by shallow hole rock drilling and blasting to carry out push-type bottom mining operation, from the bottom plate to the bottom plate to the upper surface of the lower layered cement body; Step 4: After all the mining of the access road is completed, the mining area is backfilled with rough stones. After the backfilling is completed, a closed board wall is made on the side of the roadway, and the tailings are filled to the top of the empty area; Step 5: Use the above method to carry out mining from the upper plate to the lower plate in sequence.
2. The step-by-step mining method for top and bottom pillar recovery of metal mines according to claim 1, characterized in that: In step two, pipe-seam type anchor support is used on both sides, and double-layer round steel support is used under the false bottom of the top plate. The left and right ends of the round steel of the double-layer round steel support extend into the side wall of the tunnel. A round log frame is used to connect the double-layer round steel support and the false bottom of the top plate. The left and right ends of the bottom of the double-layer round steel support are fixedly connected to the pipe-seam type anchor support.
3. The step-by-step mining method for top and bottom pillar recovery of metal mines according to claim 2, characterized in that: The log frame is formed by connecting three layers of logs, each layer of logs is formed by a plurality of log segments arranged side by side, and the log segments of two adjacent layers are perpendicular to each other.
4. The step-by-step mining method for top and bottom pillar recovery of metal mines according to claim 1, characterized in that: In step three, pipe-seam anchor support is carried out on both sides.
5. The step-by-step mining method for top and bottom pillar recovery of metal mines according to claim 4, characterized in that: In step three, a combined support method of anchor rods and threaded belts is used at the locations where joints are developed on both sides.