Novel control box for full-face heading machine
By designing a new control box for full-section tunneling machine, combining the communication between PLC controller and multiple systems, efficient remote control and safety guarantee of full-section tunneling machine is achieved, and the problem of insufficient construction efficiency and safety in the existing technology is solved. Reduce costs and improve the intelligence level of construction management.
Patent Information
- Application Number
- CN202411101554.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-12
- Publication Date
- 2024-11-12
AI Technical Summary
The existing coal mine underground full-section boring machine control box is difficult to meet the efficient, safe and economical construction needs, especially under the special engineering geological conditions of rapid advancement and efficient support, ventilation and dust removal, and water supply and drainage, and lacks multifunctionality. Intelligent control capability.
A new control box for full-section tunneling machine was designed, using PLC controller and multiple systems (I/O modules, guidance systems, monitoring systems, gas detection systems, sound and light alarm systems, UWB personnel positioning systems, infrared pyrolysis systems The wireless reception module and data processing module realize the remote control and remote control of the full-section boring machine's distance-of-sight control and remote control, and has multiple security guarantees and data monitoring and analysis functions.
It realizes efficient remote control and safety guarantee of the full-section boring machine, reduces peripheral wiring and reduces costs, and improves the safety and construction efficiency of staff through real-time monitoring and analysis of multiple sensors and display screens.
Smart Images

Figure CN118933835A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to an electric control system of a full-face tunneling machine in an underground coal mine, in particular to a new control box for the full-face tunneling machine. Background Art
[0002] The development of rock tunnel excavation technology and equipment is directly related to the production capacity and safety of coal mines. With the rapid development of comprehensive mechanized coal mining technology, the speed of mining face advancement is getting faster and faster, and the requirements for tunnel excavation speed are getting higher and higher. Coal mine rock tunnel excavation technology has gone through the drilling and blasting method and the comprehensive excavation method, and has now developed to the third stage TBM method. The traditional drilling and blasting method and the comprehensive excavation method are limited by technology and construction technology, and are increasingly unable to meet the higher requirements of major projects for construction efficiency, safety, social benefits, economic benefits, etc., and it is difficult to meet the balanced development of coal mining. The full-section tunnel boring machine can achieve efficient rock breaking, continuous slag discharge, rapid support, ventilation and dust removal, and synchronous operation of water supply and drainage. It is designed for special engineering geological conditions in coal mines, can achieve synchronous excavation, anchoring and transportation, timely support, can improve the adaptability to slope and surrounding rock, small radius turning ability, integrate the technology of kilometer-long directional drilling rigs, and can achieve exploration every time it is excavated, and organic integration of equipment, construction specifications and organizational management.
[0003] Existing control box
[0004] As the control core of the full-face tunnel boring machine, the control box is the top priority for ensuring the safe and effective use of the full-face tunnel boring machine in the tunneling working face. Therefore, it is essential to develop a set of multifunctional intelligent control boxes for full-face tunnel boring machines. Summary of the invention
[0005] With regard to the above-mentioned problems existing in the prior art, the object of the present invention is to provide a new control box for a full-face tunnel boring machine to solve the problems raised in the above-mentioned background technology.
[0006] To achieve the above object, the present invention provides the following technical solutions:
[0007] A new control box for a full-face tunnel boring machine includes a PLC controller; the PLC controller is communicatively connected with an I / O module, the I / O module is communicatively connected with an industrial computer, a guide system, a monitoring system, a gas detection system, and an audible and visual alarm system, the PLC controller is electrically connected with switches in a combination switch cabinet, and the switches in the combination switch cabinet are electrically connected with a cutter motor, a dust removal fan, a cooling water pump motor, an anchor drilling rig pump motor, a booster water pump motor, a propulsion pump motor, and a tensioning pump motor, respectively; the PLC controller is communicatively connected with a UWB personnel positioning system, the PLC controller is communicatively connected with a positioning identification card installed on a personnel vehicle through a wireless receiving module; the PLC controller is communicatively connected with an infrared pyroelectric sensor; the PLC controller is communicatively connected with a display screen.
[0008] As a further solution of the present invention: the PLC controller is communicatively connected with the data processing module.
[0009] As a further solution of the present invention: the PLC controller emergency stop button is communicatively connected.
[0010] As a further solution of the present invention: the cutter disc motor and cooling water pump motor are provided in multiple groups.
[0011] As a further solution of the present invention: the PLC controller is electrically connected to the switching power supply and the intrinsically safe power supply, and the switching power supply is connected to the external power supply.
[0012] As a further solution of the present invention: the switching power supply and the intrinsically safe power supply are installed inside the flameproof enclosure.
[0013] As a further solution of the present invention: the I / O module is communicatively connected to a voice alarm system.
[0014] Compared with the prior art, the present invention has the following beneficial effects:
[0015] The present invention realizes line-of-sight remote control and remote control of the full-face tunnel boring machine through a wireless receiving module and a data processing module, which reduces peripheral wiring and reduces costs compared to existing intelligent tunnel boring machines on the market. The multiple guarantees of UWB personnel positioning technology and infrared pyroelectric sensors can accurately identify workers who have mistakenly entered dangerous areas, and send out sound and light alarms. The voice alarm content can be expanded according to user requirements, and the recognition accuracy is high to ensure the safety of workers. The display screen on the control box of the present invention can monitor and display the data of hydraulic oil and the status parameters of the full-face tunnel boring machine and the positions of personnel and vehicles in real time. The monitored data can be analyzed and processed. If the data is abnormal, an alarm will be immediately issued to shut down the machine and an alarm message will be displayed on the display screen to assist operators in analyzing, discovering and solving problems. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 The present invention is a structural block diagram of a new control box for a full-face tunnel boring machine disclosed in an embodiment. DETAILED DESCRIPTION
[0017] The following will clearly and completely describe the technical solutions in the embodiments of the present invention in conjunction with the drawings in the embodiments of the present invention; it is obvious that the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0018] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "provided with", "connected", and "connected" should be understood in a broad sense; for example, it can be a fixed connection, a detachable connection, or an integral connection, a mechanical connection, or an electrical connection, a direct connection, or an indirect connection through an intermediate medium, or the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0019] See also Figure 1 , a new control box for a full-face tunnel boring machine, including a PLC controller; the PLC controller is connected to the I / O module in communication, and the I / O module is connected to the industrial computer, the guide system, the monitoring system, the gas detection system, and the sound and light alarm system in communication. The control loop uses the PLC as the control center, receives the signals of the external main command element and the detection element, processes the data, issues action commands, monitors the motor operation status and other actuators, and controls and protects the equipment. The detection part includes oil pump motor winding temperature detection, combination switch cabinet data detection, stroke detection, oil temperature detection, and the detection function is completed through the I / O module. The PLC controller is the core control component of this product, which reads the data collected by the I / O module and outputs the control signal through the I / O module to complete the control of the whole machine. The control signal from the operating console is read, and after being processed by the PLC, the control signal is output when all conditions are met, and the combination switch cabinet and other actuators are controlled to make the equipment operate normally. PLC monitors the equipment at all times during operation, and detects the oil pump motor winding temperature, oil tank oil temperature, cylinder stroke, pipeline pressure, and flow rate. If a problem occurs, the corresponding work is stopped and a corresponding display is made on the monitoring interface to allow operators to quickly find the problem.
[0020] The PLC controller is connected to the UWB personnel positioning system. The PLC controller communicates with the positioning identification card installed on the personnel vehicle through the wireless receiving module, which can achieve accurate positioning and facilitate the work. The multiple guarantees of UWB personnel positioning technology and infrared pyroelectric sensor can accurately identify the staff who have strayed into the dangerous area, and send out sound and light alarms. The voice alarm content can be expanded according to user requirements, and the recognition accuracy rate is as high as 100%, ensuring the safety of the staff.
[0021] The PLC controller is connected to the data processing module for communication, realizing line-of-sight remote control and remote control of the full-face tunnel boring machine. Compared with existing intelligent tunnel boring machines on the market, it reduces peripheral wiring and reduces costs.
[0022] The PLC controller emergency stop button communication connection; when an emergency occurs, any emergency stop button on the emergency stop circuit can be used to immediately stop the operation of all motors and other actuators to ensure the safety of the machine.
[0023] The PLC controller is connected to the infrared pyroelectric sensor for communication; the control box can receive the infrared pyroelectric sensor signal. The new control box has the function of monitoring whether there are people working in the dangerous area, and has the functions of graded warning and alarm locking. When the personnel of the excavation face approach the dangerous area of the working face, within the range of 5 meters of the dangerous area, the warning is first realized. When the personnel mistakenly enter the dangerous area within 2 meters, the distance range can be adjusted according to the requirements, and the excavation face is quickly locked. At the same time, an audible and visual voice alarm is issued, and the voice alarm content can be expanded according to the requirements.
[0024] The PLC controller is electrically connected to the switches in the combination switch cabinet. The switches in the combination switch cabinet are electrically connected to the cutter head motor, dust removal fan, cooling water pump motor, anchor drill pump motor, booster water pump motor, propulsion pump motor, and tensioning pump motor. The cutter head motor and cooling water pump motor are equipped with multiple groups. The work of each motor is controlled by the PLC controller to facilitate the use of the device and ensure safety.
[0025] The PLC controller is connected to the switching power supply and the intrinsically safe power supply. The switching power supply is connected to the external power supply. The DC24V power supply is transmitted through the switching power supply, and the DC24V is used as the internal control power supply.
[0026] The switch power supply and intrinsically safe power supply are installed inside the flameproof enclosure, and the control box adopts a flameproof and intrinsically safe design. The control box enclosure adopts a flameproof and intrinsically safe structural design, the intrinsically safe power supply is installed in the flameproof cavity, and all components are installed in the control box. The intrinsically safe or flameproof safety connection is adopted with its associated equipment to increase safety.
[0027] The I / O module is connected to the voice alarm system for communication; the voice alarm content can be expanded as required.
[0028] The PLC controller is connected to the display screen in communication; the display screen can monitor and display the data of hydraulic oil, the status parameters of the full-section tunnel boring machine, and the positions of personnel and vehicles in real time, and can analyze and process the monitored data. If the data is abnormal, it will immediately alarm and shut down, and display the alarm information on the display screen. It can switch between single screen, double screen, quad screen, six screen, and scrolling screen, and users can switch according to different functional requirements; the display supports data query function; it has the function of customizing the configuration screen, and uses LCD screen and graphic image splicing method to display data, images, curves, etc.; it can analyze massive historical data and real-time data to assist operators in analyzing, discovering, and solving problems.
[0029] The control box of the present invention has multiple signal outputs, including RJ45 Ethernet, optical fiber, WIFI wireless signal, RS232 / 485 serial port, and passive node signal output. It can conveniently realize the upload of full-section tunnel boring machine status data and the integrated control of the entire tunneling working face system device; the control box has a unique Lin-bus communication protocol standard, and can be networked simply and quickly through the LIN bus. The node devices on the bus are divided into one host and multiple hosts. The LIN bus is a linear topology network. All node devices are connected together through a single line. The host controls the entire communication process on the LIN bus, effectively reducing the wiring of underground equipment and facilitating data upload and equipment monitoring and management.
[0030] The present invention realizes the line-of-sight remote control and remote control of the full-face tunnel boring machine through the wireless receiving module and the data processing module, which reduces the peripheral wiring and reduces the cost compared with the existing intelligent tunnel boring machines on the market. The multiple guarantees of UWB personnel positioning technology and infrared pyroelectric sensor can accurately identify the staff who have strayed into the dangerous area, and send out sound and light alarms. The voice alarm content can be expanded according to user requirements, and the recognition accuracy rate is as high as 100%, ensuring the safety of the staff.
[0031] The display screen on the control box of the present invention can monitor and display the data of hydraulic oil and the status parameters of the full-section tunnel boring machine and the positions of personnel and vehicles in real time, and can analyze and process the monitored data. If the data is abnormal, an alarm will be immediately given to shut down the machine and an alarm message will be displayed on the display screen, so as to assist the operator in analyzing, discovering and solving the problem.
[0032] It will be apparent to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be considered exemplary and non-restrictive from any point of view. The scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention, and any reference numerals in the claims should not be considered as limiting the claims involved.
[0033] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.
Claims
1. A new control box for full-face tunnel boring machines. It is characterized in that It includes a PLC controller; the PLC controller is communicatively connected with the I / O module, the I / O module is communicatively connected with the industrial computer, the guide system, the monitoring system, the gas detection system, and the sound and light alarm system, the PLC controller is electrically connected with the switches in the combination switch cabinet, and the switches in the combination switch cabinet are electrically connected with the cutter motor, the dust removal fan, the cooling water pump motor, the anchor drilling rig pump motor, the booster water pump motor, the propulsion pump motor, and the tensioning pump motor respectively; the PLC controller is communicatively connected with the UWB personnel positioning system, the PLC controller is communicatively connected with the positioning identification card installed on the personnel vehicle through the wireless receiving module; the PLC controller is communicatively connected with the infrared pyroelectric sensor; the PLC controller is communicatively connected with the display screen.
2. A new control box for a full-face tunnel boring machine according to claim 1, It is characterized in that The PLC controller is communicatively connected with the data processing module.
3. A new control box for a full-face tunnel boring machine according to claim 2, It is characterized in that The PLC controller emergency stop button is communicated and connected.
4. A new control box for a full-face tunnel boring machine according to claim 3, It is characterized in that The cutter head motor and cooling water pump motor are provided with multiple groups.
5. A new control box for a full-face tunnel boring machine according to claim 4, It is characterized in that The PLC controller is electrically connected to a switching power supply and an intrinsically safe power supply, and the switching power supply is connected to an external power supply.
6. A new control box for a full-face tunnel boring machine according to claim 5, It is characterized in that The switching power supply and the intrinsically safe power supply are installed inside the flameproof enclosure.
7. A new control box for a full-face tunnel boring machine according to claim 6, It is characterized in that The I / O module is in communication connection with the voice alarm system.
