Retrusive grouting construction method for sandy gravel stratum
The position of the grouting and reinforcement drilling holes of sand and pebble formations is determined through the total station and the angle measurement device. The connection sleeve and sealing ring are used to achieve local grouting of different lengths and inclinations. There is no need for sealing the pipe material cement-water glass double The liquid slurry solves the problems of slurry sealing and oblique drilling in the backward grouting reinforcement of sand and pebble formations, and improves construction efficiency and simplicity of operation.
Patent Information
- Application Number
- CN202410939729.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-15
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2044-07-15
AI Technical Summary
During the backward grouting and reinforcement process of sand pebble formation, there are problems such as grouting hole slurry sealing, not suitable for oblique downward sand pebble drilling, and the local size is not suitable for adjustment.
The total station is used to determine the position of the grouting reinforced drilling hole, and the angle of the drilling rod is adjusted by adjusting the height-adjustable angle measurement device. The drilling hole is coordinated by the steel pipe, and the slurry outlet pipe composed of the connecting sleeve and the sealing ring is used to achieve different lengths and inclinations. For fixed-domain grouting, no need for sealing the pipe material cement-water glass double slurry during the reinforcement process.
It realizes accurate positioning of grouting holes and localized reinforcement of different lengths and inclinations, avoids blocking of slurry diffusion channels, is suitable for different working conditions, saves materials, improves construction efficiency and simplicity of operation.
Smart Images

Figure CN118933862A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of underground engineering, in particular to a sand and gravel stratum retreat type grouting construction method. Background Art
[0002] Rail transit construction often encounters many unfavorable geological conditions such as gravel strata, and engineering geological disasters occur from time to time, which imposes many restrictions on the safety and efficient development of engineering construction. Gravel strata have the characteristics of loose structure, poor cementation ability, weak self-stabilization ability, strong permeability, and low cohesion. They are typical mechanically unstable strata. In the process of treating gravel strata, the most commonly used method is grouting treatment. The principle of this treatment technology is relatively simple, that is, by injecting cementing materials in the form of slurry into the target stratum, its mechanical properties are changed to achieve the purpose of reducing permeability and increasing stratum strength. Due to the special properties of sand and gravel themselves and the different particle sizes, grouting reinforcement is more difficult. At present, backward grouting is often used, but there are also related technical problems: for example, it is necessary to drill to the end of the designed area at one time, and drill jamming often occurs; during grouting, the slurry has strong fluidity before solidification and the slurry diffusion area is uncontrollable; after the slurry diffuses, it may flow back into the front section of the backward direction and solidify, making it difficult to retreat the drill rod; when the grouting pipe retreats to the next grouting area, the surrounding slurry diffusion channel is blocked by the grouting liquid diffusion of the previous grouting section, and the grouting diffusion area is insufficient, affecting the reinforcement effect.
[0003] The invention patent with the publication number CN117721805A proposes a method and structure for backward localized grouting in gravel formations, which can achieve the effect of filling gravel formations and improve the permeability of formations. However, the method has the following shortcomings: (1) It is necessary to inject the sealing material cement-water glass double liquid slurry around the grouting pipe. Due to the complex geological conditions of the gravel formation, the slurry will inevitably seep into the gravel formation during this process, and the localized slurry diffusion channel may be blocked in the later stage; (2) When the borehole is inclined downward, due to the influence of the slurry gravity factor, the grouting pressure is difficult to accurately control during the grouting process. The double liquid slurry injection process around the grouting pipe will diffuse to both sides of the hole, seriously blocking the diffusion of the localized slurry in the later stage. Therefore, the patent method is not suitable for grouting in gravel boreholes inclined downward; (3) The localized size of the grouting section is not suitable for changing, and the position of the blocking point of the grouting pipe during the sealing period is difficult to adjust appropriately according to different working conditions. Summary of the invention
[0004] The invention provides a sand-pebble stratum retreat grouting construction method to solve the technical problems in the prior art of sand-pebble stratum retreat grouting reinforcement process such as grouting hole slurry blocking, unsuitability for downward oblique sand-pebble drilling grouting, and difficulty in adjusting local size.
[0005] In order to achieve the above object, the specific scheme adopted by the present invention is: A sand and gravel stratum retreat grouting construction method mainly comprises the following steps: S1. Use a total station to determine the location of the sand and gravel stratum grouting reinforcement drilling hole, fix the drill rod of the drilling device to a height-adjustable angle measuring device, use the angle measuring device to measure and adjust the drilling angle of the drill rod, and use the drilling device to perform a hole opening operation; S2. After the hole is opened, the drill bit of the drilling device is taken out, a hole opening pipe is inserted into the hole, the hole opening is sealed with cement-water glass double slurry sealing material, and a flange is installed at the hole opening; S3. Install a steel pipe outside the drill bit of the drilling device, adjust the angle of the drill rod in real time during the drilling process, and ensure that the drill bit and the steel pipe are advanced in coordination, drill to the target depth, that is, obtain the grouting hole, and take out the drilling device; S4, connect a plurality of cylindrical slurry outlet sections to a slurry outlet pipe with a length not less than the depth of the grouting hole through a connecting sleeve, the connecting sleeve comprises a support pipe with threaded sections at both ends, a sealing inner ring coaxially arranged inside the support pipe, and a sealing outer ring coaxially arranged outside the support pipe, the slurry outlet section is threadedly connected to the threaded section of the support pipe, the outer diameter of the sealing outer ring is larger than the diameter of the grouting hole, and the inner diameter of the sealing inner ring is slightly larger than the outer diameter of the grouting pipe; insert the slurry outlet pipe into the steel pipe, the sealing outer ring and the steel pipe can fit each other and slide smoothly when the slurry outlet pipe is inserted, and when the slurry outlet pipe is extended to the bottom of the grouting hole, the steel pipe is pulled out, and the sealing outer ring fits closely with the wall of the grouting hole; S5, inserting the grouting pipe along the cavity formed by the grouting section and the sealing inner ring to the bottom of the grouting hole; S6. Use the backward grouting method to carry out local grouting reinforcement on the grouting holes one by one.
[0006] Furthermore, the angle measuring device comprises a base, a positioning tube with an overall C-shaped structure arranged on the base, a magnetic electronic digital display angle meter placed on the base close to the positioning tube, and three height-adjustable positioning legs hinged to the base; The base is symmetrically provided with arc-shaped slide grooves at both ends of the positioning tube; the drill rod can be placed parallel to the positioning tube at the opening arranged axially from the positioning tube; a limiting unit is provided in the middle of the contact surface between the positioning tube and the base, and sliding units that can slide along the corresponding side arc-shaped slide grooves are provided at both ends; the sliding units are symmetrically arranged with the limiting unit as the center; the limiting unit and the sliding unit have the same structure, both of which include a vertical fixing bolt and a fixing nut arranged on the vertical fixing bolt; one end of the vertical fixing bolt is fixedly connected to the positioning tube, and the other end passes through the base and extends to the bottom of the base; when adjusting the drill rod angle, the positioning tube is rotated to make the sliding unit move along the arc-shaped slide groove with the limiting unit as the center point; when it is rotated to the target angle, the fixing nut is tightened to make it abut against the base, so that the positioning tube can be fixed.
[0007] Furthermore, the positioning tube is also provided with a positioning unit capable of positioning the drill rod placed in the positioning tube, and the positioning unit includes a positioning nut welded on the positioning tube, and a positioning bolt threadedly connected to the positioning nut, and one end of the positioning bolt extends into the cavity of the positioning tube.
[0008] Furthermore, the base is circular, and the vertical fixing bolts in the limiting unit pass through the center of the base.
[0009] Furthermore, two fixing nuts are arranged on each vertical fixing bolt, respectively arranged on the upper and lower sides of the base.
[0010] Furthermore, three pairs of arc-shaped limiting hoops are fixed on the bottom surface of the base, and the positioning legs are hinged to the base through the limiting hoops.
[0011] Furthermore, a conical positioning foot is provided at the lower portion of the positioning leg.
[0012] Furthermore, in step S4, a plurality of slurry outlets are evenly distributed on the circumferential surface of the slurry outlet section.
[0013] Furthermore, in step S6, the grouting pressure control value is 0.5-1.0 MPa, and when the grouting pressure reaches the final pressure state, the grouting is continued for a period of time and then stopped.
[0014] Furthermore, in step S6, during the localized grouting reinforcement, the connecting casing is used as the localized position.
[0015] The technical solution of the present invention has the following beneficial effects: (1) In the backward localized grouting method suitable for sand and gravel formations provided by the present invention, the length of the grouting pipe can be set by using the grouting section and the connecting sleeve section. By connecting grouting sections of different lengths through the connecting sleeve, localized grouting reinforcement of different lengths can be achieved, which solves the problem in the prior art that the stuck point is difficult to adjust appropriately according to the working conditions.
[0016] (2) In the backward localized grouting method for different inclination angles of sand and gravel formations provided by the present invention, the sealing outer ring and the sealing inner ring of the connecting sleeve can isolate the slurry in the closed grouting section, achieving the effect of localized reinforcement grouting density filling of different lengths, and solving the problem of blocking the localized slurry diffusion channel in the later stage in the prior art.
[0017] (3) In the backward localized grouting method for different inclination angles of sand and gravel formations provided by the present invention, the sealing outer ring and the sealing inner ring of the connecting sleeve can effectively isolate and seal the grouting slurry. Compared with the prior art, there is no need to inject the sealing material cement-water glass double liquid slurry and the corresponding grouting steps. It can be applied to drilling conditions with different inclination angles, saves grouting materials, and achieves the effects of simple operation, carbon reduction, and efficient construction. It has the characteristics of clear process, easy method operation, and high promotion and applicability. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 This is one of the structural schematic diagrams of the angle measuring device.
[0019] Figure 2 This is the second structural schematic diagram of the angle measuring device.
[0020] Figure 3 This is the third structural schematic diagram of the angle measuring device.
[0021] Figure 4 This is a schematic diagram of the hole opening operation.
[0022] Figure 5 Schematic diagram of setting the orifice pipe and flange at the orifice.
[0023] Figure 6 It is a schematic diagram of the coordinated drilling of the drilling device and the steel pipe.
[0024] Figure 7 This is a schematic diagram after the slurry discharge pipe is installed.
[0025] Figure 8 This is a schematic diagram after the steel pipe is pulled out.
[0026] Fig. 9 This is a schematic diagram of the grouting pipe after it is inserted into the slurry outlet pipe.
[0027] Fig.10 Schematic diagram of the bottom area of the grouting hole after grouting reinforcement.
[0028] Fig.11 This is a schematic diagram of the middle area of the grouting hole after grouting reinforcement.
[0029] Fig.12 A cross-sectional view of the connecting sleeve.
[0030] Fig.13 This is a plan view of the connecting sleeve.
[0031] Fig.14 This is the plan view of the sand and gravel stratum after grouting reinforcement.
[0032] Graphic markings: 1. Positioning tube, 1-1. Positioning bolt, 1-2. Positioning nut, 1-3. Vertical fixing bolt, 1-4. Fixing nut, 1-5. Opening, 2. Electronic digital display angle meter, 3. Base, 3-1. Arc slide, 3-2. Limiting hoop, 4. Positioning leg, 4-1. Limiting steel bar, 4-2. Height adjustment steel bar, 4-3. Connecting tube, 4-4. Conical positioning leg, 4-5. Height fixing bolt, 4 -6. Height fixing nut; 5. Sand and gravel formation; 6. Drilling device; 7. Orifice pipe; 8. Flange; 9. Steel pipe; 10. Slurry outlet section; 10-1. Slurry outlet; 11. Connecting sleeve; 11-1. Sealing outer ring; 11-2. Threaded section; 11-3. Support pipe; 11-4. Sealing inner ring; 11-5. Grouting pipe reserved hole; 12. Grouting pipe; 13. Bottom grouting reinforcement section; 14. Middle grouting reinforcement section. DETAILED DESCRIPTION
[0033] The technical solution of the present invention will be clearly and completely described below in conjunction with specific embodiments. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0034] In the description of the present invention, it is necessary to understand that the terms "upper" and "lower" etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the scope of protection of the present invention.
[0035] When conducting underground tunneling for rail transit construction in some cities, the geological distribution is mainly mixed fill, silty clay, silt, fine sand, medium sand, sandy gravel, strongly weathered mudstone, and medium weathered mudstone. Tunnel construction often passes through sandy gravel strata. The pebbles are gray and grayish yellow, filled with fine sand. The pebbles are mainly quartzite and granite, and are round or sub-round with a layer thickness of 2 to 4.1 meters. After excavation, the self-stabilization ability is very poor, and it is easy to collapse. The ground settlement is difficult to control, resulting in the inability to carry out construction.
[0036] The invention discloses a sand-pebble stratum retreat grouting construction method, which mainly comprises the following steps: S1. Use a total station to determine the location of the grouting reinforcement drilling hole in the sand and gravel formation, fix the drill rod of the drilling device to a height-adjustable angle measuring device, use the angle measuring device to measure and adjust the drilling angle of the drill rod to ensure the drilling direction and the accuracy of the subsequent drilling, and use the drilling device to perform the drilling operation; S2, after the hole is opened, take out the drill bit of the drilling device 6, insert the hole opening tube 7 into the hole, seal the hole opening with cement-water glass double slurry sealing material, and install the flange 8 at the hole opening; S3, a steel pipe 9 is installed outside the drilling device 6, and the angle of the drill rod is adjusted in real time during the drilling process, and the drill bit and the steel pipe 9 are ensured to advance together. After reaching the designed depth together, a grouting hole is obtained, and the debris in the grouting hole is cleaned. The inclination angle and position of the grouting hole are detected. After meeting the design requirements, the drilling device 6 is taken out; S4. Connect several cylindrical slurry outlet sections 10 through connecting sleeves 11 to form a slurry outlet pipe with a length not less than the depth of the grouting hole. The surface of the slurry outlet section 10 is provided with annularly distributed slurry outlets 10-1, and the axes of the slurry outlets 10-1 are distributed in a cross-inclined shape; the connecting sleeve 11 includes a support tube 11-3 with threaded sections 11-2 at both ends, a sealing inner ring 11-4 coaxially arranged inside the support tube 11-3, and a sealing outer ring 11-1 coaxially arranged outside the support tube 11-3. The slurry outlet section 10 is threadedly connected to the threaded section 11-2 of the support tube 11-3. The outer diameter of the sealing outer ring 11-1 is larger than the diameter of the grouting hole, which can block the slurry from entering the grouting hole during the backward grouting stage. Flow to the previous grouting reinforcement section to ensure that the slurry reinforcement channel is not blocked. The inner cavity of the sealing inner ring 11-4 is a grouting pipe reserved hole 11-5. The grouting pipe reserved hole 11-5 can be adjusted accordingly according to the diameter of the grouting pipe 12. The grouting pipe reserved hole 11-5 is slightly larger than the straight drop size of the grouting pipe 12, which is convenient for the grouting pipe 12 to move freely in the connecting sleeve 11. The sealing inner ring 11-4 can isolate the slurry in the current grouting section to ensure the grouting quality of each grouting section. The grouting pipe is inserted into the steel pipe 9, and the external sealing outer ring 11-1 is tightly fitted with the steel pipe 9. When the grouting pipe is extended to the bottom of the borehole, the steel pipe 9 is pulled out, and the sealing outer ring 11-1 is closely fitted with the grouting hole wall; S5, insert the grouting pipe 12 along the grouting pipe, pass through the grouting pipe reserved hole 11-5 and extend into the bottom of the borehole. When passing through the connecting sleeve 11, mark the side wall of the grouting pipe 12 to facilitate the control of the position of the grouting pipe opening during the grouting stage; S6. The boreholes are reinforced by localized grouting in sequence by the backward grouting method. After the grouting reinforcement of the bottom grouting reinforcement section is completed, the grouting pipe is retreated to the next grouting section for grouting until the grouting reinforcement of each section is completed.
[0037] Please note that, please refer to Figures 1 to 3 The angle measuring device of the present invention comprises a base 3, a positioning tube 1 with an overall C-shaped structure arranged on the base 3, a magnetic electronic digital display angle meter 2 placed on the base 3 close to the positioning tube 1, and three height-adjustable positioning legs 4 hinged to the base 3.
[0038] A retaining nut 1-2 is installed on the top outer surface of the positioning tube 1, and a retaining bolt 1-1 vertically passes through the retaining nut 1-2 and extends to the inside of the positioning tube 1, and the end of the retaining bolt 1-1 can vertically contact the drill pipe.
[0039] The drill rod is placed inside the positioning tube 1 through the opening 1-5 of the positioning steel tube, and the drill rod is placed at the bottom of the positioning tube 1, and the drill rod is parallel to the axis of the positioning tube 1.
[0040] An arc-shaped slide groove 3-1 is provided on the base 3 along the thickness direction. A limiting unit is provided in the middle of the center position of the contact surface between the positioning tube 1 and the base 3, and sliding units that can slide along the corresponding side arc-shaped slide groove 3-1 are provided at both ends. The sliding units are symmetrically arranged with the limiting unit as the center. The limiting unit and the sliding unit have the same structure, both of which include a vertical fixing bolt 1-3 and a fixing nut 1-4 arranged on the vertical fixing bolt 1-3. One end of the vertical fixing bolt 1-3 is fixedly connected to the positioning tube 1, and the other end passes through the base 3 and extends to the bottom of the base 3. When adjusting the drill rod angle, the positioning tube 1 is rotated to make the sliding unit move along the arc-shaped slide groove 3-1 with the limiting unit as the center point. When it is rotated to the target angle, the fixing nut 1-4 is tightened to make it abut against the base 3, so that the positioning tube 1 can be fixed.
[0041] Specifically, the vertical fixing bolt 1 - 3 in the limiting unit passes through the center of the base 3 and extends to the bottom of the base 3 , and the vertical fixing bolt 1 - 3 is provided with fixing nuts 1 - 4 distributed on the upper and lower sides of the base 3 .
[0042] The vertical fixing bolt 1-3 in the sliding unit passes vertically through the arc-shaped slide groove 3-1, and is fixed by fixing nuts 1-4 arranged on both sides of the base 3. The axial direction of the positioning tube 1 and the drill rod can be adjusted to be consistent with the drilling direction through the arc-shaped slide groove 3-1, and then the vertical fixing bolt 1-3 is fixed by using the fixing nuts 1-4 and the base 3.
[0043] An arc-shaped limiting hoop 3-2 is fixed on the lower surface of the base 3, and every two limiting hoops 3-2 form a group, and there are three groups in total; the limiting hoop 3-2 is made of steel bars or steel plates.
[0044] A positioning leg 4 is installed at the bottom of the base 3. The positioning leg 4 includes a limiting steel bar 4-1, a height-adjusting steel bar 4-2, a connecting pipe 4-3, and a conical positioning foot 4-4. The limiting steel bar 4-1 is vertically welded to the height-adjusting steel bar 4-2. At least one pair of bolt holes is arranged on the connecting pipe 4-3. Each pair of bolt holes is symmetrically arranged on both sides of the connecting pipe 4-3. Height fixing nuts 4-6 are welded on the outer periphery of the bolt holes. The height-adjusting steel bar 4-2 is inserted into the connecting pipe 4-3. The height of the positioning leg 4 is adjusted by the length of the height-adjusting steel bar 4-2 in the connecting pipe 4-3. When the height is appropriate, the height-adjusting steel bar 4-2 adjusted to the target height can be fixed by the height fixing bolt 4-5 matched with the height fixing nut 4-6.
[0045] The limiting steel bar 4-1 is vertically installed in the limiting hoop 3-2, and the supporting angle of the positioning leg 4 is adjusted by rotating the limiting steel bar 4-1.
[0046] The lower part of the connecting tube 4 - 3 in the positioning leg 4 is a conical positioning foot 4 - 4 , which can stably support on the ground or other working platforms to prevent the support rod from sliding and affecting the positioning stability and accuracy of the positioning support 4 .
[0047] Measuring the drilling angle of the drill rod by using an angle measuring device specifically includes the following steps: 1) Connect the positioning tube 1 to the base 3: Connect the vertical fixing bolts 1-3 in the limiting unit to the base 3, and fix the vertical fixing bolts 1-3 with fixing nuts 1-4 on both sides of the base 3. Install the positioning bolts 1-1 on the top of the positioning tube 1 according to the position of the positioning nuts 1-2. 2) Position the support leg 4 and connect it, insert the height-adjusting steel bar 4-2 into the connecting pipe 4-3, adjust the height of the height-adjusting steel bar 4-2 in the lower connecting pipe 4-3, and fix the height fixing bolt 4-5; 3) Adjustment of the position of the base 3: The drill rod is placed in the positioning tube 1 through the opening 1-5 of the positioning tube 1, and the vertical fixing bolt 1-3 in the sliding unit is vertically passed through the arc-shaped slide groove 3-1, and the direction of the positioning tube 1 is adjusted to ensure that the drill rod is parallel to the axis of the positioning tube 1, and the drill rod is fixed by the clamping bolt 1-1 at the top of the positioning tube 1, and the limiting steel bar 4-1 is vertically fixed in the limiting hoop 3-2, and the angle of the positioning leg 4 is appropriately adjusted, and the length of the heightening steel bar 4-2 is adjusted so that the base 3 can be kept in a proper position; 4) Adjustment of the drill rod and the center of the borehole: Adjust the position of the drill rod to the center of the borehole, and fine-tune the device by adjusting the angle of the positioning leg 4 to ensure that the drill rod and the center of the borehole are effectively aligned; 5) Drill pipe inclination measurement and adjustment of drilling direction: Place the electronic digital display angle meter 2 on the base 3 close to the surface of the positioning tube 1, read the data of the electronic digital display angle meter 2, and determine whether it meets the design limitations and engineering requirements. If it does not meet the requirements, adjust the drilling direction of the drill pipe until it meets the requirements.
[0048] The technical solution of the present invention is described in detail below in conjunction with specific embodiments.
[0049] Example 1 A sand and gravel stratum retreat grouting construction method mainly comprises the following steps: Step 1: Determine the construction scope of the grouting drilling, calculate the coordinate position of the hole according to the coordinates of the control points that have been laid out and the layout plan of the sand and gravel grouting reinforcement grouting holes, and use the total station to determine the hole position; Step 2: Before drilling, use an angle measuring device to determine the angle of the sand and gravel formation grouting reinforcement drilling hole, fix the drill rod position, and use the drilling device to drill the grouting hole. The grouting hole diameter is 63mm, and the grouting hole drilling angle is 30° (the drilling angle refers to the angle between the drilling direction of the punch and the horizontal plane). The grouting hole is set in a plum blossom shape in the cross section. When drilling, low pressure and slow rotation are used. After drilling, the drilling angle of the drill rod is measured with an angle measuring device, and the drilling angle of the drill rod is adjusted according to the result to ensure the accuracy of the drilling direction and the subsequent drilling; Step 3: After drilling, take out the drilling device 6 from the borehole, insert the orifice tube 7 into the hole, wrap the hemp silk around the orifice tube 7 near the orifice, and apply cement-water glass double liquid slurry. After the orifice tube 7 is sent into the borehole, wait for the cement-water glass double liquid slurry to harden and combine with the surrounding sand and gravel to play a sealing role, and install the flange 8 at the orifice; Step 4: Add a steel pipe 9 to the outside of the drilling device 6. During the drilling process, the two are advanced together. The drilling device 6 and the steel pipe 9 are kept 30 cm apart in the hole. During the drilling process, the angle of the drill rod is measured by an angle measuring device to effectively control the deviation rate of the drilling hole. Re-measurement is performed every 3.5 m of drilling, and the debris in the borehole is cleaned. After the drilling reaches the designed depth of 7 m, a grouting hole is obtained. The inclination angle and position of the grouting hole are detected. After meeting the design requirements, the drilling device 6 is taken out; Step 5: Connect several cylindrical slurry outlet sections 10 through connecting sleeves 11 to form a slurry outlet pipe with a length not less than the depth of the grouting hole. The slurry outlet section 10 is evenly distributed with several slurry outlets 10-1. The diameter of the slurry outlet 10-1 is 6 mm. The slurry outlets 10-1 are distributed in a ring shape with an axial spacing of 5 cm along the pipe. The slurry outlets 10-1 are staggered.
[0050] Step 6, insert the grouting pipe into the steel pipe 9, and evenly apply a small amount of lubricant on the inner surface of the steel pipe 9 before insertion. The external sealing outer ring 11-1 is tightly fitted with the steel pipe 9. When the grouting pipe is inserted into the bottom of the borehole, the steel pipe 9 is pulled out, and the sealing outer ring 11-1 is tightly fitted with the grouting hole wall; It should be noted that the Ф32mm grouting pipe 12 is inserted along the grouting pipe, through the grouting pipe reserved hole 11-5 and extended to the bottom of the borehole. When passing through the connecting sleeve 11, mark the wall of the grouting pipe 12 to facilitate the control of the position of the grouting pipe mouth during the grouting stage; Step 7: Use the backward grouting method to carry out localized grouting reinforcement on the boreholes in sequence. The ratio of cement to water is 1:1, the cement grade is 42.5, and the grouting pressure control value is 0.5-1.0 MPa. When the grouting pressure reaches the final pressure state, continue grouting for 10 minutes and then stop grouting. During this period, it should be ensured that there is no sudden increase in the grouting pressure. The grouting reinforcement operation is carried out by controlling the grouting pressure; Step 8: After the grouting reinforcement of the bottom grouting reinforcement section is completed, the grouting pipe retreats to the next grouting section for grouting until the grouting reinforcement of each section is completed.
[0051] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Any equivalent changes or modifications made according to the essence of the present invention should be included in the protection scope of the present invention.
Claims
1. A sand and gravel stratum retreat grouting construction method, characterized in that: The main steps are as follows: S1. Use a total station to determine the location of the grouting reinforcement drilling hole in the sand and gravel formation, fix the drill rod of the drilling device to a height-adjustable angle measuring device, use the angle measuring device to measure and adjust the drilling angle of the drill rod, and use the drilling device to perform a hole opening operation; S2. After the hole is opened, the drill bit of the drilling device is taken out, a hole opening pipe is inserted into the hole, the hole opening is sealed with cement-water glass double slurry sealing material, and a flange is installed at the hole opening; S3. Install a steel pipe outside the drill bit of the drilling device, adjust the angle of the drill rod in real time during the drilling process, and ensure that the drill bit and the steel pipe are advanced in coordination, drill to the target depth, that is, obtain the grouting hole, and take out the drilling device; S4, connect a plurality of cylindrical slurry outlet sections to a slurry outlet pipe with a length not less than the depth of the grouting hole through a connecting sleeve, the connecting sleeve comprises a support pipe with threaded sections at both ends, a sealing inner ring coaxially arranged inside the support pipe, and a sealing outer ring coaxially arranged outside the support pipe, the slurry outlet section is threadedly connected to the threaded section of the support pipe, the outer diameter of the sealing outer ring is larger than the diameter of the grouting hole, and the inner diameter of the sealing inner ring is slightly larger than the outer diameter of the grouting pipe; insert the slurry outlet pipe into the steel pipe, the sealing outer ring and the steel pipe can fit each other and slide smoothly when the slurry outlet pipe is inserted, and when the slurry outlet pipe is extended to the bottom of the grouting hole, the steel pipe is pulled out, and the sealing outer ring fits closely with the wall of the grouting hole; S5, inserting the grouting pipe along the cavity formed by the grouting section and the sealing inner ring to the bottom of the grouting hole; S6. Use the backward grouting method to carry out local grouting reinforcement on the grouting holes one by one.
2. A sand and gravel stratum retreat grouting construction method according to claim 1, characterized in that: The angle measuring device comprises a base, a positioning tube with an overall C-shaped structure arranged on the base, a magnetic electronic digital display angle meter placed on the base close to the positioning tube, and three height-adjustable positioning legs hinged to the base; The base is symmetrically provided with arc-shaped slide grooves at both ends of the positioning tube; the drill rod can be placed parallel to the positioning tube at the opening arranged axially from the positioning tube; a limiting unit is provided in the middle of the contact surface between the positioning tube and the base, and sliding units that can slide along the corresponding side arc-shaped slide grooves are provided at both ends; the sliding units are symmetrically arranged with the limiting unit as the center; the limiting unit and the sliding unit have the same structure, both of which include a vertical fixing bolt and a fixing nut arranged on the vertical fixing bolt; one end of the vertical fixing bolt is fixedly connected to the positioning tube, and the other end passes through the base and extends to the bottom of the base; when adjusting the drill rod angle, the positioning tube is rotated to make the sliding unit move along the arc-shaped slide groove with the limiting unit as the center point; when it is rotated to the target angle, the fixing nut is tightened to make it abut against the base, so that the positioning tube can be fixed.
3. A sand and gravel stratum retreat grouting construction method according to claim 2, characterized in that: The positioning tube is also provided with a positioning unit capable of positioning the drill rod placed in the positioning tube. The positioning unit includes a positioning nut welded to the positioning tube and a positioning bolt threadedly connected to the positioning nut. One end of the positioning bolt extends into the cavity of the positioning tube.
4. A sand and gravel stratum retreat grouting construction method according to claim 2, characterized in that: The base is circular, and the vertical fixing bolts in the limiting unit pass through the center of the base.
5. The sand and gravel stratum retreat grouting construction method according to claim 2, characterized in that: Two fixing nuts are arranged on each vertical fixing bolt, respectively arranged on the upper and lower sides of the base.
6. A sand and gravel stratum retreat grouting construction method according to claim 2, characterized in that: Three pairs of arc-shaped limiting hoops are fixed on the bottom surface of the base, and the positioning legs are hinged to the base through the limiting hoops.
7. The sand and gravel stratum retreat grouting construction method according to claim 2, characterized in that: A conical positioning foot is provided at the lower part of the positioning leg.
8. The sand and gravel stratum retreat grouting construction method according to claim 1, characterized in that: In step S4, a plurality of slurry outlets are evenly distributed on the circumference of the slurry outlet section.
9. The sand and gravel stratum retreat grouting construction method according to claim 1, characterized in that: In step S6, the grouting pressure control value is 0.5-1.0 MPa, and when the grouting pressure reaches the final pressure state, the grouting is continued for a period of time and then stopped.
10. The sand and gravel stratum retreat grouting construction method according to claim 1, characterized in that: In step S6, when localized grouting reinforcement is performed, the connecting casing is used as the localized position.
Citation Information
Patent Citations
Method of segmenting grouting by using grouting anchor cable
CN109882223A
Drill bit grouting stopping and drill stem sublevel retreating type grouting method
CN110529155A
Tunnel fractured rock mass grouting and water plugging device and method
CN113982653A
Retrusive localized grouting method and structure suitable for sandy gravel stratum
CN117721805A
Multi-purpose total inspection device and steel pipe multistage grouting tunnel reinforcement digital construction method using same
WO2023167383A1
Cited By
Grouting device for mine geological disaster control
CN119981976A