Slurry supplementing device and method for deep hole behind segment wall of water-rich sandy gravel stratum

By using deep hole slurry replenishing devices and methods behind pipe walls in water-rich sand pebbles, the loose layer is directly injected into cement slurry to fill, which solves the problem of hysteresis settlement in shield construction, improves the stability and construction efficiency of the formation, and reduces the stability of the structure and reduces the security risks.

CN118933903APending Publication Date: 2024-11-12POWERCHINA RAILWAY CONSTR +1
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202411307425.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-19
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

In water-rich sand pebbles, the over-excavation phenomenon caused by shield construction leads to the formation of cavity or loose layers, which is difficult to identify and fill in time, causing the risk of lag settlement, and lacks effective slurry replenishment methods.

Method used

A deep hole slurry replenishment device and slurry replenishment method are adopted for pipe sheet walls of water-rich sand pebble formations. The cement slurry is directly injected into the loose sand pebble layer or cavity through synchronous grouting or secondary grouting equipment, and the pipe pressing device is used. Accurate filling with assembled slurry tubes to ensure the compact formation.

Benefits of technology

It effectively prevents hysteresis settlement, improves filling efficiency and effect, enhances formation stability, reduces construction safety risks, and improves construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933903A_ABST
    Figure CN118933903A_ABST
Patent Text Reader

Abstract

The invention discloses a slurry supplementing device and a slurry supplementing method for a deep hole behind a water-rich sandy gravel stratum segment wall, which are characterized in that slurry is supplemented to a formed loose sandy gravel layer through the slurry supplementing device, and cement slurry is directly injected into the loose sandy gravel layer or a cavity by adopting synchronous grouting or secondary grouting equipment and is fully filled into the loose sandy gravel layer or the cavity; and lagged settlement caused by upward movement of the water-rich sandy gravel stratum cavity can be effectively prevented. The synchronous grouting or secondary grouting technology is adopted, the grouting process can be monitored and adjusted in real time, it is guaranteed that grout is fully filled, and existing resources are fully utilized. And the cement paste is directly injected into the loose sand and gravel layer or the cavity, so that the filling efficiency and effect are improved. It is ensured that the loose sand and gravel layer or the cavity is fully filled with slurry, and cavities and gaps are reduced. The stability of the tunnel structure is guaranteed by filling the loose sand and gravel layer or the cavity. The overall stability of the stratum is improved through injection of the cement paste, and tunnel deformation and damage caused by stratum deformation are reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to shield construction in water-rich sand and gravel formations, and in particular to a deep hole grouting device and a grouting method behind a pipe segment wall in a water-rich sand and gravel formation. Background Art

[0002] As the cutting-edge equipment in the field of international tunnel construction, the shield machine has become the first choice in urban rail transit construction with its significant advantages - low safety risk, excellent tunnel forming quality, efficient construction progress and relatively low cost. Especially in water-rich gravel strata, the successful application of the shield method has not only greatly promoted the rapid development of cities such as Chengdu and Lanzhou, but also demonstrated its strong adaptability and technical strength.

[0003] However, in the complex environment of water-rich sand and gravel strata, although shield construction has proven its feasibility, it still faces a severe challenge: delayed settlement. This phenomenon is manifested as significant settlement of the surface and surrounding buildings after shield construction. It has high uncertainty and may even cause major safety accidents in severe cases. In-depth analysis of the reasons is mainly due to the inevitable over-excavation during shield construction, which causes cavities to form or become loose in the upper strata. Unfortunately, current constructors lack effective means to accurately identify these cavities or loose layers and fill them with grouting in a timely manner, which lays a hidden danger for delayed settlement.

[0004] The patent with publication number CN116950693A discloses a grouting reinforcement device for tunnel lining in water-rich karst strata and an automatic grouting method. The device is mainly composed of an integrated mixing and grouting device, a grouting pipe on the tunnel lining, and a drainage pipe. These pipes are arranged in a circumferential direction, close to the facing soil surface of the lining, and are connected to the mixing and grouting device. A drainage induction valve with a controllable switch is installed on the drainage pipe. The tunnel lining grouting reinforcement device and the automatic grouting method get rid of the complex process of traditional manual grouting, can monitor the environmental changes of the facing soil surface of the tunnel lining in real time, and promote the recycling of groundwater.

[0005] However, according to the above scheme, there are still some shortcomings. For example, in some cases, the gaps behind the segment wall cannot be completely filled. Faced with this challenge, it has become a top priority to find an effective method to timely fill the cavities or loose layers in the sand and gravel strata caused by over-excavation during shield construction. This is not only to prevent the occurrence of delayed settlement, but also to fundamentally reduce the safety risks of shield construction in water-rich sand and gravel strata. Therefore, researchers and engineers are actively investing in research and development, striving to make breakthroughs in monitoring technology, grouting technology, etc., to provide solid guarantees for the safety and efficiency of shield construction. Summary of the invention

[0006] The purpose of the present invention is to overcome the shortcomings of the prior art and provide a deep hole grouting device and grouting method behind the wall of a water-rich sand and gravel formation segment, which uses grouting equipment to grout the cavity or loose layer behind the wall of the segment to fill it densely.

[0007] The objective of the present invention is achieved through the following technical solutions:

[0008] A deep hole grouting method behind a pipe segment wall in a water-rich sand and gravel formation, wherein a loose sand and gravel layer is grouted by a grouting device, and cement slurry is directly injected into the loose sand and gravel layer or cavity to fill it fully by using synchronous grouting or secondary grouting equipment, which can effectively prevent the cavities in the water-rich sand and gravel formation from moving upward and causing delayed settlement.

[0009] As a preferred method, due to the particularity of the water-rich sand and gravel strata, there is an over-square phenomenon during the shield excavation process, and a loose sand and gravel layer or cavity is formed above the excavation surface. As the thrust cylinder pushes the pipe segment forward for a distance (generally one ring of pipe segment width), the pipe segment is assembled at the shield tail, and then excavation is continued. As the shield moves forward, the loose sand and gravel layer formed passes through the front shield, middle shield, hinged seal, shield tail, shield tail seal, and finally reaches the rear of the shield tail;

[0010] The loose sand and gravel layer formed is replenished by the grouting device, and the cement slurry is directly injected into the loose sand and gravel layer or cavity and filled fully by the synchronous grouting or secondary grouting equipment commonly used in shield construction, which can effectively prevent the upward movement of the cavities in the water-rich sand and gravel formation and cause delayed settlement.

[0011] As a preferred method, one end of the ball valve is connected to the embedded part of the lifting hole, and the other end is connected to the external threaded joint. The ball valve is opened, and the concrete on the outer surface of the pipe segment at the end of the extension pipe is punched through (using a chisel and a hammer or an electric hammer), and then the ball valve is closed;

[0012] The pipe pressing device is installed on the segment assembly machine, and the fixed frame is fixed to the assembly machine head (the segment lifting bolts can be used for fixing and bolt connection at the same time). The segment assembly machine is used to assemble the various functions of the segment. The pipe pressing device is rotated to the top of the segment behind the shield tail, and the core pipe is placed in the first section of the steel flower pipe to form a grouting pipe. The ball valve is opened, and then one end of the grouting pipe is inserted into the segment lifting hole through the ball valve. The segment assembly machine is used to support one end of the support frame on the inner surface of the segment, and the grouting pipe extending out of the segment is in the guide frame. Then, using the hydraulic control system on the shield, operate the cylinder piston rod to extend, press one end of the grouting pipe, and press the conical head of the grouting pipe into the loose sand and gravel. When only a small length (such as 3-10cm) is left at one end of the grouting pipe in the external threaded joint, stop pressing, retract the cylinder piston rod, connect the second core pipe with the previous core pipe through threads, connect the middle steel pipe with the first steel pipe through threads, and continue to press the newly combined grouting pipe, and repeat this cycle (that is, it can include at least two middle steel pipes, and the number of core pipes is equal to the sum of the number of middle steel pipes and the number of first steel pipes), until the grouting pipe cannot be pressed in (it is judged that the dense sand and gravel layer has been reached). Then, remove the pipe pressing device and prepare for grouting.

[0013] As a preferred method, the grouting can be carried out by connecting the grouting pipe of the synchronous grouting equipment or the secondary grouting equipment on the shield machine with the second internal thread on the core pipe, and the cement slurry is injected into the loose sand and gravel layer or cavity through the grouting channel and the grouting hole;

[0014] According to the needs, the core tube can be gradually pulled out and the segmented grouting method can be used, or the core tube can be pulled out at one time and only one section of the core tube can be left inside. When the grouting pressure reaches the design value, stop grouting. Take out all the grouting pipes, and then connect the grouting pipes to the external threaded joints. Fill the volume of the pulled out grouting pipes with cement slurry, close the ball valve, and remove the ball valve after the cement slurry solidifies. Use plugging materials to waterproof and seal the hoisting hole channel. The grouting construction at this position is completed.

[0015] A deep hole grouting device behind a pipe segment wall in a water-rich sandy gravel formation, comprising a pipe pressing device and a grouting pipe;

[0016] The pipe pressing device includes a fixing frame, a supporting frame, a guide frame, a cylinder piston rod and a cylinder barrel; the fixing frame is connected to the supporting frame, and the guide frame and the cylinder barrel are arranged on the supporting frame, and the guide frame is used to guide the extension direction of the cylinder piston rod and the grouting pipe;

[0017] The grouting pipe comprises an outer pipe and a core pipe which can be assembled and used; the outer pipe is provided with a plurality of grouting holes, and the core pipe can be inserted into the outer pipe;

[0018] It also includes a grouting connection structure, which includes a lifting hole embedded part, a ball valve and an extension pipe; the lifting hole embedded part and the extension pipe are embedded on the pipe segment, and before the deep hole grouting construction, one end of the ball valve is connected to the lifting hole embedded part, and the other end is connected to the threaded joint.

[0019] As a preferred embodiment, the threaded joint is an external threaded joint.

[0020] As a preferred embodiment, the outer tube includes a first section of steel flower tube and a middle section of steel flower tube. The first section of steel flower tube includes a cone head and a seamless steel tube A. The seamless steel tube A is drilled with multiple grouting holes arranged in a plum blossom shape; a cone head is welded at one end of the seamless steel tube A, and a first internal thread A is made on the inner side of the other end; the middle section of steel flower tube includes a seamless steel tube B. One end of the seamless steel tube B is made into a first external thread, and the other end is made into a first internal thread B, and multiple grouting holes are drilled in a plum blossom shape.

[0021] As a preferred embodiment, seamless steel pipe B and seamless steel pipe A are made of steel pipes of the same specifications.

[0022] As a preferred embodiment, the core tube is made of a solid steel rod, one end of which is made into a second external thread, and the other end is made into a second internal thread, and the center of the solid steel rod is drilled into a circular grouting channel.

[0023] As a preferred embodiment, the seamless steel pipe A, the seamless steel pipe B and the core pipe have the same length, and the lengths of the seamless steel pipe A, the seamless steel pipe B and the core pipe are all L, and the maximum extension distance of the oil cylinder piston rod is H, H=L+a, and a is 5-50mm. As a preferred embodiment, a sealing groove is provided in the external threaded joint, and a rubber sealing ring is installed in the sealing groove; the seamless steel pipe A and / or the seamless steel pipe B and the external threaded joint are sealed by a rubber sealing ring.

[0024] The present invention has at least the following beneficial effects: The present invention adopts synchronous grouting or secondary grouting technology, which can monitor and adjust the grouting process in real time, ensure the full filling of slurry, and make full use of existing resources. The cement slurry is directly injected into the loose sand and gravel layer or cavity, which improves the filling efficiency and effect. Ensure that the loose sand and gravel layer or cavity is fully filled with slurry to reduce cavities and gaps. The present invention effectively prevents the delayed settlement caused by the upward movement of the cavity by filling the loose sand and gravel layer or cavity, thereby ensuring the stability of the tunnel structure. The injection of cement slurry increases the overall stability of the formation and reduces the deformation and damage of the tunnel caused by the deformation of the formation. By filling the cavity in time, the risk of surface settlement is reduced, and the impact on the surrounding environment and buildings is small. The present invention adopts synchronous grouting or secondary grouting technology, which can speed up the construction progress and improve the construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only illustrate embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.

[0026] Figure 1 This is a schematic diagram of the shield excavation super-square vault stratum;

[0027] Figure 2 This is a schematic diagram of the deep hole grouting device behind the segment wall;

[0028] Figure 3 It is a schematic diagram of the pipe pressing device;

[0029] Figure 4 This is the cross-section of the first section of the steel flower tube;

[0030] Figure 5 This is the cross-section of the middle section of the steel flower tube;

[0031] Figure 6 is a cross-sectional view of the core tube;

[0032] Figure 7 Detailed drawing of the grouting hole location;

[0033] Figure 8 Schematic diagram of grouting effect.

[0034] In the figure, 1-cutter head excavation surface, 2-loose sand and gravel layer, 3-dense sand and gravel layer, 4-cavity, 5-middle shield, 6-hinged seal, 7-shield tail, 8-thrust cylinder, 9-shield tail seal, 10-slurry baffle, 11-grouting pipe, 12-grouting hole position, 13-segment, 14-pipe pressing device, 15-segment assembly machine support frame, 16-telescopic cylinder, 17-assembly machine head, 18-fixed frame, 19-support frame, 20-guide frame, 21-cylinder piston rod, 22-cylinder barrel, 23-first section of steel flower pipe, 24-cone head, 25-grouting hole, 26-seamless steel pipe A, 27-first internal thread B, 28-middle section of steel flower pipe, 29-first external thread, 30-core pipe, 31-second external thread, 32-grouting channel, 33-second internal thread, 34-extension pipe, 35-embedded parts of lifting holes, 36-ball valve, 37-sealing groove, 38-rubber sealing ring, 39-external thread joint, 40-hoop, 41-cement slurry. DETAILED DESCRIPTION

[0035] The technical solution of the present invention is further described in detail below in conjunction with the accompanying drawings, but the protection scope of the present invention is not limited to the following.

[0036] Hereinafter, different embodiments of the present disclosure will be described with reference to the accompanying drawings. However, it should be understood that the present disclosure is not limited to the specific form disclosed herein, but rather, the present disclosure should be interpreted as covering different changes, equivalents and / or replacements of the embodiments of the present disclosure. When describing the accompanying drawings, similar reference numerals may be used to indicate similar components.

[0037] In the present disclosure, if there is a statement "A or B", "at least one of A and / or B", or "one or more of A and / or B", it can include all possible combinations of the listed items. For example, the statement "A or B", "at least one of A and B", or "at least one of A or B" refers to all of the following situations: (1) including at least one A, (2) including at least one B, or (3) including both at least one A and at least one B.

[0038] The expressions used in different embodiments of the present disclosure, if there is "first", "second", "the first" or "the second" can modify different elements, regardless of order and / or importance, without limiting the corresponding elements. For example, a first user device and a second user device refer to different user devices, although both of them are user devices. For example, a first element can be referred to as a second element, and similarly, a second element can be referred to as a first element without departing from the scope of the present disclosure.

[0039] It will be understood that when an element (e.g., a first element) is referred to as being (operably or communicatively) "connected to" or "coupled to" another element (e.g., a second element), the element may be directly connected or coupled to the other element, or any other element (e.g., a third element) may be interposed therebetween. Conversely, when an element (e.g., a first element) is referred to as being "directly connected" or "directly coupled to" another element (the second element), no element (e.g., a third element) is interposed therebetween.

[0040] In the present disclosure, the terms are used to describe specific embodiments and do not limit the present disclosure. As used herein, the singular form is intended to also include the plural form, unless the content clearly indicates otherwise. In the specification, it should be understood that the term "including" or "having" represents the presence of a feature, number, step, operation, structural element, component or combination thereof, without excluding in advance the possibility of the presence or addition of one or more other features, numbers, steps, operations, structural elements, components or combinations thereof.

[0041] It should be understood that certain details are provided in the following description to facilitate a complete understanding of the example embodiments. However, one of ordinary skill in the art should understand that the example embodiments can be implemented without these specific details. For example, the system can be shown in a block diagram to avoid obscuring the example with unnecessary details. In other examples, well-known processes, structures, and techniques may not be shown in unnecessary details to avoid obscuring the example.

[0042] like Figure 1 As shown, a grouting method is used to grout the formed loose sand and gravel layer 2 through a grouting device, and a cement slurry 41 is directly injected into the loose sand and gravel layer 2 or the cavity 4 by synchronous grouting or secondary grouting equipment to fill it fully, which can effectively prevent the cavities in the water-rich sand and gravel stratum from moving upward and causing delayed settlement, such as Figure 8 As shown, the grouting effect is demonstrated.

[0043] In a preferred embodiment, due to the particularity of the water-rich sand and gravel stratum, there is an over-square phenomenon during the shield excavation process, and a loose sand and gravel layer 2 or a cavity 4 is formed above the excavation surface. As the thrust cylinder 8 pushes the pipe segment 13 forward for a distance (generally the width of one ring of pipe segment 13), the pipe segment 13 is assembled at the shield tail 7, and then excavation is continued. As the shield moves forward, the formed loose sand and gravel layer 2 passes through the front shield, the middle shield 5, the hinged seal 6, the shield tail 7, the shield tail seal 9, and finally reaches the rear of the shield tail 7;

[0044] The formed loose sand and gravel layer 2 is grouted by a grouting device, and the cement slurry 41 is directly injected into the loose sand and gravel layer 2 or the cavity 4 and filled fully by using synchronous grouting or secondary grouting equipment commonly used in shield construction, which can effectively prevent the cavities in the water-rich sand and gravel stratum from moving upward and causing delayed settlement.

[0045] In a preferred embodiment, when the shield segment 13 at the super-square position just leaves the shield tail 7, deep hole grouting construction should be carried out in time, and the segment 13 assembly machine can just reach this position at this time. One end of the ball valve 36 is connected to the lifting hole embedded part 35, and the other end is connected to the external threaded joint 39. Open the ball valve 36, punch through the concrete on the outer surface of the segment 13 at the end of the extension pipe 34 (using a chisel and a hammer or an electric hammer), and then close the ball valve 36;

[0046] The pipe pressing device 14 is installed on the segment 13 assembly machine, and the fixing frame 18 is fixed to the assembly machine head 17 (the segment 13 hanging bolt fixing method can be adopted and bolt connection can be used at the same time), and the segment 13 assembly machine is used to assemble the various functions of the segment 13, and the pipe pressing device 14 is rotated to the top of the segment 13 behind the shield tail 7. The present invention installs the grouting device on the segment 13 assembly machine head 17, and uses the precise positioning function of the segment 13 assembly machine to directly press the steel flower pipe through the segment 13 grouting hole 25 into the loose stratum behind the segment 13 wall using a hydraulic cylinder. Place the core tube 30 into the first section of the steel flower tube 23 to form a grouting tube 11, open the ball valve 36, and then insert one end of the grouting tube 11 into the lifting hole of the pipe segment 13 through the ball valve 36, and use the pipe segment 13 assembly machine to support one end of the support frame 19 on the inner surface of the pipe segment 13, and the grouting tube 11 extending out of the pipe segment 13 is in the guide frame 20 (the outer diameter of the grouting tube 11 is matched with a small gap inside the guide frame 20 (for example, a gap of 1-3mm), and the outer diameter of the cylinder piston rod 21 is equal to the outer diameter of the grouting tube 11). Then, using the hydraulic control system on the shield, the cylinder piston rod 21 is operated to extend, press one end of the grouting pipe 11, and press the cone head 24 end of the grouting pipe 11 into the loose sand and gravel layer 2. When only a small section of one end of the grouting pipe 11 is left outside the external threaded joint 39, the pressing is stopped, the cylinder piston rod 21 is retracted, the second core tube 30 is threadedly connected to the previous core tube 30, the middle section steel flower tube 28 is threadedly connected to the first section steel flower tube 23, and the combined grouting pipe 11 is continued to be pressed in until the grouting pipe 11 cannot be pressed in anymore (it is judged that the dense sand and gravel layer 3 has been reached).

[0047] In a preferred embodiment, grouting can be performed by connecting the grouting pipe of the synchronous grouting equipment or the secondary grouting equipment on the shield machine to the second internal thread 33 on the core pipe 30, and the cement slurry 41 is injected into the loose sand and gravel layer 2 or the cavity 4 through the grouting channel 32 and the grouting hole 25;

[0048] According to the demand, the core tube 30 can be gradually withdrawn by the segmented grouting method or the full-section grouting method in which the core tube 30 is withdrawn at one time and only one section of the core tube 30 is left inside; when the grouting pressure reaches the design value, the grouting is stopped. After the grouting is completed, the grouting pipe 11 is completely taken out, and then the grouting pipe is connected to the external threaded joint 39, and the volume of the withdrawn grouting pipe 11 is completely filled with cement slurry 41, and the ball valve 36 is closed. After the cement slurry 41 solidifies, the ball valve 36 is removed, and the suspension hole channel is waterproofed and blocked with plugging materials, and the grouting construction at this position is completed.

[0049] The present embodiment provides a grouting method, which utilizes the six-degree-of-freedom precise positioning function of the segment 13 assembly machine, and adopts a grouting device to directly press the steel flower pipe into the deep loose stratum behind the wall of the vault segment 13 when the segment 13 escapes from the shield tail 7, and then grouting is filled to the full. This grouting device utilizes multiple components or parts such as the segment 13 assembly machine, hydraulic valve group, segment 13 grouting holes 25, and grouting equipment on the original shield machine, and has multiple advantages such as simple structure, practicality, precise and timely grouting locations, good sealing, and low construction cost. It can be widely promoted and applied in similar strata to reduce the safety risk of delayed settlement in shield construction in water-rich sand and gravel strata. A grouting device includes a pipe pressing device 14 and a grouting pipe 11;

[0050] The pipe pressing device 14 includes a fixing frame 18, a supporting frame 19, a guide frame 20, a cylinder piston rod 21 and a cylinder barrel 22; the fixing frame 18 is connected to the supporting frame 19, and the guide frame 20 and the cylinder barrel 22 are arranged on the supporting frame 19, and the guide frame 20 is used to guide the extension direction of the cylinder piston rod 21 and the grouting pipe 11;

[0051] The grouting pipe 11 includes an outer pipe and a core pipe 30 that can be assembled and used; a plurality of grouting holes 25 are provided on the outer pipe, and the core pipe 30 can be inserted into the outer pipe;

[0052] In order to prevent water seepage or grout leakage from the water-rich sand and gravel layer through the grouting hole position 12 of the pipe segment 13 during the grouting construction process, a special design is made for the grouting device. Figure 7 The grouting device also includes a grouting connection structure, which includes a lifting hole embedded part 35, a ball valve 36 and an extension pipe 34; the lifting hole embedded part 35 and the extension pipe 34 are pre-buried on the pipe segment 13, and before the deep hole grouting construction, one end of the ball valve 36 is connected to the lifting hole embedded part 35, and the other end is connected to the threaded joint.

[0053] In a preferred embodiment, the threaded joint is an external threaded joint 39 .

[0054] In a preferred embodiment, the outer tube includes a first section steel flower tube 23 and a middle section steel flower tube 28, wherein the first section steel flower tube 23 includes a cone head 24 and a seamless steel tube A26 (see Figure 4 ), a plurality of circular grouting holes 25 are drilled in a plum blossom arrangement in a seamless steel pipe A26; a cone head 24 is welded at one end of the seamless steel pipe A26, and a first internal thread A is formed on the inner side of the other end; the middle section steel flower pipe 28 includes a seamless steel pipe B (see Figure 5 ), one end of the seamless steel pipe B is made into a first external thread 29, the other end is made into a first internal thread B27, and a plurality of circular grouting holes 25 are drilled in a plum blossom shape.

[0055] In a preferred embodiment, the seamless steel pipe B and the seamless steel pipe A26 are made of steel pipes of the same specifications. In a preferred embodiment, the core pipe 30 is made of a solid steel rod, one end of which is made into a second external thread 31, and the other end is made into a second internal thread 33. The center of the solid steel rod is drilled into a circular grouting channel 32, such as Figure 6 shown.

[0056] In a preferred embodiment, the seamless steel pipe A26, the seamless steel pipe B and the core pipe 30 are of the same length. Assume that the lengths of the seamless steel pipe A26, the seamless steel pipe B and the core pipe 30 are all L, and the maximum extension distance of the cylinder piston rod 21 is H, H=L+a, and a is 5-50mm.

[0057] In a preferred embodiment, a sealing groove 37 is provided in the external threaded joint 39 , and a rubber sealing ring 38 is installed in the sealing groove 37 ; the seamless steel pipe A26 and / or the seamless steel pipe B and the external threaded joint 39 are sealed by the rubber sealing ring 38 .

[0058] For ease of understanding, the present invention provides the following solutions:

[0059] 1) Composition of deep hole grouting device

[0060] like Figure 2 ,like Figure 3 It can be seen that the deep hole grouting device behind the wall of the pipe segment 13 is composed of a pipe segment 13 assembly machine, a pipe pressing device 14, a grouting pipe 11, etc. The shield tail 7 is provided with a grouting plate 10. The pipe pressing device 14 includes a fixing frame 18, a supporting frame 19, a guide frame 20, a cylinder piston rod 21, a cylinder barrel 22, etc. The grouting pipe 11 includes a first section steel flower pipe 23, a middle section steel flower pipe 28 and a core pipe 30. The first section of the steel flower tube 23 is composed of a cone head 24 and a seamless steel pipe. The seamless steel pipe is drilled with multiple circular grouting holes 25 in a plum blossom shape, the cone head 24 is welded at one end, and the inner side of the other end is made into a first internal thread; similarly, the middle section of the steel flower tube 28 is made of a seamless steel pipe of the same specification, one end is made into a first external thread 29, the other end is made into a first internal thread 27, and multiple circular grouting holes 25 are drilled in a plum blossom shape; the core tube 30 is made of a solid steel rod, one end is made into a second external thread 31, the other end is made into a second internal thread 33, and the center of the solid steel rod is drilled into a central grouting channel 32; the first section of the steel flower tube 23 (excluding the cone head 24), the middle section of the steel flower tube 28 and the core tube 30 are the same length, and are slightly shorter than the maximum extension distance of the cylinder piston rod 21.

[0061] In order to prevent water seepage or grout leakage from the water-rich sand and gravel layer through the grouting hole position 12 of the pipe segment 13 during the grouting construction process, a special design is made for the grouting device. Figure 7As shown, the lifting hole embedded part 35 (also used as grouting hole 25) and the extension pipe 34 are embedded in the pipe segment 13. Before deep hole grouting construction, one end of the ball valve 36 is connected to the lifting hole embedded part 35, and the other end is connected to the external thread joint 39. The ball valve 36 is opened to penetrate the concrete on the outer surface of the pipe segment 13 at the end of the extension pipe 34, and then the grouting pipe 11 is pressed into the loose sand and gravel layer 2 using the pipe pressing device 14. A transition fit is used between the inner diameter of the first section steel flower pipe 23 and the middle section steel flower pipe 28 and the outer diameter of the core pipe 30 (this gap does not need to ensure sealing. The transition fit is to make the grouting pipe a whole to prevent the steel flower pipe from deforming when pressed in. At the same time, the transition fit also facilitates the sealing effect of the clamp 40). A sealing groove 37 is opened on the inner diameter of the external thread, and a rubber sealing ring 38 is installed. The outer diameter of the first section steel flower pipe 23 or the middle section steel flower pipe 28 and the inner diameter of the external thread joint 39 are sealed by a rubber sealing ring 38. Before the grouting pipe 11 is pressed in to complete the grouting, the clamp 40 is tightened close to the external threaded joint 39. The function of the clamp 40 is to tighten the middle section of the steel flower pipe with a slight deformation, so that it is tightly attached to the core pipe of the transition fit, and plays a sealing role. A transition fit is adopted between the outer diameter of the first section of the steel flower pipe 23 or the middle section of the steel flower pipe 28 and the inner diameter of the extension pipe 34. In summary, the inner diameter of the first section of the steel flower pipe 23 or the middle section of the steel flower pipe 28 and the outer diameter of the core pipe 30 are sealed by the clamp 40, and the outer diameter of the first section of the steel flower pipe 23 or the middle section of the steel flower pipe 28 and the inner diameter of the external threaded joint 39 are sealed by the rubber sealing ring 38. A transition fit is adopted between multiple outer diameters and inner diameters, and the clamp 40 and the rubber sealing ring 38 play a sealing role, so that there will be no water seepage or leakage during the grouting process.

[0062] 2) Determination of the timing of grouting and its effect

[0063] like Figure 1 As shown, due to the particularity of the water-rich gravel stratum, there is an over-square phenomenon during the shield excavation process, and a loose gravel layer 2 or a cavity 4 is formed above the cutter head excavation surface 1. As the thrust cylinder 8 pushes the pipe segment 13 forward for a distance (generally the width of one ring of the pipe segment 13), the pipe segment 13 is assembled at the shield tail 7, and then the excavation is continued. As the shield moves forward, the formed loose gravel layer 2 passes through the front shield, the middle shield 5, the hinged seal 6, the shield tail 7, the shield tail seal 9, and finally reaches the rear of the shield tail 7. At this time, the formed loose gravel layer 2 is grouted by the grouting device, and the synchronous grouting or two-grout grouting equipment commonly used in shield construction is used to directly inject cement slurry 41 into the loose gravel layer 2 or the cavity 4 and fill it fully, which can effectively prevent the cavities in the water-rich gravel stratum from moving upward and causing delayed settlement.

[0064] 3) Deep hole pressing process behind the segment 13 wall

[0065] When the shield super-square position segment 13 just detaches from the shield tail 7, deep hole grouting construction should be carried out in time, and the segment 13 assembly machine can just reach this position at this time. First, one end of the ball valve 36 is connected to the lifting hole embedded part 35, and the other end is connected to the external threaded joint 39. Open the ball valve 36, punch through the concrete on the outer surface of the segment 13 at the end of the extension pipe 34, and then close the ball valve 36. The pipe pressing device 14 is installed on the segment 13 assembly machine, and the fixing frame 18 is fixed to the assembly machine head 17 (the segment 13 lifting bolt fixing method can be used and bolts can be used at the same time), and the assembly machine head 17 is connected to the segment assembly machine support frame 15 through the telescopic cylinder 16. The functions of the segment 13 are assembled using the segment 13 assembly machine, the pipe pressing device 14 is rotated to the top of the segment 13 behind the shield tail 7, the core tube 30 is placed in the first section of the steel flower tube 23 to form a grouting tube 11, the ball valve 36 is opened, and then one end of the grouting tube 11 is inserted into the lifting hole of the segment 13 through the ball valve 36, and the segment 13 assembly machine is used to support one end of the support frame 19 on the inner surface of the segment 13, and the grouting tube 11 extending out of the segment 13 is in the guide frame 20 (the outer diameter of the grouting tube 11 is matched with a small gap inside the guide frame 20, and the outer diameter of the cylinder piston rod 21 is equal to the outer diameter of the grouting tube 11). Then, the hydraulic control system on the shield is used to operate the cylinder piston rod 21 to extend, press one end of the grouting pipe 11, and press the cone head 24 end of the grouting pipe 11 into the loose sand and gravel. When only a small length of one end of the grouting pipe 11 is left at the external threaded joint 39, the pressing is stopped, the cylinder piston rod 21 is retracted, the second core pipe 30 is connected to the previous core pipe 30 by thread, the middle steel flower pipe 28 is connected to the first steel flower pipe 23 by thread, and the combined grouting pipe 11 is continued to be pressed in, and the cycle is repeated until the grouting pipe 11 cannot be pressed in (it is judged that the dense sand and gravel layer 3 has been reached). Then, the pipe pressing device 14 is removed, and the clamp 40 is tightened close to the external threaded joint 39 to prepare for grouting.

[0066] 4) Deep hole grouting process behind the wall of segment 13

[0067] Grouting can be performed by connecting the grouting pipe of the synchronous grouting equipment or the secondary grouting equipment on the shield machine to the second internal thread 33 on the core pipe 30, and the cement slurry 41 is injected into the loose sand and gravel layer 2 or the cavity 4 through the grouting channel 32 and the grouting hole 25. According to the needs, the core pipe 30 can be gradually extracted by the segmented grouting method or the full-section grouting method in which the core pipe 30 is extracted at one time and only one section of the core pipe 30 is left inside. When the grouting pressure reaches the design value, stop grouting. After the grouting is completed, the grouting pipe 11 is completely taken out, and then the grouting pipe is connected to the external thread joint 39, and the volume of the extracted grouting pipe 11 is fully filled with cement slurry 41, and the ball valve 36 is closed. After the cement slurry 41 solidifies, the ball valve 36 is removed, and the lifting hole channel is waterproofed and blocked with plugging materials. The grouting construction at this position is completed.

[0068] 5) Advantages of deep hole grouting device and grouting method behind segment 13 wall

[0069] (1) The present invention makes full use of the original shield equipment such as the segment 13 assembly machine, grouting equipment and hydraulic control system, thereby reducing the equipment investment cost;

[0070] (2) The components of the grouting device such as the pipe pressing device 14, the grouting pipe 11 and the ball valve 36 of the present invention can be reused, which effectively reduces the construction cost;

[0071] (3) A variety of sealing methods such as clamps 40, rubber sealing rings 38, and transition fits are used to reduce water seepage or leakage during the grouting construction process and improve the working environment;

[0072] (4) The transition fit between the steel flower tube and the core tube 30 not only improves the pressure bearing capacity of the grouting tube 11, but also ensures the sealing effect between the steel flower tube and the core tube 30;

[0073] (5) The design of the guide frame 20 ensures the accurate positioning of the grouting pipe 11 and prevents deformation;

[0074] (6) After the lifting hole of the pipe segment 13 is out of the shield tail 7, the grouting operation behind the wall of the pipe segment 13 can be carried out in time, and the grouting can be done in time and at an accurate position;

[0075] (7) The present invention is particularly suitable for conditions where the stratum has a certain arching effect and the deformation of the super-square arch stratum during shield excavation has not yet affected the ground surface and nearby buildings (structures) until the grouting is completed.

[0076] In one embodiment, the present invention further discloses a grouting method.

[0077] A grouting method comprises the following steps:

[0078] Identify the cavity 4 or loose layer;

[0079] By filling the tunnel or soil layer with gas and monitoring the pressure and flow changes of the gas, the existence of the cavity 4 or loose layer can be identified. During the filling process, if the gas encounters a cavity 4 or a loose layer, the pressure change will be significantly different from that of the normal soil layer.

[0080] Inflation steps: S1 Preparation of inflation equipment: prepare gas filling equipment (air pump) and pressure sensor. S2 Gas filling: fill the soil layer with gas (such as nitrogen or air). S3 Monitoring pressure changes: record the pressure changes during the inflation process.

[0081] Based on the change in gas pressure, the existence of the cavity 4 or the loose layer can be determined.

[0082] ΔP(t)=P0-P(t)

[0083] ΔP(t) is the pressure change. P0 is the initial pressure. P(t) is the pressure measured after inflation. If ΔP(t) exceeds a certain threshold (for example, set to 20% of the initial pressure) within a short period of time (for example, 1 minute), it can be determined that there is a cavity 4 or a loose layer.

[0084] The initial pressure P0 is determined. The initial pressure monitored before gas injection is P0=100kPa, and the pressure change threshold is: ΔP(t)=0.2*100kPa=20kPa. One minute later, the measured pressure after inflation is P(t)=85kPa, and ΔP is calculated to be 15kPa. In this example, the condition of the existence of cavity 4 or loose layer is not met, and it can be judged that there is no cavity 4 or loose layer.

[0085] Preferably, air is inflated from the embedded part 35 of the lifting hole to the wall of the segment 13, making full use of existing resources and avoiding repeated drilling of holes on the segment 13. The present invention is inflated in two cases. One is that during shield tunneling, due to over-excavation and other conditions, it is known that there is a cavity 4 or a loose layer behind the wall of the segment 13. The other case is that the shield tunneling parameters are abnormal and it is necessary to confirm whether there is a cavity 4 or a loose layer. In this case, air is also required. Inflating is to find the cavity 4 or the loose layer on the one hand, and it is helpful to calculate the amount of grouting on the other hand.

[0086] Grouting steps:

[0087] First, calculate the inflation volume. The inflation volume (the amount of gas injected) is calculated by flow rate and time:

[0088] Vq=Q×t

[0089] Q is the inflation flow rate (m 3 / s).

[0090] The volume of cavity 4 is proportional to the amount of gas filled and the pressure change. Calculate the volume Vc of cavity 4:

[0091] Vc=k·Vq·ΔP(t) / P0

[0092] Where k is a coefficient (usually between 0.1-0.3).

[0093] Calculation of grouting amount:

[0094] The grouting amount Wg is closely related to the volume of cavity 4:

[0095] Wg=Vc·,ρ -g.

[0096] ,ρ -g is the density of the slurry (kg / m 3 ), for example, the density of cement slurry 41 is about 1700 kg / m 3 .

[0097] According to the slurry flow characteristics:

[0098] The flow velocity of the slurry in the cavity 4 is v = Q / A

[0099] in,

[0100] A is the cross-sectional area of ​​the grouting hole 25, and d is the hole diameter.

[0101] The present invention adopts dynamic grouting technology, which is dynamically adjusted according to the pressure difference. During the grouting process, the flow rate of the slurry is usually related to the injection pressure (or pressure difference). For non-Newtonian fluids (such as slurry), we can use the following formula to describe the flow rate: Q = k·ΔP·A

[0102] ΔP<30kPa v g =k1·ΔP

[0103] 30kPa≤ΔP<60kPa v g =k2·(ΔP-30)+v0

[0104] ΔP≥60kPa v g =k3·(ΔP-60)+v1

[0105] Among them, v0 is the base speed, and its value is generally 1-5; v1 is the acceleration speed, and its value is generally 5.1-10; v g is the grouting speed; k1 is the coefficient of the small pressure difference interval, generally 0.1-1, k2 is the coefficient of the medium pressure difference interval, generally 1.1-2, k3 is the coefficient of the high pressure difference interval, and the value range is 2.1-3.

[0106] The present invention provides the following embodiments:

[0107] Inflating flow rate Q = 0.01, m- 3 . / s

[0108] Initial pressure P0 = 100 kPa

[0109] After inflation, the pressure is P(15) = 60 kPa, 15 means 15 seconds

[0110] Slurry density ρ -g =1700kg / m 3 (Normal cement slurry 1600~1900kg / m 3 )

[0111] Coefficient k = 0.2

[0112] Calculate the pressure difference after inflation:

[0113] ΔP(15)=100-60=40kPa

[0114] Gas filling amount:

[0115] Vq=0.01m 3 / s×15s=0.15m 3

[0116] Calculate the volume of cavity 4:

[0117] Vc=0.2×0.15×40 / 100=0.12m 3

[0118] Grouting amount:

[0119] Wg=Vc·,ρ -g =0.12×1700=204kg

[0120] The size of the grouting hole 25 is set to d = 0.05m

[0121] According to Calculated A = 0.00196m 2

[0122] According to ΔP(15)=100-60=40kPa

[0123] v g =k2·(ΔP-30)+v0=1.5m / kPa·s×10kPa+2m / s=17m / s

[0124] According to the above embodiments, when the diameter of the grouting hole 25 is a circular hole of 5 cm, the grouting speed can be calculated according to the inflation volume. After the grouting speed is calculated according to the on-site conditions, the grouting speed can be appropriately increased according to the synchronous grouting time to ensure that the cavity 4 is filled within the time range of the shield stay. It is mainly noted that the grouting speed of the loose layer of the present invention is consistent with the grouting speed of the cavity 4, that is, the gap of the loose layer is considered to be a large cavity 4 composed of several small cavities 4, and the grouting speed of the loose layer is kept consistent with the grouting speed of the cavity 4.

[0125] Although the preferred embodiments of the present invention have been described, those skilled in the art may make additional changes and modifications to these embodiments once they are aware of the basic creative concepts. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the present invention. The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. It should be pointed out that any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.

Claims

1. A deep hole grouting method behind the wall of a pipe segment in a water-rich sandy gravel formation. It is characterized in that The loose sand and gravel layer formed is replenished by the grouting device, and the cement slurry is directly injected into the loose sand and gravel layer or cavity and filled fully by synchronous grouting or secondary grouting equipment, which can effectively prevent the cavities in the water-rich sand and gravel formation from moving upward and causing delayed settlement.

2. A deep hole grouting method for the rear wall of a pipe segment in a water-rich sandy gravel formation according to claim 1, Features: The thrust cylinder pushes the pipe segment forward for a distance, and then assembles the pipe segment at the shield tail, and then excavates again. As the shield moves forward, the loose sand and gravel layer formed passes through the front shield, middle shield, hinged seal, shield tail, shield tail seal, and finally reaches the rear of the shield tail; The loose sand and gravel layer formed is replenished by the grouting device, and the cement slurry is directly injected into the loose sand and gravel layer or cavity and filled fully by the synchronous grouting or secondary grouting equipment commonly used in shield construction, which can effectively prevent the upward movement of the cavities in the water-rich sand and gravel formation and cause delayed settlement.

3. A deep hole grouting method for the rear wall of a pipe segment in a water-rich sandy gravel formation according to claim 1, Features: One end of the ball valve is connected to the embedded part of the lifting hole, and the other end is connected to the external threaded joint. Open the ball valve, punch through the concrete on the outer surface of the pipe segment at the end of the extension pipe, and then close the ball valve; The pipe pressing device is installed on the segment assembling machine, and the fixed frame is fixed to the assembling machine head. The segment assembling machine is used to rotate the pipe pressing device to the top of the segment behind the shield tail, and the core tube is placed in the first section of the steel flower tube to form a grouting tube. The ball valve is opened, and then one end of the grouting tube is inserted into the segment lifting hole through the ball valve. The segment assembling machine is used to support one end of the support frame on the inner surface of the segment, and the grouting tube extending out of the segment is in the guide frame; using the hydraulic control system on the shield, the cylinder piston rod is operated to extend, press one end of the grouting tube, and press the cone head end of the grouting tube into the loose sand and gravel. When only a small length of one end of the grouting tube is left in the external threaded joint, stop pressing, retract the cylinder piston rod, and connect the second core tube to the previous core tube through threads, and the middle section of the steel flower tube is connected to the first section of the steel flower tube through threads. Continue to press the combined grouting tube until the grouting tube cannot be pressed in.

4. A deep hole grouting method for rear wall of a pipe segment in a water-rich sandy gravel formation according to claim 3, Features: Grouting can be done by connecting the grouting pipe of the synchronous grouting equipment or the secondary grouting equipment on the shield machine with the second internal thread on the core pipe, and the cement slurry is injected into the loose sand and gravel layer or cavity through the grouting channel and the grouting hole; According to the needs, the core tube can be gradually pulled out and the segmented grouting method can be adopted, or the core tube can be pulled out at one time and only one section of the core tube can be left inside by the full-section grouting method; when the grouting pressure reaches the design value, stop grouting; take out all the grouting tubes, and then connect the grouting tubes to the external threaded joints, fill the volume of the pulled out grouting tubes with cement slurry, close the ball valve, remove the ball valve after the cement slurry solidifies, and use the plugging material to waterproof and seal the lifting hole channel, and the grouting construction at this position is completed.

5. A deep hole grouting device behind the wall of a pipe segment in a water-rich sand and gravel formation. Features: A deep hole grouting method for the rear wall of a pipe segment in a water-rich sandy gravel formation as described in any one of claims 1 to 4; It includes a pipe pressing device and a grouting pipe; The pipe pressing device includes a fixing frame, a supporting frame, a guide frame, a cylinder piston rod and a cylinder barrel; the fixing frame is connected to the supporting frame, and the guide frame and the cylinder barrel are arranged on the supporting frame, and the guide frame is used to guide the extension direction of the cylinder piston rod; The grouting pipe comprises an outer pipe and a core pipe which can be assembled and used; the outer pipe is provided with a plurality of grouting holes, and the core pipe can be inserted into the outer pipe; It also includes a grouting connection structure, which includes a lifting hole embedded part, a ball valve and an extension pipe; the lifting hole embedded part and the extension pipe are embedded on the pipe segment, and before the deep hole grouting construction, one end of the ball valve is connected to the lifting hole embedded part, and the other end is connected to the threaded joint.

6. A deep hole grouting device for the rear wall of a pipe segment in a water-rich sandy gravel formation according to claim 5, Features: The threaded connector is an external threaded connector.

7. The deep hole grouting device for the rear wall of a pipe segment in a water-rich sandy gravel formation according to claim 5, Features: The outer tube includes a first section of steel flower tube and a middle section of steel flower tube. The first section of steel flower tube includes a cone head and a seamless steel tube A. The seamless steel tube A is drilled with multiple grouting holes arranged in a plum blossom shape; a cone head is welded at one end of the seamless steel tube A, and a first internal thread A is made on the inner side of the other end; the middle section of steel flower tube includes a seamless steel tube B. One end of the seamless steel tube B is made into a first external thread, and the other end is made into a first internal thread B, and multiple grouting holes are drilled in a plum blossom shape.

8. A deep hole grouting device for the rear wall of a pipe segment in a water-rich sandy gravel formation according to claim 7, Features: Seamless steel pipe B and seamless steel pipe A are made of steel pipes of the same specifications.

9. A deep hole grouting device for the rear wall of a pipe segment in a water-rich sandy gravel formation according to claim 7 or 8, Features: The core tube is made of a solid steel rod, one end of which is made into a second external thread, and the other end is made into a second internal thread. The center of the solid steel rod is drilled into a circular grouting channel.

10. A deep hole grouting device for the rear wall of a pipe segment in a water-rich sandy gravel formation according to claim 9, Features: The lengths of seamless steel pipe A, seamless steel pipe B and core pipe are consistent. Assuming that the lengths of seamless steel pipe A, seamless steel pipe B and core pipe are all L, the maximum extension distance of the cylinder piston rod is H, H=L+a, and a is 5-50mm.

Citation Information

Cited By

  • Grouting reinforcement device and method for local loose soil layer behind shield segment wall

    CN120575908A

  • Grouting reinforcement device and method for loose soil layer behind shield segment wall

    CN120575908B