Tunnel ventilation early warning, monitoring and adjusting method and system

By using real-time image information analysis and an emergency air supply system, the problem of ventilation systems failing to reach accident areas in a timely manner during tunnel construction was solved, enabling intelligent ventilation and alarms within the tunnel and ensuring the safety of construction personnel.

CN118934037AActive Publication Date: 2024-11-12SICHUAN FIFTEENTH CONSTR CO LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202411197159.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-29
Publication Date
2024-11-12
Estimated Expiration
2044-08-29

AI Technical Summary

Technical Problem

The existing tunnel construction ventilation system cannot deliver fresh air to the accident area in a timely manner, and cannot effectively deal with harmful gases and dust in the tunnel, affecting the safety of construction workers.

Method used

By collecting real-time image information inside the tunnel, analyzing information on construction personnel, tunnel collapse, and wall cracks, intelligent or emergency ventilation can be controlled inside the tunnel. Targeted or emergency ventilation can be achieved through fans, ducts, and emergency air supply components. Combined with image processing and alarm systems, the safety of construction personnel can be ensured.

Benefits of technology

Intelligent ventilation has been implemented in the tunnel, which can promptly deliver fresh air to construction workers, remove harmful gases and dust, improve construction safety, and send alarm signals to the outside world in a timely manner.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118934037A_ABST
    Figure CN118934037A_ABST
Patent Text Reader

Abstract

The invention provides a tunnel ventilation early warning monitoring adjustment method and system, and relates to the field of ventilation early warning coordination. According to the scheme of the invention, the method comprises the steps: firstly, collecting image information in a tunnel in real time, and carrying out the real-time monitoring; analyzing constructor information, tunnel collapse information and tunnel wall crack information; intelligent ventilation in the tunnel is controlled according to the information of the constructors; according to the tunnel collapse information, emergency ventilation in the tunnel is controlled, and an alarm signal is sent to an external terminal; and according to the tunnel wall crack information, emergency ventilation in the tunnel is controlled, and a pre-alarm signal is sent to an external terminal. In the second aspect, the tunnel ventilation early warning monitoring and adjusting system comprises a fan, an air pipe, an information acquisition unit, a controller unit, an alarm unit, a risk early warning unit and an emergency air supply assembly. According to the invention, image information in the tunnel can be collected in real time, the image information is analyzed, and related actions such as alarm and coordination can be carried out.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of intelligent tunnel ventilation alarm, and in particular to a tunnel ventilation early warning monitoring and adjustment method and system. Background Art

[0002] Tunnels are one of the important facilities for human transportation. During the tunnel construction process, due to factors such as explosive explosions, the use of internal combustion machinery, and the release of harmful gases in the strata during excavation, the air in the tunnel is very dirty, which has a serious impact on the human body, so the tunnel needs to be ventilated. Ventilation in the tunnel can supply fresh air to the tunnel, remove harmful gases, steam, dust, gun smoke and other harmful substances in the tunnel, and make the temperature, relative humidity and flow rate of the air in the tunnel meet the specified standards. The construction ventilation method should be determined according to many factors such as the length of the tunnel, the cross-sectional size of the excavation tunnel, the construction method and equipment conditions. In construction, there are two types of natural ventilation and forced mechanical ventilation. Natural ventilation is a way to achieve ventilation by using the temperature difference or wind pressure difference between the inside and outside of the cave. It is generally limited to short and straight tunnels and is greatly affected by the climatic conditions outside the tunnel. Therefore, it is rare to rely entirely on natural ventilation. Most tunnels should use forced mechanical ventilation.

[0003] During the tunnel excavation construction process, it is necessary to realize the automatic detection of air volume, dust, harmful gases, temperature and humidity in the tunnel, improve the ventilation status monitoring system, and automatically control the adjustment facilities and control execution system. The patent with the authorization announcement number CN105867262B discloses an automatic monitoring system for tunnel construction ventilation, which has a monitoring cabinet, a field control cabinet and a sensor cabinet; the sensor cabinet collects the environmental parameters of the site through sensors and transmits them to the field control cabinet through wireless transmission technology. The monitoring cabinet and the field control cabinet are connected through optical fiber; the field control cabinet and the sensor cabinet communicate through a wireless local area network; the field control cabinet displays the sensor parameters through the touch screen on the one hand, and transmits the control commands and sensor parameters of the site to the monitoring cabinet through optical fiber on the other hand. The monitoring cabinet receives and displays the environmental parameters on the site on the one hand; on the other hand, the frequency of the frequency converter is controlled by the decision algorithm to adjust the air supply of the fan. It can be seen from the specification and drawings of the public patent that when the tunnel is built, the environmental parameters such as air volume, dust, harmful gases, temperature, humidity, etc. in the tunnel will be transmitted to the monitoring cabinet in real time. The monitoring cabinet controls the frequency of the frequency converter according to the changes in the environmental parameters, thereby adjusting the air supply in the tunnel. However, the air outlet of the fan is fixed at a preset position in the tunnel, and the fan can only supply air to the preset position in the tunnel, and the supplied air then slowly diffuses to the surrounding area of ​​the tunnel; in order to supply fresh air, exhaust harmful gases and control the temperature at various locations in the tunnel in time, the fan needs to increase its power to achieve rapid diffusion of the air sent out from the outlet.

[0004] In the event of an accident, in order to protect construction workers from respiratory damage caused by harmful gases or to reduce respiratory damage, fresh air needs to be delivered to the construction workers' location as soon as possible. However, the technical solution described in the above patent cannot reach the area requiring emergency ventilation in time even if the air delivered from the air outlet spreads rapidly in the tunnel. Summary of the invention

[0005] The purpose of the present invention is to provide a tunnel ventilation early warning monitoring and adjustment method, which can address the above-mentioned deficiencies in the prior art, analyze the safety situation in the tunnel in real time, and promptly give an alarm if an accident occurs in the tunnel, and provide emergency air supply to the tunnel to ensure the safety of construction workers.

[0006] Another object of the present invention is to provide a tunnel ventilation early warning monitoring and adjustment system, which can propose solutions to the deficiencies of the existing technology, analyze the safety situation in the tunnel in real time, and promptly issue an alarm if an accident occurs in the tunnel, and provide emergency air supply to the tunnel to ensure the safety of construction workers.

[0007] The present invention is achieved through the following technical solutions: In a first aspect, a method for early warning monitoring and adjustment of tunnel ventilation includes the following steps: real-time acquisition of image information in a tunnel, and real-time monitoring of the tunnel through the image information; processing the image information, and analyzing to obtain construction personnel information, tunnel collapse information, and tunnel wall crack information; controlling intelligent ventilation in the tunnel according to the construction personnel information; controlling emergency ventilation in the tunnel according to the tunnel collapse information, and sending an alarm signal to an external terminal; controlling emergency ventilation in the tunnel according to the tunnel wall crack information, and sending a pre-alarm signal to an external terminal.

[0008] Based on the first aspect, further, in the invention, the step of controlling intelligent ventilation in the tunnel according to the construction workers information includes: when multiple construction workers gather in the tunnel, controlling the tunnel to perform fixed-point ventilation; when multiple construction workers are dispersed in the tunnel, controlling the tunnel to perform emergency ventilation.

[0009] Based on the first aspect, further, in the invention, when the tunnel wall crack information is analyzed, the steps of controlling emergency ventilation in the tunnel and sending a pre-alarm signal to the external terminal include: the tunnel wall crack information includes the crack area ratio, the total crack area and the crack area change rate. When the crack area ratio, the total crack area and the crack area change rate are all greater than the threshold, a pre-alarm signal is sent to the external terminal.

[0010] In the second aspect, a tunnel ventilation early warning monitoring and adjustment system is applied to the tunnel ventilation early warning monitoring and adjustment method, including a fan, an air duct, an information collection unit, a controller unit, an emergency air supply component and a traction component; a plurality of information collection units are installed in the tunnel along the extension direction; the output end of the fan cooperates with the air duct, and the air duct is installed along the extension direction of the tunnel; the emergency air supply component is installed in the air duct, and the air duct is provided with a plurality of emergency air supply parts cooperating with the emergency air supply component along the extension direction; the traction component can pull the emergency air supply component back and forth along the extension direction of the air duct, so that the emergency air supply component cooperates with the preset emergency air supply part; the information collection unit is connected to the risk early warning unit; the traction component, the fan, the alarm unit and the risk early warning unit are all connected to the controller unit.

[0011] Based on the second aspect, further, in the invention, the above-mentioned emergency air supply assembly includes an emergency air supply shell and a connecting side panel; both sides of the emergency air supply shell are connected to the connecting side panels; in the emergency ventilation state, the traction assembly pulls the emergency air supply shell to cooperate with the preset emergency air supply part, and the connecting side panels on both sides of the emergency air supply shell open the preset emergency air supply part, and the fan supplies air to the preset emergency air supply part; in the non-emergency ventilation state, multiple emergency air supply parts are closed, the fan supplies air to one end of the air duct, and the other end of the air duct supplies air to the tunnel.

[0012] Based on the second aspect, further, in the invention, the emergency air supply shell is provided with a first air outlet on both sides, the connected side panel is provided with a second air outlet cooperating with the first air outlet, and the connected side panel close to the fan side is provided with a third air outlet; in the emergency ventilation state, the first air outlet of the emergency air supply shell deviates from the second air outlet of the connected side panel, and the third air outlet of the connected side panel close to the fan side is connected to the first air outlet of the emergency air supply shell; in the non-emergency ventilation state, the second air outlet of the connected side panel is connected to the first air outlet of the emergency air supply shell.

[0013] Based on the second aspect, further, in the invention, a bearing member is installed on the inner side wall of the above-mentioned emergency air supply shell, and a first elastic member is connected between the bearing member and the connecting side panel; the emergency air supply part is provided with an emergency air supply port, and mounting grooves are provided on both sides of the emergency air supply port, and a second elastic member is connected to the surface wall of the mounting groove, and a wind shield plate is connected to the free end of the second elastic member, and the wind shield plate is provided with an inclined portion cooperating with the connecting side panel; in the emergency ventilation state, the connecting side panel is pressed toward the inclined portion of the wind shield plate by the action of the first elastic member, and the wind shield plate moves into the mounting groove after being force-bearing, thereby opening the emergency air supply port; in the non-emergency ventilation state, the connecting side panel leaves the emergency air supply part, and the wind shield plate moves out of the mounting groove under the action of the second elastic member, thereby closing the emergency air supply port.

[0014] Based on the second aspect, further, in the invention, the above also includes a lighting assembly, the lighting assembly includes a generator, a connecting part, a wind blade and a lighting lamp; the generator is installed in the emergency air supply shell, the input end of the generator is connected to the connecting part, and the connecting part is circumferentially installed with multiple wind blades, and the heights of the multiple wind blades are adapted to the height of the first air outlet; the output end of the generator is connected to the lighting lamp, and the lighting lamp is located in the emergency air supply shell.

[0015] Based on the second aspect, further, in the invention, the traction assembly includes a traction member, a guide rail and a slider; Guide rails are installed on both sides of the air duct, and the guide rails are installed along the extension direction of the air duct. Two oppositely arranged sliders are installed at the bottom end of the emergency air supply shell, and the sliders are matched with the corresponding guide rails; the traction member can control the slider to move back and forth along the extension direction of the guide rail.

[0016] Based on the second aspect, further, in the invention, a plurality of environmental characteristic sensors are installed in the tunnel along the extension direction, and the plurality of environmental characteristic sensors are all connected to the controller unit.

[0017] Compared with the prior art, the present invention has the following advantages and beneficial effects: On the first aspect, an embodiment of the present invention provides a tunnel ventilation early warning monitoring and adjustment method, which analyzes the safety situation in the tunnel in real time, and then obtains construction personnel information, tunnel collapse information and tunnel wall crack information through analysis; based on the construction personnel information, intelligent ventilation is performed in the tunnel; based on the tunnel collapse information, emergency air supply is performed in the tunnel, and an alarm signal is sent to an external terminal; based on the tunnel wall crack information, emergency air supply is performed in the tunnel, and a pre-alarm signal is sent to an external terminal; realizing intelligent ventilation in the tunnel can ensure the safety of construction personnel and improve the quality of the construction environment, and an alarm signal can be sent to the outside world in time when danger occurs in the tunnel.

[0018] In the second aspect, an embodiment of the present invention provides a tunnel ventilation early warning monitoring and adjustment system, in which an information collection unit can collect image information in the tunnel in real time, a risk early warning unit processes the image information, and obtains construction personnel information, tunnel collapse information and tunnel wall crack information; the risk early warning unit can analyze the safety situation in the tunnel based on the above information; if tunnel collapse information is processed, the risk early warning unit sends an alarm signal to the controller unit, the controller unit controls the alarm unit to send an alarm signal to an external terminal, and performs emergency air supply to the tunnel; if there is only one construction team working in the tunnel, the controller unit controls the system to supply emergency air to the tunnel, and at the same time can reduce the power of the fan to achieve the purpose of saving electricity; if there are multiple construction teams working in the tunnel, the controller unit controls the system to supply air to a fixed point in the tunnel; if the cracks in the tunnel wall exceed the threshold, the controller unit controls the alarm unit to send a pre-alarm signal to the external terminal. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] In order to more clearly illustrate the technical solutions of the exemplary embodiments of the present invention, the following briefly introduces the drawings required for use in the embodiments. It should be understood that the following drawings only illustrate certain embodiments of the present invention and should not be regarded as limiting the scope. For those of ordinary skill in the art, other relevant drawings can be obtained based on these drawings without creative work. In the drawings: Figure 1 This is a three-dimensional diagram of the tunnel ventilation early warning monitoring and adjustment system; Figure 2 It is the longitudinal cross-sectional view of the air duct; Figure 3 for Figure 2 Enlarged view of point A in the middle; Figure 4 This is a schematic diagram of installing the guide rail and the slider in the air duct; Figure 5 This is the schematic diagram of the controller unit; Figure 6 This is the schematic diagram of the environmental characteristic sensor; Figure 7 It is a schematic diagram of the principle of image information processing by the risk warning unit 28; Figure 8 Analyze the safety situation schematic diagram in the tunnel for risk warning sheet; Fig. 9 This is the principle diagram of image processing; Fig.10 This is a flow chart of the tunnel ventilation early warning monitoring and adjustment method.

[0020] The marks and corresponding names of components in the accompanying drawings are: 1-tunnel, 2-fan, 3-air duct, 4-emergency air supply shell, 5-bearing part, 6-generator, 7-lighting lamp, 8-connecting part, 9-wind blade, 10-emergency air supply port, 11-wind shield, 12-inclined part, 13-installing groove, 14-first air outlet, 15-second air outlet, 16-third air outlet, 17-guide rail, 18-slider, 19-emergency air supply part, 20-controller unit, 21-traction assembly, 22-oxygen sensor, 23-CO concentration sensor, 24-information collection unit, 25-dust concentration sensor, 26-temperature sensor, 27-environmental characteristic sensor, 28-risk warning unit, 29-alarm unit, 30-connect side panel. DETAILED DESCRIPTION

[0021] In order to make the objectives, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with embodiments and drawings. The exemplary embodiments of the present invention and their description are only used to explain the present invention and are not intended to limit the present invention. Example 1

[0022] Please refer to Fig.10 .

[0023] A method for early warning monitoring and adjustment of tunnel ventilation comprises the following steps: real-time acquisition of image information in a tunnel 1, and real-time monitoring of the tunnel 1 through the image information; processing the image information, and analyzing to obtain construction personnel information, tunnel collapse information, and tunnel wall crack information; controlling intelligent ventilation in the tunnel 1 according to the construction personnel information; controlling emergency ventilation in the tunnel 1 according to the tunnel collapse information, and sending an alarm signal to an external terminal; controlling emergency ventilation in the tunnel 1 according to the tunnel wall crack information, and sending a pre-alarm signal to an external terminal.

[0024] In this embodiment, S101: collect image information in the tunnel in real time, and monitor the tunnel in real time through the image information; collect image information in tunnel 1, and the image information can cover the entire range of tunnel 1, so as to realize all-round monitoring of tunnel 1; S102: process the image information, and analyze to obtain construction personnel information, tunnel collapse information and tunnel wall crack information; perform operations such as filtering and denoising on the image information to improve the accuracy of the image information, and the recognition model analyzes the processed image information to analyze the construction personnel information, tunnel collapse information and tunnel wall crack information; S103: when the construction personnel information is analyzed, control the intelligent ventilation in tunnel 1; when the image information analyzes the construction personnel information, there is a construction team carrying out construction work in tunnel 1, and according to the number of construction teams and the location of the construction teams in the tunnel, the intelligent ventilation in tunnel 1 is performed, and the intelligent ventilation method is more environmentally friendly and efficient; S104: analyze the When tunnel collapse information is obtained, emergency ventilation is controlled in tunnel 1, and an alarm signal is sent to an external terminal; when tunnel collapse information is analyzed from the image information, collapse occurs in tunnel 1, emergency ventilation in the tunnel is controlled in time, dust and harmful gases at the collapsed position are removed, and fresh air is supplied to the collapsed position for use by construction personnel trapped in the tunnel, and an alarm signal is sent to the outside world, so that rescue forces from the outside can go to the accident tunnel for rescue in time; S105: when information about cracks in the tunnel wall is obtained from the analysis, emergency ventilation is controlled in tunnel 1, and a pre-alarm signal is sent to an external terminal; when information about cracks in the tunnel wall is obtained from the analysis, cracks appear on the surface wall of tunnel 1, and the cracks can be analyzed to determine that the tunnel may collapse at the cracks, and emergency ventilation is performed at the cracks in advance. If tunnel 1 collapses, rescue measures can be taken as soon as possible, and a pre-alarm signal is sent to an external terminal, so that relevant staff can take remedial measures for the cracks in tunnel 1.

[0025] Based on the first aspect, further, in the invention, according to the information of construction workers, the step of controlling intelligent ventilation in tunnel 1 includes: when multiple construction workers gather in tunnel 1, controlling fixed-point ventilation in tunnel 1; when multiple construction workers in tunnel 1 are dispersed, controlling emergency ventilation in tunnel 1.

[0026] In this embodiment, when the information of construction personnel appears in the tunnel 1, intelligent ventilation can be performed in the tunnel 1; the intelligent ventilation methods include fixed-point ventilation and emergency ventilation. Specifically, fixed-point ventilation: ventilation is performed at a preset position in the tunnel 1, and fresh air is diffused in the tunnel 1. Finally, the fresh air can cover the entire tunnel 1, which is suitable for the scenario where multiple construction teams are dispersed in the tunnel 1 for construction; emergency ventilation: first, when a danger occurs in the tunnel 1, emergency ventilation is controlled in the tunnel 1, and fresh air can be replenished in large quantities at the accident site in a timely manner, and harmful gases and dust at the accident site can be removed, and fresh air can be replenished for trapped construction personnel; second, when multiple construction teams gather together in the tunnel 1 for construction, emergency ventilation is controlled in the tunnel 1, and fresh air can be replenished in large quantities at the construction site in a timely manner, and fresh air can be replenished for multiple construction teams at the same time, without considering whether the fresh air can diffuse to the surrounding area, which has the advantages of high efficiency and energy saving.

[0027] Based on the first aspect, further, in the invention, when the tunnel wall crack information is analyzed, the steps of controlling the emergency ventilation in the tunnel 1 and sending a pre-alarm signal to the external terminal include: the tunnel wall crack information includes the crack area ratio, the total crack area and the crack area change rate. When the crack area ratio, the total crack area and the crack area change rate are all greater than the threshold, a pre-alarm signal is sent to the external terminal.

[0028] In this embodiment, the crack analysis is mainly performed on three factors: the crack area ratio, the total crack area and the crack area change rate. If the measurement results of these three factors all exceed the threshold, it will be determined that a collapse will occur in tunnel 1, and the pre-alarm information will be sent to the external terminal; if only the crack area ratio is used for judgment, if the crack area has not spread for a long time, tunnel 1 will not issue a false alarm caused by collapse; if only the total crack area is used for judgment, if the total crack area is much smaller than the area of ​​tunnel 1, tunnel 1 will not issue a false alarm caused by collapse; if only the crack area change rate is used for judgment, if the crack area change rate is much smaller than the area of ​​tunnel 1, tunnel 1 will not issue a false alarm caused by collapse; the crack area ratio, the total crack area and the crack area change rate are used together to judge tunnel collapse, which can greatly improve the accuracy. Example 2

[0029] Please refer to Figures 1 to 9 .

[0030] Secondly, the tunnel intelligent ventilation control system includes a fan 2, an air duct 3, an information collection unit 24, a controller unit 20, an emergency air supply component and a traction component 21; a plurality of information collection units 24 are installed in the tunnel 1 along the extension direction; the output end of the fan 2 cooperates with the air duct 3, and the air duct 3 is installed along the extension direction of the tunnel 1; the emergency air supply component is installed in the air duct 3, and the air duct 3 is provided with a plurality of emergency air supply parts 19 that cooperate with the emergency air supply component along the extension direction; the traction component 21 can pull the emergency air supply component to move back and forth along the extension direction of the air duct 3, so that the emergency air supply component cooperates with the preset emergency air supply part 19; the information collection unit 24 is connected to the risk warning unit 28; the traction component 21, the fan 2, the alarm unit 29 and the risk warning unit 28 are all connected to the controller unit 20.

[0031] In this embodiment, during the construction of the tunnel 1, the controller unit 20 automatically controls the execution system to ensure the safety of the construction workers in the tunnel 1. The air duct 3 is installed along the extension direction of the tunnel 1 and can be installed on the top wall of the tunnel 1. The fan 2 is installed outside the tunnel 1 (the fan 2 is set up in a location with clean air, good ventilation and a stable foundation). The output end of the fan 2 is aligned with the air duct 3. The fan 2 can supply air to the air duct 3. The air duct 3 sends the air into the tunnel 1 and presses the air in the tunnel 1 out of the tunnel 1, so that the harmful gas, dust, etc. in the tunnel 1 can be discharged from the tunnel 1, and fresh air can be added into the tunnel 1 to ensure the safety of the construction workers; a plurality of information collection units 24 are installed along the extension direction in the tunnel 1, and the information collection units 24 can be installed at a certain distance. The information acquisition unit 24 can collect image information in the tunnel 1 in real time, and the risk warning unit 28 processes the image information and obtains construction personnel information, tunnel collapse information and tunnel wall crack information. The specific processing process is as follows: (1) Image segmentation: The risk warning unit 28 uses the firefly algorithm to obtain the optimal segmentation threshold, and then segments the image background and the target; (2) Image feature extraction: Establish a grayscale co-occurrence matrix for texture features, and use a feature algorithm based on accelerated segmentation test to extract corner features; (3) CNN identifies the target type: Input layer: input image features; Convolution layer: perform convolution operations on image features, (where Fj(N) is the jth feature of the Nth layer; f(x) is the activation function; δi(N) is the bias; Ki is the jth feature map of channel K; N is the number of layers of the neural network; Oi,j(N) is the convolution kernel); Pooling layer: reduces and downsamples image features. (Where Yi is the probability of category i, the output value is 0-1; u is the output feature value, and n is the number of features); Full connection: connect all the features of the image, input them into the classifier, and calculate the score of each category. (4) Use a mature image recognition model to identify the test sample and obtain the recognition result. The risk warning unit 28 can analyze the safety situation in the tunnel according to the processing results; First, the risk warning unit 28 obtains the tunnel collapse information, and the risk warning unit 28 determines that there is a danger in the tunnel 1. The risk warning unit 28 sends an alarm signal to the controller unit 20. The controller unit 20 controls the alarm unit 29 to send an alarm signal to the external terminal (the alarm signal includes the location information of the construction personnel and the alarm reason information), and the controller unit 20 simultaneously controls the traction component 21 to drive the emergency air supply component to move in the air duct 3. The emergency air supply component finally stops at the trapped construction personnel and opens the corresponding emergency air supply unit 19. The fresh air sent in can remove the dust and harmful gases at the construction personnel's location, and can also replenish fresh air to the construction personnel, so that the trapped construction personnel can persist until the arrival of the external rescue team. Secondly, the risk warning unit 28 obtains the information of the construction personnel. If there is only one construction team working in the tunnel 1, the risk warning unit 28 sends a non-alarm signal to the controller unit 20. The controller unit 20 only controls the traction component 21 to drive the emergency air supply component to move in the air duct 3. The emergency air supply component finally stops at the construction team. The fresh air can remove the dust and harmful gases at the construction personnel, and can also replenish fresh air for the construction personnel; the fan 2 only needs to supply air to the construction location, without considering the need for fresh air to spread to the surrounding area, so the power of the fan 2 can be reduced to achieve the purpose of saving electricity; if there are multiple construction teams working in the tunnel 1, the risk warning unit 28 sends a non-alarm signal to the controller unit 20, and the controller unit 20 fan 2 supplies air to a fixed point in the tunnel 1 to ensure that each construction team gets enough fresh air supply. Thirdly, the risk warning unit 28 obtains the information of cracks in the tunnel wall. The risk warning unit 28 can analyze the safety situation in the tunnel based on the information of cracks in the tunnel wall; specifically, image processing: the risk warning unit 28 performs image processing based on the collected information. Because the surface of the tunnel is uneven, the background is complex and the light is uneven, it is difficult to separate the cracks and the background. The tunnel image matrix is ​​obtained to calculate the eigenvalues ​​and eigenvectors of the covariance matrix, and the eigenvalues ​​are sorted, and K weighted eigenvalues ​​and eigenvectors are selected as the main body. A larger high-dimensional fuzzy image is selected to calculate the grayscale value, and the grayscale threshold of the maximum inter-class variance between the crack and the background is evaluated, and the grayscale threshold is used for OTSU segmentation. The second-order statistical characteristics of the original image and noise are calculated, and the restoration and secondary noise reduction are completed by the Wiener algorithm. Then Poisson fusion is completed with a smaller low-dimensional fuzzy image, and the segmented crack image is fused into the crack area of ​​the low-dimensional fuzzy image.The image after Poisson fusion retains the extremely low background of the low-dimensional image and the general outline of the crack, which greatly enhances the contrast between the crack and the background. Finally, the grayscale value of the Poisson fusion image is analyzed, and the grayscale threshold of the maximum inter-class variance is calculated to perform OTSU segmentation again to obtain the final crack image. Crack analysis: crack analysis of the processed image can greatly improve accuracy. Crack analysis mainly analyzes three factors: crack area ratio, total crack area and crack area change rate. If the measurement results of these three factors exceed the threshold, the risk warning unit 28 will determine that tunnel 1 will collapse and send the pre-alarm information to the controller unit 20, and the controller unit 20 will control the alarm unit 29 to issue a pre-alarm; if only the crack area ratio is used for judgment, if the crack area has not spread for a long time, tunnel 1 will not issue a collapse, which will cause a false alarm; if only the total crack area is used for judgment, if the total crack area is much smaller than the area of ​​tunnel 1, tunnel 1 will not issue a collapse, which will cause a false alarm; if only the crack area change rate is used for judgment, if the crack area change rate is much smaller than the area of ​​tunnel 1, tunnel 1 will not issue a collapse, which will cause a false alarm; the crack area ratio, total crack area and crack area change rate are used to jointly determine tunnel collapse, which can greatly improve accuracy; further, the information acquisition unit 24 can be a camera, which can obtain the construction picture in the tunnel in real time.

[0032] Based on the second aspect, further, in the invention, the emergency air supply assembly includes an emergency air supply shell 4 and a connecting side panel 30; both sides of the emergency air supply shell 4 are connected to the connecting side panel 30; in the emergency ventilation state, the traction assembly 21 pulls the emergency air supply shell 4 to cooperate with the preset emergency air supply part 19, and the connecting side panels 30 on both sides of the emergency air supply shell 4 open the preset emergency air supply part 19, and the fan 2 supplies air to the preset emergency air supply part 19; in the non-emergency ventilation state, multiple emergency air supply parts 19 are closed, the fan 2 supplies air to one end of the air duct 3, and the other end of the air duct 3 supplies air to the tunnel 1.

[0033] In this embodiment, the information acquisition unit 24 can collect image information in the tunnel 1 in real time, the risk warning unit 28 processes the image information and obtains construction personnel information, tunnel collapse information and tunnel wall crack information, the risk warning unit 28 can analyze the safety situation in the tunnel, and the risk warning unit 28 transmits the analysis results to the controller unit 20, and the controller unit 20 then takes corresponding measures; specifically, in the emergency ventilation state, when the emergency air supply shell 4 moves to the corresponding emergency air supply part 19, the connecting side panels 30 on both sides of the emergency air supply shell 4 can open the emergency air supply part 19, and the fan 2 is connected to the air duct 3 When the internal air supply passes through the emergency air supply shell 4, the emergency air supply shell 4 can guide the fresh air to the corresponding emergency air supply unit 19, and the emergency air supply unit 19 can blow the fresh air into the tunnel 1, so that the fresh air can reach the vicinity of the trapped construction workers in time, and can remove the dust and harmful gases at the construction workers in time, and can also replenish fresh air for the construction workers. It is suitable for the scenario where the tunnel 1 collapses and the construction workers are trapped; in the non-emergency ventilation state, the multiple emergency air supply units 19 in the air duct 3 are all closed, and the fan 2 can supply air to the tunnel 1 at a fixed point, which is suitable for the scenario where multiple construction teams are working at the same time in the tunnel 1.

[0034] Based on the second aspect, further, in the invention, the emergency air supply shell 4 is provided with a first air outlet 14 on both sides, the connecting side panel 30 is provided with a second air outlet 15 cooperating with the first air outlet 14, and the connecting side panel 30 close to the fan 2 is provided with a third air outlet 16; in the emergency ventilation state, the first air outlet 14 of the emergency air supply shell 4 deviates from the second air outlet 15 of the connecting side panel 30, and the third air outlet 16 of the connecting side panel 30 close to the fan 2 is connected to the first air outlet 14 of the emergency air supply shell 4; in the non-emergency ventilation state, the second air outlet 15 of the connecting side panel 30 is connected to the first air outlet 14 of the emergency air supply shell 4.

[0035] In this embodiment, in the non-emergency air supply state, the multiple emergency air supply parts 19 in the tunnel 1 are all closed, and when the second air outlets 15 of the two connected side panels 30 are connected to the first air outlet 14 of the emergency air supply shell 4, the air supplied by the fan 2 to the air duct 3 can pass through the emergency air supply component and be transported to the other end of the air duct 3 to supply air to a fixed point in the tunnel 1; in the emergency ventilation state, the traction component 21 pulls the emergency air supply shell 4 to a preset position in the air duct 3, and the two connected side panels 30 open the corresponding emergency air supply parts 19, and the second air outlets 15 of the two connected side panels 30 are connected to the first air outlet 14 of the emergency air supply shell 4. The openings 15 are staggered with the first air outlet 14 of the emergency air supply shell 4. The first air outlet 14 of the emergency air supply shell 4 is connected to the third air outlet 16 of the connected side panel 30 (the connected side panel 30 close to the fan 2). When the fan 2 supplies air to the air duct 3, the emergency air supply shell 4 can guide the fresh air to the corresponding emergency air supply unit 19, and the emergency air supply unit 19 then transports the fresh air into the tunnel 1. The fresh air can reach the vicinity of the trapped construction personnel, promptly remove the dust and harmful gases at the trapped construction personnel, and also replenish fresh air for the construction personnel.

[0036] Based on the second aspect, further, in the invention, a bearing member 5 is installed on the inner side wall of the emergency air supply shell 4, and a first elastic member is connected between the bearing member 5 and the connecting side panel 30; the emergency air supply part 19 is provided with an emergency air supply port 10, and mounting grooves 13 are provided on both sides of the emergency air supply port 10, and a second elastic member is connected to the surface wall of the mounting groove 13, and a wind shield plate 11 is connected to the free end of the second elastic member, and the wind shield plate 11 is provided with an inclined portion 12 that cooperates with the connecting side panel 30; in the emergency ventilation state, the connecting side panel 30 is pressed against the inclined portion 12 of the wind shield plate 11 by the action of the first elastic member, and the wind shield plate 11 moves into the mounting groove 13 after being forced, so as to open the emergency air supply port 10; in the non-emergency ventilation state, the connecting side panel 30 leaves the emergency air supply part 19, and the wind shield plate 11 moves out of the mounting groove 13 under the action of the second elastic member, so as to close the emergency air supply port 10.

[0037] In this embodiment, the two connecting side panels 30 are respectively located on opposite sides of the emergency air supply shell 4, and a first elastic member is installed between the connecting side panels 30 and the bearing member 5, and the connecting side panels 30 and the emergency air supply shell 4 are slidably matched; in the non-emergency ventilation state, the emergency air supply shell 4 is at the non-emergency air supply portion 19 in the air duct 3, and the connecting side panels 30 abut against the surface wall of the air duct 3 to compress the first elastic member, and the second air outlets 15 of the two connecting side panels 30 are both connected to the first air outlet 14 of the emergency air supply shell 4. When the fan 2 supplies air to the air duct 3, the wind can pass through the emergency air supply assembly to reach the other end of the air duct 3 and supply air to a fixed point in the tunnel 1; in the emergency ventilation state, the traction assembly 21 can pull the emergency air supply shell 4 to the preset emergency air supply part 19, and the connected side plate 30 is pressed against the inclined portion 12 of the wind shield 11 under the action of the first elastic member. The pressure of the connected side plate 30 pressing against the inclined portion 12 of the wind shield 11 can be decomposed into a thrust toward the installation groove 13 and a pressure along the inclined direction, toward the installation groove 13. The thrust of the groove 13 can push the wind shield 11 into the installation groove 13 until the two wind shields 11 are completely pushed into the installation groove 13, and the two connected side panels 30 open the emergency air supply port 10. When the fan 2 supplies air to the air duct 3, the fresh air can be directed to the emergency air supply port 10 when it reaches the emergency air supply shell 4. The fresh air can reach the vicinity of the trapped construction workers in time, and remove the dust and harmful gases at the construction workers in time, and can also replenish fresh air for the construction workers; the emergency air supply shell When leaving the emergency air supply port 10, the connecting side panels 30 pass through the inclined surface 12 of the wind shielding plate 11 until the two connecting side panels 30 completely leave the emergency air supply port 10. After the two connecting side panels 30 leave the emergency air supply port 10, the two connecting side panels 30 abut against the surface wall of the air duct 3 to compress the first elastic member, and the two wind shielding plates 11 move outwards from the mounting groove 13 under the action of the second elastic member until the two wind shielding plates 11 completely cover the emergency air supply port 10, so that the emergency air supply port 10 is closed.

[0038] Based on the second aspect, further, the invention also includes a lighting assembly, which includes a generator 6, a connecting member 8, a wind blade 9 and a lighting lamp 7; the generator 6 is installed in the emergency air supply shell 4, and the input end of the generator 6 is connected to the connecting member 8, and the connecting member 8 is circumferentially installed with multiple wind blades 9, and the heights of the multiple wind blades 9 are all adapted to the height of the first air outlet 14; the output end of the generator 6 is connected to the lighting lamp 7, and the lighting lamp 7 is located in the emergency air supply shell 4.

[0039] In this embodiment, the generator 6 is installed in the emergency air supply shell 4, the input end of the generator 6 is connected to the connecting piece 8, and the connecting piece 8 is equipped with multiple wind blades 9 along the circumferential direction. The multiple wind blades 9 are located at the first air outlet 14, and the output end of the generator 6 is connected to the lighting lamp 7 (the lighting lamp 7 is installed in the emergency air supply shell 4); in the emergency ventilation state, the two connected side panels 30 open the emergency air supply port 10, and the second air outlets 15 of the two connected side panels 30 are staggered with the first air outlet 14 of the emergency air supply shell 4, and the first air outlet 14 of the emergency air supply shell 4 is connected to the third air outlet 16 of the connected side panel 30 (the connected side panel 30 close to the side of the fan 2), and the fan 2 is connected to the air duct 3 enters the emergency air supply shell 4, the fresh air passes through multiple wind blades 9 and drives multiple wind blades 9 to rotate, the wind blades 9 can generate electricity for the generator 6 after rotating, the generator 6 can light up the lighting lamp 7 after generating electricity, the lighting lamp 7 can illuminate the accident point where the collapse in the tunnel 1 occurs, the trapped construction workers can clearly see the surrounding environment and escape route, reduce confusion and panic in the accident, and improve the escape efficiency of the construction workers; and after the fresh air passes through multiple wind blades 9, it can also replenish fresh air for the trapped construction workers, and remove harmful gases and dust at the accident site, so that the trapped construction workers can hold on until the arrival of external rescue forces.

[0040] Based on the second aspect, further, in the invention, the traction assembly 21 includes a traction member, a guide rail 17 and a slider 18; guide rails 17 are installed on both sides of the air duct 3, and the guide rails 17 are installed along the extension direction of the air duct 3. Two relatively arranged sliders 18 are installed at the bottom end of the emergency air supply shell 4, and the sliders 18 are matched with the corresponding guide rails 17; the traction member can control the slider 18 to move back and forth along the extension direction of the guide rail 17.

[0041] In this embodiment, the guide rail 17 is installed on the surface wall of the air duct 3 along the extension direction of the air duct 3, and sliders 18 are installed on both sides of the bottom end of the emergency air supply shell 4. The two sliders 18 at the bottom end of the emergency air supply shell 4 cooperate with the two guide rails 17. The traction member can drive the emergency air supply shell 4 to move back and forth in the air duct 3, and can cooperate with the preset emergency air supply unit 19 to supply air to the accident point in time; further, the traction member can be a winch, and winches are set up near both ends of the air duct 3. The winch is connected to the emergency air supply shell 4 through a rope, and the two opposite winches can pull the emergency air supply shell 4 by retracting and releasing the rope; the information collection unit 24 monitors the tunnel 1 in real time. Construction situation, risk warning unit 28 analyzes the safety situation in tunnel 1, when information collection unit 24 collects information that tunnel 1 collapses, risk warning unit 28 sends alarm information to controller unit 20, controller unit 20 controls alarm unit 29 to send an alarm signal to the outside, and controller unit 20 controls winch to supply emergency air to tunnel 1; further, the traction member can be a transmission belt with a transmission mechanism, the transmission belt is installed on the guide rail 17, the transmission belt and the bottom end of the emergency air supply shell 4 are matched, the transmission mechanism can transmit the transmission belt, after the transmission belt is transmitted, the emergency air supply shell 4 can be controlled to move in the air duct 3, and cooperate with the corresponding emergency air supply unit 19.

[0042] Based on the second aspect, further, in the invention, a plurality of environmental characteristic sensors 27 are installed in the tunnel 1 along the extension direction, and the plurality of environmental characteristic sensors 27 are all connected to the risk warning unit 28 .

[0043] In this embodiment, environmental characteristic sensors 27 need to be installed at certain intervals in the tunnel 1. The environmental characteristic sensors 27 can be a sensor matrix composed of a temperature sensor 26, a dust concentration sensor 25, a CO concentration sensor 23 and an oxygen sensor 22. The risk warning unit 28 can receive data from each environmental characteristic sensor 27 in real time, wherein the measured data include temperature signals, dust concentration signals, CO concentration signals and oxygen concentration signals. The risk warning unit 28 compares the above-mentioned temperature signals, dust concentration signals, CO concentration signals and oxygen concentration signals with the set threshold values. If the values ​​are greater than the threshold values ​​set by the risk warning unit 28, the risk warning unit 28 sends an alarm signal to the controller unit 20. The controller unit 20 controls the alarm unit 29 to send an alarm signal to the outside world, indicating that the tunnel 1 needs to be ventilated in time to remove dust and CO in the tunnel 1.

[0044] To sum up, in the first aspect, the embodiment of the present invention provides a tunnel ventilation early warning monitoring and adjustment method, which analyzes the safety situation in tunnel 1 in real time, and then obtains construction personnel information, tunnel collapse information and tunnel wall crack information through analysis; based on the construction personnel information, intelligent ventilation is performed in tunnel 1; based on the tunnel collapse information, emergency air supply is performed in the tunnel, and an alarm signal is sent to the external terminal; based on the tunnel wall crack information, emergency air supply is performed in tunnel 1, and a pre-alarm signal is sent to the external terminal; realizing intelligent ventilation in the tunnel can ensure the safety of construction personnel and improve the quality of the construction environment, and an alarm signal can be sent to the outside world in time when danger occurs in the tunnel.

[0045] In the second aspect, an embodiment of the present invention provides a tunnel ventilation early warning monitoring and adjustment system, in which the information collection unit 24 can collect image information in the tunnel 1 in real time, and the risk early warning unit 28 processes the image information and obtains construction personnel information, tunnel collapse information and tunnel wall crack information; the risk early warning unit 28 can analyze the safety situation in the tunnel 1 according to the above information; if the tunnel collapse information is processed, the risk early warning unit 28 sends an alarm signal to the controller unit 20, and the controller unit 20 controls the alarm unit 29 to send an alarm signal to the external terminal and provide emergency air supply to the tunnel 1; if there is only one construction team working in the tunnel 1, the controller unit 20 controls the system to supply emergency air to the tunnel, and at the same time can reduce the power of the fan 2 to achieve the purpose of saving electricity; if there are multiple construction teams working in the tunnel 1, the controller unit 20 controls the system to supply air to a fixed point in the tunnel 1; if the cracks in the tunnel wall exceed the threshold, the controller unit 20 controls the alarm unit to send a pre-alarm signal to the external terminal.

[0046] The specific implementation methods described above further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific implementation method of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.

Claims

1. A tunnel ventilation early warning monitoring and adjustment method, characterized in that: The following steps are involved: Collect image information in the tunnel in real time, and monitor the tunnel in real time through image information; Processing the image information, analyzing and obtaining construction personnel information, tunnel collapse information and tunnel wall crack information; Control intelligent ventilation in the tunnel based on construction personnel information; According to the tunnel collapse information, emergency ventilation is controlled in the tunnel and an alarm signal is sent to external terminals; According to the information of cracks in the tunnel wall, emergency ventilation is controlled in the tunnel and a pre-alarm signal is sent to external terminals.

2. The tunnel ventilation early warning monitoring and adjustment method according to claim 1 is characterized in that: The steps of controlling intelligent ventilation in the tunnel according to the construction personnel information include: When multiple construction workers gather in the tunnel, ventilation should be carried out at designated points in the tunnel; When multiple construction workers in the tunnel are dispersed, emergency ventilation should be controlled in the tunnel.

3. The tunnel ventilation early warning monitoring and adjustment method according to claim 1 is characterized in that: When the tunnel wall crack information is analyzed, the steps of controlling emergency ventilation in the tunnel and sending a pre-alarm signal to an external terminal include: The tunnel wall crack information includes the crack area ratio, the total crack area and the crack area change rate. When the crack area ratio, the total crack area and the crack area change rate are all greater than the threshold, a pre-alarm signal is sent to the external terminal.

4. A tunnel ventilation early warning monitoring and adjustment system, applied to the tunnel ventilation early warning monitoring and adjustment method according to any one of claims 1 to 3, characterized in that: It includes fans, air ducts, information collection units, controller units, alarm units, risk warning units, emergency air supply components and traction components; A plurality of the information collection units are installed in the tunnel along the extension direction; The output end of the fan cooperates with the air duct, and the air duct is installed along the extension direction of the tunnel; The emergency air supply assembly is installed in the air duct, and the air duct is provided with a plurality of emergency air supply parts cooperating with the emergency air supply assembly along the extension direction; The traction assembly can pull the emergency air supply assembly to move back and forth along the extension direction of the air duct, so that the emergency air supply assembly cooperates with the preset emergency air supply part; The information collection unit is connected to the risk warning unit; The traction component, the fan, the alarm unit and the risk warning unit are all connected to the controller unit.

5. The tunnel ventilation early warning monitoring and adjustment system according to claim 4 is characterized in that: The emergency air supply assembly includes an emergency air supply shell and a connection side plate; Both sides of the emergency air supply housing are connected to the connection side panels; In the emergency ventilation state, the traction assembly pulls the emergency air supply shell to cooperate with the preset emergency air supply part, the connecting side panels on both sides of the emergency air supply shell open the preset emergency air supply part, and the fan supplies air to the preset emergency air supply part; In a non-emergency ventilation state, the plurality of emergency air supply units are all closed, the fan supplies air to one end of the air duct, and the other end of the air duct supplies air into the tunnel.

6. The tunnel ventilation early warning monitoring and adjustment system according to claim 5 is characterized in that: Both sides of the emergency air supply housing are provided with a first air outlet, the connecting side plate is provided with a second air outlet cooperating with the first air outlet, and the connecting side plate close to the fan is provided with a third air outlet; In the emergency ventilation state, the first air outlet of the emergency air supply shell deviates from the second air outlet of the connection side panel, and the third air outlet of the connection side panel close to the fan side is connected to the first air outlet of the emergency air supply shell; In a non-emergency ventilation state, the second air outlet of the connected side panel is connected to the first air outlet of the emergency air supply shell.

7. The tunnel ventilation early warning monitoring and adjustment system according to claim 6 is characterized in that: A bearing member is installed on the inner side wall of the emergency air supply housing, and a first elastic member is connected between the bearing member and the connecting side plate; The emergency air supply part is provided with an emergency air supply port, and mounting grooves are provided on both sides of the emergency air supply port. The surface wall of the mounting groove is connected with a second elastic member, and the free end of the second elastic member is connected with a wind shield plate, and the wind shield plate is provided with an inclined portion that cooperates with the connected side plate; In the emergency ventilation state, the connected side plate is pressed toward the inclined portion of the wind shield under the action of the first elastic member, and the wind shield moves into the installation groove after being stressed, so that the emergency air supply port is opened; In the non-emergency ventilation state, the connected side plate leaves the emergency air supply portion, and the wind shield plate moves out of the installation groove under the action of the second elastic member to close the emergency air supply port.

8. The tunnel ventilation early warning monitoring and adjustment system according to claim 6 or 7, characterized in that: Also included is a lighting assembly, which includes a generator, a connecting piece, a wind blade and a lighting lamp; The generator is installed in the emergency air supply housing, the input end of the generator is connected to the connecting piece, and the connecting piece is circumferentially mounted with a plurality of wind blades, and the height of the plurality of wind blades is adapted to the height of the first air outlet; The output end of the generator is connected to the lighting lamp, and the lighting lamp is located in the emergency air supply shell.

9. The tunnel ventilation early warning monitoring and adjustment system according to any one of claims 5 to 7, characterized in that: The traction assembly includes a traction member, a guide rail and a slider; The guide rails are installed on both sides of the air duct, and the guide rails are installed along the extension direction of the air duct. Two oppositely arranged sliders are installed at the bottom end of the emergency air supply shell, and the sliders are matched with the corresponding guide rails; The traction member can control the sliding block to reciprocate along the extending direction of the guide rail.

10. The tunnel ventilation early warning monitoring and adjustment system according to any one of claims 5 to 7, characterized in that: A plurality of environmental characteristic sensors are installed in the tunnel along the extension direction, and the plurality of environmental characteristic sensors are all connected to the risk warning unit.

Citation Information

Patent Citations

  • Tunnel construction ventilation automatic monitoring system

    CN105867262A

  • Expressway tunnel rescue system and control method thereof

    CN113842575A

  • Tunnel surrounding rock collapse risk analysis method and system based on visual detection

    CN117787684A

  • Method and device for ventilating a tunnel

    EP1398461A1

  • Longitudinal ventilation facilities for road tunnel with maintenance easily

    KR101588434B1