Feeding device of vacuum induction melting furnace
By designing an automated feeding device, utilizing a motor-driven traction rope system and roller structure, the problem of cumbersome feeding in vacuum induction melting furnaces has been solved, achieving efficient and low-cost feeding operations.
Patent Information
- Application Number
- CN202411176799.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-26
- Publication Date
- 2024-11-12
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing feeding method of vacuum induction melting furnace is cumbersome, inefficient, occupies gantry crane resources, affects the lifting of other items, and requires multiple people to cooperate, thus wasting manpower.
A feeding device for a vacuum induction melting furnace was designed, including a lifting frame and a feeding cylinder. By using a motor-driven traction rope system and roller structure, the feeding cylinder can be moved and positioned automatically, avoiding the need for overhead crane lifting. The feeding can be completed by a single person.
It improved feeding efficiency, saved crane resources and labor costs, simplified operating procedures, and increased production efficiency.
Smart Images

Figure CN118936047A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of smelting equipment, and in particular to a charging device for a vacuum induction smelting furnace. Background Art
[0002] A vacuum induction melting furnace is a device used to melt metal materials by induction heating in a vacuum environment. This type of melting furnace is mainly used for the production of metals and alloys with extremely high melting quality requirements, such as special steels, titanium alloys, nickel-based alloys, etc. A vacuum induction melting furnace can provide a pure melting environment, thereby reducing the inclusions and gas content in the metal and improving the purity and performance of the metal material.
[0003] When melting metal in a vacuum induction melting furnace, the molten metal in the melting furnace is sampled, and then secondary charging is performed according to the sample composition. Since the vacuum induction melting furnace has been evacuated during the melting process, opening the furnace cover will destroy the vacuum environment in the furnace. Therefore, during the secondary charging, the raw materials are added through the secondary charging chamber of the vacuum induction melting furnace. The raw materials are placed in the secondary charging chamber of the vacuum induction melting furnace, and then the secondary charging chamber is evacuated. When the secondary charging chamber reaches the same vacuum value as the melting furnace, the isolation door between the secondary charging chamber and the melting furnace is opened, and then the raw materials are lowered into the melting furnace. However, this method of discharging is usually to use wire to tie the raw materials into the secondary charging chamber, and then hang them into the melting furnace. This method is cumbersome to operate and inefficient, and secondly, the small amount of raw materials added at one time affects the charging efficiency. Although barrel-shaped containers are now used to hold raw materials and add more raw materials at one time, the secondary charging chamber of the vacuum induction melting furnace is usually located at the top of the furnace body, and the metal raw materials are heavy. A barrel of metal raw materials can weigh hundreds of pounds. Therefore, when placing the raw materials, they need to be lifted by a crane and moved to the secondary charging chamber. However, this method requires the use of a crane, so that the crane in the factory cannot lift other heavier items, which reduces the use value of the crane. If it relies on manual lifting, it requires the cooperation of multiple people, which not only wastes manpower, but also has low handling efficiency. Therefore, there is an urgent need for a feeding device for a vacuum capacity furnace that does not occupy a crane and can perform secondary feeding efficiently. Summary of the invention
[0004] The present invention aims to provide a charging device for a vacuum induction melting furnace to solve the problem of low charging efficiency of the existing vacuum induction melting furnace.
[0005] In order to solve the above technical problems, the present invention provides the following technical solutions: a charging device for a vacuum induction melting furnace, comprising a lifting frame and a charging barrel, wherein a motor is fixedly connected to the top of the lifting frame, a reel is fixedly connected to the output shaft of the motor, and a traction rope is wound around the reel; a top frame is vertically slidably connected inside the lifting frame, a pulley is fixedly connected to the upper surface of the top frame, and one end of the traction rope passes over the pulley and extends upward to be fixedly connected to the top of the lifting frame;
[0006] The feeding barrel includes a barrel body with open top and bottom, the top of the barrel body is fixedly connected to a transversely arranged connecting rod, and the bottom of the barrel body is rotatably connected to a plurality of fan-shaped closing plates, the plurality of closing plates are used to close the opening at the bottom of the barrel body after closing, and each closing plate is fixedly connected to a fixing pin at one end away from the barrel body; the bottom of the barrel body is fixedly connected to a plurality of rollers, and the top of the barrel body is detachably connected to the top frame.
[0007] The working principle of the present invention is as follows: when in use, multiple closing plates are rotated toward the center of the bottom of the cylinder body. Since the multiple closing plates are all fan-shaped, the opening at the bottom of the cylinder body is completely closed after the closing plates are closed. Then, the fixing pins on all the closing plates are tied with cotton ropes to prevent the closing plates from spreading out. Then, the raw materials are added through the opening at the top of the cylinder body. After the raw materials are filled, the cylinder body is pushed, and the roller at the bottom of the cylinder body is used to roll and drive the cylinder body to move into the lifting frame. Then, the top of the cylinder body is connected to the top frame, and then the motor is started. When the motor is running, the output shaft drives the reel to rotate. When the reel rotates, the traction rope is wound onto the reel. As the traction rope is shortened, the traction rope pulls the top frame upward to move upward. When the top frame moves upward The feeding barrel is driven to move upward in the lifting frame. When the roller at the bottom of the feeding barrel is at the same height as the top of the vacuum induction melting furnace, the motor is stopped, and then the feeding barrel is removed from the top frame, and then pushed to the side of the secondary feeding chamber, and then the feeding barrel is placed in the secondary feeding chamber, and connected to the lifting equipment of the secondary feeding chamber through the connecting rod on the top of the barrel body, and then the secondary feeding chamber is closed for vacuuming, and the feeding barrel is lowered. When the feeding barrel moves down to the molten steel, the cotton rope is melted and burned due to the high temperature. At this time, the closing plate loses the restriction of the cotton rope, and at the same time, it spreads out of the opening at the bottom of the barrel under the squeeze of the weight of the raw materials. At this time, the raw materials in the barrel body fall into the melting furnace under the action of gravity, and the feeding is completed.
[0008] Beneficial effects of the present invention:
[0009] 1. In this solution, multiple rollers are arranged at the bottom of the barrel. Therefore, after the raw materials are filled, you only need to push the feeding barrel to move the feeding barrel filled with raw materials. There is no need to use a crane to lift it, which avoids the occupation of the crane. In addition, it is easy to operate when pushing the feeding barrel, which greatly saves the time of moving the raw materials, thereby improving the feeding efficiency.
[0010] 2. Push the feeding cylinder filled with raw materials directly into the lifting frame and connect it to the top frame. Then, the feeding cylinder can be driven by the motor to move upward to the top of the vacuum induction melting furnace. After that, remove the feeding cylinder from the top frame and push the removed feeding cylinder from the top of the vacuum induction melting furnace to the secondary feeding chamber. In this way, only one person is required to operate to complete the movement and lifting of the feeding cylinder filled with raw materials and complete the feeding. Compared with the current method of using a crane to lift and move the feeding cylinder, the crane lifting still requires personnel to direct the crane driver, and at the same time, workers are also needed to assist in moving near the feeding cylinder. However, this solution not only does not occupy the crane but also does not require a commander, greatly saving labor costs.
[0011] Furthermore, the top frame includes a "冂"-shaped movable frame. Pulley wheels are fixedly connected to the upper surfaces of two opposite side frames of the movable frame. The traction rope successively bypasses the lower surfaces of the two pulley wheels. A movable plate that slides in the opening direction is slidably connected to the movable frame, and a hook is fixedly connected to the lower surface of the movable plate. During use, the hook directly hooks the connecting rod of the feeding cylinder, and then the motor runs to wind up the traction rope. The traction rope pulls the movable frame to move upward in the lifting frame through the pulley wheels. When the movable frame moves upward, it drives the feeding cylinder to move upward synchronously through the movable plate. When it moves to an appropriate height and stops moving upward, pull the movable plate in the opening direction of the movable frame. At this time, the movable plate moves horizontally out of the movable frame, thereby driving the feeding cylinder to move out of the range of the lifting frame to the top of the vacuum induction melting furnace. Then, remove the hook from the connecting rod to place the feeding cylinder on the top of the vacuum induction melting furnace.
[0012] Furthermore, the connecting rod includes two cross bars, and the two cross bars are fixedly parallel to the top of the inner wall of the cylinder body. The middle parts of the two cross bars are fixedly connected to the same hanging ring. The purpose is to increase the stability when lifting the feeding cylinder through this setting and reduce the possibility of the feeding cylinder shaking during the lifting process.
[0013] Furthermore, a plurality of stabilizing rods are fixedly connected at intervals between the two cross bars. The purpose is to increase the stability of the two cross bars through this setting and prevent the two cross bars from bending during the lifting process.
[0014] Furthermore, the roller is made of a ball bearing. The purpose is that the roller made of a ball bearing has no rubber tire and can withstand high temperatures, avoiding damage due to high temperatures. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a schematic structural diagram of an embodiment of the feeding device of the vacuum induction melting furnace of the present invention;
[0016] Figure 2 is Figure 1 a schematic structural diagram of the cylinder body in
[0017] Figure 3 is Figure 2 Structural schematic diagram of the upward view of the middle charging cylinder;
[0018] Figure 4 is Figure 1 Structural schematic diagram of the middle top frame. Specific implementation manner
[0019] The following is a further detailed description through specific implementation manners:
[0020] The reference numerals in the accompanying drawings of the specification include: motor 1, reel 2, lifting frame 3, towing rope 4, slide rail 5, pulley 6, movable frame 7, movable plate 8, hook 9, barrel body 10, roller 11, lifting ring 12, cross bar 13, stabilizing bar 14, closing plate 15, fixing pin 16, cotton rope 17.
[0021] The embodiment is basically as shown in the attached Figure 1 ~ the attached Figure 4 shown:
[0022] The charging device of the vacuum induction melting furnace includes a lifting frame 3 and a charging cylinder. A motor 1 is fixedly connected to the top of the lifting frame 3, a reel 2 is fixedly connected to the output shaft of the motor 1, and a towing rope 4 is wound around the reel 2; Four vertical slide rails 5 are arranged in the lifting frame 3, and the four slide rails 5 are distributed in a rectangular shape. A top frame is arranged on the four slide rails 5. The top frame includes a "冂"-shaped movable frame 7. The movable frame 7 is slidably connected to the four slide rails 5. Pulley 6 is fixedly connected to the upper surfaces of the opposite two side frames of the movable frame 7. The towing rope 4 successively passes around the lower surfaces of the two pulleys 6. A movable plate 8 that slides in the opening direction is slidably connected to the movable frame 7, and a hook 9 is fixedly connected to the lower surface of the movable plate 8.
[0023] The charging cylinder includes a barrel body 10 with openings at both the top and the bottom. A horizontally arranged connecting rod is fixedly connected to the top of the barrel body 10. The connecting rod includes two cross bars 13. The two cross bars 13 are fixedly parallel to the top of the inner wall of the barrel body 10. A plurality of stabilizing bars 14 are fixedly connected at intervals between the two cross bars 13. A lifting ring 12 is fixedly connected to the middle of the two cross bars 13. A plurality of fan-shaped closing plates 15 are rotatably connected to the circumference of the bottom of the barrel body 10. The plurality of closing plates 15 are used to close the opening at the bottom of the barrel body 10 after being closed. A fixing pin 16 is fixedly connected to each end of each closing plate 15 away from the barrel body 10; Four rollers 11 made of ball bearings are fixedly connected to the bottom of the barrel body 10.
[0024] The specific implementation process is as follows:
[0025] When in use, multiple closing plates 15 are rotated toward the center of the bottom of the cylinder body 10. Since the multiple closing plates 15 are all fan-shaped, the opening at the bottom of the cylinder body 10 will be completely closed after the closing plates 15 are closed. Then, the fixing pins 16 on all the closing plates 15 are tied with cotton ropes 17 to prevent the closing plates 15 from spreading out. Then, the raw materials are added through the opening at the top of the cylinder body 10. After the raw materials are filled, the cylinder body 10 is pushed, and the roller 11 at the bottom of the cylinder body 10 is used to roll and drive the cylinder body 10 to move into the lifting frame 3. The hook 9 is hooked on the lifting ring 12, and then the motor 1 is started. When the motor 1 is running, the output shaft drives the reel 2 to rotate. When the reel 2 rotates, the traction rope 4 is wound onto the reel 2. As the traction rope 4 is shortened, the traction rope 4 pulls the top frame upward to move upward. When the top frame moves upward, it drives the feeding barrel to move upward in the lifting frame 3. When the roller 11 at the bottom of the feeding barrel is aligned with the vacuum induction melting furnace When the height of the top is consistent, stop the operation of the motor 1, pull the movable plate 8 toward the opening direction of the movable frame 7, and then the movable plate 8 moves horizontally out of the movable frame 7, thereby driving the feeding barrel to move out of the range of the lifting frame 3 to the top of the vacuum induction melting furnace, and then remove the hook 9 from the connecting rod to put the feeding barrel on the top of the vacuum induction melting furnace, and then push the feeding barrel to the side of the secondary feeding chamber, and then put the feeding barrel into the secondary feeding chamber, and connect it to the lifting equipment of the secondary feeding chamber through the connecting rod at the top of the barrel body 10, and then the secondary feeding chamber is closed for vacuuming, and the feeding barrel is lowered. When the feeding barrel moves down to the molten steel, the cotton rope 17 is melted and burned due to the high temperature. At this time, the closing plate 15 loses the restriction of the cotton rope 17, and at the same time, it disperses and flows out of the opening at the bottom of the barrel body 10 under the squeezing of the weight of the raw material. At this time, the raw material in the barrel body 10 falls into the melting furnace under the action of gravity, and the feeding is completed.
Claims
1. A charging device for a vacuum induction melting furnace, characterized in that: It includes a lifting frame and a feeding barrel. A motor is fixedly connected to the top of the lifting frame. A reel is fixedly connected to the output shaft of the motor. A towing rope is wound around the reel. A top frame is vertically slidably connected inside the lifting frame. A pulley is fixedly connected to the upper surface of the top frame. One end of the towing rope bypasses the pulley and extends upward to be fixedly connected to the top of the lifting frame. The feeding barrel includes a barrel body with open tops and bottoms. A horizontally arranged connecting rod is fixedly connected to the top of the barrel body. A plurality of fan-shaped closing plates are rotatably connected to the circumference of the bottom of the barrel body. The plurality of closing plates are used to close the open bottom of the barrel body after being closed. A fixing pin is fixedly connected to each end of each closing plate away from the barrel body. A plurality of rollers are fixedly connected to the bottom of the barrel body. The top of the barrel body is detachably connected to the top frame.
2. The charging device for the vacuum induction melting furnace according to claim 1, characterized in that: The top frame includes a "冂"-shaped movable frame. Pulleys are fixedly connected to the upper surfaces of the opposite two side frames of the movable frame. The towing rope successively bypasses the lower surfaces of the two pulleys. A movable plate that slides in the opening direction is slidably connected to the movable frame. A hook is fixedly connected to the lower surface of the movable plate.
3. The charging device for the vacuum induction melting furnace according to claim 2, characterized in that: The connecting rod includes two cross bars. The two cross bars are fixedly arranged in parallel at the top of the inner wall of the barrel body. A same hanging ring is fixedly connected to the middle of the two cross bars.
4. The charging device for the vacuum induction melting furnace according to claim 3, characterized in that: A plurality of stabilizing rods are fixedly connected at intervals between the two cross bars.
5. The charging device for the vacuum induction melting furnace according to claim 4, characterized in that: The roller is made of a ball bearing.