Vertical heading machine attitude measurement system and measurement method

Through the vertical boring machine attitude measurement system of dual cameras and dual lasers, the problems of measuring channel safety hazards and the impact of the main machine pitch angle in the prior art are solved, real-time, safe and accurate attitude measurement is achieved, and it is suitable for harsh construction environments.

CN118936433APending Publication Date: 2024-11-12TIANHE MECHANICAL EQUIP MFG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410988109.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-23
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The existing vertical boring machine attitude measurement system needs to open a measurement channel when using laser sag and photosensitive targets, which poses safety hazards, and the posture cannot be analyzed when the pitch angle of the main machine is too large, which affects construction.

Method used

The vertical boring machine attitude measurement system adopts dual cameras and dual lasers. There is no need to open a measurement channel through laser sag and industrial cameras. The data processing is performed using gyroscopes and PCs to achieve real-time attitude resolution and adapt to harsh construction environments.

Benefits of technology

The system is more secure, the data is effective in real time, and is not affected by the pitch angle of the host. It can run stably in harsh environments. It has simple steps, convenient operation and high accuracy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118936433A_ABST
    Figure CN118936433A_ABST
Patent Text Reader

Abstract

The vertical heading machine attitude measurement system provided by the invention comprises a data acquisition, transmission and processing module, the data acquisition module comprises a laser plumb aligner, a laser, an industrial camera and a gyroscope, the laser plumb aligner is fixed on a hole well wall, so that the laser plumb aligner vertically and downwards emits visible light to a lifting lug layer on a hanging scaffold and forms a first light spot; a laser is arranged on the back face of a spraying and mixing platform at the bottom of the hanging scaffold, so that the laser vertically and downwards emits visible light to a cylindrical guide platform at the top of the main machine and forms a second light spot, the view fields of the two industrial cameras can cover the first light spot and the second light spot respectively, and a gyroscope is installed on the side face of the cylindrical guide platform; the gyroscope and the industrial camera are in data communication with the data processing module through the data transmission module, the data processing module can complete attitude calculation of the vertical heading machine, safety is better, attitude measurement data are real-time and effective, and the attitude measurement method of the vertical heading machine is simple in step, convenient to operate and high in accuracy.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of vertical tunneling machines, and in particular relates to a vertical tunneling machine posture measurement system and a measurement method. Background Art

[0002] A vertical tunnel boring machine is an important equipment for digging tunnels downward to form vertical tunnel projects such as mines and ventilation shafts. In order to avoid deviations in the excavation direction, most existing vertical tunnel boring machines are equipped with a vertical tunnel boring machine attitude measurement system. This type of system is usually composed of a laser plumb line, a photosensitive target, a gyroscope and an inclinometer. Among them, the photosensitive target is used to receive the laser emitted by the plumb line installed on the starting tunnel wall. The current position and attitude of the vertical tunnel boring machine can be calculated based on the obtained light spot coordinates and the measurement data of the inclinometer and the gyroscope. However, this solution requires the opening of a measurement channel when using the laser plumb line and the photosensitive target. Due to the high height of the vertical tunnel boring machine, it is very easy for foreign objects to fall from the measurement channel to endanger the safety of equipment and personnel. At the same time, if the main engine pitch angle of the vertical tunnel boring machine is too large during the excavation process, the light spot of the laser plumb line cannot fall on the photosensitive target through the measurement channel. In this state, the current attitude of the vertical tunnel boring machine cannot be analyzed, which will affect the subsequent construction. Therefore, this type of measurement system has great disadvantages. Summary of the invention

[0003] The purpose of the present invention is to overcome one or more shortcomings in the prior art and to provide a vertical tunnel boring machine attitude measurement system based on dual cameras and dual lasers. The system does not require the opening of a measurement channel when in use and is not affected by the pitch angle of the main engine. It has better safety, can ensure that the attitude measurement data is real-time and effective, and can operate stably in harsh construction environments. The present invention also provides a vertical tunnel boring machine attitude measurement method, which has simple steps, easy operation and high accuracy.

[0004] To achieve the above-mentioned purpose, the product in the technical solution provided by the present invention is a vertical tunnel boring machine posture measurement system, comprising:

[0005] A data acquisition module, wherein the data acquisition module includes a laser plumb line, a laser, an industrial camera and a gyroscope;

[0006] A data transmission module, wherein the data transmission module includes a Moxa server and a switch;

[0007] A data processing module, wherein the data processing module comprises a PC;

[0008] The laser plumb line is fixed on the wall of the tunnel entrance through a laser plumb line bracket, the laser plumb line is aimed at the hanging plate in the tunnel, and emits a beam of visible light vertically downward to the hanging ear layer on the top of the hanging plate;

[0009] The laser is arranged on the back of the spray mixing platform at the bottom of the hanging tray, the laser is aimed at the main machine located below the hanging tray, and emits a beam of visible light vertically downward to the cylindrical guide platform on the mud and water platform at the top of the main machine;

[0010] The industrial camera comprises a first industrial camera and a second industrial camera, wherein the first industrial camera is supported by a first bracket above the hanging ear layer and is arranged close to the visible light emitted by the laser plummet, and the field of view of the first industrial camera faces downward and covers a first light spot formed on the hanging ear layer by the visible light emitted by the laser plummet; the second industrial camera is supported by a second bracket above the mud and water platform and is arranged close to the visible light emitted by the laser, and the field of view of the second industrial camera covers a second light spot formed on the cylindrical guide platform by the visible light emitted by the laser;

[0011] The gyroscope is installed on the side of the cylindrical guide platform. The gyroscope is connected to the PC through the Moxa server. The first industrial camera and the second industrial camera are connected to the PC through the switch, so that the PC can obtain gyroscope data and image information, thereby completing the posture calculation of the vertical tunnel boring machine.

[0012] Preferably, the laser is connected to the back center of the spray-mixing platform through a self-hanging bracket, and when the hanging plate is tilted, the visible light emitted by the laser to the cylindrical guide platform remains vertically downward.

[0013] Further preferably, the cylindrical guide platform is arranged at the center of the muddy water platform.

[0014] Preferably, the position and posture of the first industrial camera on the first bracket are adjustable, and the position and posture of the second industrial camera on the second bracket are adjustable.

[0015] Preferably, the gyroscope is a three-axis gyroscope.

[0016] Preferably, the Moxa server and the switch are both arranged in a guide control box of the vertical tunneling machine.

[0017] Preferably, the hanging platform is suspended above the main engine by a cable and is softly connected to the main engine, and a distance of two to three propulsion cylinder strokes is maintained between the hanging platform and the main engine.

[0018] To achieve the above object, the method in the technical solution provided by the present invention is a vertical tunnel boring machine attitude measurement system, which is implemented by using the above vertical tunnel boring machine attitude measurement system, and the measurement method comprises the following steps:

[0019] a. Establish a coordinate system, with the geographic west as the positive direction of the X-axis and the geographic south as the positive direction of the Y-axis to establish the guide coordinate system XOY, with the west direction in the field of view of the first industrial camera as the positive direction of the x-axis and the south direction as the positive direction of the y-axis to establish the first image pixel coordinate system xoy, with the west direction in the field of view of the second industrial camera as the positive direction of the x' and the south direction as the positive direction of the y' axis to establish the second image pixel coordinate system x'oy';

[0020] b. When the host and the hanging plate are both in a horizontal state, the vertical tunnel boring machine starts, and the coordinates (X mt0 ,Y mt0 ), and converts it into the coordinate (X′) of the center of the first light spot in the guide coordinate system XOY mt0 ,Y′ mt0 ), the conversion formula is:

[0021] X′ mt0 =K m *(X mt0 -P w / 2)

[0022] Y′ mt0 =K m *(Y mt0 -P h / 2)

[0023] Among them, Pw is the pixel width of the image collected by the first industrial camera, Ph is the pixel height of the image collected by the first industrial camera, and K m is the actual distance corresponding to 1 pixel in the guide coordinate system XOY;

[0024] The coordinates (X nt0 ,Y nt0 ), and converts it into the coordinate (X′) of the center of the second light spot in the guide coordinate system XOY nt0 ,Y n ' t0 ), the conversion formula is:

[0025] X n ' t0 =K m *(X nt0 -P w ' / 2)

[0026] Y n ' t0 =K m *(Y nt0 -Ph ' / 2)

[0027] Among them, Pw' is the pixel width of the image collected by the second industrial camera, Ph' is the pixel height of the image collected by the second industrial camera, and K n is the actual distance corresponding to 1 pixel in the guide coordinate system XOY;

[0028] c. During the excavation process of the vertical tunnel boring machine, the coordinates of the center of the first light spot in the first picture pixel coordinate system xoy are collected in real time by the first industrial camera as (X mt ,Y mt ), and converts it into the coordinate (X′) of the center of the first light spot in the guide coordinate system XOY mt ,Y′ mt ), the conversion formula is:

[0029] X′ mt =K m *(X mt -P wt / 2)

[0030] Y m ′m t =K m *(Y mt -P ht / 2)

[0031] Among them, Pwt is the pixel width of the image collected by the first industrial camera, Pht is the pixel height of the image collected by the first industrial camera, and K m is the actual distance corresponding to 1 pixel in the guide coordinate system XOY;

[0032] The coordinates of the center of the second light spot collected in real time by the second industrial camera in the second picture pixel coordinate system x'oy' are (X nt ,Y nt ), and converts it into the coordinate (X′) of the center of the second light spot in the guide coordinate system XOY nt ,Y n ' t ), the conversion formula is:

[0033] X n ' t =K m *(X nt -P wt ' / 2)

[0034] Y n ' t =K m *(Y nt -P ht ' / 2)

[0035] Among them, Pwt' is the pixel width of the image collected by the second industrial camera, Pht' is the pixel height of the image collected by the second industrial camera, and K n is the actual distance corresponding to 1 pixel in the guide coordinate system XOY;

[0036] d. According to the initial coordinate (X′) of the center of the first light spot in the guide coordinate system XOY mt0 ,Y′ mt0 ) and real-time coordinates (X′ mt ,Y′ mt ), calculate the displacement (ΔX t ,ΔY t ), the calculation formula is:

[0037] ΔX t =X′ mt -X′ mt0

[0038] ΔY t =Y′ mt -Y′ mt0

[0039] e. According to the initial coordinates (X') of the center of the second light spot in the guide coordinate system XOY. nt0 ,Y n ' t0 ) and real-time coordinates (X′ nt ,Y n ' t ), calculate the offset (ΔX b ,ΔY b ), the calculation formula is:

[0040] ΔX b =X′ nt -X′ nt0

[0041] ΔY b =Y n ' t -Y n ' t0

[0042] f. Record the pitch angle (X) of the host in real time through the gyroscope at ,Y at ), and calculate the offset (ΔX a ,ΔY a ), the calculation formula is:

[0043] ΔX a =H*tanX at

[0044] ΔY a =H*tanY at

[0045] Wherein, H is the distance from the top surface of the cylindrical guide platform to the cutter head on the main machine;

[0046] g. Calculate the absolute position offset (ΔX, ΔY) of the host during the excavation process. The calculation formula is:

[0047] ΔX=ΔX b -ΔX a -ΔX t

[0048] ΔY=ΔY b -ΔY a -ΔY t

[0049] h. The absolute position offset (ΔX, ΔY) and pitch angle (X at ,Y at ) is displayed on the interface of the guidance software to complete the vertical tunnel boring machine posture measurement.

[0050] Preferably, the step f further comprises recording the rollback angle D of the host in real time. t The step g also includes setting the rollback angle D t Displayed on the interface of the guidance software.

[0051] Preferably, during the excavation process of the vertical tunnel boring machine, the position and posture of the first industrial camera relative to the hanging platform do not change, and the position and posture of the second industrial camera relative to the host machine do not change.

[0052] Due to the application of the above technical solution, the present invention has the following advantages compared with the prior art:

[0053] The vertical tunnel boring machine posture measurement system provided by the present invention comprises a data acquisition module, a data transmission module and a data processing module, wherein the data acquisition module comprises a laser plumb line, a laser, an industrial camera and a gyroscope; the data transmission module comprises a Moxa server and a switch; the data processing module comprises a PC; the laser plumb line is fixed on the wall of a tunnel opening so as to align it with a hanging plate in the tunnel, and a beam of visible light is vertically emitted downward to a hanging ear layer on the top of the hanging plate to form a first light spot; the laser is arranged on the back of a spray mixing platform at the bottom of the hanging plate so as to align it with a main machine below the hanging plate, and a beam of visible light is vertically emitted downward to a cylindrical guide platform on a mud and water platform on the top of the main machine to form a second light spot; the industrial camera comprises a first industrial camera and a second industrial camera, and the first industrial camera is supported The first industrial camera is supported above the lifting lug layer and close to the visible light emitted by the laser plumb line, so that the field of view of the first industrial camera faces downward and covers the first light spot; the second industrial camera is supported above the mud and water platform and close to the visible light emitted by the laser, so that the field of view of the second industrial camera faces downward and covers the second light spot; the gyroscope is installed on the side of the cylindrical guide platform, and the gyroscope is connected to the PC through the Moxa server, and the first industrial camera and the second industrial camera are connected to the PC through the switch, so that the PC can obtain the gyroscope data and image information, thereby completing the posture solution of the vertical tunnel boring machine. When using this system, there is no need to open a measurement channel and it is not affected by the pitch angle of the host. It has better safety, can ensure that the attitude measurement data is real-time and effective, and can operate stably in harsh construction environments.

[0054] The vertical tunnel boring machine posture measurement method provided by the present invention has simple steps, convenient operation and high accuracy. BRIEF DESCRIPTION OF THE DRAWINGS

[0055] Figure 1 It is a structural schematic diagram of the vertical tunnel boring machine posture measurement system in the present invention.

[0056] Figure 2 It is a schematic diagram of the axial direction relationship between the first industrial camera coordinate system and the guide coordinate system in the present invention.

[0057] Figure 3 It is a flow chart of the vertical tunnel boring machine posture measurement method in the present invention.

[0058] Among them: 1. Well wall; 2. Lifting plate; 3. Main machine; 4. Lifting ear layer; 5. Spray mixing platform; 6. Mud and water platform; 7. Laser plumb line; 8. First industrial camera; 9. Cylindrical guide platform; 10. Laser; 11. Second industrial camera; 12. Gyroscope. DETAILED DESCRIPTION

[0059] like Figure 1As shown, the vertical tunnel boring machine posture measurement system provided by the present invention includes: a data acquisition module, a data transmission module and a data processing module, wherein the data acquisition module includes a laser plumb line 7, a laser 10, an industrial camera and a gyroscope 12, the data transmission module includes a Moxa server and a switch, and the data processing module includes a PC; specifically, the laser plumb line 7 is fixed to the shaft wall 1 of the tunnel entrance through a laser plumb line bracket, the laser plumb line 7 is aimed at the hanging plate 2 located in the tunnel, and vertically emits a beam of visible light to the ear layer 4 on the top of the hanging plate 2; the laser 10 is arranged on the back side of the spray mixing platform 5 at the bottom of the hanging plate 2, the laser 10 is aimed at the main machine 3 located below the hanging plate 2, and vertically emits a beam of visible light to the cylindrical guide platform 9 on the mud and water platform 6 on the top of the main machine 3; the industrial camera includes a first industrial camera 8 and a second industrial camera 11, the first industrial camera 8 and the second industrial camera 11. The industrial camera 8 is supported by a first bracket above the ear layer 4 and is arranged close to the visible light emitted by the laser plumb line 7. The field of view of the first industrial camera 8 faces downward and covers the first light spot formed on the ear layer 4 by the visible light emitted by the laser plumb line 7. The second industrial camera 11 is supported by a second bracket above the mud and water platform 6 and is arranged close to the visible light emitted by the laser 10. The field of view of the second industrial camera 11 faces downward and covers the second light spot formed on the cylindrical guide platform 9 by the visible light emitted by the laser 10. The gyroscope 12 is a three-axis gyroscope. The gyroscope 12 is installed on the side of the cylindrical guide platform 9. The gyroscope 12 is connected to the PC through the Moxa server. The first industrial camera 8 and the second industrial camera 11 are connected to the PC through the switch, so that the PC can obtain gyroscope data and image information, thereby completing the posture solution of the vertical tunnel boring machine.

[0060] When using the system, there is no need to open a measurement channel and it is not affected by the pitch angle of the host machine. It has better safety, can ensure that the attitude measurement data is real-time and effective, and can operate stably in harsh construction environments.

[0061] To ensure the accuracy of the measurement data, in this embodiment, the laser 10 is connected to the back center of the spray mixing platform 5 through a self-hanging bracket (such as a plumb rope). When the hanging plate 2 tilts, the laser 10 can be corrected by its own gravity so that the visible light emitted by the laser 10 to the cylindrical guide platform 9 remains vertically downward.

[0062] Furthermore, a cylindrical guide platform 9 is arranged at the center of the mud and water platform 6. At the same time, the hanging plate 2 is suspended above the main machine 3 by a cable and is softly connected to the main machine 3. A distance of two to three propulsion cylinder strokes is maintained between the hanging plate 2 and the main machine 3, which ensures that the laser 10 and the second industrial camera 11 have sufficient working space and enables the second light spot to have a higher enrichment, thereby ensuring the accuracy of the measurement result.

[0063] To facilitate field of view adjustment, in this embodiment, the position and posture of the first industrial camera 8 on the first bracket are adjustable, and the position and posture of the second industrial camera 11 on the second bracket are adjustable.

[0064] To avoid damage and improve anti-interference capabilities, Moxa servers and switches are further installed in the guide control box of the vertical tunnel boring machine.

[0065] like Figure 2 and Figure 3 As shown, the present invention also provides a vertical tunnel boring machine attitude measurement system, which is implemented by using the above-mentioned vertical tunnel boring machine attitude measurement system. The measurement method includes the following steps:

[0066] a. Establish a coordinate system, with the geographic west as the positive direction of the X-axis and the geographic south as the positive direction of the Y-axis to establish the guide coordinate system XOY, with the west direction in the field of view of the first industrial camera as the positive direction of the x-axis and the south direction as the positive direction of the y-axis to establish the first image pixel coordinate system xoy, with the west direction in the field of view of the second industrial camera as the positive direction of the x' and the south direction as the positive direction of the y' axis to establish the second image pixel coordinate system x'oy';

[0067] b. When the main engine and the hoisting platform are both in a horizontal state, the vertical tunnel boring machine starts, and the coordinates (X mt0 ,Y mt0 ), and convert it into the coordinate (X′) of the center of the first light spot in the guide coordinate system XOY mt0 ,Y′ mt0 ), the conversion formula is:

[0068] X′ mt0 =K m *(X mt0 -P w / 2)

[0069] Y′ mt0 =K m *(Y mt0 -P h / 2)

[0070] Among them, Pw is the pixel width of the image collected by the first industrial camera, Ph is the pixel height of the image collected by the first industrial camera, and K m is the actual distance corresponding to 1 pixel in the guide coordinate system XOY;

[0071] The coordinates (X nt0 ,Y nt0 ), and convert it into the coordinate (X′) of the center of the second light spot in the guide coordinate system XOYnt0 ,Y′ nt0 ), the conversion formula is:

[0072] X′ nt0 =K m *(X nt0 -P w ' / 2)

[0073] Y′ nt0 =K m *(Y nt0 -P h ' / 2)

[0074] Among them, Pw' is the pixel width of the image collected by the second industrial camera, Ph' is the pixel height of the image collected by the second industrial camera, and K n is the actual distance corresponding to 1 pixel in the guide coordinate system XOY;

[0075] c. During the excavation process of the vertical tunnel boring machine, the coordinates of the center of the first light spot in the first image pixel coordinate system xoy are collected in real time by the first industrial camera as (X mt ,Y mt ), and convert it into the coordinate (X′) of the center of the first light spot in the guide coordinate system XOY mt ,Y′ mt ), the conversion formula is:

[0076] X′ mt =K m *(X mt -P wt / 2)

[0077] Y′ mt =K m *(Y mt -P ht / 2)

[0078] Among them, Pwt is the pixel width of the image collected by the first industrial camera, Pht is the pixel height of the image collected by the first industrial camera, and K m is the actual distance corresponding to 1 pixel in the guide coordinate system XOY;

[0079] The coordinates of the center of the second light spot collected in real time by the second industrial camera in the second image pixel coordinate system x'oy' are (X nt ,Y nt ), and convert it into the coordinate (X′) of the center of the second light spot in the guide coordinate system XOY nt ,Y n ' t ), the conversion formula is:

[0080] X′ nt=K m *(X nt -P wt ' / 2)

[0081] Y′ nt =K m *(Y nt -P ht ' / 2)

[0082] Among them, Pwt' is the pixel width of the image collected by the second industrial camera, Pht' is the pixel height of the image collected by the second industrial camera, and K n is the actual distance corresponding to 1 pixel in the guide coordinate system XOY;

[0083] d. According to the initial coordinates (X′) of the center of the first light spot in the guide coordinate system XOY mt0 ,Y′ mt0 ) and real-time coordinates (X′ mt ,Y′ mt ), calculate the displacement of the lifting platform during the excavation process (ΔX t ,ΔY t ), the calculation formula is:

[0084] ΔX t =X′ mt -X′ mt0

[0085] ΔY t =Y′ mt -Y′ mt0

[0086] e. According to the initial coordinates (X′) of the center of the second light spot in the guide coordinate system XOY nt0 ,Y′ nt0 ) and real-time coordinates (X′ nt ,Y′ nt ), calculate the offset (ΔX b ,ΔY b ), the calculation formula is:

[0087] ΔX b =X′ nt -X′ nt0

[0088] ΔY b =Y′ nt -Y′ nt0

[0089] f. Use the gyroscope to record the pitch angle (X at ,Y at), and calculate the offset (ΔX a ,ΔY a ), the calculation formula is:

[0090] ΔX a =H*tan X at

[0091] ΔY a =H*tan Y at

[0092] Wherein, H is the distance from the top surface of the cylindrical guide platform to the cutter head on the main machine;

[0093] g. Calculate the absolute position offset (ΔX, ΔY) of the main engine during the excavation process. The calculation formula is:

[0094] ΔX=ΔX b -ΔX a -ΔX t

[0095] ΔY=ΔY b -ΔY a -ΔY t

[0096] h. Set the absolute position offset (ΔX, ΔY) and pitch angle (X at ,Y at ) is displayed on the interface of the guidance software to complete the vertical tunnel boring machine posture measurement.

[0097] The measuring method has simple steps, convenient operation, high accuracy and is easy to promote and use.

[0098] Preferably, step f also includes recording the rollback angle D of the host in real time t Step g also includes setting the rollback angle D t The rollback angle D generated by the host part is displayed on the interface of the guidance software. t It will not affect the position of the second light spot, but will control the rollback angle D t This is necessary to prevent affecting the operation of other equipment.

[0099] Preferably, during the excavation process of the vertical tunnel boring machine, the position and posture of the first industrial camera relative to the hanging platform do not change, and the position and posture of the second industrial camera relative to the host machine do not change, which can avoid errors introduced by perspective transformation.

[0100] It should be noted that, in the above embodiment, K m , K nThe K series parameters can be calculated based on the current camera installation height H, the actual image size width W, the camera focal length f, and the image pixel width w. The calculation formula is: k = H*W / (f*w)H.

[0101] The above embodiments are only for illustrating the technical concept and features of the present invention, and their purpose is to enable people familiar with this technology to understand the contents of the present invention and implement them accordingly. They cannot be used to limit the protection scope of the present invention. Any equivalent changes or modifications made according to the spirit of the present invention should be included in the protection scope of the present invention.

Claims

1. A vertical tunnel boring machine attitude measurement system, comprising: A data acquisition module, wherein the data acquisition module includes a laser plumb line, a laser, an industrial camera and a gyroscope; A data transmission module, wherein the data transmission module includes a Moxa server and a switch; A data processing module, wherein the data processing module comprises a PC; Features: The laser plumb line is fixed on the wall of the tunnel entrance through a laser plumb line bracket, the laser plumb line is aimed at the hanging plate in the tunnel, and emits a beam of visible light vertically downward to the hanging ear layer on the top of the hanging plate; The laser is arranged on the back of the spray mixing platform at the bottom of the hanging tray, the laser is aimed at the main machine located below the hanging tray, and emits a beam of visible light vertically downward to the cylindrical guide platform on the mud and water platform at the top of the main machine; The industrial camera comprises a first industrial camera and a second industrial camera, wherein the first industrial camera is supported by a first bracket above the hanging ear layer and is arranged close to the visible light emitted by the laser plummet, and the field of view of the first industrial camera faces downward and covers a first light spot formed on the hanging ear layer by the visible light emitted by the laser plummet; the second industrial camera is supported by a second bracket above the mud and water platform and is arranged close to the visible light emitted by the laser, and the field of view of the second industrial camera covers a second light spot formed on the cylindrical guide platform by the visible light emitted by the laser; The gyroscope is installed on the side of the cylindrical guide platform. The gyroscope is connected to the PC through the Moxa server. The first industrial camera and the second industrial camera are connected to the PC through the switch, so that the PC can obtain gyroscope data and image information, thereby completing the posture calculation of the vertical tunnel boring machine.

2. The vertical tunnel boring machine attitude measurement system according to claim 1, characterized in that: The laser is connected to the back center of the spray-mixing platform through a self-hanging bracket. When the hanging plate is tilted, the visible light emitted by the laser to the cylindrical guide platform remains vertically downward.

3. The vertical tunnel boring machine attitude measurement system according to claim 2, characterized in that: The cylindrical guide platform is arranged at the center of the muddy water platform.

4. The vertical tunnel boring machine attitude measurement system according to claim 1, characterized in that: The position and posture of the first industrial camera on the first bracket are adjustable, and the position and posture of the second industrial camera on the second bracket are adjustable.

5. The vertical tunnel boring machine attitude measurement system according to claim 1, characterized in that: The gyroscope is a three-axis gyroscope.

6. The vertical tunnel boring machine attitude measurement system according to claim 1, characterized in that: The Moxa server and the switch are both arranged in the guide control box of the vertical tunneling machine.

7. The vertical tunnel boring machine attitude measurement system according to claim 1, characterized in that: The hanging plate is suspended above the main engine by a cable and is softly connected to the main engine. The distance between the hanging plate and the main engine is two to three propulsion cylinder strokes.

8. A method for measuring the attitude of a vertical tunnel boring machine, implemented by using the vertical tunnel boring machine attitude measurement system according to any one of claims 1 to 7, the method comprising the following steps: a. Establish a coordinate system, with the geographic west as the positive direction of the X-axis and the geographic south as the positive direction of the Y-axis to establish the guide coordinate system XOY, with the west direction in the field of view of the first industrial camera as the positive direction of the x-axis and the south direction as the positive direction of the y-axis to establish the first image pixel coordinate system xoy, with the west direction in the field of view of the second industrial camera as the positive direction of the x' and the south direction as the positive direction of the y' axis to establish the second image pixel coordinate system x'oy'; b. When the host and the hanging plate are both in a horizontal state, the vertical tunnel boring machine starts, and the coordinates (X mt0 ,Y mt0 ), and converts it into the coordinate (X′) of the center of the first light spot in the guide coordinate system XOY mt0 ,Y′ mt0 ), the conversion formula is: X′ mt0 =K m *(X mt0 -P w / 2) AND' mt0 =K m *(AND mt0 -P h / 2) Among them, Pw is the pixel width of the image collected by the first industrial camera, Ph is the pixel height of the image collected by the first industrial camera, and K m is the actual distance corresponding to 1 pixel in the guide coordinate system XOY; The coordinates (X nt0 ,Y nt0 ), and converts it into the coordinate (X′) of the center of the second light spot in the guide coordinate system XOY nt0 ,Y n ' t0 ), the conversion formula is: X′ nt0 =K m *(X nt0 -P w ’ / 2) AND' nt0 =K m *(AND nt0 -P h ' / 2) Among them, Pw' is the pixel width of the image collected by the second industrial camera, Ph' is the pixel height of the image collected by the second industrial camera, and K n is the actual distance corresponding to 1 pixel in the guide coordinate system XOY; c. During the excavation process of the vertical tunnel boring machine, the coordinates of the center of the first light spot in the first picture pixel coordinate system xoy are collected in real time by the first industrial camera as (X mt ,Y mt ), and converts it into the coordinate (X′) of the center of the first light spot in the guide coordinate system XOY mt ,Y′ mt ), the conversion formula is: X′ mt =K m *(X mt -P wt / 2) AND' mt =K m *(AND mt -P ht / 2) Among them, Pwt is the pixel width of the image collected by the first industrial camera, Pht is the pixel height of the image collected by the first industrial camera, and K m is the actual distance corresponding to 1 pixel in the guide coordinate system XOY; The coordinates of the center of the second light spot collected in real time by the second industrial camera in the second picture pixel coordinate system x'oy' are (X nt ,Y nt ), and converts it into the coordinate (X′) of the center of the second light spot in the guide coordinate system XOY nt ,Y′ nt ), the conversion formula is: X′ nt =K m *(X nt -P wt ’ / 2) AND' nt =K m *(AND nt -P ht ' / 2) Among them, Pwt' is the pixel width of the image collected by the second industrial camera, Pht' is the pixel height of the image collected by the second industrial camera, and K n is the actual distance corresponding to 1 pixel in the guide coordinate system XOY; d. According to the initial coordinate (X′) of the center of the first light spot in the guide coordinate system XOY mt0 ,Y′ mt0 ) and real-time coordinates (X′ mt ,Y′ mt ), calculate the displacement (ΔX t ,ΔY t ), the calculation formula is: ΔX t =X′ mt -X′ mt0 ΔY t =Y′ mt -Y′ mt0 e. According to the initial coordinates (X') of the center of the second light spot in the guide coordinate system XOY. nt0 ,Y′ nt0 ) and real-time coordinates (X′ nt ,Y′ nt ), calculate the offset (ΔX b ,ΔY b ), the calculation formula is: ΔX b =X′ nt -X′ nt0 ΔY b =Y′ nt -Y′ nt0 f. Record the pitch angle (X) of the host in real time through the gyroscope at ,Y at ), and calculate the offset (ΔX a ,ΔY a ), the calculation formula is: ΔX a =H*tan X at ΔY a =H*tan Y at Wherein, H is the distance from the top surface of the cylindrical guide platform to the cutter head on the main machine; g. Calculate the absolute position offset (ΔX, ΔY) of the host during the excavation process. The calculation formula is: ΔX=ΔX b -ΔX a -ΔX t ΔY=ΔY b -ΔY a -ΔY t h. The absolute position offset (ΔX, ΔY) and pitch angle (X at ,Y at ) is displayed on the interface of the guidance software to complete the vertical tunnel boring machine posture measurement.

9. The method for measuring the posture of a vertical tunnel boring machine according to claim 8, characterized in that: The step f also includes recording the rollback angle D of the host in real time. t The step g also includes setting the rollback angle D t Displayed on the interface of the guidance software.

10. The method for measuring the posture of a vertical tunnel boring machine according to claim 8, characterized in that: During the excavation process of the vertical tunnel boring machine, the position and posture of the first industrial camera relative to the hanging platform do not change, and the position and posture of the second industrial camera relative to the host do not change.