Karst unfavorable geology evaluation method and treatment method based on ultrasonic detection
Ultrasonic detection technology determines the suspicious detection areas and characteristics of karst geological assessment, generates evaluation results, and solves the problem of insufficient convenience and accuracy of karst geological exploration in the prior art, improving the efficiency and accuracy of evaluation and processing.
Patent Information
- Application Number
- CN202411067861.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-06
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2044-08-06
AI Technical Summary
The prior art has poor convenience and accuracy in karst geological exploration, and relies on the experience of explorers, resulting in low accuracy of detection results.
Ultrasonic detection technology is introduced to improve the convenience and accuracy of karst geological evaluation by obtaining suspicious detection areas in the target area, determining ultrasonic detection characteristics and generating evaluation results, and foundation processing is carried out based on the evaluation results.
It improves the convenience and accuracy of karst geological assessment, ensures the suitability and efficiency of foundation treatment, and reduces the dependence of explorers on results by experience.
Smart Images

Figure CN118937482A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of narrowband Internet of Things, and in particular to a karst adverse geological assessment method and a processing method based on ultrasonic detection. Background Art
[0002] Karst landform is a general term for the surface and underground forms formed by the dissolution of soluble rocks by water with dissolving power, that is, karst landform. The main features of karst adverse geology are surface stone buds, funnels, depressions, karst troughs, etc., as well as sinkholes and caves hidden underground. Karst adverse geology may bring many safety risks during the construction process, so it is crucial to conduct a detailed assessment and take appropriate safety measures before construction. Ultrasonic detection can accurately depict the karst phenomena revealed by drilling, and help identify the regional geological background, site landforms, stratigraphic lithology and other characteristics of karst development.
[0003] The invention patent with application number: CN201611203094.8 discloses a tunnel geological karst risk assessment method based on fuzzy judgment, which includes the following steps: 1) Conducting tunnel geological survey to obtain stratigraphic lithology information of the tunnel and its surrounding rocks; 2) If the lithology is soluble rock including limestone, dolomite, gypsum or soluble conglomerate or its contact zone with non-soluble rock; and the water level is lower than the groundwater level and higher than the lower limit of karst development, the tunnel geological karst risk is assessed as high risk; 3) Collecting hydrogeological information of the tunnel and its surrounding rocks, establishing an index hierarchy table, and calculating the risk level value based on the index hierarchy table and the factor weights obtained by the fuzzy mathematics method; 4) Determining the karst cave water inrush level according to the risk level value. The above invention quantifies the scoring standard and risk level division of karst cave water inrush, which is intuitive and can clearly judge the degree of influencing factors based on the score.
[0004] However, when the above-mentioned existing technologies are used for geological exploration, it is necessary to conduct in-depth exploration inside the tunnel, which is less convenient and relies on the experience of the exploration personnel to obtain the exploration results. When the exploration personnel are inexperienced, the accuracy of the exploration is low.
[0005] In view of this, there is an urgent need for karst adverse geological assessment methods and treatment methods based on ultrasonic detection to at least solve the above-mentioned deficiencies. Summary of the invention
[0006] One of the purposes of the present invention is to provide a karst adverse geological assessment method and processing method based on ultrasonic detection, and introduce ultrasonic detection technology to extract ultrasonic detection features of suspicious detection areas in areas where karst adverse geological assessment is required. The assessment results of the suspicious detection areas are generated according to the ultrasonic detection features. The convenience and accuracy of karst adverse geological assessment are improved, and the subsequent processing based on the assessment results is also more appropriate.
[0007] The method for evaluating karst adverse geology based on ultrasonic detection provided by an embodiment of the present invention includes:
[0008] Step 1: Obtain the suspicious detection area of the target area;
[0009] Step 2: Detect the suspicious detection area based on ultrasonic detection technology and determine the ultrasonic detection characteristics;
[0010] Step 3: Generate an assessment result of the suspicious detection area based on the ultrasonic detection characteristics.
[0011] Preferably, step 1: obtaining a suspicious detection area of a target area includes:
[0012] Obtain historical detection records of karst adverse geology;
[0013] Determine the basis for suspicious detection areas based on historical detection records;
[0014] The suspicious detection area is determined according to the basis for determining the suspicious detection area and the area information of the target area.
[0015] Preferably, the basis for determining the suspicious detection area is determined based on historical detection records, including:
[0016] Extracting the first target area features according to the historical detection records;
[0017] Performing feature clustering according to the first target area feature to determine the target area feature cluster;
[0018] Determine a first target region feature corresponding to the target region feature cluster and use it as a second target region feature;
[0019] In the same target region feature cluster, each second target region feature is traversed in turn, and the second target region feature being traversed is used as the third target region feature;
[0020] Extracting the associated target region feature of the third target region feature according to the historical detection record where the third target region feature is located;
[0021] If the associated target area feature meets the feature combination condition, the associated target area feature and the second target area feature are used as the feature combination, and the feature combination is used as the basis for determining the suspicious detection area;
[0022] If the associated target area feature does not satisfy the feature combination condition, the second target area feature is used as the basis for determining the suspicious detection area.
[0023] Preferably, the characteristic combination conditions include:
[0024] In each historical detection record where the fourth target area feature is located, an associated target area feature of the fourth target area feature that is similar to the associated target area feature of the third target area feature can be found, and the associated target area feature of the fourth target area feature has similar features to the first target area feature; wherein the fourth target area feature is the second target area feature other than the third target area feature in the same target area feature cluster.
[0025] Preferably, step 2: detecting the suspicious detection area based on ultrasonic detection technology and determining ultrasonic detection features includes:
[0026] Detect suspicious detection areas based on ultrasonic detection technology and obtain ultrasonic detection signals;
[0027] Based on the ultrasonic detection signal feature extraction template, the ultrasonic detection feature is determined according to the ultrasonic detection signal.
[0028] Preferably, step 3: generating an evaluation result of the suspicious detection area according to the ultrasonic detection characteristics, comprises:
[0029] Obtaining karst adverse geological assessment models;
[0030] The ultrasonic detection characteristics are input into the karst adverse geological assessment model to obtain the assessment results.
[0031] The method for processing karst adverse geological conditions based on ultrasonic detection provided by the embodiment of the present invention further includes:
[0032] Obtaining an assessment result of a suspicious detection area of a target area, wherein the assessment result is assessed by the above-mentioned karst adverse geology assessment method;
[0033] Guide the foundation treatment in the karst adverse geological areas based on the assessment results;
[0034] During the foundation treatment process, ultrasonic detection technology is used to coordinate the foundation treatment and construction process verification;
[0035] After the foundation treatment process is completed, the karst unfavorable geological area is comprehensively checked.
[0036] Preferably, the assessment results are used to guide the foundation treatment in the karst adverse geological area, including:
[0037] Based on the assessment results, determine the design requirements for the planned treatment caves in the karst adverse geological areas;
[0038] Loft out and determine drilling hole position marks according to design requirements;
[0039] Control the drilling rig to go to the drilling hole mark to carry out drilling construction;
[0040] Analyze the design requirements and obtain the theoretical injection volume of each borehole;
[0041] Conduct on-site pouring tests based on theoretical pouring volume to determine construction parameters;
[0042] Carry out foundation treatment according to construction parameters.
[0043] The method for processing karst adverse geological conditions based on ultrasonic detection provided by the embodiment of the present invention further includes:
[0044] When performing foundation treatment according to construction parameters, if the total pouring volume reaches half of the designed total pouring volume in the design requirements, and the pouring pressure increase value is less than or equal to the preset pouring pressure increase value threshold, the cause of the abnormal pressure increase is attributed and the construction parameters are adjusted accordingly.
[0045] Preferably, the cause of abnormal boost is attributed, including:
[0046] Obtaining abnormal empirical data on perfusion pressure;
[0047] Based on the abnormal perfusion pressure empirical data, determine the abnormal scenario set;
[0048] Calculate the scenario similarity between the abnormal scenario and the construction scenario in the abnormal scenario set;
[0049] If the scenario similarity is greater than or equal to the preset scenario similarity threshold, the corresponding abnormal scenario is used as the target scenario;
[0050] Analyze the abnormal perfusion pressure experience data and obtain subsequent analysis records of the target scenario;
[0051] Extract similar analysis items between subsequent analysis records;
[0052] Extract the different analysis items between subsequent analysis records;
[0053] Comparing the accuracy of a first analysis result in a subsequent analysis record having different analysis items and a second analysis result in a corresponding different subsequent analysis record;
[0054] If the accuracy of the first analysis result is greater than that of the second analysis result, the different analysis items are used as supplementary items;
[0055] Similar analysis items and supplementary items extracted from the same subsequent analysis record are taken together as combined items;
[0056] When attributing the cause of the boost abnormality, attribution is performed when the attribution item meets the attribution condition; the attribution condition is: there is at least one combination item for which each content item can find a corresponding attribution item.
[0057] Preferably, an overall verification is performed on the karst adverse geological area, including:
[0058] Based on the core drilling inspection method, the fullness of the stable cavity is inspected;
[0059] Based on heavy-duty dynamic penetration test, the strength of the grouting body that stabilizes the cavern is tested;
[0060] Among them, based on the drilling core inspection method, the fullness of the stable cavity is inspected, including:
[0061] Obtaining drill core samples from stable caverns;
[0062] Based on the core samples taken from the boreholes, the average ratio of core length to drilling depth was obtained;
[0063] Get the core description vector of the drill core sample;
[0064] Determine the library based on the core description vector and the preset standard correction value, and determine the standard correction value of the average ratio;
[0065] The average ratio and the standard correction value are correspondingly multiplied to obtain a fullness determination value. If the fullness determination value is greater than or equal to a preset fullness determination value threshold, it is determined that the fullness of the stable cave body passes the test;
[0066] Among them, based on the heavy dynamic penetration test, the strength of the grouting body of the stable cavern is tested, including:
[0067] Obtain the grouting shape information of the stable cavity;
[0068] Determine the shape characteristics of the grouting body according to the shape information of the grouting body;
[0069] Determine the heavy-duty dynamic penetration scheme based on the shape characteristics of the grouting body and the standard shape characteristics;
[0070] According to the heavy-duty dynamic probing scheme, the strength of the grouting body that stabilizes the cavern is tested.
[0071] The beneficial effects of the present invention are:
[0072] The present invention introduces ultrasonic detection technology to extract ultrasonic detection features of suspicious detection areas in areas where karst adverse geological assessment is required. The assessment results of the suspicious detection areas are generated according to the ultrasonic detection features. The convenience and accuracy of karst adverse geological assessment are improved, and the subsequent processing based on the assessment results is also more appropriate.
[0073] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or understood by practicing the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures specifically pointed out in the present application documents.
[0074] The technical solution of the present invention is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS
[0075] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0076] Figure 1 It is a schematic diagram of a karst adverse geological assessment method based on ultrasonic detection in an embodiment of the present invention. DETAILED DESCRIPTION
[0077] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.
[0078] The embodiment of the present invention provides a method for evaluating karst adverse geology based on ultrasonic detection, such as Figure 1 As shown, including:
[0079] Step 1: Obtain the suspected detection area of the target area; the target area is an area that needs to be evaluated for karst adverse geology, such as an area where engineering construction is required; the suspected detection area is an area where karst adverse geology may exist, such as a carbonate rock distribution area;
[0080] Step 2: Detect the suspicious detection area based on ultrasonic detection technology and determine the ultrasonic detection characteristics; wherein the ultrasonic detection characteristics are: the reflection, propagation and attenuation characteristics of the suspicious detection area obtained by ultrasonic detection technology;
[0081] Step 3: Generate an assessment result of the suspected detection area based on the ultrasonic detection characteristics. The assessment result is: the unfavorable karst geological performance in the suspected detection area, such as: surface stone buds, funnels, depressions and karst troughs.
[0082] The working principle and beneficial effects of the above technical solution are:
[0083] The present invention introduces ultrasonic detection technology to extract ultrasonic detection features of suspicious detection areas in areas where karst adverse geological assessment is required. The assessment results of the suspicious detection areas are generated according to the ultrasonic detection features. The convenience and accuracy of karst adverse geological assessment are improved, and the subsequent processing based on the assessment results is also more appropriate.
[0084] In one embodiment, step 1: obtaining a suspicious detection area of a target area includes:
[0085] Obtain historical detection records of karst adverse geology; historical detection records are: adverse geological phenomena and related data recorded during geological surveys, explorations or monitoring in karst areas in the past, such as surface features;
[0086] According to the historical detection records, the basis for determining the suspicious detection area is determined; wherein the basis for determining the suspicious detection area is: the basis or standard for determining the suspicious detection area, such as: what kind of surface features are suspicious detection areas;
[0087] The suspicious detection area is determined according to the basis for determining the suspicious detection area and the area information of the target area.
[0088] The working principle and beneficial effects of the above technical solution are:
[0089] When conducting an assessment of karst adverse geology in a target area, the detection efficiency of directly performing ultrasonic detection on the entire target area is low. Therefore, the present invention determines the basis for determining the suspicious detection area through the historical detection records of karst adverse geology, and determines the suspicious detection area according to the basis for determining the suspicious detection area and the regional information of the target area. The process of determining the suspicious detection area is more appropriate.
[0090] In one embodiment, the basis for determining the suspicious detection area is determined based on the historical detection records, including:
[0091] Extracting the first target area characteristics according to the historical detection records; wherein the first target area characteristics are: the regional characteristics of the area where the karst unfavorable geology was detected in history;
[0092] Perform feature clustering according to the first target region feature to determine a target region feature cluster; wherein the target region feature cluster is: a set including multiple similar first target region features obtained by feature clustering;
[0093] Determine a first target region feature corresponding to the target region feature cluster and use it as a second target region feature;
[0094] In the same target region feature cluster, each second target region feature is traversed in turn, and the second target region feature being traversed is used as the third target region feature;
[0095] Extracting the associated target region feature of the third target region feature according to the historical detection record where the third target region feature is located; wherein the associated target region feature is: the first target region feature except the third target region feature in the historical detection record where the third target region feature is located;
[0096] If the associated target area feature meets the feature combination condition, the associated target area feature and the second target area feature are used as a feature combination, and the feature combination is used as a basis for determining the suspicious detection area; wherein the feature combination condition is: whether the associated target area feature and the second target area feature work together to determine the suspicious detection area;
[0097] If the associated target area feature does not satisfy the feature combination condition, the second target area feature is used as the basis for determining the suspicious detection area.
[0098] The working principle and beneficial effects of the above technical solution are:
[0099] Determine the basis for determining the suspicious detection area, extract the first target area feature of the area where karst adverse geology has been detected in history, perform feature clustering on the first target area feature to obtain the target area feature cluster, and then determine the second target area feature corresponding to the target area feature cluster, and the second target area feature eliminates the interference features in the first target area feature. There may be more than one type of basis corresponding to the basis for determining the suspicious detection area, for example: obvious karst landforms (such as caves, karst depressions) and special hydrogeological conditions (such as karst springs, underground rivers) cannot directly determine the suspicious detection area separately, but the coexistence of the two can be determined. Therefore, obtain the associated target area feature of the third target area feature in the same target area feature cluster, and judge whether the associated target area feature meets the feature combination condition. If it meets the condition, the associated target area feature and the second target area feature are used as a feature combination, and the feature combination is used as the basis for determining the suspicious detection area. If it does not meet the condition, the second target area feature is directly used as the basis for determining the suspicious detection area, which improves the rationality of the determination process of the basis for determining the suspicious detection area.
[0100] In one embodiment, the feature combination condition includes:
[0101] In each historical detection record where the fourth target area feature is located, an associated target area feature of the fourth target area feature that is similar to the associated target area feature of the third target area feature can be found, and the associated target area feature of the fourth target area feature has similar features to the first target area feature; wherein the fourth target area feature is the second target area feature other than the third target area feature in the same target area feature cluster.
[0102] The working principle and beneficial effects of the above technical solution are:
[0103] The present invention introduces a feature combination condition, specifically, in each historical detection record where the fourth target area feature is located, an associated target area feature of the fourth target area feature that is similar to the associated target area feature of the third target area feature can be found, indicating that the third target area feature and the associated target area feature appear correspondingly in each historical detection record corresponding to the target area feature cluster. In addition, the associated target area feature also has similar features to the first target area feature, that is, the associated target area feature itself has also appeared in the area feature corresponding to the historical detection record, thereby improving the accuracy of obtaining the basis for determining the suspicious detection area.
[0104] In one embodiment, step 2: detecting the suspicious detection area based on ultrasonic detection technology and determining ultrasonic detection features includes:
[0105] Detect the suspicious detection area based on ultrasonic detection technology to obtain ultrasonic detection signals; wherein the ultrasonic detection signals are: detection signals of ultrasonic detection equipment;
[0106] Based on the ultrasonic detection signal feature extraction template, the ultrasonic detection feature is determined according to the ultrasonic detection signal. The ultrasonic detection signal feature extraction template is a template for generating parameters representing underground structure characteristics based on the ultrasonic detection signal; the ultrasonic detection features are: signal strength, frequency, waveform, arrival time and attenuation rate, etc.
[0107] The working principle and beneficial effects of the above technical solution are:
[0108] The present invention detects ultrasonic detection signals based on ultrasonic detection technology, and introduces an ultrasonic detection signal feature extraction template to extract ultrasonic detection features in the ultrasonic detection signals, so that the extraction efficiency of ultrasonic detection features is higher.
[0109] In one embodiment, step 3: generating an evaluation result of a suspicious detection area according to the ultrasonic detection feature includes:
[0110] Obtaining a karst adverse geological assessment model; wherein the karst adverse geological assessment model is: an AI model trained according to an assessment record of karst adverse geological assessment performed manually based on ultrasonic detection records;
[0111] The ultrasonic detection characteristics are input into the karst adverse geological assessment model to obtain the assessment results.
[0112] The working principle and beneficial effects of the above technical solution are:
[0113] The present invention introduces a karst adverse geological assessment model to automatically obtain assessment results according to ultrasonic detection characteristics, which is more intelligent.
[0114] The embodiment of the present invention provides a method for processing karst adverse geology based on ultrasonic detection, comprising:
[0115] Obtaining an evaluation result of a suspicious detection area in a target area, wherein the evaluation result is evaluated by the karst adverse geology evaluation method described in any one of the above embodiments;
[0116] According to the assessment results, the foundation treatment of the karst unfavorable geological area is guided; the foundation treatment is as follows: the unfavorable karst geology is treated with premixed fluidized solidified soil, the idle red clay on site is fully mixed with the configured solidifying agent slurry in a certain proportion, and the fluidized solidified soil mixture or the solidifying agent pure slurry is injected into the cave by the high-pressure concrete pouring process, high-pressure rotary spraying process and other methods;
[0117] During the foundation treatment process, the foundation treatment and construction process are coordinated based on ultrasonic detection technology. The coordinated foundation treatment and construction process verification is as follows: when performing foundation treatment, ultrasonic detection is immediately performed after a treatment process is completed, and the treatment results are verified to determine whether the treatment is appropriate and make timely adjustments;
[0118] After the foundation treatment process is completed, the karst unfavorable geological area is checked as a whole. The overall check is: after all the foundation treatment processes are completed, ultrasonic detection technology is used again to detect whether all the karst caves have been filled.
[0119] The working principle and beneficial effects of the above technical solution are:
[0120] The ground treatment process includes:
[0121] (1) Measurement and layout
[0122] The borehole positions of the karst cave to be treated are precisely laid out according to the spacing required by the design, and steel bars are placed as signs. The borehole positions include high-pressure injection fluidized solidification soil holes and high-pressure rotary jet grouting holes.
[0123] (2) Drilling rig in place and drilling
[0124] Before the drilling rig is in place, the lava treatment site should be leveled, the drilling rig should be moved to the hole to be drilled, the drill bit should be aligned with the center of the hole, and the drilling rig should be leveled, placed stably and horizontally, the verticality of the drill rod should be adjusted, and then the position of the drilling rig should be adjusted so that the drill bit is aligned with the drilling hole.
[0125] After the drilling rig is in place, drilling construction can be carried out. The geological drilling rig is used to drill holes, and the distribution and filling type of the karst (soil) caves are verified. The diameter of the hole is 127mm, and the hole depth is to the bottom plate of the cave. After the hole is drilled, a φ110 PVC pipe is inserted to ensure that the hole does not collapse during the pouring and grouting construction process.
[0126] Any grouting hole and the surrounding adjacent holes can be used as vent holes and observation holes, without the need to drill separate holes as vent holes and observation holes.
[0127] The hole diameter error is no more than 5mm, the plane dimension error of the drilling position is no more than 50mm, and the inclination of the hole is no more than 1.0%.
[0128] (3) Preparation of solidified soil mixture
[0129] The solidification soil mix ratio is determined by the laboratory through experiments based on the reference mix ratio given by the design and the two indicators of filling density and grouting body strength required by the design after the unstable cavity is treated. The mix ratio of solidification agent slurry: solidification agent = 1:1 (mass ratio); the mix ratio of premixed fluidized solidification soil: solidification agent: soil: water = 1:0.15:1 (mass ratio).
[0130] When drilling, start mixing the fluidized solidified soil according to the mix ratio. First, prepare the solidifying agent slurry. The solidifying agent slurry uses an automatic cement slurry slurry machine. Add the solidifying agent into the feed hopper and add water directly into the mixing barrel. Turn on the mixer. The feed ratio of the solidifying agent and water is automatically controlled by the mixer. Stir for 10 to 20 minutes to prepare the solidifying agent slurry. Secondly, prepare the fluidized solidified soil. Pump the solidifying agent slurry into the mixing tank of the spraying machine. At the same time, use the loader to add red clay into the feed hopper. Start the stirring and mixing device. The feed ratio of red clay and solidifying agent slurry is automatically controlled by the mixer device. Stir for 30 minutes to prepare the fluidized solidified soil for pumping and pouring.
[0131] (4) Pumping fluidized soil
[0132] Before construction, the grouting volume of each hole is calculated in advance according to the theoretical design volume, and a field grouting test is carried out in combination with the theoretical design volume to determine the construction parameters such as grouting pressure, amount of fluidized solidified soil, mix ratio, and grouting times. The relevant parameters obtained in this way are used as construction control parameters for formal construction.
[0133] Use the delivery pump of the sprayer to pour the fluidized solidified soil into the cave through the high-pressure delivery pipe. The vertical pipe is lifted as it is poured, and the pouring is done section by section. The fluidity of the fluidized solidified soil does not need to be controlled. The thicker the better if it meets the pumping requirements. Control the pouring volume and pouring speed of each pouring section. If the pouring volume reaches half of the theoretical design volume and the pouring pressure does not increase significantly, stop immediately and analyze the reasons or adjust the process parameters; during the pouring construction, closely observe the changes in the surface of the cave. Once cracks and lifting are found on the ground, reduce the pumping pressure and pouring volume.
[0134] Termination conditions for high-pressure grouting of fluidized solidified soil: a. Slurry bubbling out of the hole or slurry and water returning from the hole; b. The grouting volume of fluidized solidified soil in a single hole reaches the theoretical design volume; either of the two conditions will suffice.
[0135] After the fluidized solidified soil hardens to a certain strength (for example: 3d), the high-pressure rotary jet grouting method is used to further fill the unfilled parts and pores.
[0136] (5) High pressure spraying trolley positioning, test spraying, and pipe insertion
[0137] Before the high-pressure spraying trolley is put into place, check whether the hole position marks and grouting holes have been damaged by the high-pressure injection of fluidized soil solidification construction. If damaged, re-drill the hole positions and drill the holes.
[0138] The high-pressure jet grouting trolley is moved to the hole mouth and then the hydraulic legs are raised and lowered to level the trolley, with the spray rod aligned with the center of the hole mouth.
[0139] Before lowering the spray boom into the hole, stop at the hole mouth and conduct a test spray to check whether various pipelines, mechanical operation and nozzle spraying are normal. After all parameters meet the requirements, lower the spray boom into the hole.
[0140] Use the winch of the high-pressure spraying trolley to lift the spray rod, align the nozzle through the hole mouth to the center of the hole, and adjust the spray direction, align the nozzle to the center of the spray range, and put the spray rod into the hole until the bottom of the hole. After passing the inspection by the quality inspection and supervisor, high-pressure jet grouting can be carried out.
[0141] (6) Preparation of curing agent slurry
[0142] The curing agent slurry is prepared according to the curing agent slurry preparation method, and the prepared slurry is pumped into the barrel of a high-pressure grouting pump to be used for high-pressure rotary jet grouting.
[0143] (7) High-pressure jet grouting operation
[0144] 1. In-situ static spraying
[0145] After the nozzle reaches the bottom of the hole, first send high-pressure curing agent pure slurry and compressed air, and perform in-situ spraying according to the specified technical parameters. After checking that all spraying parameters meet the specified values and the spraying situation is normal, start lifting and spraying.
[0146] 2. Jet lifting
[0147] The high-pressure jet grouting operation is carried out continuously while rotating and lifting at the lifting speed determined by the experiment. When the hole depth exceeds the length of the spray rod and the spray rod needs to be replaced, the jet grouting is resumed again. The spray rod should be reinserted into the sprayed solid for more than 0.5m, and the spraying should be continued after 2 minutes of spraying according to the design parameters; if there is a special situation where the spraying needs to be stopped halfway and the spray rod needs to be extended, the hole must be washed again, and the hole washing depth is 1.5m below the stop spraying elevation, and the spray pipe should enter at least 1.0m below the stop spraying elevation. When the lifting is 1.0m from the top elevation of the designed reinforcement body, the lifting speed should be slowed down, and the high-pressure jet grouting of the hole should be terminated after reaching the specified final spraying elevation.
[0148] Calculate the amount of grouting required before construction, and inject grouting holes in sequence from bottom to top. Spray 0.3 to 0.5 m more at the top of the grouting section, with a grouting pressure greater than 30 MPa and an injection rate greater than 20% (volume ratio of slurry to reinforced soil).
[0149] 3. Grouting and backfilling
[0150] After the jet grouting is completed, due to the water separation effect of the slurry, there is generally a different degree of shrinkage, resulting in a concave hole on the top of the consolidation body. Combined with the sealing hole, static pressure grouting is carried out. After the grouting is completed, the jetting equipment (nozzle and spray rod) is removed, and the remaining slurry is used to continue grouting from the hole until the slurry level no longer sinks.
[0151] 4. Parameter inspection and recording
[0152] Every half hour, check the slurry inlet, slurry return density, air pressure, water pressure, slurry pressure, lifting speed and other construction parameters and make records. If any abnormal situation occurs during the construction process, record it and notify the supervisor and designer in time.
[0153] During the spraying process, special personnel are assigned to inspect various lines (pipes), and quality inspectors monitor the construction parameters throughout the entire process. If there is any deviation, it will be corrected immediately.
[0154] (8) Cleaning and relocation of equipment
[0155] After the hole spraying is completed, inject an appropriate amount of clean water into the slurry tank, turn on the high-pressure pump, clean the remaining cement slurry in all pipelines, and clean the soil adhering to the spraying pipe head to avoid clogging of the pipeline.
[0156] Move the pile driver to carry out the construction of the next drilling hole.
[0157] (9) Detection
[0158] After the treatment, the filling inside the stable cave body should be dense and stable. The inspection contents include the filling density and the strength of the grouting body. The fullness is tested by coring through drilling, and the strength of the grouting body is tested by heavy-duty dynamic penetration test.
[0159] The present invention determines the karst unfavorable geological area and performs foundation treatment according to the evaluation results of the suspicious detection area, coordinates the foundation treatment and the construction process verification during the treatment process, and finally performs an overall verification, thereby improving the efficiency and quality of the geological treatment.
[0160] In one embodiment, the foundation treatment in the karst adverse geological area is guided according to the assessment results, including:
[0161] According to the assessment results, the design requirements for the planned treatment caves in the karst unfavorable geological area are determined; the design requirements are: the planned treatment caves are based on the requirements for the treatment of the karst unfavorable geological foundation of premixed fluidized solidified soil, such as where the drilling holes need to be set, what slurry ratio is required, and how much injection volume is required for each drilling hole, etc.;
[0162] Lofting is performed according to the design requirements and drilling hole position marks are determined; wherein the drilling hole position marks are: steel bars placed at the drilling hole position;
[0163] Control the drilling rig to go to the drilling hole mark to carry out drilling construction;
[0164] Analyze the design requirements and obtain the theoretical injection volume of each borehole; the theoretical injection volume is: the fluidized solidified soil that should be injected into the borehole;
[0165] According to the theoretical injection volume, an on-site injection test is carried out to determine the construction parameters; among them, the construction parameters are: the control parameters of construction equipment such as mud mixing injection, soil spraying machine, high-pressure mud pump, and fluidized soil grouting machine.
[0166] Carry out foundation treatment according to construction parameters.
[0167] The working principle and beneficial effects of the above technical solution are:
[0168] The present invention determines the design requirements of the karst cave to be treated based on the evaluation results, and determines and marks the borehole positions based on the design requirements. The drilling machine is controlled to go to the borehole position mark to perform drilling construction, and a perfusion test is performed according to the theoretical perfusion volume of the borehole. The construction parameters of each construction equipment are determined according to the perfusion test results, and the foundation treatment is performed according to the construction parameters, so that the treatment process is more suitable.
[0169] In one embodiment, performing foundation treatment according to the construction parameters further includes:
[0170] When the foundation treatment is carried out according to the construction parameters, if the total amount of pouring reaches half of the total amount of pouring in the design requirements, and the pouring pressure increase value is less than or equal to the preset pouring pressure increase value threshold, the cause of the abnormal pressure increase is attributed and the construction parameters are adjusted accordingly. Among them, the pouring pressure increase value threshold is preset manually.
[0171] The working principle and beneficial effects of the above technical solution are:
[0172] Generally, the injection pressure increase value will increase with the increase of the filling volume. Based on the pressure information, the abnormal situation can be attributed. Therefore, the present invention performs injection pressure detection during the drilling injection process. When the injection volume reaches half of the theoretical design volume, if the injection pressure does not increase significantly, it will be stopped immediately and the cause will be analyzed or the process parameters will be adjusted, thereby improving the timeliness of the detection of injection abnormalities.
[0173] In one embodiment, attributing the cause of the boost abnormality includes:
[0174] Acquire abnormal injection pressure experience data; wherein the abnormal injection pressure experience data is: data records of abnormal injection pressure compared with normal injection pressure collected in previous construction or injection operations;
[0175] According to the abnormal experience data of perfusion pressure, an abnormal scenario set is determined; wherein the abnormal scenario set is: abnormal features, such as: the perfusion pressure is greater than the theoretical value, and another example: the perfusion pressure is less than the theoretical value;
[0176] Calculate the scenario similarity between the abnormal scenario and the construction scenario in the abnormal scenario set; wherein the construction scenario is a pouring scenario when the total pouring volume reaches half of the designed total pouring volume in the design requirements and the pouring pressure increase value is less than or equal to the preset pouring pressure increase value threshold;
[0177] If the scenario similarity is greater than or equal to a preset scenario similarity threshold, the corresponding abnormal scenario is used as the target scenario; wherein the scenario similarity threshold is manually preset;
[0178] Analyze the abnormal perfusion pressure experience data to obtain the subsequent analysis record of the target scenario; wherein the subsequent analysis record is: a manual analysis record of the abnormal perfusion pressure of the target scenario;
[0179] Extracting similar analysis items between subsequent analysis records; wherein similar analysis items are: similar analysis contents appearing in different subsequent analysis records;
[0180] Extracting different analysis items between subsequent analysis records; wherein the different analysis items are: different or different analysis contents appearing in different subsequent analysis records;
[0181] Compare the accuracy of the first analysis result in the subsequent analysis record with different analysis items and the second analysis result in the corresponding different subsequent analysis record; wherein the analysis result is the abnormal attribution result, and the accuracy is the accuracy of the abnormal attribution, which is determined according to the error of the subsequent verification and attribution results;
[0182] If the accuracy of the first analysis result is greater than that of the second analysis result, the different analysis items are used as supplementary items;
[0183] Similar analysis items and supplementary items extracted from the same subsequent analysis record are taken together as combined items;
[0184] When attributing the cause of the abnormal boost, attribution is performed when the attribution item meets the attribution condition; the attribution condition is: there is at least one combination item for which each content item can find a corresponding attribution item. Among them, the attribution item is: attribution content.
[0185] The working principle and beneficial effects of the above technical solution are:
[0186] The present invention introduces abnormal perfusion pressure experience data when the boost is abnormal, and selects target scenarios with similar abnormal scenarios. Obtain the subsequent analysis records of the target scenarios, and count the similar analysis items and different analysis items between the subsequent analysis records, compare the accuracy of the first analysis result in the subsequent analysis record with different analysis items and the second analysis result in the corresponding different subsequent analysis record, and screen reasonable supplementary items. The similar analysis items and the supplementary items extracted from the same subsequent analysis record are taken as combined items. When the attribution item satisfies that each content item in at least one combined item can find a corresponding attribution item, it is determined that attribution can be performed, thereby improving the suitability of abnormal attribution.
[0187] In one embodiment, the karst adverse geological area is comprehensively verified, including:
[0188] Based on the core drilling inspection method, the fullness of the stable cave is inspected; the stable cave is: the karst cave that has been geologically processed; the fullness is: the density of the filling material in the stable cave, reflecting the stability and bearing capacity of the cave;
[0189] Based on the heavy-duty dynamic penetration test, the strength of the grouting body that stabilizes the cavern is tested; the strength of the grouting body is: the mechanical property of the grouting body, which is an indicator for evaluating whether the grouting body can effectively support the cavern;
[0190] Among them, based on the drilling core inspection method, the fullness of the stable cavity is inspected, including:
[0191] Obtaining a borehole core sample of a stable cave body; wherein the borehole core sample is: a rock core of a stable cave body obtained based on a borehole core inspection method;
[0192] According to the core samples taken from the boreholes, an average ratio of the core length to the drilling depth is obtained; wherein the average ratio is the average of the core length of each core sample taken from the boreholes divided by the value obtained at the corresponding drilling depth;
[0193] Obtaining a core description vector of the core sample; wherein the core description vector is: a description vector describing the internal pore distribution of the core sample constructed based on the acoustic characteristics of the ultrasonic detection of the core sample;
[0194] According to the core description vector and the preset standard correction value determination library, the standard correction value of the average ratio is determined; wherein the preset standard correction value determination library includes: a plurality of one-to-one corresponding description vectors and average ratio downward adjustment values, and the more pores the core description vector corresponds to and the larger the pore space is, the larger the corresponding average ratio downward adjustment value is;
[0195] The average ratio and the standard correction value are correspondingly multiplied to obtain a fullness determination value. If the fullness determination value is greater than or equal to a preset fullness determination value threshold, it is determined that the fullness of the stable cave body passes the inspection; wherein the preset fullness determination value threshold is manually preset;
[0196] Among them, based on the heavy dynamic penetration test, the strength of the grouting body of the stable cavern is tested, including:
[0197] Obtaining the grouting body shape information of the stable cavern; wherein the grouting body shape information is: the shape of the grouting grout after solidification;
[0198] According to the grouting body shape information, determine the grouting body shape characteristics; wherein the grouting body shape characteristics include: geometric shape, size, distribution and other characteristics of the grouting body;
[0199] Determine the heavy-duty dynamic penetration test plan based on the shape characteristics of the grouting body and the standard shape characteristics; the heavy-duty dynamic penetration test plan is: a penetration test plan determined based on the shape characteristics of the grouting body, including the test location, depth and number of times;
[0200] According to the heavy dynamic penetration test plan, the strength of the grouting body of the stable cavern is tested. When testing the strength of the grouting body of the stable cavern, the heavy dynamic penetration test plan is implemented, and the test results of the grouting body strength are determined based on the penetration test results.
[0201] The working principle and beneficial effects of the above technical solution are:
[0202] The present invention performs coring on a stable cave to obtain a coring sample, and calculates the average ratio of the core length to the drilling depth. The core description vector constructed by introducing the acoustic characteristics of ultrasonic detection of the coring sample and the standard correction value determination library are used to determine the standard correction value of the average ratio, and the average ratio and the standard correction value are correspondingly multiplied to obtain the fullness determination value for subsequent fullness determination. The shape characteristics of the grouting body are extracted, and the corresponding heavy-duty dynamic probing scheme is determined. When testing the strength of the grouting body of the stable cave, the heavy-duty dynamic probing scheme is implemented, and the test results of the grouting body strength are determined based on the probing results, thereby improving the pertinence and rationality of the inspection.
[0203] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.
Claims
1. A method for evaluating karst adverse geology based on ultrasonic detection, characterized in that: include: Step 1: Obtain the suspicious detection area of the target area; Step 2: Detect the suspicious detection area based on ultrasonic detection technology and determine the ultrasonic detection characteristics; Step 3: Generate an assessment result of the suspicious detection area based on the ultrasonic detection characteristics.
2. The karst adverse geological assessment method based on ultrasonic detection according to claim 1, characterized in that: Step 1: Obtain the suspicious detection area of the target area, including: Obtain historical detection records of karst adverse geology; Determine the basis for suspicious detection areas based on historical detection records; The suspicious detection area is determined according to the basis for determining the suspicious detection area and the area information of the target area.
3. The method for evaluating karst adverse geology based on ultrasonic detection according to claim 2, characterized in that: According to the historical detection records, the basis for determining the suspicious detection area is determined, including: Extracting the first target area features according to the historical detection records; Performing feature clustering according to the first target area feature to determine the target area feature cluster; Determine a first target region feature corresponding to the target region feature cluster and use it as a second target region feature; In the same target region feature cluster, each second target region feature is traversed in turn, and the second target region feature being traversed is used as the third target region feature; Extracting the associated target region feature of the third target region feature according to the historical detection record where the third target region feature is located; If the associated target area feature meets the feature combination condition, the associated target area feature and the second target area feature are used as the feature combination, and the feature combination is used as the basis for determining the suspicious detection area; If the associated target area feature does not satisfy the feature combination condition, the second target area feature is used as the basis for determining the suspicious detection area.
4. The method for evaluating karst adverse geology based on ultrasonic detection according to claim 3, characterized in that: Feature combination conditions, including: In each historical detection record where the fourth target area feature is located, an associated target area feature of the fourth target area feature that is similar to the associated target area feature of the third target area feature can be found, and the associated target area feature of the fourth target area feature has similar features to the first target area feature; wherein the fourth target area feature is the second target area feature other than the third target area feature in the same target area feature cluster.
5. The method for evaluating karst adverse geology based on ultrasonic detection according to claim 1, characterized in that: Step 2: Detect the suspicious detection area based on ultrasonic detection technology and determine the ultrasonic detection characteristics, including: Detect suspicious detection areas based on ultrasonic detection technology and obtain ultrasonic detection signals; Based on the ultrasonic detection signal feature extraction template, the ultrasonic detection feature is determined according to the ultrasonic detection signal.
6. The method for evaluating karst adverse geology based on ultrasonic detection according to claim 1, characterized in that: Step 3: Generate evaluation results of the suspicious detection area based on the ultrasonic detection characteristics, including: Obtaining karst adverse geological assessment models; The ultrasonic detection characteristics are input into the karst adverse geological assessment model to obtain the assessment results.
7. A method for treating unfavorable karst geology based on ultrasonic detection, characterized in that: include: Obtaining an evaluation result of a suspicious detection area in a target area, wherein the evaluation result is evaluated by the karst adverse geology evaluation method according to any one of claims 1 to 6; Guide the foundation treatment in the karst adverse geological areas based on the assessment results; During the foundation treatment process, ultrasonic detection technology is used to coordinate the foundation treatment and construction process verification; After the foundation treatment process is completed, the karst unfavorable geological area is comprehensively checked.
8. The method for treating karst adverse geological conditions based on ultrasonic detection according to claim 7, characterized in that: Based on the assessment results, the foundation treatment in the karst adverse geological area is guided, including: Based on the assessment results, determine the design requirements for the planned treatment caves in the karst adverse geological areas; Loft out and determine drilling hole position marks according to design requirements; Control the drilling rig to go to the drilling hole mark to carry out drilling construction; Analyze the design requirements and obtain the theoretical injection volume of each borehole; Conduct on-site pouring tests based on theoretical pouring volume to determine construction parameters; Carry out foundation treatment according to construction parameters.
9. The method for treating unfavorable karst geology based on ultrasonic detection according to claim 8, characterized in that: Also includes: When performing foundation treatment according to construction parameters, if the total pouring volume reaches half of the designed total pouring volume in the design requirements, and the pouring pressure increase value is less than or equal to the preset pouring pressure increase value threshold, the cause of the abnormal pressure increase is attributed and the construction parameters are adjusted accordingly.
10. The method for treating unfavorable karst geology based on ultrasonic detection according to claim 7, characterized in that: Conduct overall verification of karst adverse geological areas, including: Based on the core drilling inspection method, the fullness of the stable cavity is inspected; Based on heavy-duty dynamic penetration test, the strength of the grouting body that stabilizes the cavern is tested; Among them, based on the heavy dynamic penetration test, the strength of the grouting body of the stable cavern is tested, including: Obtain the shape information of the grouting body that stabilizes the cavern; Determine the shape characteristics of the grouting body according to the shape information of the grouting body; Determine the heavy-duty dynamic penetration scheme based on the shape characteristics of the grouting body and the standard shape characteristics; According to the heavy-duty dynamic probing scheme, the strength of the grouting body that stabilizes the cavern is tested.
Citation Information
Patent Citations
Tunnel advanced geological forecasting method utilizing horizontal sound wave profile test
CN102540258A
Prediction method for bad geological type of shield tunneling based on Xgboost
CN108846521A
Multi-dimensional karst special geology comprehensive detection method
CN113419294A
Large-dip-angle large-mining-height stope coal wall mining dynamic behavior evolution rule research method
CN114705887A
Power transmission line monitoring method and related equipment
CN115577011A
Cited By
Method for detecting direction of deep hole based on slurry diffusion theory