Method for obtaining grouting scheme through surrounding rock grouting test and test device thereof

The grouting plan was obtained through surrounding rock grouting tests, and the problem of unforeseen grouting effect in tunnel projects was solved, accurate grouting parameter setting and improved sealing effect were achieved, and construction risks and costs were reduced.

CN118937636APending Publication Date: 2024-11-12CCCC SECOND HIGHWAY ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410991503.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-23
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

In tunnel engineering, the existing grouting and sealing technology cannot formulate grouting parameters in advance based on the assigned characteristics obtained in the previous survey, resulting in unforeseen sealing effect, long operating time, increased labor costs and high on-site human-machine risks, and simulated The experiment cannot truly simulate the grouting splitting effect.

Method used

Obtaining grouting schemes through surrounding rock grouting tests, including determining the surrounding rock area to be sealed, obtaining rock sample specimens, scale model, setting grouting spacing, drilling depth and pressure, conducting test sealing, and according to sealing Adjust the parameters of the plugging effect until a satisfactory grouting plan is obtained.

Benefits of technology

It realizes the acquisition of accurate grouting plans based on the actual working environment, improves the reliability and work efficiency of the sealing effect, and reduces construction risks and costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118937636A_ABST
    Figure CN118937636A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of disaster prevention and reduction of tunnel engineering, in particular to a method for obtaining a grouting scheme through a surrounding rock grouting test, a rock sample test piece of surrounding rock is obtained according to the actual operation environment, simulation is conducted according to the real surrounding rock attribute, and the simulation result is more reliable and stable; meanwhile, according to the requirements of actual grouting operation, the size of the rock sample test piece is reduced in proportion, so that grouting holes are drilled in the rock sample test piece, grouting is conducted, finally, the actual working condition is simulated by injecting pressurized gas or water flow into the rock sample test piece, and whether the plugging effect meets the requirements or not is judged; and when the requirements are not met, the layout and the size of the grouting holes are redesigned until the grouting scheme meeting the plugging effect is obtained, so that the obtained plugging result is more close to the actual result by simulating the operation environment and the operation requirements of the actual working condition, and the grouting scheme meeting the actual plugging effect can be selected through the test. Multiple on-site plugging is avoided, the working efficiency is improved, and the construction risk is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of disaster prevention and reduction of tunnel engineering, and in particular to a method for obtaining a grouting scheme through a surrounding rock grouting test and a test device thereof. Background Art

[0002] Due to the large number of surrounding rock cracks, high geological structural stress, and rich deep fault zones in the tunnel area, when encountering high-pressure gas or water bodies, it often causes instantaneous and large-scale fluid ejection. If an effective, safe and reliable grouting and plugging solution is not adopted, not only will it be impossible to excavate through, but the safety of personnel cannot be guaranteed. Especially when constructing in high-altitude extra-long tunnels, due to the low-pressure environment and the large span of the construction area, when encountering sudden mud and water gushing or harmful gases, they often show problems such as long harmful gas or water discharge distance, heavy load on mechanical devices, long disposal time, and slow emergency response. It is very easy to threaten the life safety of on-site construction personnel and cause long-term damage to the tunnel structure, which undoubtedly poses a potential huge threat to construction safety and normal construction order.

[0003] At present, grouting and plugging is a common means of dealing with disasters such as sudden mud and water gushing in tunnels, and sudden harmful gas outbursts. Although it has outstanding advantages such as efficient plugging, effective isolation, flexible use, cost savings, enhanced structure, and environmental sustainability, it cannot be formulated in advance based on parameters such as the occurrence characteristics obtained from preliminary surveys. It is necessary to conduct multiple on-site grouting and plugging tests to determine more systematic, accurate, and reasonable grouting parameters and construction plans. This undoubtedly leads to problems such as unpredictable plugging effects, long operation time, increased labor costs, and high on-site human-machine risks.

[0004] In order to solve the above problems, the plugging operation is usually simulated at present. For example, the Chinese utility model patent with the announcement number CN210690337U provides a grouting plugging effect evaluation device under dynamic water conditions, whose structure includes a dynamic water system, a grouting system, a simulated fissure equipment, a waste liquid collection bucket, a data acquisition and processing system and an image acquisition system. This technology uses the filling stratum material (such as plastic strips, crushed stone, gravel, etc.) between the upper and lower plates to simulate the stratum filling fissures, which is different from the rock stratum fissures formed by geological actions in actual underground engineering in terms of structural joints, strength, etc.

[0005] Furthermore, when the grouting plugging scheme is implemented using the grouting holes, the filling stratum material cannot truly simulate the grouting splitting effect in the actual stratum. Secondly, the grouting holes mainly adjust the grouting pressure and grouting speed, and lack the key grouting plugging parameters in the actual grouting scheme, such as the drilling hole spacing and the drill rod length, so there is a large tolerance in the field application, and it is impossible to formulate an accurate and effective grouting plugging scheme.

[0006] Therefore, the above scheme focuses on obtaining the diffusion process and law of the slurry under different dynamic water flow rates and flow directions in the laboratory. There are problems such as lack of specific grouting and plugging scheme implementation parameters and low degree of restoration. Summary of the invention

[0007] The purpose of the present invention is to provide a method for obtaining a grouting scheme through a surrounding rock grouting test and a test device thereof, so as to solve the current problems of unpredictable plugging effect, long operation time, increased labor cost, and high on-site human-machine risk.

[0008] The present invention solves the above-mentioned technical problems by:

[0009] A method for obtaining a grouting scheme through a surrounding rock grouting test comprises the following steps:

[0010] S1. Determine the surrounding rock area to be blocked, obtain rock sample specimens in the surrounding rock area to be blocked, obtain a scaled model of the surrounding rock area to be blocked, and determine the scale ratio;

[0011] S2. Set the actual longitudinal grouting spacing D a , Actual lateral grouting spacing D b , Actual drilling depth D c and grouting pressure P+ΔP, and the actual grouting scheme M is obtained, where ΔP is the gas or water pressure in the surrounding rock at the tunnel site, and P is the additional pressure;

[0012] S3, converting the actual grouting scheme M into the corresponding specimen grouting scheme m according to the scale ratio;

[0013] S4, drilling and grouting in the rock sample according to the specimen grouting scheme m obtained in step S3 to complete the test plugging;

[0014] S5. Apply pressurized gas or pressurized fluid to the top of the rock sample, and then determine whether the rock sample has leakage. If so, abandon the corresponding actual grouting plan, readjust the actual grouting plan, and execute step S2; if not, retain the corresponding actual grouting plan.

[0015] It is further defined that step S1 comprises the following steps:

[0016] S11, surveying the area to be blocked, determining the surrounding rock area to be blocked, and obtaining the longitudinal length L1, circumferential width L2, and radial length L3 of the surrounding rock to be blocked;

[0017] S12, drilling core sampling at the center of the surrounding rock area to be blocked to obtain a rock sample, and using the obtained rock sample as a scaled model of the surrounding rock area to be blocked;

[0018] S13. Determine the scale ratio according to the size of the surrounding rock to be blocked and the size of the rock sample:

[0019]

[0020] Among them, l1 is the length of the rock sample, l2 is the width of the rock sample, l3 is the height of the rock sample, n1 is the length scale ratio, n2 is the width scale ratio, and n3 is the height scale ratio.

[0021] Further defined, the step S3 is specifically as follows:

[0022] According to the scale ratio, the actual grouting scheme is converted into the corresponding specimen grouting scheme m. The specimen grouting scheme m includes the longitudinal specimen grouting spacing d a , Transverse specimen grouting spacing d b , specimen drilling depth d c And grouting pressure P+ΔP:

[0023] d a =n1D a

[0024] d b =n2D b

[0025] d c =n3D c

[0026] Among them, the value range of P is 1MPa~2MPa.

[0027] Further defined, the step S4 is specifically as follows:

[0028] S41, according to the longitudinal specimen grouting spacing d obtained in step S3 a , Transverse specimen grouting spacing d b and the specimen drilling depth d c A plurality of grouting holes arranged in an array are drilled at the bottom of the rock sample; the longitudinal distance between the grouting holes and the boundary of the rock sample does not exceed The lateral distance between the grouting hole and the boundary of the rock sample shall not exceed

[0029] S42, inject slurry into each grouting hole according to the grouting pressure P+ΔP to complete the test plugging; the grouting amount Q of each grouting hole is:

[0030] Q=Vsα(1+β)

[0031] V=d a d b d c

[0032] Among them, s is the formation porosity or fracture degree, α is the formation filling rate, and β is the slurry loss rate.

[0033] Further defined, the step S5 is specifically as follows:

[0034] S51, placing the rock sample after the test plugging is completed in a closed space, and injecting gas or water with a pressure of ΔP at the top of the rock sample;

[0035] S52, determining whether there is gas or fluid leakage at the bottom of the rock sample, if yes, executing step S53, if no, executing step S54;

[0036] S53, execute step S2, and adjust the actual longitudinal grouting spacing D a , Actual lateral grouting spacing D b , Actual drilling depth D c and grouting pressure P+ΔP;

[0037] S54, determining the specimen grouting scheme m used for the plugging test of the rock sample specimen, and matching the corresponding actual grouting scheme M according to the determined specimen grouting scheme m as the preferred grouting scheme and retaining it, and executing step S53 until all specimen grouting schemes are completed;

[0038] S55, calculating the cost of each preferred grouting scheme obtained in step S54, and selecting the preferred grouting scheme with the lowest cost as the optimal grouting scheme;

[0039] Among them, cost = slurry unit price × actual grouting volume × number of holes drilled.

[0040] A surrounding rock grouting test device comprises a grouting unit, a water / gas injection unit, a test box, a grouting unit and a power unit, wherein the test box comprises a test box body, a box door sealedly connected to the test box body and a partition arranged in the test box body;

[0041] The grouting unit is arranged in the test box body and is movably connected to the test box body. The grouting unit is located below the partition. The grouting unit is connected to the grouting unit. The output end of the water / gas injection unit extends through the test box body to above the partition. The power unit is electrically connected to the grouting unit, the water / gas injection unit and the grouting unit respectively.

[0042] It is further defined that the grouting unit includes a grouting box, a grouting plate, a grouting rod, a grouting drive and a grouting pipe; the grouting box is provided with a grouting inlet connected to the interior thereof, a grouting outlet is provided at the bottom of the grouting box, the grouting plate is arranged inside the grouting box, the grouting drive is connected to the top of the grouting plate through the grouting rod, one end of the grouting pipe is sealedly connected to the grouting outlet, the other end of the grouting pipe passes through the test box body and is connected to the grouting unit, the grouting pipe is sealedly connected to the test box body, and the grouting drive is arranged on the outside of the grouting box; the power unit is electrically connected to the grouting drive.

[0043] It is further defined that the water / gas injection unit comprises a water / gas injection box, a pressure water / gas injection plate, a pressure water / gas injection rod, a pressure water / gas injection drive and a water / gas injection pipeline;

[0044] The water injection / gas box body is connected to the interior of the test box body through a water injection / gas pipe, one end of the water injection / gas pipe is sealed and connected to the bottom of the water injection / gas box body, the other end of the water injection / gas pipe passes through the test box body and extends to the top of the partition, and the other end of the water injection / gas pipe is sealed and connected to the test box body; the pressurized water / gas plate is arranged inside the water injection / gas box body, the pressurized water / gas drive is connected to the top of the pressurized water / gas plate through the pressurized water / gas rod, the pressurized water / gas drive is located on the outside of the water injection / gas box body, and the water injection / gas pipe is located below the pressurized water / gas plate; the power unit is electrically connected to the pressurized water / gas drive.

[0045] It is further defined that the grouting unit includes a transverse moving mechanism, a longitudinal moving mechanism and a grouting telescopic head, the longitudinal moving mechanism is movably connected to the grouting box through the transverse moving mechanism, the grouting telescopic head is connected to the transverse moving mechanism, the output end of the grouting telescopic head is arranged opposite to the partition, and the power unit is electrically connected to the transverse moving mechanism, the longitudinal moving mechanism and the grouting telescopic head respectively.

[0046] It is further defined that the power unit includes a grouting switch valve, a water / gas injection switch and a plugging control switch, and the plugging control switch includes a control panel, a horizontal plugging switch, a longitudinal plugging switch and a vertical telescopic switch;

[0047] The grouting switch valve is arranged on the grouting drive and is electrically connected to the grouting drive, and the water injection / gas switch is arranged on the pressure water injection / gas drive and is electrically connected to the pressure water injection / gas drive;

[0048] The control panel is arranged on the outside of the test box body, and the transverse blocking switch, longitudinal blocking switch and vertical telescopic switch are all arranged on the control panel. The transverse blocking switch is electrically connected to the transverse moving mechanism, the longitudinal blocking switch is electrically connected to the longitudinal moving mechanism, and the vertical telescopic switch is electrically connected to the grouting telescopic head.

[0049] It is further defined that the inner wall of the grouting box is provided with a sealing member, and the sealing member is located between the partition and the end of the water injection / air pipe;

[0050] The box door is sealed and connected to the test box body through a sealing strip;

[0051] The grouting pipe is sealed and connected to the grout outlet and the test box body respectively through a sealing interface;

[0052] The water injection / gas pipeline is sealed and connected to the water injection / gas box body and the test box body through sealing interfaces.

[0053] It is further defined that the surrounding rock grouting test device also includes a gas concentration sensor, which is arranged on the inner wall of the grouting box, the gas concentration sensor is located on the peripheral side of the grouting unit, and the gas concentration sensor is located below the partition.

[0054] The beneficial effects of the present invention are:

[0055] 1. The present invention obtains rock sample specimens of surrounding rocks according to the actual working environment, so as to simulate according to the real surrounding rock properties, and the simulation result is more reliable and stable; at the same time, according to the requirements of the actual grouting operation, the rock sample specimen is proportionally reduced according to the size, so as to realize drilling grouting holes and grouting on the rock sample specimen, and finally the actual working conditions are simulated by injecting pressurized gas or pressurized water into the rock sample specimen to judge whether the plugging effect meets the requirements, and if it does not meet the requirements, the layout and size of the grouting holes are redesigned until a grouting scheme that meets the plugging effect is obtained; therefore, by simulating the working environment and working requirements of the actual working conditions, the plugging results obtained are more accurate and more in line with the actual results, so that the grouting scheme that meets the actual plugging effect can be determined in advance, avoiding multiple plugging on site, improving work efficiency, and reducing construction risks.

[0056] 2. The present invention also provides a device for implementing a surrounding rock grouting and plugging test. A rock sample with grouting holes opened according to the grouting plan is placed on a partition, and then the rock sample is sealed with a grouting box through a seal, thereby ensuring that the plugging effect can be accurately judged after the water / gas injection unit injects water / gas, thereby improving the reliability of the judgment result; then, the grouting telescopic head is controlled by the power unit to perform grouting and plugging on each grouting hole, truly simulating the actual grouting operation, further improving the accuracy and reliability of the plugging test, while reducing the test difficulty and test cost, improving the test efficiency, and meeting actual use needs. BRIEF DESCRIPTION OF THE DRAWINGS

[0057] Figure 1 This is a schematic diagram of the principle of obtaining a grouting scheme through a surrounding rock grouting test in Example 1 of the present invention;

[0058] FIG2 is a schematic diagram of the arrangement of grouting holes on a rock sample specimen in Example 1 of the present invention, wherein Figure 2a This is a schematic diagram of grouting hole layout. Figure 2b This is another schematic diagram of grouting hole layout;

[0059] Figure 3 This is a schematic diagram of the overall structure of a surrounding rock grouting test device according to Embodiment 2 of the present invention;

[0060] Figure 4 This is a front view of the surrounding rock grouting test device of Example 2 of the present invention;

[0061] Figure 5 for Figure 4 Schematic diagram of the cross section in the AA direction;

[0062] Figure 6 This is a schematic diagram of the test box in the open state of Example 2 of the present invention;

[0063] Figure 7 This is a schematic diagram of the top view of the grouting unit of Example 2 of the present invention;

[0064] Figure 8 for Figure 7 The enlarged schematic diagram of part C in the middle;

[0065] Fig. 9 for Figure 4 Schematic diagram of the cross section in the BB direction;

[0066] In the figure: 10-grouting unit; 11-grouting box; 12-grouting plate; 13-grouting rod; 14-grouting drive; 15-grouting inlet; 16-grouting outlet; 17-grouting pipe; 18-grouting control valve; 20-water injection / gas unit; 21-water injection / gas box; 22-pressure water injection / gas drive; 23-water injection / gas pipeline; 30-test box; 31-test box body; 32-box door; 33-partition; 34-buckle; 40-grouting unit; 41-lateral moving mechanism; 42-longitudinal moving mechanism; 43-grouting telescopic head; 44-blocking control switch; 50-gas concentration sensor; 60-fluid layer; 61-test piece layer; 62-grouting layer. DETAILED DESCRIPTION

[0067] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0068] refer to Figure 1 This embodiment provides a method for obtaining a grouting scheme through a surrounding rock grouting test, comprising the following steps:

[0069] S1. Determine the surrounding rock area to be blocked, obtain rock sample specimens in the surrounding rock area to be blocked, obtain a scaled model of the surrounding rock area to be blocked, and determine the scale ratio;

[0070] S2. Set the actual longitudinal grouting spacing D a , Actual lateral grouting spacing D b , Actual drilling depth D cand grouting pressure P+ΔP, and the actual grouting scheme M is obtained, where ΔP is the gas or water pressure in the surrounding rock at the tunnel site, and P is the additional pressure;

[0071] S3, converting the actual grouting scheme M into the corresponding specimen grouting scheme m according to the scale ratio;

[0072] S4, drilling and grouting in the rock sample according to the specimen grouting scheme m obtained in step S3 to complete the test plugging;

[0073] S5. Apply pressurized gas or pressurized fluid to the top of the rock sample, and then determine whether the rock sample has leakage. If so, abandon the corresponding actual grouting plan, readjust the actual grouting plan, and execute step S3; if not, retain the corresponding actual grouting plan.

[0074] To further illustrate, step S1 includes the following steps:

[0075] S11, survey the area to be blocked in the tunnel, determine the surrounding rock area to be blocked, and obtain the longitudinal length L1, circumferential width L2 and radial length L3 of the surrounding rock to be blocked;

[0076] Specifically, since the area of ​​surrounding rock that needs to be grouting-sealed in an actual tunnel is relatively large, the area to be sealed can be simplified to surrounding rock with a longitudinal length of L1, annular width of L2 and radial length of L3 based on previous exploration data and advanced geological forecasts.

[0077] S12, drilling core sampling at the center of the surrounding rock area to be blocked to obtain a rock sample, and using the obtained rock sample as a scaled model of the surrounding rock area to be blocked;

[0078] Specifically, core sampling is performed in the area to be plugged to obtain a rock sample, and the rock sample is preferably a hexahedron.

[0079] S13. Determine the scale ratio according to the size of the surrounding rock to be blocked and the size of the rock sample:

[0080]

[0081] Among them, l1 is the length of the rock sample, l2 is the width of the rock sample, l3 is the height of the rock sample, n1 is the length scale ratio, n2 is the width scale ratio, and n3 is the height scale ratio.

[0082] Further explanation, in step S2, at least one actual grouting scheme M needs to be formulated, and each actual grouting scheme M i By adjusting the actual longitudinal grouting spacing D a , Actual lateral grouting spacing D b , Actual drilling depth D cAnd the value of P in the grouting pressure P+ΔP, the value range of P is 1MPa~2MPa.

[0083] Among them, I≥40, at this time through M i represents the i-th actual grouting scheme, i = [1, 2, ..., I]; through D ai represents the actual longitudinal grouting spacing in the ith actual grouting scheme, through D bi represents the actual grouting spacing in the ith actual grouting scheme, through D ci represents the actual drilling depth in the ith actual grouting scheme, through P i represents the additional pressure in the i-th actual grouting scheme.

[0084] To further illustrate, step S3 is specifically as follows:

[0085] According to the scale ratio, the actual grouting scheme is converted into the corresponding specimen grouting scheme m. The specimen grouting scheme m includes the longitudinal specimen grouting spacing d a , Transverse specimen grouting spacing d b , specimen drilling depth d c And grouting pressure P+ΔP:

[0086] d a =n1D a

[0087] d b =n2D b

[0088] d c =n3D c

[0089] Among them, since the specimen grouting scheme m is obtained from the actual grouting scheme M, the specimen grouting scheme m is also I, through m i represents the grouting scheme of the i-th specimen, i = [1, 2, ..., I]; ΔP is equal in each specimen grouting scheme, and the longitudinal specimen grouting spacing d ai , Transverse specimen grouting spacing d bi and the specimen drilling depth d ci The corresponding actual longitudinal grouting spacing D ai , Actual lateral grouting spacing D bi and actual drilling depth D ci According to the scale theory, the additional pressure P in the specimen grouting scheme is i The additional pressure P in the corresponding actual grouting scheme i The values ​​are the same.

[0090] To further illustrate, step S4 is specifically as follows:

[0091] S41, according to the longitudinal specimen grouting spacing d obtained in step S3 a , Transverse specimen grouting spacing d b and the specimen drilling depth d c A plurality of grouting holes arranged in an array are drilled at the bottom of the rock sample; the longitudinal distance between the grouting holes and the boundary of the rock sample does not exceed The lateral distance between the grouting hole and the boundary of the rock sample shall not exceed

[0092] Specifically, select any specimen grouting scheme m i , preferably starting from i=1 in order, at this time, the corresponding specimen grouting scheme m1 is selected, and the longitudinal specimen grouting spacing d a1 , Transverse specimen grouting spacing d b1 and the specimen drilling depth d c1 Grouting holes are drilled on the rock sample to obtain multiple grouting holes.

[0093] refer to Figure 2a and Figure 2b The grouting hole array is arranged at the bottom of the rock sample, and the horizontal distance between the two adjacent grouting holes is d b1 , the longitudinal spacing is d a1 The longitudinal distance between any of the grouting holes and the boundary of the rock sample does not exceed The lateral distance between the grouting hole and the boundary of the rock sample shall not exceed

[0094] S42, inject slurry into each grouting hole according to the grouting pressure P+ΔP to complete the test plugging; the grouting amount Q of each grouting hole is:

[0095] Q=Vsα(1+β)

[0096] V=d a d b d c

[0097] Among them, s is the formation porosity or fissure degree, α is the formation filling rate, β is the slurry loss rate, when the local stratum is a fracture zone, the value range of s is 2% to 5%; when the local stratum is a fault fracture zone, the value range of s is 10% to 20%; when the local stratum is a sand layer and a filled cave, the value range of s is 30% to 40%; the value range of α is 70% to 80%, and the value range of β is 5% to 20%.

[0098] Specifically, through the specimen grouting scheme m i The grouting volume Q can be calculated i , so that the specimen grouting scheme m iDetermine the amount of slurry to be prepared and adjust the grouting plan according to the specimen. i Determine the pressure P during grouting i +ΔP, and all the grouting holes on the rock sample are sealed by grouting.

[0099] To further illustrate, step S5 is specifically as follows:

[0100] S51, placing the rock sample after the test plugging is completed in a closed space, and injecting gas or water with a pressure of ΔP at the top of the rock sample;

[0101] Specifically, a gas or water flow with a pressure of ΔP is provided to the top of the rock sample, and this method is used to simulate the environment of the gas or water storage area on the actual surrounding rock to ensure the reliability of the test.

[0102] S52, determining whether there is gas or fluid leakage at the bottom of the rock sample, if yes, executing step S53, if no, executing step S54;

[0103] Specifically, a gas concentration sensor can be used to determine whether there is a gas leak. At this time, it is also necessary to ensure that the bottom of the rock sample is in a sealed state to avoid the influence of the external environment on the judgment of the sealing effect.

[0104] At this time, if there is leakage or the leakage exceeds the safety value, it means that the grouting scheme of the specimen has been i The plugging effect cannot meet the actual requirements. If there is no leakage or the leakage does not exceed the safety value, it means that the grouting scheme m of the specimen i The blocking effect meets the actual requirements.

[0105] S53, execute step S2, and adjust the actual longitudinal grouting spacing D a , Actual lateral grouting spacing D b , Actual drilling depth D c and grouting pressure P+ΔP;

[0106] Specifically, when the specimen grouting scheme m i When the plugging effect cannot meet the actual requirements, the current specimen grouting scheme is abandoned. i The corresponding actual grouting plan needs to be re-executed in step S2.

[0107] When re-executing step S2, the actual grouting plan needs to be adjusted, for example, let i=i+1, select the next specimen grouting plan and then re-execute step S3 to match the corresponding specimen grouting plan; at this time, re-select a rock sample of the same size to execute subsequent steps, and repeat this cycle.

[0108] S54, determining the specimen grouting scheme m used for the plugging test of the rock sample specimen, and matching the corresponding actual grouting scheme M according to the determined specimen grouting scheme m as the preferred grouting scheme and retaining it, and executing step S53 until all specimen grouting schemes are completed;

[0109] Specifically, if the current specimen grouting scheme m i If the plugging requirements are met, the corresponding actual grouting scheme M is matched. i , the actual grouting scheme M i It is retained as the preferred grouting solution.

[0110] Then, step S2 is executed again, and a new actual grouting scheme is selected, and steps S3 to S5 are executed, and this cycle is repeated until all actual grouting schemes have been subjected to plugging tests, and a plurality of preferred grouting schemes are obtained after the plugging tests are completed.

[0111] S55, calculating the cost of each preferred grouting scheme obtained in step S54, and selecting the preferred grouting scheme with the lowest cost as the optimal grouting scheme; wherein cost = slurry unit price × actual grouting volume × number of drill holes;

[0112] Specifically, an optimal grouting scheme needs to be selected from all preferred grouting schemes. At this time, an evaluation can be made based on the grouting cost to reduce the cost and better meet actual needs.

[0113] Example 2

[0114] refer to Figure 3 and Figure 4 Based on the method for obtaining a grouting scheme through a surrounding rock grouting test provided in Example 1, this embodiment provides a surrounding rock grouting test device for improving the efficiency of obtaining a grouting scheme and reducing the difficulty of obtaining it, including a grouting unit 10 for providing slurry to a rock sample, a water / gas injection unit 20 for providing pressurized gas or water flow on the top of the rock sample, a test box 30 for sealing the rock sample, a grouting unit 40 for grouting and sealing the grouting hole, and an electric unit for controlling the grouting unit 10, the water / gas injection unit 20 and the grouting unit 40.

[0115] Specifically, refer to Figure 5 and Figure 6 The test box 30 includes a test box body 31, a box door 32 sealed with the test box body 31, and a partition 33 arranged in the test box body 31. The interior of the test box body 31 can be divided into a fluid layer 60, a specimen layer 61 and a grouting layer 62 from top to bottom.

[0116] The partition 33 is located between the specimen layer 61 and the grouting layer 62, and the partition 33 is used to place the rock specimen. The fluid layer 60 is located on the top of the rock specimen. The box door 32 is sealed and connected to the test box body 31 to provide a sealed space for the fluid layer 60 and the grouting layer 62. The box door 32 is tightly connected to the test box body 31 through the buckle 34. A sealing strip is set between the test box body 31 and the box door 32 to increase the sealing effect between the test box body 31 and the box door 32. A transparent area is selected to be set on the box door 32 to facilitate the observation of the grouting process inside the test box body 31.

[0117] At the same time, the rock sample is sealed and connected to the inside of the test box body 31 to prevent water / gas in the fluid layer 60 from leaking through the rock sample and the inner wall of the test box body 31, causing unreliable sealing evaluation.

[0118] Preferably, a seal is provided on the specimen layer 61 on the inner wall of the test box body 31 , so that the rock sample specimen is sealed and connected to the test box body 31 .

[0119] The output end of the grouting unit 10 is connected to the grouting unit 40 , the grouting unit 40 is arranged in the grouting layer 62 , the output end of the grouting unit 40 faces the partition 33 , and the output end of the water / gas injection unit 20 is connected to the fluid layer 60 .

[0120] Preferably, in order to quickly and reliably determine whether the gas in the fluid layer 60 has leaked into the grouting layer 62, a gas concentration sensor 50 is selected to be set in the grouting layer 62. The number of the gas concentration sensors 50 can be selected to be three. The three gas concentration sensors 50 are respectively arranged on the three end faces corresponding to the sides of the test box body 31, and the gas concentration sensor 50 is located on the outside of the grouting unit 40.

[0121] For further explanation, see Figure 5 to Figure 7 The grouting unit 40 includes a transverse moving mechanism 41 , a longitudinal moving mechanism 42 and a grouting telescopic head 43 . The transverse moving mechanism 41 is movably connected to the test box body 31 through the longitudinal moving mechanism 42 , and the grouting telescopic head 43 is connected to the transverse moving mechanism 41 .

[0122] The power unit includes a blocking control switch 44, which includes a control panel, a transverse blocking switch, a longitudinal blocking switch and a vertical telescopic switch; the control panel is arranged on the outside of the test box body 31, and the transverse blocking switch, the longitudinal blocking switch and the vertical telescopic switch are all arranged on the control panel; the longitudinal blocking switch is electrically connected to the longitudinal moving mechanism 42, and is used to drive the grouting telescopic head 43 on the transverse moving mechanism 41 to move in the longitudinal direction by controlling the longitudinal moving mechanism 42; the transverse blocking switch is electrically connected to the transverse moving mechanism 41, and is used to control the grouting telescopic head 43 to move in the longitudinal direction through the transverse moving mechanism 41; the vertical telescopic switch is electrically connected to the grouting telescopic head 43, and is used to control the grouting telescopic head 43 to rise when drilling a grouting hole for the rock sample specimen, or to grout the grouting hole that has been drilled.

[0123] Thus, the blocking control switch 44 can control the longitudinal moving mechanism 42 to drive the transverse moving mechanism 41 to move in the longitudinal direction, and control the transverse moving mechanism 41 to drive the grouting telescopic head 43 to move in the transverse direction, so that the blocking control switch 44 drives the grouting telescopic head 43 to move in the horizontal and vertical directions of the grouting layer 62.

[0124] refer to Figure 8 Preferably, an anti-collision spring plate 45 is provided on the longitudinal moving mechanism 42, and the anti-collision spring plate 45 is opposite to the transverse moving mechanism 41 to avoid collision between the transverse moving mechanism 41 and the longitudinal moving mechanism 42, thereby ensuring safe and reliable use.

[0125] Further qualification, see Fig. 9 The grouting unit 10 includes a grouting box 11, a grouting plate 12, a grouting rod 13, a grouting drive 14 and a grouting pipe 17. A grouting inlet 15 is provided on the grouting box 11. A funnel is provided outside the grouting inlet 15 for injecting slurry into the grouting box 11, and then the grouting inlet 15 is sealed.

[0126] A grouting outlet 16 is provided at the bottom of the grouting box 11, and a grouting control valve 18 is arranged on the outer side of the grouting outlet 16. The grouting outlet 16 is connected with one end of a grouting pipe 17 through the grouting control valve 18, and at the same time, the grouting outlet 16 is sealedly connected with one end of the grouting pipe 17 through a sealing interface to avoid pressure leakage inside the grouting box 11; the other end of the grouting pipe 17 passes through the test box body 31 and is connected with the grouting expansion head 43, and the other end of the grouting pipe 17 is also sealedly connected with the test box body 31 through a sealing interface to avoid pressure leakage inside the test box body 31; in actual use, the grouting test piece and the grouting flow rate can be controlled by controlling the grouting control valve 18, thereby controlling the grouting amount Q.

[0127] To further explain, the power unit also includes a grouting switch valve, a grouting plate 12 is arranged inside the grouting box 11, the grouting plate 12 is tightly connected to the inner wall of the grouting box 11, one end of the grouting rod 13 passes through the top of the grouting box 11 and extends to the inside of the grouting box 11 and is connected to the top of the grouting plate 12, the other end of the grouting rod 13 is located on the outside of the grouting box 11, the grouting switch valve is arranged on the grouting drive 14, the grouting drive 14 is installed on the top of the grouting box 11 through the mounting plate, the grouting drive 14 is connected to the grouting rod 13 by transmission, the grouting switch valve drives the grouting rod 13 to move up and down through the grouting drive 14, so that the grouting plate 12 moves downward to squeeze the pressure in the grouting box 11 to reach P+ΔP, and the grouting control valve 18 is opened to allow the slurry to be pumped into the grouting telescopic head 43 through the grouting pipe 17, and then the slurry is injected into the corresponding grouting hole through the vertical telescopic switch to complete the grouting plugging.

[0128] Specifically, the grouting drive 14 is installed above the grouting box 11 through a mounting plate. The output end of the grouting drive 14 can be selected to be vertically connected to the grouting rod 13. A nut matching with the grouting rod 13 is sleeved on the outer side of the grouting rod 13, and the nut is connected to the mounting plate. The bottom of the grouting rod 13 is rotatably connected to the grouting plate 12, so that the forward and reverse rotation of the grouting rod 13 can be controlled by controlling the forward and reverse rotation of the grouting drive 14, thereby driving the grouting plate 12 to move up and down.

[0129] Similarly, the water injection / gas unit 20 includes a water injection / gas box 21, a pressure water injection / gas plate, a pressure water injection / gas rod, a pressure water injection / gas drive 22 and a water injection / gas pipeline 23. The pressure water injection / gas plate is arranged in the water injection / gas box 21. The pressure water injection / gas drive 22 is connected to the pressure water injection / gas rod in the same way. The pressure water injection / gas rod is connected to the pressure water injection / gas plate. The bottom of the water injection / gas box 21 is connected to the fluid layer 60 through the water injection / gas pipeline 23. At this time, one end of the water injection / gas pipeline 23 is connected to the water injection / gas box 21 through a sealing interface. The bottom of the gas box body 21 is sealed and connected to avoid pressure release inside the water injection / gas box body 21; the other end of the water injection / gas pipeline 23 extends through the test box body 31 to the fluid layer 60, and the other end of the water injection / gas pipeline 23 is also sealed and connected to the test box body 31 through a sealing interface, so that gas or water with a pressure of ΔP is injected into the fluid layer 60 on the top of the blocked rock sample specimen, simulating the actual environment, and making a more realistic and reliable judgment on whether there is leakage, ensuring that the judgment is reliable and effective, while reducing the difficulty of leakage judgment and improving work efficiency.

[0130] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, a person skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some or all of the technical features thereof may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the scope of the technical solutions of the present invention.

Claims

1. A method for obtaining a grouting scheme through a surrounding rock grouting test, characterized in that: The following steps are involved: S1. Determine the surrounding rock area to be blocked, obtain rock sample specimens in the surrounding rock area to be blocked, obtain a scaled model of the surrounding rock area to be blocked, and determine the scale ratio; S2. Set the actual longitudinal grouting spacing D a , Actual lateral grouting spacing D b , Actual drilling depth D c and grouting pressure P+ΔP, and the actual grouting scheme M is obtained, where ΔP is the gas or water pressure in the surrounding rock at the tunnel site, and P is the additional pressure; S3, converting the actual grouting scheme M into the corresponding specimen grouting scheme m according to the scale ratio; S4, drilling and grouting in the rock sample according to the specimen grouting scheme m obtained in step S3 to complete the test plugging; S5. Apply pressurized gas or pressurized fluid to the top of the rock sample, and then determine whether the rock sample has leakage. If so, abandon the corresponding actual grouting plan, readjust the actual grouting plan, and execute step S2; if not, retain the corresponding actual grouting plan.

2. The method for obtaining a grouting scheme through a surrounding rock grouting test according to claim 1, characterized in that: The step S1 comprises the following steps: S11, surveying the area to be blocked, determining the surrounding rock area to be blocked, and obtaining the longitudinal length L1, circumferential width L2, and radial length L3 of the surrounding rock to be blocked; S12, drilling core sampling at the center of the surrounding rock area to be blocked to obtain a rock sample, and using the obtained rock sample as a scaled model of the surrounding rock area to be blocked; S13. Determine the scale ratio according to the size of the surrounding rock to be blocked and the size of the rock sample: Among them, l1 is the length of the rock sample, l2 is the width of the rock sample, l3 is the height of the rock sample, n1 is the length scale ratio, n2 is the width scale ratio, and n3 is the height scale ratio.

3. The method for obtaining a grouting scheme through a surrounding rock grouting test according to claim 2, characterized in that: The step S3 is specifically as follows: According to the scale ratio, the actual grouting scheme M is converted into the corresponding specimen grouting scheme m. The specimen grouting scheme m includes the longitudinal specimen grouting spacing d a , Transverse specimen grouting spacing d b , specimen drilling depth d c And grouting pressure P+ΔP: <h2 style=";text-align:left;direction:ltr">d<h2 style=";text-align:left;direction:ltr"> a <h2 style=";text-align:left;direction:ltr"> =n1D<h2 style=";text-align:left;direction:ltr"> a d b =n2D b <h2 style=";text-align:left;direction:ltr">d<h2 style=";text-align:left;direction:ltr"> c <h2 style=";text-align:left;direction:ltr"> =n3D<h2 style=";text-align:left;direction:ltr"> c Among them, the value range of P is 1MPa~2MPa.

4. The method for obtaining a grouting scheme through a surrounding rock grouting test according to claim 3, characterized in that: The step S4 is specifically as follows: S41, according to the longitudinal specimen grouting spacing d obtained in step S3 a , Transverse specimen grouting spacing d b and the specimen drilling depth d c A plurality of grouting holes arranged in an array are drilled at the bottom of the rock sample; the longitudinal distance between the grouting holes and the boundary of the rock sample does not exceed The lateral distance between the grouting hole and the boundary of the rock sample shall not exceed S42, inject slurry into each grouting hole according to the grouting pressure P+ΔP to complete the test plugging; the grouting amount Q of each grouting hole is: Q=Vsα(1+β) V=d a d b d c Among them, s is the formation porosity or fracture degree, α is the formation filling rate, and β is the slurry loss rate.

5. The method for obtaining a grouting scheme through a surrounding rock grouting test according to claim 3, characterized in that: The step S5 is specifically as follows: S51, placing the rock sample after the test plugging is completed in a closed space, and injecting gas or water with a pressure of ΔP at the top of the rock sample; S52, determining whether there is gas or fluid leakage at the bottom of the rock sample, if yes, executing step S53, if no, executing step S54; S53, execute step S2, and adjust the actual longitudinal grouting spacing D a , Actual lateral grouting spacing D b , Actual drilling depth D c and grouting pressure P+ΔP; S54, determining the specimen grouting scheme m used for the plugging test of the rock sample specimen, and matching the corresponding actual grouting scheme M according to the determined specimen grouting scheme m as the preferred grouting scheme and retaining it, and executing step S53 until all specimen grouting schemes are completed; S55, calculating the cost of each preferred grouting scheme obtained in step S54, and selecting the preferred grouting scheme with the lowest cost as the optimal grouting scheme; Among them, cost = slurry unit price × actual grouting volume × number of holes drilled.

6. A surrounding rock grouting test device, characterized in that: The invention comprises a grouting unit (10), a water injection / air injection unit (20), a test box (30), a grouting unit (40) and an electric power unit. The test box (30) comprises a test box body (31), a box door (32) sealedly connected to the test box body (31) and a partition (33) arranged in the test box body (31); The grouting unit (40) is arranged in the test box body (31) and is movably connected to the test box body (31); the grouting unit (40) is located below the partition (33); the grouting unit (10) is connected to the grouting unit (40); the output end of the water / gas injection unit (20) passes through the test box body (31) and extends to above the partition (33); the power unit is electrically connected to the grouting unit (10), the water / gas injection unit (20) and the grouting unit (40) respectively.

7. The surrounding rock grouting test device according to claim 6, characterized in that: The grouting unit (10) comprises a grouting box (11), a grouting plate (12), a grouting rod (13), a grouting drive (14) and a grouting pipe (17); the grouting box (11) is provided with a grouting inlet (15) connected to the interior thereof, the bottom of the grouting box (11) is provided with a grouting outlet (16), the grouting plate (12) is arranged inside the grouting box (11), the grouting drive (14) is connected to the top of the grouting plate (12) through the grouting rod (13), one end of the grouting pipe (17) is sealedly connected to the grouting outlet (16), the other end of the grouting pipe (17) passes through the test box body (31) and is connected to the grouting unit (40), the grouting pipe (17) is sealedly connected to the test box body (31), and the grouting drive (14) is arranged on the outside of the grouting box (11); the power unit is electrically connected to the grouting drive (14).

8. The surrounding rock grouting test device according to claim 6, characterized in that: The water injection / gas unit (20) comprises a water injection / gas box (21), a pressure water injection / gas plate, a pressure water injection / gas rod, a pressure water injection / gas drive (22) and a water injection / gas pipeline (23); The water / gas box (21) is connected to the interior of the test box body (31) through a water / gas pipe (23); one end of the water / gas pipe (23) is sealed and connected to the bottom of the water / gas box (21); the other end of the water / gas pipe (23) passes through the test box body (31) and extends to the top of the partition (33); the other end of the water / gas pipe (23) is sealed and connected to the test box body (31); the pressure water / gas plate is arranged inside the water / gas box (21); the pressure water / gas drive (22) is connected to the top of the pressure water / gas plate through a pressure water / gas rod; the pressure water / gas drive (22) is located outside the water / gas box (21); the water / gas pipe (23) is located below the pressure water / gas plate; the power unit is electrically connected to the pressure water / gas drive (22).

9. The surrounding rock grouting test device according to claim 8, characterized in that: The grouting unit (40) comprises a transverse moving mechanism (41), a longitudinal moving mechanism (42) and a grouting telescopic head (43); the longitudinal moving mechanism (42) is movably connected to the grouting box (11) via the transverse moving mechanism (41); the grouting telescopic head (43) is connected to the transverse moving mechanism (41); the output end of the grouting telescopic head (43) is arranged opposite to the partition (33); and the power unit is electrically connected to the transverse moving mechanism (41), the longitudinal moving mechanism (42) and the grouting telescopic head (43), respectively.

10. The surrounding rock grouting test device according to claim 9, characterized in that: The power unit comprises a grouting switch valve, a water / gas injection switch and a plugging control switch (44), and the plugging control switch (44) comprises a control panel, a horizontal plugging switch, a longitudinal plugging switch and a vertical telescopic switch; The grouting switch valve is arranged on the grouting drive (14) and is electrically connected to the grouting drive (14); the water injection / gas switch is arranged on the pressure water injection / gas drive (22) and is electrically connected to the pressure water injection / gas drive (22); The control panel is arranged on the outside of the test box body (31); the transverse blocking switch, the longitudinal blocking switch and the vertical telescopic switch are all arranged on the control panel; the transverse blocking switch is electrically connected to the transverse moving mechanism (41); the longitudinal blocking switch is electrically connected to the longitudinal moving mechanism (42); and the vertical telescopic switch is electrically connected to the grouting telescopic head (43).

11. The surrounding rock grouting test device according to claim 6, characterized in that: The inner wall of the grouting box (11) is provided with a sealing member, and the sealing member is located between the partition plate (33) and the end of the water injection / air pipe (23); The box door (32) is sealed and connected to the test box body (31) via a sealing strip; The grouting pipe (17) is sealedly connected to the grout outlet (16) and the test box body (31) respectively through a sealing interface; The water injection / gas pipeline (23) is sealedly connected to the water injection / gas box body (21) and the test box body (31) through sealing interfaces.

12. The surrounding rock grouting test device according to claim 11, characterized in that: The surrounding rock grouting test device further comprises a gas concentration sensor (50), wherein the gas concentration sensor (50) is arranged on the inner wall of the grouting box (11), the gas concentration sensor (50) is located on the peripheral side of the grouting unit (40), and the gas concentration sensor (50) is located below the partition (33).