Remote monitoring intelligent control system integrating water, heat, gas and electricity meters
By designing a remote monitoring intelligent control system with four hydrothermal gas and electricity meters, the remote monitoring data statistical processing, multi-dimensional verification and abnormal evaluation module of meter are used to solve the problem of poor remote monitoring data processing in the existing technology. The multi-dimensional data analysis and monitoring data expansion control effect has been improved.
Patent Information
- Application Number
- CN202411181757.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-27
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2044-08-27
AI Technical Summary
The existing remote monitoring and control scheme of four-meter-in-one hydrothermal gas and electricity meter cannot perform multi-dimensional data remote monitoring statistics and processing analysis, resulting in poor remote monitoring data processing effect of meter and poor monitoring data expansion control effect.
A remote monitoring intelligent control system with four meters in one hydrothermal gas and electricity is designed, including a meter remote monitoring data statistics processing module, a multi-dimensional verification module and anomaly evaluation control module. Through real-time data monitoring, abnormal verification and integrated calculation, it obtains The local and overall operating status of the meter and perform adaptive remote dynamic control.
It realizes the multi-dimensional data processing and analysis of the meter and the expansion and mining of monitoring data, improves the processing and control effect of remote monitoring data, and provides reliable support for coordinated and synchronous dimensional supervision data.
Smart Images

Figure CN118938771A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of metering supervision, and in particular to a remote monitoring intelligent control system integrating four meters of water, heat, gas and electricity. Background Art
[0002] Water, heat, gas and electricity meters refer to four common measuring instruments in civil life, which are used to measure residents' domestic water consumption, heat consumption, gas consumption and electricity consumption respectively; these four meters play an important role in the construction of modern smart cities, especially in the "four meters in one" intelligent management system.
[0003] When the existing remote monitoring and control scheme for the four-in-one water, heat, gas and electricity meters is implemented, it is impossible to perform multi-dimensional remote monitoring and statistics of the data of the four water, heat, gas and electricity meters during operation, and to process and analyze the data of remote monitoring and statistics in different dimensions. It is impossible to obtain the local operating status and overall operating status of the four water, heat, gas and electricity meters during operation, and to remotely dynamically control different meters based on the results of the analysis, resulting in poor multi-dimensional processing and analysis of the remote monitoring data of the meters and poor expansion and control of the monitoring data. Summary of the invention
[0004] The purpose of the present invention is to provide a remote monitoring intelligent control system that integrates water, heat, gas and electricity meters, which is used to solve the technical problems of poor multi-dimensional processing and analysis of remote monitoring data of meters and poor expansion and control of monitoring data in existing solutions.
[0005] The purpose of the present invention can be achieved through the following technical solutions:
[0006] A remote monitoring intelligent control system for water, heat, gas and electricity meters in one, including a meter remote monitoring data statistics processing module, which is used to perform data monitoring and statistics on the real-time working conditions and real-time recording conditions of different meters in different households, and to perform data processing on the real-time working monitoring data and real-time recording monitoring data corresponding to different meters, so as to obtain local monitoring processing sequences corresponding to different aspects of different meters; the local monitoring processing sequences of different aspects include local working monitoring processing sequences and local recording monitoring processing sequences;
[0007] The multi-dimensional verification module of the meter remote monitoring data is used to perform abnormal verification of different dimensions on the local monitoring processing sequences obtained by processing different aspects of different meters, and perform abnormal impact processing on the verification data with valid abnormal verification of different dimensions, so as to obtain the first local record abnormal sequence and the second local record abnormal sequence corresponding to different dimensions;
[0008] The meter remote monitoring anomaly assessment control module is used to integrate and calculate the first local record anomaly sequence and the second local record anomaly sequence obtained by processing different dimensions of different meters, obtain the anomaly supervision values corresponding to different meters, and perform data analysis on the anomaly supervision values to determine the corresponding operating status of the meter to which they belong, and adaptively perform remote dynamic control on the meter to which they belong based on the operating status obtained through the analysis.
[0009] Preferably, when data monitoring and statistics are performed on the real-time working conditions and real-time recording conditions of different meters in different households, when it is monitored that a meter starts to work, a first start instruction is generated and the meter that starts to work is marked as a target meter, and a first start timestamp generated corresponding to the first start instruction is obtained;
[0010] And, when it is monitored that the meter has finished working, a first end instruction is generated and a correspondingly generated first end timestamp is obtained;
[0011] Calculate the time difference between the first start timestamp and the first end timestamp and mark it as the first local working time difference, and sort and combine the meter number corresponding to the target meter with the first start timestamp, the first end timestamp, and the first local working time difference to obtain a local working monitoring processing sequence corresponding to the target meter;
[0012] And, generating a second start instruction when monitoring data changes after the target meter starts working, and obtaining a second start timestamp generated corresponding to the second start instruction;
[0013] When the meter finishes working and the corresponding monitored data remains unchanged, a second end instruction is generated, and a second end timestamp generated corresponding to the second end instruction is obtained;
[0014] Calculate the time difference between the second start timestamp and the second end timestamp and mark it as the second local working time difference, and sort and combine the meter number corresponding to the target meter with the second start timestamp, the second end timestamp, and the second local working time difference to obtain the local record monitoring processing sequence corresponding to the target meter.
[0015] Preferably, when implementing abnormal verification of the coordination dimension for different meters, the total number of local work monitoring and processing sequences and the total number of local record monitoring and processing sequences obtained by monitoring and processing of different meters on that day are counted, and the coordination identification identification piecewise function is used to perform data analysis to obtain the coordination identification corresponding to the meter on that day;
[0016] Among them, the expression for cooperative identification of piecewise functions is: Where XP is the coordination mark; N1 and N2 are the total number of local work monitoring and processing sequences and the total number of local record monitoring and processing sequences respectively;
[0017] The coordination flag contains a value of 0 or non-zero, indicating whether the operation coordination of the corresponding meter on that day is normal or abnormal.
[0018] Preferably, a collaborative exception instruction is generated according to a collaborative cooperation identifier whose value is non-zero, and when all local work monitoring and processing sequences and local record monitoring and processing sequences acquired by the monitoring of the meter to which it belongs are subjected to abnormal screening according to the collaborative exception instruction, the working time periods [TG1i, TG2i] and recording time periods [TJ1j, TJ2j] corresponding to all local work monitoring and processing sequences and local record monitoring and processing sequences are obtained, i and j are different local work monitoring and processing sequences and local record monitoring and processing sequences, i={1, 2, 3, ..., n}, j={1, 2, 3, ..., m}, n, m are positive integers; and the working time periods and recording time periods corresponding to the sorted local work monitoring and processing sequences and local record monitoring and processing sequences are subjected to data analysis through an abnormal screening identification piecewise function and the corresponding collaborative screening identifier is output;
[0019] Among them, the expression of the abnormal screening and identification piecewise function is: Where XS is the collaborative screening identifier corresponding to the local work monitoring processing sequence and the local record monitoring processing sequence with the same sorting number;
[0020] The collaborative screening flag includes a value of 0 or 1, indicating whether the collaborative status of the local work monitoring processing sequence and the local record monitoring processing sequence in the corresponding time period matches or does not match.
[0021] Preferably, according to the collaborative screening flag with a value of 0, the corresponding local record monitoring and processing sequence is marked as a normal record monitoring and processing sequence, and according to the collaborative screening flag with a value of 1, the corresponding local record monitoring and processing sequence is marked as an abnormal record monitoring and processing sequence, and the formula Calculate and obtain the first local record abnormality JY corresponding to the abnormal record monitoring and processing sequence; where Tc is the total duration corresponding to the abnormal record monitoring and processing sequence; Lc is the record data change value corresponding to the abnormal record monitoring and processing sequence; Tc0 and Lc0 are the standard abnormal duration and standard abnormal record change value corresponding to the meter to which they belong, respectively; max() is a function that takes the maximum value between two numbers;
[0022] All first local record abnormality degrees obtained by processing different meter tables are sorted and combined respectively to obtain the first local record abnormality sequence corresponding to the corresponding meter table.
[0023] Preferably, when implementing the abnormal verification of the collaborative synchronization dimension for different meters, the working time periods [TG1 i, TG2i] and recording time periods [TJ1k, TJ2k] corresponding to all local working monitoring processing sequences and normal recording monitoring processing sequences of different meters on the same day are obtained, k = {1, 2, 3, ..., p}, p is a positive integer, and the formula Calculate and obtain the collaborative synchronization value XT between different normal record monitoring and processing sequences and the corresponding local working monitoring and processing sequences; where TJ10 and TJ20 are the standard asynchronous start interval error and standard asynchronous end interval error corresponding to the corresponding meter, respectively.
[0024] Preferably, when the data analysis of the coordinated synchronization value is performed to determine the coordinated synchronization state between the normal record monitoring processing sequence and the corresponding local work monitoring processing sequence;
[0025] If the collaborative synchronization value is not 0, a collaborative synchronization exception instruction is generated, and the collaborative synchronization value is marked as the second local record abnormality degree;
[0026] All second local record anomaly degrees obtained by processing different meter tables are sorted and combined respectively to obtain the second local record anomaly sequence corresponding to the meter table.
[0027] Preferably, the first local record abnormal sequence and the second local record abnormal sequence corresponding to different meters are obtained. When there is data update in the first local record abnormal sequence and the second local record abnormal sequence, the formula Calculate and obtain the abnormal supervision value YJ corresponding to the meter to which it belongs; where a and b are both proportional constants greater than 0; n1 and n2 are the total number of elements in the first local record abnormal sequence and the second local record abnormal sequence, respectively; TY is the different second local record abnormality degrees in the second local record abnormal sequence; A and B are the coordination and cooperation standard values and the coordination and synchronization standard values corresponding to the meter to which it belongs, respectively.
[0028] Preferably, data analysis is performed on the abnormal supervision value to obtain the normal operation state, the slightly abnormal operation state or the severely abnormal operation state of the corresponding meter.
[0029] Preferably, based on the normal operation status, slightly abnormal operation status or seriously abnormal operation status obtained by analyzing the meter, remote no-operation control, remote active operation and maintenance confirmation prompt control or remote active maintenance confirmation prompt control is adaptively generated.
[0030] Compared with the existing solutions, the present invention achieves the following beneficial effects:
[0031] The present invention implements data processing of the collaborative cooperation dimension and the collaborative synchronization dimension on different meters respectively, and integrates the calculation and analysis of the processed data of different dimensions to obtain the first local record abnormality sequence and the second local record abnormality sequence corresponding to the meter, thereby realizing the local monitoring data processing and analysis of different dimensions of the meter, and at the same time can provide reliable collaborative synchronization dimension supervision data support for the subsequent remote dynamic control of the meter.
[0032] The present invention integrates and calculates the first local record abnormality sequence and the second local record abnormality sequence obtained by processing in different dimensions in the early stage, obtains the abnormal supervision values corresponding to different meters, performs data analysis on the abnormal supervision values to determine the operating status corresponding to the corresponding meter, and adaptively performs remote dynamic control on the corresponding meter according to the operating status obtained by analysis, thereby realizing the extended mining and control of the analysis data of different dimensions in the early stage, and improving the multi-dimensional processing and analysis effect of the remote monitoring data of the meter and the extended control effect of the monitoring data. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] The present invention will be further described below in conjunction with the accompanying drawings.
[0034] Figure 1 The present invention is a flowchart of the operation of a remote monitoring intelligent control system for integrating water, heat, gas and electricity meters. DETAILED DESCRIPTION
[0035] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0036] like Figure 1 As shown, the present invention is a remote monitoring intelligent control system for water, heat, gas and electricity four-in-one meters, including a meter remote monitoring data statistical processing module, a meter remote monitoring data multi-dimensional verification module and a meter remote monitoring abnormality assessment control module;
[0037] The meter remote monitoring data statistics processing module is used to monitor and count the real-time working conditions and real-time recording conditions of different meters in different households, and to process the real-time working monitoring data and real-time recording monitoring data corresponding to different meters to obtain local monitoring processing sequences corresponding to different aspects of different meters; including:
[0038] It should be noted that the meter is a synonym for the four meters of water, heat, gas and electricity;
[0039] When data monitoring and statistics are performed on the real-time working conditions and real-time recording conditions of different meters in different households, when it is monitored that a meter starts to work, a first start instruction is generated and the meter that starts to work is marked as a target meter, and a first start timestamp generated corresponding to the first start instruction is obtained; in the embodiment of the present invention, the units of different types of timestamps are accurate to seconds;
[0040] In addition, in the embodiment of the present invention, the real-time working conditions of different meters correspond to manually operating the equipment to make it run, and the real-time recording conditions correspond to the data recorded when the equipment is running or on standby; the monitoring statistics corresponding to the real-time working conditions and the real-time recording conditions can be realized based on the existing Internet of Things technology, for example: monitoring the switches of the equipment corresponding to different meters through mechanical switch sensors or vibration sensors; monitoring and recording the operating data of different meters through smart meters; and transmitting data through communication technologies such as LoRaWAN or NB-IoT;
[0041] And, when it is monitored that the meter has finished working, a first end instruction is generated and a correspondingly generated first end timestamp is obtained;
[0042] Calculate the time difference between the first start timestamp and the first end timestamp and mark it as the first local working time difference, and sort and combine the meter number corresponding to the target meter with the first start timestamp, the first end timestamp, and the first local working time difference to obtain a local working monitoring processing sequence corresponding to the target meter;
[0043] And, generating a second start instruction when monitoring data changes after the target meter starts working, and obtaining a second start timestamp generated corresponding to the second start instruction;
[0044] When the meter finishes working and the corresponding monitored data remains unchanged, a second end instruction is generated, and a second end timestamp generated corresponding to the second end instruction is obtained;
[0045] Calculate the time difference between the second start timestamp and the second end timestamp and mark it as the second local working time difference, and sort and combine the meter number corresponding to the target meter with the second start timestamp, the second end timestamp, and the second local working time difference to obtain a local record monitoring processing sequence corresponding to the target meter;
[0046] In the embodiment of the present invention, by monitoring, counting and processing the real-time working conditions and real-time recording conditions of different meters every day, corresponding local working monitoring and processing sequences and local recording monitoring and processing sequences are obtained, which can not only realize the monitoring, counting and digital processing of the daily operation of different meters, but also provide reliable data support for subsequent data analysis and expansion control of different dimensions of different meters.
[0047] The multi-dimensional verification module of meter remote monitoring data is used to perform abnormal verification in different dimensions on the local monitoring processing sequences obtained by processing different aspects of different meters, and perform abnormal impact processing on the verification data with valid abnormal verification in different dimensions, so as to obtain the first local record abnormal sequence and the second local record abnormal sequence corresponding to different dimensions; including:
[0048] When implementing abnormal verification of the coordination dimension for different meters, the total number of local work monitoring and processing sequences and the total number of local record monitoring and processing sequences obtained by monitoring and processing of different meters on that day are counted, and the coordination identification identification piecewise function is used to perform data analysis to obtain the coordination identification corresponding to the meter on that day;
[0049] Among them, the expression for cooperative identification of piecewise functions is: Where XP is the coordination mark; N1 and N2 are the total number of local work monitoring and processing sequences and the total number of local record monitoring and processing sequences respectively;
[0050] It should be noted that the coordination mark is used to digitally represent the coordination status of different working aspects and recording aspects of the meter to which it belongs on that day;
[0051] The coordination flag contains a value of 0 or non-zero, indicating whether the operation coordination of the meter to which it belongs is normal or abnormal on that day;
[0052] In the embodiment of the present invention, by processing and calculating the data of the working and recording aspects of different meters on the same day to obtain the corresponding coordination identification, reliable digital data support can be provided for the subsequent coordination status analysis of the meter on the same day;
[0053] Generate a normal coordination instruction according to the coordination flag whose value is 0;
[0054] Generate a collaborative exception instruction according to a collaborative cooperation identifier with a non-zero value, and perform abnormal screening on all local work monitoring and processing sequences and local record monitoring and processing sequences obtained by monitoring the meter on the same day according to the collaborative exception instruction, and obtain the working time periods [TG1i, TG2i] and recording time periods [TJ1j, TJ2j] corresponding to all local work monitoring and processing sequences and local record monitoring and processing sequences, i and j are different local work monitoring and processing sequences and local record monitoring and processing sequences, i = {1, 2, 3, ..., n}, j = {1, 2, 3, ..., m}, n, m are positive integers; and perform data analysis on the working time periods and recording time periods corresponding to the sorted local work monitoring and processing sequences and local record monitoring and processing sequences through the abnormal screening recognition piecewise function and output the corresponding collaborative screening identifier; the sorting here can be achieved according to the order of Beijing time;
[0055] Among them, the expression of the abnormal screening and identification piecewise function is: Where XS is the collaborative screening identifier corresponding to the local work monitoring processing sequence and the local record monitoring processing sequence with the same sorting number;
[0056] It should be noted that the collaborative screening identifier is used to further perform data analysis on the abnormal local record monitoring and processing sequence in the case of collaborative abnormality and to digitally represent the screening results;
[0057] The collaborative screening flag contains a value of 0 or 1, indicating whether the collaborative status of the local work monitoring processing sequence and the local record monitoring processing sequence in the corresponding time period matches or does not match;
[0058] According to the collaborative filtering flag with a value of 0, the corresponding local record monitoring and processing sequence is marked as a normal record monitoring and processing sequence, and according to the collaborative filtering flag with a value of 1, the corresponding local record monitoring and processing sequence is marked as an abnormal record monitoring and processing sequence, and the formula Calculate and obtain the first local record abnormality JY corresponding to the abnormal record monitoring and processing sequence; where Tc is the total duration corresponding to the abnormal record monitoring and processing sequence; Lc is the record data change value corresponding to the abnormal record monitoring and processing sequence; Tc0 and Lc0 are the standard abnormal duration and standard abnormal record change value corresponding to the meter to which they belong, respectively, which can be determined according to the operation design requirement data corresponding to the meter to which they belong; max() is a function that takes the maximum value between two numbers;
[0059] It should be noted that the first local record abnormality degree is used to integrate and calculate the abnormal data corresponding to different aspects of the abnormal record monitoring and processing sequence to digitally represent the impact of the local record abnormality;
[0060] All first local record abnormality degrees obtained by processing different meter tables are sorted and combined respectively to obtain the first local record abnormality sequence corresponding to the corresponding meter table;
[0061] In the embodiment of the present invention, abnormality verification is performed by performing data processing analysis of the coordination dimension on different meters. First, data analysis is performed on the total number of local work monitoring processing sequences and the total number of local record monitoring processing sequences. According to the analysis results, the local record abnormality impact corresponding to the abnormal record monitoring processing sequence obtained by the analysis is further digitally processed and calculated and combined to obtain the first local record abnormality sequence corresponding to the coordination dimension of different meters. At the same time, reliable coordination dimension supervision data support can also be provided for the subsequent remote dynamic control of the meter.
[0062] And, when implementing the abnormal verification of the collaborative synchronization dimension for different meters, obtain the working time periods [TG1 i, TG2i] and recording time periods [TJ1k, TJ2k] corresponding to all local working monitoring processing sequences and normal recording monitoring processing sequences of different meters on the same day, k = {1, 2, 3, ..., p}, p is a positive integer, and through the formula Calculate and obtain the collaborative synchronization value XT between different normal record monitoring and processing sequences and the corresponding local working monitoring and processing sequences; where TJ10 and TJ20 are the standard asynchronous start interval error and standard asynchronous end interval error corresponding to the corresponding meter, respectively, which can be determined according to the operation design requirement data corresponding to the corresponding meter;
[0063] It should be noted that the collaborative synchronization value is used to perform data calculation on the record data corresponding to different normal record monitoring processing sequences to digitally represent the local collaborative synchronization state corresponding to the corresponding meter;
[0064] When the data of the coordinated synchronization value is analyzed to determine the coordinated synchronization state between the normal record monitoring processing sequence and the corresponding local work monitoring processing sequence;
[0065] If the collaborative synchronization value is 0, a collaborative synchronization normal instruction is generated;
[0066] If the collaborative synchronization value is not 0, a collaborative synchronization exception instruction is generated, and the collaborative synchronization value is marked as the second local record abnormality degree;
[0067] All the second local record abnormality degrees obtained by processing different meter tables are sorted and combined respectively to obtain the second local record abnormality sequence corresponding to the corresponding meter table;
[0068] In the embodiment of the present invention, abnormality verification is performed by performing data processing and analysis of the collaborative synchronization dimension on different meters. First, the collaborative synchronization values between the different normal record monitoring and processing sequences of the meter and the corresponding local work monitoring and processing sequences are analyzed and screened to obtain the second local record abnormality degree and combined to obtain the second local record abnormal sequence corresponding to the meter. At the same time, reliable collaborative synchronization dimension supervision data support can also be provided for the subsequent remote dynamic control of the meter.
[0069] The meter remote monitoring anomaly assessment control module is used to integrate and calculate the first local record anomaly sequence and the second local record anomaly sequence obtained by processing different dimensions of different meters, obtain the anomaly supervision values corresponding to different meters, and perform data analysis on the anomaly supervision values to determine the corresponding operating status of the meter to which they belong, and adaptively perform remote dynamic control on the meter to which they belong according to the operating status obtained by the analysis; including:
[0070] Get the first local record exception sequence and the second local record exception sequence corresponding to different meters. When there is data update in the first local record exception sequence and the second local record exception sequence, the formula is used Calculate and obtain the abnormal supervision value YJ corresponding to the meter to which it belongs; where a and b are both proportional constants greater than 0; n1 and n2 are the total number of elements in the first local record abnormal sequence and the second local record abnormal sequence respectively; TY is the different second local record abnormality degrees in the second local record abnormal sequence; A and B are the coordination and coordination standard values and coordination and synchronization standard values corresponding to the meter to which it belongs respectively, which can be determined according to the operation design requirement data corresponding to the meter to which it belongs;
[0071] When performing data analysis on the abnormal supervision value, if the abnormal supervision value is 0, a normal operation instruction is generated and the corresponding meter is prompted to be in normal operation;
[0072] If the abnormal supervision value is 1, a minor abnormal operation instruction is generated and the corresponding meter is prompted to be in a minor abnormal operation state;
[0073] If the abnormal supervision value is greater than 1, a severe abnormal operation instruction is generated and the severe abnormal operation state of the corresponding meter is prompted;
[0074] According to the normal operation status, slightly abnormal operation status or seriously abnormal operation status obtained by the meter analysis, remote no-operation control, remote active operation and maintenance confirmation prompt control or remote active maintenance confirmation prompt control are adaptively generated;
[0075] Among them, different confirmation prompts can be implemented through the contact information reserved by the household owner of the corresponding meter.
[0076] In an embodiment of the present invention, the first local record anomaly sequence and the second local record anomaly sequence obtained by processing in different dimensions in the early stage are integrated and calculated to obtain abnormal supervision values corresponding to different meters, and data analysis is performed on the abnormal supervision values to determine the operating status corresponding to the corresponding meter. According to the operating status obtained by the analysis, the corresponding meter is adaptively remotely and dynamically controlled, thereby realizing the expansion mining and control of the analysis data of different dimensions in the early stage, and improving the multi-dimensional processing and analysis effect of the remote monitoring data of the meter and the expansion control effect of the monitoring data.
[0077] In addition, the formulas involved in the above are all dimensionless and numerical calculations. They are a formula that is closest to the actual situation obtained by collecting a large amount of data and simulating it with simulation software.
[0078] In the several embodiments provided by the present invention, it should be understood that the disclosed system can be implemented in other ways. For example, the above-described embodiments of the invention are only illustrative, for example, the division of modules is only a logical function division, and there may be other division methods in actual implementation.
[0079] The modules described as separate components may or may not be physically separated, and the components shown as modules may or may not be physical modules, and may be located in one place or distributed on multiple network modules. Some or all of the modules may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0080] In addition, each functional module in each embodiment of the present invention may be integrated into one processing module, or each module may exist physically separately, or two or more modules may be integrated into one module. The above-mentioned integrated module may be implemented in the form of hardware or in the form of hardware plus software functional modules.
[0081] It is obvious to a person skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the essential characteristics of the present invention.
[0082] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the spirit and scope of the technical solution of the present invention.
Claims
1. A remote monitoring intelligent control system integrating water, heat, gas and electricity meters, characterized in that: It includes a meter remote monitoring data statistics processing module, which is used to perform data monitoring and statistics on the real-time working conditions and real-time recording conditions of different meters in different households, and to perform data processing on the real-time working monitoring data and real-time recording monitoring data corresponding to different meters, so as to obtain local monitoring processing sequences corresponding to different aspects of different meters; the local monitoring processing sequences of different aspects include local working monitoring processing sequences and local recording monitoring processing sequences; The multi-dimensional verification module of the meter remote monitoring data is used to perform abnormal verification of different dimensions on the local monitoring processing sequences obtained by processing different aspects of different meters, and perform abnormal impact processing on the verification data with valid abnormal verification of different dimensions, so as to obtain the first local record abnormal sequence and the second local record abnormal sequence corresponding to different dimensions; The meter remote monitoring anomaly assessment control module is used to integrate and calculate the first local record anomaly sequence and the second local record anomaly sequence obtained by processing different dimensions of different meters, obtain the anomaly supervision values corresponding to different meters, and perform data analysis on the anomaly supervision values to determine the corresponding operating status of the meter to which they belong, and adaptively perform remote dynamic control on the meter to which they belong based on the operating status obtained through the analysis.
2. According to claim 1, a remote monitoring intelligent control system for water, heat, gas and electricity four-in-one meter, characterized in that: When data monitoring and statistics are performed on the real-time working conditions and real-time recording conditions of different meters in different households, when it is monitored that a meter starts to work, a first start instruction is generated and the meter that starts to work is marked as a target meter, and a first start timestamp generated corresponding to the first start instruction is obtained; And, when it is monitored that the meter has finished working, a first end instruction is generated and a correspondingly generated first end timestamp is obtained; Calculate the time difference between the first start timestamp and the first end timestamp and mark it as the first local working time difference, and sort and combine the meter number corresponding to the target meter with the first start timestamp, the first end timestamp, and the first local working time difference to obtain a local working monitoring processing sequence corresponding to the target meter; And, generating a second start instruction when monitoring data changes after the target meter starts working, and obtaining a second start timestamp generated corresponding to the second start instruction; When the meter finishes working and the corresponding monitored data remains unchanged, a second end instruction is generated, and a second end timestamp generated corresponding to the second end instruction is obtained; Calculate the time difference between the second start timestamp and the second end timestamp and mark it as the second local working time difference, and sort and combine the meter number corresponding to the target meter with the second start timestamp, the second end timestamp, and the second local working time difference to obtain the local record monitoring processing sequence corresponding to the target meter.
3. According to claim 2, a remote monitoring intelligent control system for water, heat, gas and electricity four-in-one meter, characterized in that: When implementing abnormal verification of the coordination dimension for different meters, the total number of local work monitoring and processing sequences and the total number of local record monitoring and processing sequences obtained by monitoring and processing of different meters on that day are counted, and the coordination identification identification piecewise function is used to perform data analysis to obtain the coordination identification corresponding to the meter on that day; Among them, the expression for cooperative identification of piecewise functions is: Where XP is the coordination mark; N1 and N2 are the total number of local work monitoring and processing sequences and the total number of local record monitoring and processing sequences respectively; The coordination flag contains a value of 0 or non-zero, indicating whether the operation coordination of the corresponding meter on that day is normal or abnormal.
4. According to claim 3, a remote monitoring intelligent control system for water, heat, gas and electricity four-in-one meter, characterized in that: Generate a collaborative exception instruction according to a collaborative cooperation identifier with a non-zero value, and when performing abnormal screening on all local work monitoring and processing sequences and local record monitoring and processing sequences obtained by monitoring the corresponding meter on the same day according to the collaborative exception instruction, obtain the working time periods [TG1 i, TG2i] and recording time periods [TJ1j, TJ2j] corresponding to all local work monitoring and processing sequences and local record monitoring and processing sequences, i and j are different local work monitoring and processing sequences and local record monitoring and processing sequences, i = {1, 2, 3, ..., n}, j = {1, 2, 3, ..., m}, n, m are positive integers; and perform data analysis on the working time periods and recording time periods corresponding to the sorted local work monitoring and processing sequences and local record monitoring and processing sequences through an abnormal screening recognition piecewise function, and output the corresponding collaborative screening identifier; Among them, the expression of the abnormal screening and identification piecewise function is: Where XS is the collaborative screening identifier corresponding to the local work monitoring processing sequence and the local record monitoring processing sequence with the same sorting number; The collaborative screening flag includes a value of 0 or 1, indicating whether the collaborative status of the local work monitoring processing sequence and the local record monitoring processing sequence in the corresponding time period matches or does not match.
5. According to claim 4, a remote monitoring intelligent control system for water, heat, gas and electricity four-in-one meter, characterized in that: According to the collaborative filtering flag with a value of 0, the corresponding local record monitoring and processing sequence is marked as a normal record monitoring and processing sequence, and according to the collaborative filtering flag with a value of 1, the corresponding local record monitoring and processing sequence is marked as an abnormal record monitoring and processing sequence, and the formula Calculate and obtain the first local record abnormality JY corresponding to the abnormal record monitoring and processing sequence; where Tc is the total duration corresponding to the abnormal record monitoring and processing sequence; Lc is the record data change value corresponding to the abnormal record monitoring processing sequence; Tc0 and Lc0 are the standard abnormal duration and standard abnormal record change value corresponding to the corresponding meter; max() is a function that takes the maximum value between two numbers; All first local record abnormality degrees obtained by processing different meter tables are sorted and combined respectively to obtain the first local record abnormality sequence corresponding to the corresponding meter table.
6. According to claim 5, a remote monitoring intelligent control system for water, heat, gas and electricity four-in-one meter, characterized in that: When implementing abnormal verification of the collaborative synchronization dimension for different meters, obtain the working time periods [TG1i, TG2i] and recording time periods [TJ1k, TJ2k] corresponding to all local working monitoring and processing sequences and normal recording monitoring and processing sequences of different meters on the same day, k = {1, 2, 3, ..., p}, p is a positive integer, and use the formula Calculate and obtain the collaborative synchronization value XT between different normal record monitoring and processing sequences and the corresponding local working monitoring and processing sequences; where TJ10 and TJ20 are the standard asynchronous start interval error and standard asynchronous end interval error corresponding to the corresponding meter, respectively.
7. The remote monitoring intelligent control system for water, heat, gas and electricity four-in-one according to claim 6 is characterized in that: When the data of the coordinated synchronization value is analyzed to determine the coordinated synchronization state between the normal record monitoring processing sequence and the corresponding local work monitoring processing sequence; If the collaborative synchronization value is not 0, a collaborative synchronization exception instruction is generated, and the collaborative synchronization value is marked as the second local record abnormality degree; All second local record anomaly degrees obtained by processing different meter tables are sorted and combined respectively to obtain the second local record anomaly sequence corresponding to the meter table.
8. The remote monitoring intelligent control system for water, heat, gas and electricity four-in-one according to claim 7 is characterized in that: Get the first local record exception sequence and the second local record exception sequence corresponding to different meters. When there is data update in the first local record exception sequence and the second local record exception sequence, the formula is used Calculate and obtain the abnormal supervision value YJ corresponding to the meter to which it belongs; where a and b are both proportional constants greater than 0; n1 and n2 are the total number of elements in the first local record abnormal sequence and the second local record abnormal sequence, respectively; TY is the different second local record abnormality degrees in the second local record abnormal sequence; A and B are the coordination and cooperation standard values and the coordination and synchronization standard values corresponding to the meter to which it belongs, respectively.
9. The remote monitoring intelligent control system for water, heat, gas and electricity four-in-one according to claim 8 is characterized in that: Data analysis is performed on the abnormal supervision values to obtain whether the corresponding meter is in normal operation state, slightly abnormal operation state or severely abnormal operation state.
10. A remote monitoring intelligent control system for water, heat, gas and electricity four-in-one according to claim 9, characterized in that: According to the normal operation status, slightly abnormal operation status or seriously abnormal operation status obtained by the meter analysis, remote no-operation control, remote active operation and maintenance confirmation prompt control or remote active maintenance confirmation prompt control are adaptively generated.
Citation Information
Patent Citations
Accumulated water monitoring alarm control method and system, storage medium, program and terminal
CN111768589A
Decision fusion framework-based detection algorithm for abnormalities of roller kiln firing zone
CN113532138A
Online car-hailing real-time state monitoring and management system
CN118210262A
Data processing method for ERP (Enterprise Resource Planning) system
CN118378202A
Detecting systemwide service issues by using anomaly localization
US20240143433A1
Cited By
Computerized examination supervision identification remote control method
CN119720226A
A method for remotely controlling computerized examination supervision and identification
CN119720226B
Intelligent control system for operation of energy storage system
CN120728882A