Rapid reinforcement method for standard component of pumped storage power station

By building a three-dimensional structure and steel bar template library of pumped storage power stations, the rapid reinforcement design of pumped storage power station structures is achieved, the problem of low design efficiency is solved, the efficiency and standardization of drawings are improved, and labor costs are saved.

CN118940352APending Publication Date: 2024-11-12CHINA HYDROELECTRIC ENGINEERING CONSULTING GROUP CHENGDU RESEARCH HYDROELECTRIC INVESTIGATION DESIGN AND INSTITUTE
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410914310.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-09
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The structural design and steel bar drawing of pumped storage power stations are inefficient, resulting in limited construction progress and lack of a process-based design and reusable system to improve design efficiency and reduce labor costs.

Method used

Build a three-dimensional structural template library and steel bar template library for pumped storage power stations. Through parameter adjustment, model matching and replacement, a three-dimensional steel bar model of the structure to be reinforced is generated to achieve rapid reinforcement design and construction drawings.

Benefits of technology

It effectively improves the efficiency of steel bar drawing, saves labor costs, and improves the standardization of the design.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118940352A_ABST
    Figure CN118940352A_ABST
Patent Text Reader

Abstract

The invention mainly relates to the technical field of water conservancy and hydropower engineering. In order to improve the three-dimensional reinforcement design efficiency of each structure in the design process of the pumped storage power station in the construction stage, the invention provides a rapid reinforcement method for the standard component of the pumped storage power station, which comprises the following steps of: respectively constructing a three-dimensional structure template library and a three-dimensional reinforcement template library of a hydraulic structure; parameters in the three-dimensional structure template library are modified according to the parameters of the to-be-reinforced structure to generate a three-dimensional model of the to-be-reinforced structure, model matching and model replacement are carried out in the three-dimensional reinforcing steel bar template library, a three-dimensional reinforcing steel bar model of the to-be-reinforced structure is generated, and a design drawing is provided. And meanwhile, the standardization degree of drawing is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention mainly relates to the technical field of water conservancy and hydropower engineering, and in particular to a rapid reinforcement method for standard components of a pumped storage power station. Background Art

[0002] The large-scale and rapid construction of pumped-storage power stations has also brought great challenges to the hydraulic structure design of power stations, and put forward higher requirements for power station structural designers. With the simultaneous start of construction of multiple pumped-storage power stations, the provision of steel bar drawings in the technical implementation stage has become the main task of many designers. Under the premise of certain human resources, how to improve the efficiency of steel bar drawings has become an important factor in promoting the progress of pumped-storage power stations under construction.

[0003] The structural composition of a pumped storage power station mainly includes the upper and lower reservoir structures, water transmission structure, power generation structure, and flood discharge structure. The structural composition of different power stations is basically the same, and there are a large number of components with similar structural forms. For the same structural components, after completing the first set of reinforcement drawings of the component, whether the technical steps and results such as structural design, three-dimensional reinforcement, and reinforcement drawing can be reused lacks in-depth exploration of the value of three-dimensional reinforcement models. Therefore, there is an urgent need for a process-oriented design and reusable system and method for reinforcement drawings in the technical implementation stage to improve the efficiency of structural design, three-dimensional reinforcement, and reinforcement drawing in the technical implementation stage, and reduce the labor cost of the design unit. Summary of the invention

[0004] Technical Problems to be Solved by the Invention

[0005] A rapid reinforcement method for standard components of a pumped storage power station is provided, aiming to improve the efficiency of three-dimensional reinforcement design of each structure in the design process of a pumped storage power station during the construction phase.

[0006] The technical solution adopted by the present invention to solve the above technical problems

[0007] Rapid reinforcement method for standard components of pumped storage power stations, including:

[0008] Step 1: construct a 3D structural template of each component of the hydraulic structure of the pumped storage power station, and the 3D structural templates of each component constitute a 3D structural template library;

[0009] Step 2: Based on the reinforcement rules and the constructed three-dimensional structural template, forward reinforcement is performed to generate a three-dimensional steel bar template, wherein the three-dimensional steel bar template includes a three-dimensional structural model and a three-dimensional steel bar model of the component; the three-dimensional steel bar templates of each component constitute a three-dimensional steel bar template library;

[0010] Step 3: calling the three-dimensional structure template constructed in step 1, and adjusting the parameters of the three-dimensional structure template based on the design parameters of the structure to be reinforced to obtain a three-dimensional model of the structure to be reinforced;

[0011] Step 4: Match the 3D steel template library generated in step 2 with the point, line, and surface topology of the 3D model of the structure to be reinforced in step 3 Figure 1 Precise three-dimensional steel formwork;

[0012] Step 5: Replace the three-dimensional structural model in the three-dimensional steel bar template matched in step 4 with the three-dimensional model of the structure to be reinforced in step 3 to obtain a replaced three-dimensional steel bar template;

[0013] Step 6: Reconstruct, refresh and adjust the replaced three-dimensional steel bar template to obtain the final three-dimensional steel bar model of the structure to be reinforced;

[0014] Step 7: Generate construction drawings based on the three-dimensional steel bar model of the structure to be reinforced in step 6.

[0015] Furthermore, the three-dimensional structure template library constructed in step one includes three-dimensional structure templates of various components in the upper and lower reservoir modules, the water transfer module, the power generation module and the flood discharge module.

[0016] Furthermore, when forward reinforcement is performed to generate a three-dimensional steel bar template based on the reinforcement rules and the constructed three-dimensional structural template in step 2, one three-dimensional structural template generates one or more three-dimensional steel bar templates according to the reinforcement rules.

[0017] Furthermore, the three-dimensional steel bar template generated in step 2 includes the steel bar position, reinforcement form, section form and three-dimensional structure template number; the steel bar position, reinforcement form, section form and three-dimensional structure template number are stored in the form of a structure tree.

[0018] Furthermore, the reconstruction and refreshing of the replaced three-dimensional steel bar template described in step 6 specifically includes:

[0019] Step 1: storing the point, line, and surface topological structures of each three-dimensional structure template in the three-dimensional structure template library of hydraulic structures as a first geometric type parameter, and storing the point, line, and surface topological structures in the three-dimensional model of the structure to be reinforced as a second geometric type parameter;

[0020] Step 2: establishing an association between the three-dimensional structure template and the three-dimensional steel bar template based on the first geometry type parameter;

[0021] Step 3: Replace the first geometric type parameter in the three-dimensional steel bar template matched in step 4 with the second geometric type parameter of the three-dimensional model of the structure to be reinforced.

[0022] Step 4: regenerate the three-dimensional steel bar model based on the second geometry type parameters to obtain the three-dimensional steel bar model of the structure to be reinforced.

[0023] Furthermore, if reinforcement cannot be performed based on the three-dimensional structural template generated in step one in step two, return to step one and modify the three-dimensional structural template in the three-dimensional structural template.

[0024] Furthermore, the three-dimensional reinforcement parameters involved in the reinforcement rules in step 2 specifically include reinforcement surface, guide line, reinforcement direction, reinforcement range, steel bar type, steel bar diameter, steel bar spacing, number of steel bar layers, protective layer thickness, starting point position, end point position, anchorage length, bending form, auxiliary body, auxiliary surface, auxiliary line, and auxiliary point.

[0025] Beneficial effects of the present invention

[0026] The present invention constructs a three-dimensional structure template library and a three-dimensional steel bar template library for hydraulic structures respectively, modifies parameters in the three-dimensional structure template library according to the parameters of the structure to be reinforced to generate a three-dimensional model of the structure to be reinforced, performs model matching and model replacement in the three-dimensional steel bar template library, generates a three-dimensional steel bar model of the structure to be reinforced, and issues design drawings. The efficiency of drawing steel bar drawings of pumped-storage power stations can be effectively improved, labor costs can be saved, and the standardization of drawings can be improved at the same time. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 It is a flow chart of the rapid reinforcement method for standard components of pumped storage power stations;

[0028] Figure 2 A system module unit composition diagram of a hydraulic structure for which a three-dimensional structural template is to be established;

[0029] Figure 3 It is a component diagram of the pressure regulating chamber unit in the implementation of the present invention;

[0030] Figure 4 Design size rule programming statements for the gate pier components in the surge chamber unit in the embodiment;

[0031] Figure 5 It is a three-dimensional structural model of the gate pier components in the surge chamber unit in the embodiment;

[0032] Figure 6 It is a three-dimensional steel bar model of the gate pier components of the surge chamber unit in the embodiment;

[0033] Figure 7 It is a schematic diagram of three-dimensional parameters of the gate pier components in the surge chamber unit in the embodiment;

[0034] Figure 8 It is a typical cross-sectional steel bar arrangement diagram of the gate pier components in the surge chamber unit in the embodiment. DETAILED DESCRIPTION

[0035] like Figure 1As shown, the rapid reinforcement method for standard components of pumped storage power stations described in the present invention includes the following steps.

[0036] Step 1: Construct a 3D structure template library S of hydraulic structures, such as Figure 2 As shown, the three-dimensional structural template library of the hydraulic structure includes three-dimensional structural templates of each component in the upper and lower reservoir modules A, the water delivery module B, the power generation module C and the flood discharge module D.

[0037] Among them, the components in the upper and lower reservoir modules A1 include a zigzag reservoir basin unit A1, a curved and straight reservoir basin unit A2, a slope cover unit A3, a reservoir bottom plate unit A4, a reservoir bottom drainage gallery unit A5, a panel rockfill dam unit A6, an asphalt core wall rockfill dam unit A7, ..., a gravity dam unit Aα and other units, α is the number of structural units split from the upper and lower reservoir modules A.

[0038] The components in the water delivery module B include a vertical shaft type water inlet and outlet unit B1, a side water inlet and outlet unit B2, a rock plug type water inlet and outlet unit B3, a bifurcated pipe unit B4, a water delivery tunnel unit B5, a square and round gradient section unit B6, a trash rack unit B7, ..., a pressure regulating chamber unit Bβ and other units, β is the number of structural units split from the water delivery module B.

[0039] The components in the power generation module C include a main plant unit C1, an auxiliary plant unit C2, a ball valve chamber unit C3, a main transformer chamber unit C4, a volute unit C5, a tailwater elbow unit C6, a busbar tunnel unit C7, ..., a switch station unit Cγ and other units, where γ is the number of structural units split from the power generation module C.

[0040] The components in the flood discharge module D include a side channel spillway unit D1, a deep hole flood discharge and sand discharge tunnel unit D2, a drop flow spillway unit D3, ..., and a vortex spillway unit Dδ, where δ is the number of structural units split from the flood discharge module D.

[0041] The upper and lower library module A includes units A1, ..., Aα. The components in each unit of the upper and lower library module A are expressed in the form of a matrix composed of the units:

[0042] The water delivery module B includes units B1, ..., Bβ. The matrix expression of each component in each unit of the water delivery module B according to the unit composition is:

[0043] The power generation module C includes units C1, ..., Cγ. The matrix expression of each component in each unit of the power generation module C according to the unit composition is:

[0044] The flood discharge module D includes units D1, ..., Dδ, and the matrix expression of each component in each unit of the flood discharge module D according to the unit composition is:

[0045] Where m, n, p, q are the number of structural splits of each unit, and their values ​​are positive integers in [1, +∞].

[0046] The three-dimensional structural templates of the components A11, …, Aαm; B11, …, Bβn; C11, …, Cγp; D11, …, Dδq in the upper and lower reservoir modules A, water transfer module B, power generation module C and flood discharge module D in the three-dimensional template structure library S are respectively recorded as A11-s, …, Aαm-s, B11-s, …, Bβn-s; C11-s, …, Cγp-s; D11-s, …, Dδq-s.

[0047] Step 2: Perform positive reinforcement according to the reinforcement principles determined by the structural stress calculation results, engineering experience, specifications and regulations, and the construction structure requirements and the three-dimensional structural template constructed in step 1, obtain the three-dimensional steel template of each component in the above modules, and construct a three-dimensional steel template library V, wherein the three-dimensional steel template includes a three-dimensional structural model and a three-dimensional steel model. In this process, if there is a situation where positive reinforcement cannot be performed based on the three-dimensional structural template constructed in step 1, return to step 1 and optimize the established three-dimensional structural template to ensure that a three-dimensional structural template that can be three-dimensionally reinforced is obtained, and then generate a three-dimensional steel template A11-1, ..., Aαm-v, B11-1, ..., Bβn-v; C11-1, ..., Cγp-v; D11-1, ..., Dδq-v that meets the requirements.

[0048] Step 3: When a structure to be reinforced is to be reinforced, the template in the three-dimensional structure template library of the hydraulic structure generated in step 1 is called, and the structural size parameters published in the template are modified based on the design parameters of the structure to be reinforced to obtain the three-dimensional model E of the structure to be reinforced.

[0049] Step 4: Match the three-dimensional model E of the structure to be reinforced generated in step 3 in the three-dimensional steel bar template library established in step 2; when the points, lines, and surfaces of a three-dimensional steel bar template are topologically matched with the points, lines, and surfaces in the three-dimensional model E of the structure to be reinforced Figure 1 When the three-dimensional steel bar template is consistent, the three-dimensional steel bar template is used as the adaptive steel bar template F that meets the adaptation requirements.

[0050] Step 5: Replace the three-dimensional structural model in the adapted steel bar template F described in step 4 with the three-dimensional model E of the structure to be reinforced.

[0051] Step 6: Reconstruct and refresh the steel bars with one click, adjust the reinforcement rules locally, and review the view section. Determine whether to add the three-dimensional boundary structure based on whether the three-dimensional model has a boundary structure, and finally obtain the three-dimensional steel bar model E' of the structure to be reinforced.

[0052] The steps of reconstructing and refreshing specifically include:

[0053] S1: 3D structure topology parameter storage; extract the point, line, and surface topology structure of each 3D structure template in the 3D structure template library of hydraulic structures and store it as the geometry type parameter X1; extract the point, line, and surface topology structure in the 3D model of the structure to be reinforced and store it as the 3D structure geometry parameter X2

[0054] S2: parameter association; storing the geometric type parameter X1 of each template in the three-dimensional structure template library in the three-dimensional steel bar driving parameter library, and establishing an association between the three-dimensional structure template and the three-dimensional steel bar template.

[0055] S3: Model replacement; replacing the geometric type parameter X1 in the three-dimensional steel bar template matched in step 4 with the geometric type parameter X2 of the three-dimensional model of the structure to be reinforced.

[0056] S4: 3D steel bar driver update. The 3D steel bar model is regenerated using the steel bar creation driver engine to obtain the 3D steel bar model E' of the structure to be reinforced.

[0057] Step 7: Read the section view in step 6. If the 3D boundary structure is not added in step 6, then add the 2D boundary structure in step 7. If the 3D boundary structure has been added in step 7, then no 2D boundary structure is added in step 7, and the section view page layout is adjusted to finally obtain a construction blueprint that can be provided to the construction site.

[0058] Example

[0059] This embodiment is as follows Figure 3 The reinforcement process of the indoor gate pier B173 in the surge chamber unit B17 of the water transfer module B shown in the figure is taken as an example to further explain the rapid reinforcement method for standard components of pumped storage power stations described in the present invention.

[0060] Step 1: construct a hydraulic structure three-dimensional structure template library S, which includes the indoor gate pier three-dimensional structure template B173-S. The construction method of the indoor gate pier three-dimensional structure template B173-S is as follows: Figure 4 As shown in the figure, the geometric trapezoid of the indoor gate pier is designed in the 3DE software by defining the parameters of the indoor gate pier structure, the relevant parameters of the crown beam, the release parameters, and the adjustment parameters. The design parameters of the indoor gate pier include two categories: gate pier parameters and gate slot parameters. The gate pier parameters include gate pier height, gate pier length, gate pier width, distance between the center lines of the connecting holes, net width of the orifice, fillet of the gate pier on the flow side, and fillet of the gate pier on the non-flow side. The gate slot parameters include gate slot width, gate slot thickness, distance between the center line of the gate slot and the upstream edge line of the structure, and distance between the center line of the gate slot and the upstream surface of the gate slot.

[0061] Step 2. Determine the reinforcement principles and the three-dimensional structural template constructed in step 1 according to the structural stress calculation results, engineering experience, specifications and regulations, and construction structure requirements, and perform forward reinforcement to obtain the three-dimensional steel template B173-V for indoor gate piers. The specific reinforcement principles for indoor gate piers are: the diameter of the vertical steel bars in the gate piers is 32mm, the spacing is 12.5cm, the diameter of the horizontal steel bars is 20mm, the spacing is 12.5cm, the steel bars in the gate piers are distributed to the top at one time, without distinguishing between elevation intervals, and the steel bars are not truncated. Based on the three-dimensional structural template and reinforcement rules described in step one, the surface reinforcement, fan reinforcement, and angle reinforcement methods of the Tushi reinforcement software are used for three-dimensional forward reinforcement to obtain a typical three-dimensional steel template B173-V for indoor gate piers. The typical three-dimensional steel template B173-V for indoor gate piers includes the following: Figure 5 The indoor pier three-dimensional structure model B173-V1 and Figure 6 The indoor gate pier three-dimensional steel bar model B173-V2 is shown.

[0062] In this step, if there is no indoor gate pier three-dimensional steel bar template B173-V based on the indoor gate pier three-dimensional structure template B173-S in step one, then return to step one and reversely optimize the structural design or modeling method of the indoor gate pier three-dimensional structure template B173-S to obtain the indoor gate pier three-dimensional reinforcement template B173-V that can be three-dimensionally reinforced.

[0063] Step 3: Adjust the 3D parameters of the 3D structure template B173-S for the indoor gate pier established in step 1 based on the indoor gate pier structure to be reinforced. Figure 7 As shown in the figure, the design parameters of indoor gate piers include two categories of parameters: gate pier parameters and gate slot parameters; the gate pier parameters include gate pier height of 25.7m, gate pier length of 7.0m, 1#~4# gate pier width of 4.0m, connection hole centerline spacing of 30.0m, orifice net width of 15.0m, gate pier flow side fillet of 1.0m, gate pier non-flow side fillet of 1.0m; gate slot parameters include gate slot width of 3.0m, gate slot thickness of 0.9m, distance between gate slot centerline and upstream edge of structure of 1.45m, distance between gate slot centerline and upstream surface of gate slot of 3.53m, and finally the three-dimensional model B173-E of indoor gate pier to be reinforced is obtained.

[0064] Step 4: Match the 3D steel template library generated in step 2 with the point, line, and surface topology of the 3D model B173-E of the indoor gate pier to be reinforced Figure 1 Unique three-dimensional steel bar formwork B173-V.

[0065] Step 5: Replace the indoor gate pier three-dimensional structure model B173-V1 in the indoor gate pier three-dimensional steel bar template B173-V with the indoor gate pier three-dimensional model B173-E to be reinforced constructed in step 3 by model replacement to obtain the replaced indoor gate pier three-dimensional steel bar model B173-V'.

[0066] Step 6. Reconstruct and refresh the indoor gate pier three-dimensional steel bar model B173-V' described in step 4 with one click, check the steel bar layout rules, make local adjustments, and review and adjust the view section to finally obtain the three-dimensional steel bar model B173-E' of the structure to be reinforced.

[0067] Step 7: Use the Tushi plug-in compatible with the drawing software CAD to read the 3D steel bar model B173-E' in step 6, generate the indoor gate pier steel bar diagram, add the side wall structure, bottom flow channel, impedance plate structure line around the indoor gate pier, add the structural size parameters, adjust the section view layout, and finally Figure 8 The drawings shown meet the construction requirements.

Claims

1. A rapid reinforcement method for standard components of pumped storage power stations, characterized in that: include: Step 1: construct a 3D structural template of each component of the hydraulic structure of the pumped storage power station, and the 3D structural templates of each component constitute a 3D structural template library; Step 2: Based on the reinforcement rules and the constructed three-dimensional structural template, forward reinforcement is performed to generate a three-dimensional steel bar template, wherein the three-dimensional steel bar template includes a three-dimensional structural model and a three-dimensional steel bar model of the component; the three-dimensional steel bar templates of each component constitute a three-dimensional steel bar template library; Step 3: calling the three-dimensional structure template constructed in step 1, and adjusting the parameters of the three-dimensional structure template based on the design parameters of the structure to be reinforced to obtain a three-dimensional model of the structure to be reinforced; Step 4: Match the three-dimensional steel bar template library generated in step 2 with the three-dimensional steel bar template that is consistent with the point, line, and surface topology diagram of the three-dimensional model of the structure to be reinforced in step 3; Step 5: Replace the three-dimensional structural model in the three-dimensional steel bar template obtained by matching in step 4 with the three-dimensional model of the structure to be reinforced in step 3 to obtain a replaced three-dimensional steel bar template; Step 6: Reconstruct, refresh and adjust the replaced three-dimensional steel bar template to obtain the final three-dimensional steel bar model of the structure to be reinforced; Step 7: Generate construction drawings based on the three-dimensional steel bar model of the structure to be reinforced in step 6.

2. The rapid reinforcement method for standard components of a pumped storage power station according to claim 1 is characterized in that: The three-dimensional structure template library described in step one includes three-dimensional structure templates of various components in the upper and lower reservoir modules, the water delivery module, the power generation module and the flood discharge module.

3. The rapid reinforcement method for standard components of a pumped storage power station according to claim 1 is characterized in that: When forward reinforcement is performed to generate a three-dimensional steel bar template based on the reinforcement rules and the constructed three-dimensional structural template in step 2, one three-dimensional structural template generates one or more three-dimensional steel bar templates according to the reinforcement rules.

4. The rapid reinforcement method for standard components of a pumped storage power station according to claim 1 is characterized in that: The three-dimensional steel bar template generated in step 2 includes the steel bar position, reinforcement form, section form and three-dimensional structure template number; the steel bar position, reinforcement form, section form and three-dimensional structure template number are stored in the form of a structure tree.

5. The rapid reinforcement method for standard components of a pumped storage power station according to claim 1 is characterized in that: The reconstruction and refreshing of the replaced three-dimensional steel bar template described in step 6 specifically includes: Step 1: storing the point, line, and surface topological structures of each three-dimensional structure template in the three-dimensional structure template library of hydraulic structures as a first geometric type parameter, and storing the point, line, and surface topological structures in the three-dimensional model of the structure to be reinforced as a second geometric type parameter; Step 2: establishing an association between the three-dimensional structure template and the three-dimensional steel bar template based on the first geometry type parameter; Step 3, replacing the first geometric type parameter in the three-dimensional steel bar template matched in step 4 with the second geometric type parameter of the three-dimensional model of the structure to be reinforced; Step 4: regenerate the three-dimensional steel bar model based on the second geometry type parameters to obtain the three-dimensional steel bar model of the structure to be reinforced.

6. The rapid reinforcement method for standard components of a pumped storage power station according to claim 1, characterized in that: If reinforcement cannot be performed based on the three-dimensional structural template generated in step one in step two, return to step one and modify the three-dimensional structural template in the three-dimensional structural template.

7. The rapid reinforcement method for standard components of a pumped storage power station according to claim 1, characterized in that: The three-dimensional reinforcement parameters involved in the reinforcement rules in step 2 specifically include reinforcement surface, guide line, reinforcement direction, reinforcement range, steel bar type, steel bar diameter, steel bar spacing, number of steel bar layers, protective layer thickness, starting point position, end point position, anchorage length, bending form, auxiliary body, auxiliary surface, auxiliary line, and auxiliary point.