Multi-physics field coupling rapid simulation method and system and storage medium

By collecting and splicing the state information of each physical field of the nuclear reactor, performing matrix order reduction processing, and building a timing model, the calculation complexity and inconsistency in the coupled simulation of the multi-physics field of the nuclear reactor are solved, and efficient nuclear reactor simulation is achieved.

CN118940504APending Publication Date: 2024-11-12CHINA NUCLEAR POWER TECH RES INST CO LTD +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410988009.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-23
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The multi-physics coupling simulation of nuclear reactors has extremely high computational complexity. Although the separation and coupling method improves the calculation speed, it leads to inconsistencies between different physics fields and affects the accuracy.

Method used

Through the interval time, the state information of each physics field is collected, the fully connected physics field is constructed, the matrix is ​​down-ordered, and the approximate decomposition is made into a low-dimensional linear dynamic system, and the timing model is constructed to ensure the consistency of multi-physics fields.

Benefits of technology

It reduces inconsistencies between different physics fields, improves calculation speed and accuracy, and simplifies calculation difficulty.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118940504A_ABST
    Figure CN118940504A_ABST
Patent Text Reader

Abstract

The invention discloses a multi-physical field coupling rapid simulation method and system and a storage medium, and relates to the field of nuclear reactor analogue simulation, and the method comprises the following steps: collecting state information of each physical field of a nuclear reactor in a transient process at a first preset interval time to obtain physical field snapshots of a plurality of physical fields, the transient process is obtained through simulation of a reactor simulation model corresponding to the nuclear reactor; splicing the physical field snapshots of the plurality of physical fields to obtain a full series physical field; constructing a matrix based on the full series physical field; performing order reduction processing on the matrix to construct a time sequence model corresponding to the full series physical field; and decomposing the time sequence model corresponding to the full series physical field to obtain time sequence models corresponding to a plurality of physical fields. According to the multi-physics field coupling rapid simulation method, the calculation speed can be improved, and meanwhile, the inconsistency between different physics fields can be reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of nuclear reactor simulation, and in particular to a multi-physical field coupling rapid simulation method, system and storage medium. Background Art

[0002] Nuclear reactors are highly complex systems that involve multiple physical processes that are mutually coupled, meaning their states and behaviors affect each other. In order to accurately describe and predict the behavior of a reactor, it is necessary to consider the mutual coupling between these physical processes.

[0003] The multi-physics coupling simulation of nuclear reactors has extremely high computational complexity. Currently, the numerical reactor is generally obtained by simulating multiple physical fields in the reactor, and the dynamic evolution of the nuclear reactor system is identified and tracked through the numerical reactor. In some application scenarios with high real-time requirements, the separation coupling method is generally used to increase the calculation speed. However, when the separation coupling method is used for fast calculation, the inconsistency between different physical fields also increases. This inconsistency will cause the accuracy of the numerical reactor to diverge at subsequent moments. Summary of the invention

[0004] The present application aims to solve at least one of the technical problems existing in the prior art. To this end, the present application proposes a multi-physics field coupling fast simulation method, system and storage medium, which can improve the calculation speed while reducing the inconsistency between different physical fields.

[0005] In order to solve the above technical problems, the present invention proposes the following technical solutions:

[0006] The first embodiment of the present application provides a multi-physics field coupling fast simulation method, including:

[0007] At first preset intervals, state information of each physical field of the nuclear reactor under a transient process is collected to obtain physical field snapshots of multiple physical fields, wherein the transient process is simulated by a reactor simulation model corresponding to the nuclear reactor;

[0008] The physical field snapshots of multiple physical fields are stitched together to obtain the full series physical field;

[0009] Constructing a matrix based on the full series physical field;

[0010] Performing order reduction processing on the matrix to construct a time series model corresponding to the full series physical field;

[0011] The timing model corresponding to the full series physical field is decomposed to obtain timing models corresponding to multiple physical fields.

[0012] According to the multi-physics field coupling fast simulation method of the first aspect embodiment of the present application, at least the following beneficial effects are achieved: the present application collects the state information of each physical field of the nuclear reactor under the transient process, determines the physical field snapshots of multiple physical fields, and splices the physical field snapshots of multiple physical fields to obtain a full series physical field, and realizes multi-physics field coupling by splicing and combining multiple physical fields. After that, a matrix will be constructed based on the full series physical field, and the full series physical field of the nonlinear system will be approximately decomposed into a low-dimensional linear dynamic system by reducing the order of the matrix, which simplifies the calculation difficulty and improves the calculation speed. The present application will also construct a time series model corresponding to the full series physical field based on the matrix of the reduced order processing, that is, the change of the state information of each physical field in the full series physical field over time, and decompose the time series model corresponding to the full series physical field to obtain the time series model corresponding to multiple physical fields. Since these multiple physical fields are solved and reduced in order at the same time after the combination, their consistency is guaranteed, and the inconsistency between different physical fields is reduced.

[0013] According to some embodiments of the first aspect of the present application, the matrix includes a first history matrix and a second history matrix, and the matrix is ​​constructed based on the full series physical field, including:

[0014] Determine a physical field snapshot of each physical field from a first moment to a second moment based on the full series physical field;

[0015] Constructing a first history matrix based on physical field snapshots of each physical field from a first moment to a second moment;

[0016] Determine physical field snapshots of each physical field from a third moment to a fourth moment based on the full series physical field, wherein the third moment is faster than the first moment by a first preset interval time, and the fourth moment is faster than the second moment by a first preset interval time;

[0017] A second history matrix is ​​constructed based on the physical field snapshots of each physical field from the third moment to the fourth moment.

[0018] According to some embodiments of the first aspect of the present application, the matrix is ​​reduced in order to construct a timing model corresponding to the full series physical field, including:

[0019] Performing order reduction calculation on the first history matrix to obtain reduced-order left singular vectors, reduced-order right singular vectors and reduced-order singular value matrices;

[0020] A time series model corresponding to the full-series physical field is constructed based on the reduced-order left singular vectors, the reduced-order right singular vectors, the reduced-order singular value matrix and the second history matrix.

[0021] According to some embodiments of the first aspect of the present application, performing order reduction calculation on the first history matrix to obtain reduced-order left singular vectors, reduced-order right singular vectors, and reduced-order singular value matrices includes:

[0022] Performing singular value decomposition on the first history matrix to obtain left singular vectors, right singular vectors and a singular value matrix;

[0023] Based on a preset singular value cutoff value, the left singular vector, the right singular vector and the singular value matrix are respectively reduced in order to obtain the reduced-order left singular vector, the reduced-order right singular vector and the reduced-order singular value matrix.

[0024] According to some embodiments of the first aspect of the present application, constructing the time series model corresponding to the full series physical field based on the reduced-order left singular vector, the reduced-order right singular vector, the reduced-order singular value matrix and the second history matrix includes:

[0025] Constructing a linear transformation matrix of the first history matrix and the second history matrix;

[0026] Calculating the linear transformation matrix based on the reduced-order left singular vectors, the reduced-order right singular vectors and the reduced-order singular value matrix to determine eigenvalues ​​and eigenvectors of the linear transformation matrix;

[0027] The full-series physical field is reconstructed and predicted based on the eigenvalues ​​of the linear transformation matrix to obtain a timing model corresponding to the full-series physical field.

[0028] According to some embodiments of the first aspect of the present application, the calculating the linear transformation matrix based on the reduced-order left singular vector, the reduced-order right singular vector, and the reduced-order singular value matrix to determine the eigenvalues ​​and eigenvectors of the linear transformation matrix includes:

[0029] Based on the reduced-order left singular vectors, the reduced-order right singular vectors, and the reduced-order singular value matrix, the linear transformation matrix is ​​reduced to obtain a low-order linear transformation matrix;

[0030] Performing eigendecomposition on the low-order linear transformation matrix to obtain an eigenvector of the low-order linear transformation matrix;

[0031] The linear transformation matrix is ​​calculated based on the eigenvector of the low-order linear transformation matrix to obtain the eigenvalue and eigenvector of the linear transformation matrix.

[0032] According to some embodiments of the first aspect of the present application, reconstructing and predicting the full-series physical field based on the eigenvalue of the linear conversion matrix to obtain a time series model corresponding to the full-series physical field includes:

[0033] Mapping the eigenvalues ​​of the linear conversion matrix to a first preset interval time to obtain a timing coefficient;

[0034] A timing model corresponding to the full-series physical field is constructed based on the timing coefficient and the full-series physical field at the initial moment.

[0035] According to some embodiments of the first aspect of the present application, the reactor simulation model is determined by the following method:

[0036] Obtaining structural parameters corresponding to the nuclear reactor;

[0037] Construct a three-dimensional model of the reactor based on the structural parameters of the nuclear reactor;

[0038] The reactor three-dimensional model is meshed and discretized to obtain the reactor simulation model.

[0039] The second aspect of the present application provides a multi-physics field coupling fast simulation system, including:

[0040] at least one memory;

[0041] at least one processor;

[0042] at least one program;

[0043] The program is stored in the memory, and the processor executes at least one of the programs to implement:

[0044] A multi-physics field coupling fast simulation method as described in any one of the first aspects of the present application.

[0045] A third aspect of the present application provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer-executable signal, and the computer-executable signal is used to execute:

[0046] A multi-physics field coupling fast simulation method as described in any one of the first aspects of the present application.

[0047] Additional aspects and advantages of the present application will be given in part in the description below, and in part will become apparent from the description below, or will be learned through the practice of the present application. BRIEF DESCRIPTION OF THE DRAWINGS

[0048] The accompanying drawings are used to provide further understanding of the technical solution of the present disclosure and constitute a part of the specification. Together with the embodiments of the present disclosure, they are used to explain the technical solution of the present disclosure and do not constitute a limitation on the technical solution of the present disclosure.

[0049] Figure 1 is a system architecture diagram of a system to which a multi-physics field coupling fast simulation method according to an embodiment of the present disclosure is applied;

[0050] Figure 2 is a main flow chart of a multi-physics field coupling fast simulation method according to an embodiment of the present disclosure;

[0051] Figure 3 is a flow chart of determining a reactor simulation model according to an embodiment of the present disclosure;

[0052] Figure 4 is a flowchart of constructing a first history matrix and a second history matrix based on a full series physical field according to an embodiment of the present disclosure;

[0053] Figure 5 It is a flowchart of performing order reduction processing on a matrix to construct a timing model corresponding to a full series physical field according to an embodiment of the present disclosure;

[0054] Figure 6 is a flowchart of performing order reduction calculation on a first history matrix according to an embodiment of the present disclosure;

[0055] Figure 7 It is a flowchart of constructing a time series model corresponding to a full series physical field based on reduced-order left singular vectors, reduced-order right singular vectors, reduced-order singular value matrices and a second history matrix according to an embodiment of the present disclosure;

[0056] Figure 8 is a flow chart of determining eigenvalues ​​and eigenvectors of a linear transformation matrix according to an embodiment of the present disclosure;

[0057] Fig. 9 is a flow chart of reconstructing and predicting a full series physical field based on the eigenvalue of a linear transformation matrix according to an embodiment of the present disclosure;

[0058] Fig.10 It is a module block diagram of a multi-physics field coupling fast simulation system according to an embodiment of the present disclosure. DETAILED DESCRIPTION

[0059] In order to make the purpose, technical solution and advantages of the present disclosure more clear, the present disclosure is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present disclosure and are not used to limit the present disclosure.

[0060] Before further describing the embodiments of the present disclosure in detail, the nouns and terms involved in the embodiments of the present disclosure are described. The nouns and terms involved in the embodiments of the present disclosure are subject to the following interpretations:

[0061] Nuclear reactor: The nuclear reactor is the heart of a nuclear power plant. Its working principle is as follows: an atom consists of a nucleus and extranuclear electrons. A nucleus consists of protons and neutrons. When the nucleus of uranium 235 is bombarded by external neutrons, one nucleus absorbs a neutron and splits into two nuclei with smaller mass, while releasing 2-3 neutrons. The neutrons produced by this fission bombard another uranium 235 nucleus, causing new fission. This continuous process is a chain reaction of fission. The chain reaction generates a lot of heat energy. Using circulating water (or other substances) to take away the heat can prevent the reactor from burning due to overheating. And the heat discharged by the nuclear reactor can turn water into steam, which drives the steam turbine to generate electricity.

[0062] Model reduction: The principle of model reduction is to simplify the model while ensuring accuracy, so as to reduce the amount of calculation and improve the efficiency of calculation. The essence of dimensionality reduction is to describe the multidimensional physical process that changes with time in a low-dimensional approximate manner, so as to achieve the optimization in the sense of capturing the energy of the system, thereby achieving the effect of reducing the number of calculation dimensions, reducing the amount of calculation, saving calculation time and CPU load.

[0063] Data inconsistency: refers to the contradiction and incompatibility of various types of data. Data is a description of the real world and should conform to certain semantic rules and logical common sense. However, in actual applications, due to various reasons, some data violates such semantic rules, which manifests as abnormal, incomplete or contradictory data values. For relational data, there are also entity anomalies (multiple records correspond to the same entity) and inclusion anomalies (records between multiple tables do not satisfy the inclusion relationship). All such abnormal data are collectively referred to as inconsistent data. Data inconsistency refers to the contradiction and incompatibility of data.

[0064] Nuclear reactors are highly complex systems, involving multiple physical processes, and multiple physical processes are mutually coupled, that is, their states and behaviors affect each other. In order to accurately describe and predict the behavior of the reactor, it is necessary to consider the mutual coupling relationship between these physical processes. The multi-physics field coupling simulation of nuclear reactors has extremely high computational complexity. Currently, it is generally achieved by simulating multiple physical fields in the reactor to obtain a numerical reactor, and the dynamic evolution of the nuclear reactor system is identified and tracked through the numerical reactor. In some application scenarios with high real-time requirements, the separation coupling method is generally used to increase the calculation speed. However, when the separation coupling method is used for fast calculation, the inconsistency between different physical fields also increases, and this inconsistency will cause the accuracy of the numerical reactor to diverge at subsequent moments.

[0065] Based on this, the embodiments of the present disclosure provide a method, system and storage medium for rapid simulation of multi-physical field coupling. It can decompose the matrix of a nonlinear system constructed based on a full-series physical field into a low-dimensional linear dynamic system, reducing the amount of calculation and improving the calculation speed. In addition, the present application will also construct a timing model corresponding to the full-series physical field based on the low-dimensional linear system, and decompose the timing model corresponding to the full-series physical field to obtain the timing models corresponding to multiple physical fields, because these multiple physical fields are reduced in order at the same time, reducing the inconsistency between different physical fields.

[0066] System architecture and scenario description of the application of the embodiments of the present disclosure

[0067] Figure 1 1 is a system architecture diagram of a multi-physics field coupling fast simulation method according to an embodiment of the present disclosure, which includes a terminal 140, an Internet 130, a gateway 120, a server 110, and the like.

[0068] Terminal 140 includes various forms such as desktop computers, laptop computers, PDAs (personal digital assistants), mobile phones, vehicle-mounted terminals, home theater terminals, and dedicated terminals. In addition, it can be a single device or a collection of multiple devices. Terminal 140 can communicate with Internet 130 in a wired or wireless manner to exchange data. Moreover, the multi-physics field coupling fast simulation method of the embodiment of the present disclosure can be implemented in terminal 140, and terminal 140 can display the calculation process of the multi-physics field coupling fast simulation method to the user.

[0069] The server 110 refers to a computer system that can provide certain services to the terminal 140. The multi-physics field coupling fast simulation method of the embodiment of the present disclosure can also be implemented on the server 110. Compared with the ordinary terminal 140, the server 110 has higher requirements in terms of stability, security, performance, etc. The server 110 can be a high-performance computer in a network platform, a cluster of multiple high-performance computers, a part of a high-performance computer (such as a virtual machine), a combination of parts of multiple high-performance computers (such as virtual machines), etc.

[0070] The gateway 120 is also called an internetwork connector or a protocol converter. The gateway realizes network interconnection at the transport layer and is a computer system or device that acts as a converter. The gateway is a translator between two systems that use different communication protocols, data formats or languages, or even completely different architectures. At the same time, the gateway can also provide filtering and security functions. The message sent by the terminal 140 to the server 110 must be sent to the corresponding server 110 through the gateway 120. The message sent by the server 110 to the terminal 140 must also be sent to the corresponding terminal 140 through the gateway 120.

[0071] The embodiments of the present disclosure can be applied in the fields of monitoring the operating status of a nuclear reactor, dynamic diagnosis of the operating status of a core, etc. Here, the monitoring of the operating status of a nuclear reactor is used as an example for explanation: Assuming that the embodiments of the present disclosure are implemented on the terminal 140, the user can input the structural parameters of the nuclear reactor into the terminal 140, so that the terminal 140 executes the multi-physical field coupling fast simulation method of the embodiments of the present disclosure based on the structural parameters of the nuclear reactor input by the user, and obtains the operating status of each physical field in the nuclear reactor. Further, after obtaining the operating status of each physical field in the nuclear reactor, the terminal 140 can also display the operating status of each physical field in the nuclear reactor to the user, so that the user can monitor the operating status of the nuclear reactor. Moreover, the embodiments of the present disclosure can also automatically realize the real-time monitoring of the operating status of the nuclear reactor directly through the terminal 140, and issue an alarm when the operating status of the nuclear reactor is abnormal, so that the user knows that the operating status of the nuclear reactor is abnormal.

[0072] It should be understood that the above content only illustrates some application scenarios of the present disclosure. The business scenarios to which the present disclosure can be applied may include but are not limited to the specific embodiments listed above.

[0073] General description of the disclosed embodiments

[0074] It should be emphasized that the embodiments of the present disclosure can be applied to a variety of application scenarios, such as monitoring of the operating status of a nuclear reactor, dynamic diagnosis of the operating status of the core, and other scenarios. The multi-physics field coupling simulation of a nuclear reactor has extremely high computational complexity. Currently, it is generally performed by simulating multiple physical fields in the reactor to obtain a numerical reactor, and the dynamic evolution of the nuclear reactor system is identified and tracked by the numerical reactor. In some application scenarios with high real-time requirements, a separation coupling method is generally used to improve the calculation speed. However, in the case of fast calculations using the separation coupling method, the inconsistency between different physical fields also increases, and this inconsistency will cause the accuracy of the numerical reactor to diverge at subsequent moments. Some embodiments of the present disclosure provide a multi-physics field coupling fast simulation method, system, and storage medium, which can approximate the matrix of a nonlinear system constructed based on a full series physical field into a low-dimensional linear dynamic system, reducing the amount of calculation and improving the calculation speed. In addition, this application will also construct a timing model corresponding to the fully serial physical field based on the low-dimensional linear system, and obtain timing models corresponding to multiple physical fields by decomposing the timing model corresponding to the fully serial physical field. Because these multiple physical fields are reduced in order at the same time, the inconsistency between different physical fields is reduced.

[0075] The multi-physics field coupling fast simulation method of the embodiment of the present disclosure may be executed on the terminal 140 or on the server 110 .

[0076] like Figure 2 As shown, according to one embodiment of the present disclosure, a multi-physics field coupling fast simulation method includes:

[0077] Step 210: At first preset intervals, state information of each physical field of the nuclear reactor under transient processes is collected to obtain physical field snapshots of multiple physical fields, wherein the transient processes are simulated using a reactor simulation model corresponding to the nuclear reactor;

[0078] Step 220, splicing the physical field snapshots of multiple physical fields to obtain a full series physical field;

[0079] Step 230, constructing a matrix based on the full series physical field;

[0080] Step 240, performing order reduction processing on the matrix to construct a time series model corresponding to the full series physical field;

[0081] Step 250: Decompose the timing model corresponding to the full series physical field to obtain timing models corresponding to multiple physical fields.

[0082] The above steps 210 - 250 are briefly described below.

[0083] In step 210, state information of each physical field of the nuclear reactor under transient processes is collected at first preset intervals to obtain physical field snapshots of multiple physical fields, wherein the transient processes are simulated using a reactor simulation model corresponding to the nuclear reactor.

[0084] According to the embodiments of the present disclosure, the physical fields of a nuclear reactor include fluid dynamics fields (e.g., cryogen flow), heat transfer fields (e.g., heat conduction for heating), pressure fields (e.g., interactions between fluids and solid structures), intensity fields (e.g., stress and strain of solid structures), radiation fields (e.g., propagation of neutrons and gamma rays), and power fields (e.g., energy deposition of fission or other reactions), etc. When analyzing and monitoring a nuclear reactor, it is necessary to consider the interactions and complex effects between multiple physical fields, which increases the difficulty of the research. Only through complex numerical simulations can the effects of multi-physical field coupling in the reactor be accurately described. Based on this, the present application first needs to construct a reactor simulation model corresponding to the nuclear reactor, and use the reactor simulation model corresponding to the nuclear reactor to simulate the transient processes of the physical fields of the nuclear reactor. Among them, the reactor simulation model can provide valuable information for reactor design, operation, and safety analysis.

[0085] It is understandable that high-resolution computational fluid simulation software and neutronics Monte Carlo simulation software and other software can be used to simulate the operating conditions and transient processes of various physical fields of a nuclear reactor.

[0086] Furthermore, when simulating the transient process of each physical field of a nuclear reactor, the state information of each physical field of the nuclear reactor under the transient process can be collected at intervals of a first preset interval time to obtain physical field snapshots of multiple physical fields. Among them, the first preset interval time refers to the interval time for sampling the state information of each physical field of the nuclear reactor under the transient process. A physical field snapshot refers to an unmodifiable fast data copy storage of the state information of a physical field at a certain moment. For a certain physical field in a reactor, the present application can simulate the operation process of the physical field through a reactor simulation model, and within a preset time period, sample the state information of the physical field during the operation process at intervals of a first preset interval time to obtain physical field snapshots of the physical field at multiple moments.

[0087] Moreover, in order to ensure the consistency of multiple physical fields, the physical field snapshots of the multiple physical fields obtained in the present application not only need to ensure that the sampling interval time (i.e., the first preset interval time) of the physical field snapshots of each physical field is the same, but also need to ensure that the state of the reactor within the preset time period corresponding to the multiple snapshots obtained from each physical field is the same.

[0088] Exemplarily, it is assumed that the nuclear reactor is in a steady state at time t0, and then a transient process of the nuclear reactor is introduced (such as parameter changes of the control rods of the reactor, or power transients of the reactor, or changes in heat exchange conditions). Further, for the first period of time after the transient state of the nuclear reactor (the first period of time can be 1 minute or 2 minutes), the present application simulates the operation process of multiple physical fields in the nuclear reactor in the first period of time after the transient state based on the simulation time step Δt1. Moreover, the state information of multiple physical fields in the reactor can be sampled once at a preset first preset interval time Δt2 to determine the physical field snapshots of multiple physical fields at different times. Among them, the simulation time step Δt1 can be 0.001 seconds, the first preset interval time Δt2 can be 0.02 seconds, and the first preset interval time Δt2 must be greater than the simulation time step Δt1.

[0089] In step 220, the physical field snapshots of multiple physical fields are spliced ​​to obtain a full series physical field.

[0090] According to the embodiments of the present disclosure, the full series physical field refers to a matrix obtained by splicing the physical field snapshots of multiple physical fields at a certain moment, wherein a certain moment may refer to any moment. Assume that at a certain moment there are physical field snapshots Power(N) of the power field, physical field snapshot Press(N) of the pressure field, physical field snapshot Temp(N) of the temperature field, physical field snapshot Mass(N) of the critical mass field, physical field snapshots Flux1(N) and Flux2(N) of the neutron flux field of the thermal group, etc., wherein N represents the overall number of grids of the reactor simulation model corresponding to the physical field. Due to the spatial anisotropy and the complexity of the nuclear reactor geometry, the order of magnitude of N may be very large (for example, the overall number of grids N in the reactor simulation model corresponding to a typical pressurized water reactor core may be 1*10 5 In order to ensure the consistency of these multiple physical fields, the present application can splice the physical field snapshots of multiple physical fields at a certain moment to construct a full series physical field P(M). The full series physical field P(M) can be expressed as:

[0091]

[0092] Where M = m × N; m represents the number of types of physical fields in the reactor; N represents the number of overall grids of the reactor simulation model corresponding to the physical field; P(M) i Represents the i-th data in the full series physical field P(M).

[0093] Furthermore, since the order of magnitude of N is very large and the dimension of the full series physical field P(M) is M=m×N, it can be determined that the dimension of the full series physical field P(M) is also very large, which means that calculating the full series physical field P(M) will bring huge computational complexity.

[0094] In step 230, a matrix is ​​constructed based on the full series physics.

[0095] According to an embodiment of the present application, a fully serial physical field refers to a matrix obtained by splicing physical field snapshots of multiple physical fields at a certain moment. A matrix can be constructed based on the fully serial physical field, which includes physical field snapshots of multiple physical fields at multiple consecutive moments.

[0096] Exemplarily, assuming that the matrix contains physical field snapshots of multiple physical fields at n consecutive moments, since the dimension of the full series physical field is M=m×N, the dimension of the matrix can be expressed as M×n.

[0097] The specific method of "building a matrix based on a fully serial physical field" will be described in detail below.

[0098] In step 240, the matrix is ​​reduced in order to construct a time series model corresponding to the full series physical field.

[0099] According to the embodiments of the present disclosure, since the dimension of the matrix is ​​M×n, where M is a huge value, if the matrix is ​​directly calculated, it will bring a heavy amount of calculation. Therefore, it is necessary to reduce the order of the matrix, and the dimension of the reduced-order matrix is ​​greatly reduced, which simplifies the subsequent calculation amount caused by constructing a time series model corresponding to the full series physical field based on the reduced-order matrix, and improves the calculation efficiency.

[0100] Furthermore, a time series model corresponding to the full series physical field can be constructed based on the reduced-order matrix. The time series model corresponding to the full series physical field refers to the operation process of multiple physical fields in the reactor at different times. Based on the time series model corresponding to the full series physical field, the state information of multiple physical fields of the reactor at any time can be determined.

[0101] In step 250, the timing model corresponding to the full series physical field is decomposed to obtain timing models corresponding to multiple physical fields.

[0102] According to the embodiments of the present disclosure, the timing model corresponding to the full-series physical field includes the operation process of multiple physical fields in the reactor at different times. After decomposing the timing model corresponding to the full-series physical field, the timing models corresponding to different physical places can be obtained. Because this application is to reduce the order and solve the full-series physical field obtained after the joint splicing after the joint splicing, thereby achieving the simultaneous reduction and solution of multiple physical fields, ensuring the consistency of multiple physical fields.

[0103] For example, it is assumed that at a certain moment there are physical field snapshots Power(N) of the power field, Press(N) of the pressure field, Temp(N) of the temperature field, Mass(N) of the critical mass field, Flux1(N) and Flux2(N) of the neutron flux field of the thermal group, etc. After decomposing the time series model corresponding to the full series physical field obtained by combining these multiple physical fields, the time series models corresponding to the multiple physical fields are obtained as follows:

[0104] Power i =P i ;

[0105] Press i =P i-N ;

[0106] Temp i =P i-2N ;

[0107] Flux1 i =P i-3N;

[0108] Flux2 i =P i-3N ; ...

[0110] Among them, P i Represents the i-th data in the time series model corresponding to the fully serial physical location.

[0111] The above steps 210 to 250 collect the state information of each physical field of the nuclear reactor under the transient process, determine the physical field snapshots of multiple physical fields, and splice the physical field snapshots of multiple physical fields to obtain a full series physical field. By splicing and combining multiple physical fields, multi-physical field coupling is realized. After that, a matrix will be constructed based on the full series physical field, and the matrix will be reduced in order to approximately decompose the full series physical field of the nonlinear system into a low-dimensional linear dynamic system, which simplifies the calculation difficulty and improves the calculation speed. The present application will also construct a time series model corresponding to the full series physical field based on the matrix of the reduced order processing, that is, the change of the state information of each physical field in the full series physical field over time, and decompose the time series model corresponding to the full series physical field to obtain the time series model corresponding to multiple physical fields. Since these multiple physical fields are solved and reduced in order at the same time after the combination, their consistency is guaranteed, and the inconsistency between different physical fields is reduced.

[0112] The above is a general description of step 210 to step 250. Since step 220 and step 250 have been described in detail above, only the specific implementation process of step 210, step 230 and step 240 will be described in detail below.

[0113] Detailed description of step 210

[0114] In step 210, state information of each physical field of the nuclear reactor under transient processes is collected at first preset intervals to obtain physical field snapshots of multiple physical fields, wherein the transient processes are simulated using a reactor simulation model corresponding to the nuclear reactor.

[0115] In one embodiment, referring to Figure 3 The reactor simulation model in step 210 is determined by the following method:

[0116] Step 310, obtaining structural parameters corresponding to the reactor;

[0117] Step 320: construct a three-dimensional model of the reactor based on the structural parameters of the reactor;

[0118] Step 330: mesh discretize the reactor three-dimensional model to obtain a reactor simulation model.

[0119] Steps 310 to 330 are described in detail below.

[0120] According to an embodiment of the present disclosure, the process of multi-physics coupling simulation involves modeling and solving physical processes in a nuclear reactor, and a typical multi-physics coupling simulation includes multiple physical processes such as heat conduction, fluid mechanics, and neutron transport. Furthermore, in order to accurately simulate these complex physical phenomena involved in multi-physics coupling, it is first necessary to obtain a structural parameter matrix used to indicate the structural characteristics of the reactor, and then construct a three-dimensional model of the reactor based on the structural parameter matrix. Then, the three-dimensional model of the reactor is meshed discretized to obtain a reactor simulation model. Specifically, meshing the three-dimensional model of the reactor can discretize the continuous solution domain into a number of finite sub-regions, and each sub-region is adjacent, continuous, and coordinated, thereby achieving coordination and continuity of the entire reactor simulation model.

[0121] Detailed description of step 230

[0122] In one embodiment, the matrix includes a first history matrix and a second history matrix. Figure 4 , step 230 comprises:

[0123] Step 410: determining a physical field snapshot of each physical field from a first moment to a second moment based on the full series physical field;

[0124] Step 420: construct a first history matrix based on the physical field snapshots of each physical field from the first moment to the second moment;

[0125] Step 430: determining physical field snapshots of each physical field from a third moment to a fourth moment based on the full series physical field, wherein the third moment is faster than the first moment by a first preset interval time, and the fourth moment is faster than the second moment by a first preset interval time;

[0126] Step 440: construct a second history matrix based on the physical field snapshots of each physical field from the third moment to the fourth moment.

[0127] Steps 410 to 440 are described in detail below.

[0128] According to an embodiment of the present disclosure, the first history matrix and the second history matrix both refer to physical field snapshots of multiple physical fields at multiple consecutive moments, that is, a combination of full-series physical fields at multiple consecutive moments. Moreover, because the dimension of the full-series physical field is M=m×N, the dimension of the first history matrix and the second history matrix can be expressed as M×n, where n represents the number of sampled moments in the first history matrix / second history matrix, that is, the first history matrix / second history matrix contains physical field snapshots of multiple physical fields at n consecutive moments.

[0129] It should be noted that, although the first history matrix and the second history matrix are not completely the same, there is a time-related relationship between them.

[0130] It can be understood that in order to achieve short-term prediction of a period of time after the initial t0 moment based on the physical field snapshots of multiple physical fields at the initial t0 moment, so as to determine the state information of each physical field in the reactor at different moments. First, it is necessary to construct a first history matrix based on the physical field snapshots of each physical field from the first moment to the second moment, and to construct a second history matrix based on the physical field snapshots of each physical field from the third moment to the fourth moment. The process of determining the first history matrix and the second history matrix is ​​explained here in combination with the formula:

[0131] First, based on the full series physical field P(M), the physical field snapshots of each physical field from the first moment Tn to the second moment T-1 are determined. The physical field snapshots of each physical field from the first moment Tn to the second moment T-1 can be understood as the full series physical field P(M) from the first moment Tn to the second moment T-1. Based on this, the physical field snapshots of each physical field from the first moment Tn to the second moment T-1 can be expressed as {P T-n , P T-n+1 ...P T-1}, where n represents the number of physical field snapshots of each physical field from the first moment Tn to the second moment T-1; P T-n represents the full series physical field P(M) corresponding to the first moment Tn. Then, based on the physical field snapshot {P T-n , P T-n+1 ...P T-1}Construct the first history matrix X1. The dimension of the first history matrix X1 is M×n. The first history matrix X1 can be expressed as:

[0132]

[0133] At the same time, the physical field snapshots of each physical field from the third moment T-n+1 to the fourth moment T can be determined based on the full series physical field P(M), and the third moment T-n+1 is faster than the first moment Tn by a first preset interval time, and the fourth moment T is faster than the second moment T-1 by a first preset interval time. The physical field snapshots of each physical field from the third moment T-n+1 to the fourth moment T can be understood as the full series physical field P(M) from the third moment T-n+1 to the fourth moment T. Based on this, the physical field snapshots of each physical field from the third moment T-n+1 to the fourth moment T can be expressed as {P T-n+1 , P T-n+2 ...P T}, where n represents the number of physical field snapshots of each physical field from the third moment T-n+1 to the fourth moment T; P T-n+1 represents the full series physical field P(M) corresponding to the third moment T-n+1. Then, based on the physical field snapshot {P T-n+1 , P T-n+2 ...P T}Construct the second history matrix X2. The dimension of the second history matrix X2 is M×n. The second history matrix X2 can be expressed as:

[0134]

[0135] Detailed description of step 240

[0136] In one embodiment, referring to Figure 5 , step 240 comprises:

[0137] Step 510: Perform order reduction calculation on the first historical matrix to obtain reduced-order left singular vectors, reduced-order right singular vectors, and reduced-order singular value matrices;

[0138] Step 520: construct a time series model corresponding to the full series physical field based on the reduced-order left singular vectors, the reduced-order right singular vectors, the reduced-order singular value matrix and the second history matrix.

[0139] Steps 510 to 520 are described in detail below.

[0140] According to the embodiments of the present disclosure, since the dimension of the first history matrix is ​​M×n, where M is a huge value, if the first history matrix is ​​directly calculated, it will bring a heavy amount of calculation. Therefore, it is necessary to reduce the order of the first history matrix, and the reduced-order first history matrix includes reduced-order left singular vectors, reduced-order right singular vectors, and reduced-order singular value matrices, and the dimension of the reduced-order first history matrix is ​​greatly reduced, which simplifies the amount of calculation in subsequent solutions and improves the calculation efficiency.

[0141] Furthermore, a time series model corresponding to the full series physical field can be constructed based on the reduced-order left singular vector, the reduced-order right singular vector, the reduced-order singular value matrix and the second history matrix to represent the operation process of multiple physical fields in the reactor at different times. Based on the time series model corresponding to the full series physical field, the state information of multiple physical fields of the reactor at any time can be clearly determined, which is convenient for monitoring the operating state of the reactor.

[0142] In one embodiment, referring to Figure 6 , step 510 includes:

[0143] Step 610: Perform singular value decomposition on the first history matrix to obtain left singular vectors, right singular vectors and a singular value matrix;

[0144] Step 620: Reduce the order of the left singular vector, the right singular vector and the singular value matrix based on the preset singular value cutoff value to obtain reduced-order left singular vectors, reduced-order right singular vectors and reduced-order singular value matrix.

[0145] Steps 610 to 620 are described in detail below.

[0146] According to the embodiment of the present disclosure, since the dimension of the first history matrix X1 is M×n, the dimension of M is very large. In order to reduce the amount of calculation, the first history matrix X1 needs to be reduced in order to reduce the amount of calculation. First, the first history matrix X1 is subjected to singular value decomposition. The first history matrix X1 after decomposition is:

[0147] X1=UΣV T ;

[0148] Among them, U represents the left singular vector, and the left singular vector is an orthogonal matrix; Σ represents the singular value matrix, and the singular value matrix is ​​a non-negative real diagonal matrix; V represents the right singular vector, and the right singular vector is also an orthogonal matrix.

[0149] Since the dimension of the first historical matrix X1 is relatively large, an appropriate singular value cutoff value r can be defined to reduce the data dimension M in the first historical matrix X1 to r, thereby achieving the order reduction of the first historical matrix X1. Since M>>r, the data dimension can be greatly reduced, thereby achieving the purpose of reducing the computational complexity. Furthermore, the process of reducing the order of the left singular vector, the right singular vector and the singular value matrix based on the preset singular value cutoff value can be expressed as:

[0150]

[0151] Wherein, the subscript res represents the mr singular values ​​truncated and ignored by the singular value cutoff value r; represents a reduced-order left singular vector; represents the reduced-order singular value matrix; represents a reduced-rank right singular vector.

[0152] It can be understood that the essence of step 610 to step 620 is to linearly map the first history matrix X1 into a low-dimensional space, so as to reduce the computational complexity and improve the computational efficiency.

[0153] In one embodiment, referring to Figure 7 , step 520 includes:

[0154] Step 710: construct a linear transformation matrix of the first history matrix and the second history matrix;

[0155] Step 720: Calculate the linear transformation matrix based on the reduced-order left singular vectors, the reduced-order right singular vectors, and the reduced-order singular value matrix to determine the eigenvalues ​​and eigenvectors of the linear transformation matrix;

[0156] Step 730: reconstruct and predict the full-series physical field based on the eigenvalues ​​of the linear transformation matrix to obtain a timing model corresponding to the full-series physical field.

[0157] Steps 710 to 730 are described in detail below.

[0158] According to an embodiment of the present disclosure, a linear conversion matrix can be used to indicate the linear relationship between state information of a multi-physical field at two adjacent moments. The linear conversion matrix can be expressed as:

[0159] P t =AP t-1 ;

[0160] Where A represents the linear transformation matrix; P t Represents the state information of the multi-physics field at time t; P t-1 Represents the state information of the multi-physics field at time t-1.

[0161] Because the elements in the same row and column of the first history matrix and the second history matrix in the present application are also the state information of the multi-physical field at two adjacent moments, the linear transformation matrix can be determined based on the first history matrix and the second history matrix, and the linear transformation matrix can be expressed as:

[0162] X2 = AX1;

[0163] A=X2X1 -1 =X1VΣ -1 U T ;

[0164] Where A represents the linear transformation matrix; X1 represents the first historical matrix; X2 represents the second historical matrix; U T Represents the transposed matrix of the left singular vector (the transposed matrix of an orthogonal matrix is ​​the inverse matrix of the orthogonal matrix); Σ -1 represents the inverse matrix of the singular value matrix; V represents the right singular vectors.

[0165] Furthermore, in order to reduce the computational difficulty of calculating the linear transformation matrix, the linear transformation matrix may be calculated based on the reduced-order first history matrix, thereby determining the eigenvalues ​​and eigenvectors of the linear transformation matrix.

[0166] The specific method of "calculating the linear transformation matrix based on the reduced-order left singular vectors, the reduced-order right singular vectors and the reduced-order singular value matrix to determine the eigenvalues ​​and eigenvectors of the linear transformation matrix" will be described in detail below.

[0167] After determining the eigenvalues ​​and eigenvectors of the linear transformation matrix, the eigenvalues ​​of the linear transformation matrix can be mapped to the continuous-time eigenvalues ​​to reconstruct and predict the full-series physical field and obtain a timing model corresponding to the full-series physical field.

[0168] The specific method of "reconstructing and predicting the full-series physical field based on the eigenvalues ​​of the linear transformation matrix to obtain a timing model corresponding to the full-series physical field" will be described in detail below.

[0169] In one embodiment, referring to Figure 8 , step 720 includes:

[0170] Step 810: Reduce the order of the linear transformation matrix based on the reduced-order left singular vectors, the reduced-order right singular vectors, and the reduced-order singular value matrix to obtain a low-order linear transformation matrix;

[0171] Step 820: Perform eigendecomposition on the low-order linear transformation matrix to obtain an eigenvector of the low-order linear transformation matrix;

[0172] Step 830: Calculate the linear transformation matrix based on the eigenvector of the low-order linear transformation matrix to obtain the eigenvalue and eigenvector of the linear transformation matrix.

[0173] Steps 810 to 830 are described in detail below.

[0174] According to an embodiment of the present disclosure, in order to reduce the computational difficulty of calculating the linear transformation matrix, it is necessary to calculate a low-order approximation of the linear transformation matrix based on the reduced-order first history matrix. The low-order linear transformation matrix can be expressed as:

[0175] A~=U~ T X2V~~Σ -1 ;

[0176] Among them, A~ represents the low-order linear transformation matrix; X2 represents the second history matrix; U~ T represents the transposed matrix of the reduced-order left singular vector; ~Σ -1 represents the inverse matrix of the reduced-order singular value matrix; V~ T Represents the transposed matrix of the reduced-rank right singular vectors.

[0177] Furthermore, the low-order linear transformation matrix A~ can be eigen-decomposed to obtain the eigenvector of the low-order linear transformation matrix A~. The process of eigen-decomposing the low-order linear transformation matrix A~ can be expressed as:

[0178] A~=WΛ1W -1 ;

[0179] Among them, A~ represents the low-order linear transformation matrix; W represents the eigenvector of the low-order linear transformation matrix A~; Λ1 represents the diagonal matrix.

[0180] After calculating the eigenvector W of the low-order linear transformation matrix A~, the eigenvalues ​​and eigenvectors of the full-order linear transformation matrix A can be calculated based on the eigenvector W of the low-order linear transformation matrix A~. The process of calculating the eigenvalues ​​and eigenvectors of the full-order linear transformation matrix A can be expressed as:

[0181] Φ=X2VΣ -1 W;

[0182] Wherein, Φ represents the eigenvector of the linear transformation matrix A, and the eigenvalue corresponding to Φ is Λ2; X2 represents the second history matrix; W represents the eigenvector of the low-order linear transformation matrix A~; Σ -1 represents the inverse matrix of the singular value matrix; V represents the right singular vectors.

[0183] It can be understood that the present application can obtain the eigenvalues ​​and eigenvectors of the full-order linear transformation matrix through the eigenvectors of the low-order linear transformation matrix, which reduces the difficulty of calculation and improves the calculation efficiency.

[0184] In one embodiment, referring to Fig. 9 , step 730 includes:

[0185] Step 910: Map the eigenvalues ​​of the linear conversion matrix to a first preset time interval to obtain a timing coefficient;

[0186] Step 920: construct a timing model corresponding to the full-series physical field based on the timing coefficient and the full-series physical field at the initial moment.

[0187] Steps 910 to 920 are described in detail below.

[0188] According to an embodiment of the present disclosure, after calculating the eigenvector Φ of the linear transformation matrix A and the eigenvalue Λ2 of the linear transformation matrix A, the linear relationship of the state information of the multi-physical field at two adjacent moments can be determined. Based on this, the present application can map the eigenvalue Λ2 of the discrete system to the first preset interval time Δt2 (the linear transformation matrix A is constructed based on the first history matrix and the second history matrix, and the interval time of the elements in the same row and column in the first history matrix and the second history matrix is ​​the first preset interval time Δt2) to determine the timing coefficient, and the process of determining the timing coefficient can be expressed as:

[0189] ω=(logΛ2) / Δt2;

[0190] Wherein, ω represents the timing coefficient; Λ2 represents the eigenvalue of the linear transformation matrix A; Δt2 represents the first preset interval time.

[0191] After determining the linear relationship of the state information of the multi-physical field at different moments, the state information of the full-series physical field after a plurality of first preset intervals from the initial state (here, it is assumed that the T-1 moment is the initial state) can be short-term predicted based on the timing coefficient, that is, the timing model corresponding to the full-series physical field is constructed based on the timing coefficient and the full-series physical field at the initial moment. The process of constructing the timing model corresponding to the full-series physical field can be expressed as:

[0192] P T-1 =ΦB;

[0193] P(t)=Φe ωt B;

[0194] Among them, P T-1 represents the state information of the multi-physics field at time T-1 (here, it is assumed that time T-1 is the initial state); Φ represents the eigenvector of the linear transformation matrix A; B represents P T-1 The coordinates under the eigenvector basis Φ; t represents the interval time from time T-1; ω represents the timing coefficient.

[0195] Description of the multi-physics field coupling fast simulation system and computer-readable storage medium of the present disclosure

[0196] Second, refer to Fig.10 , the embodiment of the present application provides a multi-physics field coupling fast simulation system, including:

[0197] at least one memory 200;

[0198] at least one processor 100;

[0199] at least one program;

[0200] The program is stored in the memory 200, and the processor 100 executes at least one program to implement:

[0201] A multi-physics field coupling fast simulation method as in any embodiment of the first aspect of the present application.

[0202] The processor 100 and the memory 200 may be connected via a bus or in other ways.

[0203] The memory 200, as a non-transitory readable storage medium, can be used to store non-transitory software instructions and non-transitory instructables. In addition, the memory 200 may include a high-speed random access memory, and may also include a non-transitory memory, such as at least one disk storage device, a flash memory device, or other non-transitory solid-state storage device. It is understood that the memory 200 may optionally include a memory 200 remotely arranged relative to the processor 100, and these remote memories 200 may be connected to the processor 100 via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.

[0204] The processor 100 executes non-transient software instructions, commands and signals stored in the memory 200, thereby performing various functional applications and data processing, that is, implementing the multi-physics field coupling fast simulation method of the first aspect embodiment described above.

[0205] The non-transient software instructions and instructions required to implement the multi-physics field coupling fast simulation method of the above embodiment are stored in the memory 200. When executed by the processor 100, the multi-physics field coupling fast simulation method of the first embodiment of the present application is executed, for example, the above-described Figure 2 Steps 210 to 250, Figure 3 Steps 310 to 330, Figure 4 Steps 410 to 440, Figure 5 Steps 510 to 520, Figure 6 Steps 610 to 620, Figure 7 Steps 710 to 730, Figure 8 Steps 810 to 830, Fig. 9 Steps 910 to 920 in .

[0206] In a third aspect, an embodiment of the present application provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer-executable signal, and the computer-executable signal is used to execute:

[0207] A multi-physics field coupling fast simulation method as described in any embodiment of the first aspect of the application.

[0208] For example, executing the above description Figure 2 Steps 210 to 250, Figure 3 Steps 310 to 330, Figure 4 Steps 410 to 440, Figure 5 Steps 510 to 520, Figure 6 Steps 610 to 620, Figure 7 Steps 710 to 730, Figure 8Steps 810 to 830, Fig. 9 Steps 910 to 920 in .

[0209] The device embodiments described above are merely illustrative, wherein the units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, i.e., may be located in one place, or may be distributed over multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0210] Through the description of the above embodiments, it will be appreciated by those skilled in the art that all or some steps and systems in the disclosed methods above can be implemented as software, firmware, hardware and appropriate combinations thereof. Some physical components or all physical components can be implemented as software executed by a processor, such as a central processing unit, a digital signal processor or a microprocessor, or implemented as hardware, or implemented as an integrated circuit, such as an application-specific integrated circuit. Such software can be distributed on a readable medium, and the readable medium can include a computer storage medium (or a non-transitory medium) and a communication medium (or a temporary medium). As known to those skilled in the art, the term computer storage medium includes volatile and non-volatile, removable and non-removable media implemented in any method or technology for storing information (such as a computer-readable signal, a data structure, an instruction module or other data). Computer storage media include, but are not limited to, RAM, ROM, EEPROM, flash memory or other memory technology, CD-ROM, digital versatile disk (DVD) or other optical disk storage, magnetic cassette, magnetic tape, disk storage or other magnetic storage device, or any other medium that can be used to store desired information and can be accessed by a computer. Furthermore, it is well known to those skilled in the art that communication media generally include computer readable signals, data structures, instruction modules, or other data in a modulated data signal such as a carrier wave or other transport mechanism, and may include any information delivery media.

[0211] The embodiments of the present application are described in detail above in conjunction with the accompanying drawings, but the present application is not limited to the above embodiments, and various changes can be made within the knowledge scope of ordinary technicians in the relevant technical field without departing from the purpose of the present application.

Claims

1. A fast simulation method for multi-physics field coupling, It is characterized in that include: At first preset intervals, state information of each physical field of the nuclear reactor under a transient process is collected to obtain physical field snapshots of multiple physical fields, wherein the transient process is simulated by a reactor simulation model corresponding to the nuclear reactor; The physical field snapshots of multiple physical fields are stitched together to obtain the full series physical field; Constructing a matrix based on the full series physical field; Performing order reduction processing on the matrix to construct a time series model corresponding to the full series physical field; The timing model corresponding to the full series physical field is decomposed to obtain timing models corresponding to multiple physical fields.

2. The multi-physics field coupling fast simulation method according to claim 1, It is characterized in that The matrix includes a first history matrix and a second history matrix, and the matrix is ​​constructed based on the full series physical field, including: Determine a physical field snapshot of each physical field from a first moment to a second moment based on the full series physical field; Constructing a first history matrix based on physical field snapshots of each physical field from a first moment to a second moment; Determine physical field snapshots of each physical field from a third moment to a fourth moment based on the full series physical field, wherein the third moment is faster than the first moment by a first preset interval time, and the fourth moment is faster than the second moment by a first preset interval time; A second history matrix is ​​constructed based on the physical field snapshots of each physical field from the third moment to the fourth moment.

3. The multi-physics field coupling fast simulation method according to claim 2, It is characterized in that The matrix is ​​subjected to order reduction processing to construct a time series model corresponding to the full series physical field, including: Performing order reduction calculation on the first history matrix to obtain reduced-order left singular vectors, reduced-order right singular vectors and reduced-order singular value matrices; A time series model corresponding to the full-series physical field is constructed based on the reduced-order left singular vectors, the reduced-order right singular vectors, the reduced-order singular value matrix and the second history matrix.

4. The multi-physics field coupling fast simulation method according to claim 3, It is characterized in that The step of performing order reduction calculation on the first history matrix to obtain reduced-order left singular vectors, reduced-order right singular vectors, and reduced-order singular value matrices includes: Performing singular value decomposition on the first history matrix to obtain left singular vectors, right singular vectors and a singular value matrix; Based on a preset singular value cutoff value, the left singular vector, the right singular vector and the singular value matrix are respectively reduced in order to obtain the reduced-order left singular vector, the reduced-order right singular vector and the reduced-order singular value matrix.

5. The multi-physics field coupling fast simulation method according to claim 3, It is characterized in that The constructing the time series model corresponding to the full series physical field based on the reduced-order left singular vector, the reduced-order right singular vector, the reduced-order singular value matrix and the second history matrix includes: Constructing a linear transformation matrix of the first history matrix and the second history matrix; Calculating the linear transformation matrix based on the reduced-order left singular vectors, the reduced-order right singular vectors and the reduced-order singular value matrix to determine eigenvalues ​​and eigenvectors of the linear transformation matrix; The full-series physical field is reconstructed and predicted based on the eigenvalues ​​of the linear transformation matrix to obtain a timing model corresponding to the full-series physical field.

6. The multi-physics field coupling fast simulation method according to claim 5, It is characterized in that The step of calculating the linear transformation matrix based on the reduced-order left singular vector, the reduced-order right singular vector and the reduced-order singular value matrix to determine the eigenvalues ​​and eigenvectors of the linear transformation matrix comprises: Based on the reduced-order left singular vectors, the reduced-order right singular vectors, and the reduced-order singular value matrix, the linear transformation matrix is ​​reduced to obtain a low-order linear transformation matrix; Performing eigendecomposition on the low-order linear transformation matrix to obtain an eigenvector of the low-order linear transformation matrix; The linear transformation matrix is ​​calculated based on the eigenvector of the low-order linear transformation matrix to obtain the eigenvalue and eigenvector of the linear transformation matrix.

7. The multi-physics field coupling fast simulation method according to claim 5, It is characterized in that The reconstructing and predicting the full-series physical field based on the eigenvalue of the linear conversion matrix to obtain a time series model corresponding to the full-series physical field includes: Mapping the eigenvalues ​​of the linear conversion matrix to a first preset interval time to obtain a timing coefficient; A timing model corresponding to the full-series physical field is constructed based on the timing coefficient and the full-series physical field at an initial moment.

8. The multi-physics field coupling fast simulation method according to claim 1, It is characterized in that The reactor simulation model is determined by the following method: Obtaining structural parameters corresponding to the nuclear reactor; Construct a three-dimensional model of the reactor based on the structural parameters of the nuclear reactor; The reactor three-dimensional model is meshed and discretized to obtain the reactor simulation model.

9. A multi-physics field coupling fast simulation system, It is characterized in that include: at least one memory; at least one processor; at least one program; The program is stored in the memory, and the processor executes at least one of the programs to implement: The multi-physics field coupling fast simulation method according to any one of claims 1 to 8.

10. A computer-readable storage medium, It is characterized in that The computer-readable storage medium stores a computer-executable signal, wherein the computer-executable signal is used to execute: The multi-physics field coupling fast simulation method according to any one of claims 1 to 8.

Citation Information

Cited By

  • Fast simulation method and system for multi-physical field coupling

    WO2026020923A1