Annual exploration plan exploration well number prediction method, device and equipment and storage medium
By establishing a curve of the annual completion of wells and the number of new reserves and successful wells and new reserves, combined with the target wells success rate, the problem of large prediction errors in exploration plan in the existing technology is solved, and more accurate prediction of the number of wells is achieved and geological risk assessment of traps.
Patent Information
- Application Number
- CN202310518606.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-09
- Publication Date
- 2024-11-12
AI Technical Summary
When designing annual exploration plans, the existing technology only considers the statistical relationship between the annual new reserves and the number of exploration wells, resulting in large errors and fails to effectively combine the success rate of exploration wells and the reserve relationship.
By counting the basic parameters within the historical time interval of the exploration project, we will establish the annual completed wells and the annual successful wells and the annual new reserve relationship curve, and find the statistics on the number of exploration wells and new reserves under any success rate conditions. Relationship curve and prediction based on the target well exploration success rate.
The scientificity and accuracy of the prediction of the number of exploration wells in the annual exploration plan was improved, and the constraints of the success rate of exploration wells were clarified in the preparation of exploration plan, reducing errors.
Smart Images

Figure CN118940873A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of oil and gas exploration, and in particular to a method, device, equipment and storage medium for predicting the number of exploration wells in an annual exploration plan. Background Art
[0002] Oil and gas exploration refers to geological surveys, geophysical exploration, drilling activities and other related activities carried out to identify exploration areas or prove oil and gas reserves. Oil and gas exploration is the first key link in oil and gas production. It is the basis of oil and gas production projects. Its purpose is to find and identify oil and gas resources, use various exploration methods to understand the underground geological conditions, understand the conditions of oil generation, oil storage, oil and gas migration, accumulation, preservation, etc., comprehensively evaluate the oil and gas prospects, determine favorable areas for oil and gas accumulation, find oil and gas storage closures, and prove the area of oil and gas fields, and understand the oil and gas layer conditions and production capacity.
[0003] In the prior art, when designing the number of exploration wells for an exploration project in a certain year, the number of exploration wells for the planned year is often estimated based on the newly added reserves index for the planned year and the average single-well discovered reserves of the exploration project over the past period of time, with reference to the ratio of the two. The prior art only considers the statistical relationship between the annual newly added reserves and the number of exploration wells. If the relationship is not clear, a large error will occur. Summary of the invention
[0004] In view of this, the present application provides a method, device, equipment and storage medium for predicting the number of exploratory wells in an annual exploration plan, so as to solve the problem that the prior art only considers the statistical relationship between the annual increase in reserves and the number of exploratory wells, which will cause large errors.
[0005] In a first aspect, an embodiment of the present application provides a method for predicting the number of exploration wells in an annual exploration plan, comprising:
[0006] Statistical analysis of basic parameters of exploration projects within the historical time period, including annual reserves, annual number of completed exploration wells, and annual number of successful exploration wells;
[0007] A relationship curve between the number of exploration wells completed annually and the newly added reserves is established based on the annual newly added reserves and the number of exploration wells completed annually. The relationship curve between the number of exploration wells completed annually and the newly added reserves is used to characterize the statistical relationship between the number of exploration wells and the newly added reserves under the actual success rate condition;
[0008] A relationship curve between the number of successful exploration wells per year and the newly added reserves is established based on the annual newly added reserves and the annual number of successful exploration wells. The relationship curve between the number of successful exploration wells per year and the newly added reserves is used to characterize the statistical relationship between the number of exploration wells and the newly added reserves under the condition of 100% success rate;
[0009] According to the relationship curve between the number of exploration wells completed in the year and the newly added reserves and the relationship curve between the number of successful exploration wells in the year and the newly added reserves, obtain the statistical relationship curve between the number of exploration wells and the newly added reserves under any success rate condition;
[0010] Obtaining a target exploration well success rate, where the target exploration well success rate is the exploration well success rate of the exploration project in the planned year;
[0011] Among the statistical relationship curves between the number of exploration wells and the newly added reserves under the arbitrary success rate condition, the statistical relationship curve between the number of exploration wells and the newly added reserves under the target exploration well success rate is selected;
[0012] The number of exploratory wells in the planned year is predicted based on the statistical relationship curve between the number of exploratory wells and the newly added reserves under the target exploratory well success rate.
[0013] In a possible implementation, establishing a relationship curve between the number of annual completed exploratory wells and the new reserves according to the annual new reserves and the number of annual completed exploratory wells includes:
[0014] By performing data fitting on the annual newly added reserves and the annual number of completed exploratory wells, a relationship curve between the annual number of completed exploratory wells and the newly added reserves is obtained.
[0015] In a possible implementation, establishing a relationship curve between the annual number of successful exploration wells and the new reserves according to the annual new reserves and the annual number of successful exploration wells includes:
[0016] By performing data fitting on the annual newly added reserves and the annual number of successful exploration wells, a relationship curve between the annual number of successful exploration wells and the newly added reserves is obtained.
[0017] In a possible implementation, the statistical relationship curve between the number of exploratory wells completed in the year and the newly added reserves and the relationship curve between the number of successful exploratory wells in the year and the newly added reserves are obtained under any success rate condition, including:
[0018] Taking the relationship curve between the number of exploratory wells completed in the year and the newly added reserves and the relationship curve between the number of successful exploratory wells in the year and the newly added reserves as constraints, the statistical relationship curve between the number of exploratory wells and the newly added reserves under any success rate condition is obtained through linear interpolation.
[0019] In a possible implementation, obtaining the target well exploration success rate includes:
[0020] Conduct geological risk assessment for the trap targets to be drilled in the planned year of the exploration project to obtain the success rate of exploration wells in the planned year of the exploration project.
[0021] In a second aspect, an embodiment of the present application provides a device for predicting the number of exploration wells in an annual exploration plan, comprising:
[0022] Basic parameter statistics module, which counts the basic parameters of the exploration project in the historical time period, including annual new reserves, annual completed exploration wells and annual successful exploration wells;
[0023] A module for establishing a relationship curve between the number of exploration wells completed annually and the newly added reserves, which is used to establish a relationship curve between the number of exploration wells completed annually and the newly added reserves based on the newly added reserves and the number of exploration wells completed annually. The relationship curve between the number of exploration wells completed annually and the newly added reserves is used to characterize the statistical relationship between the number of exploration wells and the newly added reserves under the actual success rate condition;
[0024] A module for establishing a relationship curve between the number of successful exploration wells per year and the newly added reserves, which is used to establish a relationship curve between the number of successful exploration wells per year and the newly added reserves according to the newly added reserves and the number of successful exploration wells per year. The relationship curve between the number of successful exploration wells per year and the newly added reserves is used to characterize the statistical relationship between the number of exploration wells and the newly added reserves under the condition of 100% success rate;
[0025] A module for obtaining a statistical relationship curve between the number of exploratory wells and newly added reserves under any success rate condition, which is used to obtain a statistical relationship curve between the number of exploratory wells and newly added reserves under any success rate condition based on the relationship curve between the number of exploratory wells completed in the year and the relationship curve between the number of successful exploratory wells in the year and the newly added reserves;
[0026] A target exploration well success rate acquisition module is used to acquire a target exploration well success rate, where the target exploration well success rate is the exploration well success rate of the exploration project in the planned year;
[0027] A module for selecting a statistical relationship curve between the number of exploration wells and the newly added reserves under the target exploration well success rate, for selecting the statistical relationship curve between the number of exploration wells and the newly added reserves under the target exploration well success rate from among the statistical relationship curves between the number of exploration wells and the newly added reserves under the arbitrary success rate condition;
[0028] The exploration well number prediction module is used to predict the number of exploration wells in the planned year based on the statistical relationship curve between the number of exploration wells and the newly added reserves under the target exploration well success rate.
[0029] In a third aspect, an embodiment of the present application provides an electronic device, including:
[0030] processor;
[0031] Memory;
[0032] And a computer program, wherein the computer program is stored in the memory, and the computer program includes instructions, and when the instructions are executed by the processor, the electronic device executes any one of the methods described in the first aspect.
[0033] In a fourth aspect, an embodiment of the present application provides a computer-readable storage medium, wherein the computer-readable storage medium includes a stored program, wherein when the program is running, the device where the computer-readable storage medium is located is controlled to execute any one of the methods described in the first aspect.
[0034] In the embodiments of the present application, by establishing a statistical relationship between the number of exploratory wells, the success rate of exploratory wells, and the newly added reserves in the exploration project, an organic combination of quantitative prediction of the number of exploratory well plans and evaluation of geological risks of closures is achieved, the constraining role of the success rate of exploratory wells in the formulation of exploration plans is clarified, and the scientific nature of the prediction results of exploration plan indicators is improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0036] Figure 1 A schematic diagram of a method for predicting the number of exploration wells in an annual exploration plan provided in an embodiment of the present application;
[0037] Figure 2 A schematic diagram of the logical relationship between various data provided in the embodiment of the present application;
[0038] Figure 3 A relationship curve between the number of exploration wells completed in an annual manner and the newly added reserves of the X exploration project provided in the embodiment of the present application;
[0039] Figure 4 The relationship curve between the number of successful exploration wells and newly added reserves of the X exploration project provided in the embodiment of the present application;
[0040] Figure 5 A statistical relationship curve between the number of exploration wells and newly added reserves under any success rate condition provided in the embodiment of the present application;
[0041] Figure 6 The present application also provides a structural block diagram of a device for predicting the number of exploration wells in an annual exploration plan;
[0042] Figure 7 A schematic diagram of the structure of an electronic device provided in an embodiment of the present application. DETAILED DESCRIPTION
[0043] In order to better understand the technical solution of the present application, the embodiments of the present application are described in detail below with reference to the accompanying drawings.
[0044] It should be clear that the described embodiments are only part of the embodiments of the present application, rather than all the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present application.
[0045] The terms used in the embodiments of the present application are only for the purpose of describing specific embodiments, and are not intended to limit the present application. The singular forms "a", "said" and "the" used in the embodiments of the present application and the appended claims are also intended to include plural forms, unless the context clearly indicates other meanings.
[0046] It should be understood that the term "and / or" used in this article is only a description of the association relationship of associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship.
[0047] The method for predicting the number of exploration wells in the annual exploration plan under the constraint of success rate provided in the embodiment of the present application is based on the basic understanding that only when the exploration well obtains industrial oil and gas flow can it contribute to reserves, considers the risk assessment of the planned annual closed drilling target, and establishes a statistical relationship between the newly added reserves, the number of exploration wells, and the success rate of exploration wells, thereby improving the scientific nature of the annual exploration plan. The detailed description is given below in conjunction with the specific implementation method.
[0048] See also Figure 1 , which is a flow chart of a method for predicting the number of exploration wells in an annual exploration plan provided in an embodiment of the present application; see Figure 2 , is a schematic diagram of the logical relationship between the various data provided in the embodiment of the present application. Figure 1 Combined with Figure 2 As shown, the method for predicting the number of exploration wells in the annual exploration plan mainly includes the following steps.
[0049] Step S101: Counting basic parameters of the exploration project in the historical time period, wherein the basic parameters include annual newly added reserves, annual number of completed exploration wells, and annual number of successful exploration wells.
[0050] In some possible implementations, the annual number of successful exploration wells may also be referred to as the “annual number of industrial oil and gas flow wells.” The ratio of the annual number of successful exploration wells to the annual number of completed exploration wells is the exploration well success rate.
[0051] Step S102: establishing a relationship curve between the number of annual completed exploratory wells and the newly added reserves according to the annual newly added reserves and the number of annual completed exploratory wells.
[0052] In the embodiment of the present application, the relationship curve between the number of exploration wells completed per year and the newly added reserves is used to characterize the statistical relationship between the number of exploration wells completed per year and the newly added reserves under the actual success rate condition. In a specific implementation, the relationship curve between the number of exploration wells completed per year and the newly added reserves can be obtained by performing data fitting on the newly added reserves per year and the number of exploration wells completed per year.
[0053] Step S103: establishing a relationship curve between the annual number of successful exploration wells and the newly added reserves according to the annual newly added reserves and the annual number of successful exploration wells.
[0054] In the embodiment of the present application, the relationship curve between the number of successful exploration wells per year and the newly added reserves is used to characterize the statistical relationship between the number of exploration wells per year and the newly added reserves under the condition of 100% success rate. In a specific implementation, the relationship curve between the number of successful exploration wells per year and the newly added reserves can be obtained by performing data fitting on the annual newly added reserves and the annual number of successful exploration wells per year.
[0055] Step S104: according to the relationship curve between the number of exploration wells completed in the year and the newly added reserves and the relationship curve between the number of successful exploration wells in the year and the newly added reserves, obtain a statistical relationship curve between the number of exploration wells and the newly added reserves under any success rate condition.
[0056] In a specific implementation, the relationship curve between the number of exploratory wells completed in the year and the newly added reserves and the relationship curve between the number of successful exploratory wells in the year and the newly added reserves can be used as constraints, and a statistical relationship curve between the number of exploratory wells and the newly added reserves under any success rate condition can be obtained through linear interpolation.
[0057] It should be pointed out that the "arbitrary success rate" can be any success rate between 0-100% according to a certain success rate interval. For example, when the success rate interval is 10%, the statistical relationship curves between the number of exploration wells and the newly added reserves under the conditions of 10%, 20%, 30%, 40%, 50%, 60%, 70%, 80%, 90%, and 100% success rates are obtained respectively. Of course, those skilled in the art can set other success rate intervals, and the embodiments of the present application are not limited to this. It can be understood that the smaller the success rate interval, the more statistical relationship curves between the number of exploration wells and the newly added reserves are obtained, and the more accurate the prediction results of the number of exploration wells obtained in the end.
[0058] Step S105: Obtain the target well exploration success rate.
[0059] In the embodiment of the present application, the target exploration well success rate is the exploration well success rate of the exploration project in the planned year. In specific implementation, a geological risk assessment can be carried out for the trap targets to be drilled in the planned year of the exploration project to obtain the exploration well success rate of the exploration project in the planned year.
[0060] Step S106: From the statistical relationship curves of the number of exploration wells and the newly added reserves under the arbitrary success rate condition, select the statistical relationship curve of the number of exploration wells and the newly added reserves under the target exploration well success rate.
[0061] For example, if the target exploration well success rate is 60%, then among the statistical relationship curves between the number of exploration wells and the newly added reserves under any success rate condition, the statistical relationship curve between the number of exploration wells and the newly added reserves under the 60% success rate is selected.
[0062] It should be pointed out that if there is no success rate in "any success rate" that is completely equal to the target exploration well success rate, then the "statistical relationship curve between the number of exploration wells and the newly added reserves under the success rate condition closest to the target exploration well success rate" is selected from the statistical relationship curve between the number of exploration wells and the newly added reserves under the arbitrary success rate condition as the statistical relationship curve between the number of exploration wells and the newly added reserves under the target exploration well success rate. For example, if the target exploration well success rate is 59%, and the success rate corresponding to the statistical relationship curve between the number of exploration wells and the newly added reserves under the 60% success rate is closest to the target exploration well success rate, then the statistical relationship curve between the number of exploration wells and the newly added reserves under the 60% success rate is selected as the statistical relationship curve between the number of exploration wells and the newly added reserves under the target exploration well success rate.
[0063] Step S107: predicting the number of exploration wells in the planned year according to the statistical relationship curve between the number of exploration wells and the newly added reserves under the target exploration well success rate.
[0064] It can be understood that after obtaining the statistical relationship curve between the number of exploratory wells and the newly added reserves under the target exploratory well success rate, the number of exploratory wells in the planned year can be directly predicted based on the statistical relationship curve between the number of exploratory wells and the newly added reserves under the target exploratory well success rate.
[0065] In the embodiments of the present application, by establishing a statistical relationship between the number of exploratory wells, the success rate of exploratory wells, and the newly added reserves in the exploration project, an organic combination of quantitative prediction of the number of exploratory well plans and evaluation of geological risks of closures is achieved, the constraining role of the success rate of exploratory wells in the formulation of exploration plans is clarified, and the scientific nature of the prediction results of exploration plan indicators is improved.
[0066] For ease of understanding, the following takes exploration project X as an example to illustrate the method for predicting the number of exploration wells in an annual exploration plan provided in an embodiment of the present application.
[0067] Specifically, three parameters, namely, annual new reserves, number of completed exploration wells, and number of industrial oil and gas flow wells, were counted for exploration project X over the past 11 years, as shown in Table 1 .
[0068] Table 1:
[0069] year Number of completed exploration wells Number of wells with industrial oil flow Newly increased geological reserves of petroleum (10,000 tons) 2011 44 32 4596.65 2012 56 29 5866.96 2013 45 25 2848.67 2014 22 20 822.06 2015 28 8 828.99 2016 32 16 773.54 2017 38 10 255.95 2018 25 13 1176.51 2019 44 22 2202.81 2020 35 19 1615.02 2021 50 20 2682.95
[0070] By fitting the data of completed exploration wells and newly added petroleum geological reserves in Table 1, the relationship curve between the number of completed exploration wells and newly added reserves in the X exploration project is obtained, as shown in Figure 1. Figure 3 shown.
[0071] By fitting the data of the number of exploration wells with industrial oil flow and the newly added petroleum geological reserves in Table 1, the relationship curve between the number of successful exploration wells and newly added reserves in the X exploration project is obtained, as shown in Figure 1. Figure 4 shown.
[0072] by Figure 3 The relationship curve between the number of exploration wells completed in an annual manner and the newly added reserves of X exploration project and Figure 4 The relationship curve between the number of successful exploration wells and the newly added reserves of the X exploration project in the year is used as a constraint. Through linear interpolation, the statistical relationship curve between the number of exploration wells and the newly added reserves under any success rate condition is obtained, as shown in the figure. Figure 5 shown.
[0073] For example, the oil geological reserve task target for the X exploration project next year is tentatively set at 30 million tons. Through the geological risk assessment of the traps to be drilled, it is estimated that the success rate of exploration wells in the next year is 50%. Figure 5 By selecting the relationship curve between the number of exploration wells and newly added reserves under a 50% exploration well success rate, it can be predicted that the number of exploration wells planned for the project in the next year is 45.
[0074] Corresponding to the above-mentioned embodiment, the present application also provides a device for predicting the number of exploration wells in an annual exploration plan.
[0075] See also Figure 6 , which is a structural block diagram of a device for predicting the number of wells in an annual exploration plan provided in this application. Figure 6 As shown, it mainly includes the following modules.
[0076] Basic parameter statistics module 601, which counts basic parameters in the historical time interval of the exploration project, wherein the basic parameters include annual newly added reserves, annual number of completed exploration wells, and annual number of successful exploration wells;
[0077] The module 602 for establishing the relationship curve between the number of exploration wells completed in an annual period and the newly added reserves is used to establish the relationship curve between the number of exploration wells completed in an annual period and the newly added reserves according to the newly added reserves and the number of exploration wells completed in an annual period. The relationship curve between the number of exploration wells completed in an annual period and the newly added reserves is used to characterize the statistical relationship between the number of exploration wells completed in an annual period and the newly added reserves under the condition of the actual success rate.
[0078] The module 603 for establishing the relationship curve between the number of successful exploration wells and the newly added reserves in an annual period is used to establish the relationship curve between the number of successful exploration wells and the newly added reserves in an annual period according to the newly added reserves and the number of successful exploration wells in an annual period. The relationship curve between the number of successful exploration wells and the newly added reserves in an annual period is used to characterize the statistical relationship between the number of exploration wells and the newly added reserves under the condition of 100% success rate.
[0079] A module 604 for obtaining a statistical relationship curve between the number of exploratory wells and newly added reserves under any success rate condition, for obtaining a statistical relationship curve between the number of exploratory wells and newly added reserves under any success rate condition according to the relationship curve between the number of exploratory wells completed in the year and the relationship curve between the number of successful exploratory wells and newly added reserves in the year;
[0080] The target exploration well success rate acquisition module 605 is used to acquire the target exploration well success rate, where the target exploration well success rate is the exploration well success rate of the exploration project in the planned year;
[0081] A statistical relationship curve selection module 606 between the number of exploration wells and the newly added reserves under the target exploration well success rate is used to select the statistical relationship curve between the number of exploration wells and the newly added reserves under the target exploration well success rate from the statistical relationship curves between the number of exploration wells and the newly added reserves under the arbitrary success rate condition;
[0082] The exploration well number prediction module 607 is used to predict the number of exploration wells in the planned year according to the statistical relationship curve between the number of exploration wells and the newly added reserves under the target exploration well success rate.
[0083] In the embodiments of the present application, by establishing a statistical relationship between the number of exploratory wells, the success rate of exploratory wells, and the newly added reserves in the exploration project, an organic combination of quantitative prediction of the number of exploratory well plans and evaluation of geological risks of closures is achieved, the constraining role of the success rate of exploratory wells in the formulation of exploration plans is clarified, and the scientific nature of the prediction results of exploration plan indicators is improved.
[0084] It should be pointed out that the specific contents involved in the embodiments of the present application can be found in the description of the above method embodiments, and for the sake of brevity, they will not be repeated here.
[0085] Corresponding to the above embodiment, an embodiment of the present application further provides an electronic device.
[0086] See also Figure 7 , is a schematic diagram of the structure of an electronic device provided in an embodiment of the present application. Figure 7 As shown, the electronic device 700 may include: a processor 701, a memory 702 and a communication unit 703. These components communicate via one or more buses. Those skilled in the art may understand that the electronic device structure shown in the figure does not constitute a limitation on the embodiments of the present application. It may be a bus structure or a star structure, and may include more or fewer components than shown in the figure, or combine certain components, or arrange components differently.
[0087] The communication unit 703 is used to establish a communication channel so that the electronic device can communicate with other devices.
[0088] The processor 701 is the control center of the electronic device. It uses various interfaces and lines to connect various parts of the entire electronic device. It runs or executes software programs and / or modules stored in the memory 702, and calls data stored in the memory to perform various functions of the electronic device and / or process data. The processor can be composed of an integrated circuit (IC), for example, it can be composed of a single packaged IC, or it can be composed of multiple packaged ICs with the same or different functions. For example, the processor 701 can include only a central processing unit (CPU). In the embodiment of the present application, the CPU can be a single computing core or multiple computing cores.
[0089] The memory 702 is used to store the execution instructions of the processor 701. The memory 702 can be implemented by any type of volatile or non-volatile storage device or a combination thereof, such as static random access memory (SRAM), electrically erasable programmable read-only memory (EEPROM), erasable programmable read-only memory (EPROM), programmable read-only memory (PROM), read-only memory (ROM), magnetic memory, flash memory, magnetic disk or optical disk.
[0090] When the execution instructions in the memory 702 are executed by the processor 701 , the electronic device 700 is enabled to execute part or all of the steps in the above method embodiments.
[0091] Corresponding to the above embodiment, the embodiment of the present application further provides a computer-readable storage medium, wherein the computer-readable storage medium may store a program, wherein when the program is running, the device where the computer-readable storage medium is located may be controlled to perform some or all of the steps in the above method embodiment. In a specific implementation, the computer-readable storage medium may be a disk, an optical disk, a read-only memory (ROM) or a random access memory (RAM).
[0092] Corresponding to the above-mentioned embodiment, the embodiment of the present application further provides a computer program product, which includes executable instructions. When the executable instructions are executed on a computer, the computer executes some or all of the steps in the above-mentioned method embodiment.
[0093] In the embodiments of the present application, "at least one" refers to one or more, and "plurality" refers to two or more. "And / or" describes the association relationship of associated objects, indicating that three relationships may exist. For example, A and / or B can represent the existence of A alone, the existence of A and B at the same time, and the existence of B alone. Among them, A and B can be singular or plural. The character " / " generally indicates that the previous and subsequent associated objects are in an "or" relationship. "At least one of the following" and similar expressions refer to any combination of these items, including any combination of single or plural items. For example, at least one of a, b and c can be represented by: a, b, c, ab, ac, bc, or abc, where a, b, c can be single or multiple.
[0094] Those of ordinary skill in the art will appreciate that the various units and algorithm steps described in the embodiments disclosed herein can be implemented in a combination of electronic hardware, computer software, and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.
[0095] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the systems, devices and units described above can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.
[0096] In several embodiments provided in the present application, any function can be stored in a computer-readable storage medium if it is implemented in the form of a software functional unit and sold or used as an independent product. Based on this understanding, the technical solution of the present application can be essentially or partly embodied in the form of a software product that contributes to the prior art. The computer software product is stored in a storage medium, including several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present application. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM), random access memory (RAM), disk or optical disk, etc., and other media that can store program codes.
[0097] The above is only a specific implementation of the present application. Any person skilled in the art can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. The protection scope of the present application should be based on the protection scope of the claims.
Claims
1. A method for predicting the number of exploration wells in an annual exploration plan, characterized in that: include: Statistical analysis of basic parameters of exploration projects within the historical time period, including annual reserves, annual number of completed exploration wells, and annual number of successful exploration wells; A relationship curve between the number of exploration wells completed annually and the newly added reserves is established based on the annual newly added reserves and the number of exploration wells completed annually. The relationship curve between the number of exploration wells completed annually and the newly added reserves is used to characterize the statistical relationship between the number of exploration wells and the newly added reserves under the actual success rate condition; A relationship curve between the number of successful exploration wells per year and the newly added reserves is established based on the annual newly added reserves and the annual number of successful exploration wells. The relationship curve between the number of successful exploration wells per year and the newly added reserves is used to characterize the statistical relationship between the number of exploration wells and the newly added reserves under the condition of 100% success rate; According to the relationship curve between the number of exploration wells completed in the year and the newly added reserves and the relationship curve between the number of successful exploration wells in the year and the newly added reserves, obtain the statistical relationship curve between the number of exploration wells and the newly added reserves under any success rate condition; Obtaining a target exploration well success rate, where the target exploration well success rate is the exploration well success rate of the exploration project in the planned year; Among the statistical relationship curves between the number of exploration wells and the newly added reserves under the arbitrary success rate condition, the statistical relationship curve between the number of exploration wells and the newly added reserves under the target exploration well success rate is selected; The number of exploratory wells in the planned year is predicted based on the statistical relationship curve between the number of exploratory wells and the newly added reserves under the target exploratory well success rate.
2. The method according to claim 1, characterized in that The relationship curve between the number of annual completed exploratory wells and the new reserves established based on the annual new reserves and the number of annual completed exploratory wells includes: By performing data fitting on the annual newly added reserves and the annual number of completed exploratory wells, a relationship curve between the annual number of completed exploratory wells and the newly added reserves is obtained.
3. The method according to claim 1, characterized in that: The relationship curve between the annual number of successful exploration wells and the newly added reserves established according to the annual newly added reserves and the annual number of successful exploration wells includes: By performing data fitting on the annual newly added reserves and the annual number of successful exploration wells, a relationship curve between the annual number of successful exploration wells and the newly added reserves is obtained.
4. The method according to claim 1, characterized in that: The method of obtaining a statistical relationship curve between the number of exploration wells and the newly added reserves under any success rate condition based on the relationship curve between the number of exploration wells completed in the year and the newly added reserves and the relationship curve between the number of successful exploration wells in the year and the newly added reserves includes: Taking the relationship curve between the number of exploratory wells completed in the year and the newly added reserves and the relationship curve between the number of successful exploratory wells in the year and the newly added reserves as constraints, the statistical relationship curve between the number of exploratory wells and the newly added reserves under any success rate condition is obtained through linear interpolation.
5. The method according to claim 1, characterized in that The obtaining of the target exploration well success rate includes: Conduct geological risk assessment for the trap targets to be drilled in the planned year of the exploration project to obtain the success rate of exploration wells in the planned year of the exploration project.
6. A device for predicting the number of wells in an annual exploration plan, characterized in that: include: Basic parameter statistics module, which counts the basic parameters of the exploration project in the historical time period, including annual new reserves, annual completed exploration wells and annual successful exploration wells; A module for establishing a relationship curve between the number of exploration wells completed annually and the newly added reserves, which is used to establish a relationship curve between the number of exploration wells completed annually and the newly added reserves based on the newly added reserves and the number of exploration wells completed annually. The relationship curve between the number of exploration wells completed annually and the newly added reserves is used to characterize the statistical relationship between the number of exploration wells and the newly added reserves under the actual success rate condition; A module for establishing a relationship curve between the number of successful exploration wells per year and the newly added reserves, which is used to establish a relationship curve between the number of successful exploration wells per year and the newly added reserves according to the newly added reserves and the number of successful exploration wells per year. The relationship curve between the number of successful exploration wells per year and the newly added reserves is used to characterize the statistical relationship between the number of exploration wells and the newly added reserves under the condition of 100% success rate; A module for obtaining a statistical relationship curve between the number of exploratory wells and newly added reserves under any success rate condition, which is used to obtain a statistical relationship curve between the number of exploratory wells and newly added reserves under any success rate condition based on the relationship curve between the number of exploratory wells completed in the year and the relationship curve between the number of successful exploratory wells in the year and the newly added reserves; A target exploration well success rate acquisition module is used to acquire a target exploration well success rate, where the target exploration well success rate is the exploration well success rate of the exploration project in the planned year; A module for selecting a statistical relationship curve between the number of exploration wells and the newly added reserves under the target exploration well success rate, for selecting the statistical relationship curve between the number of exploration wells and the newly added reserves under the target exploration well success rate from among the statistical relationship curves between the number of exploration wells and the newly added reserves under the arbitrary success rate condition; The exploration well number prediction module is used to predict the number of exploration wells in the planned year based on the statistical relationship curve between the number of exploration wells and the newly added reserves under the target exploration well success rate.
7. An electronic device, characterized in that: include: processor; Memory; And a computer program, wherein the computer program is stored in the memory, and the computer program includes instructions, and when the instructions are executed by the processor, the electronic device executes the method according to any one of claims 1 to 5.
8. A computer-readable storage medium, characterized in that: The computer-readable storage medium includes a stored program, wherein when the program is executed, the device where the computer-readable storage medium is located is controlled to execute the method according to any one of claims 1 to 5.