Robot intelligent scheduling method and system based on inspection plan
Through dynamic scheduling and real-time path planning, the problems of unreasonable path planning and unbalanced task allocation during robot inspections are solved, and the efficiency, safety and resource balance of robot inspections are achieved, and the inspection efficiency and safety are improved.
Patent Information
- Application Number
- CN202410987214.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-23
- Publication Date
- 2024-11-12
AI Technical Summary
The existing robot inspection and scheduling methods lack flexibility and intelligence, resulting in unreasonable path planning and unbalanced task allocation, affecting inspection efficiency and safety, and increasing maintenance costs.
Using the intelligent robot scheduling method based on inspection plan, the scheduling platform dynamically allocates tasks based on environmental information, robot performance and task parameters, plans the optimal path in real time, reassigns tasks and paths, monitors power and safety conditions, and ensures task continuity and Resource balance.
It achieves matching tasks and robot capabilities, responds quickly to path abnormalities, avoids resource waste and safety hazards, and ensures the smooth completion and safety of inspection tasks.
Smart Images

Figure CN118940924A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of robot technology, and in particular to a robot intelligent scheduling method and system based on inspection plan. Background Art
[0002] In the 21st century, with the rapid development of science and technology, automation and intelligence have become important forces to promote social progress. In many industries, especially in key areas such as electricity, petroleum, and chemicals, the emergence of robot inspection technology marks that inspection operations have entered a new era. Robot inspections have quickly become a powerful alternative to traditional manual inspections with their high efficiency, low cost, and low risk. They can perform tasks in harsh or dangerous environments, avoiding the safety hazards faced by humans, while providing more accurate data collection and analysis capabilities.
[0003] However, despite the significant benefits brought by robotic inspection technology, it still faces a series of challenges in practical application, especially in scheduling methods. Traditional robotic inspection scheduling methods often rely on preset paths and schedules, lacking sufficient flexibility and intelligence. This leads to the following two main problems:
[0004] Unreasonable path planning: The preset inspection path may not be able to adapt to dynamic changes in the environment, such as sudden obstacles or changes in equipment status, thus affecting the efficiency and coverage of the inspection.
[0005] Unbalanced task allocation: The lack of an intelligent task allocation mechanism can cause some robots to be overloaded while other robots are idle, resulting in uneven utilization of resources and reducing overall inspection efficiency.
[0006] The existence of these problems not only limits the potential of robotic inspection technology, but may also have a negative impact on inspection results, increasing safety risks and maintenance costs.
[0007] Therefore, it is urgent to develop an intelligent scheduling method that can overcome the above limitations. Summary of the invention
[0008] 1. Technical issues to be resolved
[0009] In view of the above-mentioned shortcomings and deficiencies of the prior art, the present invention provides a robot intelligent scheduling method and system based on inspection plan.
[0010] (II) Technical solution
[0011] In order to achieve the above object, the main technical solutions adopted by the present invention include:
[0012] In a first aspect, an embodiment of the present invention provides a robot intelligent scheduling method based on an inspection plan, comprising:
[0013] S10, the scheduling platform assigns inspection tasks to be executed to the inspection robots currently in the working time period according to the task allocation strategy;
[0014] S20, the scheduling platform traverses each inspection task, and obtains the inspection path information with the shortest inspection time according to the location information of all inspection points in the inspection task, and the scheduling platform sends the inspection path information to the inspection robot to perform the inspection task, so that the inspection robot performs the inspection task;
[0015] S30. If the scheduling platform determines that at least one inspection robot performing an inspection task is in an abnormal path state, new inspection path information is regenerated and sent to the inspection robot based on the abnormal path state and the unfinished inspection tasks of the inspection robot, so that the inspection robot can continue to perform the inspection tasks, or other inspection robots are scheduled to continue to perform the unfinished inspection tasks of the inspection robot.
[0016] Optionally, the S10 includes:
[0017] S11. The dispatching platform regularly obtains the environmental information collected by all inspection robots and the constructed environmental maps;
[0018] S12, the scheduling platform obtains parameter information of the inspection tasks in the inspection plan and performance parameters of each inspection robot;
[0019] The performance parameters include endurance, sensor type and accuracy, processing capability level, and environmental adaptability;
[0020] S13. Based on the environmental information, environmental map, parameter information of the inspection task and performance parameters of the inspection robot, the scheduling platform allocates the inspection task to be executed to the inspection robot currently in the working time period according to the task allocation strategy.
[0021] Optionally, the S13 includes:
[0022] S131, based on the environmental information, environmental map, parameter information of the inspection task and performance parameters of the inspection robot, preliminarily assigning the inspection task to be executed to the inspection robot matching the conditions;
[0023] S132, traversing the number of inspection tasks assigned to each inspection robot, and determining whether the number of inspection tasks of each inspection robot exceeds a predetermined threshold;
[0024] S133. If the number of inspection tasks of any inspection robot exceeds a predetermined threshold, the inspection tasks exceeding the predetermined threshold will be reallocated to the inspection robots whose number of inspection tasks is lower than the predetermined threshold, until the number of inspection tasks of all inspection robots is lower than or equal to the predetermined threshold.
[0025] Optionally, the S20 includes:
[0026] S21, the dispatching platform extracts all inspection point information corresponding to the inspection task of each inspection robot from the environmental map;
[0027] The inspection point information includes the location coordinates of the inspection point;
[0028] S22, according to the inspection point information, using a path planning algorithm to arrange all optional inspection paths;
[0029] Each optional inspection route covers all inspection points included in the corresponding inspection task;
[0030] S23, obtaining the length of each optional inspection path, the driving speed of the inspection robot, and the time for performing the inspection task at the inspection point, and calculating the inspection time of each optional inspection path;
[0031] S24. Compare the inspection time of each optional inspection path, select the inspection path with the shortest inspection time and send it to the inspection robot to perform the inspection task, so that the inspection robot performs the inspection task.
[0032] Optionally, the S30 includes:
[0033] S31, the dispatching platform receives in real time the inspection data fed back by at least one inspection robot;
[0034] S32, determining whether the inspection robot is in a path abnormality state according to the inspection data;
[0035] The path abnormal state includes the presence of obstacles in the inspection path;
[0036] S33. If the scheduling platform determines that at least one inspection robot performing an inspection task is in an abnormal path state, then based on the abnormal path state and the unfinished inspection tasks of the inspection robot, new inspection path information is regenerated and sent to the inspection robot so that the inspection robot can continue to perform the inspection task, or other inspection robots are scheduled to continue to perform the unfinished inspection tasks of the inspection robot.
[0037] Optionally, the S33 includes:
[0038] S331. If the dispatching platform determines that at least one inspection robot performing the inspection task is in a path abnormality state, determine whether the inspection robot can bypass the obstacle based on the information of the path abnormality state;
[0039] S332: If the inspection robot can bypass the obstacle, obtain the current position of the inspection robot and the information of the remaining inspection points, recalculate the shortest path from the current position of the inspection robot to the remaining inspection points, and control the inspection robot to continue to perform the remaining inspection tasks according to the shortest path;
[0040] S333. If the inspection robot cannot bypass the obstacle, obtain the current position and remaining inspection tasks of the inspection robot, and obtain the inspection progress of other inspection robots. Then calculate the distance between all inspection robots that have completed their inspection tasks and the inspection point corresponding to the first inspection task in the remaining inspection tasks. Schedule the inspection robot with the shortest distance to the inspection point corresponding to the first inspection task in the remaining inspection tasks, and continue to execute the remaining inspection tasks.
[0041] Optionally, before S10, the method further includes:
[0042] S00. The dispatching platform obtains the power level of the inspection robot. If the power level of the inspection robot is lower than a preset threshold, a low-power warning is issued and the inspection robot is controlled to go to a charging station to charge or replace the battery.
[0043] Optionally, the method further comprises:
[0044] S40: After any inspection robot completes the inspection task, the dispatching platform obtains the battery power information of the inspection robot. If the battery power is lower than a predetermined threshold, the inspection robot is dispatched to the charging station for charging or battery replacement.
[0045] Optionally, the method further comprises:
[0046] S50, the dispatching platform continuously monitors the safety status of the inspection robot and the environment, and when a danger is identified, triggers an alarm and controls the inspection robot to take corresponding preset safety measures;
[0047] Hazards include ambient temperature exceeding a preset threshold, concentration of a specified gas in the air exceeding a preset threshold, and the presence of flames.
[0048] In a second aspect, an embodiment of the present invention provides a robot intelligent scheduling system based on an inspection plan, the system is used to execute the robot intelligent scheduling method based on the inspection plan described in the first aspect, including:
[0049] A task allocation module is used to allocate inspection tasks to be executed to the inspection robots currently in the working time period according to the task allocation strategy;
[0050] The inspection path initial planning module is used to traverse each inspection task, obtain the inspection path information with the shortest inspection time according to the location information of all inspection points in the inspection task, and send the inspection path information to the inspection robot to perform the inspection task, so that the inspection robot performs the inspection task;
[0051] The path abnormality scheduling module is used to regenerate new inspection path information and send it to the inspection robot if it is determined that at least one inspection robot performing an inspection task is in a path abnormality state. This module enables the inspection robot to continue to perform the inspection task, or schedules other inspection robots to continue to perform the inspection task that the inspection robot has not completed.
[0052] (III) Beneficial effects
[0053] The present invention provides a robot intelligent scheduling method and system based on inspection plan. The scheduling platform dynamically adjusts task allocation according to the performance parameters of the inspection robot (such as endurance, sensor type and accuracy, processing capability level, environmental adaptability) and current environmental information to ensure that the task matches the robot capability and avoid waste of resources.
[0054] The path planning algorithm is used to calculate the optimal inspection path in combination with the inspection point location information. Even if obstacles or abnormal situations are encountered during the inspection process, the path can be quickly replanned to ensure the continuity and integrity of the inspection task.
[0055] When the robot encounters an abnormal path state (such as an obstacle), the dispatching platform can respond immediately, determine whether the obstacle can be bypassed, and re-plan the path; if the obstacle cannot be bypassed or the robot fails, other robots will be dispatched to take over the unfinished task to ensure the smooth completion of the inspection task;
[0056] During the task allocation and inspection process, the dispatching platform monitors the robot's power in real time. When the power is lower than the preset threshold, it automatically guides the robot to the charging station to charge or replace the battery, avoiding inspection interruptions due to insufficient power.
[0057] Continuously monitor the safety status of the robot and the environment. Once a danger is detected (such as excessive temperature, excessive concentration of harmful gases, signs of fire), the alarm will be triggered immediately and the robot will be directed to take safety measures to ensure the safety of personnel and equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0058] Figure 1 A schematic diagram of a flow chart of a robot intelligent scheduling method based on an inspection plan according to Embodiment 1 of the present invention;
[0059] Figure 2This is a schematic diagram of the structure of a robot intelligent scheduling system based on inspection plan according to Embodiment 2 of the present invention. DETAILED DESCRIPTION
[0060] In order to better understand the technical solution, exemplary embodiments of the present invention will be described in more detail below with reference to the accompanying drawings. Although exemplary embodiments of the present invention are shown in the accompanying drawings, it should be understood that the present invention can be implemented in various forms and should not be limited by the embodiments described herein. On the contrary, these embodiments are provided to enable a clearer and more thorough understanding of the present invention and to fully convey the scope of the present invention to those skilled in the art.
[0061] Embodiment 1
[0062] like Figure 1 As shown, this embodiment provides a robot intelligent scheduling method based on an inspection plan, which may include:
[0063] S10. The scheduling platform allocates inspection tasks to be executed to the inspection robots currently in the working time period according to the task allocation strategy.
[0064] Specifically, the scheduling platform regularly obtains the environmental information collected by all patrol robots and the constructed environmental maps; the scheduling platform obtains the parameter information of the inspection tasks in the inspection plan and the performance parameters of each patrol robot; based on the environmental information, environmental map, parameter information of the inspection tasks and performance parameters of the patrol robots, the inspection tasks to be executed are preliminarily assigned to the patrol robots that match the conditions; the number of inspection tasks assigned to each patrol robot is traversed to determine whether the number of inspection tasks of each patrol robot exceeds a predetermined threshold; if the number of inspection tasks of any patrol robot exceeds the predetermined threshold, the inspection tasks that exceed the predetermined threshold are reallocated to the patrol robots whose number of inspection tasks is lower than the predetermined threshold, until the number of inspection tasks of all patrol robots is lower than or equal to the predetermined threshold.
[0065] Optionally, the administrator can also directly assign inspection tasks to a certain inspection robot through the scheduling platform.
[0066] The performance parameters include endurance, sensor type and accuracy, processing capability level, and environmental adaptability.
[0067] For example, suppose there are three inspection robots R1, R2, and R3, and an inspection task list T1 to Tn containing several inspection points. Each task in the inspection task list has a specific priority, required time, and resource requirements. At the same time, each robot also has its own performance parameters, such as endurance, speed, load capacity, and sensor configuration.
[0068] The scheduling platform regularly collects environmental information (such as obstacle locations, terrain features, temperature and humidity, etc.) and environmental maps from R1, R2 and R3 to ensure that the maps reflect the latest environmental conditions. The scheduling platform reads the parameter information of the inspection task from the inspection plan, including but not limited to the type of task, priority, required time, inspection point location, etc. The scheduling platform reads the performance parameters of each inspection robot, including endurance, sensor type and accuracy, processing power level, and environmental adaptability. Based on the environmental information, environmental map, inspection task parameter information and inspection robot performance parameters, the scheduling platform first preliminarily assigns the inspection task to the inspection robot with matching conditions. For example, R1 may be given priority to be assigned to the inspection task T1 that requires high-precision detection because of its high-precision sensor. R1 may be preliminarily assigned to T1 and T2; R2 may be assigned to T3; R3 may be assigned to T4 and T5.
[0069] After the initial allocation, the scheduling platform checks the number of tasks for each inspection robot to ensure that it does not exceed the predetermined threshold. If it is found that the number of tasks for R1 exceeds the threshold, for example, R1 was originally assigned 5 tasks, but the threshold is set to 4, then one of the tasks will be reallocated to a robot with fewer tasks. For example, the scheduling platform will choose to reallocate T2 to R2 or R3, whose number of tasks is below the threshold.
[0070] S20. The scheduling platform traverses each inspection task, and obtains the inspection path information with the shortest inspection time based on the location information of all inspection points in the inspection task. The scheduling platform sends the inspection path information to the inspection robot to perform the inspection task, so that the inspection robot performs the inspection task.
[0071] Specifically, the scheduling platform extracts all inspection point information corresponding to the inspection task of each inspection robot from the environmental map; the inspection point information includes the location coordinates of the inspection point;
[0072] According to the inspection point information, a path planning algorithm is used to arrange all optional inspection paths; each optional inspection path covers all inspection points included in the corresponding inspection task;
[0073] For example, a task includes five inspection points (A, B, C, D, E), which are ranked according to their importance and urgency. The scheduling platform extracts the detailed location coordinate information of these five inspection points from the environmental map, including A (10, 20), B (30, 40), C (50, 60), D (70, 80), E (90, 100). Next, the scheduling platform uses a path planning algorithm (such as the A* algorithm) to determine the shortest path covering all inspection points. In this process, multiple possible path options are generated, such as ABCDE or ACBDE.
[0074] Then obtain the length of each optional inspection path, the driving speed of the inspection robot, and the time it takes to perform the inspection task at the inspection point, and calculate the inspection time of each optional inspection path;
[0075] For example, for each optional inspection path, the scheduling platform calculates the total length of the inspection path, assuming that the robot travels at a speed of 1m / s and stays at each inspection point for 1 minute. For example, the total distance of path ABCDE is 200 meters, plus the stay time, the entire inspection time is 200 seconds + 5 minutes = 5 minutes and 20 seconds.
[0076] Finally, the inspection time of each optional inspection path is compared, and the inspection path with the shortest inspection time is selected and sent to the inspection robot to perform the inspection task, so that the inspection robot performs the inspection task. In the specific implementation, the scheduling platform sends the selected inspection path information, together with the necessary navigation instructions, to the inspection robot to perform the inspection task, including the starting point, end point, inspection points along the way, and the travel direction and estimated arrival time between each point.
[0077] For example, after comparing all possible paths, assuming that path ACBDE is the shortest and the total inspection time is 5 minutes, the dispatching platform sends the optimal path information (including starting point A, end point E, and intermediate points C, B, and D) and navigation instructions to the inspection robot to be executed. After receiving the instructions, the inspection robot begins to execute the inspection task according to the planned path, starting from starting point A, passing through C, B, D in sequence, and finally reaching end point E, while performing corresponding inspection work at each point.
[0078] S30. If the scheduling platform determines that at least one inspection robot performing an inspection task is in an abnormal path state, new inspection path information is regenerated and sent to the inspection robot based on the abnormal path state and the unfinished inspection tasks of the inspection robot, so that the inspection robot can continue to perform the inspection tasks, or other inspection robots are scheduled to continue to perform the unfinished inspection tasks of the inspection robot.
[0079] Specifically, the scheduling platform receives inspection data fed back by at least one inspection robot in real time; determines whether the inspection robot is in a path abnormality state according to the inspection data; the path abnormality state includes the presence of obstacles in the inspection path;
[0080] If the dispatching platform determines that at least one inspection robot performing the inspection task is in a path abnormality state, it is determined whether the inspection robot can bypass the obstacle based on the information of the path abnormality state;
[0081] If the inspection robot can bypass the obstacle, the current position of the inspection robot and the information of the remaining inspection points are obtained, the shortest path from the current position of the inspection robot to the remaining inspection points is recalculated, and the inspection robot is controlled to continue to perform the remaining inspection tasks according to the shortest path;
[0082] If the inspection robot cannot bypass the obstacle, the current position and remaining inspection tasks of the inspection robot are obtained, and the inspection progress of other inspection robots is obtained. Then, the distance between all inspection robots that have completed their inspection tasks and the inspection point corresponding to the first inspection task in the remaining inspection tasks is calculated, and the inspection robot with the shortest distance is dispatched to the inspection point corresponding to the first inspection task in the remaining inspection tasks to continue executing the remaining inspection tasks.
[0083] For example, suppose the inspection robot R1 is executing the inspection points P1-P2-P3-P4-P5 in its task list as planned. R1 encounters an obstacle on the way to P3. R1's sensor detects the obstacle and pauses moving, while feeding back the obstacle information and current position to the scheduling platform.
[0084] If the inspection robot can bypass the obstacle, the scheduling platform will recalculate the shortest path for the inspection robot R1 to reach the remaining inspection points P3, P4, and P5, such as P5-P3-P4, and send the shortest path to the robot R1, so that it can continue to perform the remaining inspection tasks according to the new inspection path.
[0085] If the inspection robot cannot bypass the obstacle, it analyzes the current status and position of all inspection robots, identifies the robot R2 that has completed the task and is closest to the inspection point P3, and sends a command to R2, requiring it to go to P3 and take over the unfinished task of R1.
[0086] For the inspection robot R1, if R1 is damaged when encountering an obstacle, such as a damaged sensor or damaged moving parts, and cannot continue the mission or return to the base safely, in this case, the dispatching platform will instruct R1 to stop moving to avoid further damage, and issue an alarm to instruct staff to intervene or dispatch a maintenance team for on-site repairs.
[0087] In this embodiment, before S10, the dispatching platform needs to obtain the power level of the robot. If the power level of the robot is lower than a predetermined threshold, a low-power warning is issued and the robot is controlled to go to a charging station to charge or replace the battery.
[0088] Since different inspection robots may have different communication protocols, control interfaces or data formats, in order for the dispatching platform to interact with various robots, a specific interface adapter must be provided for each type of inspection robot. This adapter acts as a translator to ensure that the dispatching platform's commands can be correctly understood by the inspection robot, and the data fed back by the inspection robot can also be interpreted by the dispatching platform.
[0089] After any inspection robot completes its inspection task, the dispatching platform obtains the battery power information of the inspection robot. If the battery power is lower than a predetermined threshold, the inspection robot is dispatched to a charging station for charging or battery replacement.
[0090] The dispatch platform continuously monitors safety indicators of the environment where the inspection robot is located, including ambient temperature, concentration of harmful gases in the air (such as carbon monoxide, hydrogen sulfide, etc.), and whether there are signs of fire or smoke. Real-time data is collected using sensors installed on the robot and monitoring equipment in the environment to ensure comprehensive coverage and immediate response.
[0091] When any safety indicator is detected to exceed the preset threshold, the system will immediately trigger an alarm, notify the control center and nearby personnel, and display a warning message on the robot display.
[0092] The alarm system includes an audible alarm, visual warning lights and wireless alarm signals to ensure timely detection in various environments.
[0093] According to the preset safety strategy, the dispatching platform will automatically control the inspection robot to take corresponding measures, such as withdrawing to a safe area, shutting down equipment that may cause accidents, and starting the emergency ventilation system.
[0094] Embodiment 2
[0095] like Figure 2 As shown, this embodiment provides a robot intelligent scheduling system based on an inspection plan, which is used to execute the robot intelligent scheduling method based on an inspection plan described in Embodiment 1, and may include:
[0096] A task allocation module is used to allocate inspection tasks to be executed to the inspection robots currently in the working time period according to the task allocation strategy;
[0097] The inspection path initial planning module is used to traverse each inspection task, obtain the inspection path information with the shortest inspection time according to the location information of all inspection points in the inspection task, and send the inspection path information to the inspection robot to perform the inspection task, so that the inspection robot performs the inspection task;
[0098] The path abnormality scheduling module is used to regenerate new inspection path information and send it to the inspection robot if it is determined that at least one inspection robot performing an inspection task is in a path abnormality state. This module enables the inspection robot to continue to perform the inspection task, or schedules other inspection robots to continue to perform the inspection task that the inspection robot has not completed.
[0099] In the description of the present invention, it should be understood that the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0100] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium; it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0101] In the present invention, unless otherwise clearly specified and limited, when a first feature is “on” or “below” a second feature, it may be that the first and second features are in direct contact, or that the first and second features are in indirect contact through an intermediate medium. Moreover, when a first feature is “above”, “above” or “above” a second feature, it may be that the first feature is directly above or obliquely above the second feature, or it may simply mean that the first feature is higher in level than the second feature. When a first feature is “below”, “below” or “below” a second feature, it may be that the first feature is directly below or obliquely below the second feature, or it may simply mean that the first feature is lower in level than the second feature.
[0102] In the description of this specification, the description of the terms "one embodiment", "some embodiments", "embodiment", "example", "specific example" or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, unless they are contradictory.
[0103] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may alter, modify, replace and modify the above embodiments within the scope of the present invention.
Claims
1. A robot intelligent scheduling method based on inspection plan, characterized in that: include: S10, the scheduling platform assigns inspection tasks to be executed to the inspection robots currently in the working time period according to the task allocation strategy; S20, the scheduling platform traverses each inspection task, and obtains the inspection path information with the shortest inspection time according to the location information of all inspection points in the inspection task, and the scheduling platform sends the inspection path information to the inspection robot to perform the inspection task, so that the inspection robot performs the inspection task; S30. If the scheduling platform determines that at least one inspection robot performing an inspection task is in an abnormal path state, new inspection path information is regenerated and sent to the inspection robot based on the abnormal path state and the unfinished inspection tasks of the inspection robot, so that the inspection robot can continue to perform the inspection tasks, or other inspection robots are scheduled to continue to perform the unfinished inspection tasks of the inspection robot.
2. The robot intelligent scheduling method based on inspection plan according to claim 1 is characterized in that: The S10 includes: S11. The dispatching platform regularly obtains the environmental information collected by all inspection robots and the constructed environmental maps; S12, the scheduling platform obtains parameter information of the inspection tasks in the inspection plan and performance parameters of each inspection robot; The performance parameters include endurance, sensor type and accuracy, processing capability level, and environmental adaptability; S13. Based on the environmental information, environmental map, parameter information of the inspection task and performance parameters of the inspection robot, the scheduling platform allocates the inspection task to be executed to the inspection robot currently in the working time period according to the task allocation strategy.
3. The robot intelligent scheduling method based on inspection plan according to claim 2 is characterized in that: The S13 includes: S131, based on the environmental information, environmental map, parameter information of the inspection task and performance parameters of the inspection robot, preliminarily assigning the inspection task to be executed to the inspection robot matching the conditions; S132, traversing the number of inspection tasks assigned to each inspection robot, and determining whether the number of inspection tasks of each inspection robot exceeds a predetermined threshold; S133. If the number of inspection tasks of any inspection robot exceeds a predetermined threshold, the inspection tasks exceeding the predetermined threshold will be reallocated to the inspection robots whose number of inspection tasks is lower than the predetermined threshold, until the number of inspection tasks of all inspection robots is lower than or equal to the predetermined threshold.
4. The robot intelligent scheduling method based on inspection plan according to claim 2 is characterized in that: The S20 includes: S21, the dispatching platform extracts all inspection point information corresponding to the inspection task of each inspection robot from the environmental map; The inspection point information includes the location coordinates of the inspection point; S22, according to the inspection point information, using a path planning algorithm to arrange all optional inspection paths; Each optional inspection route covers all inspection points included in the corresponding inspection task; S23, obtaining the length of each optional inspection path, the driving speed of the inspection robot, and the time for performing the inspection task at the inspection point, and calculating the inspection time of each optional inspection path; S24. Compare the inspection time of each optional inspection path, select the inspection path with the shortest inspection time and send it to the inspection robot to perform the inspection task, so that the inspection robot performs the inspection task.
5. The robot intelligent scheduling method based on inspection plan according to claim 2 is characterized in that: The S30 includes: S31, the dispatching platform receives in real time the inspection data fed back by at least one inspection robot; S32, determining whether the inspection robot is in a path abnormality state according to the inspection data; The path abnormality state includes the presence of obstacles in the inspection path; S33. If the scheduling platform determines that at least one inspection robot performing an inspection task is in an abnormal path state, then based on the abnormal path state and the unfinished inspection tasks of the inspection robot, new inspection path information is regenerated and sent to the inspection robot so that the inspection robot can continue to perform the inspection task, or other inspection robots are scheduled to continue to perform the unfinished inspection tasks of the inspection robot.
6. The robot intelligent scheduling method based on inspection plan according to claim 5, characterized in that: The S33 includes: S331. If the dispatching platform determines that at least one inspection robot performing the inspection task is in a path abnormality state, determine whether the inspection robot can bypass the obstacle based on the information of the path abnormality state; S332: If the inspection robot can bypass the obstacle, obtain the current position of the inspection robot and the information of the remaining inspection points, recalculate the shortest path from the current position of the inspection robot to the remaining inspection points, and control the inspection robot to continue to perform the remaining inspection tasks according to the shortest path; S333. If the inspection robot cannot bypass the obstacle, obtain the current position and remaining inspection tasks of the inspection robot, and obtain the inspection progress of other inspection robots. Then calculate the distance between all inspection robots that have completed their inspection tasks and the inspection point corresponding to the first inspection task in the remaining inspection tasks. Schedule the inspection robot with the shortest distance to the inspection point corresponding to the first inspection task in the remaining inspection tasks, and continue to execute the remaining inspection tasks.
7. The robot intelligent scheduling method based on inspection plan according to claim 1, characterized in that: Before S10, the method further includes: S00. The dispatching platform obtains the power level of the inspection robot. If the power level of the inspection robot is lower than a predetermined threshold, a low-power warning is issued and the inspection robot is controlled to go to a charging station to charge or replace the battery.
8. The robot intelligent scheduling method based on inspection plan according to claim 1, characterized in that: The method further comprises: S40: After any inspection robot completes the inspection task, the dispatching platform obtains the battery power information of the inspection robot. If the battery power is lower than a predetermined threshold, the inspection robot is dispatched to the charging station for charging or battery replacement.
9. The robot intelligent scheduling method based on inspection plan according to claim 1, characterized in that: The method further comprises: S50, the dispatching platform continuously monitors the safety status of the inspection robot and the environment, and when a danger is identified, triggers an alarm and controls the inspection robot to take corresponding preset safety measures; Hazards include ambient temperature exceeding a preset threshold, concentration of a specified gas in the air exceeding a preset threshold, and the presence of flames.
10. A robot intelligent scheduling system based on inspection plan, characterized in that: The system is used to execute the robot intelligent scheduling method based on the inspection plan according to any one of claims 1 to 9, comprising: A task allocation module is used to allocate inspection tasks to be executed to the inspection robots currently in the working time period according to the task allocation strategy; The inspection path initial planning module is used to traverse each inspection task, obtain the inspection path information with the shortest inspection time according to the location information of all inspection points in the inspection task, and send the inspection path information to the inspection robot to perform the inspection task, so that the inspection robot performs the inspection task; The path abnormality scheduling module is used to regenerate new inspection path information and send it to the inspection robot if it is determined that at least one inspection robot performing an inspection task is in a path abnormality state. This module enables the inspection robot to continue to perform the inspection task, or schedules other inspection robots to continue to perform the inspection task that the inspection robot has not completed.
Citation Information
Cited By
Safety early warning platform for chemical industry park
CN119252009A
Cluster inspection method, device and system based on dynamic trajectory prediction
CN121232854A