Intelligent planning system and method for construction project

By using an intelligent construction project planning system, material consumption is optimized through data processing and artificial intelligence models. This solves the problems of relying on experience and insufficient data utilization in traditional construction project management, realizes scientific decision-making and rational material management, and improves construction efficiency and quality.

CN118941113AActive Publication Date: 2024-11-12HEBEI CONSTR GRP
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202410996581.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-24
Publication Date
2024-11-12
Estimated Expiration
2044-07-24

AI Technical Summary

Technical Problem

Traditional construction project management methods rely on manual experience, lack scientific basis, are difficult to effectively utilize data, have weak adaptability, and are unreasonable in material management, leading to waste and cost overruns.

Method used

An intelligent planning system is adopted, which uses modules for data reception, processing, material characteristic acquisition, consumption analysis, and personalized analysis to generate material usage control plans using a large artificial intelligence language model, thereby optimizing material consumption management.

Benefits of technology

It reduces reliance on human experience, improves the scientific nature and accuracy of decision-making, ensures the rationality and efficiency of material use, reduces waste, controls costs, and enhances project quality and efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118941113A_ABST
    Figure CN118941113A_ABST
Patent Text Reader

Abstract

The invention relates to an intelligent planning system and method for a construction project, and relates to the technical field of construction management, and the system comprises a data receiving module which is used for receiving initial data of a building construction project; the data processing module is used for preprocessing; the material statistics module is used for determining various building materials used by the building construction project; the material characteristic acquisition module is used for acquiring physical characteristic parameters and use requirements of various building materials used in the building construction project; the material consumption analysis module is used for determining the allowable consumption deviation range of various building materials; the personalized analysis module is used for generating a material use management and control scheme of the building construction project through an artificial intelligence language large model; the scheme output module is used for transmitting the material use management and control scheme of the building construction project to the user terminal, and the system has the advantages that the reasonable consumption level of various materials is analyzed and determined in a personalized mode according to the actual situation of the project, and therefore material use management is optimized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of construction management, and in particular to an intelligent planning system and method for a construction project. Background Art

[0002] Construction projects usually involve cooperation and coordination in multiple professional fields. In order to ensure the smooth progress of the project, detailed planning schemes are often formulated before construction to guide and coordinate the work at each stage. In addition, construction projects often face various risks during the construction process, including risks in quality, progress, material consumption, etc. Through the effective management of project planning information, the project management team can better identify and manage potential risks and take appropriate measures to reduce the impact of risks.

[0003] Traditional construction project management methods mainly rely on the experience and expertise of project managers to achieve project goals by preparing detailed project plans, monitoring construction progress, managing resources and controlling costs. However, these methods have the following limitations: strong subjectivity. Traditional methods rely on the experience and judgment of managers, are easily affected by personal factors, and lack scientific basis; insufficient data utilization. Construction projects generate a large amount of data, including design drawings, progress reports, resource usage, etc., but traditional methods often cannot make full use of these data for decision support; 3. Weak adaptability: In the face of complex and changing construction environments, traditional methods are difficult to respond and adjust quickly, which can easily lead to construction delays and cost overruns. In particular, in construction projects, the use of various building materials directly affects the quality and cost control of the project. Traditional material management methods mainly rely on manual experience, lack scientific analysis and personalized guidance, resulting in problems such as material waste and increased rework. At the same time, due to the complex construction site environment, there is a certain normal deviation range for material consumption. If it is controlled according to a fixed theoretical usage, it will be difficult to ensure reasonable use.

[0004] Therefore, it is necessary to provide an intelligent planning system and method for construction projects, which can be used to analyze and determine the reasonable consumption level of various materials according to the actual situation of the project, so as to optimize the material use management. Summary of the invention

[0005] The present invention provides an intelligent planning system for construction projects, comprising: a data receiving module for receiving initial data of a construction project; a data processing module for preprocessing the initial data of the construction project; a material statistics module for determining various types of building materials used in the construction project based on the preprocessed initial data of the construction project; a material feature acquisition module for acquiring physical property parameters and use requirements of various types of building materials used in the construction project; a material consumption analysis module for determining the allowable consumption deviation range of various types of building materials used in the construction project based on the physical property parameters and use requirements of various types of building materials used in the construction project; a personalized analysis module for generating a material use control plan for the construction project based on the allowable consumption deviation range and use requirements of various types of building materials used in the construction project through a large artificial intelligence language model; and a plan output module for transmitting the material use control plan for the construction project to a user terminal.

[0006] Furthermore, the data processing module pre-processes the initial data of the construction project, including: cleaning the initial data of the construction project; and formatting the initial data after data cleaning.

[0007] Furthermore, the material feature acquisition module is also used to: obtain physical property parameters of each sample building material; obtain usage requirements of each sample building material in different sample construction scenarios, wherein the sample construction scenarios include sample construction environments and sample construction processes; establish a knowledge graph based on the physical property parameters of each sample building material and usage requirements in different construction scenarios; the material feature acquisition module obtains the physical property parameters and usage requirements of various building materials used in the construction project, including: based on the knowledge graph, obtaining the physical property parameters and usage requirements of various building materials used in the construction project.

[0008] Furthermore, the material feature acquisition module obtains the physical property parameters and usage requirements of various types of building materials used in the construction project based on the knowledge graph, including: for each type of building material used in the construction project, based on the basic information of the building materials and the knowledge graph, determining the target sample building materials, and obtaining the physical property parameters of the target sample building materials; for each type of building material used in the construction project, based on the construction scenario of the building materials and the knowledge graph, determining the target construction scenario, and based on the target construction scenario, obtaining the usage requirements of the building materials.

[0009] Furthermore, the material consumption analysis module determines the allowable consumption deviation range of various building materials used in the construction project based on the physical property parameters and usage requirements of various building materials used in the construction project, including: establishing a consumption prediction model; determining the allowable consumption deviation range of various building materials used in the construction project based on the physical property parameters and usage requirements of various building materials used in the construction project through the consumption prediction model.

[0010] Furthermore, the material consumption analysis module determines the allowable consumption deviation range of various building materials used in the construction project through a consumption prediction model based on the physical property parameters and usage requirements of various building materials used in the construction project, including: determining the initial allowable consumption deviation range of various building materials used in the construction project through a consumption prediction model based on the physical property parameters and usage requirements of various building materials used in the construction project; obtaining consumption information of various building materials used in multiple historical construction projects; for each type of building material used in the construction project, based on the consumption information of various building materials used in the multiple historical construction projects, calculating the consumption deviation fluctuation parameter of the building material; when the consumption deviation fluctuation parameter of the building material is greater than or equal to a preset consumption deviation similarity parameter threshold, performing a single correction on the initial allowable consumption deviation range of the building material based on the construction environment and construction process of the construction project through a parameter correction model to determine the allowable consumption deviation range of the building material; when the consumption deviation fluctuation parameter of the building material is less than the preset consumption deviation similarity parameter threshold, using the initial allowable consumption deviation range of the building material as the allowable consumption deviation range of the building material.

[0011] Furthermore, the material consumption analysis module is also used to: determine the consumption deviation association parameters between any two building materials; the material consumption analysis module uses a parameter correction model to make a single correction to the initial allowable consumption deviation range of the building materials based on the construction environment and construction process of the construction project, and determines the allowable consumption deviation range of the building materials, including: using a parameter correction model to make a single correction to the initial allowable consumption deviation range of the building materials based on the construction environment and construction process of the construction project, and determining the intermediate allowable consumption deviation range of each type of building material used in the construction project; based on the consumption deviation association parameters between any two building materials, jointly correct the intermediate allowable consumption deviation range of each type of building material used in the construction project to determine the allowable consumption deviation range of each type of building material used in the construction project.

[0012] Furthermore, the personalized analysis module generates a material usage control plan for the construction project through an artificial intelligence language big model based on the allowable consumption deviation range and usage requirements of various types of construction materials used in the construction project, including: determining multiple construction nodes based on the pre-processed initial data of the construction project; determining the usage control indicators and usage recommendations of the construction materials for the multiple construction nodes based on the allowable consumption deviation range and usage requirements of various types of construction materials used in the construction project through an artificial intelligence language big model.

[0013] Furthermore, the system also includes an accounting revenue and risk assessment module for automatically generating pre-revenue reports, contract risk analysis, contract negotiation recommendations, contract review reports, break-even point analysis, and risk management strategies.

[0014] The present invention provides an intelligent planning method for a construction project, comprising: receiving initial data of a construction project; preprocessing the initial data of the construction project; determining various types of building materials used in the construction project based on the preprocessed initial data of the construction project; obtaining physical property parameters and usage requirements of various types of building materials used in the construction project; determining an allowable consumption deviation range of various types of building materials used in the construction project based on the physical property parameters and usage requirements of various types of building materials used in the construction project; generating a material use control plan for the construction project based on the allowable consumption deviation range and usage requirements of various types of building materials used in the construction project through a large artificial intelligence language model; and transmitting the material use control plan for the construction project to a user terminal.

[0015] Compared with the prior art, the intelligent planning system and method for construction projects provided in this specification have at least the following beneficial effects: Through data-driven methods, the reliance on the personal experience and judgment of project managers is reduced, making decision-making more objective and scientific. Using big data and artificial intelligence models, the demand and consumption trends of materials can be predicted more accurately, reducing errors caused by human factors. Based on the physical property parameters and usage requirements of the materials, the allowable consumption deviation range is tailored for each material to ensure the rationality and efficiency of material use. It can quickly respond to changes in the construction environment and make real-time adjustments to the material use plan to avoid over-purchasing or material shortages, thereby reducing waste. In the face of complex and changing construction environments, it can quickly analyze and process data and generate corresponding material use control plans to ensure the smooth progress of the project. Through precise material use control, rework and quality problems caused by material problems can be reduced, and the overall quality of the project can be improved. Optimize the material use plan, reduce unnecessary waste and additional costs, and effectively control the total cost of the project. Through automated data processing and solution generation, reduce manual intervention and improve work efficiency. Accumulate project experience and data into a knowledge base to provide reference and reference for future projects, and promote the accumulation and inheritance of project management knowledge. It can automatically assist in the execution of project planning, management and business processes, improve efficiency, reduce risks, and ensure contract compliance. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] This specification will be further described in the form of exemplary embodiments, which will be described in detail by the accompanying drawings. These embodiments are not restrictive, and in these embodiments, the same number represents the same structure, wherein: Figure 1 It is a module diagram of an intelligent planning system for a construction project shown in one embodiment of the present application; Figure 2 is a schematic diagram of a knowledge graph shown in an embodiment of the present application; Figure 3 It is a schematic diagram of jointly correcting the intermediate allowable consumption deviation range of each type of building material used in a construction project in one embodiment of the present application; Figure 4 It is a flow chart of an intelligent planning method for a construction project shown in one embodiment of the present application. DETAILED DESCRIPTION

[0017] In order to more clearly illustrate the technical solutions of the embodiments of this specification, the following briefly introduces the drawings required for describing the embodiments.

[0018] Figure 1 is a module diagram of an intelligent planning system for a construction project shown in an embodiment of the present application, such as Figure 1As shown, an intelligent planning system for a construction project may include a data receiving module, a data processing module, a material statistics module, a material feature acquisition module, a material consumption analysis module, a personalized analysis module, a solution output module, and a benefit and risk assessment module.

[0019] The data receiving module can be used to receive initial data of a building construction project.

[0020] Specifically, the initial data of the construction project may include a bill of quantities, a bill of materials, etc. of the construction project.

[0021] The initial data of a construction project may also include other materials, such as construction plans, project bidding and contract documents, etc.

[0022] The data processing module can be used to pre-process the initial data of the construction project.

[0023] In some embodiments, specifically including: Perform data cleaning on the initial data of the construction project; Format the initial data after data cleaning.

[0024] Specifically, the initial data of the construction project can be cleaned based on the following steps: Conduct a preliminary analysis of the bill of quantities and bill of materials to identify potential problems in the bill of quantities and bill of materials, such as missing values, outliers, and duplicate data. Develop targeted data cleaning rules based on the results of data analysis. For example, for missing values, decide whether to fill (such as using the mean, median, or mode) or delete; for outliers, decide whether to correct or remove. Modify column names to make them more descriptive and standardized. Delete empty rows and columns to reduce invalid data. Convert data formats, such as converting text numbers to numeric types for mathematical operations. Fill or delete missing values ​​according to cleaning rules. Check and delete duplicate records in the bill of quantities and bill of materials. Correct obvious errors in the bill of quantities and bill of materials, such as incorrect coding, inconsistent units, etc. Group or classify data to facilitate subsequent data analysis and processing.

[0025] The initial data after data cleaning can be formatted based on the following steps: Standardize project names and descriptions, automatically check the accuracy and consistency of project names and descriptions, make corrections or standardization, and unify measurement units and calculation methods: Automatically generate the table structure of bills of quantities and bills of materials according to standard format requirements, including column names, column widths, row heights, etc. Fill the pre-processed and standardized data into the table structure.

[0026] The material statistics module can be used to determine the various types of building materials used in the construction project based on the pre-processed initial data of the construction project.

[0027] Among them, various types of building materials used in construction projects may include structural materials (for example, steel bars, concrete, stone, wood, prefabricated components, etc.), decorative materials (for example, tiles, paint, wallpaper, glass, etc.), auxiliary materials (for example, cement bricks, thermal insulation materials, waterproof materials, hardware accessories, etc.), etc.

[0028] Specifically, the material statistics module can determine the various types of building materials used in the construction project based on the following steps: Create a database containing various building materials, including the name, specification, model, brand, supplier information, etc. The database should support dynamic updates so that new materials can be added or the information of existing materials can be updated at any time; Match and identify the project names, specifications and models in the bill of quantities and bill of materials, map the items in the bill of quantities and bill of materials with the entries in the material database, and determine the various types of building materials used in the construction project.

[0029] The material feature acquisition module can be used to obtain the physical property parameters and usage requirements of various building materials used in construction projects.

[0030] In some embodiments, the material feature acquisition module is further used to: Obtain the physical property parameters of each sample building material, such as density, bulk density, porosity, void ratio, water absorption, moisture content, hardness, strength, specific heat capacity, thermal conductivity, and elastic-plastic properties; Obtaining usage requirements for each sample building material in different sample construction scenarios, wherein the sample construction scenarios include sample construction environments and sample construction processes, and the usage requirements may include construction requirements for reducing loss of sample building materials in different sample construction scenarios; A knowledge graph is established based on the physical property parameters of each sample building material and its usage requirements in different construction scenarios.

[0031] The usage requirements of each sample building material in different sample construction scenarios can be determined manually or through relevant literature.

[0032] Specifically, Figure 2 is a schematic diagram of a knowledge graph shown in an embodiment of the present application, such as Figure 2As shown, sample building material 1 corresponds to use requirement 1 under sample construction scenario 1, sample building material 1 corresponds to use requirement 2 under sample construction scenario 2, and sample building material 1 corresponds to use requirement 3 under sample construction scenario 3. As an example only, in a dry environment, the use requirements of steel bars are relatively low, and the main focus is on whether their mechanical properties meet the design requirements. At this time, it is necessary to ensure that the specifications, models, strength grades, etc. of the steel bars meet the requirements of the construction drawings and relevant standards. At the same time, during the processing and installation process, operations should be strictly carried out in accordance with the specifications to ensure the quality of connections such as steel bar binding and welding. In a humid environment, steel bars are easily corroded by the combined action of moisture and oxygen in the air. Therefore, when using steel bars in such an environment, additional anti-corrosion measures need to be taken. For example, products with good anti-corrosion properties such as hot-dip galvanized steel bars or epoxy-coated steel bars can be used. In addition, during the construction process, attention should be paid to keeping the surface of the steel bars dry and clean to avoid the adhesion of moisture and impurities. In corrosive environments such as the seaside and chemical plants, the steel bars will rust faster, posing a serious threat to the durability and safety of the structure. Therefore, when using steel bars in such an environment, more stringent anti-corrosion measures need to be taken. In addition to selecting steel bars with excellent anti-corrosion performance, you can also apply anti-corrosion paint or wrap the steel bar surface with an anti-corrosion layer. At the same time, the anti-corrosion structural measures of the structure should also be considered during the design and construction process, such as setting up an anti-corrosion isolation layer and increasing the thickness of the protective layer. In a high temperature environment, the mechanical properties of steel bars will change, such as reduced strength and poor plasticity. Therefore, when using steel bars in such an environment, it is necessary to select varieties with better high temperature resistance and strictly follow the relevant standards and specifications for design and construction. At the same time, it is also necessary to consider the fire protection structural measures of the structure to improve the overall fire resistance of the structure.

[0033] In some embodiments, the material feature acquisition module can obtain the physical property parameters and usage requirements of various building materials used in the construction project based on the knowledge graph, specifically including: For each type of building material used in a construction project, based on the basic information and knowledge graph of the building materials, target sample building materials are determined, and physical property parameters of the target sample building materials are obtained, wherein the basic information of the building materials may include name, specification, model, brand, supplier information, etc., and the material matching degree between the building materials and the sample building materials can be calculated based on the basic information of the building materials and the basic information of the sample building materials through a first similarity determination model, and the sample building materials with a material matching degree greater than a preset material matching degree threshold and the largest matching degree are taken as target sample building materials, and the first similarity determination model may be a Convolutional Neural Network (CNN) model; For each type of building material used in a construction project, a target construction scene is determined based on the construction scene and knowledge graph of the building material, and the usage requirements of the building material are obtained based on the target construction scene. Specifically, the construction scene of the building material can be extracted from the preprocessed initial data of the construction project through a scene extraction model, and the scene similarity between the construction scene of the building material and each sample construction scene of the target sample building material corresponding to the building material can be determined through a second similarity determination model. The sample construction scene with a scene similarity greater than a preset scene similarity threshold and the largest scene similarity is taken as the target construction scene. The scene extraction model and the second similarity determination model can both be convolutional neural network (CNN) models.

[0034] The material consumption analysis module can be used to determine the allowable consumption deviation range of various building materials used in the construction project based on the physical property parameters and usage requirements of various building materials used in the construction project.

[0035] In some embodiments, specifically including: Establishing a consumption prediction model, wherein the consumption prediction model may be a convolutional neural network (CNN) model; Through the consumption prediction model, based on the physical property parameters and usage requirements of various building materials used in construction projects, the allowable consumption deviation range of various building materials used in construction projects is determined.

[0036] The allowable consumption deviation range of building materials may be a ratio range of the difference between the planned usage and the actual usage of building materials allowed in a construction project.

[0037] In some embodiments, the material consumption analysis module determines the allowable consumption deviation range of various building materials used in the construction project based on the physical property parameters and usage requirements of various building materials used in the construction project through the consumption prediction model, including: Through the consumption prediction model, based on the physical property parameters and usage requirements of various building materials used in the construction project, the initial allowable consumption deviation range of various building materials used in the construction project is determined; Obtain consumption information for various types of building materials used in multiple historical building construction projects; For each type of building material used in a construction project, the consumption deviation fluctuation parameter of the building material is calculated based on the consumption information of each type of building materials used in multiple historical construction projects. When the consumption deviation fluctuation parameter of the building material is greater than or equal to the preset consumption deviation similarity parameter threshold, the initial allowable consumption deviation range of the building material is corrected individually based on the construction environment and construction process of the construction project through the parameter correction model to determine the allowable consumption deviation range of the building material. When the consumption deviation fluctuation parameter of the building material is less than the preset consumption deviation similarity parameter threshold, the initial allowable consumption deviation range of the building material is used as the allowable consumption deviation range of the building material.

[0038] Specifically, the consumption deviation fluctuation parameter can be calculated based on the following formula: ; in, For the Consumption deviation fluctuation parameters of building materials, For the The consumption deviation value of the building material of the type in the nth historical building construction project, For the construction project of historical buildings For the The planned consumption of building materials of the type n in the construction project of the historic building, For the The actual consumption of building materials of this type in the nth historical building construction project.

[0039] In some embodiments, the material consumption analysis module is further configured to: Determine the consumption deviation correlation parameters between any two building materials.

[0040] Specifically, the consumption deviation correlation parameter between two building materials can be calculated based on the following formula: ; in, For the Building materials and Consumption deviation correlation parameters between class sample building materials, For the The mean deviation of consumption of building materials, For the The mean deviation of consumption of building materials, For the The consumption deviation value of this type of building material in the nth historical building construction project.

[0041] In some embodiments, the material consumption analysis module uses a parameter correction model to perform a single correction on the initial allowable consumption deviation range of the building materials based on the construction environment and construction process of the building construction project to determine the allowable consumption deviation range of the building materials, including: Based on the construction environment and construction process of the construction project, a single correction is made to the initial allowable consumption deviation range of the construction materials through the parameter correction model to determine the intermediate allowable consumption deviation range of each type of construction materials used in the construction project, wherein the parameter correction model may be a recurrent neural network (RNN) model; Based on the consumption deviation association parameters between any two building materials, the intermediate allowable consumption deviation range of each type of building material used in the construction project is jointly corrected to determine the allowable consumption deviation range of each type of building material used in the construction project.

[0042] Figure 3 FIG. 1 is a schematic diagram showing a joint correction of the intermediate allowable consumption deviation range of each type of building material used in a construction project in an embodiment of the present application, such as Figure 3 Specifically, the intermediate allowable consumption deviation range of each type of building materials used in the construction project can be jointly corrected based on the following process: S11. Based on the consumption deviation correlation parameters between any two types of building materials used in the construction project, the intermediate allowable consumption deviation range of each type of building materials used in the construction project is jointly corrected by a joint correction model to determine the allowable consumption deviation range of the current iteration of each type of building materials used in the construction project, wherein the joint correction model may be a deep neural network (DNN); S12. Calculate the cumulative difference of the current iteration based on the allowable consumption deviation range of the current iteration of each type of building material used in the construction project and the intermediate allowable consumption deviation range of each type of building material used in the construction project; S13. Determine whether the cumulative difference of the current iteration is less than the preset cumulative difference threshold. If so, use the allowable consumption deviation range of the current iteration of each type of building material used in the construction project as the allowable consumption deviation range of each type of building material used in the construction project. If not, execute S14.

[0043] S14, jointly correcting the intermediate allowable consumption deviation range of each type of building materials used in the construction project based on the consumption deviation association parameter between any two types of building materials used in the construction project through the joint correction model, and determining the current iteration allowable consumption deviation range of each type of building materials used in the construction project; S15. Based on the allowable consumption deviation range of the previous iteration of each type of building material used in the construction project and the allowable consumption deviation range of the current iteration of each type of building material used in the construction project, calculate the cumulative difference of the current iteration and execute S13.

[0044] Specifically, the cumulative difference of the current iteration can be calculated based on the following formula: ; in, is the cumulative difference of the current iteration, For construction projects The allowed consumption deviation range of the current iteration of the class building material, For construction projects The allowed consumption deviation range of the previous iteration of the building material class, The total amount of building materials used for a building construction project.

[0045] The personalized analysis module can be used to generate a material use control plan for a construction project based on the allowable consumption deviation range and usage requirements of various types of construction materials used in the construction project through an artificial intelligence language large model.

[0046] In some embodiments, the personalized analysis module generates a material use control plan for the construction project through an artificial intelligence language big model based on the allowable consumption deviation range and use requirements of various types of construction materials used in the construction project, including: Determine a plurality of construction nodes based on the preprocessed initial data of the building construction project; Through the artificial intelligence language large model, based on the allowable consumption deviation range and usage requirements of various building materials used in construction projects, the usage control indicators and usage recommendations of building materials for multiple construction nodes are determined.

[0047] Specifically, a node determination model may be used to determine a plurality of construction nodes based on preprocessed initial data of the building construction project, wherein the node determination model may be a convolutional neural network (CNN) model.

[0048] The input of the artificial intelligence language big model can be constructed based on the allowable consumption deviation range and usage requirements of various building materials used in construction projects, and the goal of the artificial intelligence language big model is set to determine the building material usage control indicators and usage suggestions for multiple construction nodes. The sorted data is input into the artificial intelligence language big model, which analyzes the data, combines historical project experience and current construction conditions, and performs intelligent reasoning and prediction. The artificial intelligence language big model outputs the building material usage control indicators and usage suggestions for multiple construction nodes. These indicators and suggestions should list in detail the types and quantities of building materials required for each construction node, the allowable consumption deviation range, and specific usage suggestions.

[0049] The plan output module can be used to transmit the material usage control plan of the construction project to the user terminal.

[0050] Specifically, the user terminal can provide a friendly human-computer interaction interface, where users can submit engineering data, view analysis results, obtain usage suggestions, etc.

[0051] The accounting revenue and risk assessment module can be used to automatically generate pre-revenue reports, contract risk analysis, contract negotiation suggestions, contract review reports, break-even point analysis and risk management strategies.

[0052] Specifically, the accounting profit and risk assessment module can automatically generate pre-profit reports, contract risk analysis, contract negotiation suggestions, contract review reports, break-even point analysis and risk management strategies based on artificial intelligence models.

[0053] An intelligent planning system for construction projects may include the following benefits: 1. Improve project management efficiency: By automatically processing project planning related data and executing project management tasks, the present invention significantly improves the efficiency of the workflow, reduces the time required for manual input and analysis, and makes project planning and execution faster.

[0054] 2. Reduce error rate: The application of artificial intelligence language large models reduces errors in human judgment and provides objective decisions based on data and advanced algorithms, thereby improving the accuracy of project management decisions.

[0055] 3. Optimize risk management: The system can automatically identify and assess potential risks, propose risk management strategies, and provide timely warnings to help project teams better prepare for and deal with uncertainties.

[0056] 4. Enhance contract negotiation and management capabilities: By automatically generating suggestions and review reports on contract terms, the system supports users in making more favorable and compliant decisions in contract negotiation and management.

[0057] 5. Improve data processing capabilities: The system's preprocessing module can effectively process large amounts of complex project data, ensure data quality and consistency, and provide a reliable basis for subsequent analysis and decision-making.

[0058] 6. Provide real-time decision support: The planning schemes and management reports generated by the system can be provided to project managers for reference in real time, providing immediate decision support, thereby improving the project's ability to respond to changes.

[0059] 7. Increase project transparency: Through automatically generated documents and reports, all aspects of the project and the decision-making process are more transparent, facilitating supervision and auditing.

[0060] 8. Improved user experience: The user interface is designed with a focus on intuitiveness and ease of use, reducing training requirements and allowing project teams to adopt new systems seamlessly.

[0061] 9. Enhance the comprehensiveness of project planning: By making comprehensive use of project data, the system can provide more comprehensive and detailed planning solutions, taking into account all aspects of project management.

[0062] The technical solution of the present invention not only improves the automation level of construction project management, but also improves the overall quality and efficiency of project execution, reduces costs and risks, and increases the possibility of project success.

[0063] Figure 4 is a flow chart of an intelligent planning method for a construction project shown in an embodiment of the present application, such as Figure 4 As shown, an intelligent planning method for a construction project may include the following steps.

[0064] Step 410, receiving initial data of a building construction project; Step 420, preprocessing the initial data of the building construction project; Step 430, determining various types of building materials used in the building construction project based on the preprocessed initial data of the building construction project; Step 440, obtaining physical property parameters and usage requirements of various building materials used in the construction project; Step 450, determining the allowable consumption deviation range of various building materials used in the construction project based on the physical property parameters and usage requirements of various building materials used in the construction project; Step 460, generating a material use control plan for the construction project based on the allowable consumption deviation range and use requirements of various types of construction materials used in the construction project through the artificial intelligence language big model; Step 470, transmitting the material usage control plan of the construction project to the user terminal.

[0065] An intelligent planning method for a construction project can be executed by an intelligent planning system for a construction project. For more descriptions of the intelligent planning method for a construction project, please refer to the relevant descriptions of an intelligent planning system for a construction project, which will not be repeated here.

[0066] Finally, it should be understood that the embodiments described in this specification are only used to illustrate the principles of the embodiments of this specification. Other variations may also fall within the scope of this specification. Therefore, as an example and not a limitation, alternative configurations of the embodiments of this specification may be considered consistent with the teachings of this specification. Accordingly, the embodiments of this specification are not limited to the embodiments explicitly introduced and described in this specification.

Claims

1. An intelligent planning system for construction projects, characterized in that: include: A data receiving module, used for receiving initial data of a building construction project; A data processing module, used for preprocessing the initial data of the building construction project; A material statistics module, for determining various types of building materials used in the building construction project based on the pre-processed initial data of the building construction project; A material characteristic acquisition module is used to obtain the physical characteristic parameters and usage requirements of various building materials used in the construction project; A material consumption analysis module, used to determine the allowable consumption deviation range of various building materials used in the construction project based on the physical property parameters and usage requirements of various building materials used in the construction project; A personalized analysis module, for generating a material use control plan for the construction project based on the allowable consumption deviation range and use requirements of various types of construction materials used in the construction project through an artificial intelligence language large model; The plan output module is used to transmit the material use control plan of the construction project to the user terminal.

2. The intelligent planning system for a construction project according to claim 1, characterized in that: The data processing module pre-processes the initial data of the building construction project, including: Performing data cleaning on the initial data of the building construction project; Format the initial data after data cleaning.

3. The intelligent planning system for a construction project according to claim 1, characterized in that: The material feature acquisition module is also used for: Obtain the physical property parameters of each sample building material; Obtaining usage requirements of each sample building material in different sample construction scenarios, wherein the sample construction scenarios include a sample construction environment and a sample construction process; Establish a knowledge graph based on the physical property parameters of each sample building material and its usage requirements in different construction scenarios; The material feature acquisition module acquires the physical property parameters and usage requirements of various building materials used in the construction project, including: Based on the knowledge graph, the physical property parameters and usage requirements of various building materials used in the construction project are obtained.

4. The intelligent planning system for a construction project according to claim 3 is characterized in that: The material feature acquisition module acquires the physical property parameters and usage requirements of various building materials used in the construction project based on the knowledge graph, including: For each type of building material used in the construction project, based on the basic information of the building material and the knowledge graph, determine the target sample building material, and obtain the physical property parameters of the target sample building material; For each type of building material used in the construction project, a target construction scenario is determined based on the construction scenario of the building material and the knowledge graph, and based on the target construction scenario, usage requirements of the building material are obtained.

5. The intelligent planning system for construction projects according to claim 4 is characterized in that: The material consumption analysis module determines the allowable consumption deviation range of various building materials used in the construction project based on the physical property parameters and usage requirements of various building materials used in the construction project, including: Establish consumption forecasting model; Through the consumption prediction model, based on the physical property parameters and usage requirements of various building materials used in the construction project, the allowable consumption deviation range of various building materials used in the construction project is determined.

6. The intelligent planning system for construction projects according to claim 5, characterized in that: The material consumption analysis module determines the allowable consumption deviation range of various building materials used in the construction project through the consumption prediction model based on the physical property parameters and usage requirements of various building materials used in the construction project, including: Determine the initial allowable consumption deviation range of various building materials used in the construction project through the consumption prediction model based on the physical property parameters and usage requirements of various building materials used in the construction project; Obtain consumption information for various types of building materials used in multiple historical building construction projects; For each type of building material used in the construction project, based on the consumption information of each type of building material used in the multiple historical construction projects, the consumption deviation fluctuation parameter of the building material is calculated; when the consumption deviation fluctuation parameter of the building material is greater than or equal to a preset consumption deviation similarity parameter threshold, a single correction is made to the initial allowable consumption deviation range of the building material based on the construction environment and construction process of the construction project through a parameter correction model to determine the allowable consumption deviation range of the building material; when the consumption deviation fluctuation parameter of the building material is less than the preset consumption deviation similarity parameter threshold, the initial allowable consumption deviation range of the building material is used as the allowable consumption deviation range of the building material.

7. The intelligent planning system for construction projects according to claim 6, characterized in that: The material consumption analysis module is also used for: Determine the consumption deviation correlation parameters between any two building materials; The material consumption analysis module performs a single correction on the initial allowable consumption deviation range of the building materials based on the construction environment and construction process of the building construction project through a parameter correction model to determine the allowable consumption deviation range of the building materials, including: Based on the construction environment and construction process of the construction project, a single correction is made to the initial allowable consumption deviation range of the construction materials through a parameter correction model to determine the intermediate allowable consumption deviation range of each type of construction material used in the construction project; Based on the consumption deviation association parameter between any two building materials, the intermediate allowable consumption deviation range of each type of building material used in the construction project is jointly corrected to determine the allowable consumption deviation range of each type of building material used in the construction project.

8. An intelligent planning system for construction projects according to any one of claims 1 to 7, characterized in that: The personalized analysis module generates a material use control plan for the construction project through an artificial intelligence language large model based on the allowable consumption deviation range and use requirements of various types of construction materials used in the construction project, including: Determine a plurality of construction nodes based on the preprocessed initial data of the building construction project; Through the artificial intelligence language large model, based on the allowable consumption deviation range and usage requirements of various types of building materials used in the construction project, the usage control indicators and usage recommendations of the building materials for the multiple construction nodes are determined.

9. An intelligent planning system for construction projects according to any one of claims 1 to 7, characterized in that: It also includes a profit and risk assessment module for automatically generating pre-profit reports, contract risk analysis, contract negotiation recommendations, contract review reports, break-even point analysis and risk management strategies.

10. An intelligent planning method for a construction project, characterized in that: include: Receive initial data for building construction projects; Preprocessing initial data of the building construction project; Determining various types of building materials used in the building construction project based on the preprocessed initial data of the building construction project; Obtaining the physical property parameters and usage requirements of various building materials used in the construction project; Determine the allowable consumption deviation range of various building materials used in the construction project based on the physical property parameters and usage requirements of various building materials used in the construction project; Generate a material use control plan for the construction project based on the allowable consumption deviation range and use requirements of various types of construction materials used in the construction project through an artificial intelligence language big model; The material usage control plan of the construction project is transmitted to the user terminal.

Citation Information

Patent Citations

  • Building surveying and mapping method and system, computer equipment and storage medium

    CN116844068A

  • Unmanned paving construction method and system

    CN117408450A

  • Large-screen report rapid building and displaying method based on data warehouse

    CN117575475A

  • Building material retrieval method and device, electronic equipment and storage medium

    CN117891920A

  • Building construction project planning information intelligent management system

    CN117933733A