Power dispatching method and system based on smart energy management platform

By introducing a sliding mechanism, rotating mechanism and inspection mechanism into the power dispatching system, and using visual cameras and nozzles to realize automatic inspection and repair of the cable insulation layer, the grid instability caused by cable cracks or damage is solved, and the grid is improved operational efficiency and safety.

CN118943939APending Publication Date: 2024-11-12GANSU XINSHENGXIANG ELECTRONIC TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411135791.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-19
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The existing power dispatching system cannot automatically detect cracks or damage in the cable insulation layer, and cannot be automatically repaired, resulting in cable leakage or short circuit, reducing grid stability and reliability, and increasing labor costs and economic losses.

Method used

A power dispatching system based on a smart energy management platform is designed, including a sliding mechanism, a rotary mechanism, a patrol mechanism and a cutting mechanism. The first visual camera and the nozzle are used to automatically patrol and repair the cable insulation layer, and through the wireless network The bridge is monitored in real time and the controller controls various electromechanical equipment to realize real-time monitoring and repair of the cable insulation layer.

Benefits of technology

Timely repair of cable insulation layer is achieved, the stability and reliability of the power grid is improved, labor costs and economic losses are reduced, and the transmission efficiency of the power grid is improved through automatic monitoring and repair.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118943939A_ABST
    Figure CN118943939A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of power dispatching, in particular to a smart energy management platform-based power dispatching method and system, which comprises a sliding rail, a sliding mechanism, a rotating mechanism, an inspection mechanism and a switching mechanism, and is characterized in that the sliding mechanism comprises an electric sliding table, a driving assembly and four pulleys, and the rotating mechanism comprises a rotating rod and an electric control assembly; a mounting plate is fixedly arranged at the bottom end of the rotating rod, the inspection mechanism comprises a spray head, a glue storage tank, a first visual camera, an extrusion assembly and an angle adjusting assembly, the switching mechanism comprises a positioning frame, a switching rod, a second visual camera, a rotating assembly and a swinging assembly, and the switching rod is fixedly arranged on the swinging assembly. According to the power dispatching method and system based on the smart energy management platform, the switch on the capacitor can be toggled through the switching rod, and the capacitor is put into the transformer, so that the capacitance demand of the transformer is reduced, the loss of reactive power in a circuit is reduced, and the power dispatching efficiency is greatly improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of electric power dispatching, and in particular to an electric power dispatching method and system based on a smart energy management platform. Background Art

[0003] Smart energy management platform is a platform for monitoring and managing smart energy, and smart power grid belongs to the category of smart energy. Power dispatching is an effective management method to ensure the safe and stable operation of the power grid, reliable external power supply, and orderly progress of various power production work. The specific work content of power dispatching is to judge the safety and economic operation status of the power grid based on the data information fed back by various information collection equipment or the information provided by the monitoring personnel, combined with the actual operation parameters of the power grid, such as voltage, current, frequency, load, etc., and comprehensively consider the development of various production work, issue operation instructions through telephone or automatic system, and command on-site operators or automatic control systems to make adjustments, such as adjusting the generator output, adjusting the load distribution, switching capacitors and reactors, etc., so as to ensure the continuous safe and stable operation of the power grid.

[0004] During power dispatching, it is usually necessary to collect the usage status of the cable, mainly to detect whether the insulation layer of the cable is cracked or damaged. Since the cables are generally laid in power corridors, which are not convenient for workers to enter, inspection equipment is usually used to inspect the cables during power dispatching operations.

[0005] The existing power dispatching devices or systems have the following deficiencies: 1. The use status of the power cable insulation layer can only be detected by inspection equipment, and cracks or damage on the outer wall of the cable insulation layer cannot be repaired in time. Workers are required to enter the power pipeline corridor for manual repairs, which increases labor costs and delays repair time. Cracks or damage will cause the cable to lose insulation performance, thereby causing cable leakage or short circuit, reducing the stability and reliability of the power grid, and causing voltage reduction, which will reduce the power transmission efficiency of the power grid, thereby increasing the power transmission loss of the power grid, causing considerable economic losses, and affecting the monitoring of the actual operating parameters of the power grid, making it inconvenient to comprehensively consider the dispatching work.

[0006] 2. Power transformers are an important part of the power system in the pipeline corridor project. They are widely used to provide energy support for power transmission, distribution, and control. Transformers in the power system often need to bear large reactive loads. The existing dispatching system or device cannot automatically monitor the load conditions of transformers in the power pipeline corridor. Manual inspections of the operating status of transformers are required, which reduces the efficiency of power dispatching. Summary of the invention

[0007] The purpose of the present invention is to provide a power dispatching method and system based on a smart energy management platform.

[0008] To achieve this object, the present invention adopts the following technical solutions: Provide power dispatching system based on smart energy management platform, including slide rails; It also includes a sliding mechanism, a rotating mechanism, an inspection mechanism and a cutting mechanism; The sliding mechanism is arranged on the outer wall of the slide rail, and the sliding mechanism includes an electric slide, a driving assembly and four pulleys. The electric slide is arranged below the slide rail, and a slide plate is arranged on the electric slide. Two support plates are symmetrically arranged on the top of the electric slide, and the four pulleys are symmetrically arranged on the outer walls of the two support plates. Every two pulleys are rotatably connected to the two ends of a support plate through a hinge shaft, and the driving assembly is arranged on one of the support plates. A slide groove for sliding the four pulleys is arranged on the outer wall of the slide rail; The rotating mechanism is arranged at the bottom of the slide plate, and the rotating mechanism includes a rotating rod and an electric control component. The rotating rod is rotatably arranged at the bottom of the slide plate, a U-shaped plate is fixedly arranged at the bottom of the slide plate, the electric control component is arranged on the U-shaped plate, and a mounting plate is fixedly arranged at the bottom end of the rotating rod; A partition is fixedly provided at the bottom of the mounting plate, and the inspection mechanism is arranged at one end of the partition. The inspection mechanism includes a nozzle, a glue storage tank, a first visual camera, an extrusion assembly and an angle adjustment assembly. The glue storage tank is fixedly provided at one end of the bottom of the mounting plate, the first visual camera is fixedly provided at one end of the mounting plate, the extrusion assembly is inserted on the glue storage tank, and the angle adjustment assembly is arranged on the outer wall of one end of the mounting plate. A cross plate is fixedly provided at one end of the bottom of the partition close to the glue storage tank, and two limit plates are fixedly provided on the top of the cross plate, and an arc groove is provided on the outer wall of each limit plate, and a sliding rod is inserted in the interior of each arc groove, and a clamping block is fixed between the two sliding rods, and a hard pipe is clamped on the outer wall of the clamping block, and the nozzle is fixedly provided at one end of the hard pipe; The cutting mechanism is arranged at the other end of the partition, and the cutting mechanism includes a positioning frame, a cutting rod, a second visual camera, a rotating assembly and a swinging assembly. The positioning frame is fixedly arranged on the outer wall of the partition at one end away from the glue storage tank, the second visual camera is fixedly arranged on the other end of the mounting plate, the rotating assembly is arranged on the end of the positioning frame away from the partition, the swinging assembly is arranged on the outer wall of the positioning frame, and the cutting rod is fixedly arranged on the swinging assembly.

[0009] Furthermore, the driving assembly includes a first motor, a synchronous belt and two synchronous wheels. The first motor is fixed on one of the support plates, the two synchronous wheels are respectively fixed on the output end of the first motor and one of the hinge shafts, and the synchronous belt is sleeved on the outer walls of the two synchronous wheels.

[0010] Furthermore, the electric control component includes a second motor, a first gear and a second gear. The second motor is inserted into the U-shaped plate, the first gear is fixed on its output end, the second gear is fixed on the outer wall of the rotating rod, and the first gear and the second gear are meshingly connected.

[0011] Furthermore, the swing assembly includes a rotating shaft, two first connecting rods, two sliders, two second connecting rods, two reciprocating rods and two push rods. The rotating shaft is rotatably arranged on the outer wall of the positioning frame. The two first connecting rods are respectively fixed at both ends of the rotating shaft. Each slider is hinged on an end of a first connecting rod away from the rotating shaft. Two limit rods are fixed on the outer wall of the positioning frame. Each second connecting rod is hinged on an end of a limit rod away from the positioning frame. Each reciprocating rod is hinged on an end of a limit rod close to the positioning frame. Each slider is slidably connected to the outer wall of a reciprocating rod. Each push rod is fixed on an end of a reciprocating rod away from the positioning frame. An avoidance notch for the push rod to slide is provided on the outer wall of each second connecting rod.

[0012] Furthermore, a mounting rod is fixedly provided between the ends of the two second connecting rods away from the limiting rod, a plurality of stoppers are evenly spaced on the outer wall of the mounting rod, and the cutting rod is fixedly connected to the ends of the plurality of stoppers away from the mounting rod.

[0013] Furthermore, the rotating assembly includes a third motor, a driving wheel, a driven wheel and a belt. The third motor is fixed on the outer wall of the positioning frame, the driving wheel is fixed on its output end, the driven wheel is fixed on the rotating shaft, and the belt sleeve is arranged between the driving wheel and the driven wheel.

[0014] Furthermore, the extrusion assembly includes a first electric push rod and an extrusion rod. The first electric push rod is inserted on the top of the mounting plate, and its output end extends into the interior of the glue storage tank. The extrusion rod is fixed on its output end. A discharge outlet is provided at the bottom of the storage tube. A hose is fixed between the discharge outlet and the end of the hard tube away from the nozzle. A strip-shaped spray hole is opened at the end of the nozzle.

[0015] Furthermore, the angle adjustment assembly includes a second electric push rod, a positioning rod, a connecting rod and two rocker arms. An L-shaped plate is fixedly provided at one end of the top of the mounting plate. The second electric push rod is hingedly arranged on the top of the L-shaped plate. The positioning rod is fixedly arranged at the bottom of the mounting plate through two inclined plates. The connecting rod is fixedly arranged between one ends of the two rocker arms. The output end of the second electric push rod is hingedly connected to one end of the connecting rod. The two rocker arms are rotatably arranged on the outer wall of the positioning rod. An avoidance groove for sliding the sliding rod is provided on the outer wall of one end of each rocker arm away from the connecting rod.

[0016] Furthermore, a mounting block is fixedly provided on the outer wall of one end of the hard tube away from the hose, a soft brush is fixedly provided on one end of the mounting block, a smoothing wheel is slidably provided on the other end of the mounting block through an insertion rod, and a telescopic spring is sleeved on the outer wall of the insertion rod.

[0017] The method of the power dispatching system based on the smart energy management platform comprises the following steps: S1: Automatic inspection of power cables: When conducting power dispatching, it is usually necessary to collect the usage status of the cable, mainly to detect whether the insulation layer of the cable is cracked or damaged. Cracks or damage will cause the cable to lose insulation performance, thereby causing cable leakage or short circuit, reducing the stability and reliability of the power grid. Since cables are generally laid in power corridors, and it is not convenient for workers to enter the power corridors, inspection equipment is usually used to inspect the cables during power dispatching operations. A wireless bridge is set at the bottom of the installation plate. The First Vision camera provides a real-time inspection field of view during the inspection process to monitor the cable insulation layer in real time. The video is transmitted to the display terminal, i.e. the PC side of the smart energy management platform, through a wireless bridge, so that the dispatching personnel can learn about the inspection situation in real time. When inspecting the use of the insulation layer of the cable, the first motor is first started through the controller. Since the two synchronous wheels are respectively fixedly connected to the output end of the first motor and one of the hinged shafts, the two synchronous wheels are sleeved by a synchronous belt, and each pulley is rotatably connected to the support plate through the hinged shaft. The outer wall of the slide rail is designed with a slide groove for the four pulleys to slide, so that the two support plates and the electric slide fixedly connected at the bottom thereof can move along the length of the cable.

[0018] When the first vision camera finds that the insulation layer of the cable is cracked or damaged due to aging during the inspection, the image is transmitted to the PC end of the smart energy management platform. After learning about it, the dispatcher sends a command to the controller to cut off the power of the first motor, first stop the sliding of the four pulleys, and then issue a command to start the electric slide, first drive the nozzle to slide to the cracked or damaged position through the slide, and then start the command of the second electric push rod, so that the output end of the second electric push rod is retracted or extended. The output end of the second electric push rod is hinged with one end of the connecting rod, the two swing arms are rotatably connected with the positioning rod, and the other ends of the two swing arms are sleeved with the two avoidance grooves through two sliding rods. Under the guiding action of the two arc grooves, the two sliding rods and the clamping block slide in an arc shape inside the two arc grooves, thereby driving the two swing arms to swing in an arc shape with the positioning rod as the center, and then driving the hard tube on the clamping block and the nozzle at one end of the hard tube to swing in an arc shape until the nozzle is close to the crack or damaged position, thereby satisfying the repair of cracks or damage at different positions on the outer wall of the cable.

[0019] When the nozzle approaches the crack or damaged position of the cable insulation layer, the dispatcher gives the controller a command to open the first electric push rod, so that its output end extends downward. Since its output end passes through the mounting plate and is plugged into the glue storage tank, the extrusion rod is fixedly connected to its output end. Therefore, the waterproof glue inside the glue storage tank is transported to the inside of the hard pipe through the discharge port and the hose, and then sprayed to the crack or damaged position by the hard pipe and the nozzle. The strip-shaped spray hole can ensure that the waterproof glue is spread out in a strip shape, avoiding the waterproof glue from accumulating in a circle, thereby improving the repair effect of cracks or damage and avoiding waste of resources.

[0020] It should be noted that when cracks or damaged locations are found, first, four pulleys are used to drive a soft brush to sweep away dust at the cracked or damaged locations of the cable, which facilitates the filling of waterproof glue and improves the adhesion effect of the glue to the cracked or damaged locations. After the waterproof glue is sprayed to the cracked or damaged locations, the first motor is restarted through the controller, so that the four pulleys slide again and drive the smoothing wheel to evenly spread the waterproof glue at the repair location to improve the repair effect. The telescopic spring can ensure that the smoothing wheel gradually spreads the waterproof glue, improves the smoothing effect, and does not cause repair omissions, thereby improving the repair effect.

[0021] S2: Automatic switching for double-row cable inspection: Inside the power corridor, power cables are usually laid symmetrically. After the inspection of a long row of cables inside the corridor is completed, that is, after sliding to the end, the dispatcher of the smart energy management platform issues a command to the controller to start the second motor, thereby starting the second motor through the controller. Since its output end is fixedly connected to the first gear, the second gear is fixedly connected to the rotating rod, the first gear and the second gear are meshed, and the bottom end of the rotating rod is fixedly connected to the mounting plate, the mounting plate is then driven to rotate 180 degrees through the rotating rod, so that the first visual camera rotates 180 degrees to inspect another long row of cables, thereby improving the flexibility of the inspection.

[0022] S3: Automatic monitoring of power transformers: Power transformers are an important part of the power system in the pipeline corridor project. They are widely used and provide energy support for power transmission, distribution, and control. Transformers in power systems often need to bear large reactive loads, which requires additional capacitors to compensate for the reactive power of the system. By switching capacitors, the capacitance demand of the transformer can be directly reduced, thereby avoiding the emergence of bottlenecks in the power system. A temperature sensor is designed inside the shell of the power transformer to detect the working temperature of the internal components of the transformer in real time. The second vision camera is designed with a noise sensor inside to detect the noise level of the transformer during inspection. The operating status of the transformer is detected by measuring the working temperature and noise level of the transformer. These data are sent to the smart energy management platform in real time by the temperature sensor and noise sensor in the controller and displayed on the PC side of the platform. When the dispatcher finds that the data is abnormal, it means that the capacitance demand of the transformer is large. At this time, the third motor is started by the controller, so that its output end drives the driving wheel to rotate. Since the driven wheel is fixedly connected to the rotating shaft, the driving wheel and the driven wheel are connected by a belt, thereby driving the rotating shaft to rotate.

[0023] When the rotating shaft rotates, since the two first connecting rods are fixedly connected to the rotating shaft, each slider is hinged to the end of a first connecting rod away from the rotating shaft, each slider is slidably connected to the outer wall of a reciprocating rod, each push rod is fixedly connected to the end of a reciprocating rod away from the positioning frame, and each second connecting rod is hinged to the end of a limit rod away from the positioning frame, and then the resistance force generated when the push rod rotates and slides in the two avoidance gaps drives the two second connecting rods to rotate with the hinge point of the second connecting rod and the limit rod as the center of the circle.

[0024] When the two second connecting rods rotate, since the two ends of the mounting rod are fixedly connected to the ends of the two second connecting rods away from the limit rods, the switching rod is fixedly connected to the mounting rod through a plurality of blocks, and then the switch on the capacitor is turned by the switching rod to input the capacitor into the transformer, thereby reducing the transformer capacitance demand, reducing the reactive power loss in the circuit, and improving the efficiency of the power system.

[0025] Beneficial effects of the present invention: 1. The present invention designs a sliding mechanism and an inspection mechanism, and can inspect the use of the insulation layer of the entire row of cables through the first visual camera in cooperation with the sliding mechanism, thereby facilitating timely repair of cracks or damage on the outer wall of the cable insulation layer, without the need for workers to enter the power corridor for manual repairs, saving labor costs, avoiding cracks or damage that lead to loss of cable insulation performance, thereby avoiding cable leakage or short circuit, improving the stability and reliability of the power grid operation, and avoiding voltage reduction, improving the power transmission efficiency of the power grid, reducing power transmission losses of the power grid, avoiding economic losses, and realizing automatic monitoring of the actual operating parameters of the power grid, which is convenient for personnel to comprehensively consider and carry out scheduling work.

[0026] 2. The present invention designs a switching mechanism, namely a positioning frame, a switching rod, a second visual camera, a rotating assembly and a swinging assembly, and designs a temperature sensor, which can detect the working temperature of the internal components of the transformer in real time. The second visual camera is internally designed with a noise sensor, which can detect the noise level of the transformer during inspection. The operating status of the transformer is detected by the operating temperature and noise level of the transformer. These data are sent to the smart energy management platform in real time by the temperature sensor and noise sensor in the controller and displayed on the PC end of the platform. When the dispatcher finds that the data is abnormal, it means that the capacitance demand of the transformer is large. At this time, the third motor is started by the controller, and then the switch on the capacitor is turned by the switching rod to put the capacitor into the transformer, thereby reducing the capacitance demand of the transformer, reducing the loss of reactive power in the circuit, and improving the efficiency of the power system. It can also realize automatic monitoring of the load condition of the transformer in the power pipeline corridor, without the need to manually inspect the operating status of the transformer, which greatly improves the power dispatching efficiency.

[0027] 3. The present invention is designed with a soft brush and a smoothing wheel. When a crack or damaged position is found, first, the four pulleys are used to drive the soft brush to sweep the dust at the crack or damaged position of the cable, so as to facilitate the filling of waterproof glue and improve the adhesion effect of the glue to the crack or damaged position. After the waterproof glue is sprayed to the crack or damaged position, the first motor is restarted through the controller, so that the four pulleys slide again, driving the smoothing wheel to evenly spread the waterproof glue at the repair position, thereby improving the repair effect. The telescopic spring can ensure that the smoothing wheel gradually spreads the waterproof glue, ensure that the smoothing process is carried out carefully and closely, improve the smoothing effect, and avoid repair omissions, thereby improving the repair effect.

[0028] 4. The present invention, through the design of an angle adjustment component, can drive the nozzle, soft brush and smoothing wheel to automatically adjust the glue spraying angle according to the crack or damage position of the cable insulation layer, and at the same time perform dust removal before glue spraying to improve the adhesion effect of the waterproof glue and the insulation layer, and can also smooth the waterproof glue at the corresponding position, thereby meeting the needs of repairing cracks or damage at different positions on the outer wall of the cable, thereby improving the practicality of the system.

[0029] 5. The present invention designs a wireless bridge and a controller. All electromechanical equipment inside the system is controlled by the controller, and the controller is electrically connected to the smart energy management platform. The dispatcher issues dispatch instructions to the controller through the smart energy management platform, thereby facilitating remote control of various electromechanical equipment, automatically performing power dispatching, saving labor costs, and transmitting the video to the display terminal, that is, the PC end of the smart energy management platform, through the wireless bridge, so as to facilitate real-time observation of the power operation status inside the cable corridor and carry out dispatching work accordingly.

[0030] 6. The present invention designs a rotating mechanism, namely a rotating rod and an electronic control component. In the inside of the power corridor, power cables are usually laid symmetrically. After the inspection of a long row of cables inside the corridor is completed, that is, after sliding to the end, the dispatcher of the smart energy management platform issues an instruction to the controller to start the second motor, thereby starting the second motor through the controller. Since its output end is fixedly connected to the first gear, the second gear is fixedly connected to the rotating rod, the first gear and the second gear are meshed, and the bottom end of the rotating rod is fixedly connected to the mounting plate, and then the mounting plate is driven to rotate through the rotating rod, so that the first visual camera rotates to inspect another long row of cables, thereby improving the flexibility of the inspection. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] In order to more clearly illustrate the technical solution of the embodiment of the present invention, the drawings in the embodiment of the present invention are briefly introduced below.

[0032] Figure 1 The three-dimensional structure of the present invention is shown in FIG. Figure 1 ; Figure 2 The three-dimensional structure of the present invention is shown in FIG. Figure 2; Figure 3 for Figure 2 A in the enlarged view; Figure 4 It is a three-dimensional structural schematic diagram of the switching mechanism of the present invention; Figure 5 It is a three-dimensional structural schematic diagram of the inspection mechanism of the present invention; Figure 6 for Figure 5 A in the enlarged view; Figure 7 It is a schematic diagram of the cross-sectional structure of the glue storage tank of the present invention; Figure 8 It is a three-dimensional structural schematic diagram of the sliding mechanism, rotating mechanism, inspection mechanism and switching mechanism of the present invention; Fig. 9 for Figure 8 The enlarged view of point C in the figure; Fig.10 It is a flow chart of the electric power dispatching system method of the present invention; In the figure: slide rail 1, electric slide 2, drive assembly 3, pulley 4, slide plate 5, rotating rod 6, electronic control assembly 7, mounting plate 8, partition 9, nozzle 10, glue storage tank 11, first visual camera 12, extrusion assembly 13, angle adjustment assembly 14, arc groove 15, slide bar 16, block 17, hard pipe 18, positioning frame 19, cutting rod 20, second visual camera 21, rotating assembly 22, swinging assembly 23, first motor 24, synchronous belt 25, synchronous wheel 26, second motor 27, first Gear 28, second gear 29, rotating shaft 30, first connecting rod 31, slider 32, second connecting rod 33, reciprocating rod 34, push rod 35, mounting rod 36, block 37, third motor 38, driving wheel 39, driven wheel 40, belt 41, first electric push rod 42, extrusion rod 43, hose 44, strip spray hole 45, second electric push rod 46, positioning rod 47, connecting rod 48, rocker rod 49, soft brush 50, insertion rod 51, smoothing wheel 52, telescopic spring 53, wireless bridge 54. DETAILED DESCRIPTION

[0033] The technical solution of the present invention is further described below with reference to the accompanying drawings and through specific implementation methods.

[0034] Among them, the drawings are only used for illustrative purposes and represent only schematic diagrams rather than actual pictures, and should not be understood as limitations on this patent; in order to better illustrate the embodiments of the present invention, some parts of the drawings will be omitted, enlarged or reduced, and do not represent the size of the actual product.

[0035] Reference Figures 1 to 9As shown, the power dispatching system based on the smart energy management platform includes a slide rail 1, which is used to be installed inside the power facilities remotely controlled by the smart energy management platform, such as the power pipe gallery and other areas. Since cables are generally laid in the power pipe gallery and it is not convenient for workers to enter the power pipe gallery, the slide rail 1 is designed to facilitate power dispatching. The power dispatching work can be realized without the workers personally entering the cable pipe gallery, thereby improving the power dispatching efficiency; It also includes a sliding mechanism, a rotating mechanism, an inspection mechanism and a switching mechanism. The system is equipped with a controller. All electromechanical equipment in the system is controlled by the controller, which is electrically connected to the smart energy management platform. The dispatcher issues dispatch instructions to the controller through the smart energy management platform, thereby facilitating remote control of various electromechanical equipment, automatically performing power dispatching, and saving labor costs. The sliding mechanism is arranged on the outer wall of the slide rail 1, and the sliding mechanism includes an electric slide 2, a driving assembly 3 and four pulleys 4. The electric slide 2 is arranged below the slide rail 1, and a slide plate 5 is arranged on the electric slide 2. Two support plates are symmetrically arranged on the top of the electric slide 2, and the four pulleys 4 are symmetrically arranged on the outer walls of the two support plates. Every two pulleys 4 are rotatably connected to the two ends of a support plate through a hinge shaft, and the driving assembly 3 is arranged on one of the support plates. A slide groove for sliding the four pulleys 4 is arranged on the outer wall of the slide rail 1; The rotating mechanism is arranged at the bottom of the slide plate 5, and the rotating mechanism includes a rotating rod 6 and an electric control component 7. The rotating rod 6 is rotatably arranged at the bottom of the slide plate 5, a U-shaped plate is fixedly arranged at the bottom of the slide plate 5, the electric control component 7 is arranged on the U-shaped plate, and a mounting plate 8 is fixedly arranged at the bottom end of the rotating rod 6; A partition 9 is fixedly provided at the bottom of the mounting plate 8, and an inspection mechanism is arranged at one end of the partition 9. The inspection mechanism includes a nozzle 10, a glue storage tank 11, a first visual camera 12, an extrusion assembly 13 and an angle adjustment assembly 14. The glue storage tank 11 is fixedly provided at one end of the bottom of the mounting plate 8, the first visual camera 12 is fixedly provided at one end of the mounting plate 8, the extrusion assembly 13 is inserted on the glue storage tank 11, and the angle adjustment assembly 14 is arranged on the outer wall of one end of the mounting plate 8. A transverse plate is fixedly provided at one end of the bottom of the partition 9 close to the glue storage tank 11, and two limit plates are fixedly provided on the top of the transverse plate, and an arc groove 15 is provided on the outer wall of each limit plate, and a sliding rod 16 is inserted in the interior of each arc groove 15, and a clamping block 17 is fixedly provided between the two sliding rods 16, and a hard pipe 18 is clamped on the outer wall of the clamping block 17, and the nozzle 10 is fixedly provided at one end of the hard pipe 18; The cutting mechanism is arranged at the other end of the partition 9, and the cutting mechanism includes a positioning frame 19, a cutting rod 20, a second visual camera 21, a rotating assembly 22 and a swinging assembly 23. The positioning frame 19 is fixedly arranged on the outer wall of the partition 9 at one end away from the glue storage tank 11, the second visual camera 21 is fixedly arranged on the other end of the mounting plate 8, the rotating assembly 22 is arranged on the end of the positioning frame 19 away from the partition 9, the swinging assembly 23 is arranged on the outer wall of the positioning frame 19, and the cutting rod 20 is fixedly arranged on the swinging assembly 23.

[0036] Reference Figures 1 to 9 As shown, the driving assembly 3 includes a first motor 24, a synchronous belt 25 and two synchronous wheels 26. The first motor 24 is fixed on one of the support plates, and the two synchronous wheels 26 are respectively fixed on the output end of the first motor 24 and one of the hinge shafts. The synchronous belt 25 is sleeved on the outer walls of the two synchronous wheels 26. When performing power dispatching, it is usually necessary to collect the use status of the cable, mainly to detect whether the insulation layer of the cable has cracks or damage. Cracks or damage will cause the cable to lose insulation performance, thereby causing cable leakage or short circuit, reducing the stability and reliability of the power grid. Since the cable is generally laid in the power corridor, and the power corridor is not convenient for staff to enter, when performing power dispatching operations, inspection equipment is usually used to inspect the cable, and the installation plate A wireless network bridge is set at the bottom of 8. The first visual camera 12 provides a real-time inspection field of view during the inspection process, monitors the cable insulation layer in real time, and transmits the video to the display terminal, that is, the PC end of the smart energy management platform, through the wireless network bridge, so that the dispatching personnel can learn about the inspection situation in real time. When inspecting the use of the cable insulation layer, the first motor 24 is first started by the controller. Since the two synchronous wheels 26 are respectively fixedly connected to the output end of the first motor 24 and one of the hinged shafts, the two synchronous wheels 26 are sleeved by the synchronous belt 25, and each pulley 4 is rotatably connected to the support plate through the hinge shaft. The outer wall of the slide rail 1 is designed with a slide groove for the four pulleys 4 to slide, so that the two support plates and the bottom thereof are fixedly connected to the electric slide 2 and move along the length direction of the cable.

[0037] Reference Figures 1 to 9As shown, the electric control component 7 includes a second motor 27, a first gear 28 and a second gear 29. The second motor 27 is inserted into the U-shaped plate, the first gear 28 is fixed on its output end, and the second gear 29 is fixed on the outer wall of the rotating rod 6. The first gear 28 and the second gear 29 are meshed and connected. Inside the power corridor, power cables are usually laid symmetrically. After the inspection of a long row of cables inside the corridor is completed, that is, after sliding to the end, the dispatcher of the smart energy management platform issues an instruction to the controller to start the second motor 27, thereby starting the second motor 27 through the controller. Since its output end is fixedly connected to the first gear 28, the second gear 29 is fixedly connected to the rotating rod 6, the first gear 28 and the second gear 29 are meshed and connected, and the bottom end of the rotating rod 6 is fixedly connected to the mounting plate 8, and then the mounting plate 8 is driven to rotate 180 degrees through the rotating rod 6, so that the first visual camera 12 rotates 180 degrees to inspect another long row of cables, thereby improving the flexibility of the inspection.

[0038] Reference Figures 1 to 9 As shown, the swing assembly 23 includes a rotating shaft 30, two first connecting rods 31, two sliders 32, two second connecting rods 33, two reciprocating rods 34 and two push rods 35. The rotating shaft 30 is rotatably arranged on the outer wall of the positioning frame 19. The two first connecting rods 31 are respectively fixed at both ends of the rotating shaft 30. Each slider 32 is hinged on an end of the first connecting rod 31 away from the rotating shaft 30. Two limiting rods are fixed on the outer wall of the positioning frame 19. Each second connecting rod 33 is hinged on an end of a limiting rod away from the positioning frame 19. Each reciprocating rod 34 is hinged on an end of a limiting rod close to the positioning frame 19. Each slider 32 is slidably connected to the outer wall of a reciprocating rod 34. Each push rod 35 is fixed on a reciprocating rod 34. At one end away from the positioning frame 19, an avoidance gap for the push rod 35 to slide is provided on the outer wall of each second connecting rod 33. When the rotating shaft 30 rotates, since the two first connecting rods 31 are fixedly connected to the rotating shaft 30, each slider 32 is hinged to the end of a first connecting rod 31 away from the rotating shaft 30, each slider 32 is slidably connected to the outer wall of a reciprocating rod 34, each push rod 35 is fixedly connected to the end of a reciprocating rod 34 away from the positioning frame 19, and each second connecting rod 33 is hinged to the end of a limit rod away from the positioning frame 19, and then the resistance force generated when the push rod 35 rotates and slides in the two avoidance gaps drives the two second connecting rods 33 to rotate with the hinge point of the second connecting rod 33 and the limit rod as the center of the circle.

[0039] Reference Figures 1 to 9As shown, a mounting rod 36 is fixedly provided between the ends of the two second connecting rods 33 away from the limit rod, and a plurality of blocks 37 are evenly spaced on the outer wall of the mounting rod 36. The switching rod 20 is fixedly connected to the ends of the plurality of blocks 37 away from the mounting rod 36. When the two second connecting rods 33 rotate, since the two ends of the mounting rod 36 are fixedly connected to the ends of the two second connecting rods 33 away from the limit rod, the switching rod 20 is fixedly connected to the mounting rod 36 through the plurality of blocks 37, and then the switch on the capacitor is turned by the switching rod 20 to input the capacitor into the transformer, thereby reducing the transformer capacitance demand, reducing the reactive power loss in the circuit, and improving the efficiency of the power system. Capacitors are generally arranged in rows, and the switching rod 20 with a long rod structure is convenient for turning the switches of multiple capacitors, which is beneficial to improving the switching efficiency, thereby improving the power dispatching efficiency.

[0040] Reference Figures 1 to 9 As shown, the rotating assembly 22 includes a third motor 38, a driving wheel 39, a driven wheel 40 and a belt 41. The third motor 38 is fixed on the outer wall of the positioning frame 19, the driving wheel 39 is fixed on its output end, the driven wheel 40 is fixed on the rotating shaft 30, and the belt 41 is sleeved between the driving wheel 39 and the driven wheel 40. The power transformer is an important part of the power system in the pipeline corridor project. It has a wide range of uses and provides energy support for power transmission, distribution, and control. The transformer in the power system often needs to bear a large reactive load, which requires additional capacitors to compensate for the reactive power of the system. By switching capacitors, the transformer capacitance requirement can be directly reduced, thereby avoiding the emergence of bottlenecks in the power system. The shell of the power transformer The controller is designed with a temperature sensor to detect the working temperature of the internal components of the transformer in real time. The second visual camera 21 is designed with a noise sensor to detect the noise level of the transformer during inspection. The operating status of the transformer is detected by the working temperature and noise level of the transformer. These data are sent to the smart energy management platform in real time by the temperature sensor and noise sensor in the controller and displayed on the PC side of the platform. When the dispatcher finds that the data is abnormal, it means that the capacitance demand of the transformer is large. At this time, the third motor 38 is started by the controller, so that its output end drives the driving wheel 39 to rotate. Since the driven wheel 40 is fixedly connected to the rotating shaft 30, the driving wheel 39 and the driven wheel 40 are connected by a belt 41, thereby driving the rotating shaft 30 to rotate.

[0041] Reference Figures 1 to 9As shown, the extrusion assembly 13 includes a first electric push rod 42 and an extrusion rod 43. The first electric push rod 42 is inserted on the top of the mounting plate 8, and its output end extends into the interior of the glue storage tank 11. The extrusion rod 43 is fixed on its output end. A discharge port is provided at the bottom of the storage tube. A hose 44 is fixed between the discharge port and the end of the hard tube 18 away from the nozzle 10. A strip-shaped spray hole 45 is opened at the end of the nozzle 10. When the nozzle 10 is close to the crack or damage position of the cable insulation layer, the dispatcher sends a signal to the controller to start the first electric push rod 42. The push rod 42 is driven by a command, so that its output end extends downward. Since its output end passes through the mounting plate 8 and is plugged into the glue storage tank 11, and the extrusion rod 43 is fixedly connected to its output end, the waterproof glue inside the glue storage tank 11 is transported to the inside of the hard tube 18 through the discharge port and the hose 44, and then sprayed to the crack or damaged position by the hard tube 18 and the nozzle 10. The strip-shaped spray hole 45 can ensure that the waterproof glue is spread out in a strip shape after being sprayed out, avoiding the waterproof glue from accumulating in a circular shape, thereby improving the repair effect of cracks or damages and avoiding waste of resources.

[0042] Reference Figures 1 to 9 As shown, the angle adjustment assembly 14 includes a second electric push rod 46, a positioning rod 47, a connecting rod 48 and two swing rods 49. An L-shaped plate is fixed at one end of the top of the mounting plate 8. The second electric push rod 46 is hinged at the top of the L-shaped plate. The positioning rod 47 is fixed at the bottom of the mounting plate 8 through two inclined plates. The connecting rod 48 is fixed between one ends of the two swing rods 49. The output end of the second electric push rod 46 is hinged to one end of the connecting rod 48. The two swing rods 49 are rotatably arranged on the outer wall of the positioning rod 47. An avoidance groove for sliding the slide rod 16 is provided on the outer wall of one end of each swing rod 49 away from the connecting rod 48. When the first visual camera 12 finds that the insulation layer of the cable is cracked or damaged due to aging during the inspection process, the picture is transmitted to the PC end of the smart energy management platform. After learning about it, the dispatcher sends a command to the controller to cut off the power of the first motor 24, first stops the continued sliding of the four pulleys 4, and then issues a The command to turn on the electric slide 2 first drives the nozzle 10 to slide toward the crack or damaged position through the slide plate 5, and then the command to turn on the second electric push rod 46 causes the output end of the second electric push rod 46 to retract or extend. Since the connecting rod 48 is fixedly connected to one end of the two rocker arms 49, the output end of the second electric push rod 46 is hinged to one end of the connecting rod 48, and the two rocker arms 49 are both rotatably connected to the positioning rod 47. The other ends of the two rocker arms 49 are sleeved with the two avoidance grooves through the two slide bars 16. Under the guidance of the two arc grooves 15, the two slide bars 16 and the block 17 slide in an arc inside the two arc grooves 15, thereby driving the two rocker arms 49 to swing in an arc with the positioning rod 47 as the center, and then driving the hard tube 18 on the block 17 and the nozzle 10 at one end of the hard tube 18 to swing in an arc until the nozzle 10 is close to the crack or damaged position, thereby satisfying the repair of cracks or damage at different positions on the outer wall of the cable.

[0043] Reference Figures 1 to 9 As shown, a mounting block is fixedly provided on the outer wall of one end of the hard tube 18 away from the hose 44, a soft brush 50 is fixedly provided on one end of the mounting block, and a smoothing wheel 52 is slidably provided on the other end of the mounting block through an insertion rod 51, and a telescopic spring 53 is sleeved on the outer wall of the insertion rod 51. It should be noted that when a crack or damaged position is found, first, the four pulleys 4 are used to drive the soft brush 50 to sweep the dust at the crack or damaged position of the cable, so as to facilitate the filling of waterproof glue and improve the adhesion effect of the glue to the crack or damaged position. After the waterproof glue is sprayed to the crack or damaged position, the first motor 24 is restarted through the controller, so that the four pulleys 4 slide again, driving the smoothing wheel 52 to evenly spread the waterproof glue at the repair position, thereby improving the repair effect. The telescopic spring 53 can ensure that the smoothing wheel 52 gradually spreads the waterproof glue, ensures that the smoothing process is carried out carefully and closely, improves the smoothing effect, and does not cause repair omissions, thereby improving the repair effect.

[0044] The method of the power dispatching system based on the smart energy management platform comprises the following steps: S1: Automatic inspection of power cables: When conducting power dispatching, it is usually necessary to collect the use status of the cable, mainly to detect whether the insulation layer of the cable has cracks or damage. Cracks or damage will cause the cable to lose insulation performance, thereby causing cable leakage or short circuit, reducing the stability and reliability of the power grid. Since the cables are generally laid in power corridors, and it is not convenient for workers to enter the power corridors, inspection equipment is usually used to inspect the cables during power dispatching operations. A wireless bridge is set at the bottom of the mounting plate 8. The first visual camera 12 provides a real-time inspection field of view during the inspection process, monitors the cable insulation layer in real time, and transmits the wireless network to the cable. The bridge transmits the video to the display terminal, that is, the PC end of the smart energy management platform, so that the dispatching personnel can learn about the inspection situation in real time. When inspecting the use of the insulation layer of the cable, the first motor 24 is first started through the controller. Since the two synchronous wheels 26 are respectively fixedly connected to the output end of the first motor 24 and one of the hinged shafts, the two synchronous wheels 26 are sleeved through the synchronous belt 25, and each pulley 4 is rotatably connected to the support plate through the hinge shaft. The outer wall of the slide rail 1 is designed with a slide groove for the four pulleys 4 to slide, so that the two support plates and the bottom thereof are fixedly connected to the electric slide 2 and move along the length direction of the cable.

[0045] When the first visual camera 12 finds that the insulation layer of the cable is cracked or damaged due to aging during the inspection, the image is transmitted to the PC end of the smart energy management platform. After learning about it, the dispatcher sends a command to the controller to cut off the power of the first motor 24, first stop the continued sliding of the four pulleys 4, and then issue a command to start the electric slide 2, first drive the nozzle 10 to slide to the cracked or damaged position through the slide 5, and then start the command of the second electric push rod 46, so that the output end of the second electric push rod 46 is retracted or extended. Since the connecting rod 48 is fixedly connected to one end of the two rocker arms 49, the second electric push rod The output end of 46 is hinged to one end of the connecting rod 48, and the two swing rods 49 are rotatably connected to the positioning rod 47. The other ends of the two swing rods 49 are sleeved with the two avoidance grooves through the two sliding rods 16. Under the guiding action of the two arc grooves 15, the two sliding rods 16 and the clamping block 17 slide in an arc shape inside the two arc grooves 15, thereby driving the two swing rods 49 to swing in an arc shape with the positioning rod 47 as the center of the circle, and then driving the hard tube 18 on the clamping block 17 and the nozzle 10 at one end of the hard tube 18 to swing in an arc shape until the nozzle 10 is close to the crack or damage position, thereby meeting the needs of repairing cracks or damage at different positions on the outer wall of the cable.

[0046] When the nozzle 10 is close to the crack or damaged position of the cable insulation layer, the dispatcher gives a command to the controller to open the first electric push rod 42, so that its output end extends downward. Since its output end passes through the mounting plate 8 and is plugged into the glue storage tank 11, the extrusion rod 43 is fixedly connected to its output end, and the waterproof glue inside the glue storage tank 11 is transported to the inside of the hard pipe 18 through the discharge port and the hose 44, and then sprayed to the crack or damaged position by the hard pipe 18 and the nozzle 10. The strip-shaped spray hole 45 can ensure that the waterproof glue is spread out in a strip shape after being sprayed out, avoiding the waterproof glue from accumulating in a circular shape, thereby improving the repair effect of cracks or damage and avoiding waste of resources.

[0047] It should be noted that when a crack or damaged position is found, first, the four pulleys 4 are used to drive the soft brush 50 to sweep the dust at the crack or damaged position of the cable, so as to facilitate the filling of waterproof glue and improve the adhesion effect of the glue to the crack or damaged position. After the waterproof glue is sprayed to the crack or damaged position, the first motor 24 is restarted through the controller, so that the four pulleys 4 slide again and drive the smoothing wheel 52 to evenly spread the waterproof glue at the repair position to improve the repair effect. The telescopic spring 53 can ensure that the smoothing wheel 52 gradually spreads the waterproof glue, ensures that the smoothing process is carried out carefully and tightly, improves the smoothing effect, and does not cause repair omissions, thereby improving the repair effect.

[0048] S2: Automatic switching for double-row cable inspection: Inside the power corridor, power cables are usually laid symmetrically. After the inspection of a long row of cables inside the corridor is completed, that is, after sliding to the end, the dispatcher of the smart energy management platform issues a command to the controller to start the second motor 27, thereby starting the second motor 27 through the controller. Since its output end is fixedly connected to the first gear 28, the second gear 29 is fixedly connected to the rotating rod 6, the first gear 28 and the second gear 29 are meshed and connected, and the bottom end of the rotating rod 6 is fixedly connected to the mounting plate 8, and then the mounting plate 8 is driven to rotate 180 degrees through the rotating rod 6, so that the first visual camera 12 rotates 180 degrees to inspect another long row of cables, thereby improving the flexibility of the inspection.

[0049] S3: Automatic monitoring of power transformers: The power transformer is an important part of the power system in the pipeline corridor project. It is widely used to provide energy support for power transmission, distribution, and control. The transformer in the power system often needs to bear a large reactive load, which requires additional capacitors to compensate for the reactive power of the system. By switching capacitors, the capacitance demand of the transformer can be directly reduced, thereby avoiding the bottleneck in the power system. A temperature sensor is designed inside the shell of the power transformer to detect the working temperature of the internal components of the transformer in real time. The second visual camera 21 is designed inside to detect the noise level of the transformer during inspection. The operating status of the transformer is detected by measuring the working temperature and noise level of the transformer. These data are sent to the smart energy management platform in real time by the temperature sensor and noise sensor in the controller and displayed on the PC end of the platform. When the dispatcher finds that the data is abnormal, it means that the capacitance demand of the transformer is large. At this time, the third motor 38 is started by the controller, so that its output end drives the driving wheel 39 to rotate. Since the driven wheel 40 is fixedly connected to the rotating shaft 30, the driving wheel 39 and the driven wheel 40 are connected by the belt 41, thereby driving the rotating shaft 30 to rotate.

[0050] When the rotating shaft 30 rotates, since the two first connecting rods 31 are fixedly connected to the rotating shaft 30, each slider 32 is hinged to the end of a first connecting rod 31 away from the rotating shaft 30, each slider 32 is slidably connected to the outer wall of a reciprocating rod 34, each push rod 35 is fixedly connected to the end of a reciprocating rod 34 away from the positioning frame 19, and each second connecting rod 33 is hinged to the end of a limiting rod away from the positioning frame 19, and then the resistance force generated when the push rod 35 rotates and slides in the two avoidance gaps drives the two second connecting rods 33 to rotate with the hinge point of the second connecting rod 33 and the limiting rod as the center of the circle.

[0051] When the two second connecting rods 33 rotate, since the two ends of the mounting rod 36 are fixedly connected to the ends of the two second connecting rods 33 away from the limit rod, the switching rod 20 is fixedly connected to the mounting rod 36 through a plurality of blocks 37, and then the switch on the capacitor is turned by the switching rod 20 to put the capacitor into the transformer, thereby reducing the transformer capacitance demand, reducing the reactive power loss in the circuit, and improving the efficiency of the power system.

[0052] Working principle of the present invention: When conducting power dispatching, it is usually necessary to collect the use status of the cable, mainly to detect whether the insulation layer of the cable has cracks or damage. Cracks or damage will cause the cable to lose insulation performance, thereby causing cable leakage or short circuit, reducing the stability and reliability of the power grid. Since the cables are generally laid in the power corridor, and the power corridor is not convenient for workers to enter, inspection equipment is usually used to inspect the cables during power dispatching operations. A wireless bridge is set at the bottom of the mounting plate 8. The first visual camera 12 provides a real-time inspection field of view during the inspection process, monitors the cable insulation layer in real time, and The video is transmitted to the display terminal, i.e., the PC end of the smart energy management platform, through a wireless bridge, so that the dispatching personnel can learn about the inspection situation in real time. When inspecting the use of the insulation layer of the cable, the first motor 24 is first started through the controller. Since the two synchronous wheels 26 are respectively fixedly connected to the output end of the first motor 24 and one of the hinged shafts, the two synchronous wheels 26 are sleeved through a synchronous belt 25, and each pulley 4 is rotatably connected to the support plate through a hinge shaft. A slide groove for sliding four pulleys 4 is designed on the outer wall of the slide rail 1, so that the two support plates and the bottom thereof are fixedly connected to the electric slide 2 and move along the length direction of the cable.

[0053] When the first visual camera 12 finds that the insulation layer of the cable is cracked or damaged due to aging during the inspection, the image is transmitted to the PC end of the smart energy management platform. After learning about it, the dispatcher sends a command to the controller to cut off the power of the first motor 24, first stop the continued sliding of the four pulleys 4, and then issue a command to start the electric slide 2, first drive the nozzle 10 to slide to the cracked or damaged position through the slide 5, and then start the command of the second electric push rod 46, so that the output end of the second electric push rod 46 is retracted or extended. Since the connecting rod 48 is fixedly connected to one end of the two rocker arms 49, the second electric push rod The output end of 46 is hinged to one end of the connecting rod 48, and the two swing rods 49 are rotatably connected to the positioning rod 47. The other ends of the two swing rods 49 are sleeved with the two avoidance grooves through the two sliding rods 16. Under the guiding action of the two arc grooves 15, the two sliding rods 16 and the clamping block 17 slide in an arc shape inside the two arc grooves 15, thereby driving the two swing rods 49 to swing in an arc shape with the positioning rod 47 as the center of the circle, and then driving the hard tube 18 on the clamping block 17 and the nozzle 10 at one end of the hard tube 18 to swing in an arc shape until the nozzle 10 is close to the crack or damage position, thereby meeting the needs of repairing cracks or damage at different positions on the outer wall of the cable.

[0054] When the nozzle 10 is close to the crack or damaged position of the cable insulation layer, the dispatcher gives a command to the controller to open the first electric push rod 42, so that its output end extends downward. Since its output end passes through the mounting plate 8 and is plugged into the glue storage tank 11, the extrusion rod 43 is fixedly connected to its output end, and the waterproof glue inside the glue storage tank 11 is transported to the inside of the hard pipe 18 through the discharge port and the hose 44, and then sprayed to the crack or damaged position by the hard pipe 18 and the nozzle 10. The strip-shaped spray hole 45 can ensure that the waterproof glue is spread out in a strip shape after being sprayed out, avoiding the waterproof glue from accumulating in a circular shape, thereby improving the repair effect of cracks or damage and avoiding waste of resources.

[0055] It should be noted that when a crack or damaged position is found, first, the four pulleys 4 are used to drive the soft brush 50 to sweep the dust at the crack or damaged position of the cable, so as to facilitate the filling of waterproof glue and improve the adhesion effect of the glue to the crack or damaged position. After the waterproof glue is sprayed to the crack or damaged position, the first motor 24 is restarted through the controller, so that the four pulleys 4 slide again and drive the smoothing wheel 52 to evenly spread the waterproof glue at the repair position to improve the repair effect. The telescopic spring 53 can ensure that the smoothing wheel 52 gradually spreads the waterproof glue, ensures that the smoothing process is carried out carefully and tightly, improves the smoothing effect, and does not cause repair omissions, thereby improving the repair effect.

[0056] Inside the power corridor, power cables are usually laid symmetrically. After the inspection of a long row of cables inside the corridor is completed, that is, after sliding to the end, the dispatcher of the smart energy management platform issues a command to the controller to start the second motor 27, thereby starting the second motor 27 through the controller. Since its output end is fixedly connected to the first gear 28, the second gear 29 is fixedly connected to the rotating rod 6, the first gear 28 and the second gear 29 are meshed and connected, and the bottom end of the rotating rod 6 is fixedly connected to the mounting plate 8, and then the mounting plate 8 is driven to rotate 180 degrees through the rotating rod 6, so that the first visual camera 12 rotates 180 degrees to inspect another long row of cables, thereby improving the flexibility of the inspection.

[0057] The power transformer is an important part of the power system in the pipeline corridor project. It is widely used to provide energy support for power transmission, distribution, and control. The transformer in the power system often needs to bear a large reactive load, which requires additional capacitors to compensate for the reactive power of the system. By switching capacitors, the capacitance demand of the transformer can be directly reduced, thereby avoiding the bottleneck in the power system. A temperature sensor is designed inside the shell of the power transformer to detect the working temperature of the internal components of the transformer in real time. The second visual camera 21 is designed inside to detect the noise level of the transformer during inspection. The operating status of the transformer is detected by measuring the working temperature and noise level of the transformer. These data are sent to the smart energy management platform in real time by the temperature sensor and noise sensor in the controller and displayed on the PC end of the platform. When the dispatcher finds that the data is abnormal, it means that the capacitance demand of the transformer is large. At this time, the third motor 38 is started by the controller, so that its output end drives the driving wheel 39 to rotate. Since the driven wheel 40 is fixedly connected to the rotating shaft 30, the driving wheel 39 and the driven wheel 40 are connected by the belt 41, thereby driving the rotating shaft 30 to rotate.

[0058] When the rotating shaft 30 rotates, since the two first connecting rods 31 are fixedly connected to the rotating shaft 30, each slider 32 is hinged to the end of a first connecting rod 31 away from the rotating shaft 30, each slider 32 is slidably connected to the outer wall of a reciprocating rod 34, each push rod 35 is fixedly connected to the end of a reciprocating rod 34 away from the positioning frame 19, and each second connecting rod 33 is hinged to the end of a limiting rod away from the positioning frame 19, and then the resistance force generated when the push rod 35 rotates and slides in the two avoidance gaps drives the two second connecting rods 33 to rotate with the hinge point of the second connecting rod 33 and the limiting rod as the center of the circle.

[0059] When the two second connecting rods 33 rotate, since the two ends of the mounting rod 36 are fixedly connected to the ends of the two second connecting rods 33 away from the limit rod, the switching rod 20 is fixedly connected to the mounting rod 36 through a plurality of blocks 37, and then the switch on the capacitor is turned by the switching rod 20 to put the capacitor into the transformer, thereby reducing the transformer capacitance demand, reducing the reactive power loss in the circuit, and improving the efficiency of the power system.

Claims

1. A power dispatching system based on a smart energy management platform, comprising a slide rail (1), characterized in that: It also includes a sliding mechanism, a rotating mechanism, an inspection mechanism and a cutting mechanism; The sliding mechanism is arranged on the outer wall of the slide rail (1), and comprises an electric slide (2), a driving assembly (3) and four pulleys (4); the electric slide (2) is arranged below the slide rail (1); a slide plate (5) is arranged on the electric slide (2); two support plates are symmetrically arranged on the top of the electric slide (2); the four pulleys (4) are symmetrically arranged on the outer walls of the two support plates; every two pulleys (4) are rotatably connected to the two ends of a support plate through a hinge shaft; the driving assembly (3) is arranged on one of the support plates; and a slide groove for sliding the four pulleys (4) is arranged on the outer wall of the slide rail (1); The rotating mechanism is arranged at the bottom of the slide plate (5), and comprises a rotating rod (6) and an electric control component (7). The rotating rod (6) is rotatably arranged at the bottom of the slide plate (5), a U-shaped plate is fixedly arranged at the bottom of the slide plate (5), the electric control component (7) is arranged on the U-shaped plate, and a mounting plate (8) is fixedly arranged at the bottom end of the rotating rod (6); A partition (9) is fixedly provided at the bottom of the mounting plate (8); an inspection mechanism is arranged at one end of the partition (9); the inspection mechanism comprises a nozzle (10), a glue storage tank (11), a first visual camera (12), an extrusion assembly (13) and an angle adjustment assembly (14); the glue storage tank (11) is fixedly provided at one end of the bottom of the mounting plate (8); the first visual camera (12) is fixedly provided at one end of the mounting plate (8); the extrusion assembly (13) is inserted into the glue storage tank (11); the angle adjustment assembly (14) ) is arranged on the outer wall of one end of the mounting plate (8), a transverse plate is fixedly arranged at one end of the partition plate (9) near the bottom of the glue storage tank (11), two limit plates are fixedly arranged on the top of the transverse plate, an arc groove (15) is arranged on the outer wall of each limit plate, a slide rod (16) is inserted into the interior of each arc groove (15), a clamping block (17) is fixedly arranged between the two slide rods (16), a hard pipe (18) is clamped on the outer wall of the clamping block (17), and the nozzle (10) is fixedly arranged at one end of the hard pipe (18); The cutting mechanism is arranged at the other end of the partition (9), and comprises a positioning frame (19), a cutting rod (20), a second visual camera (21), a rotating assembly (22) and a swinging assembly (23). The positioning frame (19) is fixedly arranged on the outer wall of one end of the partition (9) away from the glue storage tank (11), the second visual camera (21) is fixedly arranged on the other end of the mounting plate (8), the rotating assembly (22) is arranged on the end of the positioning frame (19) away from the partition (9), the swinging assembly (23) is arranged on the outer wall of the positioning frame (19), and the cutting rod (20) is fixedly arranged on the swinging assembly (23).

2. The power dispatching system based on the smart energy management platform according to claim 1 is characterized in that: The driving assembly (3) comprises a first motor (24), a synchronous belt (25) and two synchronous wheels (26); the first motor (24) is fixedly mounted on one of the support plates; the two synchronous wheels (26) are respectively fixedly mounted on the output end of the first motor (24) and one of the hinge shafts; and the synchronous belt (25) is sleeved on the outer walls of the two synchronous wheels (26).

3. The power dispatching system based on the smart energy management platform according to claim 2 is characterized in that: The electric control component (7) comprises a second motor (27), a first gear (28) and a second gear (29); the second motor (27) is inserted into the U-shaped plate, the first gear (28) is fixedly mounted on the output end of the second motor (27), the second gear (29) is fixedly mounted on the outer wall of the rotating rod (6), and the first gear (28) and the second gear (29) are meshingly connected.

4. The power dispatching system based on the smart energy management platform according to claim 3 is characterized in that: The swing assembly (23) comprises a rotating shaft (30), two first connecting rods (31), two sliders (32), two second connecting rods (33), two reciprocating rods (34) and two push rods (35). The rotating shaft (30) is rotatably mounted on the outer wall of the positioning frame (19). The two first connecting rods (31) are respectively fixed at both ends of the rotating shaft (30). Each slider (32) is hingedly mounted at one end of a first connecting rod (31) away from the rotating shaft (30). Two limit rods are provided, each second connecting rod (33) is hingedly arranged at one end of a limit rod away from the positioning frame (19), each reciprocating rod (34) is hingedly arranged at one end of a limit rod close to the positioning frame (19), each slider (32) is slidably connected to the outer wall of a reciprocating rod (34), each push rod (35) is fixedly arranged at one end of a reciprocating rod (34) away from the positioning frame (19), and an avoidance notch for the push rod (35) to slide is provided on the outer wall of each second connecting rod (33).

5. The power dispatching system based on the smart energy management platform according to claim 4 is characterized in that: A mounting rod (36) is fixedly provided between the ends of the two second connecting rods (33) away from the limiting rod, a plurality of stoppers (37) are arranged at equal intervals on the outer wall of the mounting rod (36), and the cutting rod (20) is fixedly connected to the ends of the plurality of stoppers (37) away from the mounting rod (36).

6. The power dispatching system based on the smart energy management platform according to claim 5 is characterized in that: The rotating assembly (22) comprises a third motor (38), a driving wheel (39), a driven wheel (40) and a belt (41); the third motor (38) is fixedly mounted on the outer wall of the positioning frame (19); the driving wheel (39) is fixedly mounted on the output end thereof; the driven wheel (40) is fixedly mounted on the rotating shaft (30); and the belt (41) is sleeved between the driving wheel (39) and the driven wheel (40).

7. The power dispatching system based on the smart energy management platform according to claim 6 is characterized in that: The extrusion assembly (13) comprises a first electric push rod (42) and an extrusion rod (43). The first electric push rod (42) is inserted into the top of the mounting plate (8), and its output end extends into the interior of the glue storage tank (11). The extrusion rod (43) is fixedly mounted on its output end. A discharge port is provided at the bottom of the storage tube. A hose (44) is fixedly mounted between the discharge port and an end of the hard tube (18) away from the nozzle (10). A strip-shaped spray hole (45) is provided at the end of the nozzle (10).

8. The power dispatching system based on the smart energy management platform according to claim 7 is characterized in that: The angle adjustment assembly (14) comprises a second electric push rod (46), a positioning rod (47), a connecting rod (48) and two swing rods (49); an L-shaped plate is fixedly provided at one end of the top of the mounting plate (8); the second electric push rod (46) is hingedly provided at the top of the L-shaped plate; the positioning rod (47) is fixedly provided at the bottom of the mounting plate (8) via two inclined plates; the connecting rod (48) is fixedly provided between one ends of the two swing rods (49); the output end of the second electric push rod (46) is hingedly provided with one end of the connecting rod (48); the two swing rods (49) are both rotatably provided on the outer wall of the positioning rod (47); and an avoidance groove for the sliding rod (16) to slide is provided on the outer wall of one end of each swing rod (49) away from the connecting rod (48).

9. The power dispatching system based on the smart energy management platform according to claim 8 is characterized in that: A mounting block is fixedly provided on the outer wall of one end of the hard tube (18) away from the hose (44), a soft brush (50) is fixedly provided on one end of the mounting block, a smoothing wheel (52) is slidably provided on the other end of the mounting block through an insertion rod (51), and a telescopic spring (53) is sleeved on the outer wall of the insertion rod (51).

10. A method for a power dispatching system based on a smart energy management platform, comprising the following steps: S1: Automatic inspection of power cables: When conducting power dispatch, it is usually necessary to collect the use status of the cable, mainly to detect whether the insulation layer of the cable is cracked or damaged. Cracks or damage will cause the cable to lose insulation performance, thereby causing cable leakage or short circuit, reducing the stability and reliability of the power grid. A wireless bridge (54) is set at the bottom of the installation plate (8). The first vision camera (12) provides a real-time inspection field of view during the inspection process, monitors the cable insulation layer in real time, and transmits the video to the display terminal through the wireless bridge (54), that is, the PC end of the smart energy management platform, which is convenient for dispatch personnel to use. When the aging condition of the insulation layer of the cable is inspected, the first motor (24) is first started through the controller. Since the two synchronous wheels (26) are respectively fixedly connected to the output end of the first motor (24) and one of the hinge shafts, the two synchronous wheels (26) are sleeved through a synchronous belt (25), and each pulley (4) is rotatably connected to the support plate through the hinge shaft. The outer wall of the slide rail (1) is designed with a slide groove for the four pulleys (4) to slide, so that the two support plates and the bottom thereof are fixedly connected to the electric slide table (2) and move along the length direction of the cable; When the first visual camera (12) finds that the insulation layer of the cable is cracked or damaged due to aging during the inspection process, the image is transmitted to the PC end of the smart energy management platform. After learning this, the dispatcher sends a command to the controller to cut off the power of the first motor (24), first stopping the continued sliding of the four pulleys (4), and then issuing a command to start the electric slide (2), first driving the nozzle (10) to slide to the cracked or damaged position through the slide plate (5), and then starting the command of the second electric push rod (46), so that the output end of the second electric push rod (46) is retracted or extended. Since the connecting rod (48) is fixedly connected to one end of the two swing rods (49), the output of the second electric push rod (46) is The ends of the two swing rods (49) are hinged to one end of the connecting rod (48), the two swing rods (49) are rotatably connected to the positioning rod (47), and the other ends of the two swing rods (49) are sleeved with the two avoidance grooves through the two slide rods (16). Under the guidance of the two arc grooves (15), the two slide rods (16) and the clamping block (17) slide in an arc shape inside the two arc grooves (15), thereby driving the two swing rods (49) to swing in an arc shape with the positioning rod (47) as the center of the circle, thereby driving the hard tube (18) on the clamping block (17) and the nozzle (10) at one end of the hard tube (18) to swing in an arc shape until the nozzle (10) is close to the crack or damage position, thereby meeting the needs of repairing cracks or damage at different positions on the outer wall of the cable; When the nozzle (10) approaches the crack or damage position of the cable insulation layer, the dispatcher issues a command to the controller to start the first electric push rod (42), so that its output end extends downward. Since its output end passes through the mounting plate (8) and is plugged into the glue storage tank (11), the extrusion rod (43) is fixedly connected to its output end, so that the waterproof glue inside the glue storage tank (11) is transported to the inside of the hard pipe (18) through the discharge port and the hose (44), and then sprayed to the crack or damage position by the hard pipe (18) and the nozzle (10). The strip-shaped spray hole (45) can ensure that the waterproof glue is spread out in a strip shape after being sprayed, thereby avoiding the waterproof glue from accumulating in a circular shape, thereby improving the repair effect of the crack or damage and avoiding waste of resources. When a crack or a damaged position is found, first, the four pulleys (4) are used to drive a soft brush (50) to sweep away dust at the crack or damaged position of the cable, so as to facilitate filling of waterproof glue and improve the adhesion effect of the glue to the crack or damaged position. After the waterproof glue is sprayed to the crack or damaged position, the first motor (24) is restarted through the controller, so that the four pulleys (4) slide again, driving the smoothing wheel (52) to evenly spread the waterproof glue at the repair position, thereby improving the repair effect. The telescopic spring (53) can ensure that the smoothing wheel (52) gradually spreads the waterproof glue; S2: Automatic switching for double-row cable inspection: In the interior of the power corridor, power cables are usually laid symmetrically. After the inspection of a long row of cables in the corridor is completed, that is, after the cables are slid to the end, the dispatcher of the smart energy management platform issues a command to the controller to start the second motor (27), thereby starting the second motor (27) through the controller. Since the output end of the motor is fixedly connected to the first gear (28), the second gear (29) is fixedly connected to the rotating rod (6), the first gear (28) and the second gear (29) are meshed and connected, and the bottom end of the rotating rod (6) is fixedly connected to the mounting plate (8). Then, the mounting plate (8) is driven to rotate 180 degrees through the rotating rod (6), so that the first visual camera (12) rotates 180 degrees to inspect another long row of cables. S3: Automatic monitoring of power transformers: A temperature sensor is designed inside the shell of the power transformer to detect the working temperature of the internal components of the transformer in real time. A noise sensor is designed inside the second visual camera (21) to detect the noise level of the transformer during inspection. The operating status of the transformer is detected by measuring the working temperature and noise level of the transformer. These data are sent to the smart energy management platform in real time by the temperature sensor and noise sensor in the controller and displayed on the PC side of the platform. When the dispatcher finds that the data is abnormal, it means that the capacitance demand of the transformer is large. At this time, the third motor (38) is started by the controller, so that its output end drives the driving wheel (39) to rotate. Since the driven wheel (40) is fixedly connected to the rotating shaft (30), the driving wheel (39) and the driven wheel (40) are connected by a belt (41), thereby driving the rotating shaft (30) to rotate. When the rotating shaft (30) rotates, since the two first connecting rods (31) are fixedly connected to the rotating shaft (30), each slider (32) is hinged to one end of the first connecting rod (31) away from the rotating shaft (30), each slider (32) is slidably connected to the outer wall of a reciprocating rod (34), each push rod (35) is fixedly connected to one end of the reciprocating rod (34) away from the positioning frame (19), and each second connecting rod (33) is hinged to one end of a limiting rod away from the positioning frame (19), and then the resistance force generated when the push rod (35) rotates and slides in the two avoidance gaps drives the two second connecting rods (33) to rotate with the hinge point of the second connecting rod (33) and the limiting rod as the center of the circle; When the two second connecting rods (33) rotate, since the two ends of the mounting rod (36) are fixedly connected to the ends of the two second connecting rods (33) away from the limiting rod, the switching rod (20) is fixedly connected to the mounting rod (36) via a plurality of stoppers (37), and then the switch on the capacitor is turned by the switching rod (20) to input the capacitor into the transformer.